SlideShare una empresa de Scribd logo
1 de 69
LAND ACQUISITION:LAND ACQUISITION:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
PROJECT DESCRIPTIONPROJECT DESCRIPTION
& CONTRACT SUMMARY& CONTRACT SUMMARY
STP – Al Haer – Presentation:
Description Of The ProjectDescription Of The Project
 Proposed Sewage Treatment Plant Phase-I, is located at southProposed Sewage Treatment Plant Phase-I, is located at south
of Riyadh in Al Haer district. Present contract is to build theof Riyadh in Al Haer district. Present contract is to build the
STP Phase-I withSTP Phase-I with capacity 640,000mcapacity 640,000m³³/day/day (168 MGD) peak(168 MGD) peak
flow andflow and 400,000m400,000m³³ /day/day (105 MGD) average flow.(105 MGD) average flow.
 MainMain contractorcontractor isis “Aziz Company Ltd.”“Aziz Company Ltd.” And he isAnd he is
responsibleresponsible toto design, construct, operate & maintaindesign, construct, operate & maintain the plantthe plant
forfor one yearone year..
STP – Al Haer – Presentation:
Raw Sewage:Raw Sewage:
 B.O.D5B.O.D5 300 mg/L300 mg/L
 C.O.DC.O.D 500 mg/L500 mg/L
 S.S.S.S. 300 mg/L300 mg/L
 TKN-NTKN-N 50 mg/L50 mg/L
 NH4-NNH4-N 40 mg/L40 mg/L
 Minimum Crude Sewage TemperatureMinimum Crude Sewage Temperature 2020ºCºC
 Maximum Crude Sewage TemperatureMaximum Crude Sewage Temperature 3535ºCºC
STP – Al Haer – Presentation:
Treated Effluent After Secondary Treatment:Treated Effluent After Secondary Treatment:
B.O.D5B.O.D5 < 20 mg/L (Monthly Average)< 20 mg/L (Monthly Average)
S.S.S.S. < 20 mg/L (Monthly Average)< 20 mg/L (Monthly Average)
Total NitrogenTotal Nitrogen < 20 mg/L (Monthly Average)< 20 mg/L (Monthly Average)
Fecal ColiformFecal Coliform <2.2 MPN per 100 ml<2.2 MPN per 100 ml
Treated Effluent After Tertiary Treatment:Treated Effluent After Tertiary Treatment:
B.O.D5B.O.D5 < 10 mg/L< 10 mg/L
S.S.S.S. < 10 mg/L< 10 mg/L
NitrogenNitrogen < 10 mg/L< 10 mg/L
Fecal ColiformFecal Coliform <2.2 MPN per 100 ml<2.2 MPN per 100 ml
STP – Al Haer – Presentation:
Sewage Treatment Units:
 Inlet lift pump station with coarse screens etc
 Pre-aeration Tank
 Grit and Grease Removal Tank
 Parshall Flumes
 Selector Tanks
 Aeration Tanks (Carousel Bio-reactor)
 Final Settling Tanks
 Tertiary Treatment Plants
 Chlorination Building
 Return Activated Sludge Pump Station
 Waste Activated Sludge Pump Station, Sludge Thickeners
 Sludge Dewatering Building Including Sludge Decanters, Sludge Dryer etc.
 Sludge Silo and Conveying System
 Odour Control Unit
 Process Pipe Work and Chambers etc.
STP – Al Haer – Presentation:
Auxiliary Building & Other Works:Auxiliary Building & Other Works:
 Control BuildingControl Building
 Generator BuildingGenerator Building
 Electrical SubstationsElectrical Substations
 Mosque, Workshop, Cafeteria & Health CentreMosque, Workshop, Cafeteria & Health Centre
 Administration and Laboratory BuildingAdministration and Laboratory Building
 Road WorksRoad Works
 Irrigation and Plantation etc.Irrigation and Plantation etc.
 Fire Fighting Pipe Networks and Hydrants etc.Fire Fighting Pipe Networks and Hydrants etc.
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
Sewage Treatment Plant – Phase ISewage Treatment Plant – Phase I
Al HaerAl Haer
General Information:General Information:
STP – Al Haer – Presentation:
General InformationGeneral Information
Contract ValueContract Value SR- 293,432,279.00SR- 293,432,279.00
Project Start DateProject Start Date 18.10.142818.10.1428
Project Finish DateProject Finish Date 17.10.143217.10.1432
Execution PeriodExecution Period 4 Years4 Years
%age of Contract Period%age of Contract Period
Finished on (29.02.1432 H)Finished on (29.02.1432 H)
84.18 %84.18 %
STP – Al Haer – Presentation:
Cont’dCont’d
Value of revised masterValue of revised master
programme upto Safar 1432Hprogramme upto Safar 1432H
SR- 293,432,279.00SR- 293,432,279.00
%age of revised master%age of revised master
Programme upto Safar 1432H.Programme upto Safar 1432H. 72.23%72.23%
Total value of works executedTotal value of works executed
upto Safar 1432H (Estimated)upto Safar 1432H (Estimated) SR. 120,832,941.60SR. 120,832,941.60
% age of total works executed% age of total works executed 41.18 %41.18 %
% age of Civil Works Executed% age of Civil Works Executed 64.14 %64.14 %
% age of Mech. Works% age of Mech. Works
ExecutedExecuted
33.71 %33.71 %
% age of Elect. Works% age of Elect. Works
ExecutedExecuted
--
PROGRESSPROGRESS
PHOTOGRAPHS:PHOTOGRAPHS:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
STP – Al Haer – Presentation:
RAIN WATER FLOODRAIN WATER FLOOD
PROTECTIONPROTECTION
ARRANGEMENTS:ARRANGEMENTS:
STP – Al Haer – Presentation:
THANK’STHANK’S
STP – Al Haer – Presentation:

