Project Management is the dynamic process that
utilizes the appropriate resources of the organization
in a controlled and structured manner, to achieve
some clearly defined objectives identified as strategic
needs. It is always conducted within a defined set of
constraints.

1/29/2014

Gagan Gupta
Monitoring &
Control

Planning

Implementation

1/29/2014

Evaluation

Gagan Gupta
• A Project is considered as Failure……
Whenever a project
doesn’t meet to the
expectation of the
Stakeholders.

1/29/2014

Gagan Gupta
• Cost & Time Over-runs
• Quality Degradation
• Frustration & Stress: sometime resulting in people
quitting
• Low Job Satisfaction
• Low Corporate Market Value
• Low Public Opinion
• Negative Media Campaigns
• May even force the company into Closure
1/29/2014

Gagan Gupta
1/29/2014

Gagan Gupta
Also Known as “You’d like it, just a bit bigger.
No Problem.”
Oh Still a bit Bigger……. OK
Even Bigger? It wasn’t in the plan but Okay….
When Scope creeps, the end
results is always more work
than expected.

1/29/2014

Gagan Gupta
• Problems:
– The changes that were not initially planned for, are added to project.
– The Project takes longer and costs more than planned and there is no
record of WHY??

• Causes:
– Not having a method to handle or recognize changes.

• What to do:
– Document the change management process to be used and followed
by Project Team.
– Educate the project Team to recognize a change or deviation from the
Plan.
– Follow the Change Management Process.
1/29/2014

Gagan Gupta
• Problems:
– Team Members do not have the information they need when they
need it.
– Issues or changes do not get escalated.
– Project reporting is sluggish

• Causes:
– The project’s communication plan was not completed.
– The project’s communication plan doesn’t have enough details.

• What to do:
– Find out the communication requirements of all team members, and
stakeholders, then document them in a common plan, and then follow
the Plan.
1/29/2014

Gagan Gupta
• You do not have enough people, the right skill-sets, or the
team is not committed to the projects.
• Problems:
– Tasks take longer than expected
to complete.
– Deadlines and milestones get
missed.
– Project completion date comes
into jeopardy.
– You end up working double shifts to
complete all the works.

1/29/2014

Gagan Gupta
• Causes:
– There was no pre-commitment of resources to the projects.
– The Project was not supported.
– There was no analysis and documentation of all skill-set required.

• What to do:
– Get executives Sponsorship for the project.
– Document which resources and skill-sets are needed to get the job
done.
– Create a plan that gives enough time to get the job done with the
allocated resources.
– Pre-assign the required resources to the team.

1/29/2014

Gagan Gupta
• “I would like a set of stairs that leads up to a bridge.”

• Problems:
– Customer will be unhappy.
– Customer will complain and you will end up doing the what they wantat your expense.

1/29/2014

Gagan Gupta
• Causes:
– What the customer wants, was not clearly documented.
– What you believe the customer wants is different that what the
customer believes they have asked for?

• What to do:
– Find out and document exactly what the customer wants.
– Inform everybody of the project scope.
– Document Business, Functional and technical requirements.

1/29/2014

Gagan Gupta
• How do you figure out how long the project will take?

• Problems:
– An unrealistic timeline or budget will be agreed to.
– You will not be able to do all the work in the time allocated.

1/29/2014

Gagan Gupta
• Causes:
– No formal estimating method
– Estimate confidence is law.
– Volume of work not understood

• What to do:
–
–
–
–

1/29/2014

List all the work as well as possible.
Estimate each work package.
Add up all work packages.
Always give answer using a range of dates

Gagan Gupta
• Sorry about the project, I left it in my car & there was a bit of
an incidents.

• Problems:
– Unexpected events cause delays.
– Domino effect of thing going wrong.

1/29/2014

Gagan Gupta
• Causes:
–
–
–
–

No Formal Risk Management.
Just try to predict the big things that can go wrong.
It’s the sum of the all little things that make a project late.
Nothing is more stressful than trying to keep on schedule when
unexpected things keep happening.

