Observed Impacts of
Marcellus Shale Drilling on
   Agricultural Lands
                 Presented to the
New York State Association of Towns
Annual Training Session & Conference
              February 21, 2011

          George R. Frantz, AICP, ASLA
      Department of City & Regional Planning
               Cornell University
Why Bradford County, PA?
                                                  Major Agricultural County
  Small Industrial
  Towns




                     Major Tourism Sector Based
                          on Outdoor Recreation




Scenic Beauty




                                                             Vibrant, Historic
                                                                 Downtowns
Marcellus
Shale
Formation
Bradford County –
5th Largest
Agricultural
County in PA




“Clean & Green” Agricultural Parcels
 w/ Natural Gas Wells
Western
Bradford County
Study Area
November 2010
• 13 active drilling/ fracking
  operations;
• 7 pads – no drilling/ not
  restored;
• 4 pads – restored
• 2 pads – newly built/ no
  drilling commenced.
• 3 water impoundments
Typical
Well Pad
• 3-5 acres;
• Level;
• Gravel surface.



* Large open storage pits
  such as in this aerial image
  have not been observed in
  Bradford County drilling
  operations. Drilling
  operations appear to prefer
  closed storage trailers
                                 Washington County - WA7
                                          Source: M. Bu, S. Upadhyay
Typical
Well
Pad
• 3-5 acres;
• Level;
• Gravel surface.
Typical
Well
Pad –
Drilling
Phase
• Drill rig, offices,
  storage, dorms
  (sometimes)
Typical
Well
Pad
• Hydraulic
  Fracturing
  Phase
Storm Water Pollution Prevention
                    Well pads
                    permitted by
                    PADEP &
                    Susquehanna
                    River Basin
                    Commission .

                    Pad design must include
                    SWPP best management
                    practices.
Storm Water Pollution Prevention
Storm Water Pollution Prevention
Storm Water Pollution Prevention
Site Restoration
                   Mandatory
                   stockpiling of
                   topsoil at time
                   of well pad
                   construction

                   (& possible use as sound
                   barrier)
Site Restoration – W05




                         8/27/09
Site Restoration – W05




                         12/17/10
Site Restoration – W05




                         9/18/10
Site Restoration – AT02




                          8/27/09
Site Restoration – AT02




                          12/5/09
Site Restoration – W09
Site Restoration – W08
Equipment left on
site after
restoration
generally will
include 1-10
wellheads, gas
cleaner, brine
storage tanks, &
metering system.
Restored Drilling Site Aerial
                                   View

                                                Original pad
                                                size:
                                                +/- 310 ft x 285 ft/
                                                +/- 88, 500 sq. ft

                                                Restored pad
                                                size:
                                                +/- 16, 000 sq. ft
                                                (1 wellhead)




Source M. Bu & S. Upadhyay. 2010
Views of a Drilling Rig – approx. 2 miles
Views of a Drilling Rig – approx. 1 mile
View of Drilling Rig – approx. 1,000 ft.
Washington County, PA
                                                     Canton Twp.
                          12 mi.                     Chartiers Twp.
                                                     Mt. Pleasant Twp.




                                        Canonsburg        Drilling Pad

                                                          Restored Drilling
                                                          Pad
                                                          Water Retention
                                   Washington             Unit

Source M. Bu & S. Upadhyay. 2010
Source M. Bu & S. Upadhyay. 2010




                                             Each square = 4 sq. miles.
    Active Pad
    Restored Pad
    Reservoir
                                   26000FT
Washington County – High Impact Area




Source M. Bu & S. Upadhyay. 2010

                                   1 Square Mile
Gas Collector Lines
Potential Impacts of Collector Lines
                 • Topsoil and subsoil
                   mixing;
                 • Soil compaction;
                 • Damage to drainage
                   systems;
                 • Proper restoration and
                   two years of monitoring
                   needed.
Gas Transmission Lines
            • So far, so good…
            • Temporary disruption of
              fields during
              construction;
            • SWPPP BMPs critical;
            • Site restoration BMPs
              critical.
Gas Transmission Lines
Delayed Site Restoration – W17




