KEYEXPERIENCE:
Around 19 years working experience in the U.A.E.
Evaluation and administration of Variation Orders, Financial Forecasts, Interim Valuations, Materials
Reconciliation and Final Accounts.
Worked with different Contracts Pipelines (potable water, sewerage and storm water) Projects.
QUALIFICATIONS: Associate Engineer (Civil)
Diploma of Quantity Surveyor (One Year)
Computer Literacy: Microsoft Excel and Word.
Languages: 1) English 2) Urdu 3) Arabic
_________________________________________________________________________________
CAREER SUMMARY:
1) May 1997 to date With Al Salmeen Gen Cont. Est.
Contract No. A-4313 “Rehabilitation of Old Water Network & House
Connections at Hilli, Power House, Sarooj Zones & Al Foah, Northern
Areas and Miscellaneous Works (Zone 2) in Al Ain Region.”
Contract No. A-4312 “Replacement of Old Water Networks and
House Connections at Dahma, Khabisi, Western and Markhaniya (Zone1)
and Miscellaneous Works in Al Ain.
Contract No. N-4927 “ DN 200 PN 160 CS Pipeline from Jabel Hafeet
Pumping Station to Summit Reservoir.
Contract No. 90809005 “UAE University New Campus PPP
Development Contract package - 1
2. Imtiaz Haider
imtiazkpr@gmail.com
Page 2 of 5
Contract No. A-1766 “Waterline Distribution Networks at Al Oha, Al
Hayer, Al Hili Industrial Area, Bida Bint Saud and Sweihan”
Contract SAM III “Construction of Well house and Waterline to the
new Constructed Reservoir, Construct Reservoir Pump Station ”
Extension Al Gharaba and Umm Ghafa Pipeline Projects
CAREER HISTORY:
1) December 2013 to date.
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. A-4313 “Rehabilitation of Old Water Network & House
Connections at Hilli, Power House, Sarooj Zones & Al Foah, Northern Areas and
Miscellaneous Works (Zone 2) in Al Ain Region”. The scope of works comprises
Water Supply Networks in Al Ain at locations; Nayadat East & west kuwaitat
Sarooj District & Sarooj Pumping station, Central District, Sanaya District, Al
Jimi District, Al Qatara, Al Hili, North pumping zone, Al Jahli and Mutaredh
District. It includes construction of DI & HDPE pipelines of diameters ranging
between (90mm to 630mm HDPE and 100mm to 800mm D.I) by open cut and
non-disruptive methods Connection Disconnection of existing lines with the new
lines. (Total Length of Pipeline is around 132KM and Total NDRC length is
around 5KM), Line Valve Chambers, Washout Chambers, Control Valve
Chambers, ARV Chambers, DMA Chambers SMP Chambers (Total No. of
Chambers are 1000) & House Connection works (Total House Connections of
sizes 20,25,32,50 & 63mm are around 3500 Nos) etc. Total Contract Value is
UAE. Dhs. 208 Million.
Position: Quantity Surveyor
Responsibilities:
Preparation of Final Account and Material Reconciliation.
Take off the Quantities from the as built drawings.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation of Receiving cum Damage Reports [RCDRs].
Preparation of revised BOQ as per final measurement.
2) August 2010 to December 2013 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. A-4312 “Replacement of Old Water Network and House
Connection at Dahma, Khabisi, Western And Markhaniya (Zone 1) and
Miscellaneous Works in AL AIN ”. The scope of works comprises Water Supply
Networks in Al Ain at locations; Sweihan Al Yahar, Al Saad Abu Samra,
Markhaniya, Asharej, Al Jimi, Khabisi Muwaiji, Muwaiji, Twam Markhaniya
Maqam Markhaniya Al Khazna, Al Bateen, Airport East distt, Abu Samra. It
includes construction of DI & HDPE pipelines of diameters ranging between
80mm and 900mm by open cut and non-disruptive methods. Connection
Disconnection of existing lines with the new lines. (Total Length of Pipeline was
around 91KM and Total NDRC length was around 2800 meters and HDD length
around 722 meters ), Line Valve Chambers, Washout Chambers, Control Valve
3. Imtiaz Haider
imtiazkpr@gmail.com
Page 3 of 5
and Flow meter Chambers, ARV Chambers, PRV Chambers SMP Chambers &
House Connection works (Total House Connections of sizes 20,25,32,50 &
63mm was 1600 Nos) etc. Total Contract Value was UAE. Dhs. 138 Million.
Position: Quantity Surveyor
Responsibilities:
Work out measurements and valuations of completed work based on progress at site.
Handling of project inspection requests and maintaining the records.
Preparation of Interim Payments.
Preparation and submission of Receiving Cum Damage Report (RCDR)
Preparation of Weekly Progress Report.
Preparation of Monthly Progress report.
Preparation of Variation order for the project.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation Final measurements as per the work done at site.
Takeoff the Quantities from the as built drawings.
Preparation Material Reconciliation.
