A Forrester Total Economic Impact™ Study Prepared For IBM


Total Economic Impact™ IBM System Storage SAN
Volume Controller
Project Director: Sadaf Roshan Bellord
Contributors: Jon Erickson
May 2012
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




TABLE OF CONTENTS
Executive Summary ................................................................................................................................................................................. 2 

     IBM SAN Volume Controller Reduces IT Capital And Operating Costs ............................................................................... 2 

     Factors Affecting Benefits And Costs ............................................................................................................................................. 3 

     Disclosures ........................................................................................................................................................................................... 4 

TEI Framework And Methodology...................................................................................................................................................... 5 

Analysis ...................................................................................................................................................................................................... 6 

     Interview Highlights .......................................................................................................................................................................... 6 

     Costs...................................................................................................................................................................................................... 8 

     Benefits ............................................................................................................................................................................................... 10 

     Flexibility............................................................................................................................................................................................ 14 

     Risk...................................................................................................................................................................................................... 15 

Financial Summary................................................................................................................................................................................ 17 

IBM System Storage SAN Volume Controller: Overview.............................................................................................................. 18 

Appendix A: Composite Organization Description ....................................................................................................................... 18 

Appendix B: Total Economic Impact™ Overview ............................................................................................................................ 19 

Appendix C: Glossary ........................................................................................................................................................................... 20 

Appendix D: Endnotes.......................................................................................................................................................................... 20 


© 2012, Forrester Research, Inc. All rights reserved. Unauthorized reproduction is strictly prohibited. Information is based on best available resources.
Opinions reflect judgment at the time and are subject to change. Forrester®, Technographics®, Forrester Wave, RoleView, TechRadar, and Total
Economic Impact are trademarks of Forrester Research, Inc. All other trademarks are the property of their respective companies. For additional
information, go to www.forrester.com.


About Forrester Consulting
Forrester Consulting provides independent and objective research-based consulting to help leaders succeed in their organizations. Ranging in
scope from a short strategy session to custom projects, Forrester’s Consulting services connect you directly with research analysts who apply
expert insight to your specific business challenges. For more information, visit www.forrester.com/consulting.




Page 1
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Executive Summary
In June 2011, IBM commissioned Forrester Consulting to examine the total economic impact and potential return on
investment (ROI) enterprises may realize by deploying System Storage SAN Volume Controller (SVC). The purpose of
this study is to provide readers with a framework to evaluate the potential financial impact of System Storage SAN
Volume Controller on enterprise organizations. SVC is designed to simplify and centralize storage infrastructure and
offer benefits of storage virtualization for large enterprises.


IBM SAN Volume Controller Reduces IT Capital And Operating Costs
Our interviews and surveys with 11 existing customers and subsequent financial analysis found that a composite
organization based on the organizations interviewed experienced the risk-adjusted ROI, costs, and benefits shown in
Table 1.1 See Appendix A for a description of the composite organization. (All numbers have been rounded).


Table 1
Composite Organization Three-Year Risk-Adjusted ROI

         ROI               Payback       Total benefits       Total costs     Net present
                            period           (PV)                (PV)           value

         75%              18 months        $6,151,813        ($3,520,622)     $2,631,191


Source: Forrester Research, Inc.



     Benefits. The composite organization experienced the following benefits that represent those experienced by the
         interviewed and surveyed companies:

         o     Capital cost avoidance. This benefit represents the capital costs avoidance associated with reduction of 650
               TB of storage.

         o     Reduction in expected staff growth. This benefit represents the savings associated with managing future
               headcount growth while the storage environment is rapidly growing.

         o     Improved efficiency of existing IT staff. This benefit represents the reduction in administrative costs of
               managing storage compared to the prior environment.

         o     Improving data availability to end users. This benefit represents improvement in system availability for
               end users.

     Costs. The composite organization experienced the following costs:

         o     Total software license and maintenance fees. This cost represents the investment in software licenses and
               support costs for SVC implementation.




Page 2
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




         o    Total hardware and support costs. This cost represents the investment in hardware and its related support
              costs.

         o    Internal implementation costs. This cost represents the internal resources used to support the
              implementation.

         o    Administrative costs. This cost represents the ongoing administrative effort associated with the deployment
              of IBM SVC.


Figure 1
Composite Organization Three-Year Risk-Adjusted ROI

  $9,000,000


  $8,000,000


  $7,000,000


  $6,000,000


  $5,000,000
                                              Risk‐adjusted                                                     Costs
                                             breakeven point                                                    Benefits
  $4,000,000
                                              at 18 months

  $3,000,000


  $2,000,000


  $1,000,000


             $0
                             Initial             Year 1             Year 2                Year 3


Source: Forrester Research, Inc.



Factors Affecting Benefits And Costs
Table 1 illustrates the risk-adjusted financial results that were achieved by the composite organization. The risk-
adjusted values take into account any potential uncertainty or variance that exists in estimating the costs and benefits,




Page 3
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




which produces more conservative estimates. The following factors may affect the financial results that an organization
may experience:

     IT efficiency. Improvements in IT process efficiency are variable and are largely based on getting staff to change
         their behavior to the new environment. Possible factors that might affect the magnitude of the gains from IT
         efficiency include the staff skill set, what new tasks staff members are transferred to do, as well as the speed to
         implement the new solution.

     Impact of availability. The overall benefit of improved availability will depend on the type of supported
         application as well as the productive value of the type and number of end users.

     Capital cost impact. Reducing capital cost of storage is dependent in part on the current per terabyte cost of
         storage, the pre investment growth of storage, as well as how quickly the organization can move to the new
         environment.


Disclosures
The reader should be aware of the following:

     The study is commissioned by IBM and delivered by the Forrester Consulting group.

     Forrester makes no assumptions as to the potential return on investment that other organizations will receive.
       Forrester strongly advises that readers should use their own estimates within the framework provided in the
       report to determine the appropriateness of an investment in IBM System Storage SAN Volume Controller.

     IBM reviewed and provided feedback to Forrester, but Forrester maintains editorial control over the study and its
       findings and does not accept changes to the study that contradict Forrester’s findings or obscure the meaning of
       the study.

     The customers for the interviews were provided by IBM and an external third-party organization.




Page 4
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




TEI Framework And Methodology

Introduction
From the information provided in the interviews, Forrester has constructed a Total Economic Impact™ framework for
those organizations considering implementing IBM System Storage SAN Volume Controller. The objective of the
framework is to identify the cost, benefit, flexibility, and risk factors that affect the investment decision.


Approach And Methodology
Forrester took a multistep approach to evaluate the impact that IBM System Storage SAN Volume Controller can have
on an organization (see Figure 2). Specifically, we:

     Interviewed IBM marketing, sales, and consulting personnel and Forrester analysts to gather data relative to
          System Storage SAN Volume Controller and the marketplace for System Storage SAN Volume Controller.

     Received primary data from a combination of in-depth customer interviews as well as a broader survey of
          customers who are currently using IBM System Storage SAN Volume Controller to obtain data with respect to
          costs, benefits, and risks.

     Designed a composite organization based on characteristics of the interviewed and surveyed organizations (see
          Appendix A).

     Constructed a financial model representative of the interviews using the TEI methodology. The financial model is
          populated with the cost and benefit data obtained from the interviews as applied to the composite organization.


Figure 2
TEI Approach


                                Conduct                                   Construct financial
  Perform due                                    Design composite                                      Write case
                                customer                                   model using TEI
   diligence                                       organization                                         study
                               interviews                                    framework


Source: Forrester Research, Inc.



Forrester employed four fundamental elements of TEI in modeling IBM/System Storage SAN Volume Controller’s
service:

          1.    Costs.

          2.    Benefits to the entire organization.

          3.    Flexibility.




Page 5
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




          4.    Risk.

Given the increasing sophistication that enterprises have regarding ROI analyses related to IT investments, Forrester’s
TEI methodology serves the purpose of providing a complete picture of the total economic impact of purchase
decisions. Please see Appendix B for additional information on the TEI methodology.




Analysis

Interview Highlights
In-depth interviews were conducted for this study, involving representatives from:

          1.    A large regional US-based financial institution with more than $170 billion worth of assets managing over
                1,600 retail branches and 2,800 ATMs. The organization services clients nationally and offers a full
                selection of technology-based banking channels including online, customer service centers, and the latest
                mobile devices.

          2.    A survey-based interview with 10 enterprise clients of SVC located within North America. These
                organizations had between 200 TB and 1,500 TB of storage within their environment and had been using
                the IBM SVC product for at least 12 months.

Interactions with SVC clients uncovered the following characteristics which formed the basis of the financial model:

     All of the interviewed organizations were large enterprise clients with at least 200 TB of primary storage within
          their environment prior to the investment in SVC. In most cases, storage assets and storage administrators were
          distributed across multiple geographical locations, increasing the complexity of the storage environment.

     A common recurring theme across the interviewed organizations was the need to better react to increasing
          demands from business owners for increased storage. For many organizations, the storage volume was
          increasing roughly 15% to 30% per year, particularly for data-rich applications.

     While these organizations struggled with the increased capital cost burden from the growth of storage, they also
          felt increased pressure to increase staff to manage the increasingly complex storage environment. However,
          many organizations could not effectively ramp staffing to meet the growth of storage either due to lack of skilled
          staff or budget cutbacks across the enterprise. As a result, organizations were faced with a growing storage
          environment that became less efficient to maintain over time while they were also unable to increase staff.

     Organizations invested in SVC to improve the efficiency and effectiveness of their IT storage environment. SVC
          allowed organizations to improve the efficiency of their existing staff while at the same time better manage the
          demand for additional staffing resources as the demand for storage capacity grew. Organization could perform
          specific storage administrator functions including provisioning new storage, storage maintenance, as well as
          scheduled and unscheduled backups and recovery more efficiently with SVC.




Page 6
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




     In terms of improved effectiveness, organizations could now better control and manage storage capacity,
          reducing spiraling upward trends around storage growth and allowing the organization to postpone future
          investments in storage assets. Organizations can better utilize existing storage through SVC’s thin provisioning
          features.

     While the interviewed organizations did note a positive return from their investment, the decision to go ahead
          with SVC was not without risk. In particular, organizations noted the importance of effective planning and
          change management within storage environment to realize benefits quickly and demonstrate value rapidly in an
          environment of ongoing cost-cutting.