Drilling Pad     Storage Site    Equipment Staging
September 2009   February 2010   October 2010
Drilling Support Services
                   • ARE subject to
                     local zoning
                     regulations;
                   • Potential long-
                     term impacts;
                   • Potential larger
                     impacts.
Drilling Support Services
               • Is your Town
                 ready for the types
                 of commercial &
                 industrial land
                 uses that follow
                 the rigs?
Heavy Truck Traffic
New York State
Department of Agriculture
and Markets
Guidelines for
Agricultural
Resources
Protection at Gas
Well Drilling Sites
Gas Well Development
      • Regulated by DEC;
      • Very little protection in
        the regulations for
        agricultural resources;
      • Protection measures
        need to be included in
        easement.
Phases of Project
          • Siting of Access
            Roads and Well Pads;
          • Construction;
          • Restoration;
          • Monitoring and
            Remediation.
Siting Goals
               • Locate access roads
                 and well pads along
                 field edges and in
                 nonagricultural areas
                 when possible;

               • Locate access roads
                 along ridge tops and
                 follow field contours
                 where possible;
               Photo: NYS Dept. Agriculture & Markets
Siting Goals
           • Permanent width of
             access roads in
             agricultural fields should
             be no more than 16 feet;

           • All existing drainage and
             erosion control
             structures should be
             avoided.
Construction Guidelines
             • The surface of the
               access roads
               constructed through
               agricultural fields should
               be level with the adjacent
               field surface;
             • Culverts and ditches
               should be installed along
               access roads to maintain
               natural drainage
               patterns;
Construction Guidelines
• All topsoil must be
  stripped from
  agricultural areas
  used for vehicle and
  equipment access
  and parking;

• Topsoil must be
  stripped from the well
  pad area and
  stockpiled separate
  from other material;
Construction Guidelines Cont.
               • Topsoil and subsoil
                 graded from the drill site
                 should not block
                 drainage;

               • Provisions for drainage
                 tile repair should be
                 included in the
                 easement agreement;

               Photo: NYS Dept. Agriculture & Markets
Construction Guidelines Cont.
• Materials from brine pits
  should be removed
  from agricultural areas;

• Brine pits should be
  covered with several
  feet of subsoil and the
  original depth of topsoil;

• Drilling mud should be
  hauled off site;
Restoration Guidelines
• All disturbed agricultural areas must be de-
  compacted to a depth of 18 inches;
• All rocks 4 inches and larger in diameter must be
  removed from the soil surface;
• Topsoil is replaced;
• Stone removal from the topsoil surface prior to
  reseeding;
Restoration Guidelines Cont.
 • All access roads must be regraded level with
   adjacent field;
 • All agricultural areas should be reseeded with the
   seed mix specified by the landowner;
 • All surface and subsurface drainage structures must
   be repaired to preconstruction conditions;
 • All construction debris must be removed from the
   site.
Monitoring
             • The project sponsor
               needs to monitor
               agricultural areas for two
               years following
               restoration;

             • Monitoring should include
               topsoil thickness, stone
               content, crop production
               and drainage.
Contact:               George Frantz
 Cornell University Department of City & Regional Planning
                      (607) 227-4652
                     grf4@cornell.edu

                      Matt Brower
           NYS Dept. Agriculture And Markets
                    (518) 457-2713
           matthew.brower@agmkt.state.ny.us

                      Mike Saviola
            NYS Dept. Agriculture and Markets
                     (607) 351-7954
            michael.saviola@agmkt.state.ny.us

Más contenido relacionado

La actualidad más candente

Bench terracing
Bench terracingBench terracing
Bench terracingAli Adnan
 
Stormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsStormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsOHM Advisors
 
