1 © Nokia 2015
Air Scale Quality Installation Presentation
Author
Rajshekhar Bhushetty
Girish Kshirsagar
Reviewer
Harvinder Rana
Surender Chandra
Vikas Dhar
Approved by
Rajnish Sarin
Vinay P Mishra
Airscale Quality Hand book Ver1.0
Airscale Introduction
AirScale OUTDOOR Subrack AMOB
P7 status
Stand-alone AMOB
AMOB stacked with Flexi modules
• IP55 environmental protection for AirScale indoor System Module
• Height: 8 HU and weigh 23kg (bear subrack)
• High performance Heat Exchanger technology for thermal management
• Operating temp range -40C up to +55C without solar radiation
• Cold start from -40°C to -5°C with optional heater(s)
• Compatible with Flexi BTS mechanics stack/wall/pole/rack installation
• Possibility to install AMOB on top of the Flexi stack (3 flexi radios under AMOB in the
stack for Zone 4 and 5 flexi radios for Zone 2)
• Supporting other modules above AMOB with additional stacking kit (under testing)
• Compatible with the 3rd part 19" racks and cabinets if clearances and airflow
requirements are followed
• Possible to install AMOB inside FCOA cabinet
• Service doors on front and rear sides
• Cable entry solution based on conduits/cable glands
HEX 4HU
Box for Air Scale
modules 4HU
Dimensions mm Inches
Height 354 14
Width 487 19
Depth 605 24
Asset
Weight
(Kg)
Weight (lbs)
AMOB Cabinet 23 51
AirScale Common Unit board (ASIA)
(Core Module)
3 7
ABIA (Expansion Module) 2 4
½ Capacity (1 Core + 3 Expansion) 32 70
Full Capacity (2 Core + 6 Expansion) 41 90
AMOB inside FCOA
(3 positions possible)
AMOB on the
pole/wall
Airscale Quality Hand book Ver1.0
Height 8U (354.8mm)
Width (front cover) 487mm
Width (cabinet)
448mm (fits into 19 inch rack)
487mm without conduits
Depth
Total 605mm
472mm from rack mounting point
Weight 23 kg (exclude ASMI plug-in modules)
Ingress Protection IP55
Operating Temperature -40°C up to +55°C (without solar radiation)
Installation
Temperature
-20°C up to +55°C
Airflow Direction
Back to front airflow direction supported for Horizontal installation (FCOA, 19” rack, Flexi stack
)
Front to back airflow direction supported for Vertical installation (wall and pole mounting
case)
Cold start
~2h from -40°C to -5°C
*Optional 2nd heater can be added to meet Telcordia GR requirement, cold start from -40°C to
-5°C in 1 hour instead of 2 hours
Nominal supply voltage
Input voltage range
-40.5 … -57 V DC
Extended Service Voltage Range supported -36Vdc .. -60Vdc Floating
Volume 104.5L
Mass capacity Support Max 18Kg inside
Power consumption
135W @ 25°C (fans)
265W (with 40W tolerance) @ +55°C (all fans at highest speed)
Cold start @ -40°C ~600W (1 heater ON 550W (inrush 22A) + fans at low speed)
40W @ 0°C (no heater, fans at low speed)
Conduit cable entry 2x1.5” + 3x 1” on each left and right side (6x1” and 4x1,5” in total)
AMOB - Exploded View
Heat Exchanger cooling contains fluorinated greenhouse gases
Hermetically sealed
Refrigerant: HFC-134a GWP value = 1430
System charge weight = 0.65Kg
Airscale Introduction
Airscale Quality Hand book Ver1.0
AMOB – Front view, door removed
AirScale Common Unit board (ASIA) AirScale Common
Module (1-2)
ABIA AirScale Capacity Module (1-6)
FYGM 473394A
GPS Module
and
AMFL 474422A
GPS installation kit
for AMOB
Heater (one by
default, one extra
in option)
AMFI 474419A
Power Distribution Unit
ESD point
Airscale Introduction
Airscale Quality Hand book Ver1.0
AMOB - Mounting Options – Wall & Pole
• AMOB can be mounted directly to:
• a wall using: AMFH + FMFA
•A pole using: AMFH + FPKA
•The stack mounting bracket from AMFH kit is not used for wall/pole mounting.
FMFA - Flexi Mounting kit
(470149A) plinth
FPKA Flexi Pole Kit
(471649A)
Right angle conduits on the top side
2x 1.5” and 2x 1.0”(another 1x 1.0” for backup)
Straight conduits on the bottom side
2x 1.5” and 3x 1.0”
Lift points
AMFH Stack/ Wall/ Pole installation kit
(474418A) includes:
- Stack mounting bracket
- front plastic cover
- Security bracket
Airscale Introduction
Airscale Quality Hand book Ver1.0
Right Size Entry Glands for Cable entry
M50
M32
Airscale Quality Hand book Ver1.0
S.No Item Specification S.No Item Specification
1 Site Master 23 Drilling Machine and Drill set
2 Screw driver set 1 Set 24 Tool Bag
3 Bit Holder Magnetic, size 1.4 ,Length 100 mm 25 Pulley Block
4 TORX Screw driver set T-10,T-15,T-20,T-25,T-30 26 Rope 1 nos
5 Ball end hex key sets 2-2.5,3,4,5,6,8 27 Krone Tool
6 Combination Pliers 28 ESD Wrist Strap
7 Combination spanners Size-13,15,16,17,19,24,27,30,32 29 Monkey Wrench
8 Tie Cutter 30 RJ 45/RJ11 crimping tool
9 Scissors Fiskars 9891 31 Allen Key Set
10 Utility Knife 32 Electric Soldering Piston W 61C
11 Hacksaw 33 Electrical Soldering Tin 1 mm
12 Co-axial Cable stripper 34 Chisel
13 Wire Stripper 35 Marker Pen or Comparable tool
14 Plastic Head hammer 36 Cleaner Spray
15 File Round 6" and Flat 8" 37 LAN cable Tester
16 Digital Multimeter 38 Power Extension Board
17 Brush 39 Hammer
18 Measuring Tape Upto 35 metre 40 Power Cable cutter
19 Spirit Level 41 Laser Torch
20 Crimping Tool T-2600 or Equivalent 42 Binocular
21 Torque Wrench 1 43 T20 Screw Driver with hole Tip
22 Compass
Tool’s List for Installing AIRSCALE
Airscale Quality Hand book Ver1.0
Infra & Power Requirements
• 1 MCB of 63 A required for System Module.
• Space for GPS is required on Sites where ever we are installing / swapping TDD , location open to sky
with 180 degree access.
• Space for RF module is required near the antenna ( for New Installation).
• 1 MCB of 32 A ( 2G, 3G, FD) or 16A ( FZNI or AZNA) required for RF Module.
• 1 Pole for System module is required in Case of New Installation
• In case of Swap we will try to use existing Location of TDD BTS
• Antenna strategy will depend on what is the scope, for swap we don’t have to change anything but in
case of New Deployment 1 Pole per Antenna is required.
• Space for Installing OFDB on pole or tower leg.
Airscale Quality Hand book Ver1.0
ASIA Air Scale Common
➢ -One ASIA Card
➢ -One Grounding Cable -with Two
Screws
ASIA
Grounding Cable
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
ABIA Air Scale Capacity
➢ One ABIA Card
ABIA
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
AMOB AirScale Subrack
➢ One AMOB Cabinet
➢ One Site Bag with Accessories
AMOB
Site Bag
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
Accessories supplied with AMOB
Glands Grommets
Lifting handle, Padlock bracket, Key, Anderson power connector with Lugs,
premade Gr cable for ASIA, Gr lugs for AMOB, Plates for covering gland
openings, Hex nut, hexalobular pan Washers
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
FSES Flexi Ext. Semi-integrated OVP
➢ One FSES OVP with prefixed Power and
GND Cable
➢ Screw and Bolts
FMFA FLEXI MOUNTING KIT FLOOR/WALL/POLE
➢ One FMFA Plinth
➢ Screw and Bolts
FPKA Flexi Pole Installation Kit
➢ Two FPKA Pole Mounting Kit with
Locking Bracket
OD kit HW Delivery Content
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
AMFH Stack installation kit
➢ One Base Plate
➢ One Security Bracket
➢ One Security Thread band
➢ One AMOB Heat Exchanger Front Cover
➢ Screws
Base Plate
Security Bracket
Security Thread band
AMOB Heat Exchanger Front Cover
OD kit HW Delivery Content
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
FPIA Flexi Pole Installation Kit
➢ One Pole Fixing Plate
➢ One Hose Clamp
➢ Screws
AMFF Blind panel
➢ One Blank Dummy Plate
OD kit HW Delivery Content
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
AMFK Cable glands for AMOB
➢ 1 x Cable glands on the AMOB left side
(2 x 1.5 inch, 3 x 1.0 inch)
Airscale HW Introduction OD kit HW Delivery Content
Airscale Quality Hand book Ver1.0
AMFS Glands Rubber Boot for AMOB
Airscale HW Introduction OD kit HW Delivery Content
Airscale Quality Hand book Ver1.0
OFDB (FODA)
➢ One FODA for every 12 CPRI Cable
Pl. Note : OFDB is mountable only on wall and Pole
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
IM Kit Supplied with Air scale
3G (2100) Label set
LTE (2300/2600) Label set
Airscale mod Label set
2G (900/1800) Label set
Labelling set
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
IM Kit Supplied with Air scale
Other IM
Tie, Tape, Saddle, Welcro, Spiral
conduit Grouting bolt &
Washers
FMCA top cover plate C clamp for grounding Lugs – 2.5,10,16,25,35 Sq.mm
