Agenda
• Background
• TIMES-NordPool
• Analysis of power trade in the Nordic countries
• Analysis of grid expansion possibilities
• Sensitivity analysis on effect of no grid expansion
• Conclusions
2 19
November
DTU Management Engineering, Technical University of Denmark
Agenda
• Background
• TIMES-NordPool
• Analysis of power trade in the Nordic countries
• Analysis of grid expansion possibilities
• Sensitivity analysis on effect of no grid expansion
• Conclusions
3 19
November
DTU Management Engineering, Technical University of Denmark
Background: Nord Pool market
4 19
November
Nord Pool: power trading market of
Nordic and Baltic countries.
The auctioning countries are divided into
bidding areas linked with interconnectors
controlled by the TSOs.
If the power flows between the bidding
areas exceed the interconnectors
transmission limit, grid congestion
occurs.
Bottlenecks in the interconnectors lead
to different prices in the various areas
composing the Nordic electric system.
DTU Management Engineering, Technical University of Denmark
Benefits of interconnectors capacity
expansion
Interconnectors are one of the main power price drivers in the Nordic countries
Interconnectors are essential for the integration of variable power sources
Interesting to assess their role and their influence on the power trade
5 19
November
Source: L’ Abbate et al. (2011)
DTU Management Engineering, Technical University of Denmark
Agenda
• Background
• TIMES-NordPool
• Analysis of power trade in the Nordic countries
• Analysis of grid expansion possibilities
• Sensitivity analysis on effect of no grid expansion
• Conclusions
6 19
November
DTU Management Engineering, Technical University of Denmark
TIMES-NordPool
TIMES-NordPool: represents the
Norwegian, Swedish and Finnish power and
thermal systems.
Purposes:
• To be run together with TIMES-DK to
better simulate power trade processes
• Exploring the future power exchange
between the Nordic countries under
different assumptions
• Assessing transmission capacity expansion
under different scenarios
7 19
November
DTU Management Engineering, Technical University of Denmark
TIMES-NordPool: Spatial resolution
• Multiregional model: Each country =
One region
• Interconnectors between Norway,
Finland and Sweden implemented as
endogenous trade processes
• Interconnectors between Nordic
countries and neighboring countries
implemented as exogenous trade
processes
8 19
November
Power prices and volumes endogenously
optimized
Power volumes calculated according to
price related criteria
DTU Management Engineering, Technical University of Denmark
TIMES-NordPool: Hard-linking with TIMES-DK
9 19
November
TRADE
TIMES-NordPool TIMES-DK
All interconnections between Nordic countries as endogenous processes
DTU Management Engineering, Technical University of Denmark
TIMES-NordPool: Time structure
• Same 32 time slices as TIMES-DK The models are consistent
• Base Year: 2010
• Time horizon: 2010-2050
10 19
November
DTU Management Engineering, Technical University of Denmark
Agenda
• Background
• TIMES-NordPool
• Analysis of power trade in the Nordic countries
• Analysis of grid expansion possibilities
• Sensitivity analysis oneffect of no grid expansion
• Conclusions
11 19
November
DTU Management Engineering, Technical University of Denmark
Assumptions for the analysis
All analyses on the power trade between the Nordic countries have been performed
using TIMES-NordPool hard-linked to TIMES-DK.
Baseline scenario considers:
• DKW and DKE: power and thermal system fossil free by 2035, entire energy system
fossil free by 2050
• NOR, FIN, SWE: no environmental constraints (NETP Carbon Neutral scenario is
implemented but not activated)
12 19
November
DTU Management Engineering, Technical University of Denmark
Transmission grid in the base year
13 19
November
Base year
Source: ENTSO-E (2012)
High integration of
power systems
DTU Management Engineering, Technical University of Denmark
Transmission grid expansion
14 19
November
Exogenous grid expansion
Source: ENTSO-E (2014)
Starting grid
+
DTU Management Engineering, Technical University of Denmark