Greenside article - Royal Golf Club bahrain
Greenside article - Royal Golf Club bahrainGreenside article - Royal Golf Club bahrain
Greenside article - Royal Golf Club bahrainPatrick Ryan
 
26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...
26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...
26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...IWRS Society
 
Full Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold MineFull Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold MineAdvisian
 
Groundwater improvement techniques
Groundwater improvement techniques Groundwater improvement techniques
Groundwater improvement techniques my-will
 
ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014RavindraSaksena
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 John M Riggs
 
New York: Alternative Stormwater Management Practice - Rain Gardens
New York: Alternative Stormwater Management Practice - Rain GardensNew York: Alternative Stormwater Management Practice - Rain Gardens
New York: Alternative Stormwater Management Practice - Rain GardensSotirakou964
 
Coastal erosion and control measures
Coastal erosion and control measuresCoastal erosion and control measures
Coastal erosion and control measuresKavitha Cingam
 
New York State Rain Garden Manual
New York State Rain Garden ManualNew York State Rain Garden Manual
New York State Rain Garden ManualSotirakou964
 
Advancements in ASR Well Design and Operations - City of Phoenix Case Study
Advancements in ASR Well Design and Operations - City of Phoenix Case StudyAdvancements in ASR Well Design and Operations - City of Phoenix Case Study
Advancements in ASR Well Design and Operations - City of Phoenix Case StudyTWCA
 

La actualidad más candente (20)

Bench terracing
Bench terracingBench terracing
Bench terracing
 
West virginia
West virginiaWest virginia
West virginia
 
Grassed water ways
Grassed water waysGrassed water ways
Grassed water ways
 
Stormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsStormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving Funds
 
SFPR-Project-Profile_0
SFPR-Project-Profile_0SFPR-Project-Profile_0
SFPR-Project-Profile_0
 
Greenside article - Royal Golf Club bahrain
Greenside article - Royal Golf Club bahrainGreenside article - Royal Golf Club bahrain
Greenside article - Royal Golf Club bahrain
 
26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...
26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...
26 nov16 participatory_gravityfed_water_conveyance_system_for_irrigation_in_h...
 
Full Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold MineFull Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold Mine
 
Life cycle pcsm for well pads
Life cycle pcsm for well padsLife cycle pcsm for well pads
Life cycle pcsm for well pads
 
Groundwater improvement techniques
Groundwater improvement techniques Groundwater improvement techniques
Groundwater improvement techniques
 
ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014
 
Webb et al 1978
Webb et al 1978Webb et al 1978
Webb et al 1978
 
July 30-1110-Ian Godwin
July 30-1110-Ian GodwinJuly 30-1110-Ian Godwin
July 30-1110-Ian Godwin
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
Comolli suolo
Comolli suoloComolli suolo
Comolli suolo
 
New York: Alternative Stormwater Management Practice - Rain Gardens
New York: Alternative Stormwater Management Practice - Rain GardensNew York: Alternative Stormwater Management Practice - Rain Gardens
New York: Alternative Stormwater Management Practice - Rain Gardens
 
Coastal erosion and control measures
Coastal erosion and control measuresCoastal erosion and control measures
Coastal erosion and control measures
 
Pennsylvania
PennsylvaniaPennsylvania
Pennsylvania
 
New York State Rain Garden Manual
New York State Rain Garden ManualNew York State Rain Garden Manual
New York State Rain Garden Manual
 
Advancements in ASR Well Design and Operations - City of Phoenix Case Study
Advancements in ASR Well Design and Operations - City of Phoenix Case StudyAdvancements in ASR Well Design and Operations - City of Phoenix Case Study
Advancements in ASR Well Design and Operations - City of Phoenix Case Study
 

Destacado

Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...
Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...
Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...joecozart
 
Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...
Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...
Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...joecozart
 
Chamber Operational Excellence
Chamber Operational ExcellenceChamber Operational Excellence
Chamber Operational Excellencejoecozart
 
