Initiating
Process Group
Project Management
Processes PMBOK 5th edition
Hossam Maghrabi,PMP
Initiating Process Group
Project Boundaries
Initiating Process Group
 The key purposes of this Process Group is define a new project or a new phase of
an existing project by obtaining authorization to start the project or phase through
the following steps,
1. Select a project to be initiated (Outside Project Boundaries).
2. The initial scope is defined and initial financial resources are committed.
3. Internal and external stakeholders who will interact and influence the overall. outcome
of the project are identified.
4. If not already assigned, the project manager will be selected.
5. This information is captured in the project charter and stakeholder register.
6. When the project charter is approved, the project becomes officially authorized.
– Initiating processes may be performed at the organizational, program, or portfolio level
and therefore, would be outside of the project’s level of control.
Initiating Process Group
Project Selection Methods
Current situation
The organization have an internal business needs or external influences.
So the organization have to create a needs analysis, feasibility study,
business case or description of the situation to take a go/no-go
decision regarding the project initiation.
 Selection Methods (Profitability Measures)
– Comparative Approach (Decision models) such as:
 B/C Ratio,
 PV, NPV,IRR and
 payback period.
– Mathematical Approach (Calculation methods) such as:
 Linear programming
 Non linear programming
Project Selection Methods
Comparative Approach
 Benefit Cost Ratio (BCR)
The ratio of financial benefits to costs to produce the
product of the project.
 BCR = (PV of Revenues)/(PV of Costs)
 BCR > 1 means the revenues (benefits) outweigh the
costs.
 BCR < 1 means the revenues (benefits) are less than the
costs.
The higher the BCR the better.
Project Selection Methods
Comparative Approach
 Cash Flow Analysis Techniques,
– Discounted Cash flows: The concept here is money in
the future is worth less than money received today.
– Present Value is based on the “time value of money”, it
is a way to take time out of the equation and evaluate
how much a project is worth right now.
– Example : If a project is expected to produce 3 annual payments of
$100,000 then PV (how much those payments are worth right now) is
going to be less then 300,000
Project Selection Methods
Comparative Approach
 Present Value Calculation,
– You don’t need to remember the formula, but you need to understand the
concept.
 Present Value = Future Value / (1+i)ⁿ
i = Interest Rate
n = Number of Periods
– The higher the Present Value, the better.
– e.g. Present value of receiving $300,000 in three years considering an interest
rate of 10%
PV = 300,000 / (1+0.1)³ = $230,769,23
Project Selection Methods
Comparative Approach
 Internal Rate of Return,
– It’s a finance term used to express the project returns as an
interest rate
– If you “invest” in the project, what is your equivalent rate (IRR) ?
Conceptually an organization has a choice whether to invest in a project, or
put that same money in a bank account.
– Obviously, the higher the IRR, the better.
– Again, you will not be asked to calculate this measure, but you need
to understand the concept.
Project Selection Methods
Comparative Approach
 Payback Period,
– Length of time it takes to recoup funds invested in the project.
– This method compares the initial investment to the cash inflows expected over
the life of the product, service or results
– Obviously with all other things being equal, shorter payback periods are
generally better for an organization.
Project Selection Methods
Comparative Approach
 Opportunity Cost,
– The cost of selecting a project over another project. i.e. the lost
opportunity cost.
– Opportunity cost asks: What is the cost of the other
opportunities we missed by investing our money in this
project?
– Example
– Project A – NPV : $100,000
– Project B – NPV : $250,000
– Opportunity Cost of selecting Project B is $ 100,000
Project Selection Methods
Comparative Approach
 (Example),
– Make one value in each column that shows the most
desirable value , given the information provided:
Project Selection Methods
Mathematical Approach
 It provides a way to calculate the value of the projects
 also called constraint optimization methods such as:
– Linear programming
– Non linear programming
 For the exam all you need to understand about mathematical
models is that they use linear, dynamic, integer, multi-
objective programming in the form of algorithms to solve a
particular problem
Initiating Process Group
& Knowledge Areas
Initiating Process Group
& Integration Management Knowledge Area
 Integration Management Knowledge Area
 Project Integration Management includes the processes and activities to
identify, define, combine, unify, and coordinate the various processes and