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
21 © Nokia 2015
M&G Model site – Installation Steps
AMOB , ASIA , ABIA
Airscale Quality Hand book Ver1.0
Modules Installed
AMOB with ABIA card and ASIA Card OFDB
OVP
RF Modules
GPS
DCDB
Airscale Quality Hand book Ver1.0
Plinth Grounding should be done before installation of AMOB Module
1. Installation - Plinth and Grounding
Wrist Strip to be used while handling module
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use
/Airscale%20Installation%20Videos/Plinth%20%26%20Grounding.mp4
• Plinth should be secured with minimum 4 Hex Bolts.
• Plinth Bolt should be tightened with correct torque.
• Grounding to be done on plinth from nearest grounding point (prefer EGB if nearby)
• Crimping of lugs to be done by hexagonal crimping tool only.
• Always Wear Anti Static Wrist Strap while handling modules
Airscale Quality Hand book Ver1.0
2. AMOB Installation – Padlock, Handle & Cover plates
Padlock Installation with
spanner
Handle Installation with T20 – 4
screws / handle
Cover Plates for Gland holes
Installation for top portion
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20basic%20Installation.mp4
• Security bracket is must to be Installed with AMOB & plinth with min 6 screws
• Padlock working properly, to be ensured after Installation
• Cover plates to be tightened properly on top side in vertical Installation
• AMOB should be grounded with Plinth using supplied double hole lugs
Security bracket should be Installed for
supporting AMOB with Plinth
Airscale Quality Hand book Ver1.0
3. AMOB Installation - FAN unit, Maintenance thread & Airflow
Fan position to be checked Maintenance thread to be
installed for FAN unit front
cover
Airflow should be Front to
Back in Vertical Installation
Airflow Back to Front in
Horizontal Installation
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20basic%20Installation.mp4
• Fan position to be checked as per horizontal or Vertical position
• Airflow should be front to back side in vertical installation
• Airflow should be back to front side in horizontal installation
• Maintenance thread should be installed for FAN unit front cover
• T20 torque driver with hole on tip to be used for changing FAN unit orientation
T20 torque driver with hole on tip
to be used for AMOB & FAN unit
Airscale Quality Hand book Ver1.0
4. AMOB Installation-FAN unit positioning
Change the FAN Position
FAN Remove FAN Position Chnge
FAN Closed FAN Front Cover
https://nokia.sharepoint.com/sites/SiSoQualityI
ndia/SiSo%20Quality%20Documents%20Nokia
%20Internal%20Use/Airscale%20Installation%2
0Videos/Fan%20unit%20position%20change1.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/Fan%20unit%20position%20change2.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/Fan%20unit%20position%20change3.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityI
ndia/SiSo%20Quality%20Documents%20Nokia
%20Internal%20Use/Airscale%20Installation%2
0Videos/Fan%20unit%20position%20change4.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/Fan%20Unit.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/FAN%20unit2.mp4
Airscale Quality Hand book Ver1.0
5. AMOB Installation- Security bracket & GND
Grounding to be done on AMOB upper side with
Flat portion of premade LUG
AMOB Installation on Plinth Security bracket should be Installed
for supporting AMOB with Plinth
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Inter
nal%20Use/Airscale%20Installation%20Videos/AMOB%20Installation%20-%20Security%20bracket.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20U
se/Airscale%20Installation%20Videos/AMOB%20grounding.mp4
• AMOB should be Installed on Plinth
• Security bracket should be Installed for supporting AMOB with Plinth
• Grounding should be done on AMOB upper side with Flat portion of premade LUG
Airscale Quality Hand book Ver1.0
6. AMOB Installation - CARD Installation
Installation of ASIA & ABIA card carefully by applying wrist strap on hand and ensure notch is properly tightened
ASIA ABIA
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20card%20Installation.mp4
• Installation of ASIA & ABIA to be ensured with notch is properly tightened
• Grounding should be done for ASIA card on cabinet of AMOB
• All unused slots should be covered with dummy plates
• Wrist strap to be used while card Installation
Airscale Quality Hand book Ver1.0
• OVP stands for Over Voltage Protection
• OVP should be installed on FPIA plate available.
• FPIA is to be Installed with help of Hose clamp.
• OVP power inlets & outlets should be sealed properly .
• OVP grounding is necessary & grounding cable should be routed from downward & grounded to AMOB plinth.
• OVP should be installed for System Module where Power cable length exceeds more than 10Mtr
• OVP can be installed backside of AMOB or on different Pole which is parallel or above the AMOB
• LUG must be used on Power cable at OVP power inlets & outlets
• XCMK Shield Grounding must be installed in OVP Grounding with 2.5 mm2 LUG
7. AMOB Installation -OVP Installation
OVP Install on back side of AMOB
with FPIA (using hose clamp)
Power cable termination at OVP
end from DCDB
Power cable OVP towards AMOB
https://nokia.sharepoint.com/sites/SiSoQualityIndia/Si
So%20Quality%20Documents%20Nokia%20Internal%2
0Use/Airscale%20Installation%20Videos/OVP%20Install
ation.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/
SiSo%20Quality%20Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20Videos/OVP%20I
nstallation-2.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/Si
So%20Quality%20Documents%20Nokia%20Internal%2
0Use/Airscale%20Installation%20Videos/OVP%20Install
ation-2.mp4
https://nokia.sharepoint.com/sites/SiSoQualit
yIndia/SiSo%20Quality%20Documents%20No
kia%20Internal%20Use/Airscale%20Installatio
n%20Videos/OVP%20-%20FPIA%20Inst.mp4
Airscale Quality Hand book Ver1.0
• OVP to DCDB Power cable should be crimped with Hexagonal crimping tool as per cross sectional area of cable.
• 16 Sqmm Power cable to be used from OVP to AMOB & crimped with 10 sq.mm bit for AMOB
• Insert 16 Sq.mm external power from OVP through M32 suggested gland inside AMOB.
• Tie to be applied on Anderson power connector.
• Power cable should be routed neatly inside cabinet.
8. AMOB Installation – Power cable
OVP to DCDB Power cable to be
crimped with proper crimping tool as
per cross sectional area of power cable
16 Sqmm Power cable to be used from
OVP to AMOB & crimped with 10
sq.mm bit for AMOB
Power cable tapping at AMOB end
Power cable tapping at OVP end
https://nokia.sharepoint.com/sites/
SiSoQualityIndia/SiSo%20Quality%2
0Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20
Videos/OVP%20power1.mp4
https://nokia.sharepoint.com/sites/
SiSoQualityIndia/SiSo%20Quality%2
0Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20
Videos/OVP%20Power2.mp4
https://nokia.sharepoint.com/sites/SiSoQ
ualityIndia/SiSo%20Quality%20Document
s%20Nokia%20Internal%20Use/Airscale%
20Installation%20Videos/AMOB%20Powe
r1.mp4
https://nokia.sharepoint.com/sites/
SiSoQualityIndia/SiSo%20Quality%2
0Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20
Videos/AMOB%20Power2.mp4
Tie to be applied on
Anderson power connector
Airscale Quality Hand book Ver1.0
9. AMOB Installation - DC power Cable
RF module Power cable tapping at
DCDB end
AMOB power cable from OVP to
DCDB/PP to be given to 63A MCB
All Power Cable XCMK Shield Grounding (OVP, DCDB & RF module end)
should be done with 2.5 mm2 Hole type LUG
• AMOB DC power should be terminated at 63A MCB
• All Power Cable XCMK Shield Grounding (OVP, DCDB & RF module end) should be done with 2.5 mm2 Hole type LUG
• Same color Installation tape to be used for Power cable at lug crimping end
Airscale Quality Hand book Ver1.0
10. AMOB Installation - ASIA power Cable & Grounding
Power cable connectivity from PDU of
AMOB to ASIA
Power taping for ASIA card is done by
Premade cable supplied in AMOB without
lug & is installed by clip
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents
%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ASIA%20power%2
0tapping.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents
%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ASIA%20groundin
