PRESENTATION
ON
WDFC Project
Submitted to Submitted by
Vikash kumar Yadav
12EJACE117
DETAILS OF PROJECT
 Name of project:- Western Dedicate Freight
Corridor
 Cost of project:-6700 crore
CONTENTS
 PREPARING THE TRACKBED
 LAYING THE TRACK
 JOINING THE TRACK SECTION
 ADDING BALLAST
 SLEEPERS
 RAILS
Preparing the Track bed
The track bed is carved into the landscape, using scrapers,
graders, bulldozers and other heavy machinery layer of
compact gravel is spread on the track bed. This, after being
compacted by rollers, provides an adequate surface for
vehicles with Tyres.
Laying the track
This time, the crane rides on the two rails that were just laid alongside the
temporary track. A train of flatcars, half loaded with LGV sleepers, arrives at the
site. It is pushed by a special diesel locomotive, which is low enough to fit
underneath the gantry cranes. The cranes remove the panels of temporary track,
and stack them onto the empty half of the sleeper train. Next, they pick up sets of
30 LGV sleepers, pre-arranged with the proper spacing using a special fixture.
The sleepers are laid on the gravel bed where the panel track was. The sleeper
train leaves the worksite loaded with sections of panel track.
Joining track sections
The sections of rail are welded together using thermite. Conventional
welding (using some type of flame) does not work well on large metal
pieces such as rails, since the heat is conducted away too quickly. Thermite
is better suited to this job. It is a mix of aluminium powder and rust (iron
oxide) powder, which reacts to produce iron, aluminum oxide, and a great
deal of heat, making it ideal to weld rail.
Adding ballast
A first layer of ballast is dumped directly onto the track, and a tamping-lining-
levelling machine, riding on the rails, forces the stones underneath the sleepers.
Each pass of this machine can raise the level of the track by 8 cm (3 in), so several
passes of ballasting and of the machine are needed to build up a layer of ballast at
least 32 cm (1 ft) thick under the sleepers. The ballast is also piled on each side of the
track for lateral stability. The machine performs the initial alignment of the track
Finishing construction
Now that the first track is almost complete, work begins on the adjacent track. This
time, however, it is not necessary to lay a temporary track. Trains running on the
first track bring the sleepers, and then the rail, which is unloaded directly onto the
sleepers by dispensing arms that swing out to the proper alignment. The Nabla
fasteners are secured, and the ballast is stuffed under the track as before.
PILES
 A slender, structural member
consisting steel or concrete or timber.
 It is installed in the ground to transfer
the structural loads to soils at some
significant depth below the base of
the structure.
PILES
PILES FOUNDATION IS USED WHEN:
The soil near the surface doesn’t have
sufficient bearing capacity (weak) to support
the structural loads.
 The estimated settlement of the soil exceeds
tolerable limits
 Differential settlement due to soil variability
or non-uniform structural loads is excessive
 Excavations to construct a shallow foundation
on a firm soil are difficult or expensive.
BALLAST
Ballast is the granular material usually
broken stone or bricks single and kanker,
gravel and sand placed and packed and
around the sleeper to transmit Load
from sleeper to formation Layer.
Size = 20mm – 65mm
Sleepers
Sleepers are members generally laid transverse
to the rails, on which the rails are fixed to
transfer the loads from the rails to the ballast
and the subgrade.
Types of Sleepers
Wooden Sleepers
Metal Sleepers
Concrete Sleepers
Concrete Sleepers
Metal Sleeper
RAILS
Types of Rails :-
The rails used in the construction of railway track
can be divided into the following three types :
(1) Double Headed Rails (D.H. Rail)
(2) Flat Footed Rails (F.F. Rail)
(3) Bull Headed Rails (B.H. Rail)
THE RAILS HAVING THEIR HEAD
AND FOOT OF
SAME DIMENSIONS ARE KNOWN
AS DOUBLE
HEADED RAIL (D.H.).
1. Double Headed Rail :-
2. FLAT FOOTED RAILS :-
The rail section having their foot
rolled to a flat are known as
flat footed rails.
3. BULL HEADED RAIL :
The rails sections having their head of
more dimension then that of their foot
are known as bull headed rails
(B.H.).
Vikash9887106700 l&t ppt
Vikash9887106700 l&t ppt

Más contenido relacionado

La actualidad más candente (20)

Excavating equipments (ACE)
Excavating equipments (ACE)Excavating equipments (ACE)
Excavating equipments (ACE)
 
Draglines
DraglinesDraglines
Draglines
 
Trenching machine
Trenching machineTrenching machine
Trenching machine
 
Scraper
ScraperScraper
Scraper
 
How clamshell bucket works
How clamshell bucket worksHow clamshell bucket works
How clamshell bucket works
 
