SlideShare una empresa de Scribd logo
1 de 4
Descargar para leer sin conexión
Process Mapping with Flowcharts
A flowchart is an outline or schematic drawing of the process your team is trying to measure or improve. It can also be a
picture of an ideal process that you would like to use. Process mapping with flowcharts can help people:
     Agree on the steps of a process and the order in which they occur
     See some of the duplicated effort and other non-value-added steps that might be lurking in a process
     Clarify working relationships between people and organizations
     Target specific steps in the process for improvement.
Process mapping is especially useful in the measure and analyze phases of Lean Six Sigma methodology.

Top-down flowchart
There are several kinds of flowcharts. The simplest is the top-down flowchart.

What can it do for you?
       Tell what the major clusters of activity are—the ones that are essential to the total process.
       Show what the process would look like without the steps that have accumulated over time to shore up an
        inefficient or faulty process.

How do you make one?
1. List the most basic steps of the process. Limit these to no more than five or six major steps.
2. Write the major steps across the top of a board, flipchart or piece of paper in the order that they occur in the process.
3. Under each major step, list the sub-steps that make up that element of the process. List them in the order that they occur.
Again, limit yourself to no more than five or six sub-steps for each major step.
Now what?
The picture you have created will show only the useful work that goes into the process.
    Compare this to the way things are actually done. Ask: “What can be done to eliminate unnecessary work?”
    Talk to your customers. Ask: “How can we improve the process to better please the people who receive our work?”
    Look at the essential process. Ask: “How can we change the process to make fewer errors and increase our speed
        of delivery?”
                  Product Spt.        Design            Model                      The top-down flowchart can be used
 Customer                                                             Others       for planning new processes as well as
                  Engineering Engineering Engineering                              examining existing ones. It helps keep
    Events              Data                                                       people focused on the whole process
   Reported           received                                                     instead of getting lost in details.
                                                                                   Details can be worked out by the team
                                                                                   members responsible for that part of
                                                                                   the process.
                Y       Isolated
                        Problem
                            ?                                                        Deployment flowchart
                                                                                     Another flowchart is the deployment
                        N                                                            chart. While the top-down flowchart
                                                                                     tells what, the deployment chart
                            Form Teams, Establish Priority                           shows both what and who.

                                                                                     What can it do for you?
                                N        Action                                           Show how the people
                                        Required                                     involved fit together.
                                           ?                                              Keep track of what each
                                    Y                                                person or organization is supposed to
                                                                                     do.
                            Action Plan
                                                                                     How do you make one?
                            Control Plan                                             1. List the major steps of the process
                                                                                     in the order in which they occur. This
                                                                                     might be the output of your work with
                    Preliminary Investigation
                                                                                     a top-down flowchart or you might
                                                                                     use some other technique to create this
                                                                                     list.
                    Y                                                                2. Across the top of your board,
                        More Data
                                                Investigation Plan                   flipchart or paper write the names of
                            ?
                                    N                                                the people or organizations involved
                                                                                     in the process.
                                                                                     3. Under the name of the person or
                              Establish priority and funding                         organization responsible for the first
                                                                                     step in the process, draw a box and
                                                                                     write that step in the box. If more than
     Deployment Flowchart                          Analysis and Improvement          one person or group is responsible for
                                                                                     a step, extend the box so it is also
under the name of that person or group.
4. If any of the other people or groups help or advise the ones with primary responsibility for that step, draw an oval under
the names of those people or groups.
5. Connect the ovals to the box with the process step in it.
6. After the first step is complete, put the second step under the people responsible for it.
7. Connect the first step to the second step, and then add ovals for any helpers or advisors in the second process step. Keep
going this way with all the steps in the process.
Now what?
The completed chart tells not only how the process operates at each step, but who is involved and what responsibility they
each have.

Ask:
       “Are the right people involved at the right time in the process?”
       “Are there too many people involved or too many hand-offs?”
       “Are there barriers between people who must work together to make the process work?”

The deployment chart can be as simple (just major steps) or as involved (sub-steps and sub-sub-steps) as you need to
make it.

Detailed flowchart
Generally top-down and deployment charts are enough to examine a process, but sometimes teams need more detail to see
where problems are occurring.

