Basic Training:
PROJECT MANAGEMENT
By:
Conart Engineers Ltd©
Vadodara
Introduction: Project Management
 What is a Project????
 A Project is a planned set of activities with start and finish dates
undertaken to achieve an objective conforming to specific requirements
 A Project has a scope.
 A Project has time, cost, quality and resource constraints.
 What is Project Management???
 Project management is the application of knowledge, skills, tools, and
techniques to project activities to meet project requirements.
“Plan the Work”
“Work the
Plan”
“Endorse the Plan”
+ 10% of
Project effort
+ 90% of
Project effort
“Align the Team”
Project Management Process
The Triple Constraint
 Every project is constrained in different ways by its:
 Scope goals: What work will be done?
 Time goals: How long should it take to complete?
 Cost goals: What should it cost?
 It is the project manager’s duty to balance
these three often-competing goals.
 Successful project management means
meeting all three goals (scope, time, and cost)
and satisfying the project’s sponsor
Project Manager Role
 Managing clients expectations
 Carrying out project start-up activities
 Directing and supporting the project team by using leadership skills
 Tracking activities
 Communicating project status
 Managing change to control deviations from the established plan
 Resolving issues in a timely manner
 Maintaining the project notebook
Project life Cycle
Project Initiation
Project Initiation
 The first, and most critical phase in the project life cycle where the project
is defined, a team is assembled, and approval is given to proceed with the
project.
 Role of Project Manager at Project Initiation:
 Develop good project objectives on assessing needs.
 Distinguish B/W functional & technical requirements and to
understand role of both.
 Develop a project charter and a program requirement documents.
Project
Initiation
People
Involved
Project
Selection
Right Start
Project
Charter
Project
Requirement
Documents
People Involved in Project
 Two Categories of people are involved:
 Project Stakeholders: Are persons & Organization such as customers,
sponsors, Performing organization and the public, that are actively
involved in the project , or whose interests may be positively or
negatively affected by execution or completion of project.
 Project Personnel's: There are 3 types of project personnel’s
 Project Manager: Responsible for managing project.
 Project team: Group i.e. performing the work of project.
Core Project Team: Persons that will participate heavily in planning
and managing work
Project Selection
 Project Selection factor may be either Quantitative or Qualitative.
 Quantitative Involves:
 Benefit Cost Ratio: (Benefit)/(cost)
 The higher the ratio, the better the deal is.
 Its limitation is that it only focus on ration, not on the work
involved.
 And also it does not calculate in a way that takes into account the
time value of money.
 Present Value: PV = FV/( 1+ i)n
 FV is Future value
 I is interest rate or internal discount rate per the time measures
 N is number of time period.
 Its advantage is that it takes into account the time value of money.
Project Selection
 Project Selection factor may be either Quantitative or Qualitative.
 Quantitative Involves:
 Net Present value: PV benefits - PV investments
 It is used to compare revenues to costs in arriving at the value of a
project
 It can also be used to compare the present value of any two cash
flow projections.
 Payback Period
 The simplest method of determining value of cash is by
determining what the payback period is.
 This approach is nothing more than calculating how long it will
take to earn or save as much as you have invested.
Project Selection
 Project Selection factor may be either Quantitative or Qualitative.
 Qualitative Involves:
 Stakeholders Bias: Senior manager is likely to consider biases,
preferences or aversions of key stakeholders. This is difficult to
avoid, so it must be recognized. .
 Organizational fit: It addresses whether the project fits what the
organization is able to accomplish, undertake & whether it will
further organizations strategic mission.
 Risk: Preliminary analysis of risk should be done to decide whether
the project is worth undertaking despite its associated risk.
Right Start
 Project Initiation should start with a solid needs assessments and then
expands on it through the development of objectives, functional
requirements, and technical requirements.
Needs Objectives
Functional
requirements
Technical
requirements
Key Stakeholders Project Team
Project Charter and Project requirement documents
 Project Charter clearly defines what is to be produced or accomplished
 Its five major elements include:
 Assignments.
 Responsibility.
 Authority.
 Scope.
 Authorized signature.
Project requirement documents describes the identified project
requirements in details for project stakeholders. It also provides definitive
linkage to initiation & planning. Other requirements includes:
 Project objectives.
Scope statements.
