SlideShare una empresa de Scribd logo
1 de 41
www.ilxgroup.com
by Karen Swanston
Project Management
PRINCE2®
in 30 mins
P R I N C E 2 I N 3 0 M I N U T E S
Introduction
2
Karen Swanston
A very enthusiastic and experienced trainer,
specialising in PRINCE2 and M_o_R
(Management of Risk) training for more than
nine years.
Along with her experience, Karen has a
passion for designing and delivering training
in a fun and easy manner. Because of this,
she consistently receives above average
feedback and exam results from her
students. Her blend of experience and
enthusiasm is what makes her the ideal
speaker for this session
P R I N C E 2 I N 3 0 M I N U T E S
This session will take you through how easy
PRINCE2 can be to learn.
We’ll look at the basics of the framework without
overcomplicating it, and provide you with some
quick and easy-to-use hints and tips.
Easy to learn
P R I N C E 2 I N 3 0 M I N U T E S
Definition of a PRINCE2 Project
A project is a temporary organisation
that is created for the purpose of delivering
one or more business products,
according to an agreed business case.
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Product
ProjectBusinessasusual
Output
Change
Outcome
Users
Benefit Dis-benefit
Stuff
Specialist Product
P R I N C E 2 I N 3 0 M I N U T E S
OutPut
Change
OutCome
Users
Stuff
Specialist Product
ProjectBusinessasusual
Benefit Dis-benefit
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 four integrated elements
7 Principles (guiding obligations and good practices)
Washing your hands
7 Themes (Addressed continually throughout the project)
Ingredients to be used
7 Processes (step-wise progression through a project)
Recipe to follow
Tailoring to the environment (flexibility)
Cottage Pie for one? Including Carrots?
P R I N C E 2 I N 3 0 M I N U T E S
Principles
• Continued business justification
• Learn from experience
• Defined roles & responsibilities
• Manage by stages
• Manage by exception
• Focus on products
• Tailor to suit the project environment
P R I N C E 2 I N 3 0 M I N U T E S
Themes
• Business case
• Organization
• Quality
• Plans
• Risk
• Change
• Progress
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 processes
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
INITIATING
A PROJECT
DIRECTING A PROJECT
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 processes
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
INITIATING
A PROJECT
DIRECTING A PROJECT
P R I N C E 2 I N 3 0 M I N U T E S
Starting up a project
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Organization
PROJECTMANAGEMENTTEAM
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
Corporate or programme management
Directing – Project Board
Managing – Project Manager
Delivering – Team Manager
ProjectManagementTeam
P R I N C E 2 I N 3 0 M I N U T E S
Business case
Confirm
benefit
Verify
updated
Business Case
Verify
outline
Business Case
Verify
detailed
Business Case
Develop
Business Case
Maintain
Business Case
Pre-
project
Initiation
stage
Subsequent delivery
stage(s)
Final delivery
stage
Post-
project
Confirm
benefit
Confirm
benefit
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
Initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
PRINCE2 processes
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
Authorize
Initiation
PRINCE2 processes
INITIATING
A PROJECT
P R I N C E 2 I N 3 0 M I N U T E S
Initiating a project
© Copyright 2013.
Reproduced under
Licence from
AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Risk definition
A risk is: an uncertain event or set of
events that, should it occur, will have an
effect on the achievement of objectives
MAY
MIGHT
COULD
P R I N C E 2 I N 3 0 M I N U T E S
Issue definition
A issue is: something that has happened
or it will happen that was not planned.
WILL
HAS
NO UNCERTAINTY
P R I N C E 2 I N 3 0 M I N U T E S
Quality
PRODUCT
DESCRIPTION
Engine: petrol,
3.5L
PROJECT PRODUCT DESCRIPTION
PRODUCT
DESCRIPTION
Cream leather
seats
PRODUCT
DESCRIPTION
Tyres: Dunlop
245/40 R19
ACCEPTANCE
CRITERIA
1. 0-60 mph in 3 seconds
2. Up to 2 years old
3. ‘What Car’ top 10 most
desirable cars
CUSTOMER
QUALITY
EXPECTATIONS
1.Fast Car
2.New Car
3.Flashy Car
P R I N C E 2 I N 3 0 M I N U T E S
Plans
TIME & COSTPROJECT PLAN
e e e e
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
DIRECTING A PROJECT
PRINCE2 processes
P R I N C E 2 I N 3 0 M I N U T E S
Plans
TIME & COSTSTAGE PLAN
TIME & COSTPROJECT PLAN
e e e e
e e e e
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
PRINCE2 processes
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
PRINCE2 processes
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
PRINCE2 processes
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Plans
TEAM
PLAN
WORKPACKAGE
TIME & COSTSTAGE PLAN
TIME & COSTPROJECT PLAN
e e e e
e e e e
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 processes
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
Checkpoint
report
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Progress – reporting
P R O J E C T B O A R D
S e n i o r u s e r E x e c u t i v e S e n i o r s u p p l i e r
C O R P O R AT E O R P R O G R AM M E M AN A G E M E N T
P R O J E C T M A N A G E R
T E A M M A N A G E R
H I G H L I G H T R E P O R T
C H E C K P O I N T R E P O R T
H I G H L I G H T R E P O R T
P R I N C E 2 I N 3 0 M I N U T E S
Progress – tolerances
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
Confirm all
products are
completed
Evaluate the
project
Communication
Archive project
documentation
PRINCE2 processes
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
Confirm all
products are
completed
Evaluate the
project
Communication
Archive project
documentation
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
PRINCE2 processes
M A N D A T E
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
During this session we
have stepped through some of the
basic concepts of PRINCE2
without overcomplicating it,
and provided you with some quick,
easy-to-use hints and tips.
Easy to learn
P R I N C E 2 I N 3 0 M I N U T E S
Questions?
P R I N C E 2 I N 3 0 M I N U T E S
Why ILX?
For more information about our courses,
visit our website ilxgroup.com,
give us a call on +44 (0) 1270 611 600 or send an email to:
Individuals enquiries suzanne.bailey@ilxgroup.com
Corporate enquiries paula.gower@ilxgroup.com
P R I N C E 2 I N 3 0 M I N U T E S
Recommended courses
PRINCE2
Programme
& Project
Sponsorship
APM Project
Management
Qualification
Change
Management
P R I N C E 2 I N 3 0 M I N U T E S
I L X G R O U P, U n i t e d K i n g d o m
7 t h F l o o r
9 5 A l d w y c h
L o n d o n W C 2 B 4 J F - U K
T: + 4 4 ( 0 ) 2 0 7 3 7 1 4 4 4 4
Thank you for listening
I L X G R O U P, Au s t r a l i a
7 3 0 S p r i n g v a l e R d
M u l g r a v e , V I C 3 1 7 0
A u s t r a l i a
T: + 6 1 1 3 0 0 4 5 9 4 5 9
www.ilxgroup.com