g.mp4
ASIA grounded by using premade
grounding cable with grounding point on
AMOB
• Power cable connectivity from PDU of AMOB to ASIA should be routed properly & without hinderance to other cables
• Premade power cable is supplied with AMOB which is to be connected on ASIA without lugs
• The ASIA power cable clip needs to be ensured tightened properly and Power cable strands should not be visible
• All cables should be labelled properly
• 2 Gnd points of ASIA on AMOB should be secured with both grounding cables supplied with AMOB and connected to ASIA with angular end of lug
Airscale Quality Hand book Ver1.0
11. OFDB Installation & GND
OFDB to be Installed nearby AMOB on top position with help of hose
clamp
OFDB grounding point
OFDB grounding cable to be
connected on plinth of AMOB
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia
%20Internal%20Use/Airscale%20Installation%20Videos/ODF%20Installation.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20I
nternal%20Use/Airscale%20Installation%20Videos/ODF%20Installation2.mp4
• OFDB to be Installed nearby AMOB on top position with help of hose clamp
• OFDB grounding should be done on AMOB Plinth
• Optical cable groundings should be terminated at bus bar available with OFDB
• Optical cables from RF modules should be inserted from bottom side and routed through / tightened with screws inside OFDB
Airscale Quality Hand book Ver1.0
12.OFDB Installation-Flower cable
Flower cable – 2 Inlets from left side of OFDB Flower cable – Installation inside OFDB Flower cable – Installation inside AMOB,
Spiral conduit & welcro used for routing
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality
%20Documents%20Nokia%20Internal%20Use/Airscale%20Installatio
n%20Videos/ODF%20flower%20cable%20Installation1.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%
20Quality%20Documents%20Nokia%20Internal%20Use/Ai
rscale%20Installation%20Videos/ODF%20flower%20cable
%20Installation2.mp4
https://nokia.sharepoint.com/sites/SiSo
QualityIndia/SiSo%20Quality%20Docum
ents%20Nokia%20Internal%20Use/Airsc
ale%20Installation%20Videos/ODF%20fl
ower%20cable%20Installation3.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiS
o%20Quality%20Documents%20Nokia%20Internal%20U
se/Airscale%20Installation%20Videos/AMOB%20flower
%20cable%20Installation.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiS
o%20Quality%20Documents%20Nokia%20Internal%20U
se/Airscale%20Installation%20Videos/AMOB%20flower
%20cable%20Installation1.mp4
https://nokia.sharepoint.com/s
ites/SiSoQualityIndia/SiSo%20
Quality%20Documents%20Nok
ia%20Internal%20Use/Airscale
%20Installation%20Videos/AM
OB%20flower%20cable%20Inst
allation3.mp4
Upper cable entry used for Vertical port and extra cable should be role in 2nd roller
Lower cable entry used for horizontal port and extra cable should be role in 1st roller
• Flower cable – 2 Inlets from left side of OFDB
• Flower cable – Installation inside AMOB, Spiral conduit & Velcro to be used for routing
• Unused Optical ports IP cap to be secured
Airscale Quality Hand book Ver1.0
13.OFDB Installation-Optical cable
Optical cable Installation inside OFDB
12 Optical cable Inlet points and grounding
points in OFDB
Optical cable grounding Installation at OFDB
end – Y point to be covered by additional
tape to avoid water ingress
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use
/Airscale%20Installation%20Videos/ODF%20-%20Opt%20cable%20Connectivity1%20.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%
20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ODF%20-
%20Opt%20cable%20Connectivity2%20.mp4
Optical cable should be insert from bottom
right of OFDB and Grounding of Optical cable
connected on back side of OFDB
z
Left bottom cable entry used for horizontal
port and right bottom cable entry used for
vertical port and should secured with nut on
bottom side
• Optical cable grounding should be done on OFDB grounding points.
• Optical cable should be insert from bottom right of OFDB and tightened with nuts on bottom side inside OFDB.
• Left bottom cable entry to be used for horizontal port connectivity of OFDB and right bottom cable entry to be used for vertical port
• Grounding of Optical cable should be connected on back side bus bar of OFDB
Airscale Quality Hand book Ver1.0
2G 3G 4G TDD
1st Flower cable 2nd Flower cable
3G Cable
Port: 4/5/6
2G Cable
Port: 3
FD + 2G Cable
Port: 1 & 2
TDD Cable
Cable 1 (2G 3G 4G)
Cable 2 ( TDD)
Technology VS OFDB Connectivity
Airscale Quality Hand book Ver1.0
14. AMOB Installation - Cable Entry Glands
GPS and Alarm cable entry
through M32 glands
Optical Flower cable in through
M50 gland
Power cable entry to be done
through M32
LMP and Ethernet Media cable
entry through M32 glands
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos
/Gland%20%26%20Grommets%20Cable%20entry%20AMOB.mp4 Airscale Quality Hand book Ver1.0
FMCA cover should be cover with Plate for RF module
15. Installation of FMCA and LMP Jumper
LMP Jumper cable installed in AMOB for
login without opening door of AMOB
• FMCA top cover should be cover with Plate for RF module
Airscale Quality Hand book Ver1.0
16. Installation of RF modules with Torque Wrench
All jumpers should be tightened with Torque Wrench R
RF module Installation & Its grounding
• All jumper should be tightened with correct torque 25NM
• Power cable should be terminated at correct rated MCB
• Ensure labelling is done for all the cables Installed at RF module end.
Airscale Quality Hand book Ver1.0
17. Installation of Antenna & Jumper
R Antenna Installation with locknuts to be ensured Jumper routing should be done properly with tie
• Ensure ring washer on clamps
• Lock nut must be used for tightening GSM clamps
• Connectors must be properly weatherproofed
Airscale Quality Hand book Ver1.0
18. Installation of GPS & DDF
GPS to be installed with 180 deg open to sky DDF with Back mount frame grounding
• GPS to be installed with 180 deg open to sky
• DDF with Back mount frame grounding to be done
• Alarm cable shield grounding to be done at DDF end
Airscale Quality Hand book Ver1.0
19. LABELING-PLN,OVP and OFDB GND at Plinth
Air scale PLN GND
Air scale ODF GND
Air scale OVP GND
Airscale Quality Hand book Ver1.0
20. LABELING-POWER ,ALM,GPS and LAN at AMOB end
GPS-Air scale ASIx GPS
EAC-Air scale ASIx
ALM
LAN-Air scale ASIx TX
ASIA Power(Black)+ve –Air
Scale AMOB to ASIA PP
ASIA Power(Blue) (-ve) -Air
scale AMOB to ASIA PP
Airscale Quality Hand book Ver1.0
21. LABELING-Flower Optical cable at OFDB end
Flower OPT cable
1-Air scale FMS-
ASM-A
Flower OPT cable 2
-Air scale FMS-
ASM-B
Airscale Quality Hand book Ver1.0
Flower OPT cable
1-Air scale FMS-
ASM-A
Flower OPT cable 2
-Air scale FMS-
ASM-B
22. LABELING-Flower Optical cable at AMOB
Airscale Quality Hand book Ver1.0
23. LABELING-OVP Power Cable
OVP Output cable-Air scale OVP –
AMOB PDU
OVP input cable-Air scale OVP-PP
Airscale Quality Hand book Ver1.0
24. Labeling - AMOB PDU Power
OVP Output cable to AMOB cable-Air
scale OVP –AMOB PDU
AMOB MSB –Airscale AMOB OVP-
PP
Airscale Quality Hand book Ver1.0
25. LABELING-ALM at DDF
ALARM GND-Airscale DDF GND ALARM CABLE-Air scale ASIx ALM-1
Airscale Quality Hand book Ver1.0
26. LABELING- OPT at OFDB
OPT GND-CIPRI 1800-FR1/2-PLN
GND-SM-GND
OPTICAL CABLE-CIPRI SM-ABIx 1800-
FR1/2/3
Airscale Quality Hand book Ver1.0
27. LABELING-RF GND
RF Module gnd-1800-FR1/2/3-GND RF Module plinth gnd-1800-FR1/2/3-
PLN-GND
Airscale Quality Hand book Ver1.0
28. LABELING-RF Power and OPT
RF Module Power cable-1800-
FR1/2/3-PP
RF Module OPTICAL CABLE-CIPRI SM-
ABIx 1800-FR1/2/3
Airscale Quality Hand book Ver1.0
29. LABELING – Jumpers at RF end
RF Module to Antenna Jumper sector
1/2/3 TX- 1800-SEC1/2/3-ANTLN 1
RF Module to Antenna Jumper sector
1/2/3 RX- 1800-SEC1/2/3-ANTLN 2
Airscale Quality Hand book Ver1.0
RF Module to Antenna Jumper sector
1/2/3 TX- 1800-SEC1/2/3-ANTLN 1
RF Module to Antenna Jumper sector
1/2/3 RX- 1800-SEC1/2/3-ANTLN 2
WHITE -1ST SECTOR
RED-2ND SECTOR
BLUE -3RD SECOR
ANTLN 1 –TX
ANTLN2 -RX
30. LABELING – Jumpers at Antenna end
Airscale Quality Hand book Ver1.0
31. LABLING- RF POWER and GPS
GPS-Air scale ASIx GPS
AMOB Cable Routing (Grounding
& Power Cables)
Airscale Quality Hand book Ver1.0