Power generation in 2050
15 19
November
Solar
35%
Wind
Onshore
65%
DKE
Solar
18%
Wind
Onshore
82%
DKW
Coal
9%
Hydro
57%Natural
Gas
4%
Wind
Offshore
17%
Wind
Onshore
13%
NOR Biomass
4%
Coal
19%
Hydro
56%
Wind
Offshore
11%
Wind
Onshore
6%
Nuclear
4% SWE
Biomass
8%
Coal
42%
Hydro
13%
Wind
Offshore
12%
Wind
Onshore
3%
Nuclear
22%
FIN
DTU Management Engineering, Technical University of Denmark
Electricity prices in 2050
16 19
November
DTU Management Engineering, Technical University of Denmark
Power trade between Norway and Denmark
in 2050
17 19
November
Trade is ongoing:
• Until marginal costs equal
• Until congestion occurs
P
o
w
e
r
p
r
i
c
e
P
o
w
e
r
f
l
o
w
DTU Management Engineering, Technical University of Denmark
Price convergence
Between 2010 and 2020 about 7.5 GW of new transmission lines are installed
18 19
November
..less congestions
DTU Management Engineering, Technical University of Denmark
Agenda
• Background
• TIMES-NordPool
• Analysis of power trade in the Nordic countries
• Analysis of grid expansion possibilities
• Sensitivity analysis on effect of no grid expansion
• Conclusions
19 19
November
DTU Management Engineering, Technical University of Denmark
Analysis of grid expansion
• Uncertainty on grid expansion after
2020
• Endogenous optimization of grid
expansion
• Possible new interconnectors from
ENTSO-E in Ten-Year Network
Development Plan 2014 (TYNDP)
• Constraint on starting year, no on
transmission capacity
20 19
November
DTU Management Engineering, Technical University of Denmark
Uncertainty on costs of future interconnectors
Sensitivity analysis with interconnectors costs: under which cost condition the
interconnectors are built?
21 19
November
Low Medium High
k€/MW INVCOST O&M INVCOST O&M INVCOST O&M
NOR-SWE 190 0.4 310 0.7 440 1.0
NOR-FIN 600 1.4 1000 2.3 1400 3.2
SWE-FIN 56 0.1 91 0.2 130 0.3
DKW-DKE 430 1.0 725 1.6 1020 2.3
DKW-SWE 560 1.3 930 2.1 1300 2.9
SWE-GER 260 0.6 429 1.0 600 1.4
SWE-LAT 300 0.7 500 1.1 700 1.6
NOR-HOL 1033 2.3 1721 4.0 2410 5.4
Source: ENTSO-E (2014)
DTU Management Engineering, Technical University of Denmark
Endogenous grid expansion: sensitivity
analysis
22 19
November
Low interconnectors costs Medium interconnectors costs High interconnectors costs
Exogenous power prices not consistent
DTU Management Engineering, Technical University of Denmark
Agenda
• Background
• TIMES-NordPool
• Analysis of power trade in the Nordic countries
• Analysis of grid expansion possibilities
• Sensitivity analysis on effect of no grid expansion
• Conclusions
23 19
November
DTU Management Engineering, Technical University of Denmark
Sensitivity analysis: only existing
interconnectors
How does the Nordic power system react to a changeless transmission grid?
Only interconnectors existing or under construction by 2015 are considered
24 19
November
Region
Average relative price
increase
Average absolute
price increase
(€/MWh)
Price relative
stnrd dev
increase
DKE 7% 3.4 59%
DKW 1% 0.5 64%
FIN 1% 0.5 53%
NOR 9% 3.9 88%
SWE 12% 4.8 87%
Most
penalized
country
DTU Management Engineering, Technical University of Denmark
Agenda
• Background
• TIMES-NordPool
• Analysis of power trade in the Nordic countries
• Analysis of grid expansion possibilities
• Sensitivity analysis on effect of no grid expansion
• Conclusions
25 19
November
DTU Management Engineering, Technical University of Denmark
Conclusions
TIMES-NPM hard-linked to TIMES-DK allows:
• Calculating endogenously the power prices and volumes between Denmark and the
rest of the Nordic countries  Limiting the risk of the assumptions on the
exogenous trade processess for the Danish interconnectors
• Optimizing endogenously the transmission grid expansion
• Assessing for the Nordic interconnectors the cost thresholds within which they are
feasible
• Assessing for each Nordic country the average increase of power prices if the
planned interconnectors are not built
26 19
November
DTU Management Engineering, Technical University of Denmark27 19
November
Jacopo Tattini
jactat@dtu.dk
http://www.sys.man.dtu.dk/Research/Energy-Systems-Analysis/PhD-projects