 Product descriptions.
 User Characteristics.
 Assumptions
 Constraints.
 Interrelated projects
 Functional & Technical requirements
Project Planning
Project Planning Includes
Project Core Team
Scope Planning
Work Breakdown Structure
Estimating
Schedule & Cost Planning
Resource & Risk Planning
Procurement & Communication
Planning
Quality Planning
The Project Plan
Project Planning
 Ensures all work is identified.
 Schedule activities in logical manner.
 Address risk.
 Create realistic schedule.
 Obtain commitment.
 Ensure Resource availability.
 Adequate planning leads to the correct completion of work
 Inadequate planning leads to frustration towards the end of the project
& poor project performance
Project Core Team
 Core Project team members are involved people who will actively plan
and aid in the implementation of the project.
 Core team group should be small, highly interactive and flexible.
 It should include members who are self directed and interactive.
 It should not include the whole team and senior management.
 Scope: The sum of the products, services & results to be provided as a
project.
 Scope Planning: The process of progressively elaborating the work of
project, which involves developing a written scope statement that
includes the project justification, the major deliverables & project
objectives.
 It is most important type of planning because planning for everything else,
including costs, resources, risk etc depends on it.
Scope Planning
Work breakdown Structure (WBS)
 A Work Breakdown Structure (WBS) is a hierarchical (from general to
specific) tree structure of deliverables and tasks that need to be
performed to complete a project.
 The Work Breakdown Structure is the foundation for effective project
planning, costing and management.
 It is the most important aspect in setting-up a Project
 It is the foundation on which everything else builds
 Lowest Level of WBS is the Work Package (WP)
 WP can be clearly defined allowing package to be costed, scheduled and
resourced
 WP contains a list of Tasks to be Performed that form the basis for the
Schedule
 WP allows assignment of responsibilities (Work Package Manger, WPM)
Work breakdown Structure (WBS)
 WBS allows hierarchical build-up of costs and schedule
 Cost and Schedule can be reported at any level of the WBS
 WBS facilitates strong management during project execution (Cost and
Schedule control)
 WBS can be used for many other things - Document Management, Risk
Management
Estimation
 Estimate: It is the quantitative assessment of likely amount or outcome.
WBS
 Time: For Scheduling
 Cost: For Budgeting
 Equipment: For Resource allocation
Project Plan
Estimate
Schedule Planning
 It determines the time duration required to complete the project.
 It helps to manage time side of the triple constraint.
 Most commonly used scheduling tools & techniques available include
network diagrams, Gantt charts, project calendars & Milestone charts.
 Each of them can be used for planning purposes as well as to manage
execution of the work during the life of project.
 Three Methods for Scheduling are:
 PERT Technique: It is an ‘ Event oriented’ system & ‘ Activity on Arrow’
system.
 CPM Method: It is an ‘ Activity on Arrow’ system that is ‘ Activity
oriented’.
 PDM Method: It is an ‘ Activity on Node’ system that is ‘ Activity
oriented’.
Cost Planning
 Points to consider
 Enterprise environmental factor (culture, markets condition etc).
 Organizational process assets ( guidelines, processes, procedures )
 Project Scope statement.
 Project plan
 WBS
 Schedule
 Resource plan
 Risk management plan.
 Cost Components
 Direct Cost: Cost that directly attributes to project i.e. cost of labor,
material & equipments.
 Indirect Cost: Cost for organizational support not directly attributes to
project such as electricity, heating etc.
Resource Planning
 It covers people, material, facilities, and other resources.
 Tools & Techniques includes:
 Roles & responsibilities matrix.
 Resource Gantt Charts.
 Resource loading table.
 Resource loading histogram.
 Resource leveling.
Risk Planning
 Project risk is an uncertain event or condition that, if it occurs, has a
positive or negative effect on a project objective
 A combination of the probability of a defined threat or opportunity
(Likelihood) and the magnitude of the consequences of the occurrence
(Impact) defines a Risk Index”
 Risk Impact
Threat → Scope → Poor Quality Product
Threat → Schedule → Late Delivery
Threat → Cost → Overspend
 In addition there are health, safety and environmental threats that must
be managed.
Risk Management Process
 Identify Risks
 Assess likelihood and impact
 Rank risks and prioritise
 Define risk management approach & actions
 Implement actions
 Monitor & review
Procurement, Communication & Quality Planning
 Procurement Planning: Involves deciding whether to procure outside
services & how to choose which outside entity to use.
 Communication Planning: It facilitates proper people getting proper
message at proper time.
 Quality Planning: Quality can be maintained by building quality control &
quality assurance processes into project costs & schedule from the
beginning.
WBS
Scheduling
Resource
Risk
Procurement
Communication
Quality
Project Plan
Project Implementation
Project Implementation
Step 1
Perform Tasks
Step 3
Manage Change
Step 4
Update the Plan
Step 2
Track Progress
Resolve
Issues
Collect Project Data
Supplier Status
Reports/
Meetings
Automated
Information
Systems
Project
Manager
Team Member Status
Review Meetings
Team Member
Status Reports
Project Performance
 Gantt schedule performance charts
 Cost performance charts
 Earned value techniques
Schedule performance charts
 Gantt charts
Cost Performance charts
Cost Performance Chart
$0
$10
$20
$30
$40
$50
$60
$70
$80
$90
$100
Weeks
TotalCosts(X1000)
PV 3 6 18 30 44 54 64 80 83 89
AC 8 16 30 48 66
1 2 3 4 5 6 7 8 9 10
Earned Value Analysis (EVA)
 Planned Value (PV): This is the budget for what was scheduled to have
been performed within the reporting period. This may also be called the
budget plan, performance measurement baseline or planned earned
value for this period.
 Actual Cost (AC): The actual cost of work completed within a given
reporting period. This includes only those costs related to work
performed to date.
 Estimate to Complete (ETC):What it will cost to finish the rest of the
project or an individual work task.
 Budget at Completion (BAC):The budget approved for the project. This is
also called the performance measurement baseline for the project.
 Estimate at Completion (EAC): Forecasted project cost determined at the
end of each reporting period.
 Earned Value (EV): This is the budgeted cost for the work that has actually
been performed within the given reporting period. Actual earned value is
the sum of the budgets for all work that has been completed for the
reporting period. At the activity level, it is equal to the percent complete
of an activity times its original budget.
Earned Value Analysis (EVA)
 Cost Variance = EV – AC
 Schedule Variance = EV – PV
 Cost performance index = EV/AC
 Schedule performance index = EV/PV
 EAC = BAC/CPI
Managing Project Change
 Categories of Change
 Customer requested
a. Typically the largest source of change
 All others
a. Internal company requests
b. Government regulation
c. Team members
Changes
Addressing Project Changes
 Call a team meeting.
 Explain what the change is.
 Obtain feedback from team members.
 Identify alternative corrective options.
 Prepare a decision matrix.
 Select a recommended option(s).
 Present information to upper management/customer.
 Implement the approved course of action.
Decision Matrix
RISKOPTION
IMPACT ON
SCHEDULEQUALITY COST
Describe course
of action for this
option
Quantify impact
on quality
Quantify impact
on cost
Quantify impact
on schedule
Indicate level of
risk as:
H - high
M - medium
L - low
Use overtime to
complete work
that’s behind
schedule
No impact on
quality
Will increase
cost by 5%
Will get project
back on
schedule
L
Overlap work on
later critical path
activities by
adding staff
No impact on
quality
Will increase
cost by 10%
Will get project
back on
schedule
H
Issue Resolution
 Disagreements that should be …
 Documented
 Assigned
 Scheduled
 Tracked
 Escalated
 Resolved
Project Closeout
 Project closeout: Is the process of finalizing all the activities across all of
the project process groups to formally close the project.
 Major Activates Performed:
 Providing customer with all information's.
 Preparing final payments.
 Reassigning project team members.
 Prepare final cost schedule report.
 Terminating outstanding PO.
 Disposing excess material & supply.
 Documenting lessons learnt.
 Rewarding project members.
Closeout Issues
 Project Team
 Loss of interest in work.
 Fear of no future work.
 Dissatisfaction with next assignment.
 Loss of team identity.
Diversion of effort.
 Reassignment of Personnel.
 Customers
 Loss of attitude.
 Change in personnel.
Resistance to ownership & change.
 Scope creep.
Knowledge transfer.
Scope verification & Customers Acceptance
 Scope Verification: Is the core teams thorough internal check of the WBS
to confirm that everything was done correctly.
 Customers Acceptance:
 Be sure to get acceptance documented by having the customers sign
off on a acceptance form.
 With technical approval also make sure customer is fully satisfied.
 Think wisely and ask customer “ what else can we do for you” it might
lead to a new project.
 Lessons Learnt:
 They should be captured as occurred.
 Should be documented in details.
 Should be Communicated to stakeholders.
 Should be Filed & Accessible.
Administrative & Contract Closure
 Key Points
Documenting project results to formalize acceptance of the product or
service by client.
 Collecting project records & ensuring they reflect final specifications.
Analyzing project success & effectiveness through lessons learned &
procurement audits.
 Archiving information for further use.
Closing out the project with team, stakeholders, and
yourself includes appropriate recognition & celebration
of your efforts.

Más contenido relacionado

La actualidad más candente

Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Schedulingsslovepk
 
Project management
Project managementProject management
Project managementSimran Kaur
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures Ian Cammack
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
 
Project management
Project managementProject management
Project managementJay Raval
 
Project controls
Project controlsProject controls
Project controlsAshok Kumar
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Phil Comelio
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project managementJared C. Powell
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaImran Jamil
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and schedulingadeel hamid
 

La actualidad más candente (20)

Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
 
Project management
Project managementProject management
Project management
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
Project management
Project managementProject management
Project management
 
Project controls
Project controlsProject controls
Project controls
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
10- PMP Training - Risk Management
10- PMP Training - Risk Management 10- PMP Training - Risk Management
10- PMP Training - Risk Management
 
Budgeting
BudgetingBudgeting
Budgeting
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Pmp basics you need to know
Pmp basics you need to knowPmp basics you need to know
Pmp basics you need to know
 
Contract management
Contract managementContract management
Contract management
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and scheduling
 

Destacado

Work plan and Scope creep
Work plan and Scope creepWork plan and Scope creep
Work plan and Scope creepOnkar Tendulkar
 
The ultimate guide to inbound scope creep
The ultimate guide to inbound scope creepThe ultimate guide to inbound scope creep
The ultimate guide to inbound scope creepTuristicae
 
CRS AMPV Background and Issues March 2014
CRS AMPV Background and Issues March 2014CRS AMPV Background and Issues March 2014
CRS AMPV Background and Issues March 2014Tom "Blad" Lindblad
 
Got Scope Creep Presentation by Axium
Got Scope Creep Presentation by AxiumGot Scope Creep Presentation by Axium
Got Scope Creep Presentation by AxiumAxium
 
Veda Williams Project Management Secrets A Disciplined Approach To Develo...
Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...
Veda Williams Project Management Secrets A Disciplined Approach To Develo...Vincenzo Barone
 
Project management challenges
Project management challengesProject management challenges
Project management challengesChristos Pittis
 
CSBA - FY-2016 Weapon Systems Factbook
CSBA - FY-2016  Weapon Systems FactbookCSBA - FY-2016  Weapon Systems Factbook
CSBA - FY-2016 Weapon Systems FactbookTom "Blad" Lindblad
 
6 things-that-derail-projects-e book
6 things-that-derail-projects-e book6 things-that-derail-projects-e book
6 things-that-derail-projects-e bookRohan Kumar
 
Training Scope Creep Linked In
Training Scope Creep Linked InTraining Scope Creep Linked In
Training Scope Creep Linked Inhaddadmazen
 
Business analyst basic softskills
Business analyst basic softskillsBusiness analyst basic softskills
Business analyst basic softskillsScribblegeek
 
How to Manage Scope Change in Your Next Project | BDO Connections 2016
How to Manage Scope Change in Your Next Project | BDO Connections 2016How to Manage Scope Change in Your Next Project | BDO Connections 2016
How to Manage Scope Change in Your Next Project | BDO Connections 2016BDO IT Solutions
 
WCSD 2015: Milestones and Delivery. Tough Conversations and Scope Creep
WCSD 2015: Milestones and Delivery. Tough Conversations and Scope CreepWCSD 2015: Milestones and Delivery. Tough Conversations and Scope Creep
WCSD 2015: Milestones and Delivery. Tough Conversations and Scope CreepWes Chyrchel
 
Useful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope CreepUseful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope CreepMichael Vaughn
 
Managing Scope Creep in Development Projects
Managing Scope Creep in Development ProjectsManaging Scope Creep in Development Projects
Managing Scope Creep in Development ProjectsDhivya Arunagiri
 
Multiple project's management in service industry
Multiple project's management in service industryMultiple project's management in service industry
Multiple project's management in service industrySamit Jain
 
Managing scope creep in IT projects
Managing scope creep in IT projectsManaging scope creep in IT projects
Managing scope creep in IT projectsHimanshu Prabhakar
 

Destacado (16)

Work plan and Scope creep
Work plan and Scope creepWork plan and Scope creep
Work plan and Scope creep
 
The ultimate guide to inbound scope creep
The ultimate guide to inbound scope creepThe ultimate guide to inbound scope creep
The ultimate guide to inbound scope creep
 
CRS AMPV Background and Issues March 2014
CRS AMPV Background and Issues March 2014CRS AMPV Background and Issues March 2014
CRS AMPV Background and Issues March 2014
 
Got Scope Creep Presentation by Axium
Got Scope Creep Presentation by AxiumGot Scope Creep Presentation by Axium
Got Scope Creep Presentation by Axium
 
Veda Williams Project Management Secrets A Disciplined Approach To Develo...
Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...
Veda Williams Project Management Secrets A Disciplined Approach To Develo...
 
Project management challenges
Project management challengesProject management challenges
Project management challenges
 
CSBA - FY-2016 Weapon Systems Factbook
CSBA - FY-2016  Weapon Systems FactbookCSBA - FY-2016  Weapon Systems Factbook
CSBA - FY-2016 Weapon Systems Factbook
 
6 things-that-derail-projects-e book
6 things-that-derail-projects-e book6 things-that-derail-projects-e book
6 things-that-derail-projects-e book
 
Training Scope Creep Linked In
Training Scope Creep Linked InTraining Scope Creep Linked In
Training Scope Creep Linked In
 
Business analyst basic softskills
Business analyst basic softskillsBusiness analyst basic softskills
Business analyst basic softskills
 
How to Manage Scope Change in Your Next Project | BDO Connections 2016
How to Manage Scope Change in Your Next Project | BDO Connections 2016How to Manage Scope Change in Your Next Project | BDO Connections 2016
How to Manage Scope Change in Your Next Project | BDO Connections 2016
 
WCSD 2015: Milestones and Delivery. Tough Conversations and Scope Creep
WCSD 2015: Milestones and Delivery. Tough Conversations and Scope CreepWCSD 2015: Milestones and Delivery. Tough Conversations and Scope Creep
WCSD 2015: Milestones and Delivery. Tough Conversations and Scope Creep
 
Useful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope CreepUseful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope Creep
 
Managing Scope Creep in Development Projects
Managing Scope Creep in Development ProjectsManaging Scope Creep in Development Projects
Managing Scope Creep in Development Projects
 
Multiple project's management in service industry
Multiple project's management in service industryMultiple project's management in service industry
Multiple project's management in service industry
 
Managing scope creep in IT projects
Managing scope creep in IT projectsManaging scope creep in IT projects
Managing scope creep in IT projects
 

Similar a Project Mangement

Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3POOJA UDAYAN
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementN Raghuraman
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Managementneha2788
 
1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx ggggggggggggggggg1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx gggggggggggggggggadabotor7
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleKate Pynn
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
L03 integration management
L03 integration managementL03 integration management
L03 integration managementAsa Chan
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
Primavera6.0
Primavera6.0Primavera6.0
Primavera6.0niict
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life CycleReema
 

Similar a Project Mangement (20)

Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx ggggggggggggggggg1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx ggggggggggggggggg
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
L03 integration management
L03 integration managementL03 integration management
L03 integration management
 
6396901
63969016396901
6396901
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
Primavera6.0
Primavera6.0Primavera6.0
Primavera6.0
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 

Project Mangement

  • 2. Introduction: Project Management  What is a Project????  A Project is a planned set of activities with start and finish dates undertaken to achieve an objective conforming to specific requirements  A Project has a scope.  A Project has time, cost, quality and resource constraints.  What is Project Management???  Project management is the application of knowledge, skills, tools, and techniques to project activities to meet project requirements.
  • 3. “Plan the Work” “Work the Plan” “Endorse the Plan” + 10% of Project effort + 90% of Project effort “Align the Team” Project Management Process
  • 4. The Triple Constraint  Every project is constrained in different ways by its:  Scope goals: What work will be done?  Time goals: How long should it take to complete?  Cost goals: What should it cost?  It is the project manager’s duty to balance these three often-competing goals.  Successful project management means meeting all three goals (scope, time, and cost) and satisfying the project’s sponsor
  • 5. Project Manager Role  Managing clients expectations  Carrying out project start-up activities  Directing and supporting the project team by using leadership skills  Tracking activities  Communicating project status  Managing change to control deviations from the established plan  Resolving issues in a timely manner  Maintaining the project notebook
  • 8. Project Initiation  The first, and most critical phase in the project life cycle where the project is defined, a team is assembled, and approval is given to proceed with the project.  Role of Project Manager at Project Initiation:  Develop good project objectives on assessing needs.  Distinguish B/W functional & technical requirements and to understand role of both.  Develop a project charter and a program requirement documents. Project Initiation People Involved Project Selection Right Start Project Charter Project Requirement Documents
  • 9. People Involved in Project  Two Categories of people are involved:  Project Stakeholders: Are persons & Organization such as customers, sponsors, Performing organization and the public, that are actively involved in the project , or whose interests may be positively or negatively affected by execution or completion of project.  Project Personnel's: There are 3 types of project personnel’s  Project Manager: Responsible for managing project.  Project team: Group i.e. performing the work of project. Core Project Team: Persons that will participate heavily in planning and managing work
  • 10. Project Selection  Project Selection factor may be either Quantitative or Qualitative.  Quantitative Involves:  Benefit Cost Ratio: (Benefit)/(cost)  The higher the ratio, the better the deal is.  Its limitation is that it only focus on ration, not on the work involved.  And also it does not calculate in a way that takes into account the time value of money.  Present Value: PV = FV/( 1+ i)n  FV is Future value  I is interest rate or internal discount rate per the time measures  N is number of time period.  Its advantage is that it takes into account the time value of money.
  • 11. Project Selection  Project Selection factor may be either Quantitative or Qualitative.  Quantitative Involves:  Net Present value: PV benefits - PV investments  It is used to compare revenues to costs in arriving at the value of a project  It can also be used to compare the present value of any two cash flow projections.  Payback Period  The simplest method of determining value of cash is by determining what the payback period is.  This approach is nothing more than calculating how long it will take to earn or save as much as you have invested.
  • 12. Project Selection  Project Selection factor may be either Quantitative or Qualitative.  Qualitative Involves:  Stakeholders Bias: Senior manager is likely to consider biases, preferences or aversions of key stakeholders. This is difficult to avoid, so it must be recognized. .  Organizational fit: It addresses whether the project fits what the organization is able to accomplish, undertake & whether it will further organizations strategic mission.  Risk: Preliminary analysis of risk should be done to decide whether the project is worth undertaking despite its associated risk.
  • 13. Right Start  Project Initiation should start with a solid needs assessments and then expands on it through the development of objectives, functional requirements, and technical requirements. Needs Objectives Functional requirements Technical requirements Key Stakeholders Project Team
  • 14. Project Charter and Project requirement documents  Project Charter clearly defines what is to be produced or accomplished  Its five major elements include:  Assignments.  Responsibility.  Authority.  Scope.  Authorized signature. Project requirement documents describes the identified project requirements in details for project stakeholders. It also provides definitive linkage to initiation & planning. Other requirements includes:  Project objectives. Scope statements.  Product descriptions.  User Characteristics.  Assumptions  Constraints.  Interrelated projects  Functional & Technical requirements
