Improving the organization's
performance by using Lean Six
Sigma methodology
Rodica Ghinea
July 2013
when talking about
Performance = evaluating the financial performance
July 2013
Performance = a comprehensive approach including both
financial and non-financial aspects
In the late 1950’s
currentlycurrently
LEAN
Lean Manufacturing =
Toyota Production
System(TPS)
improving the processes by
eliminating waste
Six Sigma
Six Sigma- Motorola
set of tools and strategies for
improving the quality
LEAN- Six Sigma
a combination of the two methodologies for improving the
performance of a process / company through systematic
application of tools, strategies and politics for continuous
improvement
+
+
July 2013
To build a company's
Development Plan
started with the
company
processes
To determine the
structure of the
business (product
distribution)
July 2013
In order
For that:
Know the
business
July 2013
Analyze current processes in
Supply Chain
Analyze current processes in
manufacturing
Build the actual
VSM
Build the future
VSM
Improve
services
And that means:
I. Build VSM
II. Establish the activities
that bring add value
Kanban
building
map
value
Remove
waste
III. Through the stock
management
Usework
standard
SupplyChain
July 2013
Made an analysis of business structure
A = high runner = 73 products bring 80 % turnover
B = repeater = 130 products bring 19% of turnover
C= stranger = 66 products bring 2 % of turnover
Tool used: Paretto Diagram
July 2013
0
20
40
60
80
100
120
140
A B C
73
130
66
number products
1761066 RON
7511953 RON
76581 RON
Which helped to make the decisions:
July 2013
Automatizations
Lean Cells
Customized
products
For A products
(high runners)
For B products
(repeaters)
For C products
( strangers)
I. Build VSM
July 2013
Performance before implementation:
7 activities;
OFR = 90%;
MTPT = 140 days;
OEE = 65%
LT = 25 days
Efficiency = 65%
Tact time = 5.7 sec
Based on data collected has been built the
future status for VSM
July 2013
FUTURE STATUS
After implementation of the new
VSM expect to:
July 2013
reduce the number of the activities to 4;
with an OFR = 95%;
and rotate the material stock at each 100 days (MTPT = 100 days);
with a rate of using the equipments of 85 % ( OEE)
and delivering the A products in 5 days (LT = 5 days)
To obtain this performance needs to implement
the VSM- action plan
July 2013
Action Product type responsible data
Implement the cells layout B HS mar.13
Kanban implementation inter-
operational A, B VA dec.13
Implementation Kanban finish
product A, B DC ian.14
Implementation Kanban-
secondary operations
A, B
SN sep.13
Implement work standard for each
product family
A, B
BB nov.13
Design and implement Kanban for
primary parts
A, B
CB mar.14
Standardise the box for parts A, B
GH aug.13
Implement a conveyor between
packaging and verification B GI may.14
“U” CELL
July 2013
price
New layout 300 euro/pcs
II. Status of waste (MUDA)
July 2013
Work time: 8 h
Production time : 2.75 h
Defects or purchasing
activities : 4.25 hmanufacturing
defects
purchasing
waste distribution (hour)
waste
waste
adding value
2,75
1,25
3
About 70% of work time is lost.
To increase the value added
need to be implemented the
following activities:
July 2013
Activity Price Responsible status
Design and
implement a
new assemble
table
600 eur BU Manager