Más contenido relacionado

La actualidad más candente

Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
Shahid Rasool
 
Interworking wcdma to lte
Interworking wcdma to lteInterworking wcdma to lte
Interworking wcdma to lte
bahar
 
LTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HOLTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HO
paulo_campolina
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
Shelton Siziba
 

La actualidad más candente (20)

LTE: X2 interface
LTE: X2 interfaceLTE: X2 interface
LTE: X2 interface
 
FDD_LTE_19_New_Feature_Document.pdf.pdf
FDD_LTE_19_New_Feature_Document.pdf.pdfFDD_LTE_19_New_Feature_Document.pdf.pdf
FDD_LTE_19_New_Feature_Document.pdf.pdf
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
 
Intermediate: 5G Network Architecture Options (Updated)
Intermediate: 5G Network Architecture Options (Updated)Intermediate: 5G Network Architecture Options (Updated)
Intermediate: 5G Network Architecture Options (Updated)
 
Deep Dive 5G NR-RAN Release 2018 Q4.pptx
Deep Dive 5G NR-RAN Release 2018 Q4.pptxDeep Dive 5G NR-RAN Release 2018 Q4.pptx
Deep Dive 5G NR-RAN Release 2018 Q4.pptx
 
Lte kpi accessability
Lte kpi accessabilityLte kpi accessability
Lte kpi accessability
 
5G Basic Call Flows.pdf
5G Basic Call Flows.pdf5G Basic Call Flows.pdf
5G Basic Call Flows.pdf
 
RAN - Intro, I&C & Basic Troubleshooting (3).pptx
RAN - Intro, I&C & Basic Troubleshooting (3).pptxRAN - Intro, I&C & Basic Troubleshooting (3).pptx
RAN - Intro, I&C & Basic Troubleshooting (3).pptx
 
3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization
 
Huawei gsm grfu introduction
Huawei gsm grfu introductionHuawei gsm grfu introduction
Huawei gsm grfu introduction
 
Interworking wcdma to lte
Interworking wcdma to lteInterworking wcdma to lte
Interworking wcdma to lte
 
1-NSA Basical Precedure Introduction -trainning 5G RADIO FREQUENCY EMERSON E...
1-NSA Basical  Precedure Introduction -trainning 5G RADIO FREQUENCY EMERSON E...1-NSA Basical  Precedure Introduction -trainning 5G RADIO FREQUENCY EMERSON E...
1-NSA Basical Precedure Introduction -trainning 5G RADIO FREQUENCY EMERSON E...
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini link
 
Nec neo microwave equipment introduction
Nec neo microwave equipment introductionNec neo microwave equipment introduction
Nec neo microwave equipment introduction
 
LTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HOLTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HO
 
Nokia LTE IP Planning Guide
Nokia LTE IP Planning GuideNokia LTE IP Planning Guide
Nokia LTE IP Planning Guide
 
Huawei umts node b configuration principle
Huawei umts node b configuration principleHuawei umts node b configuration principle
Huawei umts node b configuration principle
 
Huawei RET alarms Troubleshooting Guide Flow Chart
Huawei RET alarms Troubleshooting Guide   Flow Chart Huawei RET alarms Troubleshooting Guide   Flow Chart
Huawei RET alarms Troubleshooting Guide Flow Chart
 
ZTE-umts-congestion-control-feature-guide-v8-5-2011312
ZTE-umts-congestion-control-feature-guide-v8-5-2011312ZTE-umts-congestion-control-feature-guide-v8-5-2011312
ZTE-umts-congestion-control-feature-guide-v8-5-2011312
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
 

Similar a Airscale Model site Quality Handbook -.pdf

Similar a Airscale Model site Quality Handbook -.pdf (20)

Ornate Solar x Canadian Solar HiKu Series | High Efficiency Solar Panels
Ornate Solar x Canadian Solar HiKu Series | High Efficiency Solar PanelsOrnate Solar x Canadian Solar HiKu Series | High Efficiency Solar Panels
Ornate Solar x Canadian Solar HiKu Series | High Efficiency Solar Panels
 
01 verso en_0703
01 verso en_070301 verso en_0703
01 verso en_0703
 
RotorK process Controls
RotorK process ControlsRotorK process Controls
RotorK process Controls
 
1. naffco fm 200 clean-agent-system
1. naffco fm 200 clean-agent-system1. naffco fm 200 clean-agent-system
1. naffco fm 200 clean-agent-system
 
Air fiber af5_af5u_ug
Air fiber af5_af5u_ugAir fiber af5_af5u_ug
Air fiber af5_af5u_ug
 
Hazloc AEU1 Air Heater - Hazardous Area Explosion Proof ATEX Zone 1 Certified
Hazloc AEU1 Air Heater - Hazardous Area Explosion Proof ATEX Zone 1 CertifiedHazloc AEU1 Air Heater - Hazardous Area Explosion Proof ATEX Zone 1 Certified
Hazloc AEU1 Air Heater - Hazardous Area Explosion Proof ATEX Zone 1 Certified
 
Esco Pharma Product and Service Guide
Esco Pharma Product and Service GuideEsco Pharma Product and Service Guide
Esco Pharma Product and Service Guide
 
A105 06b fq range_an
A105 06b  fq range_anA105 06b  fq range_an
A105 06b fq range_an
 
Mitsubishi inverter freqrol-f700 series dienhathe.vn
Mitsubishi inverter freqrol-f700 series dienhathe.vnMitsubishi inverter freqrol-f700 series dienhathe.vn
Mitsubishi inverter freqrol-f700 series dienhathe.vn
 
Mitsubishi inverter freqrol-f700 series
Mitsubishi inverter freqrol-f700 seriesMitsubishi inverter freqrol-f700 series
Mitsubishi inverter freqrol-f700 series
 
Mitsubishi inverter freqrol-f700 series
Mitsubishi inverter freqrol-f700 seriesMitsubishi inverter freqrol-f700 series
Mitsubishi inverter freqrol-f700 series
 
Level Limit Switch-Soliswitch FTE31
Level Limit Switch-Soliswitch FTE31Level Limit Switch-Soliswitch FTE31
Level Limit Switch-Soliswitch FTE31
 
Air insulated sf6 ring main unit
Air insulated sf6 ring main unitAir insulated sf6 ring main unit
Air insulated sf6 ring main unit
 
Air insulated sf6 ring main unit
Air insulated sf6 ring main unitAir insulated sf6 ring main unit
Air insulated sf6 ring main unit
 
huawei-s1730s-s48p4s-a-brochure-datasheet.pdf
huawei-s1730s-s48p4s-a-brochure-datasheet.pdfhuawei-s1730s-s48p4s-a-brochure-datasheet.pdf
huawei-s1730s-s48p4s-a-brochure-datasheet.pdf
 
huawei-s5735s-l12t4s-a-brochure-datasheet.pdf
huawei-s5735s-l12t4s-a-brochure-datasheet.pdfhuawei-s5735s-l12t4s-a-brochure-datasheet.pdf
huawei-s5735s-l12t4s-a-brochure-datasheet.pdf
 
02 verso compact_en_0703
02 verso compact_en_070302 verso compact_en_0703
02 verso compact_en_0703
 
huawei-s5735s-s48p4x-a-brochure-datasheet.pdf
huawei-s5735s-s48p4x-a-brochure-datasheet.pdfhuawei-s5735s-s48p4x-a-brochure-datasheet.pdf
huawei-s5735s-s48p4x-a-brochure-datasheet.pdf
 
huawei-s5735-s48p4x-brochure-datasheet.pdf
huawei-s5735-s48p4x-brochure-datasheet.pdfhuawei-s5735-s48p4x-brochure-datasheet.pdf
huawei-s5735-s48p4x-brochure-datasheet.pdf
 
huawei-s5735-l48p4x-a-brochure-datasheet.pdf
huawei-s5735-l48p4x-a-brochure-datasheet.pdfhuawei-s5735-l48p4x-a-brochure-datasheet.pdf
huawei-s5735-l48p4x-a-brochure-datasheet.pdf
 