Más contenido relacionado

Destacado (8)

Download Buku
Download BukuDownload Buku
Download Buku
 
Dcs write up
Dcs write upDcs write up
Dcs write up
 
Sayings sample
Sayings sampleSayings sample
Sayings sample
 
Presentazione per hangout
Presentazione per hangoutPresentazione per hangout
Presentazione per hangout
 
Managemen Bencana
Managemen BencanaManagemen Bencana
Managemen Bencana
 
Child abuse
Child abuseChild abuse
Child abuse
 
Prevent child sexual_abuse_2
Prevent child sexual_abuse_2Prevent child sexual_abuse_2
Prevent child sexual_abuse_2
 
History of art
History of artHistory of art
History of art
 

Similar a 2.stp haer 120211

Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CVRahul Shinde
 
Pulsation Study and Mechanical Vibration Analysis
Pulsation Study and Mechanical Vibration AnalysisPulsation Study and Mechanical Vibration Analysis
Pulsation Study and Mechanical Vibration AnalysisiFluids
 
Mec Brief 2009
Mec Brief 2009Mec Brief 2009
Mec Brief 2009Ahmed
 
Presentation altifort groep englisch v1
Presentation altifort groep englisch v1Presentation altifort groep englisch v1
Presentation altifort groep englisch v1Guido Van Baelen
 
Acepac Ttaf Fiber Optic Presentation
Acepac Ttaf Fiber Optic PresentationAcepac Ttaf Fiber Optic Presentation
Acepac Ttaf Fiber Optic PresentationAcepac
 
Oil and gas hardfacing and cargbide coating ppt
Oil and gas  hardfacing and cargbide coating pptOil and gas  hardfacing and cargbide coating ppt
Oil and gas hardfacing and cargbide coating pptspraymet
 
Avantech Fukushima Presentation- Science Cafe
Avantech Fukushima Presentation- Science CafeAvantech Fukushima Presentation- Science Cafe
Avantech Fukushima Presentation- Science CafeEngenuitySC
 
Full Presentataion - May 2015
Full Presentataion - May 2015Full Presentataion - May 2015
Full Presentataion - May 2015Mirza Ismail
 
Regulating Oil and Gas Production Emissions
Regulating Oil and Gas Production EmissionsRegulating Oil and Gas Production Emissions
Regulating Oil and Gas Production EmissionsBret Gallo
 
Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011
Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011
Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011Mukesh Kumar Gupta
 

Similar a 2.stp haer 120211 (20)

CVAkhlaghi (0116)
CVAkhlaghi (0116)CVAkhlaghi (0116)
CVAkhlaghi (0116)
 
2016 Samir A. Fattah CV
2016 Samir A. Fattah CV2016 Samir A. Fattah CV
2016 Samir A. Fattah CV
 
BKP Resume
BKP  ResumeBKP  Resume
BKP Resume
 
Tank Cleaning
Tank CleaningTank Cleaning
Tank Cleaning
 
Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CV
 
Pulsation Study and Mechanical Vibration Analysis
Pulsation Study and Mechanical Vibration AnalysisPulsation Study and Mechanical Vibration Analysis
Pulsation Study and Mechanical Vibration Analysis
 
EHE-Profile
EHE-ProfileEHE-Profile
EHE-Profile
 
EHE-Profile
EHE-ProfileEHE-Profile
EHE-Profile
 
Mec Brief 2009
Mec Brief 2009Mec Brief 2009
Mec Brief 2009
 
Presentation altifort groep englisch v1
Presentation altifort groep englisch v1Presentation altifort groep englisch v1
Presentation altifort groep englisch v1
 