Más contenido relacionado

Destacado

Destacado (20)

Second ETSAP book
Second ETSAP book Second ETSAP book
Second ETSAP book
 
Analysis of the role of energy storages in Belgium and Netherlands with TIMES
Analysis of the role of energy storages in Belgium and Netherlands with TIMESAnalysis of the role of energy storages in Belgium and Netherlands with TIMES
Analysis of the role of energy storages in Belgium and Netherlands with TIMES
 
JRC-EU-TIMES updates and outlook
JRC-EU-TIMES updates and outlookJRC-EU-TIMES updates and outlook
JRC-EU-TIMES updates and outlook
 
Evaluation of the role of energy storages in Europe with TIMES PanEU
Evaluation of the role of energy storages in Europe with TIMES PanEUEvaluation of the role of energy storages in Europe with TIMES PanEU
Evaluation of the role of energy storages in Europe with TIMES PanEU
 
Model archaeology
Model archaeologyModel archaeology
Model archaeology
 
Modelling investment decision making in the power sector under imperfect fore...
Modelling investment decision making in the power sector under imperfect fore...Modelling investment decision making in the power sector under imperfect fore...
Modelling investment decision making in the power sector under imperfect fore...
 
Techniques for Running Large Numbers of Scenarios in TIMES
Techniques for Running Large Numbers of Scenarios in TIMESTechniques for Running Large Numbers of Scenarios in TIMES
Techniques for Running Large Numbers of Scenarios in TIMES
 
Introducing Electricity Dispatchability Features in TIMES modelling Framework
Introducing Electricity Dispatchability Features in TIMES modelling FrameworkIntroducing Electricity Dispatchability Features in TIMES modelling Framework
Introducing Electricity Dispatchability Features in TIMES modelling Framework
 
Residential heat pumps in the future Danish energy system
Residential heat pumps in the future Danish energy systemResidential heat pumps in the future Danish energy system
Residential heat pumps in the future Danish energy system
 
Times Spain: an analytical tool for energy policy assessment in Spain
Times Spain: an analytical tool for energy policy assessment in SpainTimes Spain: an analytical tool for energy policy assessment in Spain
Times Spain: an analytical tool for energy policy assessment in Spain
 
Modelling the demand in Spain with Med-Pro
Modelling the demand in Spain with Med-ProModelling the demand in Spain with Med-Pro
Modelling the demand in Spain with Med-Pro
 
Addressing Uncertainty in TIMES Using Monte Carlo Analysis
Addressing Uncertainty in TIMES Using Monte Carlo AnalysisAddressing Uncertainty in TIMES Using Monte Carlo Analysis
Addressing Uncertainty in TIMES Using Monte Carlo Analysis
 
TIMES-GTAP soft-link methodology and interface
TIMES-GTAP soft-link methodology and interfaceTIMES-GTAP soft-link methodology and interface
TIMES-GTAP soft-link methodology and interface
 
Power systems reliability assessment in prospective analyses
Power systems reliability assessment in prospective analysesPower systems reliability assessment in prospective analyses
Power systems reliability assessment in prospective analyses
 
Impact of technology uncertainty on future low-carbon pathways in the UK
Impact of technology uncertainty on future low-carbon pathways in the UKImpact of technology uncertainty on future low-carbon pathways in the UK
Impact of technology uncertainty on future low-carbon pathways in the UK
 
Collaboration forum for ETSAP-TIAM based on GIT version control
Collaboration forum for ETSAP-TIAM based on GIT version controlCollaboration forum for ETSAP-TIAM based on GIT version control
Collaboration forum for ETSAP-TIAM based on GIT version control
 
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
 
Development of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectivesDevelopment of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectives
 
A Generalized Equilibrium Approach to Balance the Residual Abatements Resulti...
A Generalized Equilibrium Approach to Balance the Residual Abatements Resulti...A Generalized Equilibrium Approach to Balance the Residual Abatements Resulti...
A Generalized Equilibrium Approach to Balance the Residual Abatements Resulti...
 