• What to do:
–
–
–
–
–
1/29/2014

List all the work as well as possible.
Figure out what can go wrong with each piece of work.
Prioritize each risk as High/ Medium/ Low Probability or impact.
Sort the list.
Create a plan to deal with the risks at the top of list.
Gagan Gupta
• “Emergency Phone installed, Deliverable completed”

• Problems:
– Difficult to get the agreement that the product is finished.
– Customer Keep wanting more, saying you didn’t do it to their
Specification.

1/29/2014

Gagan Gupta
• Causes:
– The Milestones or deliverables were not measurable.
– The customer never told us How many they wanted So we just
assumed 1,

• What to do:
– Ensure Milestones or Deliverables are:
Clearly Defined
Measurable (Quantifiable)

1/29/2014

Gagan Gupta
• Of course we Can do that for you.

• Problems:
– There was little or no planning before deciding you can get the job
done.
– The task you agree to turns out to be more work than expected.
– It takes you longer and jeopardizes other deliverables.
1/29/2014

Gagan Gupta
• Causes:
– Not enough time spent planning.
– You may have been pressured into giving an answer right then and
there.
– Didn’t have a full understanding of the work involved before
committing.

• What to do:
– Take the time to fully understand the work before agreeing to it.
– Its okay to say the work is not possible or will take too long
– Only agree to work when you’re sure it can be done, this will benefit
you and your managers.

1/29/2014

Gagan Gupta
• Hurry .... We have a tight deadline. No time to plan. Just start digging.

• Problems:
– The plan is flawed from the start.
– The project gets out of control and can’t be recovered.

1/29/2014

Gagan Gupta
• Causes:
– You have to do the work and weren’t also given time for project
management.
– Perhaps you only have 10% or 20% allotment for the project
management duties.

• What to do:
– Planning a project is like setting out a roadmap. Without it you will
likely get lost.
– Controlling a project is like driving a car. You have to continuously
watch the road (the Plan) and make little adjustments.

1/29/2014

Gagan Gupta
• I think I know how this helmet goes on. I have been riding scooters for two
years now.

• Problems:
–
–
–
–
–
1/29/2014

Your project don’t finish on time.
Your project are always squeezed at the end.
Your project are stressful.
You have to deal with unrealistic expectation or customers.
You feel your projects are out of control.
Gagan Gupta
• Causes:
– People often don’t know what they don’t know.
– Their project are out of control but they don’t know WHY??
– They feel they are doing okay but could benefit from formal project
management education.

• What to do:
– Learn the methods, tools, and techniques successful Project manager
use to initiate, plan, execute and control their projects.

1/29/2014

Gagan Gupta
Presented by Gagan Gupta
1/29/2014

Gagan Gupta

Más contenido relacionado

La actualidad más candente

File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1test prod1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1test prod1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2test prod1
 
File 1 extra slide 1
File 1 extra slide 1File 1 extra slide 1
File 1 extra slide 1test prod1
 
File 1 extra slide 2
File 1 extra slide 2File 1 extra slide 2
File 1 extra slide 2test prod1
 
File 1 four extra slides 1
File 1 four extra slides 1File 1 four extra slides 1
File 1 four extra slides 1test prod1
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Arvin Dela Cruz
 
Agile project tracking - burn up charts
Agile project tracking - burn up chartsAgile project tracking - burn up charts
Agile project tracking - burn up chartsJonny LeRoy
 
Project timeline slides v2
Project timeline slides v2Project timeline slides v2
Project timeline slides v2Eileen Feng
 
Everyone is a project manager. You can too!
Everyone is a project manager. You can too!Everyone is a project manager. You can too!
Everyone is a project manager. You can too!Linchpin
 
7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business 7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business KeepSolid
 

La actualidad más candente (16)

File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2
 
File 1 extra slide 1
File 1 extra slide 1File 1 extra slide 1
File 1 extra slide 1
 
File 1 extra slide 2
File 1 extra slide 2File 1 extra slide 2
File 1 extra slide 2
 
