3G Single Site Verification Report
Site ID: DHK_V1415
24-08-2015
Commercial-in-Confidence
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 2 of 67
Contents
1 Introduction.....................................................................................................................................3
1.1 Site Information ...........................................................................................................Error! Bookmark not defined.
2 Test Details.......................................................................................................................................5
2.1 Tool & SIM Information...................................................................................................................................................5
2.2 DT Check List ....................................................................................................................................................................5
2.3 Drive Test Plots……............................................................................................................................................
2G Drive Test Plots
RxLevel Plot (Idle Mode)..........................................................................................Error! Bookmark not defined.
RxQual Plot ..................................................................................................................Error! Bookmark not defined.
3G Drive Test Plots
RSCP Plot (Idle Mode)...............................................................................................Error! Bookmark not defined.
Ec/Io Plot ......................................................................................................................Error! Bookmark not defined.
UE Tx power plot ........................................................................................................Error! Bookmark not defined.
3 Summary............................................................................................. Error! Bookmark not defined.
3.1 DT KPI...............................................................................................................................................................................64
3.2Analysis .............................................................................................................................................................................67
3.3 Comments .....................................................................................................................Error! Bookmark not defined.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 3 of 67
Introduction
1.1 Site Information
Items Details
Cluster Name/ID 3G_DHK_CL11 & 12
Sub cluster Name/ID 3G_DHK_CL11 & 12
Cluster Type Urban
Site Name/ID DHK_V1415
Number of cell 01
District Name Dhaka
Serving Area Suvastu Najar Valley, North Badda, Progoti Soroni,
Dhaka.
RNC Name RNDH01
Report Prepared: Ishaque Uddin
Drive Test Engineer: Habib
3G Site engineering parameter:
3G Cell Name 3G Cell ID LAC (DEC) RNCID (DEC) PSC UARFCH_DL
DHK_V1415_4 4147 750 231 511 10738
3G physical parameter:
Node B ID Cell name Azimuth Tilt (M) Tilt (E) Height(m) LONG LAT Comment
DHK_ V1415 DHK_V1415_4 90.42506 23.78991 ok
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 4 of 67
Floor wise sectors:
Floor Serving cell ID (2G) Serving PSC (3G) Comment
Basement 1 4144 (IBS),3675 511 (IBS), 120 BL Feedback:
 3G : NOK. In some area coverage is poor. Huawei need to
proposed solution plan. 3G legend should be as per
proposalindoor format.
 2G: NOK. IBS is not serving in most of thefloors. Poor
Rx level.
Huawei Feedback:
 2G: Rx level is fair ( Basement 1, Basement 2,
Basement 1, GF,3rd
FL). Others floor coverage is under
satisfactory level.Need to check the conectivity of all DAS
& combiner in the all week Rx level floors.Overall Rx
Qual is under satisfactory level in all floors.
For permanent solution,Additional antenna required for
poor Rx level floors.
 3G: Overall serving pattern is satisfactory level
except few samples in few floors.RSCP is poor (
Basement 1, Basement 2, Basement 1, GF, 1st
FL, 3rd
FL). Overall Ec/No is under satisfactory level. Need to
check the conectivity of all DAS & combiner in the all
week RSCP floors.Also need to increse the CPICH power
for more RSCP. For permanent solution,Additional
antenna required for poor RSCP floors.
Basement 2 4144 (IBS) 511 (IBS)
Basement 3
4144 (IBS) 511 (IBS)
GF 4144
(IBS),8273,3674,3675
511
(IBS),104,112,120,272
1st
FL 4144 (IBS) 511 (IBS)
2nd
FL 4144 (IBS),3674 511 (IBS)
3rd
FL 4144
(IBS),10752,3674,3675 511 (IBS),104,112
4th
FL
4144 (IBS) 511 (IBS),112
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 5 of 67
2 Test Details
Tool &SIM Information
Start date 8/09/2014 Finish date 8/09/2014
Report Date 5/09/2014
Test software Genex probe Test mobile Huawei 2800
Extra antenna Not Used Data Card HUAWEI-E372U
Max car speed Walk Test Avg. Car speed Walk Test
USIM IMSI Mobile Number
1
2
3
4
2.2 DT Check List
Category Checks
Check
Comment(OK/
NOK/NA)
General Confirm Site is on -air and no alarm on site. OK
Check with Neighbor Relation table OK
Check R99 (Voice, VP 5 call sampling in each sector) OK
Check HSPA (5 calls in each sector) OK
Check cell reselection (2G to 3G and vice versa) OK
Dedicated Mode
Call from BL to BL (both incoming and outgoing) OK
Call from BL to Others operators (both incoming and outgoing) OK
Inter systemHO (3G to 2G) OK
Voice Quality
Test Handover to first neighbor (both incoming and outgoing) OK
Silent call OK Not found
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 6 of 67
2.3 2G Walk test plots for all Floors (As per D4U):
Basement 1 (Progoti Soroni End) Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overall serving pattern is under satisfactory level.One spot found serving macro cell due to DAS does not
work properly.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 7 of 67
Basement 1 (Progoti Soroni End) Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OeverallRx level is fair.
Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in
this floor.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 8 of 67
Basement 1 (Progoti Soroni End) Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 9 of 67
Basement 2 (Progoti Soroni End)Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 10 of 67
Basement 2 (Progoti Soroni End)Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OeverallRx level is fair.
Recommendations: Rx level is fair due to DAS does not work properly.Need to check theconnectivity of All DAS
in this floor. Also additional antenna required.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 11 of 67
Basement 2 (Progoti Soroni End)Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 12 of 67
Basement 3 (Progoti Soroni End)Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 13 of 67
Basement 3 (Progoti Soroni End)Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OeverallRx level is fair.
Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in
this floor.Also additional antenna required.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 14 of 67
Basement 3 (Progoti Soroni End)Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 15 of 67
Ground Floor Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overallserving pattern is not satisfactory level.three macro cells are serving in this floor due to DAS does not
work properly.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 16 of 67
Ground Floor Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OeverallRx level is fair.
Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in
this floor.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 17 of 67
Ground Floor Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 18 of 67
1st Floor Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 19 of 67
1st Floor Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OeverallRx level is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 20 of 67
1st Floor Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 21 of 67
2nd Floor Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 22 of 67
2nd Floor Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OeverallRx level is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 23 of 67