Más contenido relacionado

La actualidad más candente

PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
TURKI , PMP
 
PRINCE2 Overview
PRINCE2 OverviewPRINCE2 Overview
PRINCE2 Overview
projectingIT
 

La actualidad más candente (20)

PRINCE2 Process Model
PRINCE2 Process ModelPRINCE2 Process Model
PRINCE2 Process Model
 
PRINCE2 Foundation Classroom slides - Sample - Classic
PRINCE2 Foundation Classroom slides - Sample - ClassicPRINCE2 Foundation Classroom slides - Sample - Classic
PRINCE2 Foundation Classroom slides - Sample - Classic
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | Edureka
 
PRINCE2 Foundation Training Manual by Frank Turley
PRINCE2 Foundation Training Manual by Frank TurleyPRINCE2 Foundation Training Manual by Frank Turley
PRINCE2 Foundation Training Manual by Frank Turley
 
AXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® PractitionerAXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® Practitioner
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Agile Project Management for PMP's
Agile Project Management for PMP'sAgile Project Management for PMP's
Agile Project Management for PMP's
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
PRINCE2 Practitioner Classroom slides - Sample
PRINCE2 Practitioner Classroom slides - Sample PRINCE2 Practitioner Classroom slides - Sample
PRINCE2 Practitioner Classroom slides - Sample
 
IT Project Management - Aligning PMBOK Processes and SDLC
IT Project Management  - Aligning PMBOK Processes and SDLCIT Project Management  - Aligning PMBOK Processes and SDLC
IT Project Management - Aligning PMBOK Processes and SDLC
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full course
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
 