What can it do for you?
       Show what actually happens at each step in the process in detail
       Show what happens when non-standard events occur
       Graphically display processes so you can easily see redundancies and other wasted effort.

How do you do it?
To construct a detailed flowchart, various symbols can be used to represent process steps.
1. Draw the first symbol, and then write a description of the process step inside the symbol.
2. Draw the second symbol. Write the description. Connect the two symbols with an arrow showing the direction of flow.
3. Continue this way until you have completed the process or the part of the process you wanted to examine.

Each symbol should represent only one action or one yes-no decision. This is what gives the detailed flowchart its detail.
It is also what makes the creation of detailed flowcharts so time consuming.




                                                                                             Each symbol should
                                                                                          represent only one action
                                                                                           or one yes-no decision.
                                                                                            This is what gives the
                                                                                            detailed flowchart its
                                                                                            detail. It is also what
                                                                                            makes the creation of
                                                                                            detailed flowcharts so
                                                                                               time consuming.
Now what?
                                   Look at the completed flowchart.

                                   Ask:
                                           Where are there redundancies that could be eliminated?
                                           Where are there steps that seem out of order?
                                           What steps are missing that could improve the process?
                                           Where is time lost waiting or sending things back and
                                   forth?
                                           What steps add no value to the customer?

                                   A detailed flowchart can be a powerful tool for examining a
                                   process that has built up needless complexity, but be warned.
                                   Creating all this detail is time-consuming.

                                   Before you begin, ask:
                                        Is all this detail necessary?
                                        Can the detailed flowchart be limited to only a small
                                   part of the total process?




Steven Bonacorsi is the President of the International Standard for Lean Six Sigma
(ISLSS) and Certified Lean Six Sigma Master Black Belt instructor and coach. Steven
Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and
Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for
Lean Six Sigma process improvement methodologies.
                             Author for the Process Excellence Network (PEX Network /
                             IQPC).
                             FREE Lean Six Sigma and BPM content

International Standard for Lean Six Sigma
Steven Bonacorsi, President and Lean Six Sigma Master Black Belt
47 Seasons Lane, Londonderry, NH 03053, USA
Phone: + (1) 603-401-7047
Steven Bonacorsi e-mail
Steven Bonacorsi LinkedIn
Steven Bonacorsi Twitter
Lean Six Sigma Group

Más contenido relacionado

Más de Steven Bonacorsi

Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
Steven Bonacorsi
 

Más de Steven Bonacorsi (20)

Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 
IGrafx Performance Management Whitepaper
IGrafx Performance Management WhitepaperIGrafx Performance Management Whitepaper
IGrafx Performance Management Whitepaper
 
IGrafx Multinational Case Study
IGrafx Multinational Case StudyIGrafx Multinational Case Study
IGrafx Multinational Case Study
 
IGrafx Process6 Sig Bro
IGrafx Process6 Sig BroIGrafx Process6 Sig Bro
IGrafx Process6 Sig Bro
 

Último

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 

Último (20)