project management activities within the Project Management Process
Groups.
 It includes making choices about resource allocation, making trade-offs among
competing objectives and alternatives, and managing the interdependencies
among the project management Knowledge Areas.
 It’s necessary in situations where individual processes interact.
 For example,
 A cost estimate needed for a contingency plan involves integrating the processes in the
Project Cost, Time, and Risk Management Knowledge Areas.
 The integrative nature of projects and project management can be understood by
thinking of other types of activities performed while completing a project.
 For Example Develop, review, analyze, and understand the scope. This includes the project and
product requirements, criteria, assumptions, constraints, and other influences related to a
project, and how each will be managed or addressed within the project;
Initiating Process Group
Develop Project Charter
Current situation
 Project statement of work, Business case or Agreements have been
developed outside the project.
 An entity external to the project such as a sponsor, program or project
management office (PMO) staff person, or a portfolio governing body
chairperson or authorized representative decided to go with the new
project and will sponsor it.
 The organization need to validates the alignment of the project with the
strategy and ongoing work of the organization. Also, it must be have
 A well-defined project and project boundaries,
 A way for senior management to formally accept and commit to the project,
 A formal record of the project.
Develop Project Charter
Data Flow Diagram
It is recommended that the
project manager participate
in the development of the
project charter to obtain a
foundational understanding
of the project requirements.
This understanding will better
allow for efficient resources
allocation to project
activities.
Develop Project Charter: Inputs
1. Project Statement of Work(SOW)
Is a narrative description of products, services, or results to be delivered by a
roject.
 The SOW references the following,
 Business need, based on a market demand, technological advance, legal requirement,
government regulation, or environmental consideration. (Typically, the business need
and the cost-benefit analysis are contained in the business case to justify the project.)
 Product scope description. It also document the relationship between the products,
services, or results being created and the business need that the project will address.
 Strategic plan. The strategic plan documents the organization’s strategic vision, goals,
and objectives and may contain a high-level mission statement (All projects should be
aligned with their organization’s strategic plan).
 For internal projects, the project initiator or sponsor provides SOW based on business needs,
product, or service requirements. For external projects, the SOW be received from the customer as
part of a bid document, (e.g., a request for proposal, request for information, or request for bid) or
as part of a contract.
Develop Project Charter: Inputs
2. Business Case
 It used for decision making by managers or executives above the project level to
determine whether or not the project is worth the required investment.
 The project manager is responsible for ensuring that the project effectively and
efficiently meets the goals of the organization and those requirements of a broad
set of stakeholders, as defined in the business case.
 Periodic review of the business case by the sponsoring organization confirm that
the project is still aligned with the business case.
3. Agreements are used to define initial intentions for a project.
 Agreements may take the form of contracts, memorandums of understanding
(MOUs), service level agreements (SLA), letter of agreements, letters of intent,
verbal agreements, email, or other written agreements.
4. Enterprise Environmental Factors (EEF).
5. Organizational Process Assets (OPA).
Develop Project Charter:
Tools & Techniques (T&T)
1. Expert Judgment, To assess the inputs used to develop the
project charter
2. Facilitation Techniques, Like Brainstorming, conflict resolution,
problem solving, and meeting management to used by facilitators to
help teams and individuals accomplish project activities.
General Notes:
1. A project manager is identified and assigned as early in the project as is
feasible, preferably while the project charter is being developed and always
prior to the start of planning.
2. The two techniques above have broad application within project
management processes.
Develop Project Charter: Outputs
Project Charter
 It is the document issued by the project initiator or sponsor.
 It formally authorizes the existence of a project.
 It provides the project manager with the authority to apply
organizational resources to project activities.