File 1 four extra slides 1
File 1 four extra slides 1File 1 four extra slides 1
File 1 four extra slides 1
 
Effective Scrum
Effective ScrumEffective Scrum
Effective Scrum
 
Scrum Framework 2021_4
Scrum Framework 2021_4Scrum Framework 2021_4
Scrum Framework 2021_4
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)
 
Being prepared for the Unexpected
Being prepared for the UnexpectedBeing prepared for the Unexpected
Being prepared for the Unexpected
 
Agile project tracking - burn up charts
Agile project tracking - burn up chartsAgile project tracking - burn up charts
Agile project tracking - burn up charts
 
Time Mgmt
Time MgmtTime Mgmt
Time Mgmt
 
Project timeline slides v2
Project timeline slides v2Project timeline slides v2
Project timeline slides v2
 
Everyone is a project manager. You can too!
Everyone is a project manager. You can too!Everyone is a project manager. You can too!
Everyone is a project manager. You can too!
 
What agile is not
What agile is notWhat agile is not
What agile is not
 
7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business 7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business
 

Destacado

Investments - Project management benefits
Investments - Project management benefitsInvestments - Project management benefits
Investments - Project management benefitsDenise Fotopoulou
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Managementcombera
 
Pm deep dive risk management
Pm deep dive   risk managementPm deep dive   risk management
Pm deep dive risk managementNiraj Agarwal
 
Leveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User ExperienceLeveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User ExperienceJohn Judge
 
Pm Risk Analysis Management
Pm Risk Analysis ManagementPm Risk Analysis Management
Pm Risk Analysis Managementjonathan077070
 
Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...Janet Jaiswal
 
Qualitative vs quantitative data
Qualitative vs quantitative dataQualitative vs quantitative data
Qualitative vs quantitative dataDanule
 
Pm risks-and-constraints
Pm risks-and-constraintsPm risks-and-constraints
Pm risks-and-constraintswkkgrace
 
Amplifying Your Content with Social Media
Amplifying Your Content with Social MediaAmplifying Your Content with Social Media
Amplifying Your Content with Social MediaHubSpot
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Managementguest484a666
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklistimaduddin91
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 LeadershipCraig Brown
 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overviewguokejing
 

Destacado (14)

Investments - Project management benefits
Investments - Project management benefitsInvestments - Project management benefits
Investments - Project management benefits
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Management
 
Pm deep dive risk management
Pm deep dive   risk managementPm deep dive   risk management
Pm deep dive risk management
 
Leveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User ExperienceLeveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User Experience
 
Pm Risk Analysis Management
Pm Risk Analysis ManagementPm Risk Analysis Management
Pm Risk Analysis Management
 
Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...
 
Qualitative vs quantitative data
Qualitative vs quantitative dataQualitative vs quantitative data
Qualitative vs quantitative data
 
Pm risks-and-constraints
Pm risks-and-constraintsPm risks-and-constraints
Pm risks-and-constraints
 
Amplifying Your Content with Social Media
Amplifying Your Content with Social MediaAmplifying Your Content with Social Media
Amplifying Your Content with Social Media
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Management
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 Leadership
 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overview
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 

Similar a Risk Management: Evaluate Risks in your Project

File 1 four extra slides 2
File 1 four extra slides 2File 1 four extra slides 2
File 1 four extra slides 2test prod1
 
Recipe cards task 1 pro forma
Recipe cards task 1 pro formaRecipe cards task 1 pro forma
Recipe cards task 1 pro formaPJG123
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdfSAMPREET3
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gSatyanarayana Gande
 
Release planning in Scrum
Release planning in ScrumRelease planning in Scrum
Release planning in ScrumArne Åhlander
 
2. ideas and planning
2. ideas and planning2. ideas and planning
2. ideas and planningJack Hickman
 
Project Planning.ppt
Project Planning.pptProject Planning.ppt
Project Planning.pptselam49
 
ACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsMia Horrigan
 
Rescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsRescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsBarry Curry
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)Lviv Startup Club
 