Cultural Resources Protection: a Proactive Approach
Cultural Resources Protection: a Proactive ApproachCultural Resources Protection: a Proactive Approach
Cultural Resources Protection: a Proactive ApproachGeorge_Frantz
 
Hi Q Energy BP
Hi Q Energy BPHi Q Energy BP
Hi Q Energy BPclaassenp
 
Parish Property Use Swearngan 030809
Parish Property Use Swearngan 030809Parish Property Use Swearngan 030809
Parish Property Use Swearngan 030809Chip Swearngan
 
Signs of Sustainability in China
Signs of Sustainability in ChinaSigns of Sustainability in China
Signs of Sustainability in ChinaGeorge_Frantz
 
Bernanke & Metavante 011507 Cswearngan
Bernanke & Metavante 011507 CswearnganBernanke & Metavante 011507 Cswearngan
Bernanke & Metavante 011507 CswearnganChip Swearngan
 
Ecm strategy outline
Ecm strategy outlineEcm strategy outline
Ecm strategy outlineJP Harris
 
It Is Raining
It Is RainingIt Is Raining
It Is Rainingnapbryant
 
Land Use, Agriculture & Farmland Protection Strategies
Land Use, Agriculture & Farmland Protection StrategiesLand Use, Agriculture & Farmland Protection Strategies
Land Use, Agriculture & Farmland Protection StrategiesGeorge_Frantz
 
Japans Economy Oleh Bilyy
Japans Economy Oleh BilyyJapans Economy Oleh Bilyy
Japans Economy Oleh Bilyybilyy oleh
 
problem solving of mathematics
problem solving of mathematicsproblem solving of mathematics
problem solving of mathematicsguest74d3e9
 

Destacado (18)

Untitled 1
Untitled 1Untitled 1
Untitled 1
 
Strata Pp2 Lr
Strata Pp2 LrStrata Pp2 Lr
Strata Pp2 Lr
 
2002 Vrod
2002 Vrod2002 Vrod
2002 Vrod
 
Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...
Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...
Planning A Productive & Efficient Board Retreat Acce Chamber Executive Ma...
 
Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...
Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...
Improving Your Organizational Sales Leadership Acce Chamber Executive Magazin...
 
Chamber Operational Excellence
Chamber Operational ExcellenceChamber Operational Excellence
Chamber Operational Excellence
 
Mat statistik kel.1
Mat statistik kel.1Mat statistik kel.1
Mat statistik kel.1
 
Cultural Resources Protection: a Proactive Approach
Cultural Resources Protection: a Proactive ApproachCultural Resources Protection: a Proactive Approach
Cultural Resources Protection: a Proactive Approach
 
Hi Q Energy BP
Hi Q Energy BPHi Q Energy BP
Hi Q Energy BP
 
Parish Property Use Swearngan 030809
Parish Property Use Swearngan 030809Parish Property Use Swearngan 030809
Parish Property Use Swearngan 030809
 
Signs of Sustainability in China
Signs of Sustainability in ChinaSigns of Sustainability in China
Signs of Sustainability in China
 
Bernanke & Metavante 011507 Cswearngan
Bernanke & Metavante 011507 CswearnganBernanke & Metavante 011507 Cswearngan
Bernanke & Metavante 011507 Cswearngan
 
Ecm strategy outline
Ecm strategy outlineEcm strategy outline
Ecm strategy outline
 
It Is Raining
It Is RainingIt Is Raining
It Is Raining
 
Land Use, Agriculture & Farmland Protection Strategies
Land Use, Agriculture & Farmland Protection StrategiesLand Use, Agriculture & Farmland Protection Strategies
Land Use, Agriculture & Farmland Protection Strategies
 
Japans Economy Oleh Bilyy
Japans Economy Oleh BilyyJapans Economy Oleh Bilyy
Japans Economy Oleh Bilyy
 
Fotosfx1
Fotosfx1Fotosfx1
Fotosfx1
 
problem solving of mathematics
problem solving of mathematicsproblem solving of mathematics
problem solving of mathematics
 