Notes,
 A project charter establish internal agreements within an
organization to assure proper delivery under the contract.
 A project charter is not considered to be a contract, because there
is no consideration or money promised or exchanged in its
creation.
Develop Project Charter: Outputs
Project Charter documents the following project’s information ,
– Project purpose or justification(business needs),
– Measurable project objectives and related success criteria,
– High-level requirements,
– Assumptions and constraints,
– High-level project description and boundaries,
– High-level risks,
– Summary milestone schedule,
– Summary budget,
– Stakeholder list,
– Project approval requirements
 (i.e., what constitutes project success, who decides the project is successful, and who signs off
on the project),
– Assigned project manager, responsibility, and authority level,
– Name and authority of the sponsor or other person(s) authorizing the project charter.
Initiating Process Group
& Stakeholder Management Knowledge Area
 Project stakeholders are individuals, groups, or organizations who may affect,
be affected by, or perceive themselves to be affected by a decision, activity, or
outcome of a project.
 Project Stakeholder Management includes the processes required to
1. Identify the people, groups, or organizations that could impact or be impacted by the
project,
2. Analyze stakeholder expectations and their impact on the project,
3. Develop appropriate management strategies for effectively engaging stakeholders in
project decisions and execution.
Initiating Process Group
Identify Stakeholders
Current situation
 Project charter have been developed, the project aurhorized and the
project manager identfied.
 Every project will have stakeholders who are impacted by or can impact
the project in a positive or negative way. While some stakeholders may
have a limited ability to influence the project, others may have
significant influence on the project and its expected outcomes.
 The ability of the project manager to correctly identify and manage
these stakeholders in an appropriate manner can mean the difference
between success and failure.
General Notes:
1. Stakeholder satisfaction should be managed as a key project objective.
Identify Stakeholders
It is critical for project success to
identify the stakeholders early in
the project or phase and to
analyze their levels of interest,
their individual expectations, as
well as their importance and
influence.
The initial assessment of the
stakeholders should be reviewed
and updated regularly.
Identify Stakeholders: Inputs
1. Project Charter, It provide information about internal and external
parties related with the project and affected by the result or the
execution of the project
2. Procurement Documents, If a project is the result of a procurement
activity or is based on an established contract, the parties in that
contract are key project stakeholders.
3. Enterprise Environmental Factors (EEF).
4. Organizational Process Assets (OPA).
The buyer structures procurement documents to facilitate an accurate
and complete response from each prospective seller and to facilitate
easy evaluation of the responses.
1. Stakeholder Analysis
1. Identify all potential project stakeholders and
relevant information
2. Analyze the potential impact or support each
stakeholder could generate, and classify them
using one of the following models,
 Power/interest grid, (Authority & Concern)
 Power/influence, (Authority & their active
involvement )
 Influence/impact, (Involvement & ability to effect
changes)
 Salience model, (power, urgency &
legitimacy)
3. Prioritize the stakeholders to ensure the efficient
use of effort to communicate and manage their
expectations.
4. Assess how key stakeholders are likely to react
or respond in various situations.
Identify Stakeholders:
Tools & Techniques (T&T)
Identify Stakeholders:
Tools & Techniques (T&T)
2. Expert Judgment
 Expert judgment can be obtained through individual consultations (one-on-one
meetings, interviews, etc.) or through a panel format (focus groups, surveys,
etc.). Example of expert,
 Identified key stakeholders;
 Project managers who have worked on projects in the same area (directly or through
lessons learned);
 Subject matter experts (SMEs) in the business or project area;
 Industry groups and consultants; and
3. Meetings, Profile analysis meetings are project meetings designed to develop
an understanding of major project stakeholders, and they can be used to exchange
and analyze information about roles, interests, knowledge, and the overall position of
each stakeholder facing the project.
Identify Stakeholders: Outputs
1. Stakeholder Register,
The stakeholder register should be consulted and updated on a regular basis, as
stakeholders may change—or new ones identified—throughout the life cycle of the project.