Implement
standard work
0 Engineer

Kanban
implementation
0 Engineer

July 2013
75
150
131
Productivity after implementation
manufacturing
through Kanban
implementation
through work standard
After implementation the
productivy will increase as:
July 2013
1. Increase productivity
2. OFR = 92%
3. OEE = 85%
4. Decrease stock by 20%
5. Increase workplace
ergonomics
6. Released a surface of
300 square meters
152
240
300
0
50
100
150
200
250
300
350
before
implementation
work standard
after 1 month after 6 monts
Evolution productivity
Series1
Linear (Series1)
After implementation :
Red- crises situation- not
enough time to bring in
time !
Yellow - warning signal- a
good moment for ordering
Green – enough parts for
production
Code of colour:
July 2013
Kanban: Card that contains all identifiers landmark for an article/ sub-
assembly / finished product, such as: code, quantity, position, destination
provider.
III. Kanban
delay in
deliveries
Model: Design Kanban
July 2013
III. Kanban
monthly
consumption min max box type A box type B box type C
anti-drill plate 13206 4052 10129 10
2.5" SH cap 3VL 1935 484 1209 2
2.5" SH cap5VL 7163 1791 4477 4
2.5" SH cap 5BA 659 165 412 1
2.5" SH cap 5E 863 216 539 1
2.5" SH cap 5OV 3046 762 1904 4
3" SH cap 3VL 1935 484 1209 2
3" SH cap 5VL 3112 778 1945 4
3" SH cap 5BA 659 165 412 1
3" SH cap 5E 863 216 539 1
3" SH cap 5OV 762 762 1904 4 4
III. Supply Chain
To understand the situation, it has used another tool-
the Ishikawa Diagram:
Iulie 2013
July 2013
III. Supply Chain
22.7 55.3
17.3 44.7
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
hours %
Supply Chain structure
MUDA
value added
The activities developed into the Supply Chain Department
have been analysed. Around 44.7% of weekly work time it
is lost.
July 2013
III. Supply Chain
To improve the performance of department has been
established an action plan to improve purchasing services
Action
A P
C D
A P
C D
A P
C D
A P
C D
A P
C D
A P
C D
A P
C D
A P
C D
implemen tthe matrix communication with clients
and / or suppliers
establish responsible for purchasing on group
materials
make decision buy/not buy in max 48 h
build a new and simplified map of processes for
supply chain
Status
group documents by category
standard implementation for organizing shelves
processing orders based on FIFO principle
implementing standardized document for purchasing
indirect materials and for services
July 2013
3114
1118
3135
1113 998
12117
2118
5086
1126
88
4543
1737
3024
30
8
635
985
0
0
0
5000
10000
15000
20000
< 3 months (3:6]months (6:12]months (12:24]months > 24 months
(*1000)RON
Stock Distribution
merch.
selling
raw mat.
indirect
materials
components
packaging
Has developed an analysis to understand the
distribution of stock:
July 2013
1. Implement an working standard for procurement process
2. Introduce the order into the ERP operating system-max 48h
3. appointment responsible for articles category purchasing
4. Construction ERP interface easily accessible without risk
Strategic actions:
1. Reduce the variant of type packaging
2. Implementing Kanban to the supplier for components and raw materials
3. identifying new suppliers in Romania / Europe
Based on the analysis has been established the
action plan
Results after implementation
July 2013
5048.8
882.6
2119
0 0
1892.8
723.8
1260
0 30.0
2500.0
5000.0
7500.0
(x1000)RON
stock trend after implementation
merch.
selling
raw mat.
indirect materials
components
packaging
0
5000
10000
15000
20000
25000 Stock trend after implementation
before
after
Conclusions
July 2013
KPI before trend after
OFR (%) 90 95
MTPT
(days)
140 100
OEE (%) 65 95
Stoc (%) 45 15
LT (days) 25 5
Performance
Company
Make a
plan and
schedule
Implement
Check the
results
Take new
actions
For:
- questions
- helping to save your company
- helping to develop your company/department
- guidance for developing performance project
write to me on : ghinearodica@yahoo.com
July 2013
Some slides were removed from the initial presentation.
Thank You!
July 2013

Más contenido relacionado

La actualidad más candente

Introduction Of Six Sigma for IT & BPO by Vision Raval
Introduction Of Six Sigma for IT & BPO by Vision RavalIntroduction Of Six Sigma for IT & BPO by Vision Raval
Introduction Of Six Sigma for IT & BPO by Vision RavalVision Raval
 
Apply Six sigma to sales and marketing
Apply Six sigma to sales and marketingApply Six sigma to sales and marketing
Apply Six sigma to sales and marketingtheairliner
 
Intro to six sigma s depoe.ppt
Intro to six sigma s depoe.pptIntro to six sigma s depoe.ppt
Intro to six sigma s depoe.pptStephen Depoe
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigmaRahul Singh
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Kaustav Lahiri
 
Six sigma in customer satisfaction
Six sigma in customer satisfactionSix sigma in customer satisfaction
Six sigma in customer satisfactionsaravanan
 
SCP Six Sigma presentation 6.30.2010
SCP Six Sigma presentation 6.30.2010SCP Six Sigma presentation 6.30.2010
SCP Six Sigma presentation 6.30.2010The Hackett Group
 
Six Sigma Asse
Six Sigma AsseSix Sigma Asse
Six Sigma Assetpuyleart
 
Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609maedog
 
Lean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledgeLean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledgeXuan Tran Phu
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 
Six sigma Slides Best and Simple
Six sigma Slides Best and SimpleSix sigma Slides Best and Simple
Six sigma Slides Best and Simplelinecraft
 
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT Firdaus Albarqoni
 

La actualidad más candente (20)

Is 09 six-sigma
Is 09 six-sigmaIs 09 six-sigma
Is 09 six-sigma
 
LEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINALLEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINAL
 
Introduction Of Six Sigma for IT & BPO by Vision Raval
Introduction Of Six Sigma for IT & BPO by Vision RavalIntroduction Of Six Sigma for IT & BPO by Vision Raval
Introduction Of Six Sigma for IT & BPO by Vision Raval
 
Apply Six sigma to sales and marketing
Apply Six sigma to sales and marketingApply Six sigma to sales and marketing
Apply Six sigma to sales and marketing
 
Intro to six sigma s depoe.ppt
Intro to six sigma s depoe.pptIntro to six sigma s depoe.ppt
Intro to six sigma s depoe.ppt
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigma
 
Six sigma overview
Six sigma overviewSix sigma overview
Six sigma overview
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Six sigma in customer satisfaction
Six sigma in customer satisfactionSix sigma in customer satisfaction
Six sigma in customer satisfaction
 
SCP Six Sigma presentation 6.30.2010
SCP Six Sigma presentation 6.30.2010SCP Six Sigma presentation 6.30.2010
SCP Six Sigma presentation 6.30.2010
 
Six Sigma Asse
Six Sigma AsseSix Sigma Asse
Six Sigma Asse
 
Six sigma
Six sigma Six sigma
Six sigma
 
Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609Process Improvement Through Use Of Lean Six Sigma Methods 110609
Process Improvement Through Use Of Lean Six Sigma Methods 110609
 
Lean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledgeLean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledge
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Improving Project Management Skills with Lean Six Sigma
Improving Project Management Skills with Lean Six Sigma Improving Project Management Skills with Lean Six Sigma
Improving Project Management Skills with Lean Six Sigma
 
six sigma
six sigmasix sigma
six sigma
 
Six sigma Slides Best and Simple
Six sigma Slides Best and SimpleSix sigma Slides Best and Simple
Six sigma Slides Best and Simple
 
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
 

Destacado

01 overview of lean six sigma
01   overview of lean six sigma01   overview of lean six sigma
01 overview of lean six sigmaviragonline2002
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
The New Cost To Value Curve
The New Cost To Value CurveThe New Cost To Value Curve
The New Cost To Value CurveWim Rampen
 
The Center for Agile Thinking: Client Pitch
The Center for Agile Thinking: Client PitchThe Center for Agile Thinking: Client Pitch
The Center for Agile Thinking: Client PitchVenkat Iyer
 
Mass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathMass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathJohnHamman
 
PET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewoldPET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewoldBineyam Gebrewold
 
Lean-Six Sigma for Employees
Lean-Six Sigma for EmployeesLean-Six Sigma for Employees
Lean-Six Sigma for EmployeesHeinrich Edimo
 
Staffing strategies that cut cost
Staffing strategies that cut costStaffing strategies that cut cost
Staffing strategies that cut costCraig Albin
 
Case classic pen company with extension
Case classic pen company with extensionCase classic pen company with extension
Case classic pen company with extensionCaritAndersen
 
Lean Six Sigma - Executive Overview Introduction Brochure
Lean Six Sigma - Executive Overview  Introduction  BrochureLean Six Sigma - Executive Overview  Introduction  Brochure
Lean Six Sigma - Executive Overview Introduction BrochurePartner
 
The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)KaiNexus
 
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...KaiNexus
 
Creating a Culture of Continuous Improvement
Creating a Culture of Continuous ImprovementCreating a Culture of Continuous Improvement
Creating a Culture of Continuous ImprovementAaron Silvers
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian KalacJulian Kalac P.Eng
 
A CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality ImprovementA CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality ImprovementHealth Catalyst
 
Strategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas IndustryStrategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas Industrynaveen_ncn
 
Administration of Continuous Improvement Initiative
Administration of Continuous Improvement InitiativeAdministration of Continuous Improvement Initiative
Administration of Continuous Improvement InitiativeMaurice Spann, LSSBB
 

Destacado (18)

01 overview of lean six sigma
01   overview of lean six sigma01   overview of lean six sigma
01 overview of lean six sigma
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
The New Cost To Value Curve
The New Cost To Value CurveThe New Cost To Value Curve
The New Cost To Value Curve
 
The Center for Agile Thinking: Client Pitch
The Center for Agile Thinking: Client PitchThe Center for Agile Thinking: Client Pitch
The Center for Agile Thinking: Client Pitch
 
Mass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathMass to Lean to Six Sigma Path
Mass to Lean to Six Sigma Path
 
PET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewoldPET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewold
 
Lean-Six Sigma for Employees
Lean-Six Sigma for EmployeesLean-Six Sigma for Employees
Lean-Six Sigma for Employees
 
Staffing strategies that cut cost
Staffing strategies that cut costStaffing strategies that cut cost
Staffing strategies that cut cost
 
Case classic pen company with extension
Case classic pen company with extensionCase classic pen company with extension
Case classic pen company with extension
 
Lean Six Sigma - Executive Overview Introduction Brochure
Lean Six Sigma - Executive Overview  Introduction  BrochureLean Six Sigma - Executive Overview  Introduction  Brochure
Lean Six Sigma - Executive Overview Introduction Brochure
 
The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)
 
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
 
Creating a Culture of Continuous Improvement
Creating a Culture of Continuous ImprovementCreating a Culture of Continuous Improvement
Creating a Culture of Continuous Improvement
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
 
A CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality ImprovementA CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality Improvement
 
Strategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas IndustryStrategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas Industry
 
Lean And Six Sigma
Lean And Six SigmaLean And Six Sigma
Lean And Six Sigma
 
Administration of Continuous Improvement Initiative
Administration of Continuous Improvement InitiativeAdministration of Continuous Improvement Initiative
Administration of Continuous Improvement Initiative
 

Similar a Improve performance through Lean - Six Sigma management

ba accounting fm_may06_p43-44
ba accounting fm_may06_p43-44ba accounting fm_may06_p43-44
ba accounting fm_may06_p43-44Hudson Grieve
 
Problem solving thru qc circle (1)
Problem solving thru qc circle (1)Problem solving thru qc circle (1)
Problem solving thru qc circle (1)Jitesh Gaurav
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6smadhan0711
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 
Lean Manufacturing Cost Cutting Methods
Lean Manufacturing   Cost Cutting MethodsLean Manufacturing   Cost Cutting Methods
Lean Manufacturing Cost Cutting MethodsExerciseLeanLLC
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BECATHERINE NGUYEN
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!Mahibur Rahman
 
Presentation SLOB Material Reduction
Presentation SLOB Material ReductionPresentation SLOB Material Reduction
Presentation SLOB Material ReductionCATHERINE NGUYEN
 
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...Yamini Kahaliya
 
Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
Cv francisco dominguez december 2014
Cv francisco dominguez   december 2014Cv francisco dominguez   december 2014
Cv francisco dominguez december 2014Fran D. Bueno
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)Abhishek Kumar
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturingahmad bassiouny
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Simon Misiewicz
 

Similar a Improve performance through Lean - Six Sigma management (20)

Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
Work Portfolio 1
Work Portfolio 1Work Portfolio 1
Work Portfolio 1
 
ba accounting fm_may06_p43-44
ba accounting fm_may06_p43-44ba accounting fm_may06_p43-44
ba accounting fm_may06_p43-44
 
Problem solving thru qc circle (1)
Problem solving thru qc circle (1)Problem solving thru qc circle (1)
Problem solving thru qc circle (1)
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6s
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
Lean Manufacturing Cost Cutting Methods
Lean Manufacturing   Cost Cutting MethodsLean Manufacturing   Cost Cutting Methods
Lean Manufacturing Cost Cutting Methods
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BE
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!
 
Presentation SLOB Material Reduction
Presentation SLOB Material ReductionPresentation SLOB Material Reduction
Presentation SLOB Material Reduction
 
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
 
White Paper_RIAB
White Paper_RIABWhite Paper_RIAB
White Paper_RIAB
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Cv francisco dominguez december 2014
Cv francisco dominguez   december 2014Cv francisco dominguez   december 2014
Cv francisco dominguez december 2014
 
Lean consulting
Lean consultingLean consulting
Lean consulting
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturing
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase
 

Último

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 

Último (20)

Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

Improve performance through Lean - Six Sigma management

  • 1. Improving the organization's performance by using Lean Six Sigma methodology Rodica Ghinea July 2013
  • 2. when talking about Performance = evaluating the financial performance July 2013 Performance = a comprehensive approach including both financial and non-financial aspects In the late 1950’s currentlycurrently
  • 3. LEAN Lean Manufacturing = Toyota Production System(TPS) improving the processes by eliminating waste Six Sigma Six Sigma- Motorola set of tools and strategies for improving the quality LEAN- Six Sigma a combination of the two methodologies for improving the performance of a process / company through systematic application of tools, strategies and politics for continuous improvement + + July 2013
  • 4. To build a company's Development Plan started with the company processes To determine the structure of the business (product distribution) July 2013 In order
  • 5. For that: Know the business July 2013 Analyze current processes in Supply Chain Analyze current processes in manufacturing Build the actual VSM Build the future VSM Improve services
  • 6. And that means: I. Build VSM II. Establish the activities that bring add value Kanban building map value Remove waste III. Through the stock management Usework standard SupplyChain July 2013
  • 7. Made an analysis of business structure A = high runner = 73 products bring 80 % turnover B = repeater = 130 products bring 19% of turnover C= stranger = 66 products bring 2 % of turnover Tool used: Paretto Diagram July 2013 0 20 40 60 80 100 120 140 A B C 73 130 66 number products 1761066 RON 7511953 RON 76581 RON
  • 8. Which helped to make the decisions: July 2013 Automatizations Lean Cells Customized products For A products (high runners) For B products (repeaters) For C products ( strangers)
  • 9. I. Build VSM July 2013 Performance before implementation: 7 activities; OFR = 90%; MTPT = 140 days; OEE = 65% LT = 25 days Efficiency = 65% Tact time = 5.7 sec
  • 10. Based on data collected has been built the future status for VSM July 2013 FUTURE STATUS
  • 11. After implementation of the new VSM expect to: July 2013 reduce the number of the activities to 4; with an OFR = 95%; and rotate the material stock at each 100 days (MTPT = 100 days); with a rate of using the equipments of 85 % ( OEE) and delivering the A products in 5 days (LT = 5 days)
  • 12. To obtain this performance needs to implement the VSM- action plan July 2013 Action Product type responsible data Implement the cells layout B HS mar.13 Kanban implementation inter- operational A, B VA dec.13 Implementation Kanban finish product A, B DC ian.14 Implementation Kanban- secondary operations A, B SN sep.13 Implement work standard for each product family A, B BB nov.13 Design and implement Kanban for primary parts A, B CB mar.14 Standardise the box for parts A, B GH aug.13 Implement a conveyor between packaging and verification B GI may.14
  • 13. “U” CELL July 2013 price New layout 300 euro/pcs
  • 14. II. Status of waste (MUDA) July 2013 Work time: 8 h Production time : 2.75 h Defects or purchasing activities : 4.25 hmanufacturing defects purchasing waste distribution (hour) waste waste adding value 2,75 1,25 3 About 70% of work time is lost.