AgilePM® - Agile Project Management - Foundation
AgilePM® - Agile Project Management - FoundationAgilePM® - Agile Project Management - Foundation
AgilePM® - Agile Project Management - Foundation
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
The Project Management Plan in 20 steps
The Project Management Plan in 20 stepsThe Project Management Plan in 20 steps
The Project Management Plan in 20 steps
 
PRINCE2 Overview
PRINCE2 OverviewPRINCE2 Overview
PRINCE2 Overview
 

Similar a Prince2 explained in 30mins

Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2
sundong
 
PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®
Rajiv Sharma
 
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdfyour-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
hiwotmengistu3
 

Similar a Prince2 explained in 30mins (20)

prince2in30mins-170503124814.pdf
prince2in30mins-170503124814.pdfprince2in30mins-170503124814.pdf
prince2in30mins-170503124814.pdf
 
A guide for project managers prince2
A guide for project managers prince2A guide for project managers prince2
A guide for project managers prince2
 
4Cite Capability Statement (pdf)
4Cite Capability Statement (pdf)4Cite Capability Statement (pdf)
4Cite Capability Statement (pdf)
 
PRINCE2 Basic Concepts
PRINCE2 Basic ConceptsPRINCE2 Basic Concepts
PRINCE2 Basic Concepts
 
PRINCE2 quick guide
PRINCE2 quick guidePRINCE2 quick guide
PRINCE2 quick guide
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Project management in easy steps
Project management in easy stepsProject management in easy steps
Project management in easy steps
 
ePMO & Enterprise Implementations
ePMO & Enterprise ImplementationsePMO & Enterprise Implementations
ePMO & Enterprise Implementations
 
Project management intro from prince2 foundation
Project management intro from prince2  foundationProject management intro from prince2  foundation
Project management intro from prince2 foundation
 
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
 
Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2
 
PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®
 
PRINCE2 Executive Briefing
PRINCE2 Executive BriefingPRINCE2 Executive Briefing
PRINCE2 Executive Briefing
 
Guidelines for Managing Projects
Guidelines for Managing ProjectsGuidelines for Managing Projects
Guidelines for Managing Projects
 
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdfyour-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
 
Project Management Slides Powerpoint Template.pptx
Project Management Slides Powerpoint Template.pptxProject Management Slides Powerpoint Template.pptx
Project Management Slides Powerpoint Template.pptx
 
PRINCE 2 foundation & practitioner certification training
PRINCE 2   foundation & practitioner certification trainingPRINCE 2   foundation & practitioner certification training
PRINCE 2 foundation & practitioner certification training
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for all
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Prince2009
Prince2009Prince2009
Prince2009
 

Más de ILX Group

Más de ILX Group (16)

Agile: a fresh perspective
Agile: a fresh perspectiveAgile: a fresh perspective
Agile: a fresh perspective
 
How to identify and manage resistance to change
How to identify and manage resistance to changeHow to identify and manage resistance to change
How to identify and manage resistance to change
 
What's changing with ITIL® 4?
What's changing with ITIL® 4?What's changing with ITIL® 4?
What's changing with ITIL® 4?
 
PRINCE2®: The 7 principles of football management
PRINCE2®: The 7 principles of football managementPRINCE2®: The 7 principles of football management
PRINCE2®: The 7 principles of football management
 
An introduction to the Praxis Framework™ webinar
An introduction to the Praxis Framework™ webinarAn introduction to the Praxis Framework™ webinar
An introduction to the Praxis Framework™ webinar
 
Identifying and managing resistance to change
Identifying and managing resistance to change Identifying and managing resistance to change
Identifying and managing resistance to change
 
Prince2 2017
Prince2 2017 Prince2 2017
Prince2 2017
 
Change Management - Implementing Swift & Sudden Change (Brexit)
Change Management - Implementing Swift & Sudden Change (Brexit)Change Management - Implementing Swift & Sudden Change (Brexit)
Change Management - Implementing Swift & Sudden Change (Brexit)
 
Lean six sigma demystified webinar
Lean six sigma demystified webinarLean six sigma demystified webinar
Lean six sigma demystified webinar
 
Actionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challengeActionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challenge
 
Project management - Stakeholders and project success - Overcoming project f...
Project management - Stakeholders and project success  - Overcoming project f...Project management - Stakeholders and project success  - Overcoming project f...
Project management - Stakeholders and project success - Overcoming project f...
 