VEDAViz for ETSAP partners
VEDAViz for ETSAP partnersVEDAViz for ETSAP partners
VEDAViz for ETSAP partners
 

Similar a Value of the interconnectors in the Nordic countries

Wind Resource Mapping Project for Nepal (ESMAP)- Inception Workshop
Wind Resource Mapping Project for Nepal (ESMAP)- Inception WorkshopWind Resource Mapping Project for Nepal (ESMAP)- Inception Workshop
Wind Resource Mapping Project for Nepal (ESMAP)- Inception Workshop
Kushal Gurung
 

Similar a Value of the interconnectors in the Nordic countries (20)

Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
 
The benefits of european TSO cooperation, Peder Ø. Andreasen, ENTSO-E, Sähköv...
The benefits of european TSO cooperation, Peder Ø. Andreasen, ENTSO-E, Sähköv...The benefits of european TSO cooperation, Peder Ø. Andreasen, ENTSO-E, Sähköv...
The benefits of european TSO cooperation, Peder Ø. Andreasen, ENTSO-E, Sähköv...
 
Fingrid Current: Three scenarios for the development of the power system. Jus...
Fingrid Current: Three scenarios for the development of the power system. Jus...Fingrid Current: Three scenarios for the development of the power system. Jus...
Fingrid Current: Three scenarios for the development of the power system. Jus...
 
Ensuring European Energy Transition: key research and innovation actions need...
Ensuring European Energy Transition: key research and innovation actions need...Ensuring European Energy Transition: key research and innovation actions need...
Ensuring European Energy Transition: key research and innovation actions need...
 
Cv pbe 2019
Cv pbe 2019Cv pbe 2019
Cv pbe 2019
 
Statnett - Nord.link - Status of a Transnational Project - Ingard Moen
Statnett - Nord.link - Status of a Transnational Project - Ingard MoenStatnett - Nord.link - Status of a Transnational Project - Ingard Moen
Statnett - Nord.link - Status of a Transnational Project - Ingard Moen
 
Addressing flexibility and decarbonization of energy systems through TIMES mo...
Addressing flexibility and decarbonization of energy systems through TIMES mo...Addressing flexibility and decarbonization of energy systems through TIMES mo...
Addressing flexibility and decarbonization of energy systems through TIMES mo...
 
How Do Various Risk Factors Influence the Green Certificate Market of Norway ...
How Do Various Risk Factors Influence the Green Certificate Market of Norway ...How Do Various Risk Factors Influence the Green Certificate Market of Norway ...
How Do Various Risk Factors Influence the Green Certificate Market of Norway ...
 
Global Electricity Network Feasibility Study
Global Electricity Network Feasibility StudyGlobal Electricity Network Feasibility Study
Global Electricity Network Feasibility Study
 
Integration of Electricity markets of Baltic/Nordic and Europe
Integration of Electricity markets of Baltic/Nordic and EuropeIntegration of Electricity markets of Baltic/Nordic and Europe
Integration of Electricity markets of Baltic/Nordic and Europe
 
Øyvind Stakkeland - Value Creation by Interconnecting Norwegian Hydro and Eur...
Øyvind Stakkeland - Value Creation by Interconnecting Norwegian Hydro and Eur...Øyvind Stakkeland - Value Creation by Interconnecting Norwegian Hydro and Eur...
Øyvind Stakkeland - Value Creation by Interconnecting Norwegian Hydro and Eur...
 
Wind Resource Mapping Project for Nepal (ESMAP)- Inception Workshop
Wind Resource Mapping Project for Nepal (ESMAP)- Inception WorkshopWind Resource Mapping Project for Nepal (ESMAP)- Inception Workshop
Wind Resource Mapping Project for Nepal (ESMAP)- Inception Workshop
 
Wind Energy trends in Denmark - Aisma vitina, ea energy analyses
Wind Energy trends in Denmark - Aisma vitina, ea energy analysesWind Energy trends in Denmark - Aisma vitina, ea energy analyses
Wind Energy trends in Denmark - Aisma vitina, ea energy analyses
 
Fingrid Current: Simon-Erik Ollus, Vice President, Trading and Asset Optimisa...
Fingrid Current: Simon-Erik Ollus, Vice President, Trading and Asset Optimisa...Fingrid Current: Simon-Erik Ollus, Vice President, Trading and Asset Optimisa...
Fingrid Current: Simon-Erik Ollus, Vice President, Trading and Asset Optimisa...
 
