SlideShare una empresa de Scribd logo
1 de 50
Our Products & Services
Manufacturing
Solutions
&
Services
Projects
Upto 1200kV
Insulator Hardware
Assembly
Upto 1200kV
Insulator Clamps &
Connectors
2
3
HIGH PERFORMANCE CONDUCTOR
MECHANICAL CREEP AT HIGH TEMPERATURE TEST ON
ALUMINIUM OXIDE/POLYMER MATRIX CORE CONDUCTOR
4
TESTING ARRANGEMENT
5
TESTING ARRANGEMENT
6
TESTING ARRANGEMENT
7
Applied Tension 30 kN APPLIED TENSION 40kN
APPLIED TENSION 50kN APPLIED TENSION 60kN
8
APPLIED CURRENT
800 AMPS
APPLIED CURRENT
900 AMPS
APPLIED CURRENT
1000 AMPS
9
START TIME 9:15AM
DATE 02.01.14
END TIME 10:00AM
DATE 04.01.14
CONDUCTOR TEMP. MEASUREMENT POINT- CH-4
10
DEAD END JOINT –A TEMP. MEASUREMENT POINT CH-1,CH-2
& CH-3
START TIME
9:15AM
DATE 02.01.14
END TIME
10:00AM
DATE 04.01.14
11
DEAD END JOINT –B TEMP. MEASUREMENT POINT
CH-5, CH-7 & CH-8
START TIME
9:15AM
DATE 02.01.14
END TIME
10:00AM
DATE 04.01.14
12
85.2
108.5 117
127.7
135.5
142.7
149.2
158.1
158.6 158.9 159.2
26.3 28.8 30.0 31.4 32.3 33.2
34.0 34.9 35.6 36.4
36.9
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
0 5 10 15 20 25 30 35 40 45 50 55
TEMP°C
TIME IN HOURS
Aluminium Oxide/Polymer
Matrix core HPC
RESULT
13
PROPOSED SPLICE METHOD
14
15
VALIDATION OF HELICALLY FORMED TERMINATION
FOR AAAC AND AL59 CONDUCTOR
TEST ON AAAC CONDUCTOR WITH HELICALLY
FORMED DEAD END GRIP
16
TEST ON AAAC CONDUCTOR WITH
HELICALLY FORMED DEAD END GRIP
AAAC 525 Sq mm Conductor
UTS 95% = 139kN withstood
17
INNOVATIVE SOLUTION FOR
LINE UPRATING
18
19
EMERGENCY RESTORATION TOWER
 If electrical power supply is interrupted due to
damage or destruction of transmission towers,
there will be huge financial loss to the
transmission utilities.
 The use of ERS permits restoration of power
transmission in a matter of few hours by creating
a by – pass until the original structure is restored.
 When the original towers are restored and
reconnected to the grid, the ERS is dismantled
and stored for future use.
20
CASE STUDY 1
GHAZIABAD: 132 kV LINE BETWEEN
VAISHALI AND SAHIBABAD
21
• Ghaziabad Development Authority
requested UPPTCL to re-route their
132 kV Transmission Line from Vaishali
to Sahibabad which was a hindrance
for completing their flyover project.
• UPPTCL decided to shift the line and
construct a multi circuit tower in place
of existing tower and also uprate the
line by changing the conductor from
ACSR to ACCC.
CASE STATEMENT
22
• Initial and detailed survey were made
before and after the award of contract.
• After detailed survey, the technical
team concluded that 3 ERS tower of
30M high will be required in view of the
multi storey mansions and residential
apartments.
• Erection works began on 21st April and
was finished by 27th April.
SURVEY
23
• After erection, we waited for the shutdown of 33kV
Line that was crossing the section between ERS 1
and Multi circuit as well as a 11kV Line that was
crossing the section between ERS 1 & ERS 2.
• In the meantime, stringing works were carried out
between ERS 2 and ERS 3.
• On 30th April, UPPTCL provided a shutdown of 33
kV Line for 2 hours within which the stringing work
between the Multi Circuit tower and ERS 1 was
done.
CHALLENGES