Más contenido relacionado

La actualidad más candente

PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioKose Jumnichi
 
10.2 Manage Communication
10.2 Manage Communication10.2 Manage Communication
10.2 Manage CommunicationDavidMcLachlan1
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)owaishazara
 
Chap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewChap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewAnand Bobade
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
Project Management Steps And Process Powerpoint Presentation Slide
Project Management Steps And Process Powerpoint Presentation SlideProject Management Steps And Process Powerpoint Presentation Slide
Project Management Steps And Process Powerpoint Presentation SlideSlideTeam
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areasguestfe6ad
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1Anand Bobade
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...JustAcademy
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter TemplateNaseer Muhammud
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMOfficers PMOAcademy
 
Stakeholder Chapter 13
Stakeholder Chapter 13Stakeholder Chapter 13
Stakeholder Chapter 13KareemBullard1
 

La actualidad más candente (20)

PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visio
 
10.2 Manage Communication
10.2 Manage Communication10.2 Manage Communication
10.2 Manage Communication
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)
 
PMP_Project Integration Management
PMP_Project Integration ManagementPMP_Project Integration Management
PMP_Project Integration Management
 
Chap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewChap 4.0 Project integration management Overview
Chap 4.0 Project integration management Overview
 
PMO services
PMO servicesPMO services
PMO services
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Roles of project managers in oe
Roles of project managers in oeRoles of project managers in oe
Roles of project managers in oe
 
Project Management Steps And Process Powerpoint Presentation Slide
Project Management Steps And Process Powerpoint Presentation SlideProject Management Steps And Process Powerpoint Presentation Slide
Project Management Steps And Process Powerpoint Presentation Slide
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
PgMP 02 - Program Performance Domainv1
PgMP 02 - Program Performance Domainv1PgMP 02 - Program Performance Domainv1
PgMP 02 - Program Performance Domainv1
 
Stakeholder Chapter 13
Stakeholder Chapter 13Stakeholder Chapter 13
Stakeholder Chapter 13
 

Destacado

PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkHossam Maghrabi
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process groupHossam Maghrabi
 
Pmbok 5th planning process group part two
Pmbok 5th planning process group part twoPmbok 5th planning process group part two
Pmbok 5th planning process group part twoHossam Maghrabi
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OneHossam Maghrabi
 
Risk management overview
Risk management overviewRisk management overview
Risk management overviewHossam Maghrabi
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part threeHossam Maghrabi
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneHossam Maghrabi
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementHossam Maghrabi
 
PMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in EnglishPMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in EnglishRicardo Viana Vargas
 
Introduction to pmp
Introduction to pmpIntroduction to pmp
Introduction to pmpshkadry
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & SkillsPMC Mentor
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOKGeoDiga
 
Four Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueFour Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueWorkfront
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Simon Misiewicz
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Mena M. Eissa
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5pankajsh10
 

Destacado (20)

PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process group
 
Pmbok 5th planning process group part two
Pmbok 5th planning process group part twoPmbok 5th planning process group part two
Pmbok 5th planning process group part two
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
 
Risk management overview
Risk management overviewRisk management overview
Risk management overview
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part three
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part One
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk Management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
PMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in EnglishPMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in English
 
Introduction to pmp
Introduction to pmpIntroduction to pmp
Introduction to pmp
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOK
 
Pmbok 5 ed diagram
Pmbok 5 ed diagramPmbok 5 ed diagram
Pmbok 5 ed diagram
 
Four Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueFour Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering Value
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 

Similar a PMBOK_5th_Initiating Process Group -

Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes GroupsSourabh Kumar
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementChris Gorga
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 
Project management glossary_of_terms
Project management glossary_of_termsProject management glossary_of_terms
Project management glossary_of_termsnagham ali hasan
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...GlobalSkillup
 
Project management
Project managementProject management
Project managementsatya pal
 
Project management professional
Project management professionalProject management professional
Project management professionalReema
 
L03 integration management
L03 integration managementL03 integration management
L03 integration managementAsa Chan
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxAASTHA76
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 
CMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting ActivityCMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting Activitytmschaf
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 

Similar a PMBOK_5th_Initiating Process Group - (20)

Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes Groups
 
Pmp inititating process group
Pmp inititating process groupPmp inititating process group
Pmp inititating process group
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 
Assignment
Assignment Assignment
Assignment
 