2nd Floor Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 24 of 67
3rd Floor Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overallserving pattern is almost ok.Maximum samples are found serving ok.Some samples are found macro
cell due to DAS issue.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 25 of 67
3rd Floor Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OverallRx level is poor.
Recommendation: Need to check theconnectivity of all DAS in this floor.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 26 of 67
3rd Floor Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 27 of 67
4th Floor Serving Cell ID Plot-(Idle Mode-MS1)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 28 of 67
4th Floor Post_RxLevel Plot-(Idle Mode-MS1)
Comments: OeverallRx level is almost ok.One spot is found week coverage.
Recommendations: Need to check the connectivity of L4O15 for improving 2G coverage value.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 29 of 67
4th Floor Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: OverallRx Qual is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 30 of 67
3G Walk test plots for all Floors (As per D4U):
Basement 1 (Progoti Soroni End) PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 31 of 67
Basement 1 (Progoti Soroni End) RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is Poor.
Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 32 of 67
Basement 1 (Progoti Soroni End) Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is under satisfactory level.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 33 of 67
Basement 1 (Progoti Soroni End) UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 34 of 67
Basement 2 (Progoti Soroni End)PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 35 of 67
Basement 2 (Progoti Soroni End)RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is Poor.
Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 36 of 67
Basement 2 (Progoti Soroni End)Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is under satisfactory level.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 37 of 67
Basement 2 (Progoti Soroni End)UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 38 of 67
Basement 3 (Progoti Soroni End)PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 39 of 67
Basement 3 (Progoti Soroni End)RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is Poor.
Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 40 of 67
Basement 3 (Progoti Soroni End)Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is under satisfactory level.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 41 of 67
Basement 3 (Progoti Soroni End) UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 42 of 67
Ground Floor PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is almost ok.Few samples are serving macro cell.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 43 of 67
Ground Floor RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is Poor.
Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 44 of 67
Ground Floor Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is almost ok.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 45 of 67
Ground Floor UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power Poor. Poor Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 46 of 67
1st Floor PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 47 of 67
1st Floor RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is Poor.
Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 48 of 67
1st Floor Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is under satisfactory level.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 49 of 67
1st Floor UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 50 of 67
2nd Floor PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 51 of 67
2nd Floor RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is almot ok..
Recommendation: For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 52 of 67
2nd Floor Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is under satisfactory level.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 53 of 67
2nd Floor UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 54 of 67
3rd Floor PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 55 of 67
3rd Floor RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is Poor.
Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 56 of 67
3rd Floor Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is under satisfactory level.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 57 of 67
3rd Floor UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 58 of 67
4th Floor PSC Plot-(Idle Mode-MS3)
Comments: Overallserving pattern is under satisfactory level.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 59 of 67
4th Floor RSCP Plot-(Idle Mode-MS3)
Comments: OverallRSCP is almost ok.Some samples are found fair RSCP.
Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 60 of 67
4th Floor Ec/Io Plot-(Dedicate Mode-MS4)
Comments: OverallEc/No is under satisfactory level.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 61 of 67
4th Floor UE Tx power plot-(Dedicate Mode-MS4)
Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage.
.
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 62 of 67
Basement 1 -Ping test :
Basement 2-Ping test :
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 63 of 67
Basement 3-Ping test :
Ground Floor -Ping test :
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 64 of 67
1st Floor -Ping test :
2nd Floor -Ping test :
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 65 of 67
3rd Floor -Ping test :
4th Floor -Ping test :
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 66 of 67
3.1.1 DT KPI
CLASSES INDICATORS SERVICES Minimum accepted value
Measuredvalue
(MAX)
Measuredvalue
(Average)
Basement 1=403.28 kbps Basement 1=399.41 kbps
Basement 2= Basement 2=
Basement 3= Basement 3=
G FL=403.28 kbps G FL=399.41 kbps
1st
FL=403.28 kbps 1st
FL=401.56 kbps
2nd
FL=403.28 kbps 2nd
FL=399.04 kbps
3rd
FL=404.13 kbps 3rd
FL= 399.40 kbps
4th
FL= 403.28 kbps 4th
FL=398.61 kbps
PS DL FTP
Throughput for
HSDPA (UE
Category. 6,10 ,
20) (FTP); TCP,
window size =
Category 20
HSDPA 21.1
Mbps (Measured
on Application
Level)
(Measuredon ApplicationLevel)
Average throughput = 80% ofthe
384kbps bearerrate up to -79for
DU and-84 for U, -92for SU.
Avg. throughput > 14Mbps & Peak
throughput >=16Mbps. The
stationaryUE is near theantenna
(CQI >=27); 2.MTU=1500; TCP
receive windowsize>256KB; file
size=200MB.
Optimizationthroughput: Average
throughput >4Mbps (in mobility
Basement 1= 8.09Mbps Basement 1= 7.90Mbps
Basement 2= 9.34Mbps Basement 2=7.87Mbps
Basement 3= 10.97Mbps Basement 3= 9.02Mbps
G FL=9.15 Mbps G FL=7.54 Mbps
1st
FL= 9.73 Mbps 1st
FL=8.23 Mbps
2nd
FL= 9.79Mbps 2nd
FL= 9.10Mbps
3rd
FL=9.51 Mbps 3rd
FL= 8.90 Mbps
4th
FL= 8.83 Mbps 4th
FL= 6.45 Mbps
Category 20
HSUPA 5.8 Mbps
(Measuredon
Application
Level)
(Measuredon ApplicationLevel)
Site Acceptance Throughput:
Avg. throughput > 3.6Mbps &
Peak throughput >=4 Mbps. The
stationaryUE is near theantenna
(CQI >=27); 2.MTU=1500; TCP
receive windowsize>128KB; file
size=50MB.
Basement 1= 2.98Mbps Basement 1=2.01Mbps
Basement 2= 2.78Mbps Basement 2= 2.09Mbps
Basement 3= 2.90Mbps Basement 3= 2.01Mbps
G FL=3.60 Mbps G FL=2.79 Mbps
1st
FL= 3.21 Mbps 1st
FL= 2.84 Mbps
2nd
FL=3.26 Mbps 2nd
FL=2.91 Mbps
3rd
FL= 3.14 Mbps 3rd
FL= 2.50 Mbps
OTBL 2G Modernization & 3G Project
2015-09-02 Huawei Confidential Page 67 of 67
4th
FL= 3.40 Mbps 4th
FL=3.07 Mbps
Series of 100
small pings (32
bytes) in a raw
(<1s between
pings)
PingHSDPA HSDPA
Average response time is less than
100 ms
Basement 1=128 ms
Basement 2=129 ms
Basement 3=158 ms
G FL=35 ms
1st
FL= 69 ms
2nd
FL=27 ms
3rd
FL=26 ms
4th
FL=45 ms
Successful
Completion
rate
R99 & HSDPA
The rateof 3Gservices
successfully completedshould
exceed90% of total numberof
calls >= 20 call
Basement 1=100%
Basement 2=100%
Basement 3=100%
G FL= 100%
1st
FL= 100%
2nd
FL= 100%
3rd
FL= 100%
4th
FL= 100%
Comment on poor coverage (if any):
1. InGround FL under the stair RSCP is bad because of Macro cell served that position.3.2
Analysis
1. No abnormalities found.
3.3 Comments
1. All the KPIs reflect good performance and show no abnormalities.