Más de HakeemUllah7

quinolones 08767565455688-Dr Sumera.pptx
quinolones 08767565455688-Dr Sumera.pptxquinolones 08767565455688-Dr Sumera.pptx
quinolones 08767565455688-Dr Sumera.pptx
HakeemUllah7
 
erythropoietin-56564564564646200819095519.pdf
erythropoietin-56564564564646200819095519.pdferythropoietin-56564564564646200819095519.pdf
erythropoietin-56564564564646200819095519.pdf
HakeemUllah7
 
ANTI INFLAM 7886786786868MATOR8998989989988 .pptx
ANTI INFLAM 7886786786868MATOR8998989989988 .pptxANTI INFLAM 7886786786868MATOR8998989989988 .pptx
ANTI INFLAM 7886786786868MATOR8998989989988 .pptx
HakeemUllah7
 
vocabulary-for-essays3457395739457394753975.pdf
vocabulary-for-essays3457395739457394753975.pdfvocabulary-for-essays3457395739457394753975.pdf
vocabulary-for-essays3457395739457394753975.pdf
HakeemUllah7
 
anti-inflammatorydrugs Pharma-130618095137-phpapp02.pptx
anti-inflammatorydrugs Pharma-130618095137-phpapp02.pptxanti-inflammatorydrugs Pharma-130618095137-phpapp02.pptx
anti-inflammatorydrugs Pharma-130618095137-phpapp02.pptx
HakeemUllah7
 
Routes of drugs dministration PDF For study.pdf
Routes of drugs dministration PDF For study.pdfRoutes of drugs dministration PDF For study.pdf
Routes of drugs dministration PDF For study.pdf
HakeemUllah7
 
Systems abd workibg on field eligibity is certification cleared0.pdf
Systems abd workibg on field eligibity is certification cleared0.pdfSystems abd workibg on field eligibity is certification cleared0.pdf
Systems abd workibg on field eligibity is certification cleared0.pdf
HakeemUllah7
 
Working on sites Cerateria has inceaed pdf
Working on sites Cerateria has inceaed pdfWorking on sites Cerateria has inceaed pdf
Working on sites Cerateria has inceaed pdf
HakeemUllah7
 
HUaweiQEHS certification in Systems and working on isiyes.pdf
HUaweiQEHS certification in Systems and working on isiyes.pdfHUaweiQEHS certification in Systems and working on isiyes.pdf
HUaweiQEHS certification in Systems and working on isiyes.pdf
HakeemUllah7
 
chw-09-Medication-Drug-Interaction.pptx
chw-09-Medication-Drug-Interaction.pptxchw-09-Medication-Drug-Interaction.pptx
chw-09-Medication-Drug-Interaction.pptx
HakeemUllah7
 

Más de HakeemUllah7 (20)

quinolones 08767565455688-Dr Sumera.pptx
quinolones 08767565455688-Dr Sumera.pptxquinolones 08767565455688-Dr Sumera.pptx
quinolones 08767565455688-Dr Sumera.pptx
 
Bacitracin Topical 01- Sumera Feroz.pptx
Bacitracin Topical 01- Sumera Feroz.pptxBacitracin Topical 01- Sumera Feroz.pptx
Bacitracin Topical 01- Sumera Feroz.pptx
 
erythropoietin-56564564564646200819095519.pdf
erythropoietin-56564564564646200819095519.pdferythropoietin-56564564564646200819095519.pdf
erythropoietin-56564564564646200819095519.pdf
 
ANTI INFLAM 7886786786868MATOR8998989989988 .pptx
ANTI INFLAM 7886786786868MATOR8998989989988 .pptxANTI INFLAM 7886786786868MATOR8998989989988 .pptx
ANTI INFLAM 7886786786868MATOR8998989989988 .pptx
 
vocabulary-for-essays3457395739457394753975.pdf
vocabulary-for-essays3457395739457394753975.pdfvocabulary-for-essays3457395739457394753975.pdf
vocabulary-for-essays3457395739457394753975.pdf
 
anti-inflammatorydrugs Pharma-130618095137-phpapp02.pptx
anti-inflammatorydrugs Pharma-130618095137-phpapp02.pptxanti-inflammatorydrugs Pharma-130618095137-phpapp02.pptx
anti-inflammatorydrugs Pharma-130618095137-phpapp02.pptx
 
Tricyclic Antidepressants slides ppt.pdf
Tricyclic Antidepressants slides ppt.pdfTricyclic Antidepressants slides ppt.pdf
Tricyclic Antidepressants slides ppt.pdf
 
Routes of drugs dministration PDF For study.pdf
Routes of drugs dministration PDF For study.pdfRoutes of drugs dministration PDF For study.pdf
Routes of drugs dministration PDF For study.pdf
 
Systems abd workibg on field eligibity is certification cleared0.pdf
Systems abd workibg on field eligibity is certification cleared0.pdfSystems abd workibg on field eligibity is certification cleared0.pdf
Systems abd workibg on field eligibity is certification cleared0.pdf
 
Working on sites Cerateria has inceaed pdf
Working on sites Cerateria has inceaed pdfWorking on sites Cerateria has inceaed pdf
Working on sites Cerateria has inceaed pdf
 
HUaweiQEHS certification in Systems and working on isiyes.pdf
HUaweiQEHS certification in Systems and working on isiyes.pdfHUaweiQEHS certification in Systems and working on isiyes.pdf
HUaweiQEHS certification in Systems and working on isiyes.pdf
 
chw-09-Medication-Drug-Interaction.pptx
chw-09-Medication-Drug-Interaction.pptxchw-09-Medication-Drug-Interaction.pptx
chw-09-Medication-Drug-Interaction.pptx
 
hepatitisb-180325204319.pptx
hepatitisb-180325204319.pptxhepatitisb-180325204319.pptx
hepatitisb-180325204319.pptx
 
SGME1SAEHS809234332085688.pdf
SGME1SAEHS809234332085688.pdfSGME1SAEHS809234332085688.pdf
SGME1SAEHS809234332085688.pdf
 
Drugs for Diarrhea and IBS.pptx
Drugs for Diarrhea and IBS.pptxDrugs for Diarrhea and IBS.pptx
Drugs for Diarrhea and IBS.pptx
 
antidiarreaolsims-171025144324.pdf
antidiarreaolsims-171025144324.pdfantidiarreaolsims-171025144324.pdf
antidiarreaolsims-171025144324.pdf
 
diuretics-171130131557.pdf
diuretics-171130131557.pdfdiuretics-171130131557.pdf
diuretics-171130131557.pdf
 
skeletalmusclerelaxants-161103031625.pdf
skeletalmusclerelaxants-161103031625.pdfskeletalmusclerelaxants-161103031625.pdf
skeletalmusclerelaxants-161103031625.pdf
 
antidiarrhoealagent-140715002700-phpapp01.pdf
antidiarrhoealagent-140715002700-phpapp01.pdfantidiarrhoealagent-140715002700-phpapp01.pdf
antidiarrhoealagent-140715002700-phpapp01.pdf
 
quinolones-170308055400.pptx
quinolones-170308055400.pptxquinolones-170308055400.pptx
quinolones-170308055400.pptx
 

Último

Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
FIDO Alliance
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
FIDO Alliance
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
panagenda
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
UXDXConf
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
UK Journal
 

Último (20)

Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The InsideCollecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 