Construction Equipment
 Construction Equipment  Construction Equipment
Construction Equipment
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 
Behaviour of piles under the effect of lateral loading in sandy soil
Behaviour of piles under the effect of lateral loading in sandy soilBehaviour of piles under the effect of lateral loading in sandy soil
Behaviour of piles under the effect of lateral loading in sandy soil
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
types of excavators
types of excavatorstypes of excavators
types of excavators
 
Bulldozer
BulldozerBulldozer
Bulldozer
 
Earth moving equipment
Earth moving equipmentEarth moving equipment
Earth moving equipment
 
Shaft sinking.
Shaft sinking.Shaft sinking.
Shaft sinking.
 
Earth moving equipments
Earth moving equipmentsEarth moving equipments
Earth moving equipments
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Block 20 Types of Rollers 13
Block 20   Types of Rollers 13Block 20   Types of Rollers 13
Block 20 Types of Rollers 13
 
Material handling equipments
Material handling equipmentsMaterial handling equipments
Material handling equipments
 
Types Of Roller Used For Construction
Types Of Roller Used For Construction Types Of Roller Used For Construction
Types Of Roller Used For Construction
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
 

Destacado

Earth queak
Earth queakEarth queak
Earth queakmag_fun
 
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSAbba Hassan Musa
 
CE 6002 CONCRETE TECHNOLOGY UNIT V
CE 6002 CONCRETE TECHNOLOGY UNIT VCE 6002 CONCRETE TECHNOLOGY UNIT V
CE 6002 CONCRETE TECHNOLOGY UNIT Vcivilguna
 
Highway & Railway Engineering
Highway & Railway EngineeringHighway & Railway Engineering
Highway & Railway EngineeringGAURAV. H .TANDON
 
Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationShashank Javalagi
 
Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concretebhavin shah
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railwayKhusro_khan
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedSlideShare
 

Destacado (11)

Earth queak
Earth queakEarth queak
Earth queak
 
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
 
CE 6002 CONCRETE TECHNOLOGY UNIT V
CE 6002 CONCRETE TECHNOLOGY UNIT VCE 6002 CONCRETE TECHNOLOGY UNIT V
CE 6002 CONCRETE TECHNOLOGY UNIT V
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Highway & Railway Engineering
Highway & Railway EngineeringHighway & Railway Engineering
Highway & Railway Engineering
 
Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total station
 
Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concrete
 
Civil Engineering
Civil EngineeringCivil Engineering
Civil Engineering
 
Road construction
Road constructionRoad construction
Road construction
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-Presented
 

Similar a Vikash9887106700 l&t ppt

Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineeringDnyaneshwar More
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railwaysVipul Naidu
 
T M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYST M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYSAnwar Sami
 
design of pile foundation anna university syllabus
design of pile foundation anna university syllabusdesign of pile foundation anna university syllabus
design of pile foundation anna university syllabusambipathi1986
 
Railway engineering
Railway engineeringRailway engineering
Railway engineeringjmaghade99
 
Transmission tower
Transmission towerTransmission tower
Transmission towerKiran Hadiya
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
5-180501044424.pdf
5-180501044424.pdf5-180501044424.pdf
5-180501044424.pdfRijuDasgupta
 
Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)comsats
 
Types of pile foundation
Types of pile foundationTypes of pile foundation
Types of pile foundationdhruvalsu
 
pavement-design-ppt.pptx
pavement-design-ppt.pptxpavement-design-ppt.pptx
pavement-design-ppt.pptxAmanKumar915397
 

Similar a Vikash9887106700 l&t ppt (20)

Railwayengineering
RailwayengineeringRailwayengineering
Railwayengineering
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
T M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYST M A E S POLYTECHNIC HOSPET BOYS
T M A E S POLYTECHNIC HOSPET BOYS
 
design of pile foundation anna university syllabus
design of pile foundation anna university syllabusdesign of pile foundation anna university syllabus
design of pile foundation anna university syllabus
 
Different types of pile
Different types of pile Different types of pile
Different types of pile
 
Mine cart
Mine cartMine cart
Mine cart
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
5-180501044424.pdf
5-180501044424.pdf5-180501044424.pdf
5-180501044424.pdf
 
Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)
 
Types of pile foundation
Types of pile foundationTypes of pile foundation
Types of pile foundation
 
pavement-design-ppt.pptx
pavement-design-ppt.pptxpavement-design-ppt.pptx
pavement-design-ppt.pptx
 
