SlideShare una empresa de Scribd logo
1 de 10
The Plastic Still
Fabrication and Assembly Instructions

Prepared by: Jim Baker
• Basic Design
This still is basically a Charles 803 design which produces 190 proof
alcohol in one pass. The water/alcohol steam passes through a cooled
chamber, the water vapor cools and drops out and the alcohol vapor
passes on into a cooling chamber, liquefies and is collected.

• Materials
Three inch Schedule 40 PVC pipe is used for the main body. The pipe
connecting the upper and lower sections is 1 ½ inch PVC pipe. The
feed throughs are ½ inch CPVC which is exactly 7/8 inch OD. CPVC
cement or universal cement is used for connections. Two part white
boat epoxy that comes in a stick from Wal-Mart is useful to strengthen
feed throughs.
Note: Although the PVC will hold up at the 200F temperatures, it is
flexible at that temp. Support the Still so it is not subjected to any
bending or squeezing. Note the mounting on the previous photo.
•

Tools

The only tools required are:
1.
Drill press with a vise.
2.
Miter saw
3.
Rat tail file
4.
Sand Paper
5.
7/8 inch drill bit
6.
¼ inch drill bit
7.
1 7/8 inch hole saw for tube into condenser.
• Parts
The exploded view of the Still shows dimensions and the parts.
All of these parts except the marbles can be purchased at
Lowe’s or Home Depot. The marbles were found at Dollar Tree.
About 5 bags for $1 each were used.
Washer drain hose is great for connecting boiler to still. The
hose ID is 7/8 inch.
The steam discharge nozzle should point down and be at the
same level as the low proof (water) overflow. Drill enough
holes in the outlet cap to equal the area of the ½ “ pipe. Put
one hole in the top of the elbow so steam can go upward
toward the marbles.
• Fabrication
1.
2.
3.

4.
5.
6.

The output side of the still is on the right and the inputs on the left. This
avoids interferences.
Cut and drill the components first. Drill the 7/8” holes straight into the
pipes and adapters. This hole size just fits the ½”CPVC. Test the fit of the
½ “ tube into a 7/8 “ hole to ensure compatibility.
Drill through the 3”x1 ½ “ bottom adapter of the condenser with a 1 7/8”
hole saw to allow the 1 ½ “ pipe to pass through. You might try installing
a section of 1 ½” pipe directly on the top of the adapter rather than drilling
through. Bevel the end and cement in place. The section of 1 ½ “ tube
above the adapter must stay put or the condenser won’t work.
Drill through the brass adapters with a ¼” drill. This is to allow the ¼”
tubing to pass through.
Trim the SS shower drain plate to fit inside the 3” tube.
Wrap copper tubing around a 1 ½ “ pipe to form the coils. Hold the 1 ½ “
tube and go around it with the as purchased coil. Don’t try to start with a
straight piece of copper tubing. Leave at least a 1 foot tail on each end of
the coil to go through the top of the sections. Pull the finished coils out to
reach bottom of sections. Leave enough space for marbles to pass through
the coils in the separator.
Caution: Do the assembly in order or you can end up with some embarrassing
situations.

•

Assembly

1.
2.

Install ½” CPVC penetrations into the 3” tubes, caps and adapters with cement. Note:
do not install the ½” steam inlet tube yet.
Steam Inlet: Insert the ½ “ tube through the hole in the coupling and then cement the
nozzle onto the inside end. Push the tube back out and add cement and push back in
until nozzle is in the proper place. Add boat epoxy around tube on outside to
strengthen connection.

3.

Drain Plate: Place the plate about 3” into the bottom of the separator section and then
glue in the split ring support to hold it in place.

4.

Copper coil in separator: Stretch the coil to reach the plate and with the top coil below
the Temperature probe penetration. The two tails should extend above the top of the 3”
tube.

5.

Add the marbles up to the top coil and shake into place. Marbles must be on the inside
and outside of the coils.

6.
7.
8.
9.

Place the 3x1 ½ “adapter over the copper tubing tails and cement the cap in place.
Cement the bottom sections in place.
Assemble the Condenser section similar to the above procedures.
Connect the Condenser to the Separator and finish assembly of the Still.
Caution: Do the assembly in order or you can end up with some embarrassing
situations.

•

Assembly

1.
2.