Trans o sonic
Trans o sonicTrans o sonic
Trans o sonic
 
sin heat exchangers
sin heat exchangerssin heat exchangers
sin heat exchangers
 
Acepac Ttaf Fiber Optic Presentation
Acepac Ttaf Fiber Optic PresentationAcepac Ttaf Fiber Optic Presentation
Acepac Ttaf Fiber Optic Presentation
 
Oil and gas hardfacing and cargbide coating ppt
Oil and gas  hardfacing and cargbide coating pptOil and gas  hardfacing and cargbide coating ppt
Oil and gas hardfacing and cargbide coating ppt
 
Avantech Fukushima Presentation- Science Cafe
Avantech Fukushima Presentation- Science CafeAvantech Fukushima Presentation- Science Cafe
Avantech Fukushima Presentation- Science Cafe
 
Full Presentataion - May 2015
Full Presentataion - May 2015Full Presentataion - May 2015
Full Presentataion - May 2015
 
Ali CV
Ali CVAli CV
Ali CV
 
PSC Rigtools Range
PSC Rigtools RangePSC Rigtools Range
PSC Rigtools Range
 
Regulating Oil and Gas Production Emissions
Regulating Oil and Gas Production EmissionsRegulating Oil and Gas Production Emissions
Regulating Oil and Gas Production Emissions
 
Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011
Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011
Global Trend &amp; Perspective on LNG - Lng World Summit Doha 2011
 

Último

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 

Último (20)

