CURRICULUM VITAE
PERSONAL:
Name: Imtiaz Haider
Father’s Name: Ghulam Haider
Contact No. +971-55-8265234
Profession Quantity Surveyor
Date of Birth: 13th
May 1971
Mobility: U.A.E Driving License
Visa Status: Valid UAE Residence Visa
Nationality: Pakistani
Passport No: B4182837
KEYEXPERIENCE:
 Around 19 years working experience in the U.A.E.
 Evaluation and administration of Variation Orders, Financial Forecasts, Interim Valuations, Materials
Reconciliation and Final Accounts.
 Worked with different Contracts Pipelines (potable water, sewerage and storm water) Projects.
QUALIFICATIONS: Associate Engineer (Civil)
Diploma of Quantity Surveyor (One Year)
Computer Literacy: Microsoft Excel and Word.
Languages: 1) English 2) Urdu 3) Arabic
_________________________________________________________________________________
CAREER SUMMARY:
1) May 1997 to date With Al Salmeen Gen Cont. Est.
Contract No. A-4313 “Rehabilitation of Old Water Network & House
Connections at Hilli, Power House, Sarooj Zones & Al Foah, Northern
Areas and Miscellaneous Works (Zone 2) in Al Ain Region.”
Contract No. A-4312 “Replacement of Old Water Networks and
House Connections at Dahma, Khabisi, Western and Markhaniya (Zone1)
and Miscellaneous Works in Al Ain.
Contract No. N-4927 “ DN 200 PN 160 CS Pipeline from Jabel Hafeet
Pumping Station to Summit Reservoir.
Contract No. 90809005 “UAE University New Campus PPP
Development Contract package - 1
Imtiaz Haider
imtiazkpr@gmail.com
Page 2 of 5
Contract No. A-1766 “Waterline Distribution Networks at Al Oha, Al
Hayer, Al Hili Industrial Area, Bida Bint Saud and Sweihan”
Contract SAM III “Construction of Well house and Waterline to the
new Constructed Reservoir, Construct Reservoir Pump Station ”
Extension Al Gharaba and Umm Ghafa Pipeline Projects
CAREER HISTORY:
1) December 2013 to date.
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. A-4313 “Rehabilitation of Old Water Network & House
Connections at Hilli, Power House, Sarooj Zones & Al Foah, Northern Areas and
Miscellaneous Works (Zone 2) in Al Ain Region”. The scope of works comprises
Water Supply Networks in Al Ain at locations; Nayadat East & west kuwaitat
Sarooj District & Sarooj Pumping station, Central District, Sanaya District, Al
Jimi District, Al Qatara, Al Hili, North pumping zone, Al Jahli and Mutaredh
District. It includes construction of DI & HDPE pipelines of diameters ranging
between (90mm to 630mm HDPE and 100mm to 800mm D.I) by open cut and
non-disruptive methods Connection Disconnection of existing lines with the new
lines. (Total Length of Pipeline is around 132KM and Total NDRC length is
around 5KM), Line Valve Chambers, Washout Chambers, Control Valve
Chambers, ARV Chambers, DMA Chambers SMP Chambers (Total No. of
Chambers are 1000) & House Connection works (Total House Connections of
sizes 20,25,32,50 & 63mm are around 3500 Nos) etc. Total Contract Value is
UAE. Dhs. 208 Million.
Position: Quantity Surveyor
Responsibilities:
Preparation of Final Account and Material Reconciliation.
Take off the Quantities from the as built drawings.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation of Receiving cum Damage Reports [RCDRs].
Preparation of revised BOQ as per final measurement.
2) August 2010 to December 2013 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. A-4312 “Replacement of Old Water Network and House
Connection at Dahma, Khabisi, Western And Markhaniya (Zone 1) and
Miscellaneous Works in AL AIN ”. The scope of works comprises Water Supply
Networks in Al Ain at locations; Sweihan Al Yahar, Al Saad Abu Samra,
Markhaniya, Asharej, Al Jimi, Khabisi Muwaiji, Muwaiji, Twam Markhaniya
Maqam Markhaniya Al Khazna, Al Bateen, Airport East distt, Abu Samra. It
includes construction of DI & HDPE pipelines of diameters ranging between
80mm and 900mm by open cut and non-disruptive methods. Connection
Disconnection of existing lines with the new lines. (Total Length of Pipeline was
around 91KM and Total NDRC length was around 2800 meters and HDD length
around 722 meters ), Line Valve Chambers, Washout Chambers, Control Valve
Imtiaz Haider
imtiazkpr@gmail.com
Page 3 of 5
and Flow meter Chambers, ARV Chambers, PRV Chambers SMP Chambers &
House Connection works (Total House Connections of sizes 20,25,32,50 &
63mm was 1600 Nos) etc. Total Contract Value was UAE. Dhs. 138 Million.
Position: Quantity Surveyor
Responsibilities:
Work out measurements and valuations of completed work based on progress at site.
Handling of project inspection requests and maintaining the records.
Preparation of Interim Payments.
Preparation and submission of Receiving Cum Damage Report (RCDR)
Preparation of Weekly Progress Report.
Preparation of Monthly Progress report.
Preparation of Variation order for the project.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation Final measurements as per the work done at site.
Takeoff the Quantities from the as built drawings.
Preparation Material Reconciliation.
Preparation Revised Bill of Quantities as per Final Measurements