Similar a Observed Impacts of Marcellus Shale Drilling on Agricultural Lands

Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83redaphid
 
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Dean Rist
 
Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - RajasthanUdip Das
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsAndrea Drabicki
 
NRCS Pond Construction
NRCS Pond ConstructionNRCS Pond Construction
NRCS Pond ConstructionGrant Schultz
 
REPAIR OF THE SPILLWAY AT PANDOH DAM
REPAIR OF THE  SPILLWAY AT PANDOH DAM REPAIR OF THE  SPILLWAY AT PANDOH DAM
REPAIR OF THE SPILLWAY AT PANDOH DAM Hemant Thakur
 
State & Federal Regulation of Hydraulic Fracturing: A Comparative Analysis
State & Federal Regulation of Hydraulic Fracturing: A Comparative AnalysisState & Federal Regulation of Hydraulic Fracturing: A Comparative Analysis
State & Federal Regulation of Hydraulic Fracturing: A Comparative AnalysisDan Arthur
 
Cumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAsCumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAsBSH Admin
 
Sand dune stablization in Jaisalmer India
Sand dune stablization in Jaisalmer IndiaSand dune stablization in Jaisalmer India
Sand dune stablization in Jaisalmer Indiaanshu1907
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...GauravGautam344043
 
Planning of reservoir
Planning of reservoirPlanning of reservoir
Planning of reservoirnumber113
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008GreenHomeNYC
 
Dredging and Disposal Site Reclamation at John Redmond Reservoir, Kansas
Dredging and Disposal Site Reclamation at John Redmond Reservoir, KansasDredging and Disposal Site Reclamation at John Redmond Reservoir, Kansas
Dredging and Disposal Site Reclamation at John Redmond Reservoir, KansasMatt Unruh
 
Concept of oc mine planning & design(final)
Concept  of oc mine planning & design(final)Concept  of oc mine planning & design(final)
Concept of oc mine planning & design(final)sou_suk_sou
 
Shaw Road Erosion and Sediment Plan
Shaw Road Erosion and Sediment PlanShaw Road Erosion and Sediment Plan
Shaw Road Erosion and Sediment PlanJesse Jones
 
NATCL Biopile Management Plan Dec 2014 - IFU
NATCL  Biopile Management Plan Dec 2014 - IFUNATCL  Biopile Management Plan Dec 2014 - IFU
NATCL Biopile Management Plan Dec 2014 - IFUStacey O'Sullivan
 

Similar a Observed Impacts of Marcellus Shale Drilling on Agricultural Lands (20)

Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83
 
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
 
Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - Rajasthan
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation Recommendaitons
 
NRCS Pond Construction
NRCS Pond ConstructionNRCS Pond Construction
NRCS Pond Construction
 
REPAIR OF THE SPILLWAY AT PANDOH DAM
REPAIR OF THE  SPILLWAY AT PANDOH DAM REPAIR OF THE  SPILLWAY AT PANDOH DAM
REPAIR OF THE SPILLWAY AT PANDOH DAM
 
Green Infrastructure Maintenance Workshop
Green Infrastructure Maintenance WorkshopGreen Infrastructure Maintenance Workshop
Green Infrastructure Maintenance Workshop
 
State & Federal Regulation of Hydraulic Fracturing: A Comparative Analysis
State & Federal Regulation of Hydraulic Fracturing: A Comparative AnalysisState & Federal Regulation of Hydraulic Fracturing: A Comparative Analysis
State & Federal Regulation of Hydraulic Fracturing: A Comparative Analysis
 
Cumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAsCumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAs
 
Sand dune stablization in Jaisalmer India
Sand dune stablization in Jaisalmer IndiaSand dune stablization in Jaisalmer India
Sand dune stablization in Jaisalmer India
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...
 