Modular Ringer Crane Bogies
Modular Ringer Crane BogiesModular Ringer Crane Bogies
Modular Ringer Crane Bogies
 
Bridges Functionality and Aesthetics
Bridges Functionality and AestheticsBridges Functionality and Aesthetics
Bridges Functionality and Aesthetics
 
DESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENTDESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENT
 

Último

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Último (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Vikash9887106700 l&t ppt

  • 1.
  • 2. A PRESENTATION ON WDFC Project Submitted to Submitted by Vikash kumar Yadav 12EJACE117
  • 3. DETAILS OF PROJECT  Name of project:- Western Dedicate Freight Corridor  Cost of project:-6700 crore
  • 4. CONTENTS  PREPARING THE TRACKBED  LAYING THE TRACK  JOINING THE TRACK SECTION  ADDING BALLAST  SLEEPERS  RAILS
  • 5. Preparing the Track bed The track bed is carved into the landscape, using scrapers, graders, bulldozers and other heavy machinery layer of compact gravel is spread on the track bed. This, after being compacted by rollers, provides an adequate surface for vehicles with Tyres.
  • 6. Laying the track This time, the crane rides on the two rails that were just laid alongside the temporary track. A train of flatcars, half loaded with LGV sleepers, arrives at the site. It is pushed by a special diesel locomotive, which is low enough to fit underneath the gantry cranes. The cranes remove the panels of temporary track, and stack them onto the empty half of the sleeper train. Next, they pick up sets of 30 LGV sleepers, pre-arranged with the proper spacing using a special fixture. The sleepers are laid on the gravel bed where the panel track was. The sleeper train leaves the worksite loaded with sections of panel track.
  • 7. Joining track sections The sections of rail are welded together using thermite. Conventional welding (using some type of flame) does not work well on large metal pieces such as rails, since the heat is conducted away too quickly. Thermite is better suited to this job. It is a mix of aluminium powder and rust (iron oxide) powder, which reacts to produce iron, aluminum oxide, and a great deal of heat, making it ideal to weld rail.
  • 8. Adding ballast A first layer of ballast is dumped directly onto the track, and a tamping-lining- levelling machine, riding on the rails, forces the stones underneath the sleepers. Each pass of this machine can raise the level of the track by 8 cm (3 in), so several passes of ballasting and of the machine are needed to build up a layer of ballast at least 32 cm (1 ft) thick under the sleepers. The ballast is also piled on each side of the track for lateral stability. The machine performs the initial alignment of the track
  • 9. Finishing construction Now that the first track is almost complete, work begins on the adjacent track. This time, however, it is not necessary to lay a temporary track. Trains running on the first track bring the sleepers, and then the rail, which is unloaded directly onto the sleepers by dispensing arms that swing out to the proper alignment. The Nabla fasteners are secured, and the ballast is stuffed under the track as before.
  • 10. PILES  A slender, structural member consisting steel or concrete or timber.  It is installed in the ground to transfer the structural loads to soils at some significant depth below the base of the structure.
  • 11. PILES
  • 12. PILES FOUNDATION IS USED WHEN: The soil near the surface doesn’t have sufficient bearing capacity (weak) to support the structural loads.  The estimated settlement of the soil exceeds tolerable limits  Differential settlement due to soil variability or non-uniform structural loads is excessive  Excavations to construct a shallow foundation on a firm soil are difficult or expensive.
  • 13. BALLAST Ballast is the granular material usually broken stone or bricks single and kanker, gravel and sand placed and packed and around the sleeper to transmit Load from sleeper to formation Layer. Size = 20mm – 65mm
  • 14.
  • 15. Sleepers Sleepers are members generally laid transverse to the rails, on which the rails are fixed to transfer the loads from the rails to the ballast and the subgrade.
  • 16. Types of Sleepers Wooden Sleepers Metal Sleepers Concrete Sleepers
  • 17.
  • 20. RAILS
  • 21. Types of Rails :- The rails used in the construction of railway track can be divided into the following three types : (1) Double Headed Rails (D.H. Rail) (2) Flat Footed Rails (F.F. Rail) (3) Bull Headed Rails (B.H. Rail)
  • 22. THE RAILS HAVING THEIR HEAD AND FOOT OF SAME DIMENSIONS ARE KNOWN AS DOUBLE HEADED RAIL (D.H.). 1. Double Headed Rail :-
  • 23.
  • 24. 2. FLAT FOOTED RAILS :- The rail section having their foot rolled to a flat are known as flat footed rails.
  • 25.
  • 26. 3. BULL HEADED RAIL : The rails sections having their head of more dimension then that of their foot are known as bull headed rails (B.H.).