Más contenido relacionado

La actualidad más candente

3 g rf_opt_process_ppt
3 g rf_opt_process_ppt3 g rf_opt_process_ppt
3 g rf_opt_process_pptHatim100
 
Overview Of Gsm Cellular Network &amp; Operations
Overview Of Gsm Cellular Network &amp; OperationsOverview Of Gsm Cellular Network &amp; Operations
Overview Of Gsm Cellular Network &amp; OperationsDeepak Sharma
 
01 gsm bss network kpi (mos) optimization manual
01 gsm bss network kpi (mos) optimization manual01 gsm bss network kpi (mos) optimization manual
01 gsm bss network kpi (mos) optimization manualtharinduwije
 
Introduction to Nokia RNC
Introduction to Nokia RNCIntroduction to Nokia RNC
Introduction to Nokia RNCAhmed Nabeeh
 
Rf optimisation
Rf optimisationRf optimisation
Rf optimisationAnto Radde
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
Kpi 2g troubleshootin
Kpi 2g troubleshootinKpi 2g troubleshootin
Kpi 2g troubleshootinAbd Yehia
 
LTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdfLTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdfVahidZibakalam3
 
Wcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationWcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationMichael Ofili
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationYogender Singh Rana
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopnavaidkhan
 
3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimizationshagahod
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parametersLinh Phạm
 

La actualidad más candente (20)

3 g rf_opt_process_ppt
3 g rf_opt_process_ppt3 g rf_opt_process_ppt
3 g rf_opt_process_ppt
 
Overview Of Gsm Cellular Network &amp; Operations
Overview Of Gsm Cellular Network &amp; OperationsOverview Of Gsm Cellular Network &amp; Operations
Overview Of Gsm Cellular Network &amp; Operations
 