Ch04
Ch04Ch04
Ch04
 
Project management glossary_of_terms
Project management glossary_of_termsProject management glossary_of_terms
Project management glossary_of_terms
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
 
Project management
Project managementProject management
Project management
 
Project management professional
Project management professionalProject management professional
Project management professional
 
Project management
Project managementProject management
Project management
 
abate and h.pptx
abate and h.pptxabate and h.pptx
abate and h.pptx
 
L03 integration management
L03 integration managementL03 integration management
L03 integration management
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 
CMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting ActivityCMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting Activity
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 

Último

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNitya salvi
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Ram V Chary
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siligurimeghakumariji156
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 

Último (16)

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 

PMBOK_5th_Initiating Process Group -

  • 1. Initiating Process Group Project Management Processes PMBOK 5th edition Hossam Maghrabi,PMP
  • 3. Initiating Process Group  The key purposes of this Process Group is define a new project or a new phase of an existing project by obtaining authorization to start the project or phase through the following steps, 1. Select a project to be initiated (Outside Project Boundaries). 2. The initial scope is defined and initial financial resources are committed. 3. Internal and external stakeholders who will interact and influence the overall. outcome of the project are identified. 4. If not already assigned, the project manager will be selected. 5. This information is captured in the project charter and stakeholder register. 6. When the project charter is approved, the project becomes officially authorized. – Initiating processes may be performed at the organizational, program, or portfolio level and therefore, would be outside of the project’s level of control.
  • 4. Initiating Process Group Project Selection Methods Current situation The organization have an internal business needs or external influences. So the organization have to create a needs analysis, feasibility study, business case or description of the situation to take a go/no-go decision regarding the project initiation.  Selection Methods (Profitability Measures) – Comparative Approach (Decision models) such as:  B/C Ratio,  PV, NPV,IRR and  payback period. – Mathematical Approach (Calculation methods) such as:  Linear programming  Non linear programming
  • 5. Project Selection Methods Comparative Approach  Benefit Cost Ratio (BCR) The ratio of financial benefits to costs to produce the product of the project.  BCR = (PV of Revenues)/(PV of Costs)  BCR > 1 means the revenues (benefits) outweigh the costs.  BCR < 1 means the revenues (benefits) are less than the costs. The higher the BCR the better.
  • 6. Project Selection Methods Comparative Approach  Cash Flow Analysis Techniques, – Discounted Cash flows: The concept here is money in the future is worth less than money received today. – Present Value is based on the “time value of money”, it is a way to take time out of the equation and evaluate how much a project is worth right now. – Example : If a project is expected to produce 3 annual payments of $100,000 then PV (how much those payments are worth right now) is going to be less then 300,000
  • 7. Project Selection Methods Comparative Approach  Present Value Calculation, – You don’t need to remember the formula, but you need to understand the concept.  Present Value = Future Value / (1+i)ⁿ i = Interest Rate n = Number of Periods – The higher the Present Value, the better. – e.g. Present value of receiving $300,000 in three years considering an interest rate of 10% PV = 300,000 / (1+0.1)³ = $230,769,23
  • 8. Project Selection Methods Comparative Approach  Internal Rate of Return, – It’s a finance term used to express the project returns as an interest rate – If you “invest” in the project, what is your equivalent rate (IRR) ? Conceptually an organization has a choice whether to invest in a project, or put that same money in a bank account. – Obviously, the higher the IRR, the better. – Again, you will not be asked to calculate this measure, but you need to understand the concept.
  • 9. Project Selection Methods Comparative Approach  Payback Period, – Length of time it takes to recoup funds invested in the project. – This method compares the initial investment to the cash inflows expected over the life of the product, service or results – Obviously with all other things being equal, shorter payback periods are generally better for an organization.
  • 10. Project Selection Methods Comparative Approach  Opportunity Cost, – The cost of selecting a project over another project. i.e. the lost opportunity cost. – Opportunity cost asks: What is the cost of the other opportunities we missed by investing our money in this project? – Example – Project A – NPV : $100,000 – Project B – NPV : $250,000 – Opportunity Cost of selecting Project B is $ 100,000