Install ½” CPVC penetrations into the 3” tubes, caps and adapters with cement. Note:
do not install the ½” steam inlet tube yet.
Steam Inlet: Insert the ½ “ tube through the hole in the coupling and then cement the
nozzle onto the inside end. Push the tube back out and add cement and push back in
until nozzle is in the proper place. Add boat epoxy around tube on outside to
strengthen connection.

3.

Drain Plate: Place the plate about 3” into the bottom of the separator section and then
glue in the split ring support to hold it in place.

4.

Copper coil in separator: Stretch the coil to reach the plate and with the top coil below
the Temperature probe penetration. The two tails should extend above the top of the 3”
tube.

5.

Add the marbles up to the top coil and shake into place. Marbles must be on the inside
and outside of the coils.

6.
7.
8.
9.

Place the 3x1 ½ “adapter over the copper tubing tails and cement the cap in place.
Cement the bottom sections in place.
Assemble the Condenser section similar to the above procedures.
Connect the Condenser to the Separator and finish assembly of the Still.

Más contenido relacionado

La actualidad más candente

La actualidad más candente (16)

House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Unit 1 sanitary fittings
Unit 1  sanitary fittingsUnit 1  sanitary fittings
Unit 1 sanitary fittings
 
Helios Solar Systems Installation Instructions
Helios Solar Systems Installation InstructionsHelios Solar Systems Installation Instructions
Helios Solar Systems Installation Instructions
 
Sanotary installation
Sanotary installationSanotary installation
Sanotary installation
 
5 traps & sovent
5 traps & sovent5 traps & sovent
5 traps & sovent
 
Billy Sweet Chimney Show - work showcase
Billy Sweet Chimney Show - work showcaseBilly Sweet Chimney Show - work showcase
Billy Sweet Chimney Show - work showcase
 
Hardware fittings
Hardware fittingsHardware fittings
Hardware fittings
 
STORAGE: Key factors in bin usage
STORAGE: Key factors in bin usageSTORAGE: Key factors in bin usage
STORAGE: Key factors in bin usage
 
Presentation washroom design
Presentation  washroom designPresentation  washroom design
Presentation washroom design
 
Fit a bath and wash basin
Fit a bath and wash basinFit a bath and wash basin
Fit a bath and wash basin
 
Types of flanges
Types of flangesTypes of flanges
Types of flanges
 
sanitary
sanitarysanitary
sanitary
 
Report toilet building construction
Report toilet building constructionReport toilet building construction
Report toilet building construction
 
Flanges
FlangesFlanges
Flanges
 
Galaxy ppt
Galaxy pptGalaxy ppt
Galaxy ppt
 
precast manholes
precast manholesprecast manholes
precast manholes
 

Destacado

9 synthesis of reaction separation system lec 9 heterogenous separation
9 synthesis of reaction separation system lec 9 heterogenous separation9 synthesis of reaction separation system lec 9 heterogenous separation
9 synthesis of reaction separation system lec 9 heterogenous separation
ayimsevenfold
 
Pilot plant testing for hydrocyclone design
Pilot plant testing for hydrocyclone  design Pilot plant testing for hydrocyclone  design
Pilot plant testing for hydrocyclone design
reyhane mazahernasab
 
Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...
Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...
Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...
Ruturaj Deshpande
 
Venturi Scrubber - Dedusting
Venturi Scrubber - DedustingVenturi Scrubber - Dedusting
Venturi Scrubber - Dedusting
Tomas Eriksson
 

Destacado (20)

Small Scale Biodiesel Production
Small Scale Biodiesel ProductionSmall Scale Biodiesel Production
Small Scale Biodiesel Production
 
Effect of Geometric Configuration on Performance of Uniflow Cyclone
Effect of Geometric Configuration on Performance of Uniflow CycloneEffect of Geometric Configuration on Performance of Uniflow Cyclone
Effect of Geometric Configuration on Performance of Uniflow Cyclone
 
Foreign part separator-FPS
Foreign part separator-FPSForeign part separator-FPS
Foreign part separator-FPS
 
Fm 4
Fm 4Fm 4
Fm 4
 
Separator Qdk
Separator QdkSeparator Qdk
Separator Qdk
 
Air pollution notes
Air pollution notesAir pollution notes
Air pollution notes
 
9 synthesis of reaction separation system lec 9 heterogenous separation
9 synthesis of reaction separation system lec 9 heterogenous separation9 synthesis of reaction separation system lec 9 heterogenous separation
9 synthesis of reaction separation system lec 9 heterogenous separation
 
Pilot plant testing for hydrocyclone design
Pilot plant testing for hydrocyclone  design Pilot plant testing for hydrocyclone  design
Pilot plant testing for hydrocyclone design
 
Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...
Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...
Analysis of Inferior Vena Cava Filter using STAR CCM+’s Lagrangian Particle T...
 