  • 15. To increase the value added need to be implemented the following activities: July 2013 Activity Price Responsible status Design and implement a new assemble table 600 eur BU Manager  Implement standard work 0 Engineer  Kanban implementation 0 Engineer 
  • 16. July 2013 75 150 131 Productivity after implementation manufacturing through Kanban implementation through work standard After implementation the productivy will increase as:
  • 17. July 2013 1. Increase productivity 2. OFR = 92% 3. OEE = 85% 4. Decrease stock by 20% 5. Increase workplace ergonomics 6. Released a surface of 300 square meters 152 240 300 0 50 100 150 200 250 300 350 before implementation work standard after 1 month after 6 monts Evolution productivity Series1 Linear (Series1) After implementation :
  • 18. Red- crises situation- not enough time to bring in time ! Yellow - warning signal- a good moment for ordering Green – enough parts for production Code of colour: July 2013 Kanban: Card that contains all identifiers landmark for an article/ sub- assembly / finished product, such as: code, quantity, position, destination provider. III. Kanban delay in deliveries
  • 19. Model: Design Kanban July 2013 III. Kanban monthly consumption min max box type A box type B box type C anti-drill plate 13206 4052 10129 10 2.5" SH cap 3VL 1935 484 1209 2 2.5" SH cap5VL 7163 1791 4477 4 2.5" SH cap 5BA 659 165 412 1 2.5" SH cap 5E 863 216 539 1 2.5" SH cap 5OV 3046 762 1904 4 3" SH cap 3VL 1935 484 1209 2 3" SH cap 5VL 3112 778 1945 4 3" SH cap 5BA 659 165 412 1 3" SH cap 5E 863 216 539 1 3" SH cap 5OV 762 762 1904 4 4
  • 20. III. Supply Chain To understand the situation, it has used another tool- the Ishikawa Diagram: Iulie 2013
  • 21. July 2013 III. Supply Chain 22.7 55.3 17.3 44.7 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% hours % Supply Chain structure MUDA value added The activities developed into the Supply Chain Department have been analysed. Around 44.7% of weekly work time it is lost.
  • 22. July 2013 III. Supply Chain To improve the performance of department has been established an action plan to improve purchasing services Action A P C D A P C D A P C D A P C D A P C D A P C D A P C D A P C D implemen tthe matrix communication with clients and / or suppliers establish responsible for purchasing on group materials make decision buy/not buy in max 48 h build a new and simplified map of processes for supply chain Status group documents by category standard implementation for organizing shelves processing orders based on FIFO principle implementing standardized document for purchasing indirect materials and for services
  • 23. July 2013 3114 1118 3135 1113 998 12117 2118 5086 1126 88 4543 1737 3024 30 8 635 985 0 0 0 5000 10000 15000 20000 < 3 months (3:6]months (6:12]months (12:24]months > 24 months (*1000)RON Stock Distribution merch. selling raw mat. indirect materials components packaging Has developed an analysis to understand the distribution of stock:
  • 24. July 2013 1. Implement an working standard for procurement process 2. Introduce the order into the ERP operating system-max 48h 3. appointment responsible for articles category purchasing 4. Construction ERP interface easily accessible without risk Strategic actions: 1. Reduce the variant of type packaging 2. Implementing Kanban to the supplier for components and raw materials 3. identifying new suppliers in Romania / Europe Based on the analysis has been established the action plan
  • 25. Results after implementation July 2013 5048.8 882.6 2119 0 0 1892.8 723.8 1260 0 30.0 2500.0 5000.0 7500.0 (x1000)RON stock trend after implementation merch. selling raw mat. indirect materials components packaging 0 5000 10000 15000 20000 25000 Stock trend after implementation before after
  • 26. Conclusions July 2013 KPI before trend after OFR (%) 90 95 MTPT (days) 140 100 OEE (%) 65 95 Stoc (%) 45 15 LT (days) 25 5 Performance Company Make a plan and schedule Implement Check the results Take new actions