Composite Organization
Based on in-depth interviews with an existing customer provided by IBM and surveys of 10 customers using IBM SVC,
Forrester constructed a TEI framework, a composite company, and an associated ROI analysis that illustrates the areas
financially affected. The composite organization that Forrester synthesized from these results represents a large
organization with 5,000 employees that is managing more than 4 PB of data. The organization deployed IBM SVC to
better manage its growing storage needs.


Framework Assumptions
Table 2 provides the model assumptions that Forrester used in this analysis.


Table 2
Model Assumptions

      Ref.                                         Metric                      Calculation           Value

       A1              Hours per week                                                                          40

       A2              Weeks per year                                                                          52

       A3              Hours per year (M-F, 9-5)                                 A1*A2                       2,080

       A5              Average fully loaded salary of storage administrator                             $120,000

       A6              Fully loaded hourly rate of storage administrator         (A5/A3)                      $58

       A7              Average fully loaded salary of end user                                          $100,000

       A8              Fully loaded hourly rate of end user                      (A7/A3)                      $48


Source: Forrester Research, Inc.



The discount rate used in the PV and NPV calculations is 10% and time horizon used for the financial modeling is three
years. Organizations typically use discount rates between 8% and 16% based on their current environment. Readers are




Page 7
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




urged to consult with their respective company’s finance department to determine the most appropriate discount rate
to use within their own organizations.


Costs
This section describes and lists the costs related to planning, testing, and implementing IBM SVC over the three-year
period. Cost consumptions are based on detailed interviews with an organization using IBM SVC and a survey
completed with 10 existing IBM SVC customers. All costs are based on list prices and recommended vendor discount.
These costs do not include any negotiated discounts. The following cost model for the composite organization serves as
a framework for other organizations.


Total Software License And Maintenance Fees
This category represents 79% of the overall investment. There are three components to the software costs: base system
software, FlashCopy, and Remote Mirror. IBM recommends 45% as a representative vendor discount for software
purchased for this investment. The software maintenance costs for Year 1 are included in the initial software licensing
cost. The maintenance cost starts in Year 2 and equates to 20% of the software license list price. Table 3 illustrates the
calculation.


Table 3
Total Software License And Maintenance Fees

   Ref.                   Metric               Calculation         Initial     Year 1        Year 2         Year 3

    B1       Base pricing                                         $1,056,000            $0   $211,200         $211,200

    B2       FlashCopy — source only                               $356,224             $0    $71,245          $71,245

             Remote Mirror — source and
    B3                                                             $682,083             $0   $136,417         $136,417
             target

             Total software license and
    Bt                                          B1+B2+B3          $2,094,307            $0   $418,862         $418,862
             maintenance fees


Source: Forrester Research, Inc.



Total Hardware And Support Costs
This category represents 6% of the overall investment in IBM SVC. It includes hardware costs and related maintenance
costs for SVC engines without SSD. IBM recommends 45% as a representative vendor discount for hardware purchased
for this investment. Table 4 presents the calculation.




Page 8
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Table 4
Total Hardware And Support Costs

   Ref.                Metric            Calculation         Initial      Year 1         Year 2     Year 3

    C1       Hardware                                        $154,000              $0     $30,800    $30,800

             Total hardware and
    Ct                                          C1           $154,000              $0     $30,800    $30,800
             support costs


Source: Forrester Research, Inc.



Internal Implementation Costs
The next component of costs is internal implementation costs. It describes the internal resources required to plan and
implement IBM SVC. During this phase, the organization used the equivalent of three full-time resources allocated 30%
of their time to planning, testing, and implementation. The organizations interviewed and surveyed used SVC to
simplify their storage environment and eliminate downtime resulting from outdated equipment. This category
represents 3% of the overall investment. Table 5 illustrates the calculation.


Table 5
Internal Implementation Costs

   Ref.                    Metric                    Calculation        Per period

   D1        Number of people                                                        3

   D2        Average fully loaded hourly rate                              $120,000

   D3        Percent of time spent                                             30%

    Dt       Internal implementation costs           D1*D2*D3              $108,000


Source: Forrester Research, Inc.



Temporary Administrative Support
The final category of costs represents the temporary resources to manage hardware migration. It represents 12% of the
overall investment. Organizations interviewed used equivalent of two full-time contractors for two years to support
planning, testing, and deployment. These individuals were tasked to provision new hardware and decommission old
hardware. Table 6 presents this calculation.




Page 9
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Table 6
Temporary Administrative Costs

   Ref.                        Metric                   Calculation        Initial            Year 1

    E1       Number of people                                                          2

    E2       Hourly rate per person                                         $110,000

    Et       Temporary administrative costs               E1*E2             $220,000           $220,000


Source: Forrester Research, Inc.



Total Costs
Table 7 summarizes costs associated with the implementation of IBM SVC.


Table 7
Total Costs — Non-Risk-Adjusted

                                                                                                                        Present
                       Costs                  Initial         Year 1      Year 2           Year 3          Total
                                                                                                                         value

 Total software license and
                                         ($2,094,307)                     ($418,862)       ($418,862)   ($2,932,029)   ($2,755,170)
 maintenance fees

 Total hardware and support costs          ($154,000)                      ($30,800)        ($30,800)     ($215,600)    ($202,595)

 Internal implementation costs             ($108,000)                                                     ($108,000)    ($108,000)

 Temporary administrative costs            ($220,000)        ($220,000)                                   ($440,000)    ($420,000)

 Total costs                             ($2,576,307)        ($220,000)   ($449,662)       ($449,662)   ($3,695,629)   ($3,485,765)


Source: Forrester Research, Inc.



Benefits
The benefits that we had sufficient data to quantify financially were: 1) capital cost avoidance; 2) reduction in expected
staff growth; 3) improved efficiency of existing staff; and 4) improved data availability to end users. These benefits
represent business and IT operating savings and capital savings that represented a three-year risk-adjusted PV of
$6,151,813. Readers should note that these benefits represent the values that the interviewed and surveyed organizations
received from deployment of IBM SVC.




Page 10
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Capital Costs Avoidance
Customers interviewed have been able to decommission as much as 650 TB of storage or 15% of overall storage as a
result of freeing up unused capacity as well as reducing growth of storage within their environment. For existing assets,
organizations indicated improved flexibility to increase capacity utilization within the storage pool, using existing
storage more efficiently rather than purchasing new storage. In addition, improved flexibility allows organizations to
control their storage growth by rightsizing their environment to the storage needs of current applications. This capital
savings over three years of investment equates to roughly $5,000,000 driven by an improvement of capacity utilization
of between 20% and 30% as well as a yearly reduction in the growth of storage by on average 15%. The savings includes
hardware costs savings and resources required to manage and provision. Table 8 illustrates this calculation. This
category represents 62% of the overall benefits.


Table 8
Capital Costs Avoidance

   Ref.                            Metric                         Calculation    Year 1        Year 2        Year 3

             Capital cost avoided associated with
    F1                                                                          $1,000,000   $1,500,000     $2,500,000
             decommissioned terabytes of storage

    Ft       Capital costs avoidance                                  F1        $1,000,000   $1,500,000     $2,500,000


Source: Forrester Research, Inc.



Reduction In Expected Staff Growth
Organizations interviewed and surveyed have shown double-digit growth in the volume of data that they are managing
while keeping their staff size flat. In the pre-SVC environment, organizations struggled to keep up with data growth,
resulting in the need to increase staff at the same rate as data. The increase in staff was necessary to manage the
escalation in physical storage equipment.

After implementing SVC, its virtualization capability enabled the organizations to better manage capacity between their
primary and secondary storage environment. These organizations were able to manage physical storage equipment of
different brand through a single source. It allowed storage administrators to manage and control a greater share of
storage per staff member over a multiple locations. As a result, the organization did not have to hire additional staff at
the same rate as the baseline data growth.

To estimate this saving for the composite organization, we assume that the organization would have been required to
hire five people in various IT roles to manage the growth within the storage environment. The reduction in staff growth
isn’t limited to storage administrators and will include staff who would be involved in planning, provisioning, and
ongoing management. Table 9 demonstrates the calculation used. This category represents 23% of the overall benefits.




Page 11
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Table 9
Reduced Staff Growth

   Ref.                    Metric                   Calculation          Yearly

   G1        Number of workers saved                                                5

   G2        Annual fully loaded salary                                      $120,000

             Reduction in expected staff
    Gt                                                 G1*G2                 $600,000
             growth


Source: Forrester Research, Inc.



Improved Efficiency Of Existing Staff
In addition to trimming the growth of staff, organizations also noted their existing storage administration staff was
made more efficient through the use of SVC tools. For example, the use of thin provisioning features allowed staff to
reduce the time it took to make changes or updates to the storage environment.

For the composite organization, we estimate that 10 IT staff members with fully loaded annual salary of $120,000
allocated 70% of their time to provisioning and ongoing management. Interviewed and surveyed organizations cited
that their teams experienced 26% in staff efficiency improvement as compared to the prior environment. To remain
conservative, we estimate that the organization realized 50% of benefits in Year 1, 75% in Year 2, and 100% in Year 3.
Table 10 exhibits this calculation. This category represents 7% of the overall benefits.


Table 10
IT Productivity Savings

   Ref.                   Metric                 Calculation       Initial       Year 2       Year 3

   H1        Number of workers                                           10             10        10

   H2        Annual fully loaded salary                           $120,000     $120,000      $120,000

             Percent of time allocated to
   H3        provisioning and ongoing                                  70%          70%          70%
             management

             Percent improvement in staff
   H4        efficiency compared with                                  26%          26%          26%
             previous environment

   H5        Percent of benefit realized                               60%         100%         100%

             Improved efficiency of
    Ht                                        H1*H2*H3*H4*H5      $131,040     $218,400      $218,400
             existing staff




Page 12
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Source: Forrester Research, Inc.



Improving Data Availability To End Users
With increased complexity within the storage environment, another area affected by the investment in SVC was backup
and recovery of data. Interviewed organizations noted that with the increase in data growth, the time to perform
scheduled backups increased at a constant rate. For many organizations, having storage across multiple geographies
compounded the time and effort to perform scheduled backups. In particular, several organizations noted that many of
the actual backups went beyond the expected backup windows, impacting the productivity of users accessing data.

Several organizations noted that using SVC to virtualize has improved availability of data access to applications.
Organizations interviewed cited the ability to move application data between storage resources within a virtualized
environment without having to take the application offline has significantly reduced downtime. By maintaining
application availability to storage resources, organizations were able to maintain consistently high levels of uptime
versus the environment prior to SVC.