Dehydration bed
Dehydration bed Dehydration bed
Dehydration bed
 
Flushing plans
Flushing plansFlushing plans
Flushing plans
 
7. air pollution control
7. air pollution control7. air pollution control
7. air pollution control
 
14 stokes law and grit separators
14 stokes law and grit separators14 stokes law and grit separators
14 stokes law and grit separators
 
L 25 and 26 final
L 25 and 26  finalL 25 and 26  final
L 25 and 26 final
 
Venturi Scrubber - Dedusting
Venturi Scrubber - DedustingVenturi Scrubber - Dedusting
Venturi Scrubber - Dedusting
 
Cyclone Theory
Cyclone TheoryCyclone Theory
Cyclone Theory
 
VRM
VRMVRM
VRM
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
Electrostatic precipitator design
Electrostatic precipitator designElectrostatic precipitator design
Electrostatic precipitator design
 
UASB reactors
UASB reactorsUASB reactors
UASB reactors
 

Similar a The Plastic Still

Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidet
Zulaiha Amaria
 
Install commercial refrigeration unit.
Install commercial refrigeration unit.Install commercial refrigeration unit.
Install commercial refrigeration unit.
WALEED NASIR
 
Odl tube training
Odl tube trainingOdl tube training
Odl tube training
guest77936b
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
Praveen Sudarsan
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
MEL3360
 
Grande Palazzo Pool Water Fountain
Grande Palazzo Pool Water FountainGrande Palazzo Pool Water Fountain
Grande Palazzo Pool Water Fountain
Brook Kavanugh
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
Zulaiha Amaria
 

Similar a The Plastic Still (20)

MEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPESMEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPES
 
2004 0824 Mt
2004 0824 Mt2004 0824 Mt
2004 0824 Mt
 
Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidet
 
Install commercial refrigeration unit.
Install commercial refrigeration unit.Install commercial refrigeration unit.
Install commercial refrigeration unit.
 
Odl tube training
Odl tube trainingOdl tube training
Odl tube training
 
2004_0605TN
2004_0605TN2004_0605TN
2004_0605TN
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 
Still tutorial ppt
Still tutorial pptStill tutorial ppt
Still tutorial ppt
 
Grande Palazzo Pool Water Fountain
Grande Palazzo Pool Water FountainGrande Palazzo Pool Water Fountain
Grande Palazzo Pool Water Fountain
 
Instruction manual
Instruction manualInstruction manual
Instruction manual
 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
 
Cardiac valve bioreactor
Cardiac valve bioreactorCardiac valve bioreactor
Cardiac valve bioreactor
 
2004 0923 Ca
2004 0923 Ca2004 0923 Ca
2004 0923 Ca
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
valve types.pptx
valve types.pptxvalve types.pptx
valve types.pptx
 
pipes and fittings
pipes and fittingspipes and fittings
pipes and fittings
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipes
 
Tube expansion
Tube expansionTube expansion
Tube expansion
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 

Último

Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...
Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...
Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...
Sheetaleventcompany
 
💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...
💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...
💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...
Sheetaleventcompany
 
Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...
Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...
Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...
Sheetaleventcompany
 
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
Sheetaleventcompany
 
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Sheetaleventcompany
 
Electrocardiogram (ECG) physiological basis .pdf
Electrocardiogram (ECG) physiological basis .pdfElectrocardiogram (ECG) physiological basis .pdf
Electrocardiogram (ECG) physiological basis .pdf
MedicoseAcademics
 
Control of Local Blood Flow: acute and chronic
Control of Local Blood Flow: acute and chronicControl of Local Blood Flow: acute and chronic
Control of Local Blood Flow: acute and chronic
MedicoseAcademics
 
Dehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service Dehradun
Dehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service DehradunDehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service Dehradun
Dehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service Dehradun
Sheetaleventcompany
 
Jual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan CytotecJual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan Cytotec
jualobat34
 
Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...
Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...
Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...
Sheetaleventcompany
 
Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...
Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...
Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...
Sheetaleventcompany
 
💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...
💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...
💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...
Sheetaleventcompany
 

Último (20)

❤️Chandigarh Escorts Service☎️9814379184☎️ Call Girl service in Chandigarh☎️ ...
❤️Chandigarh Escorts Service☎️9814379184☎️ Call Girl service in Chandigarh☎️ ...❤️Chandigarh Escorts Service☎️9814379184☎️ Call Girl service in Chandigarh☎️ ...
❤️Chandigarh Escorts Service☎️9814379184☎️ Call Girl service in Chandigarh☎️ ...
 
Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...
Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...
Jaipur Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Jaipur No💰...
 
💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...
💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...
💚Call Girls In Amritsar 💯Anvi 📲🔝8725944379🔝Amritsar Call Girl No💰Advance Cash...
 
Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...
Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...
Goa Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Goa No💰Advanc...
 
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
 
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
 
tongue disease lecture Dr Assadawy legacy
tongue disease lecture Dr Assadawy legacytongue disease lecture Dr Assadawy legacy
tongue disease lecture Dr Assadawy legacy
 
Call Girls Mussoorie Just Call 8854095900 Top Class Call Girl Service Available
Call Girls Mussoorie Just Call 8854095900 Top Class Call Girl Service AvailableCall Girls Mussoorie Just Call 8854095900 Top Class Call Girl Service Available
Call Girls Mussoorie Just Call 8854095900 Top Class Call Girl Service Available
 
Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...
Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...
Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...
 
Kolkata Call Girls Shobhabazar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Gir...
Kolkata Call Girls Shobhabazar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Gir...Kolkata Call Girls Shobhabazar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Gir...
Kolkata Call Girls Shobhabazar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Gir...
 
Electrocardiogram (ECG) physiological basis .pdf
Electrocardiogram (ECG) physiological basis .pdfElectrocardiogram (ECG) physiological basis .pdf
Electrocardiogram (ECG) physiological basis .pdf
 
Control of Local Blood Flow: acute and chronic
Control of Local Blood Flow: acute and chronicControl of Local Blood Flow: acute and chronic
Control of Local Blood Flow: acute and chronic
 
Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...
Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...
Chandigarh Call Girls Service ❤️🍑 9809698092 👄🫦Independent Escort Service Cha...
 
Dehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service Dehradun
Dehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service DehradunDehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service Dehradun
Dehradun Call Girl Service ❤️🍑 8854095900 👄🫦Independent Escort Service Dehradun
 
Jual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan CytotecJual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi Di Dubai UAE Wa 0838-4800-7379 Obat Penggugur Kandungan Cytotec
 
Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...
Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...
Premium Call Girls Dehradun {8854095900} ❤️VVIP ANJU Call Girls in Dehradun U...
 
Bandra East [ best call girls in Mumbai Get 50% Off On VIP Escorts Service 90...
Bandra East [ best call girls in Mumbai Get 50% Off On VIP Escorts Service 90...Bandra East [ best call girls in Mumbai Get 50% Off On VIP Escorts Service 90...
Bandra East [ best call girls in Mumbai Get 50% Off On VIP Escorts Service 90...
 
Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...
Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...
Gorgeous Call Girls Dehradun {8854095900} ❤️VVIP ROCKY Call Girls in Dehradun...
 
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
 
💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...
💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...
💚Chandigarh Call Girls 💯Riya 📲🔝8868886958🔝Call Girls In Chandigarh No💰Advance...
 