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 

2.stp haer 120211

  • 1.
  • 2. LAND ACQUISITION:LAND ACQUISITION: STP – Al Haer – Presentation:
  • 3. STP – Al Haer – Presentation:
  • 4. PROJECT DESCRIPTIONPROJECT DESCRIPTION & CONTRACT SUMMARY& CONTRACT SUMMARY STP – Al Haer – Presentation:
  • 5. Description Of The ProjectDescription Of The Project  Proposed Sewage Treatment Plant Phase-I, is located at southProposed Sewage Treatment Plant Phase-I, is located at south of Riyadh in Al Haer district. Present contract is to build theof Riyadh in Al Haer district. Present contract is to build the STP Phase-I withSTP Phase-I with capacity 640,000mcapacity 640,000m³³/day/day (168 MGD) peak(168 MGD) peak flow andflow and 400,000m400,000m³³ /day/day (105 MGD) average flow.(105 MGD) average flow.  MainMain contractorcontractor isis “Aziz Company Ltd.”“Aziz Company Ltd.” And he isAnd he is responsibleresponsible toto design, construct, operate & maintaindesign, construct, operate & maintain the plantthe plant forfor one yearone year.. STP – Al Haer – Presentation:
  • 6. Raw Sewage:Raw Sewage:  B.O.D5B.O.D5 300 mg/L300 mg/L  C.O.DC.O.D 500 mg/L500 mg/L  S.S.S.S. 300 mg/L300 mg/L  TKN-NTKN-N 50 mg/L50 mg/L  NH4-NNH4-N 40 mg/L40 mg/L  Minimum Crude Sewage TemperatureMinimum Crude Sewage Temperature 2020ºCºC  Maximum Crude Sewage TemperatureMaximum Crude Sewage Temperature 3535ºCºC STP – Al Haer – Presentation:
  • 7. Treated Effluent After Secondary Treatment:Treated Effluent After Secondary Treatment: B.O.D5B.O.D5 < 20 mg/L (Monthly Average)< 20 mg/L (Monthly Average) S.S.S.S. < 20 mg/L (Monthly Average)< 20 mg/L (Monthly Average) Total NitrogenTotal Nitrogen < 20 mg/L (Monthly Average)< 20 mg/L (Monthly Average) Fecal ColiformFecal Coliform <2.2 MPN per 100 ml<2.2 MPN per 100 ml Treated Effluent After Tertiary Treatment:Treated Effluent After Tertiary Treatment: B.O.D5B.O.D5 < 10 mg/L< 10 mg/L S.S.S.S. < 10 mg/L< 10 mg/L NitrogenNitrogen < 10 mg/L< 10 mg/L Fecal ColiformFecal Coliform <2.2 MPN per 100 ml<2.2 MPN per 100 ml STP – Al Haer – Presentation:
  • 8. Sewage Treatment Units:  Inlet lift pump station with coarse screens etc  Pre-aeration Tank  Grit and Grease Removal Tank  Parshall Flumes  Selector Tanks  Aeration Tanks (Carousel Bio-reactor)  Final Settling Tanks  Tertiary Treatment Plants  Chlorination Building  Return Activated Sludge Pump Station  Waste Activated Sludge Pump Station, Sludge Thickeners  Sludge Dewatering Building Including Sludge Decanters, Sludge Dryer etc.  Sludge Silo and Conveying System  Odour Control Unit  Process Pipe Work and Chambers etc. STP – Al Haer – Presentation:
  • 9. Auxiliary Building & Other Works:Auxiliary Building & Other Works:  Control BuildingControl Building  Generator BuildingGenerator Building  Electrical SubstationsElectrical Substations  Mosque, Workshop, Cafeteria & Health CentreMosque, Workshop, Cafeteria & Health Centre  Administration and Laboratory BuildingAdministration and Laboratory Building  Road WorksRoad Works  Irrigation and Plantation etc.Irrigation and Plantation etc.  Fire Fighting Pipe Networks and Hydrants etc.Fire Fighting Pipe Networks and Hydrants etc. STP – Al Haer – Presentation:
  • 10. STP – Al Haer – Presentation:
  • 11. Sewage Treatment Plant – Phase ISewage Treatment Plant – Phase I Al HaerAl Haer General Information:General Information: STP – Al Haer – Presentation: General InformationGeneral Information Contract ValueContract Value SR- 293,432,279.00SR- 293,432,279.00 Project Start DateProject Start Date 18.10.142818.10.1428 Project Finish DateProject Finish Date 17.10.143217.10.1432 Execution PeriodExecution Period 4 Years4 Years %age of Contract Period%age of Contract Period Finished on (29.02.1432 H)Finished on (29.02.1432 H) 84.18 %84.18 %
  • 12. STP – Al Haer – Presentation: Cont’dCont’d Value of revised masterValue of revised master programme upto Safar 1432Hprogramme upto Safar 1432H SR- 293,432,279.00SR- 293,432,279.00 %age of revised master%age of revised master Programme upto Safar 1432H.Programme upto Safar 1432H. 72.23%72.23% Total value of works executedTotal value of works executed upto Safar 1432H (Estimated)upto Safar 1432H (Estimated) SR. 120,832,941.60SR. 120,832,941.60 % age of total works executed% age of total works executed 41.18 %41.18 % % age of Civil Works Executed% age of Civil Works Executed 64.14 %64.14 % % age of Mech. Works% age of Mech. Works ExecutedExecuted 33.71 %33.71 % % age of Elect. Works% age of Elect. Works ExecutedExecuted --
  • 14. STP – Al Haer – Presentation:
  • 15. STP – Al Haer – Presentation:
  • 16. STP – Al Haer – Presentation:
  • 17. STP – Al Haer – Presentation:
  • 18. STP – Al Haer – Presentation:
  • 19.
  • 20.
  • 21. STP – Al Haer – Presentation:
  • 22. STP – Al Haer – Presentation:
  • 23. STP – Al Haer – Presentation:
  • 24. STP – Al Haer – Presentation:
  • 25. STP – Al Haer – Presentation:
  • 26. STP – Al Haer – Presentation:
  • 27. STP – Al Haer – Presentation:
  • 28. STP – Al Haer – Presentation:
  • 29. STP – Al Haer – Presentation:
  • 30. STP – Al Haer – Presentation:
  • 31. STP – Al Haer – Presentation:
  • 32. STP – Al Haer – Presentation:
  • 33. STP – Al Haer – Presentation:
  • 34. STP – Al Haer – Presentation:
  • 35.
  • 36. STP – Al Haer – Presentation:
  • 37. STP – Al Haer – Presentation:
  • 38. STP – Al Haer – Presentation:
  • 39. STP – Al Haer – Presentation:
  • 40. STP – Al Haer – Presentation:
  • 41. STP – Al Haer – Presentation:
  • 42. STP – Al Haer – Presentation:
  • 43. STP – Al Haer – Presentation:
  • 44. STP – Al Haer – Presentation:
  • 45. STP – Al Haer – Presentation:
  • 46. STP – Al Haer – Presentation:
  • 47.
  • 48. STP – Al Haer – Presentation:
  • 49. STP – Al Haer – Presentation:
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58. STP – Al Haer – Presentation:
  • 59. STP – Al Haer – Presentation:
  • 60.
  • 61. STP – Al Haer – Presentation:
  • 62. STP – Al Haer – Presentation:
  • 63. STP – Al Haer – Presentation:
  • 64. STP – Al Haer – Presentation:
  • 65.
  • 66. STP – Al Haer – Presentation:
  • 67. RAIN WATER FLOODRAIN WATER FLOOD PROTECTIONPROTECTION ARRANGEMENTS:ARRANGEMENTS: STP – Al Haer – Presentation:
  • 68.
  • 69. THANK’STHANK’S STP – Al Haer – Presentation: