SlideShare una empresa de Scribd logo
1 de 42
Blue Green Dream © 2012. All rights reserved.
Innovations in Planning for
Urban Resilience and Sustainability:
Blue Green Dream’s Integrated Interactions
The Sustainable Green Infrastructure Conference
23rd October 2014
Prof. Čedo Maksimović: BGD Lead
Imperial College London
c.maksimovic@imperial.ac.uk
Dr Karl M. Smith – BGD Project Manager
kmsmith@imperial.ac.uk
Blue Green Dream © 2012. All rights reserved.
To BGD or not to BGD, that is not the question now
BGD methodology meets the needs
of the future innovative spatial planning and design
of new cities and retrofitting of the existing ones.
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
The Blue Green Dream Principle
Synergistic merging of Green Infrastructure with
Urban Water (Blue) Systems
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
The Blue Green Dream Mission
Innovative urban planning through integration of urban water and
green infrastructure with other eco-system services to:
• Support urban adaptation to climate change  urban resilience
• Provide resource efficient, Blue Green Solutions
• Deliver, through use of Ecosystems Services, multiple benefits to
future new and retrofitted cities
Blue Green Dream © 2012. All rights reserved.
Urban water systems development
Key BG principle:
Delivery of multi-benefit solutions through use of natural processes and
Maximisation of synergistic interactions with urban Ecosystem Services
Blue Green Dream © 2012. All rights reserved.
Why BGD?
The threat of Climate Change…
BG
D
BG
D
Blue Green Dream © 2012. All rights reserved.
2
3o
C
Some issues tackled by Blue Greening
Flooding Droughts Air pollution
Heat island
Noise levels dB(A)
< 40.0
40.0 <= < 42.0
42.0 <= < 44.0
44.0 <= < 46.0
46.0 <= < 48.0
48.0 <= < 50.0
50.0 <= < 52.0
52.0 <= < 54.0
54.0 <= < 56.0
56.0 <= < 58.0
58.0 <= < 60.0
60.0 <=
CUW-UK
Signs and symbols
Road axis
Emission line
Surf ace
Main building
Area
Area source
Point source
Length Scale 1:10000
00 50 100 200 300 400
m
Porto Montenegro
day noise lev el af ter reconstruction
13
Noise
Crime
Urban agriculture
Water pollution
+ Energy efficiency of buildings
Healthy cities
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream: Key Facts
• Over 3 Million € project: 2012/16
• Funded by EIT - European Institute
of Innovations and Technologies
• Test and demo sites in France,
Germany, The Netherlands & UK
• ≈ 20 PhD students
• ≈ 40 MSc students
• 17 partners
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
The BGD consortium
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
Blue Green Dream
Activities and Services
Development of New Computer Models
and Planning Tools
Monitoring & Quantifying BG
Solution Benefits
Innovative Urban Planning Consultancy
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
BG test and demo sites
Blue Green Dream © 2012. All rights reserved.
European
regional centres
SC-NS
NEE
EMMEWMMA
CSEE
CORE
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
BGD Design and Planning Tools
1. District/neighborhood level
2. Street level
3. Building level
indoor and outdoor
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved.
REDUCED PLUVIAL FLOOD RISK
SC-NS
NEE
EMME
WMMA
CSEE
CORE
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved.
Blue Green Dream © 2012. All rights reserved.
ENCHANCEMENT OF
BIODIVERSITY
SC-NS
NEE
EMME
WMMA
CSEE
CORE
Blue Green Dream © 2012. All rights reserved.
INCREASED AMENITY
AND URBAN HEALTH
SC-NS
NEE
EMME
WMMA
CSEE
CORE
Blue Green Dream © 2012. All rights reserved.
Interactions of urban
ecosystem services
Blue Green Dream © 2012. All rights reserved.
CP method = Possible analysis of interactions
Tensor decompositions are computed in parallel for sampled blocks, these are then merged
to obtain the global components A, B, C and a core tensor.
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
BGD Integrated Modelling System (IMS)
•BGD centred on interactions between:
 Different physical domains
 Physical and engineering systems
 Technologies and social systems
To capture these interactions, different BGD
tools and models tools need to communicate
and exchange data
BGD IMS interlinks BGD tools and models
Enables full benefits of BG Solutions and
Urban Ecosystems Interactions to be realised
Blue Green Dream © 2012. All rights reserved.
Resulting benefits:
•Lower construction & operational costs
•Higher market value of properties
•Enhanced human health and wellbeing
Conventional design
•Not all interactions addressed
•Additional costs incurred or lower
quality obtained (red zones)
The integrated, BGD, planning approach
Blue Green Dream © 2012. All rights reserved.
Blue Green Infrastructure (GI) Planning and Practice
RIBA Work stages 2013
BGI Infrastructure
Blue Green Dream © 2012. All rights reserved.
Definition of site-specific
problems and solutions
required
Scoping of BG solutions and
proposal for implementation
and their spatial allocation
Detailed parametric design;
Quantification of interactions
and performance
indicators
COUNTRY-REGION SCALE CITY-NEIGHBOURHOOD SCALE
NEIGHBOURHOOD-
BUILDING SCALE
Detailed design of BG
solutions
Possible BG conceptGI as a requirement
for solutions
1. Preparation 2. Concept design 3. Detailed Design
Planner & Decision makers
Architect
Multi-disciplinary specialists
BGI - BG solutions
Blue Green Infrastructure (GI)
Planning and Practice
BGD Planning Methodology
Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
Blue Green Dream © 2012. All rights reserved.
The 1851 Estate – Proposed World class BGD hub
Blue Green Dream © 2012. All rights reserved.
The World class BGD site;
Does it have to be a dream only
Blue Green Dream © 2012. All rights reserved.
MARLOW ROAD LONDON
JOINT WORK WITH PTEA
Model with proposed trees layout
Total solar radiation on facade during June, July & August:
83.1 kWh/m2 (solar load reduction 38.0% + transmission reduction 16%)
Blue Green Dream © 2012. All rights reserved.
Urban adiabatic cooling – particular selection
of deciduous threes with high leaf surface area
- existing - Carpinus Betulus, Catalpa bignonioides, Acer
sp., Juglans nigra, Platanus sp
- new - Liqiudambar sp.
Passive heating - threes that loose leafs first
week in October
- Acer platanoides, Alnus glutinosa,
Winter wind barrier - evergreen threes
-existing - Picea abies, Taxus baccata,
Pinus sp., Pseudotsuga sp.
-new - Pinus nigra, Thuja columnaris,
-Juniperus communis „Hibernica“
Semi open space - for social activities
central zone threes - high treetop( 3-4m)
- Celtis Australis, Rhustiphina, Betula verrucosa
Wind corridor for the building
free cooling - summer night
Wind corridor for the urban adiabatic
cooling - summer day
Clusters orientation – south /north
to maximize passive heating and sun
energy harvesting by PV and Solar
collectors
summerwind-night
summerwind-day
PARAMETRICURBANDESIGN
BGD project 1: University Campus - Zagreb
Blue Green Dream © 2012. All rights reserved.
New demo – Gardens by the Bay
Courtesy of Grant Associates
Blue Green Dream © 2012. All rights reserved.
1
BGD project 2: Holland Plain,
Singapore
Blue Green Dream © 2012. All rights reserved.
World Bank Paris
Blue Green Dream © 2012. All rights reserved.
Summary of the WB Paris retrofitting results
HQE Report
Calcul Cep bâtiment neuf ou nouvelle partie de bâtiment avec Moteur
CSTB pour RT 2005 - Bâtiment neuf - Affaire : Bureaux – Façade
fenêtre - Solution 3
Cep = Cep 5p = 88.0 kWh EP/m2.an
Cep référence = 154.0 kWh EP/m2.an
Gain 5p = +42.9 %
Le Cep (Cep 5 postes) du bâtiment est conforme à l'Arrêté du 24/05/2006
Le gain obtenu permet de prétendre à un label THPE 2005 cf arrêté du 8 mai 2007
Blue Green Dream © 2012. All rights reserved.
• Expertise on modelling and quantifying benefits of BG Solutions
• Urban and spatial planning tools and services for optimising
design and implementation of BG Solutions
• A fully integrated approach - benefits provided by BG Solutions
tailored to the needs of local stakeholders and environment
BGD/BGG Implementation
Blue Green Dream © 2012. All rights reserved.
... BGD ... A NEW ERA IN HUMAN CIVILISATIONEVOLUTION
Blue Green Dream © 2012. All rights reserved.
Contact details

Más contenido relacionado

La actualidad más candente

Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)
Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)
Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)Steve Lojuntin
 
[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...
[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...
[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...GBC Finland
 
Zero Energy Building Development in Malaysia (9th SERI - UKM)
Zero Energy Building Development in Malaysia (9th SERI - UKM)Zero Energy Building Development in Malaysia (9th SERI - UKM)
Zero Energy Building Development in Malaysia (9th SERI - UKM)Steve Lojuntin
 
م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...
م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...
م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...Egyptian Engineers Association
 
Energy in Construction - Kubik
Energy in Construction - KubikEnergy in Construction - Kubik
Energy in Construction - KubikSandra Meno
 
Nearly Zero Energy Building (nZEB) in Malaysia
Nearly Zero Energy Building (nZEB) in MalaysiaNearly Zero Energy Building (nZEB) in Malaysia
Nearly Zero Energy Building (nZEB) in MalaysiaSteve Lojuntin
 
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...Egyptian Engineers Association
 
Zero Energy Buildings
Zero Energy BuildingsZero Energy Buildings
Zero Energy BuildingsJeffrey Funk
 
2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance DesignSteve Lojuntin
 
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Steve Lojuntin
 
Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Steve Lojuntin
 
Zero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA MalaysiaZero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA MalaysiaSteve Lojuntin
 
New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...
New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...
New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...novacsi
 
GREEN BUILDINGS
GREEN BUILDINGSGREEN BUILDINGS
GREEN BUILDINGSRobbySahoo
 
Richard presentation march
Richard presentation marchRichard presentation march
Richard presentation marchbbptoronto
 
م.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونية
م.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونيةم.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونية
م.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونيةEgyptian Engineers Association
 

La actualidad más candente (20)

Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)
Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)
Zero Energy Building Concept, Methodology and Assessment tool in Malaysia (2021)
 
[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...
[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...
[Nordic GBC Conference 2013] Mikko Hyytinen: Green market study - The demand ...
 
Zero Energy Building Development in Malaysia (9th SERI - UKM)
Zero Energy Building Development in Malaysia (9th SERI - UKM)Zero Energy Building Development in Malaysia (9th SERI - UKM)
Zero Energy Building Development in Malaysia (9th SERI - UKM)
 
م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...
م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...
م.75-مبادرة#تواصل_تطوير-أ.د.عبدالحكيم حسبو-التوجهات العالميه في استخدام الطاق...
 
Energy in Construction - Kubik
Energy in Construction - KubikEnergy in Construction - Kubik
Energy in Construction - Kubik
 
Presentation on Energy efficient Green Buildings
Presentation on Energy efficient Green BuildingsPresentation on Energy efficient Green Buildings
Presentation on Energy efficient Green Buildings
 
Nearly Zero Energy Building (nZEB) in Malaysia
Nearly Zero Energy Building (nZEB) in MalaysiaNearly Zero Energy Building (nZEB) in Malaysia
Nearly Zero Energy Building (nZEB) in Malaysia
 
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
-Overcoming the Global Challenges - Securing the World’s Food, Energy and Wat...
 
Zero Energy Buildings
Zero Energy BuildingsZero Energy Buildings
Zero Energy Buildings
 
2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design
 
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
 
Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...
 
Zero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA MalaysiaZero Energy Building in Malaysia by SEDA Malaysia
Zero Energy Building in Malaysia by SEDA Malaysia
 
New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...
New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...
New Songdo City, South Korea: Bringing LEED to a Mega Project in a New Market...
 
GREEN BUILDINGS
GREEN BUILDINGSGREEN BUILDINGS
GREEN BUILDINGS
 
Richard presentation march
Richard presentation marchRichard presentation march
Richard presentation march
 
GEO
GEOGEO
GEO
 
م.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونية
م.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونيةم.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونية
م.39-مبادرة#تواصل_تطوير-أ.د.هانى أحمد منيب-إدارة المخلفات الإلكترونية
 
Tokyo Initiative for a Low Carbon & Resilient City
Tokyo Initiative for a Low Carbon & Resilient CityTokyo Initiative for a Low Carbon & Resilient City
Tokyo Initiative for a Low Carbon & Resilient City
 
Green job in indonesia
Green job in indonesia Green job in indonesia
Green job in indonesia
 

Destacado

Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...
Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...
Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...Green Social Engineering
 
Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...
Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...
Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...Green Social Engineering
 
Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...
Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...
Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...Green Social Engineering
 
Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...
Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...
Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...Green Social Engineering
 
Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...
Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...
Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...Green Social Engineering
 
Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...
Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...
Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...Green Social Engineering
 

Destacado (6)

Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...
Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...
Professor Walter Distaso - Green Infrastructure's Contribution to Economic Gr...
 
Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...
Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...
Dr Ambra Burl - Healthy Parks, Healthy People - Presentation at The Sustainab...
 
Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...
Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...
Dr Mike Wells presentation at The Sustainable Green Infrastructure Conference...
 
Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...
Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...
Peter Massini - Presentation at The Sustainable Green Infrastructure Conferen...
 
Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...
Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...
Janet Pell's Presentation at The Sustainable Green Infrastructure Conference ...
 
Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...
Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...
Howard Wood - Presentation at The Sustainable Green Infrastructure Conference...
 

Similar a Professor Cedo Maksimovic presentation at The Sustainable Green Infrastructure Conference 2014 - Innovations in Planning for Urban Resilience & Sustainability - Blue Green Dream's Inegrated Interactions

Adb airfield solutions moving airports to a greener future 20121023
Adb airfield solutions moving airports to a greener future 20121023Adb airfield solutions moving airports to a greener future 20121023
Adb airfield solutions moving airports to a greener future 20121023Jean Luc Devisscher
 
CCU & les nouvelles molécules de la transition énergétique | 2 février 2021
CCU & les nouvelles molécules de la transition énergétique | 2 février 2021CCU & les nouvelles molécules de la transition énergétique | 2 février 2021
CCU & les nouvelles molécules de la transition énergétique | 2 février 2021Cluster TWEED
 
Iaetsd green building
Iaetsd green buildingIaetsd green building
Iaetsd green buildingIaetsd Iaetsd
 
European Green IT Webinar 2014 - Green Code Lab (France)
European Green IT Webinar 2014 - Green Code Lab (France)European Green IT Webinar 2014 - Green Code Lab (France)
European Green IT Webinar 2014 - Green Code Lab (France)GreenLabCenter
 
Analysis Of Sustainable Energy Systems In Ecovillages A Review Of Progress I...
Analysis Of Sustainable Energy Systems In Ecovillages  A Review Of Progress I...Analysis Of Sustainable Energy Systems In Ecovillages  A Review Of Progress I...
Analysis Of Sustainable Energy Systems In Ecovillages A Review Of Progress I...Arlene Smith
 
Bill Jolly 3rd Annual Conference On Cost Effective Sustainability
Bill Jolly   3rd Annual Conference On Cost Effective SustainabilityBill Jolly   3rd Annual Conference On Cost Effective Sustainability
Bill Jolly 3rd Annual Conference On Cost Effective SustainabilityBilljolly
 
An Approach in the Direction of Green City Concept-''Sustainable Development'
An Approach in the Direction of Green City Concept-''Sustainable Development'An Approach in the Direction of Green City Concept-''Sustainable Development'
An Approach in the Direction of Green City Concept-''Sustainable Development'IRJET Journal
 
Applying sustainable concept on building
Applying sustainable concept on buildingApplying sustainable concept on building
Applying sustainable concept on buildingRidzuan Ewan
 
How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...
How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...
How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...catherinewall
 
Green deal awareness - Chris Broadbent, BRE
Green deal awareness  - Chris Broadbent, BREGreen deal awareness  - Chris Broadbent, BRE
Green deal awareness - Chris Broadbent, BREsustainableCoRE
 
Bed Zed Carbon Neutral Toolkit Part2 Summary
Bed Zed Carbon Neutral Toolkit Part2 SummaryBed Zed Carbon Neutral Toolkit Part2 Summary
Bed Zed Carbon Neutral Toolkit Part2 SummaryX YZ
 
TSB Environmental Data Workshop - 5th July 2013
TSB Environmental Data Workshop - 5th July 2013TSB Environmental Data Workshop - 5th July 2013
TSB Environmental Data Workshop - 5th July 2013100%Open
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects Avanceon
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Dutch Power
 
Green banking and mrv adfiap takashi hongo jbic
Green banking and mrv adfiap  takashi hongo jbicGreen banking and mrv adfiap  takashi hongo jbic
Green banking and mrv adfiap takashi hongo jbicADFIAP
 
Optical networks and the ecodesign tradeoff between climate change mitigation...
Optical networks and the ecodesign tradeoff between climate change mitigation...Optical networks and the ecodesign tradeoff between climate change mitigation...
Optical networks and the ecodesign tradeoff between climate change mitigation...ADVA
 
Eu horizon europe_info_29042021
Eu horizon europe_info_29042021Eu horizon europe_info_29042021
Eu horizon europe_info_29042021Business Turku
 

Similar a Professor Cedo Maksimovic presentation at The Sustainable Green Infrastructure Conference 2014 - Innovations in Planning for Urban Resilience & Sustainability - Blue Green Dream's Inegrated Interactions (20)

Adb airfield solutions moving airports to a greener future 20121023
Adb airfield solutions moving airports to a greener future 20121023Adb airfield solutions moving airports to a greener future 20121023
Adb airfield solutions moving airports to a greener future 20121023
 
CCU & les nouvelles molécules de la transition énergétique | 2 février 2021
CCU & les nouvelles molécules de la transition énergétique | 2 février 2021CCU & les nouvelles molécules de la transition énergétique | 2 février 2021
CCU & les nouvelles molécules de la transition énergétique | 2 février 2021
 
Kiev presentations validation workshop 24 september
Kiev   presentations validation workshop 24 septemberKiev   presentations validation workshop 24 september
Kiev presentations validation workshop 24 september
 
Kiev presentations validation workshop 24 september
Kiev   presentations validation workshop 24 septemberKiev   presentations validation workshop 24 september
Kiev presentations validation workshop 24 september
 
Iaetsd green building
Iaetsd green buildingIaetsd green building
Iaetsd green building
 
European Green IT Webinar 2014 - Green Code Lab (France)
European Green IT Webinar 2014 - Green Code Lab (France)European Green IT Webinar 2014 - Green Code Lab (France)
European Green IT Webinar 2014 - Green Code Lab (France)
 
Analysis Of Sustainable Energy Systems In Ecovillages A Review Of Progress I...
Analysis Of Sustainable Energy Systems In Ecovillages  A Review Of Progress I...Analysis Of Sustainable Energy Systems In Ecovillages  A Review Of Progress I...
Analysis Of Sustainable Energy Systems In Ecovillages A Review Of Progress I...
 
Bill Jolly 3rd Annual Conference On Cost Effective Sustainability
Bill Jolly   3rd Annual Conference On Cost Effective SustainabilityBill Jolly   3rd Annual Conference On Cost Effective Sustainability
Bill Jolly 3rd Annual Conference On Cost Effective Sustainability
 
An Approach in the Direction of Green City Concept-''Sustainable Development'
An Approach in the Direction of Green City Concept-''Sustainable Development'An Approach in the Direction of Green City Concept-''Sustainable Development'
An Approach in the Direction of Green City Concept-''Sustainable Development'
 
Applying sustainable concept on building
Applying sustainable concept on buildingApplying sustainable concept on building
Applying sustainable concept on building
 
How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...
How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...
How ICT will help deliver ESB\'s Sustainability Strategy, Padraig McManus, CE...
 
Green deal awareness - Chris Broadbent, BRE
Green deal awareness  - Chris Broadbent, BREGreen deal awareness  - Chris Broadbent, BRE
Green deal awareness - Chris Broadbent, BRE
 
Copenhagen
CopenhagenCopenhagen
Copenhagen
 
Bed Zed Carbon Neutral Toolkit Part2 Summary
Bed Zed Carbon Neutral Toolkit Part2 SummaryBed Zed Carbon Neutral Toolkit Part2 Summary
Bed Zed Carbon Neutral Toolkit Part2 Summary
 
TSB Environmental Data Workshop - 5th July 2013
TSB Environmental Data Workshop - 5th July 2013TSB Environmental Data Workshop - 5th July 2013
TSB Environmental Data Workshop - 5th July 2013
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
 
Green banking and mrv adfiap takashi hongo jbic
Green banking and mrv adfiap  takashi hongo jbicGreen banking and mrv adfiap  takashi hongo jbic
Green banking and mrv adfiap takashi hongo jbic
 
Optical networks and the ecodesign tradeoff between climate change mitigation...
Optical networks and the ecodesign tradeoff between climate change mitigation...Optical networks and the ecodesign tradeoff between climate change mitigation...
Optical networks and the ecodesign tradeoff between climate change mitigation...
 
Eu horizon europe_info_29042021
Eu horizon europe_info_29042021Eu horizon europe_info_29042021
Eu horizon europe_info_29042021
 

Último

1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLSarandianics
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...tanu pandey
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
A PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaA PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaMiteshKumar471773
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...SUHANI PANDEY
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...nehasharma67844
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...SUHANI PANDEY
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Último (20)

1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
A PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaA PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of India
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 

Professor Cedo Maksimovic presentation at The Sustainable Green Infrastructure Conference 2014 - Innovations in Planning for Urban Resilience & Sustainability - Blue Green Dream's Inegrated Interactions

  • 1. Blue Green Dream © 2012. All rights reserved. Innovations in Planning for Urban Resilience and Sustainability: Blue Green Dream’s Integrated Interactions The Sustainable Green Infrastructure Conference 23rd October 2014 Prof. Čedo Maksimović: BGD Lead Imperial College London c.maksimovic@imperial.ac.uk Dr Karl M. Smith – BGD Project Manager kmsmith@imperial.ac.uk
  • 2. Blue Green Dream © 2012. All rights reserved. To BGD or not to BGD, that is not the question now BGD methodology meets the needs of the future innovative spatial planning and design of new cities and retrofitting of the existing ones.
  • 3. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk The Blue Green Dream Principle Synergistic merging of Green Infrastructure with Urban Water (Blue) Systems
  • 4. Blue Green Dream © 2012. All rights reserved.
  • 5. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk The Blue Green Dream Mission Innovative urban planning through integration of urban water and green infrastructure with other eco-system services to: • Support urban adaptation to climate change  urban resilience • Provide resource efficient, Blue Green Solutions • Deliver, through use of Ecosystems Services, multiple benefits to future new and retrofitted cities
  • 6. Blue Green Dream © 2012. All rights reserved. Urban water systems development Key BG principle: Delivery of multi-benefit solutions through use of natural processes and Maximisation of synergistic interactions with urban Ecosystem Services
  • 7. Blue Green Dream © 2012. All rights reserved. Why BGD? The threat of Climate Change… BG D BG D
  • 8. Blue Green Dream © 2012. All rights reserved. 2 3o C Some issues tackled by Blue Greening Flooding Droughts Air pollution Heat island Noise levels dB(A) < 40.0 40.0 <= < 42.0 42.0 <= < 44.0 44.0 <= < 46.0 46.0 <= < 48.0 48.0 <= < 50.0 50.0 <= < 52.0 52.0 <= < 54.0 54.0 <= < 56.0 56.0 <= < 58.0 58.0 <= < 60.0 60.0 <= CUW-UK Signs and symbols Road axis Emission line Surf ace Main building Area Area source Point source Length Scale 1:10000 00 50 100 200 300 400 m Porto Montenegro day noise lev el af ter reconstruction 13 Noise Crime Urban agriculture Water pollution + Energy efficiency of buildings Healthy cities
  • 9. Blue Green Dream © 2012. All rights reserved. Blue Green Dream: Key Facts • Over 3 Million € project: 2012/16 • Funded by EIT - European Institute of Innovations and Technologies • Test and demo sites in France, Germany, The Netherlands & UK • ≈ 20 PhD students • ≈ 40 MSc students • 17 partners
  • 10. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk The BGD consortium
  • 11. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk Blue Green Dream Activities and Services Development of New Computer Models and Planning Tools Monitoring & Quantifying BG Solution Benefits Innovative Urban Planning Consultancy
  • 12. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk BG test and demo sites
  • 13. Blue Green Dream © 2012. All rights reserved. European regional centres SC-NS NEE EMMEWMMA CSEE CORE
  • 14. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk BGD Design and Planning Tools 1. District/neighborhood level 2. Street level 3. Building level indoor and outdoor
  • 15. Blue Green Dream © 2012. All rights reserved.
  • 16. Blue Green Dream © 2012. All rights reserved.
  • 17. Blue Green Dream © 2012. All rights reserved.
  • 18. Blue Green Dream © 2012. All rights reserved.
  • 19. Blue Green Dream © 2012. All rights reserved.
  • 20. Blue Green Dream © 2012. All rights reserved. REDUCED PLUVIAL FLOOD RISK SC-NS NEE EMME WMMA CSEE CORE
  • 21. Blue Green Dream © 2012. All rights reserved.
  • 22. Blue Green Dream © 2012. All rights reserved.
  • 23. Blue Green Dream © 2012. All rights reserved. ENCHANCEMENT OF BIODIVERSITY SC-NS NEE EMME WMMA CSEE CORE
  • 24. Blue Green Dream © 2012. All rights reserved. INCREASED AMENITY AND URBAN HEALTH SC-NS NEE EMME WMMA CSEE CORE
  • 25. Blue Green Dream © 2012. All rights reserved. Interactions of urban ecosystem services
  • 26. Blue Green Dream © 2012. All rights reserved. CP method = Possible analysis of interactions Tensor decompositions are computed in parallel for sampled blocks, these are then merged to obtain the global components A, B, C and a core tensor.
  • 27. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk BGD Integrated Modelling System (IMS) •BGD centred on interactions between:  Different physical domains  Physical and engineering systems  Technologies and social systems To capture these interactions, different BGD tools and models tools need to communicate and exchange data BGD IMS interlinks BGD tools and models Enables full benefits of BG Solutions and Urban Ecosystems Interactions to be realised
  • 28. Blue Green Dream © 2012. All rights reserved. Resulting benefits: •Lower construction & operational costs •Higher market value of properties •Enhanced human health and wellbeing Conventional design •Not all interactions addressed •Additional costs incurred or lower quality obtained (red zones) The integrated, BGD, planning approach
  • 29. Blue Green Dream © 2012. All rights reserved. Blue Green Infrastructure (GI) Planning and Practice RIBA Work stages 2013 BGI Infrastructure
  • 30. Blue Green Dream © 2012. All rights reserved. Definition of site-specific problems and solutions required Scoping of BG solutions and proposal for implementation and their spatial allocation Detailed parametric design; Quantification of interactions and performance indicators COUNTRY-REGION SCALE CITY-NEIGHBOURHOOD SCALE NEIGHBOURHOOD- BUILDING SCALE Detailed design of BG solutions Possible BG conceptGI as a requirement for solutions 1. Preparation 2. Concept design 3. Detailed Design Planner & Decision makers Architect Multi-disciplinary specialists BGI - BG solutions Blue Green Infrastructure (GI) Planning and Practice BGD Planning Methodology
  • 31. Blue Green Dream © 2012. All rights reserved. www.bgd.org.uk
  • 32. Blue Green Dream © 2012. All rights reserved. The 1851 Estate – Proposed World class BGD hub
  • 33. Blue Green Dream © 2012. All rights reserved. The World class BGD site; Does it have to be a dream only
  • 34. Blue Green Dream © 2012. All rights reserved. MARLOW ROAD LONDON JOINT WORK WITH PTEA Model with proposed trees layout Total solar radiation on facade during June, July & August: 83.1 kWh/m2 (solar load reduction 38.0% + transmission reduction 16%)
  • 35. Blue Green Dream © 2012. All rights reserved. Urban adiabatic cooling – particular selection of deciduous threes with high leaf surface area - existing - Carpinus Betulus, Catalpa bignonioides, Acer sp., Juglans nigra, Platanus sp - new - Liqiudambar sp. Passive heating - threes that loose leafs first week in October - Acer platanoides, Alnus glutinosa, Winter wind barrier - evergreen threes -existing - Picea abies, Taxus baccata, Pinus sp., Pseudotsuga sp. -new - Pinus nigra, Thuja columnaris, -Juniperus communis „Hibernica“ Semi open space - for social activities central zone threes - high treetop( 3-4m) - Celtis Australis, Rhustiphina, Betula verrucosa Wind corridor for the building free cooling - summer night Wind corridor for the urban adiabatic cooling - summer day Clusters orientation – south /north to maximize passive heating and sun energy harvesting by PV and Solar collectors summerwind-night summerwind-day PARAMETRICURBANDESIGN BGD project 1: University Campus - Zagreb
  • 36. Blue Green Dream © 2012. All rights reserved. New demo – Gardens by the Bay Courtesy of Grant Associates
  • 37. Blue Green Dream © 2012. All rights reserved. 1 BGD project 2: Holland Plain, Singapore
  • 38. Blue Green Dream © 2012. All rights reserved. World Bank Paris
  • 39. Blue Green Dream © 2012. All rights reserved. Summary of the WB Paris retrofitting results HQE Report Calcul Cep bâtiment neuf ou nouvelle partie de bâtiment avec Moteur CSTB pour RT 2005 - Bâtiment neuf - Affaire : Bureaux – Façade fenêtre - Solution 3 Cep = Cep 5p = 88.0 kWh EP/m2.an Cep référence = 154.0 kWh EP/m2.an Gain 5p = +42.9 % Le Cep (Cep 5 postes) du bâtiment est conforme à l'Arrêté du 24/05/2006 Le gain obtenu permet de prétendre à un label THPE 2005 cf arrêté du 8 mai 2007
  • 40. Blue Green Dream © 2012. All rights reserved. • Expertise on modelling and quantifying benefits of BG Solutions • Urban and spatial planning tools and services for optimising design and implementation of BG Solutions • A fully integrated approach - benefits provided by BG Solutions tailored to the needs of local stakeholders and environment BGD/BGG Implementation
  • 41. Blue Green Dream © 2012. All rights reserved. ... BGD ... A NEW ERA IN HUMAN CIVILISATIONEVOLUTION
  • 42. Blue Green Dream © 2012. All rights reserved. Contact details

Notas del editor

  1. At present GI is introduced after the concept design (as a possibility and a strategy) and seriously considered in the Detailed design. Problem with this is following: If we didn’t set the requirements (1. preparations) and there is no regulations to use it then developers/investors/clients plus Architects and Planners are not forced to us eGI.. They will use GI to meet minimum of regulations or for decoration only. And if it is not in the concept design (on top of the planning permit is issued) it will never find its place in the concept design. Even if we want to add it, it will be either too late or not financially viable.
  2. What we need to do is to introduce the specialist and “GI need” as earlier as possible. The best way to do that is to start with the preparation (Strategies and Policies) to set up the need for the GI. Preparation –– Defining need Concept design – From this stage, specialists have to be deeply involved so the overall solution can be provided. They provide concept for maximising synergistic effects arising from use of a combination of GI tailored to the site. Designed design: use of powerful software tools and mdoels to measure and quantify the impact that new build/ retrofitting of GI will have on the local environment and situation post-construction. Planning for maintenance and life cycle management is essential.