Airscale Model site Quality Handbook -.pdf

  • 1. 1 © Nokia 2015 Air Scale Quality Installation Presentation Author Rajshekhar Bhushetty Girish Kshirsagar Reviewer Harvinder Rana Surender Chandra Vikas Dhar Approved by Rajnish Sarin Vinay P Mishra Airscale Quality Hand book Ver1.0
  • 2. Airscale Introduction AirScale OUTDOOR Subrack AMOB P7 status Stand-alone AMOB AMOB stacked with Flexi modules • IP55 environmental protection for AirScale indoor System Module • Height: 8 HU and weigh 23kg (bear subrack) • High performance Heat Exchanger technology for thermal management • Operating temp range -40C up to +55C without solar radiation • Cold start from -40°C to -5°C with optional heater(s) • Compatible with Flexi BTS mechanics stack/wall/pole/rack installation • Possibility to install AMOB on top of the Flexi stack (3 flexi radios under AMOB in the stack for Zone 4 and 5 flexi radios for Zone 2) • Supporting other modules above AMOB with additional stacking kit (under testing) • Compatible with the 3rd part 19" racks and cabinets if clearances and airflow requirements are followed • Possible to install AMOB inside FCOA cabinet • Service doors on front and rear sides • Cable entry solution based on conduits/cable glands HEX 4HU Box for Air Scale modules 4HU Dimensions mm Inches Height 354 14 Width 487 19 Depth 605 24 Asset Weight (Kg) Weight (lbs) AMOB Cabinet 23 51 AirScale Common Unit board (ASIA) (Core Module) 3 7 ABIA (Expansion Module) 2 4 ½ Capacity (1 Core + 3 Expansion) 32 70 Full Capacity (2 Core + 6 Expansion) 41 90 AMOB inside FCOA (3 positions possible) AMOB on the pole/wall Airscale Quality Hand book Ver1.0
  • 3. Height 8U (354.8mm) Width (front cover) 487mm Width (cabinet) 448mm (fits into 19 inch rack) 487mm without conduits Depth Total 605mm 472mm from rack mounting point Weight 23 kg (exclude ASMI plug-in modules) Ingress Protection IP55 Operating Temperature -40°C up to +55°C (without solar radiation) Installation Temperature -20°C up to +55°C Airflow Direction Back to front airflow direction supported for Horizontal installation (FCOA, 19” rack, Flexi stack ) Front to back airflow direction supported for Vertical installation (wall and pole mounting case) Cold start ~2h from -40°C to -5°C *Optional 2nd heater can be added to meet Telcordia GR requirement, cold start from -40°C to -5°C in 1 hour instead of 2 hours Nominal supply voltage Input voltage range -40.5 … -57 V DC Extended Service Voltage Range supported -36Vdc .. -60Vdc Floating Volume 104.5L Mass capacity Support Max 18Kg inside Power consumption 135W @ 25°C (fans) 265W (with 40W tolerance) @ +55°C (all fans at highest speed) Cold start @ -40°C ~600W (1 heater ON 550W (inrush 22A) + fans at low speed) 40W @ 0°C (no heater, fans at low speed) Conduit cable entry 2x1.5” + 3x 1” on each left and right side (6x1” and 4x1,5” in total) AMOB - Exploded View Heat Exchanger cooling contains fluorinated greenhouse gases Hermetically sealed Refrigerant: HFC-134a GWP value = 1430 System charge weight = 0.65Kg Airscale Introduction Airscale Quality Hand book Ver1.0
  • 4. AMOB – Front view, door removed AirScale Common Unit board (ASIA) AirScale Common Module (1-2) ABIA AirScale Capacity Module (1-6) FYGM 473394A GPS Module and AMFL 474422A GPS installation kit for AMOB Heater (one by default, one extra in option) AMFI 474419A Power Distribution Unit ESD point Airscale Introduction Airscale Quality Hand book Ver1.0
  • 5. AMOB - Mounting Options – Wall & Pole • AMOB can be mounted directly to: • a wall using: AMFH + FMFA •A pole using: AMFH + FPKA •The stack mounting bracket from AMFH kit is not used for wall/pole mounting. FMFA - Flexi Mounting kit (470149A) plinth FPKA Flexi Pole Kit (471649A) Right angle conduits on the top side 2x 1.5” and 2x 1.0”(another 1x 1.0” for backup) Straight conduits on the bottom side 2x 1.5” and 3x 1.0” Lift points AMFH Stack/ Wall/ Pole installation kit (474418A) includes: - Stack mounting bracket - front plastic cover - Security bracket Airscale Introduction Airscale Quality Hand book Ver1.0
  • 6. Right Size Entry Glands for Cable entry M50 M32 Airscale Quality Hand book Ver1.0
  • 7. S.No Item Specification S.No Item Specification 1 Site Master 23 Drilling Machine and Drill set 2 Screw driver set 1 Set 24 Tool Bag 3 Bit Holder Magnetic, size 1.4 ,Length 100 mm 25 Pulley Block 4 TORX Screw driver set T-10,T-15,T-20,T-25,T-30 26 Rope 1 nos 5 Ball end hex key sets 2-2.5,3,4,5,6,8 27 Krone Tool 6 Combination Pliers 28 ESD Wrist Strap 7 Combination spanners Size-13,15,16,17,19,24,27,30,32 29 Monkey Wrench 8 Tie Cutter 30 RJ 45/RJ11 crimping tool 9 Scissors Fiskars 9891 31 Allen Key Set 10 Utility Knife 32 Electric Soldering Piston W 61C 11 Hacksaw 33 Electrical Soldering Tin 1 mm 12 Co-axial Cable stripper 34 Chisel 13 Wire Stripper 35 Marker Pen or Comparable tool 14 Plastic Head hammer 36 Cleaner Spray 15 File Round 6" and Flat 8" 37 LAN cable Tester 16 Digital Multimeter 38 Power Extension Board 17 Brush 39 Hammer 18 Measuring Tape Upto 35 metre 40 Power Cable cutter 19 Spirit Level 41 Laser Torch 20 Crimping Tool T-2600 or Equivalent 42 Binocular 21 Torque Wrench 1 43 T20 Screw Driver with hole Tip 22 Compass Tool’s List for Installing AIRSCALE Airscale Quality Hand book Ver1.0
  • 8. Infra & Power Requirements • 1 MCB of 63 A required for System Module. • Space for GPS is required on Sites where ever we are installing / swapping TDD , location open to sky with 180 degree access. • Space for RF module is required near the antenna ( for New Installation). • 1 MCB of 32 A ( 2G, 3G, FD) or 16A ( FZNI or AZNA) required for RF Module. • 1 Pole for System module is required in Case of New Installation • In case of Swap we will try to use existing Location of TDD BTS • Antenna strategy will depend on what is the scope, for swap we don’t have to change anything but in case of New Deployment 1 Pole per Antenna is required. • Space for Installing OFDB on pole or tower leg. Airscale Quality Hand book Ver1.0
  • 9. ASIA Air Scale Common ➢ -One ASIA Card ➢ -One Grounding Cable -with Two Screws ASIA Grounding Cable Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 10. ABIA Air Scale Capacity ➢ One ABIA Card ABIA Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 11. AMOB AirScale Subrack ➢ One AMOB Cabinet ➢ One Site Bag with Accessories AMOB Site Bag Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 12. Accessories supplied with AMOB Glands Grommets Lifting handle, Padlock bracket, Key, Anderson power connector with Lugs, premade Gr cable for ASIA, Gr lugs for AMOB, Plates for covering gland openings, Hex nut, hexalobular pan Washers Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 13. FSES Flexi Ext. Semi-integrated OVP ➢ One FSES OVP with prefixed Power and GND Cable ➢ Screw and Bolts FMFA FLEXI MOUNTING KIT FLOOR/WALL/POLE ➢ One FMFA Plinth ➢ Screw and Bolts FPKA Flexi Pole Installation Kit ➢ Two FPKA Pole Mounting Kit with Locking Bracket OD kit HW Delivery Content Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 14. AMFH Stack installation kit ➢ One Base Plate ➢ One Security Bracket ➢ One Security Thread band ➢ One AMOB Heat Exchanger Front Cover ➢ Screws Base Plate Security Bracket Security Thread band AMOB Heat Exchanger Front Cover OD kit HW Delivery Content Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 15. FPIA Flexi Pole Installation Kit ➢ One Pole Fixing Plate ➢ One Hose Clamp ➢ Screws AMFF Blind panel ➢ One Blank Dummy Plate OD kit HW Delivery Content Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 16. AMFK Cable glands for AMOB ➢ 1 x Cable glands on the AMOB left side (2 x 1.5 inch, 3 x 1.0 inch) Airscale HW Introduction OD kit HW Delivery Content Airscale Quality Hand book Ver1.0
  • 17. AMFS Glands Rubber Boot for AMOB Airscale HW Introduction OD kit HW Delivery Content Airscale Quality Hand book Ver1.0
  • 18. OFDB (FODA) ➢ One FODA for every 12 CPRI Cable Pl. Note : OFDB is mountable only on wall and Pole Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 19. IM Kit Supplied with Air scale 3G (2100) Label set LTE (2300/2600) Label set Airscale mod Label set 2G (900/1800) Label set Labelling set Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 20. IM Kit Supplied with Air scale Other IM Tie, Tape, Saddle, Welcro, Spiral conduit Grouting bolt & Washers FMCA top cover plate C clamp for grounding Lugs – 2.5,10,16,25,35 Sq.mm Airscale HW Introduction Airscale Quality Hand book Ver1.0