  • 11. Project Selection Methods Comparative Approach  (Example), – Make one value in each column that shows the most desirable value , given the information provided:
  • 12. Project Selection Methods Mathematical Approach  It provides a way to calculate the value of the projects  also called constraint optimization methods such as: – Linear programming – Non linear programming  For the exam all you need to understand about mathematical models is that they use linear, dynamic, integer, multi- objective programming in the form of algorithms to solve a particular problem
  • 13. Initiating Process Group & Knowledge Areas
  • 14. Initiating Process Group & Integration Management Knowledge Area  Integration Management Knowledge Area  Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.  It includes making choices about resource allocation, making trade-offs among competing objectives and alternatives, and managing the interdependencies among the project management Knowledge Areas.  It’s necessary in situations where individual processes interact.  For example,  A cost estimate needed for a contingency plan involves integrating the processes in the Project Cost, Time, and Risk Management Knowledge Areas.  The integrative nature of projects and project management can be understood by thinking of other types of activities performed while completing a project.  For Example Develop, review, analyze, and understand the scope. This includes the project and product requirements, criteria, assumptions, constraints, and other influences related to a project, and how each will be managed or addressed within the project;
  • 15. Initiating Process Group Develop Project Charter Current situation  Project statement of work, Business case or Agreements have been developed outside the project.  An entity external to the project such as a sponsor, program or project management office (PMO) staff person, or a portfolio governing body chairperson or authorized representative decided to go with the new project and will sponsor it.  The organization need to validates the alignment of the project with the strategy and ongoing work of the organization. Also, it must be have  A well-defined project and project boundaries,  A way for senior management to formally accept and commit to the project,  A formal record of the project.
  • 16. Develop Project Charter Data Flow Diagram It is recommended that the project manager participate in the development of the project charter to obtain a foundational understanding of the project requirements. This understanding will better allow for efficient resources allocation to project activities.
  • 17. Develop Project Charter: Inputs 1. Project Statement of Work(SOW) Is a narrative description of products, services, or results to be delivered by a roject.  The SOW references the following,  Business need, based on a market demand, technological advance, legal requirement, government regulation, or environmental consideration. (Typically, the business need and the cost-benefit analysis are contained in the business case to justify the project.)  Product scope description. It also document the relationship between the products, services, or results being created and the business need that the project will address.  Strategic plan. The strategic plan documents the organization’s strategic vision, goals, and objectives and may contain a high-level mission statement (All projects should be aligned with their organization’s strategic plan).  For internal projects, the project initiator or sponsor provides SOW based on business needs, product, or service requirements. For external projects, the SOW be received from the customer as part of a bid document, (e.g., a request for proposal, request for information, or request for bid) or as part of a contract.
  • 18. Develop Project Charter: Inputs 2. Business Case  It used for decision making by managers or executives above the project level to determine whether or not the project is worth the required investment.  The project manager is responsible for ensuring that the project effectively and efficiently meets the goals of the organization and those requirements of a broad set of stakeholders, as defined in the business case.  Periodic review of the business case by the sponsoring organization confirm that the project is still aligned with the business case. 3. Agreements are used to define initial intentions for a project.  Agreements may take the form of contracts, memorandums of understanding (MOUs), service level agreements (SLA), letter of agreements, letters of intent, verbal agreements, email, or other written agreements. 4. Enterprise Environmental Factors (EEF). 5. Organizational Process Assets (OPA).
  • 19. Develop Project Charter: Tools & Techniques (T&T) 1. Expert Judgment, To assess the inputs used to develop the project charter 2. Facilitation Techniques, Like Brainstorming, conflict resolution, problem solving, and meeting management to used by facilitators to help teams and individuals accomplish project activities. General Notes: 1. A project manager is identified and assigned as early in the project as is feasible, preferably while the project charter is being developed and always prior to the start of planning. 2. The two techniques above have broad application within project management processes.