For the composite organization, we estimate on average 1,500 employees at a fully loaded hourly rate of $48
experienced 20 hours of downtime annually prior to the investment in SVC. This downtime was specifically a result of
increasing backup and recovery windows. The downtime affected end users’ ability to access data and reduced system
availability. Data from interviews and surveys revealed that organizations’ ability to get new storage capacity
operational has improved by 17% as compared to the prior environment. Table 11 illustrates the calculation. This
category represents 8% of the overall benefits.


Table 11
Improving Data Availability To End Users


   Ref.                    Metric                   Calculation      Initial        Year 2     Year 3

    I1       Total number of employees                                  1,500          1,500      1,500

    I2       Average fully loaded hourly rate                             $48           $48        $48

             Average time spent on backup
    I3                                                                         20        20         20
             and recovery

             Percent improvement to get
             new storage capacity
    I4                                                                   17%            17%        17%
             operational faster as compared
             to previous environment


    I5       Percent of benefit realized                                 60%           100%       100%



    It       Improving data availability to        G1*G2*G3*G4      $146,880        $244,800   $244,800




Page 13
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




             end users


Source: Forrester Research, Inc.



Total Benefits
Table 12 summaries the total quantitative benefits associated with implementation of IBM SVC.


Table 12
Total Benefits — Non-Risk-Adjusted

                 Benefits                   Year 1                Year 2       Year 3        Total              PV

 Capital costs avoidance                    $1,000,000            $1,500,000   $2,500,000    $5,000,000       $4,027,047

 Reduction in expected staff
                                              $600,000             $600,000     $600,000     $1,800,000       $1,492,111
 growth

 Improved efficiency of existing
                                              $131,040             $218,400     $218,400      $567,840          $463,710
 staff

 Improving data availability to
                                              $146,880             $244,800     $244,800      $636,480          $519,763
 end users

 Total benefits                             $1,877,920            $2,563,200   $3,563,200    $8,004,320       $6,502,632


Source: Forrester Research, Inc.



Flexibility
As defined by Forrester, flexibility represents an investment in additional capacity or capability that could be turned
into business benefit for some future additional investment. This provides an organization with the “right” or the ability
to engage in future initiatives but not the obligation to do so. There are multiple scenarios in which a customer might
choose to implement SVC and later realize additional uses and business opportunities. Flexibility would also be
quantified when evaluated as part of a specific project (described in more detail in Appendix A).

If the following metrics are available — the asset value by measuring the benefits (that is, costs avoided or saved,
revenue generated, and/or capital saved), the costs to acquire the solution, and the number of years to measure the
investment — we can estimate the flexibility option by using the Black-Scholes option pricing model.




Page 14
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Table 13
Flexibility Benefit Framework

              Metric                                                       Calculation

Asset value (benefit)              IT or business costs avoided, revenue generated, capital saved

Cost to acquire option             Planning and discovery, subscription, and annual maintenance are examples of costs to
                                   consider

Expiration                         Time-to-expire (in years)

Flexibility                        Black-Scholes option pricing model


Source: Forrester Research, Inc.



Risk
Forrester defines two types of risk associated with this analysis: implementation risk and impact risk. “Implementation
risk” is the risk that a proposed investment in IBM System Storage SAN Volume Controller may deviate from the
original or expected requirements, resulting in higher costs than anticipated. “Impact risk” refers to the risk that the
business or technology needs of the organization may not be met by the investment in SAN Volume Controller,
resulting in lower overall total benefits. The greater the uncertainty, the wider the potential range of outcomes for cost
and benefit estimates.

Quantitatively capturing investment and impact risk by directly adjusting the financial estimates results in more
meaningful and accurate estimates and a more accurate projection of the ROI. In general, risks affect costs by raising
the original estimates, and they affect benefits by reducing the original estimates. The risk-adjusted numbers should be
taken as “realistic” expectations since they represent the expected values considering risk.

The following implementation risks that affect costs are identified as part of this analysis:

     The implementation costs could vary based on the internal skill set and competencies.

     The implementation costs could take longer than anticipated due to lack of planning and testing of the solution.

The following impact risks that affect benefits are identified as part of the analysis:

     The improvement in administrative effort could vary depending on the prior infrastructure and virtualization
        effort.

     The amount of excess capacity reclaimed and the level of storage growth reduced could be lower than originally
        anticipated, leading to reduced storage cost savings.

     The level of downtime reduced could be lower than originally anticipated.




Page 15
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Table 14 shows the values used to adjust for risk and uncertainty in the cost and benefit estimates. The TEI model uses a
triangular distribution method to calculate risk-adjusted values. To construct the distribution, it is necessary to first
estimate the low, most likely, and high values that could occur within the current environment. The risk-adjusted value
is the mean of the distribution of those points. Readers are urged to apply their own risk ranges based on their own
degree of confidence in the cost and benefit estimates.


Table 14
Cost And Benefit Risk Adjustments

                                                                                  Most
       Costs                                                          Low                       High        Mean
                                                                                  likely

       Total software license and maintenance fees                    98%         100%          105%        101%

       Total hardware and support costs                               98%         100%          105%        101%

       Internal implementation costs                                  98%         100%          105%        101%

       Administrative costs                                           98%         100%          105%        101%

                                                                                  Most
       Benefits                                                       Low                       High        Mean
                                                                                  likely

       Capital cost avoidance                                         80%         100%          103%         94%

       Reduction in expected staff growth                             80%         100%          103%         94%

       Improved efficiency of existing staff                          90%         100%          105%         98%

       Improving data availability to end users                       90%         100%          105%         98%


Source: Forrester Research, Inc.



Readers are urged to apply their own risk ranges based on their own degree of confidence in the cost and benefit
estimates.




Page 16
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




Financial Summary
The financial results calculated in the Costs and Benefits Sections can be used to determine the return on investment,
net present value, and payback period for the organization’s investment in SAN Volume Controller. These are shown in
Table 15 below.


Table 15
Cash Flow — Non-Risk-Adjusted

    Categories             Initial        Year 1       Year 2       Year 3         Total         PV

 Costs                 ($2,576,307)      ($220,000)   ($449,661)   ($449,661)   ($3,695,629)   ($3,485,765)

 Benefits                                $1,877,920   $2,563,200   $3,563,200    $8,004,320     $6,502,632

 Net benefits          ($2,576,307)      $1,657,920   $2,113,539   $3,113,539    $4,308,691     $3,016,867

 ROI                               87%

 Payback period          17 months


Source: Forrester Research, Inc.



Table 16 below shows the risk-adjusted ROI, NPV, and payback period values. These values are determined by applying
the risk-adjustment values from Table 14 in the Risk section to the cost and benefits numbers in Tables 7 and 12.


Table 16
Cash Flow — Risk-Adjusted

    Categories             Initial        Year 1       Year 2       Year 3         Total         PV

 Costs                 ($2,602,070)      ($222,200)   ($454,158)   ($454,158)   ($3,732,585)   ($3,520,622)

 Benefits                                $1,776,362   $2,427,936   $3,367,936    $7,572,234     $6,151,813

 Net benefits          ($2,602,070)      $1,554,162   $1,973,778   $2,913,778    $3,839,648     $2,631,191

 ROI                               75%

 Payback period          18 months


Source: Forrester Research, Inc.




Page 17
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




IBM System Storage SAN Volume Controller: Overview
SAN Volume Controller is a storage virtualization system that enables a single point of control for storage resources to
help support improved business application availability and greater resource utilization. The objective is to manage
storage resources in the IT infrastructure and to make sure they’re used to the advantage of business — and do it
quickly, efficiently, in real time, while avoiding increases in administrative costs.

SAN Volume Controller provides an easy-to-use graphical interface for central management. With this single interface,
administrators can perform configuration, management and service tasks in a consistent manner over multiple storage
systems, even from different vendors, which help to improve productivity.

Because it hides the physical characteristics of storage from host systems, SAN Volume Controller is designed to help
insulate host applications from physical changes to the storage pool. This ability can help applications continue to run
without disruption while changes are made to the storage infrastructure, which can help businesses increase availability
to customers.

Storage and server virtualization are complementary technologies that help enable organizations to build a completely
virtualized infrastructure. When used together, server and storage virtualization are intended to enable businesses to
derive greater benefit from each technology than if they deployed them alone.




Appendix A: Composite Organization Description
For this TEI study, Forrester has created a composite organization to illustrate the quantifiable costs and benefits of
implementing System Storage SAN Volume Controller. The composite company is intended to represent a large
organization with 5,000 employees and is based on characteristics of the interviewed and surveyed customers.

The composite company has more than 4 PB of storage existing within the environment. In purchasing System Storage
SAN Volume Controller, the composite company had the following objectives:

     Manage disparate storage assets. Use a single management platform to reduce the cost around storage growth
        and improve the efficiency of storage administrators, while at the same time maintaining high levels of availability
        for end user applications.

     Improve existing storage capacity utilization. As their storage environments grew, the capital cost required to
       increase physical storage space increased. Interviewed and surveyed organizations also saw the need to pool their
       existing resources through virtualization, allowing them to better maximize the use of their existing assets by
       having the flexibility to shift data to less costly resources.

     Pressure to do more with existing staff. Another common theme among the interviewed organizations was the
       need to control storage administration costs with increasing amount of storage under management. Storage
       virtualization allowed the interviewed organizations to centralize their storage administration leading to higher
       levels of efficiency.




Page 18
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




For the purpose of the analysis, Forrester assumes that the organization had invested in SVC as part of an overall
initiative to contain the overall costs of storage management while increasing the availability and scalability of primary
and secondary storage.




Appendix B: Total Economic Impact™ Overview
Total Economic Impact is a methodology developed by Forrester Research that enhances a company’s technology
decision-making processes and assists vendors in communicating the value proposition of their products and services
to clients. The TEI methodology helps companies demonstrate, justify, and realize the tangible value of IT initiatives to
both senior management and other key business stakeholders.

The TEI methodology consists of four components to evaluate investment value: benefits, costs, risks, and flexibility.


Benefits
Benefits represent the value delivered to the user organization — IT and/or business units — by the proposed product
or project. Often product or project justification exercises focus just on IT cost and cost reduction, leaving little room to
analyze the effect of the technology on the entire organization. The TEI methodology and the resulting financial model
place equal weight on the measure of benefits and the measure of costs, allowing for a full examination of the effect of
the technology on the entire organization. Calculation of benefit estimates involves a clear dialogue with the user
organization to understand the specific value that is created. In addition, Forrester also requires that there be a clear line
of accountability established between the measurement and justification of benefit estimates after the project has been
completed. This ensures that benefit estimates tie back directly to the bottom line.