Part 3 optimization 3G
Part 3 optimization 3GPart 3 optimization 3G
Part 3 optimization 3G
 
01 gsm bss network kpi (mos) optimization manual
01 gsm bss network kpi (mos) optimization manual01 gsm bss network kpi (mos) optimization manual
01 gsm bss network kpi (mos) optimization manual
 
Introduction to Nokia RNC
Introduction to Nokia RNCIntroduction to Nokia RNC
Introduction to Nokia RNC
 
Rf optimisation
Rf optimisationRf optimisation
Rf optimisation
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
Kpi 2g troubleshootin
Kpi 2g troubleshootinKpi 2g troubleshootin
Kpi 2g troubleshootin
 
LTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdfLTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdf
 
ZTE BTS Manual
ZTE BTS ManualZTE BTS Manual
ZTE BTS Manual
 
Wcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationWcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS Investigation
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimization
 
Cs fallback feature
Cs fallback featureCs fallback feature
Cs fallback feature
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shop
 
rf planning
rf planningrf planning
rf planning
 
3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization
 
Channel element
Channel elementChannel element
Channel element
 
3 g call flow
3 g call flow3 g call flow
3 g call flow
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parameters
 
LTE KPI
LTE KPILTE KPI
LTE KPI
 

Destacado

In building solutions ibs using distributed antenna system
In building solutions  ibs  using distributed antenna systemIn building solutions  ibs  using distributed antenna system
In building solutions ibs using distributed antenna systemIAEME Publication
 
IBS Presentation
IBS PresentationIBS Presentation
IBS PresentationPk Doctors
 
Gren tech indoor coverage solutions
Gren tech indoor coverage solutions Gren tech indoor coverage solutions
Gren tech indoor coverage solutions bappyni
 
WaveIN introduction
WaveIN introductionWaveIN introduction
WaveIN introductionJed Lee
 
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOSNEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOSIlissa Miller
 
Ibwave propagation quick start guide
Ibwave propagation   quick start guideIbwave propagation   quick start guide
Ibwave propagation quick start guideVirak Sou
 
Optimization Module Overview
Optimization Module OverviewOptimization Module Overview
Optimization Module OverviewiBwave Solutions
 
Simpler & Faster Deployment of Small Cell Networks 2
Simpler & Faster Deployment of Small Cell Networks 2Simpler & Faster Deployment of Small Cell Networks 2
Simpler & Faster Deployment of Small Cell Networks 2Small Cell Forum
 
Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...
Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...
Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...Small Cell Forum
 
In-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder SystemsIn-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder Systemstelecom-wiring
 
Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)engramjadislam78
 
Wireless Infrastructure Solutions
Wireless Infrastructure SolutionsWireless Infrastructure Solutions
Wireless Infrastructure Solutionstelecom-wiring
 
How to perform walktest from nemo outdoor
How to perform walktest from nemo outdoor How to perform walktest from nemo outdoor
How to perform walktest from nemo outdoor Telebeansolutions
 
Presentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIMPresentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIMSujeeva Ranasinghe, MBA
 

Destacado (20)

IBS Training
IBS TrainingIBS Training
IBS Training
 
Ibs Rajeesh
Ibs RajeeshIbs Rajeesh
Ibs Rajeesh
 
IBS
IBSIBS
IBS
 
In building solutions ibs using distributed antenna system
In building solutions  ibs  using distributed antenna systemIn building solutions  ibs  using distributed antenna system
In building solutions ibs using distributed antenna system
 
IBS Presentation
IBS PresentationIBS Presentation
IBS Presentation
 
Gren tech indoor coverage solutions
Gren tech indoor coverage solutions Gren tech indoor coverage solutions
Gren tech indoor coverage solutions
 
WaveIN introduction
WaveIN introductionWaveIN introduction
WaveIN introduction
 
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOSNEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
 
Distributed Antenna System
Distributed Antenna SystemDistributed Antenna System
Distributed Antenna System
 
Ibwave propagation quick start guide
Ibwave propagation   quick start guideIbwave propagation   quick start guide
Ibwave propagation quick start guide
 
Optimization Module Overview
Optimization Module OverviewOptimization Module Overview
Optimization Module Overview
 
Simpler & Faster Deployment of Small Cell Networks 2
Simpler & Faster Deployment of Small Cell Networks 2Simpler & Faster Deployment of Small Cell Networks 2
Simpler & Faster Deployment of Small Cell Networks 2
 
Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...
Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...
Ibwave The in building wireless standard: INNOVATIVE PLANNING OF SMALL CELL N...
 