3) November 2008 to July 2010 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. N-4927 “DN 200 PN 160 CS Pipeline from Jabel Hafeet Pumping
Station to Summit Reservoir”. The construction involved , 219.1mm PN 160
carbon steel pipe line Installation from the manifold of Base pumping station to
summit reservoir, Construction of water chambers & pulls box chambers for
fibber optic cable, Installation of high pressure valves inside Base pumping
station, Summit Reservoir & Water chambers, Interconnection of the new
transmission to the existing 219.1 mm CS pipe line near the summit reservoir
with high pressure valve, Distribution pipe line from summit pumping station to
place reservoirs, Complete refurbishment and upgrade of existing de- aerator
system and controls, Fibber optic cable in UPVC conduit along pipe line,
Cathodic protection for existing and proposed pipe work with all required supply,
installation and construction works. Total Contract Value Was 80 Million.
Position: Quantity Surveyor
Responsibilities:
Work out measurements and valuations of completed work based on progress at site.
Handling of project inspection requests and maintaining the records.
Preparation of Interim Payments.
Preparation and submission of Receiving Cum Damage Report (RCDR)
Preparation of Weekly Progress Report.
Preparation of Monthly Progress report.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation Final measurements as per the work done at site.
Takeoff the Quantities from the as built drawings.
Preparation Revised Bill of Quantities as per Final Measurements
Imtiaz Haider
imtiazkpr@gmail.com
Page 4 of 5
4) February 2007 to October 2008 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. 90809005 “UAE University New Campus PPP Development
Contract package-1”. The construction involved, Water Network that is
installation of 300 mm dia. 400 mm dia. and 500 mm dia. ductile iron pipe lines,
construction of various chambers for air release valves, washout valves and line
valve, Fire Fighting system, Irrigation system, Strom Drainage, Sewer system,
Telecommunication system Street Lighting system, Electrical Work, Asphalt
roads, Road Marking, Traffic Sign, Pre-cast concrete kerbs, Pre-cast concrete
pavers, Concrete Encased Ducts and Bridge Construction. Total Contract Value
75 Million.
Position: Quantity Surveyor
Responsibilities:
Work out measurements and valuations of completed work based on progress at site.
Handling of project inspection requests and maintaining the records.
Preparation of Interim Payments.
Preparation and submission of Receiving Cum Damage Report (RCDR)
Preparation of Weekly Progress Report.
Preparation of Monthly Progress report.
Preparation of Variation order for the project.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation Final measurements as per the work done at site.
Takeoff the Quantities from the as built drawings.
Preparation Material Reconciliation.
Preparation Revised Bill of Quantities as per Final Measurements
5) August 2003 to December 2006 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. A-1766 “Waterline Distribution Networks at Al Oha, Al Hayer, Al
Hili Industrial Area, Bida Bint Saud and Sweihan”. The scope of works
comprises Water Supply Networks in Al Ain at locations; Al Foah Al Yahar, Hili
Industrial Area, Bida Bint Saud Al Qattara, Al KharaisKhatam Al Shakla, VIP
Farms, Well Feild, Masaudi, Muwaiji and Khabisi. It includes construction of DI
Pipelines of diameters ranging between 600mm and 100mm by open cut and non-
disruptive methods (Total Length of Pipeline was around 114 km and total NDRC
around 700 meters, Line Valve Chambers, Washout Chambers ARV Chambers
Fire Hydrants, House Connection Work as per work Order nos. (Total House
Connection of Size 20, 25, 32, 50 & 63mm was Around 1550 Nos.) etc. Total
Contract Value was 61.5 Million.
Position: Jnr. Quantity Surveyor
Responsibilities:
Handling of project inspection requests and maintaining the records.
Preparation of Interim Valuations.
Preparation of Receiving cum Damage Reports [RCDRs].
Preparation of Variation Orders.
Review and check the As Built Drawings.
Materials Reconciliation.
Other project related works.
Imtiaz Haider
imtiazkpr@gmail.com
Page 5 of 5
6) May 1997 to May 1999 [with Contractor in the U.A.E]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract SAM III “Construction of well house and water line for the well house
and take water for the new reservoir. Waterline DI 600mm dia to 100mm dia
Around 30 km line has been laid. Extension of this project Pipeline of diameter
ranging between 600mm to 100mm open cut method (Total length of Pipeline
was around 40km, Line Valve Chambers Washout Chambers ARV Chamber
Construction of Reservoir and Pump Station, Connection Disconnection with the
Existing lines with Extension Al Gharaba and Umm Ghafa project.
Position: Astt. Quantity Surveyor
Responsibilities
Handling of project inspection requests and maintaining the records.
Monitored The Store Activities and Materials
Preparation of Receiving cum Damage Reports [RCDRs].
Review and check the As Built Drawings.
Materials Reconciliation.
Other project related works.