Costs
Costs represent the investment necessary to capture the value, or benefits, of the proposed project. IT or the business
units may incur costs in the form of fully burdened labor, subcontractors, or materials. Costs consider all the
investments and expenses necessary to deliver the proposed value. In addition, the cost category within TEI captures
any incremental costs over the existing environment for ongoing costs associated with the solution. All costs must be
tied to the benefits that are created.


Risk
Risk measures the uncertainty of benefit and cost estimates contained within the investment. Uncertainty is measured
in two ways: 1) the likelihood that the cost and benefit estimates will meet the original projections, and 2) the likelihood
that the estimates will be measured and tracked over time. TEI applies a probability density function known as
“triangular distribution” to the values entered. At minimum, three values are calculated to estimate the underlying
range around each cost and benefit.


Flexibility
Within the TEI methodology, direct benefits represent one part of the investment value. While direct benefits can
typically be the primary way to justify a project, Forrester believes that organizations should be able to measure the




Page 19
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




strategic value of an investment. Flexibility represents the value that can be obtained for some future additional
investment building on top of the initial investment already made. For instance, an investment in an enterprisewide
upgrade of an office productivity suite can potentially increase standardization (to increase efficiency) and reduce
licensing costs. However, an embedded collaboration feature may translate to greater worker productivity if activated.
The collaboration can only be used with additional investment in training at some future point in time. However,
having the ability to capture that benefit has a present value that can be estimated. The flexibility component of TEI
captures that value.




Appendix C: Glossary
Discount rate: The interest rate used in cash flow analysis to take into account the time value of money. Although the
Federal Reserve Bank sets a discount rate, companies often set a discount rate based on their business and investment
environment. Forrester assumes a yearly discount rate of 10% for this analysis. Organizations typically use discount
rates between 8% and 16% based on their current environment. Readers are urged to consult their respective
organization to determine the most appropriate discount rate to use in their own environment.

Net present value (NPV): The present or current value of (discounted) future net cash flows given an interest rate (the
discount rate). A positive project NPV normally indicates that the investment should be made, unless other projects
have higher NPVs.

Present value (PV): The present or current value of (discounted) cost and benefit estimates given at an interest rate
(the discount rate). The PV of costs and benefits feed into the total net present value of cash flows.

Payback period: The breakeven point for an investment. The point in time at which net benefits (benefits minus costs)
equal initial investment or cost.

Return on investment (ROI): A measure of a project’s expected return in percentage terms. ROI is calculated by
dividing net benefits (benefits minus costs) by costs.


A Note On Cash Flow Tables
The following is a note on the cash flow tables used in this study (see the example table below). The initial investment
column contains costs incurred at “time 0” or at the beginning of Year 1. Those costs are not discounted. All other cash
flows in Years 1 through 3 are discounted using the discount rate (shown in Framework Assumptions section) at the
end of the year. Present value (PV) calculations are calculated for each total cost and benefit estimate. Net present value
(NPV) calculations are not calculated until the summary tables and are the sum of the initial investment and the
discounted cash flows in each year.




Appendix D: Endnotes




Page 20
Forrester Consulting
Total Economic Impact™ IBM System Storage SAN Volume Controller




1
 Forrester risk-adjusts the summary financial metrics to take into account the potential uncertainty of the cost and
benefit estimates.




Page 21

Más contenido relacionado

La actualidad más candente

IT Optimization: Navigation Fiscal Austerity
IT Optimization: Navigation Fiscal AusterityIT Optimization: Navigation Fiscal Austerity
IT Optimization: Navigation Fiscal AusterityOmar Toor
 
Business Resilience
Business ResilienceBusiness Resilience
Business Resiliencerix57
 
Building control efficiency: Rationalization, optimization and redesign
Building control efficiency: Rationalization, optimization and redesign Building control efficiency: Rationalization, optimization and redesign
Building control efficiency: Rationalization, optimization and redesign Vladimir Matviychuk
 
Implementing Erp Systems In Small And Midsize Manufacturing Firms
Implementing Erp Systems In Small And Midsize Manufacturing FirmsImplementing Erp Systems In Small And Midsize Manufacturing Firms
Implementing Erp Systems In Small And Midsize Manufacturing FirmsDonovan Mulder
 
Business Continuity Getting Started
Business Continuity Getting StartedBusiness Continuity Getting Started
Business Continuity Getting Startedmxp5714
 
Business Continuity Strategy Benchmarking April 8th, 2009
Business Continuity Strategy Benchmarking April 8th, 2009Business Continuity Strategy Benchmarking April 8th, 2009
Business Continuity Strategy Benchmarking April 8th, 2009Mauro Giorgi
 
The value-of-energy-trading-and-risk-management-systems (1)
The value-of-energy-trading-and-risk-management-systems (1)The value-of-energy-trading-and-risk-management-systems (1)
The value-of-energy-trading-and-risk-management-systems (1)Samantha Johnston
 
An EBS Retirement Party - You're Uninvited
An EBS Retirement Party - You're UninvitedAn EBS Retirement Party - You're Uninvited
An EBS Retirement Party - You're Uninvitedeprentise
 
Business Continuity Planning
Business Continuity PlanningBusiness Continuity Planning
Business Continuity PlanningManaged Networks
 
CIA Quebec 11 Sept 2015 Presentation C Louis Final
CIA Quebec 11 Sept 2015 Presentation C Louis FinalCIA Quebec 11 Sept 2015 Presentation C Louis Final
CIA Quebec 11 Sept 2015 Presentation C Louis FinalClaire Louis
 
IT Consolidation: The 5E Framework
IT Consolidation: The 5E FrameworkIT Consolidation: The 5E Framework
IT Consolidation: The 5E FrameworkRavi Bansal
 

La actualidad más candente (13)

BCM Glossary by BCI
BCM Glossary by BCIBCM Glossary by BCI
BCM Glossary by BCI
 
IT Optimization: Navigation Fiscal Austerity
IT Optimization: Navigation Fiscal AusterityIT Optimization: Navigation Fiscal Austerity
IT Optimization: Navigation Fiscal Austerity
 
Business Resilience
Business ResilienceBusiness Resilience
Business Resilience
 
Building control efficiency: Rationalization, optimization and redesign
Building control efficiency: Rationalization, optimization and redesign Building control efficiency: Rationalization, optimization and redesign
Building control efficiency: Rationalization, optimization and redesign
 
Implementing Erp Systems In Small And Midsize Manufacturing Firms
Implementing Erp Systems In Small And Midsize Manufacturing FirmsImplementing Erp Systems In Small And Midsize Manufacturing Firms
Implementing Erp Systems In Small And Midsize Manufacturing Firms
 
Business Continuity Getting Started
Business Continuity Getting StartedBusiness Continuity Getting Started
Business Continuity Getting Started
 
Business Continuity Strategy Benchmarking April 8th, 2009
Business Continuity Strategy Benchmarking April 8th, 2009Business Continuity Strategy Benchmarking April 8th, 2009
Business Continuity Strategy Benchmarking April 8th, 2009
 
The value-of-energy-trading-and-risk-management-systems (1)
The value-of-energy-trading-and-risk-management-systems (1)The value-of-energy-trading-and-risk-management-systems (1)
The value-of-energy-trading-and-risk-management-systems (1)
 
An EBS Retirement Party - You're Uninvited
An EBS Retirement Party - You're UninvitedAn EBS Retirement Party - You're Uninvited
An EBS Retirement Party - You're Uninvited
 
Business Continuity Planning
Business Continuity PlanningBusiness Continuity Planning
Business Continuity Planning
 
CIA Quebec 11 Sept 2015 Presentation C Louis Final
CIA Quebec 11 Sept 2015 Presentation C Louis FinalCIA Quebec 11 Sept 2015 Presentation C Louis Final
CIA Quebec 11 Sept 2015 Presentation C Louis Final
 
Case study v7.2
Case study v7.2Case study v7.2
Case study v7.2
 
IT Consolidation: The 5E Framework
IT Consolidation: The 5E FrameworkIT Consolidation: The 5E Framework
IT Consolidation: The 5E Framework
 

Destacado

Kabanata 13
Kabanata 13Kabanata 13
Kabanata 13mma1213
 
Ebba by Kritterium - New Collection Essentials Spring 2016
Ebba by Kritterium - New Collection Essentials Spring 2016Ebba by Kritterium - New Collection Essentials Spring 2016
Ebba by Kritterium - New Collection Essentials Spring 2016Luz Amparo Cerón
 
Ebba by Kritterium - Spring Summer New Colletion 2016
Ebba by Kritterium - Spring Summer New Colletion 2016Ebba by Kritterium - Spring Summer New Colletion 2016
Ebba by Kritterium - Spring Summer New Colletion 2016Luz Amparo Cerón
 
Outlet Ebba by Kritterium 2016
Outlet Ebba by Kritterium 2016Outlet Ebba by Kritterium 2016
Outlet Ebba by Kritterium 2016Luz Amparo Cerón
 
Ebba By Kritterium / Winter Collection - 16
Ebba By Kritterium / Winter Collection - 16Ebba By Kritterium / Winter Collection - 16
Ebba By Kritterium / Winter Collection - 16Luz Amparo Cerón
 

Destacado (7)

Kabanata 13
Kabanata 13Kabanata 13
Kabanata 13
 
Ebba by Kritterium - New Collection Essentials Spring 2016
Ebba by Kritterium - New Collection Essentials Spring 2016Ebba by Kritterium - New Collection Essentials Spring 2016
Ebba by Kritterium - New Collection Essentials Spring 2016
 
Kritterium agosto 4
Kritterium agosto 4Kritterium agosto 4
Kritterium agosto 4
 
Ebba by Kritterium - Spring Summer New Colletion 2016
Ebba by Kritterium - Spring Summer New Colletion 2016Ebba by Kritterium - Spring Summer New Colletion 2016
Ebba by Kritterium - Spring Summer New Colletion 2016
 
Catálogo Kritterium Ebba
Catálogo Kritterium EbbaCatálogo Kritterium Ebba
Catálogo Kritterium Ebba
 
Outlet Ebba by Kritterium 2016
Outlet Ebba by Kritterium 2016Outlet Ebba by Kritterium 2016
Outlet Ebba by Kritterium 2016
 
Ebba By Kritterium / Winter Collection - 16
Ebba By Kritterium / Winter Collection - 16Ebba By Kritterium / Winter Collection - 16
Ebba By Kritterium / Winter Collection - 16
 