Gravel pits sept_2010
Gravel pits sept_2010Gravel pits sept_2010
Gravel pits sept_2010
 
Planning of reservoir
Planning of reservoirPlanning of reservoir
Planning of reservoir
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
September 1 - 0153 - Mike Pniewski
September 1 - 0153 - Mike PniewskiSeptember 1 - 0153 - Mike Pniewski
September 1 - 0153 - Mike Pniewski
 
Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008
 
Dredging and Disposal Site Reclamation at John Redmond Reservoir, Kansas
Dredging and Disposal Site Reclamation at John Redmond Reservoir, KansasDredging and Disposal Site Reclamation at John Redmond Reservoir, Kansas
Dredging and Disposal Site Reclamation at John Redmond Reservoir, Kansas
 
Concept of oc mine planning & design(final)
Concept  of oc mine planning & design(final)Concept  of oc mine planning & design(final)
Concept of oc mine planning & design(final)
 
Shaw Road Erosion and Sediment Plan
Shaw Road Erosion and Sediment PlanShaw Road Erosion and Sediment Plan
Shaw Road Erosion and Sediment Plan
 
NATCL Biopile Management Plan Dec 2014 - IFU
NATCL  Biopile Management Plan Dec 2014 - IFUNATCL  Biopile Management Plan Dec 2014 - IFU
NATCL Biopile Management Plan Dec 2014 - IFU
 