Más contenido relacionado

La actualidad más candente

Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...Md. Shahadot Hossain
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVjignesh kadam
 
larry_dosher opengr resume
larry_dosher opengr resumelarry_dosher opengr resume
larry_dosher opengr resumeLarry Dosher
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015Ibrahim Consultant
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins ResumeRusty Adkins
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUMETed Beery
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineerRobin Dargavel BEng (Hons)
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2John Churchill
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 

La actualidad más candente (20)

bio data 1
bio data 1bio data 1
bio data 1
 
Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...
 
CIVIL ENGR.C.V
CIVIL ENGR.C.VCIVIL ENGR.C.V
CIVIL ENGR.C.V
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
larry_dosher opengr resume
larry_dosher opengr resumelarry_dosher opengr resume
larry_dosher opengr resume
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
CV -mosleh
CV -moslehCV -mosleh
CV -mosleh
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
Don's #2
Don's #2Don's #2
Don's #2
 

Similar a CV Imtiaz Haider

ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)NABIL NASSAR
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Sajjad Gilal
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWAhmed Senosy
 

Similar a CV Imtiaz Haider (20)

ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
CV1
CV1CV1
CV1
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 

CV Imtiaz Haider

  • 1. Imtiaz Haider imtiazkpr@gmail.com Page 1 of 5 CURRICULUM VITAE PERSONAL: Name: Imtiaz Haider Father’s Name: Ghulam Haider Contact No. +971-55-8265234 Profession Quantity Surveyor Date of Birth: 13th May 1971 Mobility: U.A.E Driving License Visa Status: Valid UAE Residence Visa Nationality: Pakistani Passport No: B4182837 KEYEXPERIENCE:  Around 19 years working experience in the U.A.E.  Evaluation and administration of Variation Orders, Financial Forecasts, Interim Valuations, Materials Reconciliation and Final Accounts.  Worked with different Contracts Pipelines (potable water, sewerage and storm water) Projects. QUALIFICATIONS: Associate Engineer (Civil) Diploma of Quantity Surveyor (One Year) Computer Literacy: Microsoft Excel and Word. Languages: 1) English 2) Urdu 3) Arabic _________________________________________________________________________________ CAREER SUMMARY: 1) May 1997 to date With Al Salmeen Gen Cont. Est. Contract No. A-4313 “Rehabilitation of Old Water Network & House Connections at Hilli, Power House, Sarooj Zones & Al Foah, Northern Areas and Miscellaneous Works (Zone 2) in Al Ain Region.” Contract No. A-4312 “Replacement of Old Water Networks and House Connections at Dahma, Khabisi, Western and Markhaniya (Zone1) and Miscellaneous Works in Al Ain. Contract No. N-4927 “ DN 200 PN 160 CS Pipeline from Jabel Hafeet Pumping Station to Summit Reservoir. Contract No. 90809005 “UAE University New Campus PPP Development Contract package - 1
  • 2. Imtiaz Haider imtiazkpr@gmail.com Page 2 of 5 Contract No. A-1766 “Waterline Distribution Networks at Al Oha, Al Hayer, Al Hili Industrial Area, Bida Bint Saud and Sweihan” Contract SAM III “Construction of Well house and Waterline to the new Constructed Reservoir, Construct Reservoir Pump Station ” Extension Al Gharaba and Umm Ghafa Pipeline Projects CAREER HISTORY: 1) December 2013 to date. Employer: Al Salmeen Gen. Cont. Est. Scope of Works: Contract No. A-4313 “Rehabilitation of Old Water Network & House Connections at Hilli, Power House, Sarooj Zones & Al Foah, Northern Areas and Miscellaneous Works (Zone 2) in Al Ain Region”. The scope of works comprises Water Supply Networks in Al Ain at locations; Nayadat East & west kuwaitat Sarooj District & Sarooj Pumping station, Central District, Sanaya District, Al Jimi District, Al Qatara, Al Hili, North pumping zone, Al Jahli and Mutaredh District. It