Nordic Energy ways in Europe – Clean, Competitive and Connected
Nordic Energy ways in Europe – Clean, Competitive and ConnectedNordic Energy ways in Europe – Clean, Competitive and Connected
Nordic Energy ways in Europe – Clean, Competitive and Connected
 
Measuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in NorwayMeasuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in Norway
 
Time-slice and regional structure – Experiences with NET- model
Time-slice and regional structure – Experiences with NET- modelTime-slice and regional structure – Experiences with NET- model
Time-slice and regional structure – Experiences with NET- model
 
Nord pool
Nord poolNord pool
Nord pool
 
Smartness Indicator
Smartness IndicatorSmartness Indicator
Smartness Indicator
 
Sei ipcc seminarrium
Sei  ipcc seminarriumSei  ipcc seminarrium
Sei ipcc seminarrium
 

Más de IEA-ETSAP

Más de IEA-ETSAP (20)

Variable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionVariable Renewable Energy in China's Transition
Variable Renewable Energy in China's Transition
 
The Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuelsThe Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuels
 
The role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transitionThe role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transition
 
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
 
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
 
Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...
 
Presentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/RoadmapPresentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/Roadmap
 
Flexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogenFlexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogen
 
Bioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibilityBioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibility
 
Reframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCPReframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCP
 
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
 
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
 
Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...
 
Energy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop TurinEnergy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop Turin
 
Integrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiencesIntegrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiences
 
Updates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMRUpdates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMR
 
Energy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP GroupEnergy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP Group
 
Applying science fiction to approach the future
Applying science fiction to approach the futureApplying science fiction to approach the future
Applying science fiction to approach the future
 
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
 
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
 

Último

➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men 🔝Mathura🔝 Escorts...
➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men  🔝Mathura🔝   Escorts...➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men  🔝Mathura🔝   Escorts...
➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men 🔝Mathura🔝 Escorts...
amitlee9823
 
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
amitlee9823
 
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
amitlee9823
 
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
amitlee9823
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
only4webmaster01
 
Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
JoseMangaJr1
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
amitlee9823
 
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night StandCall Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
amitlee9823
 
Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
amitlee9823
 

Último (20)

➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men 🔝Mathura🔝 Escorts...
➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men  🔝Mathura🔝   Escorts...➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men  🔝Mathura🔝   Escorts...
➥🔝 7737669865 🔝▻ Mathura Call-girls in Women Seeking Men 🔝Mathura🔝 Escorts...
 
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
 
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Bommasandra Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
 
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
 
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 9155563397 👗 Top Class Call Girl Service B...
 
(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7
(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7
(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
Capstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics ProgramCapstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics Program
 
Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
 
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Call me @ 9892124323 Cheap Rate Call Girls in Vashi with Real Photo 100% Secure
Call me @ 9892124323  Cheap Rate Call Girls in Vashi with Real Photo 100% SecureCall me @ 9892124323  Cheap Rate Call Girls in Vashi with Real Photo 100% Secure
Call me @ 9892124323 Cheap Rate Call Girls in Vashi with Real Photo 100% Secure
 
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night StandCall Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Hsr Layout ☎ 7737669865 🥵 Book Your One night Stand
 
April 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's AnalysisApril 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's Analysis
 
hybrid Seed Production In Chilli & Capsicum.pptx
hybrid Seed Production In Chilli & Capsicum.pptxhybrid Seed Production In Chilli & Capsicum.pptx
hybrid Seed Production In Chilli & Capsicum.pptx
 
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
Call Girls Bannerghatta Road Just Call 👗 7737669865 👗 Top Class Call Girl Ser...
 
Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hsr Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
 

Value of the interconnectors in the Nordic countries

  • 1. Value of the interconnectors in the Nordic countries Jacopo Tattini PhD Student at Energy System Analysis Group System Analysis Division DTU Management Engineering Maurizio Gargiulo E4SMA
  • 2. DTU Management Engineering, Technical University of Denmark Agenda • Background • TIMES-NordPool • Analysis of power trade in the Nordic countries • Analysis of grid expansion possibilities • Sensitivity analysis on effect of no grid expansion • Conclusions 2 19 November
  • 3. DTU Management Engineering, Technical University of Denmark Agenda • Background • TIMES-NordPool • Analysis of power trade in the Nordic countries • Analysis of grid expansion possibilities • Sensitivity analysis on effect of no grid expansion • Conclusions 3 19 November
  • 4. DTU Management Engineering, Technical University of Denmark Background: Nord Pool market 4 19 November Nord Pool: power trading market of Nordic and Baltic countries. The auctioning countries are divided into bidding areas linked with interconnectors controlled by the TSOs. If the power flows between the bidding areas exceed the interconnectors transmission limit, grid congestion occurs. Bottlenecks in the interconnectors lead to different prices in the various areas composing the Nordic electric system.
  • 5. DTU Management Engineering, Technical University of Denmark Benefits of interconnectors capacity expansion Interconnectors are one of the main power price drivers in the Nordic countries Interconnectors are essential for the integration of variable power sources Interesting to assess their role and their influence on the power trade 5 19 November Source: L’ Abbate et al. (2011)
  • 6. DTU Management Engineering, Technical University of Denmark Agenda • Background • TIMES-NordPool • Analysis of power trade in the Nordic countries • Analysis of grid expansion possibilities • Sensitivity analysis on effect of no grid expansion • Conclusions 6 19 November
  • 7. DTU Management Engineering, Technical University of Denmark TIMES-NordPool TIMES-NordPool: represents the Norwegian, Swedish and Finnish power and thermal systems. Purposes: • To be run together with TIMES-DK to better simulate power trade processes • Exploring the future power exchange between the Nordic countries under different assumptions • Assessing transmission capacity expansion under different scenarios 7 19 November
  • 8. DTU Management Engineering, Technical University of Denmark TIMES-NordPool: Spatial resolution • Multiregional model: Each country = One region • Interconnectors between Norway, Finland and Sweden implemented as endogenous trade processes • Interconnectors between Nordic countries and neighboring countries implemented as exogenous trade processes 8 19 November Power prices and volumes endogenously optimized Power volumes calculated according to price related criteria
  • 9. DTU Management Engineering, Technical University of Denmark TIMES-NordPool: Hard-linking with TIMES-DK 9 19 November TRADE TIMES-NordPool TIMES-DK All interconnections between Nordic countries as endogenous processes
  • 10. DTU Management Engineering, Technical University of Denmark TIMES-NordPool: Time structure • Same 32 time slices as TIMES-DK The models are consistent • Base Year: 2010 • Time horizon: 2010-2050 10 19 November
  • 11. DTU Management Engineering, Technical University of Denmark Agenda • Background • TIMES-NordPool • Analysis of power trade in the Nordic countries • Analysis of grid expansion possibilities • Sensitivity analysis oneffect of no grid expansion • Conclusions 11 19 November
  • 12. DTU Management Engineering, Technical University of Denmark Assumptions for the analysis All analyses on the power trade between the Nordic countries have been performed using TIMES-NordPool hard-linked to TIMES-DK. Baseline scenario considers: • DKW and DKE: power and thermal system fossil free by 2035, entire energy system fossil free by 2050 • NOR, FIN, SWE: no environmental constraints (NETP Carbon Neutral scenario is implemented but not activated) 12 19 November
  • 13. DTU Management Engineering, Technical University of Denmark Transmission grid in the base year 13 19 November Base year Source: ENTSO-E (2012) High integration of power systems