IBS PST - BY MALIK ISSA
IBS PST - BY MALIK ISSAIBS PST - BY MALIK ISSA
IBS PST - BY MALIK ISSA
 
zafarresume
zafarresumezafarresume
zafarresume
 
In-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder SystemsIn-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder Systems
 
Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)Mpr mss 1 c_user_manual (Alcatel Lucent)
Mpr mss 1 c_user_manual (Alcatel Lucent)
 
Wireless Infrastructure Solutions
Wireless Infrastructure SolutionsWireless Infrastructure Solutions
Wireless Infrastructure Solutions
 
How to perform walktest from nemo outdoor
How to perform walktest from nemo outdoor How to perform walktest from nemo outdoor
How to perform walktest from nemo outdoor
 
Presentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIMPresentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIM
 

Similar a 3 g ibs walk test report dhk_v1415_tems

Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...EMERSON EDUARDO RODRIGUES
 
Ccna 4 Chapter 7 V4.0 Answers
Ccna 4 Chapter 7 V4.0 AnswersCcna 4 Chapter 7 V4.0 Answers
Ccna 4 Chapter 7 V4.0 Answersccna4discovery
 
Performance Evaluation of GTP-U and SRv6 Stateless Translation
Performance Evaluation of GTP-U and SRv6 Stateless TranslationPerformance Evaluation of GTP-U and SRv6 Stateless Translation
Performance Evaluation of GTP-U and SRv6 Stateless TranslationChunghan Lee
 
NSA Mobility Managment.pptx
NSA Mobility Managment.pptxNSA Mobility Managment.pptx
NSA Mobility Managment.pptxErayUyanik
 
Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013
Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013
Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013Đồng Quốc Vương
 
2 drive test analysis ver1
2 drive test analysis ver12 drive test analysis ver1
2 drive test analysis ver1Virak Sou
 
Bruno Decraene - Improving network availability through the graceful shutdown...
Bruno Decraene - Improving network availability through the graceful shutdown...Bruno Decraene - Improving network availability through the graceful shutdown...
Bruno Decraene - Improving network availability through the graceful shutdown...PROIDEA
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...EMERSON EDUARDO RODRIGUES
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptxssuser2b76bb
 
Gsm 2 g rollout dt
Gsm 2 g rollout dtGsm 2 g rollout dt
Gsm 2 g rollout dtINAYAT ULHAQ
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rmEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rmEMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272EMERSON EDUARDO RODRIGUES
 
Huawei gsm grfu introduction
Huawei gsm grfu introductionHuawei gsm grfu introduction
Huawei gsm grfu introductionsad_RNP
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1EMERSON EDUARDO RODRIGUES
 

Similar a 3 g ibs walk test report dhk_v1415_tems (20)

Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
 
Ccna 4 Chapter 7 V4.0 Answers
Ccna 4 Chapter 7 V4.0 AnswersCcna 4 Chapter 7 V4.0 Answers
Ccna 4 Chapter 7 V4.0 Answers
 
Performance Evaluation of GTP-U and SRv6 Stateless Translation
Performance Evaluation of GTP-U and SRv6 Stateless TranslationPerformance Evaluation of GTP-U and SRv6 Stateless Translation
Performance Evaluation of GTP-U and SRv6 Stateless Translation
 
NSA Mobility Managment.pptx
NSA Mobility Managment.pptxNSA Mobility Managment.pptx
NSA Mobility Managment.pptx
 
Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013
Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013
Www ccnav5 net_ccna_3_v5_0_scaling_networks_final_exam_2013
 
2 drive test analysis ver1
2 drive test analysis ver12 drive test analysis ver1
2 drive test analysis ver1
 
Bruno Decraene - Improving network availability through the graceful shutdown...
Bruno Decraene - Improving network availability through the graceful shutdown...Bruno Decraene - Improving network availability through the graceful shutdown...
Bruno Decraene - Improving network availability through the graceful shutdown...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
 
Gsm 2 g rollout dt
Gsm 2 g rollout dtGsm 2 g rollout dt
Gsm 2 g rollout dt
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rmEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm
 
Deepak Rathi
Deepak RathiDeepak Rathi
Deepak Rathi
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
 
Huawei gsm grfu introduction
Huawei gsm grfu introductionHuawei gsm grfu introduction
Huawei gsm grfu introduction
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
 

Último

Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...HyderabadDolls
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...HyderabadDolls
 
20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdf20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdfkhraisr
 
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...vershagrag
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制vexqp
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 
Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...
Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...
Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...HyderabadDolls
 
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...HyderabadDolls
 
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...gajnagarg
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxronsairoathenadugay
 
Introduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxIntroduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxAniqa Zai
 
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...HyderabadDolls
 
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...gajnagarg
 
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...Elaine Werffeli
 
Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?RemarkSemacio
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...nirzagarg
 
Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...
Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...
Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...HyderabadDolls
 
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 

Último (20)

Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
 
20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdf20240412-SmartCityIndex-2024-Full-Report.pdf
20240412-SmartCityIndex-2024-Full-Report.pdf
 
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 
Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...
Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...
Charbagh + Female Escorts Service in Lucknow | Starting ₹,5K To @25k with A/C...
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
 
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
 
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 
Introduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxIntroduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptx
 
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
Nirala Nagar / Cheap Call Girls In Lucknow Phone No 9548273370 Elite Escort S...
 
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
 
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
 
Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
 
Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...
Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...
Kalyani ? Call Girl in Kolkata | Service-oriented sexy call girls 8005736733 ...
 
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
 
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rohtak [ 7014168258 ] Call Me For Genuine Models We...
 

3 g ibs walk test report dhk_v1415_tems

  • 1. 3G Single Site Verification Report Site ID: DHK_V1415 24-08-2015 Commercial-in-Confidence
  • 2. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 2 of 67 Contents 1 Introduction.....................................................................................................................................3 1.1 Site Information ...........................................................................................................Error! Bookmark not defined. 2 Test Details.......................................................................................................................................5 2.1 Tool & SIM Information...................................................................................................................................................5 2.2 DT Check List ....................................................................................................................................................................5 2.3 Drive Test Plots……............................................................................................................................................ 2G Drive Test Plots RxLevel Plot (Idle Mode)..........................................................................................Error! Bookmark not defined. RxQual Plot ..................................................................................................................Error! Bookmark not defined. 3G Drive Test Plots RSCP Plot (Idle Mode)...............................................................................................Error! Bookmark not defined. Ec/Io Plot ......................................................................................................................Error! Bookmark not defined. UE Tx power plot ........................................................................................................Error! Bookmark not defined. 3 Summary............................................................................................. Error! Bookmark not defined. 3.1 DT KPI...............................................................................................................................................................................64 3.2Analysis .............................................................................................................................................................................67 3.3 Comments .....................................................................................................................Error! Bookmark not defined.
  • 3. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 3 of 67 Introduction 1.1 Site Information Items Details Cluster Name/ID 3G_DHK_CL11 & 12 Sub cluster Name/ID 3G_DHK_CL11 & 12 Cluster Type Urban Site Name/ID DHK_V1415 Number of cell 01 District Name Dhaka Serving Area Suvastu Najar Valley, North Badda, Progoti Soroni, Dhaka. RNC Name RNDH01 Report Prepared: Ishaque Uddin Drive Test Engineer: Habib 3G Site engineering parameter: 3G Cell Name 3G Cell ID LAC (DEC) RNCID (DEC) PSC UARFCH_DL DHK_V1415_4 4147 750 231 511 10738 3G physical parameter: Node B ID Cell name Azimuth Tilt (M) Tilt (E) Height(m) LONG LAT Comment DHK_ V1415 DHK_V1415_4 90.42506 23.78991 ok
  • 4. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 4 of 67 Floor wise sectors: Floor Serving cell ID (2G) Serving PSC (3G) Comment Basement 1 4144 (IBS),3675 511 (IBS), 120 BL Feedback:  3G : NOK. In some area coverage is poor. Huawei need to proposed solution plan. 3G legend should be as per proposalindoor format.  2G: NOK. IBS is not serving in most of thefloors. Poor Rx level. Huawei Feedback:  2G: Rx level is fair ( Basement 1, Basement 2, Basement 1, GF,3rd FL). Others floor coverage is under satisfactory level.Need to check the conectivity of all DAS & combiner in the all week Rx level floors.Overall Rx Qual is under satisfactory level in all floors. For permanent solution,Additional antenna required for poor Rx level floors.  3G: Overall serving pattern is satisfactory level except few samples in few floors.RSCP is poor ( Basement 1, Basement 2, Basement 1, GF, 1st FL, 3rd FL). Overall Ec/No is under satisfactory level. Need to check the conectivity of all DAS & combiner in the all week RSCP floors.Also need to increse the CPICH power for more RSCP. For permanent solution,Additional antenna required for poor RSCP floors. Basement 2 4144 (IBS) 511 (IBS) Basement 3 4144 (IBS) 511 (IBS) GF 4144 (IBS),8273,3674,3675 511 (IBS),104,112,120,272 1st FL 4144 (IBS) 511 (IBS) 2nd FL 4144 (IBS),3674 511 (IBS) 3rd FL 4144 (IBS),10752,3674,3675 511 (IBS),104,112 4th FL 4144 (IBS) 511 (IBS),112
  • 5. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 5 of 67 2 Test Details Tool &SIM Information Start date 8/09/2014 Finish date 8/09/2014 Report Date 5/09/2014 Test software Genex probe Test mobile Huawei 2800 Extra antenna Not Used Data Card HUAWEI-E372U Max car speed Walk Test Avg. Car speed Walk Test USIM IMSI Mobile Number 1 2 3 4 2.2 DT Check List Category Checks Check Comment(OK/ NOK/NA) General Confirm Site is on -air and no alarm on site. OK Check with Neighbor Relation table OK Check R99 (Voice, VP 5 call sampling in each sector) OK Check HSPA (5 calls in each sector) OK Check cell reselection (2G to 3G and vice versa) OK Dedicated Mode Call from BL to BL (both incoming and outgoing) OK Call from BL to Others operators (both incoming and outgoing) OK Inter systemHO (3G to 2G) OK Voice Quality Test Handover to first neighbor (both incoming and outgoing) OK Silent call OK Not found
  • 6. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 6 of 67 2.3 2G Walk test plots for all Floors (As per D4U): Basement 1 (Progoti Soroni End) Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overall serving pattern is under satisfactory level.One spot found serving macro cell due to DAS does not work properly.
  • 7. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 7 of 67 Basement 1 (Progoti Soroni End) Post_RxLevel Plot-(Idle Mode-MS1) Comments: OeverallRx level is fair. Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in this floor.
  • 8. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 8 of 67 Basement 1 (Progoti Soroni End) Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 9. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 9 of 67 Basement 2 (Progoti Soroni End)Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overallserving pattern is under satisfactory level.