How combining the methodology of PRINCE2 and the framework of ITIL can enable...
How combining the methodology of PRINCE2 and the framework of ITIL can enable...How combining the methodology of PRINCE2 and the framework of ITIL can enable...
How combining the methodology of PRINCE2 and the framework of ITIL can enable...
 
AN INSIGHT INTO PRINCE2®
AN INSIGHT INTO PRINCE2®AN INSIGHT INTO PRINCE2®
AN INSIGHT INTO PRINCE2®
 
Introduction to ITIL® Practitioner
Introduction to ITIL® Practitioner Introduction to ITIL® Practitioner
Introduction to ITIL® Practitioner
 
Mind the Gap - Learning Technologies Conference 2016 by Russell Kenrick
Mind the Gap - Learning Technologies Conference 2016 by Russell KenrickMind the Gap - Learning Technologies Conference 2016 by Russell Kenrick
Mind the Gap - Learning Technologies Conference 2016 by Russell Kenrick
 
Maximising and monitoring project management competence
Maximising and monitoring project management competenceMaximising and monitoring project management competence
Maximising and monitoring project management competence
 

Último

CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
anilsa9823
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 

Último (20)

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 

Prince2 explained in 30mins

  • 1. www.ilxgroup.com by Karen Swanston Project Management PRINCE2® in 30 mins
  • 2. P R I N C E 2 I N 3 0 M I N U T E S Introduction 2 Karen Swanston A very enthusiastic and experienced trainer, specialising in PRINCE2 and M_o_R (Management of Risk) training for more than nine years. Along with her experience, Karen has a passion for designing and delivering training in a fun and easy manner. Because of this, she consistently receives above average feedback and exam results from her students. Her blend of experience and enthusiasm is what makes her the ideal speaker for this session
  • 3. P R I N C E 2 I N 3 0 M I N U T E S This session will take you through how easy PRINCE2 can be to learn. We’ll look at the basics of the framework without overcomplicating it, and provide you with some quick and easy-to-use hints and tips. Easy to learn
  • 4. P R I N C E 2 I N 3 0 M I N U T E S Definition of a PRINCE2 Project A project is a temporary organisation that is created for the purpose of delivering one or more business products, according to an agreed business case. © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 5. P R I N C E 2 I N 3 0 M I N U T E S Product ProjectBusinessasusual Output Change Outcome Users Benefit Dis-benefit Stuff Specialist Product
  • 6. P R I N C E 2 I N 3 0 M I N U T E S OutPut Change OutCome Users Stuff Specialist Product ProjectBusinessasusual Benefit Dis-benefit
  • 7. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 four integrated elements 7 Principles (guiding obligations and good practices) Washing your hands 7 Themes (Addressed continually throughout the project) Ingredients to be used 7 Processes (step-wise progression through a project) Recipe to follow Tailoring to the environment (flexibility) Cottage Pie for one? Including Carrots?
  • 8. P R I N C E 2 I N 3 0 M I N U T E S Principles • Continued business justification • Learn from experience • Defined roles & responsibilities • Manage by stages • Manage by exception • Focus on products • Tailor to suit the project environment
  • 9. P R I N C E 2 I N 3 0 M I N U T E S Themes • Business case • Organization • Quality • Plans • Risk • Change • Progress
  • 10. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 processes Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT INITIATING A PROJECT DIRECTING A PROJECT
  • 11. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 processes Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT INITIATING A PROJECT DIRECTING A PROJECT
  • 12. P R I N C E 2 I N 3 0 M I N U T E S Starting up a project © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 13. P R I N C E 2 I N 3 0 M I N U T E S Organization PROJECTMANAGEMENTTEAM © Copyright 2013. Reproduced under Licence from AXELOS Limited. Corporate or programme management Directing – Project Board Managing – Project Manager Delivering – Team Manager ProjectManagementTeam
  • 14. P R I N C E 2 I N 3 0 M I N U T E S Business case Confirm benefit Verify updated Business Case Verify outline Business Case Verify detailed Business Case Develop Business Case Maintain Business Case Pre- project Initiation stage Subsequent delivery stage(s) Final delivery stage Post- project Confirm benefit Confirm benefit © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 15. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize Initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT PRINCE2 processes