  • 20. Develop Project Charter: Outputs Project Charter  It is the document issued by the project initiator or sponsor.  It formally authorizes the existence of a project.  It provides the project manager with the authority to apply organizational resources to project activities. Notes,  A project charter establish internal agreements within an organization to assure proper delivery under the contract.  A project charter is not considered to be a contract, because there is no consideration or money promised or exchanged in its creation.
  • 21. Develop Project Charter: Outputs Project Charter documents the following project’s information , – Project purpose or justification(business needs), – Measurable project objectives and related success criteria, – High-level requirements, – Assumptions and constraints, – High-level project description and boundaries, – High-level risks, – Summary milestone schedule, – Summary budget, – Stakeholder list, – Project approval requirements  (i.e., what constitutes project success, who decides the project is successful, and who signs off on the project), – Assigned project manager, responsibility, and authority level, – Name and authority of the sponsor or other person(s) authorizing the project charter.
  • 22. Initiating Process Group & Stakeholder Management Knowledge Area  Project stakeholders are individuals, groups, or organizations who may affect, be affected by, or perceive themselves to be affected by a decision, activity, or outcome of a project.  Project Stakeholder Management includes the processes required to 1. Identify the people, groups, or organizations that could impact or be impacted by the project, 2. Analyze stakeholder expectations and their impact on the project, 3. Develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution.
  • 23. Initiating Process Group Identify Stakeholders Current situation  Project charter have been developed, the project aurhorized and the project manager identfied.  Every project will have stakeholders who are impacted by or can impact the project in a positive or negative way. While some stakeholders may have a limited ability to influence the project, others may have significant influence on the project and its expected outcomes.  The ability of the project manager to correctly identify and manage these stakeholders in an appropriate manner can mean the difference between success and failure. General Notes: 1. Stakeholder satisfaction should be managed as a key project objective.
  • 24. Identify Stakeholders It is critical for project success to identify the stakeholders early in the project or phase and to analyze their levels of interest, their individual expectations, as well as their importance and influence. The initial assessment of the stakeholders should be reviewed and updated regularly.
  • 25. Identify Stakeholders: Inputs 1. Project Charter, It provide information about internal and external parties related with the project and affected by the result or the execution of the project 2. Procurement Documents, If a project is the result of a procurement activity or is based on an established contract, the parties in that contract are key project stakeholders. 3. Enterprise Environmental Factors (EEF). 4. Organizational Process Assets (OPA). The buyer structures procurement documents to facilitate an accurate and complete response from each prospective seller and to facilitate easy evaluation of the responses.
  • 26. 1. Stakeholder Analysis 1. Identify all potential project stakeholders and relevant information 2. Analyze the potential impact or support each stakeholder could generate, and classify them using one of the following models,  Power/interest grid, (Authority & Concern)  Power/influence, (Authority & their active involvement )  Influence/impact, (Involvement & ability to effect changes)  Salience model, (power, urgency & legitimacy) 3. Prioritize the stakeholders to ensure the efficient use of effort to communicate and manage their expectations. 4. Assess how key stakeholders are likely to react or respond in various situations. Identify Stakeholders: Tools & Techniques (T&T)
  • 27. Identify Stakeholders: Tools & Techniques (T&T) 2. Expert Judgment  Expert judgment can be obtained through individual consultations (one-on-one meetings, interviews, etc.) or through a panel format (focus groups, surveys, etc.). Example of expert,  Identified key stakeholders;  Project managers who have worked on projects in the same area (directly or through lessons learned);  Subject matter experts (SMEs) in the business or project area;  Industry groups and consultants; and 3. Meetings, Profile analysis meetings are project meetings designed to develop an understanding of major project stakeholders, and they can be used to exchange and analyze information about roles, interests, knowledge, and the overall position of each stakeholder facing the project.
  • 28. Identify Stakeholders: Outputs 1. Stakeholder Register, The stakeholder register should be consulted and updated on a regular basis, as stakeholders may change—or new ones identified—throughout the life cycle of the project.