includes construction of DI & HDPE pipelines of diameters ranging between (90mm to 630mm HDPE and 100mm to 800mm D.I) by open cut and non-disruptive methods Connection Disconnection of existing lines with the new lines. (Total Length of Pipeline is around 132KM and Total NDRC length is around 5KM), Line Valve Chambers, Washout Chambers, Control Valve Chambers, ARV Chambers, DMA Chambers SMP Chambers (Total No. of Chambers are 1000) & House Connection works (Total House Connections of sizes 20,25,32,50 & 63mm are around 3500 Nos) etc. Total Contract Value is UAE. Dhs. 208 Million. Position: Quantity Surveyor Responsibilities: Preparation of Final Account and Material Reconciliation. Take off the Quantities from the as built drawings. Preparation of new Rates for the new items not covered by the original contract BOQ. Preparation of Receiving cum Damage Reports [RCDRs]. Preparation of revised BOQ as per final measurement. 2) August 2010 to December 2013 [with Contractor in the U.A.E.] Employer: Al Salmeen Gen. Cont. Est. Scope of Works: Contract No. A-4312 “Replacement of Old Water Network and House Connection at Dahma, Khabisi, Western And Markhaniya (Zone 1) and Miscellaneous Works in AL AIN ”. The scope of works comprises Water Supply Networks in Al Ain at locations; Sweihan Al Yahar, Al Saad Abu Samra, Markhaniya, Asharej, Al Jimi, Khabisi Muwaiji, Muwaiji, Twam Markhaniya Maqam Markhaniya Al Khazna, Al Bateen, Airport East distt, Abu Samra. It includes construction of DI & HDPE pipelines of diameters ranging between 80mm and 900mm by open cut and non-disruptive methods. Connection Disconnection of existing lines with the new lines. (Total Length of Pipeline was around 91KM and Total NDRC length was around 2800 meters and HDD length around 722 meters ), Line Valve Chambers, Washout Chambers, Control Valve
  • 3. Imtiaz Haider imtiazkpr@gmail.com Page 3 of 5 and Flow meter Chambers, ARV Chambers, PRV Chambers SMP Chambers & House Connection works (Total House Connections of sizes 20,25,32,50 & 63mm was 1600 Nos) etc. Total Contract Value was UAE. Dhs. 138 Million. Position: Quantity Surveyor Responsibilities: Work out measurements and valuations of completed work based on progress at site. Handling of project inspection requests and maintaining the records. Preparation of Interim Payments. Preparation and submission of Receiving Cum Damage Report (RCDR) Preparation of Weekly Progress Report. Preparation of Monthly Progress report. Preparation of Variation order for the project. Preparation of new Rates for the new items not covered by the original contract BOQ. Preparation Final measurements as per the work done at site. Takeoff the Quantities from the as built drawings. Preparation Material Reconciliation. Preparation Revised Bill of Quantities as per Final Measurements 3) November 2008 to July 2010 [with Contractor in the U.A.E.] Employer: Al Salmeen Gen. Cont. Est. Scope of Works: Contract No. N-4927 “DN 200 PN 160 CS Pipeline from Jabel Hafeet Pumping Station to Summit Reservoir”. The construction involved , 219.1mm PN 160 carbon steel pipe line Installation from the manifold of Base pumping station to summit reservoir, Construction of water chambers & pulls box chambers for fibber optic cable, Installation of high pressure valves inside Base pumping station, Summit Reservoir & Water chambers, Interconnection of the new transmission to the existing 219.1 mm CS pipe line near the summit reservoir with high pressure valve, Distribution pipe line from summit pumping station to place reservoirs, Complete refurbishment and upgrade of existing de- aerator system and controls, Fibber optic cable in UPVC conduit along pipe line, Cathodic protection for existing and proposed pipe work with all required supply, installation and construction works. Total Contract Value Was 80 Million. Position: Quantity Surveyor Responsibilities: Work out measurements and valuations of completed work based on progress at site. Handling of project inspection requests and maintaining the records. Preparation of Interim Payments. Preparation and submission of Receiving Cum Damage Report (RCDR) Preparation of Weekly Progress Report. Preparation of Monthly Progress report. Preparation of new Rates for the new items not covered by the original contract BOQ. Preparation Final measurements as per the work done at site. Takeoff the Quantities from the as built drawings. Preparation Revised Bill of Quantities as per Final Measurements