33 kV Line Crossing24
• Later on, 1st May, shutdown on 11kV Line
was provided for 2 hours to complete the
stringing between ERS 1 & ERS 2.
• Stringing between ERS 3 and 132 kV tower
was delayed by 5 days due to non-
availability of shutdown.
• After the line is shifted to ERS, UPPTCL
dismantled the existing 132 kV Towers and
replaced them with Multi Circuit Towers.
CHALLENGES
11 kV Line Crossing25
 Even after installing the ERS, we were not able to
string the line as UPPTCL could not provide
shutdown on the 132kV Line.
 This shows how critical that particular line is and
it would have taken years to complete the project
without ERS.
 Both the flyover project and line uprating would
have been on hold.
IMPACT
26
• No heavy machinery or earth movers were
introduced for execution of above, other
than for transportation.
• It is worthwhile to mention that, after
shifting the line to ERS, there was a
severe hailstorm but the tower withstood
the same without any damage to it.
• The bypass line is in charged state since
then serving utility customers who didn’t
have to undergo suspension of service.
OUTCOME
27
Live line from existing
to ERS tower
Live Line between two
ERS Towers
Tower with cross arm
& insulator28
GHAZIABAD: 400 kV ATUR –
INDRA PURAM LINE
CASE STUDY 2
29
• A 400 kV Transmission Line between Atur
and Indira Puram, abandoned since March
2017 and was likely to remain idle for at
least three months, due to a line crossing
over 132 kV Single Circuit Transmission
Line between Loni and Mohan Nagar in
Uttar Pradesh.
• The bottom crossarm of 132 kV Tower was
at a height of 53m which didn’t provide the
necessary clearance required for stringing
the 400kV line.
• The situation was that the height of 132kV
tower has to be reduced and it required a
shutdown for 5 to 7 days which was not
possible.
CASE STATEMENT
30
• Our engineering team conducted a
survey and made a detailed report.
• This project was a huge challenge as
the particular corridor contains a
Highway crossing, River crossing and a
Flyover Crossing.
• After analyzing the detailed report, three
locations were chosen for ERS erection.
SURVEY
31
• Based on the experience from previous
project, new techniques were followed in
order to fasten the erection time.
• Also as the crew was experienced, the entire
erection was done in 3 days whereas the
previous work took 6 days.
• We did a challenging feat of taking the
bypass line across the highway without any
disruption of highway traffic even for a
minute
EXPERIENCE
Flyover Crossing32
• On 7th June, UPPTCL provided a shutdown
for 3 hours within which we carried out the
stringing on ERS and destringing of 132 kV
Line.
• Again after installing the tower, there was
heavy rain and stormy wind but no damage
was made to the ERS.
• No heavy machinery or earth movers were
introduced for execution of above, other than
for transportation.
OUTCOME
River Crossing33
OUTCOME
• This exercise helped in completing a project which would evacuate 580 MW line where
substantial investment was already made on 98% stretch of the line and associated substation
would have remained idle for indefinite period.
