Helmut Wannenmacher, profile picture

Helmut Wannenmacher

Sort by
Baulos SBT3.1: Bohr- und Injektionsarbeiten für den Schacht Sommerau 2
Control of operational and technical aspects of grouting works in tunnelling and heavy construction
Hydro 2016 wannenmacher
Operational analyses of pressure tunnel and shaft grouting operations
LARGE TBM PROJECTS IN SWITZERLAND – EXPERIENCE AND STATE OF THE ART
Tum vortragfinal
Underground Excavation Behavior of the Queenston Formation
Aspects of pressure tunnel lining with special focus on pre-stressed pressure tunnels
Der Einfluss von Gebirgsparametern auf die Penetration
Challenges during Design and Construction of an Underground Chip Factory (Waferfab)
Unexpected performance and cost factors for hard rock TBM. Analyses of specific cases with the thrust- penetration gradient
The Niagara Tunnel Facility Project