Preparation Revised Bill of Quantities as per Final Measurements
3) November 2008 to July 2010 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. N-4927 “DN 200 PN 160 CS Pipeline from Jabel Hafeet Pumping
Station to Summit Reservoir”. The construction involved , 219.1mm PN 160
carbon steel pipe line Installation from the manifold of Base pumping station to
summit reservoir, Construction of water chambers & pulls box chambers for
fibber optic cable, Installation of high pressure valves inside Base pumping
station, Summit Reservoir & Water chambers, Interconnection of the new
transmission to the existing 219.1 mm CS pipe line near the summit reservoir
with high pressure valve, Distribution pipe line from summit pumping station to
place reservoirs, Complete refurbishment and upgrade of existing de- aerator
system and controls, Fibber optic cable in UPVC conduit along pipe line,
Cathodic protection for existing and proposed pipe work with all required supply,
installation and construction works. Total Contract Value Was 80 Million.
Position: Quantity Surveyor
Responsibilities:
Work out measurements and valuations of completed work based on progress at site.
Handling of project inspection requests and maintaining the records.
Preparation of Interim Payments.
Preparation and submission of Receiving Cum Damage Report (RCDR)
Preparation of Weekly Progress Report.
Preparation of Monthly Progress report.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation Final measurements as per the work done at site.
Takeoff the Quantities from the as built drawings.
Preparation Revised Bill of Quantities as per Final Measurements
4. Imtiaz Haider
imtiazkpr@gmail.com
Page 4 of 5
4) February 2007 to October 2008 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. 90809005 “UAE University New Campus PPP Development
Contract package-1”. The construction involved, Water Network that is
installation of 300 mm dia. 400 mm dia. and 500 mm dia. ductile iron pipe lines,
construction of various chambers for air release valves, washout valves and line
valve, Fire Fighting system, Irrigation system, Strom Drainage, Sewer system,
Telecommunication system Street Lighting system, Electrical Work, Asphalt
roads, Road Marking, Traffic Sign, Pre-cast concrete kerbs, Pre-cast concrete
pavers, Concrete Encased Ducts and Bridge Construction. Total Contract Value
75 Million.
Position: Quantity Surveyor
Responsibilities:
Work out measurements and valuations of completed work based on progress at site.
Handling of project inspection requests and maintaining the records.
Preparation of Interim Payments.
Preparation and submission of Receiving Cum Damage Report (RCDR)
Preparation of Weekly Progress Report.
Preparation of Monthly Progress report.
Preparation of Variation order for the project.
Preparation of new Rates for the new items not covered by the original contract BOQ.
Preparation Final measurements as per the work done at site.
Takeoff the Quantities from the as built drawings.
Preparation Material Reconciliation.
Preparation Revised Bill of Quantities as per Final Measurements
5) August 2003 to December 2006 [with Contractor in the U.A.E.]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract No. A-1766 “Waterline Distribution Networks at Al Oha, Al Hayer, Al
Hili Industrial Area, Bida Bint Saud and Sweihan”. The scope of works
comprises Water Supply Networks in Al Ain at locations; Al Foah Al Yahar, Hili
Industrial Area, Bida Bint Saud Al Qattara, Al KharaisKhatam Al Shakla, VIP
Farms, Well Feild, Masaudi, Muwaiji and Khabisi. It includes construction of DI
Pipelines of diameters ranging between 600mm and 100mm by open cut and non-
disruptive methods (Total Length of Pipeline was around 114 km and total NDRC
around 700 meters, Line Valve Chambers, Washout Chambers ARV Chambers
Fire Hydrants, House Connection Work as per work Order nos. (Total House
Connection of Size 20, 25, 32, 50 & 63mm was Around 1550 Nos.) etc. Total
Contract Value was 61.5 Million.
Position: Jnr. Quantity Surveyor
Responsibilities:
Handling of project inspection requests and maintaining the records.
Preparation of Interim Valuations.
Preparation of Receiving cum Damage Reports [RCDRs].
Preparation of Variation Orders.
Review and check the As Built Drawings.
Materials Reconciliation.
Other project related works.
5. Imtiaz Haider
imtiazkpr@gmail.com
Page 5 of 5
6) May 1997 to May 1999 [with Contractor in the U.A.E]
Employer: Al Salmeen Gen. Cont. Est.
Scope of Works: Contract SAM III “Construction of well house and water line for the well house
and take water for the new reservoir. Waterline DI 600mm dia to 100mm dia
Around 30 km line has been laid. Extension of this project Pipeline of diameter
ranging between 600mm to 100mm open cut method (Total length of Pipeline
was around 40km, Line Valve Chambers Washout Chambers ARV Chamber
Construction of Reservoir and Pump Station, Connection Disconnection with the
Existing lines with Extension Al Gharaba and Umm Ghafa project.
Position: Astt. Quantity Surveyor
Responsibilities
Handling of project inspection requests and maintaining the records.
Monitored The Store Activities and Materials
Preparation of Receiving cum Damage Reports [RCDRs].
Review and check the As Built Drawings.
Materials Reconciliation.
Other project related works.