  • 10. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 10 of 67 Basement 2 (Progoti Soroni End)Post_RxLevel Plot-(Idle Mode-MS1) Comments: OeverallRx level is fair. Recommendations: Rx level is fair due to DAS does not work properly.Need to check theconnectivity of All DAS in this floor. Also additional antenna required.
  • 11. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 11 of 67 Basement 2 (Progoti Soroni End)Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 12. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 12 of 67 Basement 3 (Progoti Soroni End)Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overallserving pattern is under satisfactory level.
  • 13. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 13 of 67 Basement 3 (Progoti Soroni End)Post_RxLevel Plot-(Idle Mode-MS1) Comments: OeverallRx level is fair. Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in this floor.Also additional antenna required.
  • 14. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 14 of 67 Basement 3 (Progoti Soroni End)Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 15. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 15 of 67 Ground Floor Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overallserving pattern is not satisfactory level.three macro cells are serving in this floor due to DAS does not work properly.
  • 16. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 16 of 67 Ground Floor Post_RxLevel Plot-(Idle Mode-MS1) Comments: OeverallRx level is fair. Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in this floor.
  • 17. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 17 of 67 Ground Floor Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 18. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 18 of 67 1st Floor Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overallserving pattern is under satisfactory level.
  • 19. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 19 of 67 1st Floor Post_RxLevel Plot-(Idle Mode-MS1) Comments: OeverallRx level is under satisfactory level.
  • 20. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 20 of 67 1st Floor Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 21. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 21 of 67 2nd Floor Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overallserving pattern is under satisfactory level.
  • 22. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 22 of 67 2nd Floor Post_RxLevel Plot-(Idle Mode-MS1) Comments: OeverallRx level is under satisfactory level.
  • 23. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 23 of 67 2nd Floor Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 24. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 24 of 67 3rd Floor Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overallserving pattern is almost ok.Maximum samples are found serving ok.Some samples are found macro cell due to DAS issue.
  • 25. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 25 of 67 3rd Floor Post_RxLevel Plot-(Idle Mode-MS1) Comments: OverallRx level is poor. Recommendation: Need to check theconnectivity of all DAS in this floor.
  • 26. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 26 of 67 3rd Floor Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 27. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 27 of 67 4th Floor Serving Cell ID Plot-(Idle Mode-MS1) Comments: Overallserving pattern is under satisfactory level.
  • 28. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 28 of 67 4th Floor Post_RxLevel Plot-(Idle Mode-MS1) Comments: OeverallRx level is almost ok.One spot is found week coverage. Recommendations: Need to check the connectivity of L4O15 for improving 2G coverage value.
  • 29. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 29 of 67 4th Floor Post_RxQual Plot-(Dedicate Mode-MS2) Comments: OverallRx Qual is under satisfactory level.
  • 30. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 30 of 67 3G Walk test plots for all Floors (As per D4U): Basement 1 (Progoti Soroni End) PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is under satisfactory level.
  • 31. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 31 of 67 Basement 1 (Progoti Soroni End) RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is Poor. Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
  • 32. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 32 of 67 Basement 1 (Progoti Soroni End) Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is under satisfactory level. .
  • 33. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 33 of 67 Basement 1 (Progoti Soroni End) UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage. .
  • 34. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 34 of 67 Basement 2 (Progoti Soroni End)PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is under satisfactory level.
  • 35. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 35 of 67 Basement 2 (Progoti Soroni End)RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is Poor. Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
  • 36. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 36 of 67 Basement 2 (Progoti Soroni End)Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is under satisfactory level. .
  • 37. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 37 of 67 Basement 2 (Progoti Soroni End)UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage. .
  • 38. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 38 of 67 Basement 3 (Progoti Soroni End)PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is under satisfactory level.
  • 39. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 39 of 67 Basement 3 (Progoti Soroni End)RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is Poor. Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
  • 40. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 40 of 67 Basement 3 (Progoti Soroni End)Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is under satisfactory level. .
  • 41. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 41 of 67 Basement 3 (Progoti Soroni End) UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage. .
  • 42. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 42 of 67 Ground Floor PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is almost ok.Few samples are serving macro cell.