  • 21. 21 © Nokia 2015 M&G Model site – Installation Steps AMOB , ASIA , ABIA Airscale Quality Hand book Ver1.0
  • 22. Modules Installed AMOB with ABIA card and ASIA Card OFDB OVP RF Modules GPS DCDB Airscale Quality Hand book Ver1.0
  • 23. Plinth Grounding should be done before installation of AMOB Module 1. Installation - Plinth and Grounding Wrist Strip to be used while handling module https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use /Airscale%20Installation%20Videos/Plinth%20%26%20Grounding.mp4 • Plinth should be secured with minimum 4 Hex Bolts. • Plinth Bolt should be tightened with correct torque. • Grounding to be done on plinth from nearest grounding point (prefer EGB if nearby) • Crimping of lugs to be done by hexagonal crimping tool only. • Always Wear Anti Static Wrist Strap while handling modules Airscale Quality Hand book Ver1.0
  • 24. 2. AMOB Installation – Padlock, Handle & Cover plates Padlock Installation with spanner Handle Installation with T20 – 4 screws / handle Cover Plates for Gland holes Installation for top portion https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20basic%20Installation.mp4 • Security bracket is must to be Installed with AMOB & plinth with min 6 screws • Padlock working properly, to be ensured after Installation • Cover plates to be tightened properly on top side in vertical Installation • AMOB should be grounded with Plinth using supplied double hole lugs Security bracket should be Installed for supporting AMOB with Plinth Airscale Quality Hand book Ver1.0
  • 25. 3. AMOB Installation - FAN unit, Maintenance thread & Airflow Fan position to be checked Maintenance thread to be installed for FAN unit front cover Airflow should be Front to Back in Vertical Installation Airflow Back to Front in Horizontal Installation https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20basic%20Installation.mp4 • Fan position to be checked as per horizontal or Vertical position • Airflow should be front to back side in vertical installation • Airflow should be back to front side in horizontal installation • Maintenance thread should be installed for FAN unit front cover • T20 torque driver with hole on tip to be used for changing FAN unit orientation T20 torque driver with hole on tip to be used for AMOB & FAN unit Airscale Quality Hand book Ver1.0
  • 26. 4. AMOB Installation-FAN unit positioning Change the FAN Position FAN Remove FAN Position Chnge FAN Closed FAN Front Cover https://nokia.sharepoint.com/sites/SiSoQualityI ndia/SiSo%20Quality%20Documents%20Nokia %20Internal%20Use/Airscale%20Installation%2 0Videos/Fan%20unit%20position%20change1. mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q uality%20Documents%20Nokia%20Internal%20Use/Airscale%2 0Installation%20Videos/Fan%20unit%20position%20change2. mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q uality%20Documents%20Nokia%20Internal%20Use/Airscale%2 0Installation%20Videos/Fan%20unit%20position%20change3. mp4 https://nokia.sharepoint.com/sites/SiSoQualityI ndia/SiSo%20Quality%20Documents%20Nokia %20Internal%20Use/Airscale%20Installation%2 0Videos/Fan%20unit%20position%20change4. mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q uality%20Documents%20Nokia%20Internal%20Use/Airscale%2 0Installation%20Videos/Fan%20Unit.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q uality%20Documents%20Nokia%20Internal%20Use/Airscale%2 0Installation%20Videos/FAN%20unit2.mp4 Airscale Quality Hand book Ver1.0
  • 27. 5. AMOB Installation- Security bracket & GND Grounding to be done on AMOB upper side with Flat portion of premade LUG AMOB Installation on Plinth Security bracket should be Installed for supporting AMOB with Plinth https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Inter nal%20Use/Airscale%20Installation%20Videos/AMOB%20Installation%20-%20Security%20bracket.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20U se/Airscale%20Installation%20Videos/AMOB%20grounding.mp4 • AMOB should be Installed on Plinth • Security bracket should be Installed for supporting AMOB with Plinth • Grounding should be done on AMOB upper side with Flat portion of premade LUG Airscale Quality Hand book Ver1.0
  • 28. 6. AMOB Installation - CARD Installation Installation of ASIA & ABIA card carefully by applying wrist strap on hand and ensure notch is properly tightened ASIA ABIA https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20card%20Installation.mp4 • Installation of ASIA & ABIA to be ensured with notch is properly tightened • Grounding should be done for ASIA card on cabinet of AMOB • All unused slots should be covered with dummy plates • Wrist strap to be used while card Installation Airscale Quality Hand book Ver1.0
  • 29. • OVP stands for Over Voltage Protection • OVP should be installed on FPIA plate available. • FPIA is to be Installed with help of Hose clamp. • OVP power inlets & outlets should be sealed properly . • OVP grounding is necessary & grounding cable should be routed from downward & grounded to AMOB plinth. • OVP should be installed for System Module where Power cable length exceeds more than 10Mtr • OVP can be installed backside of AMOB or on different Pole which is parallel or above the AMOB • LUG must be used on Power cable at OVP power inlets & outlets • XCMK Shield Grounding must be installed in OVP Grounding with 2.5 mm2 LUG 7. AMOB Installation -OVP Installation OVP Install on back side of AMOB with FPIA (using hose clamp) Power cable termination at OVP end from DCDB Power cable OVP towards AMOB https://nokia.sharepoint.com/sites/SiSoQualityIndia/Si So%20Quality%20Documents%20Nokia%20Internal%2 0Use/Airscale%20Installation%20Videos/OVP%20Install ation.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/ SiSo%20Quality%20Documents%20Nokia%20Internal %20Use/Airscale%20Installation%20Videos/OVP%20I nstallation-2.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/Si So%20Quality%20Documents%20Nokia%20Internal%2 0Use/Airscale%20Installation%20Videos/OVP%20Install ation-2.mp4 https://nokia.sharepoint.com/sites/SiSoQualit yIndia/SiSo%20Quality%20Documents%20No kia%20Internal%20Use/Airscale%20Installatio n%20Videos/OVP%20-%20FPIA%20Inst.mp4 Airscale Quality Hand book Ver1.0
  • 30. • OVP to DCDB Power cable should be crimped with Hexagonal crimping tool as per cross sectional area of cable. • 16 Sqmm Power cable to be used from OVP to AMOB & crimped with 10 sq.mm bit for AMOB • Insert 16 Sq.mm external power from OVP through M32 suggested gland inside AMOB. • Tie to be applied on Anderson power connector. • Power cable should be routed neatly inside cabinet. 8. AMOB Installation – Power cable OVP to DCDB Power cable to be crimped with proper crimping tool as per cross sectional area of power cable 16 Sqmm Power cable to be used from OVP to AMOB & crimped with 10 sq.mm bit for AMOB Power cable tapping at AMOB end Power cable tapping at OVP end https://nokia.sharepoint.com/sites/ SiSoQualityIndia/SiSo%20Quality%2 0Documents%20Nokia%20Internal %20Use/Airscale%20Installation%20 Videos/OVP%20power1.mp4 https://nokia.sharepoint.com/sites/ SiSoQualityIndia/SiSo%20Quality%2 0Documents%20Nokia%20Internal %20Use/Airscale%20Installation%20 Videos/OVP%20Power2.mp4 https://nokia.sharepoint.com/sites/SiSoQ ualityIndia/SiSo%20Quality%20Document s%20Nokia%20Internal%20Use/Airscale% 20Installation%20Videos/AMOB%20Powe r1.mp4 https://nokia.sharepoint.com/sites/ SiSoQualityIndia/SiSo%20Quality%2 0Documents%20Nokia%20Internal %20Use/Airscale%20Installation%20 Videos/AMOB%20Power2.mp4 Tie to be applied on Anderson power connector Airscale Quality Hand book Ver1.0
  • 31. 9. AMOB Installation - DC power Cable RF module Power cable tapping at DCDB end AMOB power cable from OVP to DCDB/PP to be given to 63A MCB All Power Cable XCMK Shield Grounding (OVP, DCDB & RF module end) should be done with 2.5 mm2 Hole type LUG • AMOB DC power should be terminated at 63A MCB • All Power Cable XCMK Shield Grounding (OVP, DCDB & RF module end) should be done with 2.5 mm2 Hole type LUG • Same color Installation tape to be used for Power cable at lug crimping end Airscale Quality Hand book Ver1.0