The Plastic Still

  • 1. The Plastic Still Fabrication and Assembly Instructions Prepared by: Jim Baker
  • 2.
  • 3. • Basic Design This still is basically a Charles 803 design which produces 190 proof alcohol in one pass. The water/alcohol steam passes through a cooled chamber, the water vapor cools and drops out and the alcohol vapor passes on into a cooling chamber, liquefies and is collected. • Materials Three inch Schedule 40 PVC pipe is used for the main body. The pipe connecting the upper and lower sections is 1 ½ inch PVC pipe. The feed throughs are ½ inch CPVC which is exactly 7/8 inch OD. CPVC cement or universal cement is used for connections. Two part white boat epoxy that comes in a stick from Wal-Mart is useful to strengthen feed throughs. Note: Although the PVC will hold up at the 200F temperatures, it is flexible at that temp. Support the Still so it is not subjected to any bending or squeezing. Note the mounting on the previous photo.
  • 4. • Tools The only tools required are: 1. Drill press with a vise. 2. Miter saw 3. Rat tail file 4. Sand Paper 5. 7/8 inch drill bit 6. ¼ inch drill bit 7. 1 7/8 inch hole saw for tube into condenser.
  • 5. • Parts The exploded view of the Still shows dimensions and the parts. All of these parts except the marbles can be purchased at Lowe’s or Home Depot. The marbles were found at Dollar Tree. About 5 bags for $1 each were used. Washer drain hose is great for connecting boiler to still. The hose ID is 7/8 inch. The steam discharge nozzle should point down and be at the same level as the low proof (water) overflow. Drill enough holes in the outlet cap to equal the area of the ½ “ pipe. Put one hole in the top of the elbow so steam can go upward toward the marbles.
  • 6.
  • 7.
  • 8. • Fabrication 1. 2. 3. 4. 5. 6. The output side of the still is on the right and the inputs on the left. This avoids interferences. Cut and drill the components first. Drill the 7/8” holes straight into the pipes and adapters. This hole size just fits the ½”CPVC. Test the fit of the ½ “ tube into a 7/8 “ hole to ensure compatibility. Drill through the 3”x1 ½ “ bottom adapter of the condenser with a 1 7/8” hole saw to allow the 1 ½ “ pipe to pass through. You might try installing a section of 1 ½” pipe directly on the top of the adapter rather than drilling through. Bevel the end and cement in place. The section of 1 ½ “ tube above the adapter must stay put or the condenser won’t work. Drill through the brass adapters with a ¼” drill. This is to allow the ¼” tubing to pass through. Trim the SS shower drain plate to fit inside the 3” tube. Wrap copper tubing around a 1 ½ “ pipe to form the coils. Hold the 1 ½ “ tube and go around it with the as purchased coil. Don’t try to start with a straight piece of copper tubing. Leave at least a 1 foot tail on each end of the coil to go through the top of the sections. Pull the finished coils out to reach bottom of sections. Leave enough space for marbles to pass through the coils in the separator.
  • 9. Caution: Do the assembly in order or you can end up with some embarrassing situations. • Assembly 1. 2. Install ½” CPVC penetrations into the 3” tubes, caps and adapters with cement. Note: do not install the ½” steam inlet tube yet. Steam Inlet: Insert the ½ “ tube through the hole in the coupling and then cement the nozzle onto the inside end. Push the tube back out and add cement and push back in until nozzle is in the proper place. Add boat epoxy around tube on outside to strengthen connection. 3. Drain Plate: Place the plate about 3” into the bottom of the separator section and then glue in the split ring support to hold it in place. 4. Copper coil in separator: Stretch the coil to reach the plate and with the top coil below the Temperature probe penetration. The two tails should extend above the top of the 3” tube. 5. Add the marbles up to the top coil and shake into place. Marbles must be on the inside and outside of the coils. 6. 7. 8. 9. Place the 3x1 ½ “adapter over the copper tubing tails and cement the cap in place. Cement the bottom sections in place. Assemble the Condenser section similar to the above procedures. Connect the Condenser to the Separator and finish assembly of the Still.
  • 10. Caution: Do the assembly in order or you can end up with some embarrassing situations. • Assembly 1. 2. Install ½” CPVC penetrations into the 3” tubes, caps and adapters with cement. Note: do not install the ½” steam inlet tube yet. Steam Inlet: Insert the ½ “ tube through the hole in the coupling and then cement the nozzle onto the inside end. Push the tube back out and add cement and push back in until nozzle is in the proper place. Add boat epoxy around tube on outside to strengthen connection. 3. Drain Plate: Place the plate about 3” into the bottom of the separator section and then glue in the split ring support to hold it in place. 4. Copper coil in separator: Stretch the coil to reach the plate and with the top coil below the Temperature probe penetration. The two tails should extend above the top of the 3” tube. 5. Add the marbles up to the top coil and shake into place. Marbles must be on the inside and outside of the coils. 6. 7. 8. 9. Place the 3x1 ½ “adapter over the copper tubing tails and cement the cap in place. Cement the bottom sections in place. Assemble the Condenser section similar to the above procedures. Connect the Condenser to the Separator and finish assembly of the Still.