  • 14. DTU Management Engineering, Technical University of Denmark Transmission grid expansion 14 19 November Exogenous grid expansion Source: ENTSO-E (2014) Starting grid +
  • 15. DTU Management Engineering, Technical University of Denmark Power generation in 2050 15 19 November Solar 35% Wind Onshore 65% DKE Solar 18% Wind Onshore 82% DKW Coal 9% Hydro 57%Natural Gas 4% Wind Offshore 17% Wind Onshore 13% NOR Biomass 4% Coal 19% Hydro 56% Wind Offshore 11% Wind Onshore 6% Nuclear 4% SWE Biomass 8% Coal 42% Hydro 13% Wind Offshore 12% Wind Onshore 3% Nuclear 22% FIN
  • 16. DTU Management Engineering, Technical University of Denmark Electricity prices in 2050 16 19 November
  • 17. DTU Management Engineering, Technical University of Denmark Power trade between Norway and Denmark in 2050 17 19 November Trade is ongoing: • Until marginal costs equal • Until congestion occurs P o w e r p r i c e P o w e r f l o w
  • 18. DTU Management Engineering, Technical University of Denmark Price convergence Between 2010 and 2020 about 7.5 GW of new transmission lines are installed 18 19 November ..less congestions
  • 19. DTU Management Engineering, Technical University of Denmark Agenda • Background • TIMES-NordPool • Analysis of power trade in the Nordic countries • Analysis of grid expansion possibilities • Sensitivity analysis on effect of no grid expansion • Conclusions 19 19 November
  • 20. DTU Management Engineering, Technical University of Denmark Analysis of grid expansion • Uncertainty on grid expansion after 2020 • Endogenous optimization of grid expansion • Possible new interconnectors from ENTSO-E in Ten-Year Network Development Plan 2014 (TYNDP) • Constraint on starting year, no on transmission capacity 20 19 November
  • 21. DTU Management Engineering, Technical University of Denmark Uncertainty on costs of future interconnectors Sensitivity analysis with interconnectors costs: under which cost condition the interconnectors are built? 21 19 November Low Medium High k€/MW INVCOST O&M INVCOST O&M INVCOST O&M NOR-SWE 190 0.4 310 0.7 440 1.0 NOR-FIN 600 1.4 1000 2.3 1400 3.2 SWE-FIN 56 0.1 91 0.2 130 0.3 DKW-DKE 430 1.0 725 1.6 1020 2.3 DKW-SWE 560 1.3 930 2.1 1300 2.9 SWE-GER 260 0.6 429 1.0 600 1.4 SWE-LAT 300 0.7 500 1.1 700 1.6 NOR-HOL 1033 2.3 1721 4.0 2410 5.4 Source: ENTSO-E (2014)
  • 22. DTU Management Engineering, Technical University of Denmark Endogenous grid expansion: sensitivity analysis 22 19 November Low interconnectors costs Medium interconnectors costs High interconnectors costs Exogenous power prices not consistent
  • 23. DTU Management Engineering, Technical University of Denmark Agenda • Background • TIMES-NordPool • Analysis of power trade in the Nordic countries • Analysis of grid expansion possibilities • Sensitivity analysis on effect of no grid expansion • Conclusions 23 19 November
  • 24. DTU Management Engineering, Technical University of Denmark Sensitivity analysis: only existing interconnectors How does the Nordic power system react to a changeless transmission grid? Only interconnectors existing or under construction by 2015 are considered 24 19 November Region Average relative price increase Average absolute price increase (€/MWh) Price relative stnrd dev increase DKE 7% 3.4 59% DKW 1% 0.5 64% FIN 1% 0.5 53% NOR 9% 3.9 88% SWE 12% 4.8 87% Most penalized country
  • 25. DTU Management Engineering, Technical University of Denmark Agenda • Background • TIMES-NordPool • Analysis of power trade in the Nordic countries • Analysis of grid expansion possibilities • Sensitivity analysis on effect of no grid expansion • Conclusions 25 19 November
  • 26. DTU Management Engineering, Technical University of Denmark Conclusions TIMES-NPM hard-linked to TIMES-DK allows: • Calculating endogenously the power prices and volumes between Denmark and the rest of the Nordic countries  Limiting the risk of the assumptions on the exogenous trade processess for the Danish interconnectors • Optimizing endogenously the transmission grid expansion • Assessing for the Nordic interconnectors the cost thresholds within which they are feasible • Assessing for each Nordic country the average increase of power prices if the planned interconnectors are not built 26 19 November
  • 27. DTU Management Engineering, Technical University of Denmark27 19 November Jacopo Tattini jactat@dtu.dk http://www.sys.man.dtu.dk/Research/Energy-Systems-Analysis/PhD-projects