  • 16. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT Authorize Initiation PRINCE2 processes INITIATING A PROJECT
  • 17. P R I N C E 2 I N 3 0 M I N U T E S Initiating a project © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 18. P R I N C E 2 I N 3 0 M I N U T E S Risk definition A risk is: an uncertain event or set of events that, should it occur, will have an effect on the achievement of objectives MAY MIGHT COULD
  • 19. P R I N C E 2 I N 3 0 M I N U T E S Issue definition A issue is: something that has happened or it will happen that was not planned. WILL HAS NO UNCERTAINTY
  • 20. P R I N C E 2 I N 3 0 M I N U T E S Quality PRODUCT DESCRIPTION Engine: petrol, 3.5L PROJECT PRODUCT DESCRIPTION PRODUCT DESCRIPTION Cream leather seats PRODUCT DESCRIPTION Tyres: Dunlop 245/40 R19 ACCEPTANCE CRITERIA 1. 0-60 mph in 3 seconds 2. Up to 2 years old 3. ‘What Car’ top 10 most desirable cars CUSTOMER QUALITY EXPECTATIONS 1.Fast Car 2.New Car 3.Flashy Car
  • 21. P R I N C E 2 I N 3 0 M I N U T E S Plans TIME & COSTPROJECT PLAN e e e e
  • 22. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID) DIRECTING A PROJECT PRINCE2 processes
  • 23. P R I N C E 2 I N 3 0 M I N U T E S Plans TIME & COSTSTAGE PLAN TIME & COSTPROJECT PLAN e e e e e e e e
  • 24. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report PRINCE2 processes MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 25. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM PRINCE2 processes MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 26. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM PRINCE2 processes MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 27. P R I N C E 2 I N 3 0 M I N U T E S Plans TEAM PLAN WORKPACKAGE TIME & COSTSTAGE PLAN TIME & COSTPROJECT PLAN e e e e e e e e
  • 28. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 processes Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT Checkpoint report INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 29. P R I N C E 2 I N 3 0 M I N U T E S Progress – reporting P R O J E C T B O A R D S e n i o r u s e r E x e c u t i v e S e n i o r s u p p l i e r C O R P O R AT E O R P R O G R AM M E M AN A G E M E N T P R O J E C T M A N A G E R T E A M M A N A G E R H I G H L I G H T R E P O R T C H E C K P O I N T R E P O R T H I G H L I G H T R E P O R T
  • 30. P R I N C E 2 I N 3 0 M I N U T E S Progress – tolerances
  • 31. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 32. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 33. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 34. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 35. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan Confirm all products are completed Evaluate the project Communication Archive project documentation PRINCE2 processes DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 36. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT Confirm all products are completed Evaluate the project Communication Archive project documentation CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan PRINCE2 processes M A N D A T E DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 37. P R I N C E 2 I N 3 0 M I N U T E S During this session we have stepped through some of the basic concepts of PRINCE2 without overcomplicating it, and provided you with some quick, easy-to-use hints and tips. Easy to learn
  • 38. P R I N C E 2 I N 3 0 M I N U T E S Questions?
  • 39. P R I N C E 2 I N 3 0 M I N U T E S Why ILX? For more information about our courses, visit our website ilxgroup.com, give us a call on +44 (0) 1270 611 600 or send an email to: Individuals enquiries suzanne.bailey@ilxgroup.com Corporate enquiries paula.gower@ilxgroup.com
  • 40. P R I N C E 2 I N 3 0 M I N U T E S Recommended courses PRINCE2 Programme & Project Sponsorship APM Project Management Qualification Change Management
  • 41. P R I N C E 2 I N 3 0 M I N U T E S I L X G R O U P, U n i t e d K i n g d o m 7 t h F l o o r 9 5 A l d w y c h L o n d o n W C 2 B 4 J F - U K T: + 4 4 ( 0 ) 2 0 7 3 7 1 4 4 4 4 Thank you for listening I L X G R O U P, Au s t r a l i a 7 3 0 S p r i n g v a l e R d M u l g r a v e , V I C 3 1 7 0 A u s t r a l i a T: + 6 1 1 3 0 0 4 5 9 4 5 9 www.ilxgroup.com