Similar a Total Economic Impact™ IBM System Storage SAN, Volume Controller

Total Economic Impact™ Study of IBM Storwize V7000
Total Economic Impact™ Study of IBM Storwize V7000Total Economic Impact™ Study of IBM Storwize V7000
Total Economic Impact™ Study of IBM Storwize V7000IBM India Smarter Computing
 
Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...
Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...
Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...IBM India Smarter Computing
 
TEI of IBM UrbanCode_Forresterreport
TEI of IBM UrbanCode_ForresterreportTEI of IBM UrbanCode_Forresterreport
TEI of IBM UrbanCode_ForresterreportAaron Burgess
 
The Total Economic Impact Of NetApp Solutions For Cloud Service Providers
The Total Economic Impact Of NetApp Solutions For Cloud Service ProvidersThe Total Economic Impact Of NetApp Solutions For Cloud Service Providers
The Total Economic Impact Of NetApp Solutions For Cloud Service ProvidersNetApp
 
The Total Economic Impact of IBM Connections
The Total Economic Impact of IBM ConnectionsThe Total Economic Impact of IBM Connections
The Total Economic Impact of IBM ConnectionsCasey Lucas
 
Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...
Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...
Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...Microsoft Private Cloud
 
The Total Economic Impact™ Of Cisco Data Virtualization
The Total Economic Impact™ Of Cisco Data VirtualizationThe Total Economic Impact™ Of Cisco Data Virtualization
The Total Economic Impact™ Of Cisco Data Virtualizationxband
 
The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...
The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...
The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...NetApp
 
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop VizWebinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop VizTasktop
 
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...David J Rosenthal
 
Clevesafe TEI Case Study
Clevesafe TEI Case StudyClevesafe TEI Case Study
Clevesafe TEI Case StudyChris Woeppel
 
IBM Total Economic Impact Study - Cost Savings and Business Benefits
IBM Total Economic Impact Study - Cost Savings and Business BenefitsIBM Total Economic Impact Study - Cost Savings and Business Benefits
IBM Total Economic Impact Study - Cost Savings and Business BenefitsCasey Lucas
 
The Total Economic Impact™ Of Epicor ERP
The Total Economic Impact™ Of Epicor ERPThe Total Economic Impact™ Of Epicor ERP
The Total Economic Impact™ Of Epicor ERPAthens Technology Center
 
The Total Economic Impact of NetApp MetroCluster
The Total Economic Impact of NetApp MetroClusterThe Total Economic Impact of NetApp MetroCluster
The Total Economic Impact of NetApp MetroClusterNetApp
 
Forrester Study about Total Economic Impact of BI Apps
Forrester Study about Total Economic Impact of BI AppsForrester Study about Total Economic Impact of BI Apps
Forrester Study about Total Economic Impact of BI AppsMiguel Garcia
 
Cloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes FromCloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes FromIBM India Smarter Computing
 
sage x3_forrester tei case study_feb 16
sage x3_forrester tei case study_feb 16sage x3_forrester tei case study_feb 16
sage x3_forrester tei case study_feb 16Ian Hunter
 
Microsoft Word - TEI of Alfresco - Final 2011-12-02.docx
Microsoft Word - TEI of Alfresco - Final 2011-12-02.docxMicrosoft Word - TEI of Alfresco - Final 2011-12-02.docx
Microsoft Word - TEI of Alfresco - Final 2011-12-02.docxAmplexorDemo
 

Similar a Total Economic Impact™ IBM System Storage SAN, Volume Controller (20)

Total Economic Impact™ Study of IBM Storwize V7000
Total Economic Impact™ Study of IBM Storwize V7000Total Economic Impact™ Study of IBM Storwize V7000
Total Economic Impact™ Study of IBM Storwize V7000
 
Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...
Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...
Forrester consulting study: The Total Economic Impact Of IBM’s Real-Time Comp...
 
TEI of IBM UrbanCode_Forresterreport
TEI of IBM UrbanCode_ForresterreportTEI of IBM UrbanCode_Forresterreport
TEI of IBM UrbanCode_Forresterreport
 
Forrester Healthcare
Forrester HealthcareForrester Healthcare
Forrester Healthcare
 
The Total Economic Impact Of NetApp Solutions For Cloud Service Providers
The Total Economic Impact Of NetApp Solutions For Cloud Service ProvidersThe Total Economic Impact Of NetApp Solutions For Cloud Service Providers
The Total Economic Impact Of NetApp Solutions For Cloud Service Providers
 
The Total Economic Impact of IBM Connections
The Total Economic Impact of IBM ConnectionsThe Total Economic Impact of IBM Connections
The Total Economic Impact of IBM Connections
 
Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...
Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...
Microsoft India - Total Economic Impact of Microsoft SQL Server 2008 Upgrade ...
 
The Total Economic Impact™ Of Cisco Data Virtualization
The Total Economic Impact™ Of Cisco Data VirtualizationThe Total Economic Impact™ Of Cisco Data Virtualization
The Total Economic Impact™ Of Cisco Data Virtualization
 
The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...
The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...
The Total Economic Impact of NetApp's Storage Solutions For Server Virtualiza...
 
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop VizWebinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
 
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
 
Clevesafe TEI Case Study
Clevesafe TEI Case StudyClevesafe TEI Case Study
Clevesafe TEI Case Study
 
IBM Total Economic Impact Study - Cost Savings and Business Benefits
IBM Total Economic Impact Study - Cost Savings and Business BenefitsIBM Total Economic Impact Study - Cost Savings and Business Benefits
IBM Total Economic Impact Study - Cost Savings and Business Benefits
 
The Total Economic Impact™ Of Epicor ERP
The Total Economic Impact™ Of Epicor ERPThe Total Economic Impact™ Of Epicor ERP
The Total Economic Impact™ Of Epicor ERP
 
The Total Economic Impact of NetApp MetroCluster
The Total Economic Impact of NetApp MetroClusterThe Total Economic Impact of NetApp MetroCluster
The Total Economic Impact of NetApp MetroCluster
 
Forrester Study about Total Economic Impact of BI Apps
Forrester Study about Total Economic Impact of BI AppsForrester Study about Total Economic Impact of BI Apps
Forrester Study about Total Economic Impact of BI Apps
 
Cloud Computing Payback
Cloud Computing PaybackCloud Computing Payback
Cloud Computing Payback
 
Cloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes FromCloud Computing Payback An Explanation Of Where The ROI Comes From
Cloud Computing Payback An Explanation Of Where The ROI Comes From
 
sage x3_forrester tei case study_feb 16
sage x3_forrester tei case study_feb 16sage x3_forrester tei case study_feb 16
sage x3_forrester tei case study_feb 16
 
Microsoft Word - TEI of Alfresco - Final 2011-12-02.docx
Microsoft Word - TEI of Alfresco - Final 2011-12-02.docxMicrosoft Word - TEI of Alfresco - Final 2011-12-02.docx
Microsoft Word - TEI of Alfresco - Final 2011-12-02.docx
 

Más de IBM India Smarter Computing

Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments IBM India Smarter Computing
 
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...IBM India Smarter Computing
 
A Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceA Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceIBM India Smarter Computing
 
IBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM India Smarter Computing
 

Más de IBM India Smarter Computing (20)

Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments Using the IBM XIV Storage System in OpenStack Cloud Environments
Using the IBM XIV Storage System in OpenStack Cloud Environments
 
All-flash Needs End to End Storage Efficiency
All-flash Needs End to End Storage EfficiencyAll-flash Needs End to End Storage Efficiency
All-flash Needs End to End Storage Efficiency
 
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
TSL03104USEN Exploring VMware vSphere Storage API for Array Integration on th...
 
IBM FlashSystem 840 Product Guide
IBM FlashSystem 840 Product GuideIBM FlashSystem 840 Product Guide
IBM FlashSystem 840 Product Guide
 
IBM System x3250 M5
IBM System x3250 M5IBM System x3250 M5
IBM System x3250 M5
 
IBM NeXtScale nx360 M4
IBM NeXtScale nx360 M4IBM NeXtScale nx360 M4
IBM NeXtScale nx360 M4
 
IBM System x3650 M4 HD
IBM System x3650 M4 HDIBM System x3650 M4 HD
IBM System x3650 M4 HD
 
IBM System x3300 M4
IBM System x3300 M4IBM System x3300 M4
IBM System x3300 M4
 
IBM System x iDataPlex dx360 M4
IBM System x iDataPlex dx360 M4IBM System x iDataPlex dx360 M4
IBM System x iDataPlex dx360 M4
 
IBM System x3500 M4
IBM System x3500 M4IBM System x3500 M4
IBM System x3500 M4
 
IBM System x3550 M4
IBM System x3550 M4IBM System x3550 M4
IBM System x3550 M4
 
IBM System x3650 M4
IBM System x3650 M4IBM System x3650 M4
IBM System x3650 M4
 
IBM System x3500 M3
IBM System x3500 M3IBM System x3500 M3
IBM System x3500 M3
 
IBM System x3400 M3
IBM System x3400 M3IBM System x3400 M3
IBM System x3400 M3
 
IBM System x3250 M3
IBM System x3250 M3IBM System x3250 M3
IBM System x3250 M3
 
IBM System x3200 M3
IBM System x3200 M3IBM System x3200 M3
IBM System x3200 M3
 
IBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and ConfigurationIBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and Configuration
 
A Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceA Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization Performance
 
IBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architecture
 
X6: The sixth generation of EXA Technology
X6: The sixth generation of EXA TechnologyX6: The sixth generation of EXA Technology
X6: The sixth generation of EXA Technology
 

Último

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 

Último (20)