• Benefits of this exercise was higher than cost by exponential proportions.
INTRODUCTION
 Traditionally overhead transmission lines have
been built on lattice type structures.
 Significant ROW and aesthetics issues have
stalled construction of new transmission line
corridors.
 Solutions with narrow corridors and smaller
footprints became the crying need of the day for
completion of critical transmission corridors.
 Replacement of traditional structures with
monopole kind of structures is a significant step
in this direction.
 Less right-of-way
 Small foundations take less land and
hence reduce the foot-print.
 For Example a 132 kV Mono pole
can be erected within a foot print of
2 Mtrs.
 Efficiently erected along Highways
and Railway Lines
ADVANTAGES
38
Pole type Structure Lattice Structure
Tower Cost Itself More Less
Maintenance Cost Less More
Installation Cost Less More
Design Risk at Joints Less More
Flexibility More Less
Aesthetics Yes --
Land Occupation (ROW) Very Less High
Logistics Less More
Environment friendly Yes --
COMPARISON WITH LATTICE STRUCTURE
39
 Various structure configuration –
monopoles and frames.
 Different voltages and circuits on same
pole.
 Distribution under-built.
 Multiple circuits in different orientation.
40
 Consist of tapered steel tubes that fit over each other to form a
stable pole.
 May be guyed or self supported and be fitted with climbing
rungs where necessary.
 Sections should be made from hollow, heavy duty, thick steel
tubes, flanged steel tubes or low-alloy, high-strength steel.
 Shaft section should be a constant-tapered hollow steel section.
 Slip joints should be designed with suitable engineering
practices.
 Should be made from galvanized hollow steel pipes or high
strength steel
CHARACTERISTICS OF MONOPOLE
41
 Professional Design Team specializing in Transmission Poles
 Expertise of Designing as per all national and international Standards as
 Standards for Designing : Guide Line ASCE – 48 - 11
OUR DESIGN CAPABILITIES
42
MANUFACTURING FACILITY
Sheet Cutting Sheet Bending
Punching Welding Galvanizing43
 Material :Hot rolled coil from Q235 to Q460, ASTM 573 GR65, GR50,
SS400, SS490, ST52-3
 Hot dip galvanized Following BS EN ISO 1461 -1999, ASTM A 123 or
any other standard by client required.
 Welding as per IS 813, AWS D 1.1
 Base Plate ASTM A 633 GRE
KEY SPECIFICATION
44
Steel Monopole sections are easily joined to each other to erect the tower.
STEEL POLE CONNECTION OPTIONS
Slip Joints Flange Joints
45
Erection of Steel Monopoles do not need much of foundation work.
We can erect the monopole by
STEEL POLE FOUNDATION OPTIONS
Concrete
foundation with
anchor bolts
Direct
Embedded
Caisson
Foundation
46
Load testing can be arranged by the third parties :-
 CPRI (Central Power Research Institute)
 SERC (Structural Engineering Research Centre)
 Richardson & Cruddas
TESTING & VALIDATION
47
Pole Drawings Approved by APTRANSCO
APPROVALS
Drawings Approved by ECG, Ghana
APPROVALS
49
SUPREME & CO. PVT. LTD.
P-200, BENARAS ROAD, HOWRAH -711108, WEST BENGAL, INDIA
Phone : +91-033-26516701-05
Fax : +91-033-26516706
Email : sales@supreme.in & info@supreme.in
Website : www.supreme.in