  • 16. Project Planning Includes Project Core Team Scope Planning Work Breakdown Structure Estimating Schedule & Cost Planning Resource & Risk Planning Procurement & Communication Planning Quality Planning The Project Plan
  • 17. Project Planning  Ensures all work is identified.  Schedule activities in logical manner.  Address risk.  Create realistic schedule.  Obtain commitment.  Ensure Resource availability.  Adequate planning leads to the correct completion of work  Inadequate planning leads to frustration towards the end of the project & poor project performance
  • 18. Project Core Team  Core Project team members are involved people who will actively plan and aid in the implementation of the project.  Core team group should be small, highly interactive and flexible.  It should include members who are self directed and interactive.  It should not include the whole team and senior management.  Scope: The sum of the products, services & results to be provided as a project.  Scope Planning: The process of progressively elaborating the work of project, which involves developing a written scope statement that includes the project justification, the major deliverables & project objectives.  It is most important type of planning because planning for everything else, including costs, resources, risk etc depends on it. Scope Planning
  • 19. Work breakdown Structure (WBS)  A Work Breakdown Structure (WBS) is a hierarchical (from general to specific) tree structure of deliverables and tasks that need to be performed to complete a project.  The Work Breakdown Structure is the foundation for effective project planning, costing and management.  It is the most important aspect in setting-up a Project  It is the foundation on which everything else builds  Lowest Level of WBS is the Work Package (WP)  WP can be clearly defined allowing package to be costed, scheduled and resourced  WP contains a list of Tasks to be Performed that form the basis for the Schedule  WP allows assignment of responsibilities (Work Package Manger, WPM)
  • 20. Work breakdown Structure (WBS)  WBS allows hierarchical build-up of costs and schedule  Cost and Schedule can be reported at any level of the WBS  WBS facilitates strong management during project execution (Cost and Schedule control)  WBS can be used for many other things - Document Management, Risk Management
  • 21. Estimation  Estimate: It is the quantitative assessment of likely amount or outcome. WBS  Time: For Scheduling  Cost: For Budgeting  Equipment: For Resource allocation Project Plan Estimate
  • 22. Schedule Planning  It determines the time duration required to complete the project.  It helps to manage time side of the triple constraint.  Most commonly used scheduling tools & techniques available include network diagrams, Gantt charts, project calendars & Milestone charts.  Each of them can be used for planning purposes as well as to manage execution of the work during the life of project.  Three Methods for Scheduling are:  PERT Technique: It is an ‘ Event oriented’ system & ‘ Activity on Arrow’ system.  CPM Method: It is an ‘ Activity on Arrow’ system that is ‘ Activity oriented’.  PDM Method: It is an ‘ Activity on Node’ system that is ‘ Activity oriented’.
  • 23. Cost Planning  Points to consider  Enterprise environmental factor (culture, markets condition etc).  Organizational process assets ( guidelines, processes, procedures )  Project Scope statement.  Project plan  WBS  Schedule  Resource plan  Risk management plan.  Cost Components  Direct Cost: Cost that directly attributes to project i.e. cost of labor, material & equipments.  Indirect Cost: Cost for organizational support not directly attributes to project such as electricity, heating etc.
  • 24. Resource Planning  It covers people, material, facilities, and other resources.  Tools & Techniques includes:  Roles & responsibilities matrix.  Resource Gantt Charts.  Resource loading table.  Resource loading histogram.  Resource leveling.
  • 25. Risk Planning  Project risk is an uncertain event or condition that, if it occurs, has a positive or negative effect on a project objective  A combination of the probability of a defined threat or opportunity (Likelihood) and the magnitude of the consequences of the occurrence (Impact) defines a Risk Index”  Risk Impact Threat → Scope → Poor Quality Product Threat → Schedule → Late Delivery Threat → Cost → Overspend  In addition there are health, safety and environmental threats that must be managed.
  • 26. Risk Management Process  Identify Risks  Assess likelihood and impact  Rank risks and prioritise  Define risk management approach & actions  Implement actions  Monitor & review
  • 27. Procurement, Communication & Quality Planning  Procurement Planning: Involves deciding whether to procure outside services & how to choose which outside entity to use.  Communication Planning: It facilitates proper people getting proper message at proper time.  Quality Planning: Quality can be maintained by building quality control & quality assurance processes into project costs & schedule from the beginning. WBS Scheduling Resource Risk Procurement Communication Quality Project Plan