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 

Total Economic Impact™ IBM System Storage SAN, Volume Controller

  • 1. A Forrester Total Economic Impact™ Study Prepared For IBM Total Economic Impact™ IBM System Storage SAN Volume Controller Project Director: Sadaf Roshan Bellord Contributors: Jon Erickson May 2012
  • 2. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller TABLE OF CONTENTS Executive Summary ................................................................................................................................................................................. 2  IBM SAN Volume Controller Reduces IT Capital And Operating Costs ............................................................................... 2  Factors Affecting Benefits And Costs ............................................................................................................................................. 3  Disclosures ........................................................................................................................................................................................... 4  TEI Framework And Methodology...................................................................................................................................................... 5  Analysis ...................................................................................................................................................................................................... 6  Interview Highlights .......................................................................................................................................................................... 6  Costs...................................................................................................................................................................................................... 8  Benefits ............................................................................................................................................................................................... 10  Flexibility............................................................................................................................................................................................ 14  Risk...................................................................................................................................................................................................... 15  Financial Summary................................................................................................................................................................................ 17  IBM System Storage SAN Volume Controller: Overview.............................................................................................................. 18  Appendix A: Composite Organization Description ....................................................................................................................... 18  Appendix B: Total Economic Impact™ Overview ............................................................................................................................ 19  Appendix C: Glossary ........................................................................................................................................................................... 20  Appendix D: Endnotes.......................................................................................................................................................................... 20  © 2012, Forrester Research, Inc. All rights reserved. Unauthorized reproduction is strictly prohibited. Information is based on best available resources. Opinions reflect judgment at the time and are subject to change. Forrester®, Technographics®, Forrester Wave, RoleView, TechRadar, and Total Economic Impact are trademarks of Forrester Research, Inc. All other trademarks are the property of their respective companies. For additional information, go to www.forrester.com. About Forrester Consulting Forrester Consulting provides independent and objective research-based consulting to help leaders succeed in their organizations. Ranging in scope from a short strategy session to custom projects, Forrester’s Consulting services connect you directly with research analysts who apply expert insight to your specific business challenges. For more information, visit www.forrester.com/consulting. Page 1
  • 3. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Executive Summary In June 2011, IBM commissioned Forrester Consulting to examine the total economic impact and potential return on investment (ROI) enterprises may realize by deploying System Storage SAN Volume Controller (SVC). The purpose of this study is to provide readers with a framework to evaluate the potential financial impact of System Storage SAN Volume Controller on enterprise organizations. SVC is designed to simplify and centralize storage infrastructure and offer benefits of storage virtualization for large enterprises. IBM SAN Volume Controller Reduces IT Capital And Operating Costs Our interviews and surveys with 11 existing customers and subsequent financial analysis found that a composite organization based on the organizations interviewed experienced the risk-adjusted ROI, costs, and benefits shown in Table 1.1 See Appendix A for a description of the composite organization. (All numbers have been rounded). Table 1 Composite Organization Three-Year Risk-Adjusted ROI ROI Payback Total benefits Total costs Net present period (PV) (PV) value 75% 18 months $6,151,813 ($3,520,622) $2,631,191 Source: Forrester Research, Inc.  Benefits. The composite organization experienced the following benefits that represent those experienced by the interviewed and surveyed companies: o Capital cost avoidance. This benefit represents the capital costs avoidance associated with reduction of 650 TB of storage. o Reduction in expected staff growth. This benefit represents the savings associated with managing future headcount growth while the storage environment is rapidly growing. o Improved efficiency of existing IT staff. This benefit represents the reduction in administrative costs of managing storage compared to the prior environment. o Improving data availability to end users. This benefit represents improvement in system availability for end users.  Costs. The composite organization experienced the following costs: o Total software license and maintenance fees. This cost represents the investment in software licenses and support costs for SVC implementation. Page 2
  • 4. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller o Total hardware and support costs. This cost represents the investment in hardware and its related support costs. o Internal implementation costs. This cost represents the internal resources used to support the implementation. o Administrative costs. This cost represents the ongoing administrative effort associated with the deployment of IBM SVC. Figure 1 Composite Organization Three-Year Risk-Adjusted ROI $9,000,000 $8,000,000 $7,000,000 $6,000,000 $5,000,000 Risk‐adjusted  Costs breakeven point  Benefits $4,000,000 at 18 months $3,000,000 $2,000,000 $1,000,000 $0 Initial Year 1 Year 2 Year 3 Source: Forrester Research, Inc. Factors Affecting Benefits And Costs Table 1 illustrates the risk-adjusted financial results that were achieved by the composite organization. The risk- adjusted values take into account any potential uncertainty or variance that exists in estimating the costs and benefits, Page 3
  • 5. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller which produces more conservative estimates. The following factors may affect the financial results that an organization may experience:  IT efficiency. Improvements in IT process efficiency are variable and are largely based on getting staff to change their behavior to the new environment. Possible factors that might affect the magnitude of the gains from IT efficiency include the staff skill set, what new tasks staff members are transferred to do, as well as the speed to implement the new solution.  Impact of availability. The overall benefit of improved availability will depend on the type of supported application as well as the productive value of the type and number of end users.  Capital cost impact. Reducing capital cost of storage is dependent in part on the current per terabyte cost of storage, the pre investment growth of storage, as well as how quickly the organization can move to the new environment. Disclosures The reader should be aware of the following:  The study is commissioned by IBM and delivered by the Forrester Consulting group.  Forrester makes no assumptions as to the potential return on investment that other organizations will receive. Forrester strongly advises that readers should use their own estimates within the framework provided in the report to determine the appropriateness of an investment in IBM System Storage SAN Volume Controller.  IBM reviewed and provided feedback to Forrester, but Forrester maintains editorial control over the study and its findings and does not accept changes to the study that contradict Forrester’s findings or obscure the meaning of the study.  The customers for the interviews were provided by IBM and an external third-party organization. Page 4
  • 6. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller TEI Framework And Methodology Introduction From the information provided in the interviews, Forrester has constructed a Total Economic Impact™ framework for those organizations considering implementing IBM System Storage SAN Volume Controller. The objective of the framework is to identify the cost, benefit, flexibility, and risk factors that affect the investment decision. Approach And Methodology Forrester took a multistep approach to evaluate the impact that IBM System Storage SAN Volume Controller can have on an organization (see Figure 2). Specifically, we:  Interviewed IBM marketing, sales, and consulting personnel and Forrester analysts to gather data relative to System Storage SAN Volume Controller and the marketplace for System Storage SAN Volume Controller.  Received primary data from a combination of in-depth customer interviews as well as a broader survey of customers who are currently using IBM System Storage SAN Volume Controller to obtain data with respect to costs, benefits, and risks.  Designed a composite organization based on characteristics of the interviewed and surveyed organizations (see Appendix A).  Constructed a financial model representative of the interviews using the TEI methodology. The financial model is populated with the cost and benefit data obtained from the interviews as applied to the composite organization. Figure 2 TEI Approach Conduct Construct financial Perform due Design composite Write case customer model using TEI diligence organization study interviews framework Source: Forrester Research, Inc. Forrester employed four fundamental elements of TEI in modeling IBM/System Storage SAN Volume Controller’s service: 1. Costs. 2. Benefits to the entire organization. 3. Flexibility. Page 5
  • 7. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller 4. Risk. Given the increasing sophistication that enterprises have regarding ROI analyses related to IT investments, Forrester’s TEI methodology serves the purpose of providing a complete picture of the total economic impact of purchase decisions. Please see Appendix B for additional information on the TEI methodology. Analysis Interview Highlights In-depth interviews were conducted for this study, involving representatives from: 1. A large regional US-based financial institution with more than $170 billion worth of assets managing over 1,600 retail branches and 2,800 ATMs. The organization services clients nationally and offers a full selection of technology-based banking channels including online, customer service centers, and the latest mobile devices. 2. A survey-based interview with 10 enterprise clients of SVC located within North America. These organizations had between 200 TB and 1,500 TB of storage within their environment and had been using the IBM SVC product for at least 12 months. Interactions with SVC clients uncovered the following characteristics which formed the basis of the financial model:  All of the interviewed organizations were large enterprise clients with at least 200 TB of primary storage within their environment prior to the investment in SVC. In most cases, storage assets and storage administrators were distributed across multiple geographical locations, increasing the complexity of the storage environment.  A common recurring theme across the interviewed organizations was the need to better react to increasing demands from business owners for increased storage. For many organizations, the storage volume was increasing roughly 15% to 30% per year, particularly for data-rich applications.  While these organizations struggled with the increased capital cost burden from the growth of storage, they also felt increased pressure to increase staff to manage the increasingly complex storage environment. However, many organizations could not effectively ramp staffing to meet the growth of storage either due to lack of skilled staff or budget cutbacks across the enterprise. As a result, organizations were faced with a growing storage environment that became less efficient to maintain over time while they were also unable to increase staff.  Organizations invested in SVC to improve the efficiency and effectiveness of their IT storage environment. SVC allowed organizations to improve the efficiency of their existing staff while at the same time better manage the demand for additional staffing resources as the demand for storage capacity grew. Organization could perform specific storage administrator functions including provisioning new storage, storage maintenance, as well as scheduled and unscheduled backups and recovery more efficiently with SVC. Page 6