Más contenido relacionado

La actualidad más candente

IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS IJMER
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and detailsMahesh Sontyal
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkKAVYA H
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication towerRohithasangaraju
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadAbhijit Kumar
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission TowerAbhijit Kumar
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Acsr moose conductor
Acsr moose conductorAcsr moose conductor
Acsr moose conductorDineshsenthil
 
Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower IJMER
 
Transmission tower
Transmission towerTransmission tower
Transmission towerKiran Hadiya
 
Construction manual for sub stations
Construction manual for sub stationsConstruction manual for sub stations
Construction manual for sub stationsAmit Kumar
 
HV Transmission line specifications
HV Transmission line specificationsHV Transmission line specifications
HV Transmission line specificationsHilal Bhat
 
Traction distribution
Traction distribution Traction distribution
Traction distribution Amit Kumar
 
Underground cabling installation
Underground cabling installationUnderground cabling installation
Underground cabling installationAmit Kumar
 
HV tower design 3
HV tower design 3HV tower design 3
HV tower design 3Thy Khy
 

La actualidad más candente (20)

IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Types of-tower
Types of-towerTypes of-tower
Types of-tower
 
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication tower
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at Allahabad
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission Tower
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Acsr moose conductor
Acsr moose conductorAcsr moose conductor
Acsr moose conductor
 
Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower Analysis and Design of Transmission Tower
Analysis and Design of Transmission Tower
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Construction manual for sub stations
Construction manual for sub stationsConstruction manual for sub stations
Construction manual for sub stations
 
design of tower
design of towerdesign of tower
design of tower
 
HV Transmission line specifications
HV Transmission line specificationsHV Transmission line specifications
HV Transmission line specifications
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 
Underground cabling installation
Underground cabling installationUnderground cabling installation
Underground cabling installation
 
Lance carriage & guiding system
Lance carriage & guiding systemLance carriage & guiding system
Lance carriage & guiding system
 
HV tower design 3
HV tower design 3HV tower design 3
HV tower design 3
 
Hot metal ladle
Hot metal ladleHot metal ladle
Hot metal ladle
 

Similar a Harish aggarwal

Sonali ppt.pptx
Sonali ppt.pptxSonali ppt.pptx
Sonali ppt.pptxRBTV1
 
Alex Argao latest resume
Alex Argao latest resumeAlex Argao latest resume
Alex Argao latest resumeAlex Argao
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfGarimaSharma754550
 
underground cable in transmission grid
underground cable in transmission gridunderground cable in transmission grid
underground cable in transmission gridEngr. naeem
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxamitpandey509058
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission towernaqeeb04
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSSaritaJoshi5
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Avirup Ghosh
 
Construction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptxConstruction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptxSatish Pydimarla
 
Solar pv power plant in indian railways and JMV Products
Solar pv power plant in indian railways and JMV ProductsSolar pv power plant in indian railways and JMV Products
Solar pv power plant in indian railways and JMV ProductsMahesh Chandra Manav
 
Sayan CESC HT Report.pdf
Sayan CESC HT Report.pdfSayan CESC HT Report.pdf
Sayan CESC HT Report.pdfSayanBasak15
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationSteve Sadler
 
Solar Power Plant At Dindigul
Solar Power Plant At DindigulSolar Power Plant At Dindigul
Solar Power Plant At Dindigulwajidsharieff
 
Fibre installation - Athene and Duffs Road Station[12].doc
Fibre installation - Athene and Duffs Road Station[12].docFibre installation - Athene and Duffs Road Station[12].doc
Fibre installation - Athene and Duffs Road Station[12].docThandabantu Magengelele
 
Residential Electrical Equipments and Services.pptx
Residential Electrical Equipments and Services.pptxResidential Electrical Equipments and Services.pptx
Residential Electrical Equipments and Services.pptxDeepti Shitoley
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdfPpt Creater
 

Similar a Harish aggarwal (20)

Sonali ppt.pptx
Sonali ppt.pptxSonali ppt.pptx
Sonali ppt.pptx
 
Alex Argao latest resume
Alex Argao latest resumeAlex Argao latest resume
Alex Argao latest resume
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
PLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
PLS 2017: Erskine Bridge Electrical and Lighting RefurbishmentPLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
PLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdf
 
underground cable in transmission grid
underground cable in transmission gridunderground cable in transmission grid
underground cable in transmission grid
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptx
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission tower
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONS
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
Construction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptxConstruction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptx
 
Solar pv power plant in indian railways and JMV Products
Solar pv power plant in indian railways and JMV ProductsSolar pv power plant in indian railways and JMV Products
Solar pv power plant in indian railways and JMV Products
 
Mike's presentation
Mike's presentationMike's presentation
Mike's presentation
 
Sayan CESC HT Report.pdf
Sayan CESC HT Report.pdfSayan CESC HT Report.pdf
Sayan CESC HT Report.pdf
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
 
CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
Solar Power Plant At Dindigul
Solar Power Plant At DindigulSolar Power Plant At Dindigul
Solar Power Plant At Dindigul
 