  • 29. Project Implementation Step 1 Perform Tasks Step 3 Manage Change Step 4 Update the Plan Step 2 Track Progress Resolve Issues
  • 30. Collect Project Data Supplier Status Reports/ Meetings Automated Information Systems Project Manager Team Member Status Review Meetings Team Member Status Reports
  • 31. Project Performance  Gantt schedule performance charts  Cost performance charts  Earned value techniques
  • 33. Cost Performance charts Cost Performance Chart $0 $10 $20 $30 $40 $50 $60 $70 $80 $90 $100 Weeks TotalCosts(X1000) PV 3 6 18 30 44 54 64 80 83 89 AC 8 16 30 48 66 1 2 3 4 5 6 7 8 9 10
  • 34. Earned Value Analysis (EVA)  Planned Value (PV): This is the budget for what was scheduled to have been performed within the reporting period. This may also be called the budget plan, performance measurement baseline or planned earned value for this period.  Actual Cost (AC): The actual cost of work completed within a given reporting period. This includes only those costs related to work performed to date.  Estimate to Complete (ETC):What it will cost to finish the rest of the project or an individual work task.  Budget at Completion (BAC):The budget approved for the project. This is also called the performance measurement baseline for the project.  Estimate at Completion (EAC): Forecasted project cost determined at the end of each reporting period.  Earned Value (EV): This is the budgeted cost for the work that has actually been performed within the given reporting period. Actual earned value is the sum of the budgets for all work that has been completed for the reporting period. At the activity level, it is equal to the percent complete of an activity times its original budget.
  • 35. Earned Value Analysis (EVA)  Cost Variance = EV – AC  Schedule Variance = EV – PV  Cost performance index = EV/AC  Schedule performance index = EV/PV  EAC = BAC/CPI
  • 36. Managing Project Change  Categories of Change  Customer requested a. Typically the largest source of change  All others a. Internal company requests b. Government regulation c. Team members Changes
  • 37. Addressing Project Changes  Call a team meeting.  Explain what the change is.  Obtain feedback from team members.  Identify alternative corrective options.  Prepare a decision matrix.  Select a recommended option(s).  Present information to upper management/customer.  Implement the approved course of action.
  • 38. Decision Matrix RISKOPTION IMPACT ON SCHEDULEQUALITY COST Describe course of action for this option Quantify impact on quality Quantify impact on cost Quantify impact on schedule Indicate level of risk as: H - high M - medium L - low Use overtime to complete work that’s behind schedule No impact on quality Will increase cost by 5% Will get project back on schedule L Overlap work on later critical path activities by adding staff No impact on quality Will increase cost by 10% Will get project back on schedule H
  • 39. Issue Resolution  Disagreements that should be …  Documented  Assigned  Scheduled  Tracked  Escalated  Resolved
  • 40. Project Closeout  Project closeout: Is the process of finalizing all the activities across all of the project process groups to formally close the project.  Major Activates Performed:  Providing customer with all information's.  Preparing final payments.  Reassigning project team members.  Prepare final cost schedule report.  Terminating outstanding PO.  Disposing excess material & supply.  Documenting lessons learnt.  Rewarding project members.
  • 41. Closeout Issues  Project Team  Loss of interest in work.  Fear of no future work.  Dissatisfaction with next assignment.  Loss of team identity. Diversion of effort.  Reassignment of Personnel.  Customers  Loss of attitude.  Change in personnel. Resistance to ownership & change.  Scope creep. Knowledge transfer.
  • 42. Scope verification & Customers Acceptance  Scope Verification: Is the core teams thorough internal check of the WBS to confirm that everything was done correctly.  Customers Acceptance:  Be sure to get acceptance documented by having the customers sign off on a acceptance form.  With technical approval also make sure customer is fully satisfied.  Think wisely and ask customer “ what else can we do for you” it might lead to a new project.  Lessons Learnt:  They should be captured as occurred.  Should be documented in details.  Should be Communicated to stakeholders.  Should be Filed & Accessible.
  • 43. Administrative & Contract Closure  Key Points Documenting project results to formalize acceptance of the product or service by client.  Collecting project records & ensuring they reflect final specifications. Analyzing project success & effectiveness through lessons learned & procurement audits.  Archiving information for further use.
  • 44. Closing out the project with team, stakeholders, and yourself includes appropriate recognition & celebration of your efforts.