  • 8. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller  In terms of improved effectiveness, organizations could now better control and manage storage capacity, reducing spiraling upward trends around storage growth and allowing the organization to postpone future investments in storage assets. Organizations can better utilize existing storage through SVC’s thin provisioning features.  While the interviewed organizations did note a positive return from their investment, the decision to go ahead with SVC was not without risk. In particular, organizations noted the importance of effective planning and change management within storage environment to realize benefits quickly and demonstrate value rapidly in an environment of ongoing cost-cutting. Composite Organization Based on in-depth interviews with an existing customer provided by IBM and surveys of 10 customers using IBM SVC, Forrester constructed a TEI framework, a composite company, and an associated ROI analysis that illustrates the areas financially affected. The composite organization that Forrester synthesized from these results represents a large organization with 5,000 employees that is managing more than 4 PB of data. The organization deployed IBM SVC to better manage its growing storage needs. Framework Assumptions Table 2 provides the model assumptions that Forrester used in this analysis. Table 2 Model Assumptions Ref. Metric Calculation Value A1 Hours per week 40 A2 Weeks per year 52 A3 Hours per year (M-F, 9-5) A1*A2 2,080 A5 Average fully loaded salary of storage administrator $120,000 A6 Fully loaded hourly rate of storage administrator (A5/A3) $58 A7 Average fully loaded salary of end user $100,000 A8 Fully loaded hourly rate of end user (A7/A3) $48 Source: Forrester Research, Inc. The discount rate used in the PV and NPV calculations is 10% and time horizon used for the financial modeling is three years. Organizations typically use discount rates between 8% and 16% based on their current environment. Readers are Page 7
  • 9. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller urged to consult with their respective company’s finance department to determine the most appropriate discount rate to use within their own organizations. Costs This section describes and lists the costs related to planning, testing, and implementing IBM SVC over the three-year period. Cost consumptions are based on detailed interviews with an organization using IBM SVC and a survey completed with 10 existing IBM SVC customers. All costs are based on list prices and recommended vendor discount. These costs do not include any negotiated discounts. The following cost model for the composite organization serves as a framework for other organizations. Total Software License And Maintenance Fees This category represents 79% of the overall investment. There are three components to the software costs: base system software, FlashCopy, and Remote Mirror. IBM recommends 45% as a representative vendor discount for software purchased for this investment. The software maintenance costs for Year 1 are included in the initial software licensing cost. The maintenance cost starts in Year 2 and equates to 20% of the software license list price. Table 3 illustrates the calculation. Table 3 Total Software License And Maintenance Fees Ref. Metric Calculation Initial Year 1 Year 2 Year 3 B1 Base pricing $1,056,000 $0 $211,200 $211,200 B2 FlashCopy — source only $356,224 $0 $71,245 $71,245 Remote Mirror — source and B3 $682,083 $0 $136,417 $136,417 target Total software license and Bt B1+B2+B3 $2,094,307 $0 $418,862 $418,862 maintenance fees Source: Forrester Research, Inc. Total Hardware And Support Costs This category represents 6% of the overall investment in IBM SVC. It includes hardware costs and related maintenance costs for SVC engines without SSD. IBM recommends 45% as a representative vendor discount for hardware purchased for this investment. Table 4 presents the calculation. Page 8
  • 10. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Table 4 Total Hardware And Support Costs Ref. Metric Calculation Initial Year 1 Year 2 Year 3 C1 Hardware $154,000 $0 $30,800 $30,800 Total hardware and Ct C1 $154,000 $0 $30,800 $30,800 support costs Source: Forrester Research, Inc. Internal Implementation Costs The next component of costs is internal implementation costs. It describes the internal resources required to plan and implement IBM SVC. During this phase, the organization used the equivalent of three full-time resources allocated 30% of their time to planning, testing, and implementation. The organizations interviewed and surveyed used SVC to simplify their storage environment and eliminate downtime resulting from outdated equipment. This category represents 3% of the overall investment. Table 5 illustrates the calculation. Table 5 Internal Implementation Costs Ref. Metric Calculation Per period D1 Number of people 3 D2 Average fully loaded hourly rate $120,000 D3 Percent of time spent 30% Dt Internal implementation costs D1*D2*D3 $108,000 Source: Forrester Research, Inc. Temporary Administrative Support The final category of costs represents the temporary resources to manage hardware migration. It represents 12% of the overall investment. Organizations interviewed used equivalent of two full-time contractors for two years to support planning, testing, and deployment. These individuals were tasked to provision new hardware and decommission old hardware. Table 6 presents this calculation. Page 9
  • 11. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Table 6 Temporary Administrative Costs Ref. Metric Calculation Initial Year 1 E1 Number of people 2 E2 Hourly rate per person $110,000 Et Temporary administrative costs E1*E2 $220,000 $220,000 Source: Forrester Research, Inc. Total Costs Table 7 summarizes costs associated with the implementation of IBM SVC. Table 7 Total Costs — Non-Risk-Adjusted Present Costs Initial Year 1 Year 2 Year 3 Total value Total software license and ($2,094,307) ($418,862) ($418,862) ($2,932,029) ($2,755,170) maintenance fees Total hardware and support costs ($154,000) ($30,800) ($30,800) ($215,600) ($202,595) Internal implementation costs ($108,000) ($108,000) ($108,000) Temporary administrative costs ($220,000) ($220,000) ($440,000) ($420,000) Total costs ($2,576,307) ($220,000) ($449,662) ($449,662) ($3,695,629) ($3,485,765) Source: Forrester Research, Inc. Benefits The benefits that we had sufficient data to quantify financially were: 1) capital cost avoidance; 2) reduction in expected staff growth; 3) improved efficiency of existing staff; and 4) improved data availability to end users. These benefits represent business and IT operating savings and capital savings that represented a three-year risk-adjusted PV of $6,151,813. Readers should note that these benefits represent the values that the interviewed and surveyed organizations received from deployment of IBM SVC. Page 10
  • 12. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Capital Costs Avoidance Customers interviewed have been able to decommission as much as 650 TB of storage or 15% of overall storage as a result of freeing up unused capacity as well as reducing growth of storage within their environment. For existing assets, organizations indicated improved flexibility to increase capacity utilization within the storage pool, using existing storage more efficiently rather than purchasing new storage. In addition, improved flexibility allows organizations to control their storage growth by rightsizing their environment to the storage needs of current applications. This capital savings over three years of investment equates to roughly $5,000,000 driven by an improvement of capacity utilization of between 20% and 30% as well as a yearly reduction in the growth of storage by on average 15%. The savings includes hardware costs savings and resources required to manage and provision. Table 8 illustrates this calculation. This category represents 62% of the overall benefits. Table 8 Capital Costs Avoidance Ref. Metric Calculation Year 1 Year 2 Year 3 Capital cost avoided associated with F1 $1,000,000 $1,500,000 $2,500,000 decommissioned terabytes of storage Ft Capital costs avoidance F1 $1,000,000 $1,500,000 $2,500,000 Source: Forrester Research, Inc. Reduction In Expected Staff Growth Organizations interviewed and surveyed have shown double-digit growth in the volume of data that they are managing while keeping their staff size flat. In the pre-SVC environment, organizations struggled to keep up with data growth, resulting in the need to increase staff at the same rate as data. The increase in staff was necessary to manage the escalation in physical storage equipment. After implementing SVC, its virtualization capability enabled the organizations to better manage capacity between their primary and secondary storage environment. These organizations were able to manage physical storage equipment of different brand through a single source. It allowed storage administrators to manage and control a greater share of storage per staff member over a multiple locations. As a result, the organization did not have to hire additional staff at the same rate as the baseline data growth. To estimate this saving for the composite organization, we assume that the organization would have been required to hire five people in various IT roles to manage the growth within the storage environment. The reduction in staff growth isn’t limited to storage administrators and will include staff who would be involved in planning, provisioning, and ongoing management. Table 9 demonstrates the calculation used. This category represents 23% of the overall benefits. Page 11
  • 13. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Table 9 Reduced Staff Growth Ref. Metric Calculation Yearly G1 Number of workers saved 5 G2 Annual fully loaded salary $120,000 Reduction in expected staff Gt G1*G2 $600,000 growth Source: Forrester Research, Inc. Improved Efficiency Of Existing Staff In addition to trimming the growth of staff, organizations also noted their existing storage administration staff was made more efficient through the use of SVC tools. For example, the use of thin provisioning features allowed staff to reduce the time it took to make changes or updates to the storage environment. For the composite organization, we estimate that 10 IT staff members with fully loaded annual salary of $120,000 allocated 70% of their time to provisioning and ongoing management. Interviewed and surveyed organizations cited that their teams experienced 26% in staff efficiency improvement as compared to the prior environment. To remain conservative, we estimate that the organization realized 50% of benefits in Year 1, 75% in Year 2, and 100% in Year 3. Table 10 exhibits this calculation. This category represents 7% of the overall benefits. Table 10 IT Productivity Savings Ref. Metric Calculation Initial Year 2 Year 3 H1 Number of workers 10 10 10 H2 Annual fully loaded salary $120,000 $120,000 $120,000 Percent of time allocated to H3 provisioning and ongoing 70% 70% 70% management Percent improvement in staff H4 efficiency compared with 26% 26% 26% previous environment H5 Percent of benefit realized 60% 100% 100% Improved efficiency of Ht H1*H2*H3*H4*H5 $131,040 $218,400 $218,400 existing staff Page 12
  • 14. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Source: Forrester Research, Inc. Improving Data Availability To End Users With increased complexity within the storage environment, another area affected by the investment in SVC was backup and recovery of data. Interviewed organizations noted that with the increase in data growth, the time to perform scheduled backups increased at a constant rate. For many organizations, having storage across multiple geographies compounded the time and effort to perform scheduled backups. In particular, several organizations noted that many of the actual backups went beyond the expected backup windows, impacting the productivity of users accessing data. Several organizations noted that using SVC to virtualize has improved availability of data access to applications. Organizations interviewed cited the ability to move application data between storage resources within a virtualized environment without having to take the application offline has significantly reduced downtime. By maintaining application availability to storage resources, organizations were able to maintain consistently high levels of uptime versus the environment prior to SVC. For the composite organization, we estimate on average 1,500 employees at a fully loaded hourly rate of $48 experienced 20 hours of downtime annually prior to the investment in SVC. This downtime was specifically a result of increasing backup and recovery windows. The downtime affected end users’ ability to access data and reduced system availability. Data from interviews and surveys revealed that organizations’ ability to get new storage capacity operational has improved by 17% as compared to the prior environment. Table 11 illustrates the calculation. This category represents 8% of the overall benefits. Table 11 Improving Data Availability To End Users Ref. Metric Calculation Initial Year 2 Year 3 I1 Total number of employees 1,500 1,500 1,500 I2 Average fully loaded hourly rate $48 $48 $48 Average time spent on backup I3 20 20 20 and recovery Percent improvement to get new storage capacity I4 17% 17% 17% operational faster as compared to previous environment I5 Percent of benefit realized 60% 100% 100% It Improving data availability to G1*G2*G3*G4 $146,880 $244,800 $244,800 Page 13
  • 15. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller end users Source: Forrester Research, Inc. Total Benefits Table 12 summaries the total quantitative benefits associated with implementation of IBM SVC. Table 12 Total Benefits — Non-Risk-Adjusted Benefits Year 1 Year 2 Year 3 Total PV Capital costs avoidance $1,000,000 $1,500,000 $2,500,000 $5,000,000 $4,027,047 Reduction in expected staff $600,000 $600,000 $600,000 $1,800,000 $1,492,111 growth Improved efficiency of existing $131,040 $218,400 $218,400 $567,840 $463,710 staff Improving data availability to $146,880 $244,800 $244,800 $636,480 $519,763 end users Total benefits $1,877,920 $2,563,200 $3,563,200 $8,004,320 $6,502,632 Source: Forrester Research, Inc. Flexibility As defined by Forrester, flexibility represents an investment in additional capacity or capability that could be turned into business benefit for some future additional investment. This provides an organization with the “right” or the ability to engage in future initiatives but not the obligation to do so. There are multiple scenarios in which a customer might choose to implement SVC and later realize additional uses and business opportunities. Flexibility would also be quantified when evaluated as part of a specific project (described in more detail in Appendix A). If the following metrics are available — the asset value by measuring the benefits (that is, costs avoided or saved, revenue generated, and/or capital saved), the costs to acquire the solution, and the number of years to measure the investment — we can estimate the flexibility option by using the Black-Scholes option pricing model. Page 14