Observed Impacts of Marcellus Shale Drilling on Agricultural Lands

  • 1. Observed Impacts of Marcellus Shale Drilling on Agricultural Lands Presented to the New York State Association of Towns Annual Training Session & Conference February 21, 2011 George R. Frantz, AICP, ASLA Department of City & Regional Planning Cornell University
  • 2. Why Bradford County, PA? Major Agricultural County Small Industrial Towns Major Tourism Sector Based on Outdoor Recreation Scenic Beauty Vibrant, Historic Downtowns
  • 4.
  • 5. Bradford County – 5th Largest Agricultural County in PA “Clean & Green” Agricultural Parcels w/ Natural Gas Wells
  • 6. Western Bradford County Study Area November 2010 • 13 active drilling/ fracking operations; • 7 pads – no drilling/ not restored; • 4 pads – restored • 2 pads – newly built/ no drilling commenced. • 3 water impoundments
  • 7. Typical Well Pad • 3-5 acres; • Level; • Gravel surface. * Large open storage pits such as in this aerial image have not been observed in Bradford County drilling operations. Drilling operations appear to prefer closed storage trailers Washington County - WA7 Source: M. Bu, S. Upadhyay
  • 8. Typical Well Pad • 3-5 acres; • Level; • Gravel surface.
  • 9. Typical Well Pad – Drilling Phase • Drill rig, offices, storage, dorms (sometimes)
  • 10. Typical Well Pad • Hydraulic Fracturing Phase
  • 11. Storm Water Pollution Prevention Well pads permitted by PADEP & Susquehanna River Basin Commission . Pad design must include SWPP best management practices.
  • 12. Storm Water Pollution Prevention
  • 13. Storm Water Pollution Prevention
  • 14. Storm Water Pollution Prevention
  • 15. Site Restoration Mandatory stockpiling of topsoil at time of well pad construction (& possible use as sound barrier)
  • 16. Site Restoration – W05 8/27/09
  • 17. Site Restoration – W05 12/17/10
  • 18. Site Restoration – W05 9/18/10
  • 19. Site Restoration – AT02 8/27/09
  • 20. Site Restoration – AT02 12/5/09
  • 22. Site Restoration – W08 Equipment left on site after restoration generally will include 1-10 wellheads, gas cleaner, brine storage tanks, & metering system.
  • 23. Restored Drilling Site Aerial View Original pad size: +/- 310 ft x 285 ft/ +/- 88, 500 sq. ft Restored pad size: +/- 16, 000 sq. ft (1 wellhead) Source M. Bu & S. Upadhyay. 2010
  • 24. Views of a Drilling Rig – approx. 2 miles
  • 25. Views of a Drilling Rig – approx. 1 mile
  • 26. View of Drilling Rig – approx. 1,000 ft.
  • 27. Washington County, PA Canton Twp. 12 mi. Chartiers Twp. Mt. Pleasant Twp. Canonsburg Drilling Pad Restored Drilling Pad Water Retention Washington Unit Source M. Bu & S. Upadhyay. 2010
  • 28. Source M. Bu & S. Upadhyay. 2010 Each square = 4 sq. miles. Active Pad Restored Pad Reservoir 26000FT
  • 29. Washington County – High Impact Area Source M. Bu & S. Upadhyay. 2010 1 Square Mile
  • 31. Potential Impacts of Collector Lines • Topsoil and subsoil mixing; • Soil compaction; • Damage to drainage systems; • Proper restoration and two years of monitoring needed.
  • 32. Gas Transmission Lines • So far, so good… • Temporary disruption of fields during construction; • SWPPP BMPs critical; • Site restoration BMPs critical.
  • 34. Delayed Site Restoration – W17 Drilling Pad Storage Site Equipment Staging September 2009 February 2010 October 2010
  • 35. Drilling Support Services • ARE subject to local zoning regulations; • Potential long- term impacts; • Potential larger impacts.
  • 36. Drilling Support Services • Is your Town ready for the types of commercial & industrial land uses that follow the rigs?
  • 38. New York State Department of Agriculture and Markets Guidelines for Agricultural Resources Protection at Gas Well Drilling Sites
  • 39. Gas Well Development • Regulated by DEC; • Very little protection in the regulations for agricultural resources; • Protection measures need to be included in easement.
  • 40. Phases of Project • Siting of Access Roads and Well Pads; • Construction; • Restoration; • Monitoring and Remediation.
  • 41. Siting Goals • Locate access roads and well pads along field edges and in nonagricultural areas when possible; • Locate access roads along ridge tops and follow field contours where possible; Photo: NYS Dept. Agriculture & Markets
  • 42. Siting Goals • Permanent width of access roads in agricultural fields should be no more than 16 feet; • All existing drainage and erosion control structures should be avoided.
  • 43. Construction Guidelines • The surface of the access roads constructed through agricultural fields should be level with the adjacent field surface; • Culverts and ditches should be installed along access roads to maintain natural drainage patterns;
  • 44. Construction Guidelines • All topsoil must be stripped from agricultural areas used for vehicle and equipment access and parking; • Topsoil must be stripped from the well pad area and stockpiled separate from other material;
  • 45. Construction Guidelines Cont. • Topsoil and subsoil graded from the drill site should not block drainage; • Provisions for drainage tile repair should be included in the easement agreement; Photo: NYS Dept. Agriculture & Markets
  • 46. Construction Guidelines Cont. • Materials from brine pits should be removed from agricultural areas; • Brine pits should be covered with several feet of subsoil and the original depth of topsoil; • Drilling mud should be hauled off site;
  • 47. Restoration Guidelines • All disturbed agricultural areas must be de- compacted to a depth of 18 inches; • All rocks 4 inches and larger in diameter must be removed from the soil surface; • Topsoil is replaced; • Stone removal from the topsoil surface prior to reseeding;
  • 48. Restoration Guidelines Cont. • All access roads must be regraded level with adjacent field; • All agricultural areas should be reseeded with the seed mix specified by the landowner; • All surface and subsurface drainage structures must be repaired to preconstruction conditions; • All construction debris must be removed from the site.
  • 49. Monitoring • The project sponsor needs to monitor agricultural areas for two years following restoration; • Monitoring should include topsoil thickness, stone content, crop production and drainage.
  • 50. Contact: George Frantz Cornell University Department of City & Regional Planning (607) 227-4652 grf4@cornell.edu Matt Brower NYS Dept. Agriculture And Markets (518) 457-2713 matthew.brower@agmkt.state.ny.us Mike Saviola NYS Dept. Agriculture and Markets (607) 351-7954 michael.saviola@agmkt.state.ny.us