Fibre installation - Athene and Duffs Road Station[12].doc
Fibre installation - Athene and Duffs Road Station[12].docFibre installation - Athene and Duffs Road Station[12].doc
Fibre installation - Athene and Duffs Road Station[12].doc
 
Residential Electrical Equipments and Services.pptx
Residential Electrical Equipments and Services.pptxResidential Electrical Equipments and Services.pptx
Residential Electrical Equipments and Services.pptx
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdf
 

Más de Harish Agarwal

Más de Harish Agarwal (15)

Aerial fibre optics
Aerial fibre opticsAerial fibre optics
Aerial fibre optics
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Monopole
MonopoleMonopole
Monopole
 
Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18
 
Covered conductor
Covered conductorCovered conductor
Covered conductor
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Fittings for lv abc
Fittings for lv abcFittings for lv abc
Fittings for lv abc
 
Covered conductor
Covered conductorCovered conductor
Covered conductor
 
Case study sterlite deadend grip
Case study  sterlite deadend gripCase study  sterlite deadend grip
Case study sterlite deadend grip
 
Pole type structures
Pole type structuresPole type structures
Pole type structures
 
Effect of GST in solar industry
Effect of GST in solar industryEffect of GST in solar industry
Effect of GST in solar industry
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipc
 
Solar water pumping_solution
Solar water pumping_solutionSolar water pumping_solution
Solar water pumping_solution
 