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 

Process mapping with flowcharts

  • 1. Process Mapping with Flowcharts A flowchart is an outline or schematic drawing of the process your team is trying to measure or improve. It can also be a picture of an ideal process that you would like to use. Process mapping with flowcharts can help people:  Agree on the steps of a process and the order in which they occur  See some of the duplicated effort and other non-value-added steps that might be lurking in a process  Clarify working relationships between people and organizations  Target specific steps in the process for improvement. Process mapping is especially useful in the measure and analyze phases of Lean Six Sigma methodology. Top-down flowchart There are several kinds of flowcharts. The simplest is the top-down flowchart. What can it do for you?  Tell what the major clusters of activity are—the ones that are essential to the total process.  Show what the process would look like without the steps that have accumulated over time to shore up an inefficient or faulty process. How do you make one? 1. List the most basic steps of the process. Limit these to no more than five or six major steps. 2. Write the major steps across the top of a board, flipchart or piece of paper in the order that they occur in the process. 3. Under each major step, list the sub-steps that make up that element of the process. List them in the order that they occur. Again, limit yourself to no more than five or six sub-steps for each major step.
  • 2. Now what? The picture you have created will show only the useful work that goes into the process.  Compare this to the way things are actually done. Ask: “What can be done to eliminate unnecessary work?”  Talk to your customers. Ask: “How can we improve the process to better please the people who receive our work?”  Look at the essential process. Ask: “How can we change the process to make fewer errors and increase our speed of delivery?” Product Spt. Design Model The top-down flowchart can be used Customer Others for planning new processes as well as Engineering Engineering Engineering examining existing ones. It helps keep Events Data people focused on the whole process Reported received instead of getting lost in details. Details can be worked out by the team members responsible for that part of the process. Y Isolated Problem ? Deployment flowchart Another flowchart is the deployment N chart. While the top-down flowchart tells what, the deployment chart Form Teams, Establish Priority shows both what and who. What can it do for you? N Action  Show how the people Required involved fit together. ?  Keep track of what each Y person or organization is supposed to do. Action Plan How do you make one? Control Plan 1. List the major steps of the process in the order in which they occur. This might be the output of your work with Preliminary Investigation a top-down flowchart or you might use some other technique to create this list. Y 2. Across the top of your board, More Data Investigation Plan flipchart or paper write the names of ? N the people or organizations involved in the process. 3. Under the name of the person or Establish priority and funding organization responsible for the first step in the process, draw a box and write that step in the box. If more than Deployment Flowchart Analysis and Improvement one person or group is responsible for a step, extend the box so it is also under the name of that person or group. 4. If any of the other people or groups help or advise the ones with primary responsibility for that step, draw an oval under the names of those people or groups. 5. Connect the ovals to the box with the process step in it. 6. After the first step is complete, put the second step under the people responsible for it. 7. Connect the first step to the second step, and then add ovals for any helpers or advisors in the second process step. Keep going this way with all the steps in the process.
  • 3. Now what? The completed chart tells not only how the process operates at each step, but who is involved and what responsibility they each have. Ask:  “Are the right people involved at the right time in the process?”  “Are there too many people involved or too many hand-offs?”  “Are there barriers between people who must work together to make the process work?” The deployment chart can be as simple (just major steps) or as involved (sub-steps and sub-sub-steps) as you need to make it. Detailed flowchart Generally top-down and deployment charts are enough to examine a process, but sometimes teams need more detail to see where problems are occurring. What can it do for you?  Show what actually happens at each step in the process in detail  Show what happens when non-standard events occur  Graphically display processes so you can easily see redundancies and other wasted effort. How do you do it? To construct a detailed flowchart, various symbols can be used to represent process steps. 1. Draw the first symbol, and then write a description of the process step inside the symbol. 2. Draw the second symbol. Write the description. Connect the two symbols with an arrow showing the direction of flow. 3. Continue this way until you have completed the process or the part of the process you wanted to examine. Each symbol should represent only one action or one yes-no decision. This is what gives the detailed flowchart its detail. It is also what makes the creation of detailed flowcharts so time consuming. Each symbol should represent only one action or one yes-no decision. This is what gives the detailed flowchart its detail. It is also what makes the creation of detailed flowcharts so time consuming.
  • 4. Now what? Look at the completed flowchart. Ask:  Where are there redundancies that could be eliminated?  Where are there steps that seem out of order?  What steps are missing that could improve the process?  Where is time lost waiting or sending things back and forth?  What steps add no value to the customer? A detailed flowchart can be a powerful tool for examining a process that has built up needless complexity, but be warned. Creating all this detail is time-consuming. Before you begin, ask:  Is all this detail necessary?  Can the detailed flowchart be limited to only a small part of the total process? Steven Bonacorsi is the President of the International Standard for Lean Six Sigma (ISLSS) and Certified Lean Six Sigma Master Black Belt instructor and coach. Steven Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six Sigma process improvement methodologies. Author for the Process Excellence Network (PEX Network / IQPC). FREE Lean Six Sigma and BPM content International Standard for Lean Six Sigma Steven Bonacorsi, President and Lean Six Sigma Master Black Belt 47 Seasons Lane, Londonderry, NH 03053, USA Phone: + (1) 603-401-7047 Steven Bonacorsi e-mail Steven Bonacorsi LinkedIn Steven Bonacorsi Twitter Lean Six Sigma Group