  • 32. 10. AMOB Installation - ASIA power Cable & Grounding Power cable connectivity from PDU of AMOB to ASIA Power taping for ASIA card is done by Premade cable supplied in AMOB without lug & is installed by clip https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents %20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ASIA%20power%2 0tapping.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents %20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ASIA%20groundin g.mp4 ASIA grounded by using premade grounding cable with grounding point on AMOB • Power cable connectivity from PDU of AMOB to ASIA should be routed properly & without hinderance to other cables • Premade power cable is supplied with AMOB which is to be connected on ASIA without lugs • The ASIA power cable clip needs to be ensured tightened properly and Power cable strands should not be visible • All cables should be labelled properly • 2 Gnd points of ASIA on AMOB should be secured with both grounding cables supplied with AMOB and connected to ASIA with angular end of lug Airscale Quality Hand book Ver1.0
  • 33. 11. OFDB Installation & GND OFDB to be Installed nearby AMOB on top position with help of hose clamp OFDB grounding point OFDB grounding cable to be connected on plinth of AMOB https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia %20Internal%20Use/Airscale%20Installation%20Videos/ODF%20Installation.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20I nternal%20Use/Airscale%20Installation%20Videos/ODF%20Installation2.mp4 • OFDB to be Installed nearby AMOB on top position with help of hose clamp • OFDB grounding should be done on AMOB Plinth • Optical cable groundings should be terminated at bus bar available with OFDB • Optical cables from RF modules should be inserted from bottom side and routed through / tightened with screws inside OFDB Airscale Quality Hand book Ver1.0
  • 34. 12.OFDB Installation-Flower cable Flower cable – 2 Inlets from left side of OFDB Flower cable – Installation inside OFDB Flower cable – Installation inside AMOB, Spiral conduit & welcro used for routing https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality %20Documents%20Nokia%20Internal%20Use/Airscale%20Installatio n%20Videos/ODF%20flower%20cable%20Installation1.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo% 20Quality%20Documents%20Nokia%20Internal%20Use/Ai rscale%20Installation%20Videos/ODF%20flower%20cable %20Installation2.mp4 https://nokia.sharepoint.com/sites/SiSo QualityIndia/SiSo%20Quality%20Docum ents%20Nokia%20Internal%20Use/Airsc ale%20Installation%20Videos/ODF%20fl ower%20cable%20Installation3.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiS o%20Quality%20Documents%20Nokia%20Internal%20U se/Airscale%20Installation%20Videos/AMOB%20flower %20cable%20Installation.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiS o%20Quality%20Documents%20Nokia%20Internal%20U se/Airscale%20Installation%20Videos/AMOB%20flower %20cable%20Installation1.mp4 https://nokia.sharepoint.com/s ites/SiSoQualityIndia/SiSo%20 Quality%20Documents%20Nok ia%20Internal%20Use/Airscale %20Installation%20Videos/AM OB%20flower%20cable%20Inst allation3.mp4 Upper cable entry used for Vertical port and extra cable should be role in 2nd roller Lower cable entry used for horizontal port and extra cable should be role in 1st roller • Flower cable – 2 Inlets from left side of OFDB • Flower cable – Installation inside AMOB, Spiral conduit & Velcro to be used for routing • Unused Optical ports IP cap to be secured Airscale Quality Hand book Ver1.0
  • 35. 13.OFDB Installation-Optical cable Optical cable Installation inside OFDB 12 Optical cable Inlet points and grounding points in OFDB Optical cable grounding Installation at OFDB end – Y point to be covered by additional tape to avoid water ingress https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use /Airscale%20Installation%20Videos/ODF%20-%20Opt%20cable%20Connectivity1%20.mp4 https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents% 20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ODF%20- %20Opt%20cable%20Connectivity2%20.mp4 Optical cable should be insert from bottom right of OFDB and Grounding of Optical cable connected on back side of OFDB z Left bottom cable entry used for horizontal port and right bottom cable entry used for vertical port and should secured with nut on bottom side • Optical cable grounding should be done on OFDB grounding points. • Optical cable should be insert from bottom right of OFDB and tightened with nuts on bottom side inside OFDB. • Left bottom cable entry to be used for horizontal port connectivity of OFDB and right bottom cable entry to be used for vertical port • Grounding of Optical cable should be connected on back side bus bar of OFDB Airscale Quality Hand book Ver1.0
  • 36. 2G 3G 4G TDD 1st Flower cable 2nd Flower cable 3G Cable Port: 4/5/6 2G Cable Port: 3 FD + 2G Cable Port: 1 & 2 TDD Cable Cable 1 (2G 3G 4G) Cable 2 ( TDD) Technology VS OFDB Connectivity Airscale Quality Hand book Ver1.0
  • 37. 14. AMOB Installation - Cable Entry Glands GPS and Alarm cable entry through M32 glands Optical Flower cable in through M50 gland Power cable entry to be done through M32 LMP and Ethernet Media cable entry through M32 glands https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos /Gland%20%26%20Grommets%20Cable%20entry%20AMOB.mp4 Airscale Quality Hand book Ver1.0
  • 38. FMCA cover should be cover with Plate for RF module 15. Installation of FMCA and LMP Jumper LMP Jumper cable installed in AMOB for login without opening door of AMOB • FMCA top cover should be cover with Plate for RF module Airscale Quality Hand book Ver1.0
  • 39. 16. Installation of RF modules with Torque Wrench All jumpers should be tightened with Torque Wrench R RF module Installation & Its grounding • All jumper should be tightened with correct torque 25NM • Power cable should be terminated at correct rated MCB • Ensure labelling is done for all the cables Installed at RF module end. Airscale Quality Hand book Ver1.0
  • 40. 17. Installation of Antenna & Jumper R Antenna Installation with locknuts to be ensured Jumper routing should be done properly with tie • Ensure ring washer on clamps • Lock nut must be used for tightening GSM clamps • Connectors must be properly weatherproofed Airscale Quality Hand book Ver1.0
  • 41. 18. Installation of GPS & DDF GPS to be installed with 180 deg open to sky DDF with Back mount frame grounding • GPS to be installed with 180 deg open to sky • DDF with Back mount frame grounding to be done • Alarm cable shield grounding to be done at DDF end Airscale Quality Hand book Ver1.0
  • 42. 19. LABELING-PLN,OVP and OFDB GND at Plinth Air scale PLN GND Air scale ODF GND Air scale OVP GND Airscale Quality Hand book Ver1.0
  • 43. 20. LABELING-POWER ,ALM,GPS and LAN at AMOB end GPS-Air scale ASIx GPS EAC-Air scale ASIx ALM LAN-Air scale ASIx TX ASIA Power(Black)+ve –Air Scale AMOB to ASIA PP ASIA Power(Blue) (-ve) -Air scale AMOB to ASIA PP Airscale Quality Hand book Ver1.0
  • 44. 21. LABELING-Flower Optical cable at OFDB end Flower OPT cable 1-Air scale FMS- ASM-A Flower OPT cable 2 -Air scale FMS- ASM-B Airscale Quality Hand book Ver1.0
  • 45. Flower OPT cable 1-Air scale FMS- ASM-A Flower OPT cable 2 -Air scale FMS- ASM-B 22. LABELING-Flower Optical cable at AMOB Airscale Quality Hand book Ver1.0
  • 46. 23. LABELING-OVP Power Cable OVP Output cable-Air scale OVP – AMOB PDU OVP input cable-Air scale OVP-PP Airscale Quality Hand book Ver1.0
  • 47. 24. Labeling - AMOB PDU Power OVP Output cable to AMOB cable-Air scale OVP –AMOB PDU AMOB MSB –Airscale AMOB OVP- PP Airscale Quality Hand book Ver1.0
  • 48. 25. LABELING-ALM at DDF ALARM GND-Airscale DDF GND ALARM CABLE-Air scale ASIx ALM-1 Airscale Quality Hand book Ver1.0
  • 49. 26. LABELING- OPT at OFDB OPT GND-CIPRI 1800-FR1/2-PLN GND-SM-GND OPTICAL CABLE-CIPRI SM-ABIx 1800- FR1/2/3 Airscale Quality Hand book Ver1.0
  • 50. 27. LABELING-RF GND RF Module gnd-1800-FR1/2/3-GND RF Module plinth gnd-1800-FR1/2/3- PLN-GND Airscale Quality Hand book Ver1.0
  • 51. 28. LABELING-RF Power and OPT RF Module Power cable-1800- FR1/2/3-PP RF Module OPTICAL CABLE-CIPRI SM- ABIx 1800-FR1/2/3 Airscale Quality Hand book Ver1.0
  • 52. 29. LABELING – Jumpers at RF end RF Module to Antenna Jumper sector 1/2/3 TX- 1800-SEC1/2/3-ANTLN 1 RF Module to Antenna Jumper sector 1/2/3 RX- 1800-SEC1/2/3-ANTLN 2 Airscale Quality Hand book Ver1.0
  • 53. RF Module to Antenna Jumper sector 1/2/3 TX- 1800-SEC1/2/3-ANTLN 1 RF Module to Antenna Jumper sector 1/2/3 RX- 1800-SEC1/2/3-ANTLN 2 WHITE -1ST SECTOR RED-2ND SECTOR BLUE -3RD SECOR ANTLN 1 –TX ANTLN2 -RX 30. LABELING – Jumpers at Antenna end Airscale Quality Hand book Ver1.0
  • 54. 31. LABLING- RF POWER and GPS GPS-Air scale ASIx GPS AMOB Cable Routing (Grounding & Power Cables) Airscale Quality Hand book Ver1.0