INTER PHASE SPACERS
INTER PHASE SPACERS INTER PHASE SPACERS
INTER PHASE SPACERS
 

Último

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 

Último (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 

Harish aggarwal

  • 1.
  • 2. Our Products & Services Manufacturing Solutions & Services Projects Upto 1200kV Insulator Hardware Assembly Upto 1200kV Insulator Clamps & Connectors 2
  • 4. MECHANICAL CREEP AT HIGH TEMPERATURE TEST ON ALUMINIUM OXIDE/POLYMER MATRIX CORE CONDUCTOR 4
  • 8. Applied Tension 30 kN APPLIED TENSION 40kN APPLIED TENSION 50kN APPLIED TENSION 60kN 8
  • 9. APPLIED CURRENT 800 AMPS APPLIED CURRENT 900 AMPS APPLIED CURRENT 1000 AMPS 9
  • 10. START TIME 9:15AM DATE 02.01.14 END TIME 10:00AM DATE 04.01.14 CONDUCTOR TEMP. MEASUREMENT POINT- CH-4 10
  • 11. DEAD END JOINT –A TEMP. MEASUREMENT POINT CH-1,CH-2 & CH-3 START TIME 9:15AM DATE 02.01.14 END TIME 10:00AM DATE 04.01.14 11
  • 12. DEAD END JOINT –B TEMP. MEASUREMENT POINT CH-5, CH-7 & CH-8 START TIME 9:15AM DATE 02.01.14 END TIME 10:00AM DATE 04.01.14 12
  • 13. 85.2 108.5 117 127.7 135.5 142.7 149.2 158.1 158.6 158.9 159.2 26.3 28.8 30.0 31.4 32.3 33.2 34.0 34.9 35.6 36.4 36.9 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 0 5 10 15 20 25 30 35 40 45 50 55 TEMP°C TIME IN HOURS Aluminium Oxide/Polymer Matrix core HPC RESULT 13
  • 15. 15 VALIDATION OF HELICALLY FORMED TERMINATION FOR AAAC AND AL59 CONDUCTOR
  • 16. TEST ON AAAC CONDUCTOR WITH HELICALLY FORMED DEAD END GRIP 16
  • 17. TEST ON AAAC CONDUCTOR WITH HELICALLY FORMED DEAD END GRIP AAAC 525 Sq mm Conductor UTS 95% = 139kN withstood 17
  • 19. 19 EMERGENCY RESTORATION TOWER  If electrical power supply is interrupted due to damage or destruction of transmission towers, there will be huge financial loss to the transmission utilities.  The use of ERS permits restoration of power transmission in a matter of few hours by creating a by – pass until the original structure is restored.  When the original towers are restored and reconnected to the grid, the ERS is dismantled and stored for future use.
  • 20. 20
  • 21. CASE STUDY 1 GHAZIABAD: 132 kV LINE BETWEEN VAISHALI AND SAHIBABAD 21
  • 22. • Ghaziabad Development Authority requested UPPTCL to re-route their 132 kV Transmission Line from Vaishali to Sahibabad which was a hindrance for completing their flyover project. • UPPTCL decided to shift the line and construct a multi circuit tower in place of existing tower and also uprate the line by changing the conductor from ACSR to ACCC. CASE STATEMENT 22
  • 23. • Initial and detailed survey were made before and after the award of contract. • After detailed survey, the technical team concluded that 3 ERS tower of 30M high will be required in view of the multi storey mansions and residential apartments. • Erection works began on 21st April and was finished by 27th April. SURVEY 23
  • 24. • After erection, we waited for the shutdown of 33kV Line that was crossing the section between ERS 1 and Multi circuit as well as a 11kV Line that was crossing the section between ERS 1 & ERS 2. • In the meantime, stringing works were carried out between ERS 2 and ERS 3. • On 30th April, UPPTCL provided a shutdown of 33 kV Line for 2 hours within which the stringing work between the Multi Circuit tower and ERS 1 was done. CHALLENGES 33 kV Line Crossing24
  • 25. • Later on, 1st May, shutdown on 11kV Line was provided for 2 hours to complete the stringing between ERS 1 & ERS 2. • Stringing between ERS 3 and 132 kV tower was delayed by 5 days due to non- availability of shutdown. • After the line is shifted to ERS, UPPTCL dismantled the existing 132 kV Towers and replaced them with Multi Circuit Towers. CHALLENGES 11 kV Line Crossing25
  • 26.  Even after installing the ERS, we were not able to string the line as UPPTCL could not provide shutdown on the 132kV Line.  This shows how critical that particular line is and it would have taken years to complete the project without ERS.  Both the flyover project and line uprating would have been on hold. IMPACT 26
  • 27. • No heavy machinery or earth movers were introduced for execution of above, other than for transportation. • It is worthwhile to mention that, after shifting the line to ERS, there was a severe hailstorm but the tower withstood the same without any damage to it. • The bypass line is in charged state since then serving utility customers who didn’t have to undergo suspension of service. OUTCOME 27
  • 28. Live line from existing to ERS tower Live Line between two ERS Towers Tower with cross arm & insulator28
  • 29. GHAZIABAD: 400 kV ATUR – INDRA PURAM LINE CASE STUDY 2 29