  • 4. Imtiaz Haider imtiazkpr@gmail.com Page 4 of 5 4) February 2007 to October 2008 [with Contractor in the U.A.E.] Employer: Al Salmeen Gen. Cont. Est. Scope of Works: Contract No. 90809005 “UAE University New Campus PPP Development Contract package-1”. The construction involved, Water Network that is installation of 300 mm dia. 400 mm dia. and 500 mm dia. ductile iron pipe lines, construction of various chambers for air release valves, washout valves and line valve, Fire Fighting system, Irrigation system, Strom Drainage, Sewer system, Telecommunication system Street Lighting system, Electrical Work, Asphalt roads, Road Marking, Traffic Sign, Pre-cast concrete kerbs, Pre-cast concrete pavers, Concrete Encased Ducts and Bridge Construction. Total Contract Value 75 Million. Position: Quantity Surveyor Responsibilities: Work out measurements and valuations of completed work based on progress at site. Handling of project inspection requests and maintaining the records. Preparation of Interim Payments. Preparation and submission of Receiving Cum Damage Report (RCDR) Preparation of Weekly Progress Report. Preparation of Monthly Progress report. Preparation of Variation order for the project. Preparation of new Rates for the new items not covered by the original contract BOQ. Preparation Final measurements as per the work done at site. Takeoff the Quantities from the as built drawings. Preparation Material Reconciliation. Preparation Revised Bill of Quantities as per Final Measurements 5) August 2003 to December 2006 [with Contractor in the U.A.E.] Employer: Al Salmeen Gen. Cont. Est. Scope of Works: Contract No. A-1766 “Waterline Distribution Networks at Al Oha, Al Hayer, Al Hili Industrial Area, Bida Bint Saud and Sweihan”. The scope of works comprises Water Supply Networks in Al Ain at locations; Al Foah Al Yahar, Hili Industrial Area, Bida Bint Saud Al Qattara, Al KharaisKhatam Al Shakla, VIP Farms, Well Feild, Masaudi, Muwaiji and Khabisi. It includes construction of DI Pipelines of diameters ranging between 600mm and 100mm by open cut and non- disruptive methods (Total Length of Pipeline was around 114 km and total NDRC around 700 meters, Line Valve Chambers, Washout Chambers ARV Chambers Fire Hydrants, House Connection Work as per work Order nos. (Total House Connection of Size 20, 25, 32, 50 & 63mm was Around 1550 Nos.) etc. Total Contract Value was 61.5 Million. Position: Jnr. Quantity Surveyor Responsibilities: Handling of project inspection requests and maintaining the records. Preparation of Interim Valuations. Preparation of Receiving cum Damage Reports [RCDRs]. Preparation of Variation Orders. Review and check the As Built Drawings. Materials Reconciliation. Other project related works.
  • 5. Imtiaz Haider imtiazkpr@gmail.com Page 5 of 5 6) May 1997 to May 1999 [with Contractor in the U.A.E] Employer: Al Salmeen Gen. Cont. Est. Scope of Works: Contract SAM III “Construction of well house and water line for the well house and take water for the new reservoir. Waterline DI 600mm dia to 100mm dia Around 30 km line has been laid. Extension of this project Pipeline of diameter ranging between 600mm to 100mm open cut method (Total length of Pipeline was around 40km, Line Valve Chambers Washout Chambers ARV Chamber Construction of Reservoir and Pump Station, Connection Disconnection with the Existing lines with Extension Al Gharaba and Umm Ghafa project. Position: Astt. Quantity Surveyor Responsibilities Handling of project inspection requests and maintaining the records. Monitored The Store Activities and Materials Preparation of Receiving cum Damage Reports [RCDRs]. Review and check the As Built Drawings. Materials Reconciliation. Other project related works.