  • 43. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 43 of 67 Ground Floor RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is Poor. Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
  • 44. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 44 of 67 Ground Floor Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is almost ok. .
  • 45. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 45 of 67 Ground Floor UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power Poor. Poor Tx power will be improve after improving 3G coverage. .
  • 46. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 46 of 67 1st Floor PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is under satisfactory level.
  • 47. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 47 of 67 1st Floor RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is Poor. Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
  • 48. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 48 of 67 1st Floor Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is under satisfactory level. .
  • 49. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 49 of 67 1st Floor UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage. .
  • 50. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 50 of 67 2nd Floor PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is under satisfactory level.
  • 51. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 51 of 67 2nd Floor RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is almot ok.. Recommendation: For more RSCP, need to increase CPICH power.
  • 52. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 52 of 67 2nd Floor Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is under satisfactory level. .
  • 53. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 53 of 67 2nd Floor UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage. .
  • 54. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 54 of 67 3rd Floor PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is under satisfactory level.
  • 55. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 55 of 67 3rd Floor RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is Poor. Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
  • 56. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 56 of 67 3rd Floor Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is under satisfactory level. .
  • 57. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 57 of 67 3rd Floor UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage. .
  • 58. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 58 of 67 4th Floor PSC Plot-(Idle Mode-MS3) Comments: Overallserving pattern is under satisfactory level.
  • 59. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 59 of 67 4th Floor RSCP Plot-(Idle Mode-MS3) Comments: OverallRSCP is almost ok.Some samples are found fair RSCP. Recommendation: Need to check theconnectivity of all DAS in this floor.For more RSCP, need to increase CPICH power.
  • 60. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 60 of 67 4th Floor Ec/Io Plot-(Dedicate Mode-MS4) Comments: OverallEc/No is under satisfactory level. .
  • 61. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 61 of 67 4th Floor UE Tx power plot-(Dedicate Mode-MS4) Comments: OverallTx power fair. Tx power will be improve after improving 3G coverage. .
  • 62. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 62 of 67 Basement 1 -Ping test : Basement 2-Ping test :
  • 63. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 63 of 67 Basement 3-Ping test : Ground Floor -Ping test :
  • 64. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 64 of 67 1st Floor -Ping test : 2nd Floor -Ping test :
  • 65. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 65 of 67 3rd Floor -Ping test : 4th Floor -Ping test :
  • 66. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 66 of 67 3.1.1 DT KPI CLASSES INDICATORS SERVICES Minimum accepted value Measuredvalue (MAX) Measuredvalue (Average) Basement 1=403.28 kbps Basement 1=399.41 kbps Basement 2= Basement 2= Basement 3= Basement 3= G FL=403.28 kbps G FL=399.41 kbps 1st FL=403.28 kbps 1st FL=401.56 kbps 2nd FL=403.28 kbps 2nd FL=399.04 kbps 3rd FL=404.13 kbps 3rd FL= 399.40 kbps 4th FL= 403.28 kbps 4th FL=398.61 kbps PS DL FTP Throughput for HSDPA (UE Category. 6,10 , 20) (FTP); TCP, window size = Category 20 HSDPA 21.1 Mbps (Measured on Application Level) (Measuredon ApplicationLevel) Average throughput = 80% ofthe 384kbps bearerrate up to -79for DU and-84 for U, -92for SU. Avg. throughput > 14Mbps & Peak throughput >=16Mbps. The stationaryUE is near theantenna (CQI >=27); 2.MTU=1500; TCP receive windowsize>256KB; file size=200MB. Optimizationthroughput: Average throughput >4Mbps (in mobility Basement 1= 8.09Mbps Basement 1= 7.90Mbps Basement 2= 9.34Mbps Basement 2=7.87Mbps Basement 3= 10.97Mbps Basement 3= 9.02Mbps G FL=9.15 Mbps G FL=7.54 Mbps 1st FL= 9.73 Mbps 1st FL=8.23 Mbps 2nd FL= 9.79Mbps 2nd FL= 9.10Mbps 3rd FL=9.51 Mbps 3rd FL= 8.90 Mbps 4th FL= 8.83 Mbps 4th FL= 6.45 Mbps Category 20 HSUPA 5.8 Mbps (Measuredon Application Level) (Measuredon ApplicationLevel) Site Acceptance Throughput: Avg. throughput > 3.6Mbps & Peak throughput >=4 Mbps. The stationaryUE is near theantenna (CQI >=27); 2.MTU=1500; TCP receive windowsize>128KB; file size=50MB. Basement 1= 2.98Mbps Basement 1=2.01Mbps Basement 2= 2.78Mbps Basement 2= 2.09Mbps Basement 3= 2.90Mbps Basement 3= 2.01Mbps G FL=3.60 Mbps G FL=2.79 Mbps 1st FL= 3.21 Mbps 1st FL= 2.84 Mbps 2nd FL=3.26 Mbps 2nd FL=2.91 Mbps 3rd FL= 3.14 Mbps 3rd FL= 2.50 Mbps
  • 67. OTBL 2G Modernization & 3G Project 2015-09-02 Huawei Confidential Page 67 of 67 4th FL= 3.40 Mbps 4th FL=3.07 Mbps Series of 100 small pings (32 bytes) in a raw (<1s between pings) PingHSDPA HSDPA Average response time is less than 100 ms Basement 1=128 ms Basement 2=129 ms Basement 3=158 ms G FL=35 ms 1st FL= 69 ms 2nd FL=27 ms 3rd FL=26 ms 4th FL=45 ms Successful Completion rate R99 & HSDPA The rateof 3Gservices successfully completedshould exceed90% of total numberof calls >= 20 call Basement 1=100% Basement 2=100% Basement 3=100% G FL= 100% 1st FL= 100% 2nd FL= 100% 3rd FL= 100% 4th FL= 100% Comment on poor coverage (if any): 1. InGround FL under the stair RSCP is bad because of Macro cell served that position.3.2 Analysis 1. No abnormalities found. 3.3 Comments 1. All the KPIs reflect good performance and show no abnormalities.