Project management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerProject management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerSue Greener
 

Similar a Risk Management: Evaluate Risks in your Project (20)

File 1 copy 2
File 1 copy 2File 1 copy 2
File 1 copy 2
 
File 1 copy 1
File 1 copy 1File 1 copy 1
File 1 copy 1
 
File 1 four extra slides 2
File 1 four extra slides 2File 1 four extra slides 2
File 1 four extra slides 2
 
Recipe cards task 1 pro forma
Recipe cards task 1 pro formaRecipe cards task 1 pro forma
Recipe cards task 1 pro forma
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya g
 
SCRUM methodology
SCRUM methodologySCRUM methodology
SCRUM methodology
 
Project Management for the Curious 2
Project Management for the Curious 2Project Management for the Curious 2
Project Management for the Curious 2
 
Agile framework
Agile frameworkAgile framework
Agile framework
 
The art of execution
The art of executionThe art of execution
The art of execution
 
Release planning in Scrum
Release planning in ScrumRelease planning in Scrum
Release planning in Scrum
 
2. ideas and planning
2. ideas and planning2. ideas and planning
2. ideas and planning
 
Project Planning.ppt
Project Planning.pptProject Planning.ppt
Project Planning.ppt
 
ACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 months
 
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdfTeaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
 
Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"
 
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdfTeaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
 
Rescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsRescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software Projects
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)
 
Project management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerProject management - a practical overview Sue Greener
Project management - a practical overview Sue Greener
 

Último

Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 

Último (20)

Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 

Risk Management: Evaluate Risks in your Project

  • 2. Project Management is the dynamic process that utilizes the appropriate resources of the organization in a controlled and structured manner, to achieve some clearly defined objectives identified as strategic needs. It is always conducted within a defined set of constraints. 1/29/2014 Gagan Gupta
  • 4. • A Project is considered as Failure…… Whenever a project doesn’t meet to the expectation of the Stakeholders. 1/29/2014 Gagan Gupta
  • 5. • Cost & Time Over-runs • Quality Degradation • Frustration & Stress: sometime resulting in people quitting • Low Job Satisfaction • Low Corporate Market Value • Low Public Opinion • Negative Media Campaigns • May even force the company into Closure 1/29/2014 Gagan Gupta
  • 7. Also Known as “You’d like it, just a bit bigger. No Problem.” Oh Still a bit Bigger……. OK Even Bigger? It wasn’t in the plan but Okay…. When Scope creeps, the end results is always more work than expected. 1/29/2014 Gagan Gupta
  • 8. • Problems: – The changes that were not initially planned for, are added to project. – The Project takes longer and costs more than planned and there is no record of WHY?? • Causes: – Not having a method to handle or recognize changes. • What to do: – Document the change management process to be used and followed by Project Team. – Educate the project Team to recognize a change or deviation from the Plan. – Follow the Change Management Process. 1/29/2014 Gagan Gupta
  • 9. • Problems: – Team Members do not have the information they need when they need it. – Issues or changes do not get escalated. – Project reporting is sluggish • Causes: – The project’s communication plan was not completed. – The project’s communication plan doesn’t have enough details. • What to do: – Find out the communication requirements of all team members, and stakeholders, then document them in a common plan, and then follow the Plan. 1/29/2014 Gagan Gupta
  • 10. • You do not have enough people, the right skill-sets, or the team is not committed to the projects. • Problems: – Tasks take longer than expected to complete. – Deadlines and milestones get missed. – Project completion date comes into jeopardy. – You end up working double shifts to complete all the works. 1/29/2014 Gagan Gupta
  • 11. • Causes: – There was no pre-commitment of resources to the projects. – The Project was not supported. – There was no analysis and documentation of all skill-set required. • What to do: – Get executives Sponsorship for the project. – Document which resources and skill-sets are needed to get the job done. – Create a plan that gives enough time to get the job done with the allocated resources. – Pre-assign the required resources to the team. 1/29/2014 Gagan Gupta
  • 12. • “I would like a set of stairs that leads up to a bridge.” • Problems: – Customer will be unhappy. – Customer will complain and you will end up doing the what they wantat your expense. 1/29/2014 Gagan Gupta
  • 13. • Causes: – What the customer wants, was not clearly documented. – What you believe the customer wants is different that what the customer believes they have asked for? • What to do: – Find out and document exactly what the customer wants. – Inform everybody of the project scope. – Document Business, Functional and technical requirements. 1/29/2014 Gagan Gupta
  • 14. • How do you figure out how long the project will take? • Problems: – An unrealistic timeline or budget will be agreed to. – You will not be able to do all the work in the time allocated. 1/29/2014 Gagan Gupta
  • 15. • Causes: – No formal estimating method – Estimate confidence is law. – Volume of work not understood • What to do: – – – – 1/29/2014 List all the work as well as possible. Estimate each work package. Add up all work packages. Always give answer using a range of dates Gagan Gupta
  • 16. • Sorry about the project, I left it in my car & there was a bit of an incidents. • Problems: – Unexpected events cause delays. – Domino effect of thing going wrong. 1/29/2014 Gagan Gupta
  • 17. • Causes: – – – – No Formal Risk Management. Just try to predict the big things that can go wrong. It’s the sum of the all little things that make a project late. Nothing is more stressful than trying to keep on schedule when unexpected things keep happening. • What to do: – – – – – 1/29/2014 List all the work as well as possible. Figure out what can go wrong with each piece of work. Prioritize each risk as High/ Medium/ Low Probability or impact. Sort the list. Create a plan to deal with the risks at the top of list. Gagan Gupta
  • 18. • “Emergency Phone installed, Deliverable completed” • Problems: – Difficult to get the agreement that the product is finished. – Customer Keep wanting more, saying you didn’t do it to their Specification. 1/29/2014 Gagan Gupta
  • 19. • Causes: – The Milestones or deliverables were not measurable. – The customer never told us How many they wanted So we just assumed 1, • What to do: – Ensure Milestones or Deliverables are: Clearly Defined Measurable (Quantifiable) 1/29/2014 Gagan Gupta
  • 20. • Of course we Can do that for you. • Problems: – There was little or no planning before deciding you can get the job done. – The task you agree to turns out to be more work than expected. – It takes you longer and jeopardizes other deliverables. 1/29/2014 Gagan Gupta
  • 21. • Causes: – Not enough time spent planning. – You may have been pressured into giving an answer right then and there. – Didn’t have a full understanding of the work involved before committing. • What to do: – Take the time to fully understand the work before agreeing to it. – Its okay to say the work is not possible or will take too long – Only agree to work when you’re sure it can be done, this will benefit you and your managers. 1/29/2014 Gagan Gupta
  • 22. • Hurry .... We have a tight deadline. No time to plan. Just start digging. • Problems: – The plan is flawed from the start. – The project gets out of control and can’t be recovered. 1/29/2014 Gagan Gupta
  • 23. • Causes: – You have to do the work and weren’t also given time for project management. – Perhaps you only have 10% or 20% allotment for the project management duties. • What to do: – Planning a project is like setting out a roadmap. Without it you will likely get lost. – Controlling a project is like driving a car. You have to continuously watch the road (the Plan) and make little adjustments. 1/29/2014 Gagan Gupta
  • 24. • I think I know how this helmet goes on. I have been riding scooters for two years now. • Problems: – – – – – 1/29/2014 Your project don’t finish on time. Your project are always squeezed at the end. Your project are stressful. You have to deal with unrealistic expectation or customers. You feel your projects are out of control. Gagan Gupta
  • 25. • Causes: – People often don’t know what they don’t know. – Their project are out of control but they don’t know WHY?? – They feel they are doing okay but could benefit from formal project management education. • What to do: – Learn the methods, tools, and techniques successful Project manager use to initiate, plan, execute and control their projects. 1/29/2014 Gagan Gupta
  • 26. Presented by Gagan Gupta 1/29/2014 Gagan Gupta