  • 16. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Table 13 Flexibility Benefit Framework Metric Calculation Asset value (benefit) IT or business costs avoided, revenue generated, capital saved Cost to acquire option Planning and discovery, subscription, and annual maintenance are examples of costs to consider Expiration Time-to-expire (in years) Flexibility Black-Scholes option pricing model Source: Forrester Research, Inc. Risk Forrester defines two types of risk associated with this analysis: implementation risk and impact risk. “Implementation risk” is the risk that a proposed investment in IBM System Storage SAN Volume Controller may deviate from the original or expected requirements, resulting in higher costs than anticipated. “Impact risk” refers to the risk that the business or technology needs of the organization may not be met by the investment in SAN Volume Controller, resulting in lower overall total benefits. The greater the uncertainty, the wider the potential range of outcomes for cost and benefit estimates. Quantitatively capturing investment and impact risk by directly adjusting the financial estimates results in more meaningful and accurate estimates and a more accurate projection of the ROI. In general, risks affect costs by raising the original estimates, and they affect benefits by reducing the original estimates. The risk-adjusted numbers should be taken as “realistic” expectations since they represent the expected values considering risk. The following implementation risks that affect costs are identified as part of this analysis:  The implementation costs could vary based on the internal skill set and competencies.  The implementation costs could take longer than anticipated due to lack of planning and testing of the solution. The following impact risks that affect benefits are identified as part of the analysis:  The improvement in administrative effort could vary depending on the prior infrastructure and virtualization effort.  The amount of excess capacity reclaimed and the level of storage growth reduced could be lower than originally anticipated, leading to reduced storage cost savings.  The level of downtime reduced could be lower than originally anticipated. Page 15
  • 17. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Table 14 shows the values used to adjust for risk and uncertainty in the cost and benefit estimates. The TEI model uses a triangular distribution method to calculate risk-adjusted values. To construct the distribution, it is necessary to first estimate the low, most likely, and high values that could occur within the current environment. The risk-adjusted value is the mean of the distribution of those points. Readers are urged to apply their own risk ranges based on their own degree of confidence in the cost and benefit estimates. Table 14 Cost And Benefit Risk Adjustments Most Costs Low High Mean likely Total software license and maintenance fees 98% 100% 105% 101% Total hardware and support costs 98% 100% 105% 101% Internal implementation costs 98% 100% 105% 101% Administrative costs 98% 100% 105% 101% Most Benefits Low High Mean likely Capital cost avoidance 80% 100% 103% 94% Reduction in expected staff growth 80% 100% 103% 94% Improved efficiency of existing staff 90% 100% 105% 98% Improving data availability to end users 90% 100% 105% 98% Source: Forrester Research, Inc. Readers are urged to apply their own risk ranges based on their own degree of confidence in the cost and benefit estimates. Page 16
  • 18. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller Financial Summary The financial results calculated in the Costs and Benefits Sections can be used to determine the return on investment, net present value, and payback period for the organization’s investment in SAN Volume Controller. These are shown in Table 15 below. Table 15 Cash Flow — Non-Risk-Adjusted Categories Initial Year 1 Year 2 Year 3 Total PV Costs ($2,576,307) ($220,000) ($449,661) ($449,661) ($3,695,629) ($3,485,765) Benefits $1,877,920 $2,563,200 $3,563,200 $8,004,320 $6,502,632 Net benefits ($2,576,307) $1,657,920 $2,113,539 $3,113,539 $4,308,691 $3,016,867 ROI 87% Payback period 17 months Source: Forrester Research, Inc. Table 16 below shows the risk-adjusted ROI, NPV, and payback period values. These values are determined by applying the risk-adjustment values from Table 14 in the Risk section to the cost and benefits numbers in Tables 7 and 12. Table 16 Cash Flow — Risk-Adjusted Categories Initial Year 1 Year 2 Year 3 Total PV Costs ($2,602,070) ($222,200) ($454,158) ($454,158) ($3,732,585) ($3,520,622) Benefits $1,776,362 $2,427,936 $3,367,936 $7,572,234 $6,151,813 Net benefits ($2,602,070) $1,554,162 $1,973,778 $2,913,778 $3,839,648 $2,631,191 ROI 75% Payback period 18 months Source: Forrester Research, Inc. Page 17
  • 19. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller IBM System Storage SAN Volume Controller: Overview SAN Volume Controller is a storage virtualization system that enables a single point of control for storage resources to help support improved business application availability and greater resource utilization. The objective is to manage storage resources in the IT infrastructure and to make sure they’re used to the advantage of business — and do it quickly, efficiently, in real time, while avoiding increases in administrative costs. SAN Volume Controller provides an easy-to-use graphical interface for central management. With this single interface, administrators can perform configuration, management and service tasks in a consistent manner over multiple storage systems, even from different vendors, which help to improve productivity. Because it hides the physical characteristics of storage from host systems, SAN Volume Controller is designed to help insulate host applications from physical changes to the storage pool. This ability can help applications continue to run without disruption while changes are made to the storage infrastructure, which can help businesses increase availability to customers. Storage and server virtualization are complementary technologies that help enable organizations to build a completely virtualized infrastructure. When used together, server and storage virtualization are intended to enable businesses to derive greater benefit from each technology than if they deployed them alone. Appendix A: Composite Organization Description For this TEI study, Forrester has created a composite organization to illustrate the quantifiable costs and benefits of implementing System Storage SAN Volume Controller. The composite company is intended to represent a large organization with 5,000 employees and is based on characteristics of the interviewed and surveyed customers. The composite company has more than 4 PB of storage existing within the environment. In purchasing System Storage SAN Volume Controller, the composite company had the following objectives:  Manage disparate storage assets. Use a single management platform to reduce the cost around storage growth and improve the efficiency of storage administrators, while at the same time maintaining high levels of availability for end user applications.  Improve existing storage capacity utilization. As their storage environments grew, the capital cost required to increase physical storage space increased. Interviewed and surveyed organizations also saw the need to pool their existing resources through virtualization, allowing them to better maximize the use of their existing assets by having the flexibility to shift data to less costly resources.  Pressure to do more with existing staff. Another common theme among the interviewed organizations was the need to control storage administration costs with increasing amount of storage under management. Storage virtualization allowed the interviewed organizations to centralize their storage administration leading to higher levels of efficiency. Page 18
  • 20. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller For the purpose of the analysis, Forrester assumes that the organization had invested in SVC as part of an overall initiative to contain the overall costs of storage management while increasing the availability and scalability of primary and secondary storage. Appendix B: Total Economic Impact™ Overview Total Economic Impact is a methodology developed by Forrester Research that enhances a company’s technology decision-making processes and assists vendors in communicating the value proposition of their products and services to clients. The TEI methodology helps companies demonstrate, justify, and realize the tangible value of IT initiatives to both senior management and other key business stakeholders. The TEI methodology consists of four components to evaluate investment value: benefits, costs, risks, and flexibility. Benefits Benefits represent the value delivered to the user organization — IT and/or business units — by the proposed product or project. Often product or project justification exercises focus just on IT cost and cost reduction, leaving little room to analyze the effect of the technology on the entire organization. The TEI methodology and the resulting financial model place equal weight on the measure of benefits and the measure of costs, allowing for a full examination of the effect of the technology on the entire organization. Calculation of benefit estimates involves a clear dialogue with the user organization to understand the specific value that is created. In addition, Forrester also requires that there be a clear line of accountability established between the measurement and justification of benefit estimates after the project has been completed. This ensures that benefit estimates tie back directly to the bottom line. Costs Costs represent the investment necessary to capture the value, or benefits, of the proposed project. IT or the business units may incur costs in the form of fully burdened labor, subcontractors, or materials. Costs consider all the investments and expenses necessary to deliver the proposed value. In addition, the cost category within TEI captures any incremental costs over the existing environment for ongoing costs associated with the solution. All costs must be tied to the benefits that are created. Risk Risk measures the uncertainty of benefit and cost estimates contained within the investment. Uncertainty is measured in two ways: 1) the likelihood that the cost and benefit estimates will meet the original projections, and 2) the likelihood that the estimates will be measured and tracked over time. TEI applies a probability density function known as “triangular distribution” to the values entered. At minimum, three values are calculated to estimate the underlying range around each cost and benefit. Flexibility Within the TEI methodology, direct benefits represent one part of the investment value. While direct benefits can typically be the primary way to justify a project, Forrester believes that organizations should be able to measure the Page 19
  • 21. Forrester Consulting Total Economic Impact™ IBM System Storage SAN Volume Controller strategic value of an investment. Flexibility represents the value that can be obtained for some future additional investment building on top of the initial investment already made. For instance, an investment in an enterprisewide upgrade of an office productivity suite can potentially increase standardization (to increase efficiency) and reduce licensing costs. However, an embedded collaboration feature may translate to greater worker productivity if activated. The collaboration can only be used with additional investment in training at some future point in time. However, having the ability to capture that benefit has a present value that can be estimated. The flexibility component of TEI captures that value. Appendix C: Glossary Discount rate: The interest rate used in cash flow analysis to take into account the time value of money. Although the Federal Reserve Bank sets a discount rate, companies often set a discount rate based on their business and investment environment. Forrester assumes a yearly discount rate of 10% for this analysis. Organizations typically use discount rates between 8% and 16% based on their current environment. Readers are urged to consult their respective organization to determine the most appropriate discount rate to use in their own environment. Net present value (NPV): The present or current value of (discounted) future net cash flows given an interest rate (the discount rate). A positive project NPV normally indicates that the investment should be made, unless other projects have higher NPVs. Present value (PV): The present or current value of (discounted) cost and benefit estimates given at an interest rate (the discount rate). The PV of costs and benefits feed into the total net present value of cash flows. Payback period: The breakeven point for an investment. The point in time at which net benefits (benefits minus costs) equal initial investment or cost. Return on investment (ROI): A measure of a project’s expected return in percentage terms. ROI is calculated by dividing net benefits (benefits minus costs) by costs. A Note On Cash Flow Tables The following is a note on the cash flow tables used in this study (see the example table below). The initial investment column contains costs incurred at “time 0” or at the beginning of Year 1. Those costs are not discounted. All other cash flows in Years 1 through 3 are discounted using the discount rate (shown in Framework Assumptions section) at the end of the year. Present value (PV) calculations are calculated for each total cost and benefit estimate. Net present value (NPV) calculations are not calculated until the summary tables and are the sum of the initial investment and the discounted cash flows in each year. Appendix D: Endnotes Page 20