  • 30. • A 400 kV Transmission Line between Atur and Indira Puram, abandoned since March 2017 and was likely to remain idle for at least three months, due to a line crossing over 132 kV Single Circuit Transmission Line between Loni and Mohan Nagar in Uttar Pradesh. • The bottom crossarm of 132 kV Tower was at a height of 53m which didn’t provide the necessary clearance required for stringing the 400kV line. • The situation was that the height of 132kV tower has to be reduced and it required a shutdown for 5 to 7 days which was not possible. CASE STATEMENT 30
  • 31. • Our engineering team conducted a survey and made a detailed report. • This project was a huge challenge as the particular corridor contains a Highway crossing, River crossing and a Flyover Crossing. • After analyzing the detailed report, three locations were chosen for ERS erection. SURVEY 31
  • 32. • Based on the experience from previous project, new techniques were followed in order to fasten the erection time. • Also as the crew was experienced, the entire erection was done in 3 days whereas the previous work took 6 days. • We did a challenging feat of taking the bypass line across the highway without any disruption of highway traffic even for a minute EXPERIENCE Flyover Crossing32
  • 33. • On 7th June, UPPTCL provided a shutdown for 3 hours within which we carried out the stringing on ERS and destringing of 132 kV Line. • Again after installing the tower, there was heavy rain and stormy wind but no damage was made to the ERS. • No heavy machinery or earth movers were introduced for execution of above, other than for transportation. OUTCOME River Crossing33
  • 35. • This exercise helped in completing a project which would evacuate 580 MW line where substantial investment was already made on 98% stretch of the line and associated substation would have remained idle for indefinite period. • Benefits of this exercise was higher than cost by exponential proportions.
  • 36.
  • 37. INTRODUCTION  Traditionally overhead transmission lines have been built on lattice type structures.  Significant ROW and aesthetics issues have stalled construction of new transmission line corridors.  Solutions with narrow corridors and smaller footprints became the crying need of the day for completion of critical transmission corridors.  Replacement of traditional structures with monopole kind of structures is a significant step in this direction.
  • 38.  Less right-of-way  Small foundations take less land and hence reduce the foot-print.  For Example a 132 kV Mono pole can be erected within a foot print of 2 Mtrs.  Efficiently erected along Highways and Railway Lines ADVANTAGES 38
  • 39. Pole type Structure Lattice Structure Tower Cost Itself More Less Maintenance Cost Less More Installation Cost Less More Design Risk at Joints Less More Flexibility More Less Aesthetics Yes -- Land Occupation (ROW) Very Less High Logistics Less More Environment friendly Yes -- COMPARISON WITH LATTICE STRUCTURE 39
  • 40.  Various structure configuration – monopoles and frames.  Different voltages and circuits on same pole.  Distribution under-built.  Multiple circuits in different orientation. 40
  • 41.  Consist of tapered steel tubes that fit over each other to form a stable pole.  May be guyed or self supported and be fitted with climbing rungs where necessary.  Sections should be made from hollow, heavy duty, thick steel tubes, flanged steel tubes or low-alloy, high-strength steel.  Shaft section should be a constant-tapered hollow steel section.  Slip joints should be designed with suitable engineering practices.  Should be made from galvanized hollow steel pipes or high strength steel CHARACTERISTICS OF MONOPOLE 41
  • 42.  Professional Design Team specializing in Transmission Poles  Expertise of Designing as per all national and international Standards as  Standards for Designing : Guide Line ASCE – 48 - 11 OUR DESIGN CAPABILITIES 42
  • 43. MANUFACTURING FACILITY Sheet Cutting Sheet Bending Punching Welding Galvanizing43
  • 44.  Material :Hot rolled coil from Q235 to Q460, ASTM 573 GR65, GR50, SS400, SS490, ST52-3  Hot dip galvanized Following BS EN ISO 1461 -1999, ASTM A 123 or any other standard by client required.  Welding as per IS 813, AWS D 1.1  Base Plate ASTM A 633 GRE KEY SPECIFICATION 44
  • 45. Steel Monopole sections are easily joined to each other to erect the tower. STEEL POLE CONNECTION OPTIONS Slip Joints Flange Joints 45
  • 46. Erection of Steel Monopoles do not need much of foundation work. We can erect the monopole by STEEL POLE FOUNDATION OPTIONS Concrete foundation with anchor bolts Direct Embedded Caisson Foundation 46
  • 47. Load testing can be arranged by the third parties :-  CPRI (Central Power Research Institute)  SERC (Structural Engineering Research Centre)  Richardson & Cruddas TESTING & VALIDATION 47
  • 48. Pole Drawings Approved by APTRANSCO APPROVALS
  • 49. Drawings Approved by ECG, Ghana APPROVALS 49
  • 50. SUPREME & CO. PVT. LTD. P-200, BENARAS ROAD, HOWRAH -711108, WEST BENGAL, INDIA Phone : +91-033-26516701-05 Fax : +91-033-26516706 Email : sales@supreme.in & info@supreme.in Website : www.supreme.in