SlideShare una empresa de Scribd logo
1 de 3
Descargar para leer sin conexión
1 of 3
CURRICULUM VITAE
PERSONAL DATA
Name : Ivan Sofyan
Place / Date of Birth : Jakarta / January 23, 1976
Sex / Marital Status : Male / Married
Address : • Bumi Baja Sejahtera (BBS) III Blok C6 No 8, RT 18 RW 09,
Ciwaduk, Cilegon, Banten – Indonesia, 42400
• Pisangan Lama II No 25 RT 001/02, Pulogadung, Jakarta
Phones : +62 812 9494841 (mobile)
E-mail address : sofyan.ivan@yahoo.com
SUMMARY
I am a professional in production/operation management with excellence experience and achievement
of sixteen years in chemical multinational company.
Possessing experience in production and operation management, project management, lean saving
initiatives, restructuring, budget and cost controlling, inventory, process safety management and
quality management.
I am a self starter, able to work as team either as individual player and familiar with international
environment.
ACHIEVEMENT (No. 1 – 5 at Foseco; No. 6 – 10 at DyStar)
1. Increase OTIF (On Time In Full) from 73% into 97% based on customer demand.
2. Certification of ISO 9001; ISO 14001 and OHSAS 18001
3. Alternating raw material sourcing to lead cost reduction.
4. Increase productivity by 20% with less manpower in production.
5. Initiate HSE awareness, HSE improvements, standards and 5S implementation.
6. Restructuring organization of Synthesis Production Department.
7. Successfully manage Six Sigma + Lean Project in reducing waste water generation up to 80%
with 10% saving from total site budget.
8. Successfully manage transfer product project (from German to Indonesia) for transferring 40
products with cost saving up to 1,3 million € from 4 million € budget.
9. Increase production output in year 2003 by 17%, increasing quality and decreasing overtime.
10. Establishment of quality management system and safety deputy in Synthesis Production
Department.
2 of 3
WORKING EXPERIENCE
May 2013 - present : Production & Operations Manager at Foseco Indonesia
Description : • Starting on Jan 2015, I have responsibility to lead, direct and
control all activities related to manufacturing operations of the
company to achieve the operational objectives set by the
company. Scope of responsibility are HSE, Quality, Purchasing,
Production planning, Manufacturing, Maintenance / Engineering,
Logistic / Distribution
• Leading in safety culture and house keeping improvement
• Responsible for production planning, raw materials ordering and
inventory control
• Responsible of implementing company standards within factory
• Initiate continuous improvement (Safety improvement and
General Improvement/Kaizen) within factory
Dec 2011 – May 2013 : PPIC Manager and Site cost Controller at DyStar
Description : • Coordinate production planning based on net demand from SCM
• Responsible for inventory of materials
• Responsible for maintaining MRP parameters
• Act as interface among SCM, Production and Procurement
• Responsible to monitor and control production performance
• Responsible for preparing annual site budget and on monthly
basis controlling and reporting site cost
• Monitor and reporting site’s performance to Headquarter
Jan 2008 – Nov 2011 : Synthesis Production Manager and Site cost Controller at
DyStar
Description : • Lead, plan & organize Synthesis Production Department
• Release production planning and controlling the execution of
planning
• Responsible of implementing company strategy within
department
• Responsible for day to day operation within department
• Monitor and improve production yield and quality performance
for every product
• Initiate continuous improvement on every aspect within
department
Sep 2006 – Dec 2007 : Project Manager for waste water reduction at DyStar
Description : Reducing operational cost for waste water treatment by reducing waste
3 of 3
water generation
Feb 2005 – Sep 2006 : Project Manager for transfer product at DyStar
Description : • Implement Product Transfer Schedule 2005-2007
• Prepare and execute production planning for Production
Department
• Coordinate all departments involved to the project
• Control and monitor all activities related to the project to meet
time target
Apr 2000 – Sep 2006 : Production Supervisor at DyStar (incl. as Sr. Supervisor)
Description : • Supervising and lead groups for production
• Create and release Monthly/Weekly Production Plan
• Plan and conduct internal training for subordinates
• Control and analyze variances for all products
• Develop safety awareness and quality management
EDUCATIONAL ATTAINMENT
FORMAL
1995 - 2000 : Chemistry Dept., Padjadjaran University (UNPAD) Bandung, GPA 3.27
(Scale 4.0)
NON FORMAL
February 2014 : 8D Practical Problem Solving by Foseco, Jakarta
June 2010 : Operation/Production Management by PPM, Jakarta
April 2007 : Leadership Training by ILM, Karawaci
Sep 2006 – Jan 2007 : Black Belt Six Sigma + Lean Training by UMS Consultant, Germany
November 2006 : Production Training at DyStar Leverkusen, Germany
January 2006 : 5 S Socialization and Workshop by Responsible Care, Jakarta
April, August 2003 : Leadership Training, Team Building Training by Centrek, Lido
Certain periods in Feb –
Aug 2002, May 2003
: Quality Management System ISO 9000:2000, at PT DyStar Colours
Indonesia (DyStar)
November 2000, March
2002
: SAP R/3 System, PP-PI Module, at DyStar
Reference is on request
Jakarta, October 2016
Ivan Sofyan

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Stacey J Harris - December 2016
Stacey J Harris - December 2016Stacey J Harris - December 2016
Stacey J Harris - December 2016
 
SAM_MUNGAI'S_CV_LINKEDIN
SAM_MUNGAI'S_CV_LINKEDINSAM_MUNGAI'S_CV_LINKEDIN
SAM_MUNGAI'S_CV_LINKEDIN
 
Jacob's Resume - ID
Jacob's Resume - IDJacob's Resume - ID
Jacob's Resume - ID
 
Jacob's Resume - ID
Jacob's Resume - IDJacob's Resume - ID
Jacob's Resume - ID
 
Resume
ResumeResume
Resume
 
Sathishkumar production supervisor
Sathishkumar production supervisorSathishkumar production supervisor
Sathishkumar production supervisor
 
Johnathan Ellison Resume 2
Johnathan Ellison Resume 2Johnathan Ellison Resume 2
Johnathan Ellison Resume 2
 
MY CV.
MY CV.MY CV.
MY CV.
 
Marvin benjamin resume (Autosaved)
Marvin benjamin resume (Autosaved)Marvin benjamin resume (Autosaved)
Marvin benjamin resume (Autosaved)
 
Shiromi Kodagoda -CV
Shiromi Kodagoda -CVShiromi Kodagoda -CV
Shiromi Kodagoda -CV
 
Deepak Digambar Thaware - CV
Deepak Digambar Thaware - CV Deepak Digambar Thaware - CV
Deepak Digambar Thaware - CV
 
Richard M Nicholas Resume (1)
Richard M Nicholas Resume (1)Richard M Nicholas Resume (1)
Richard M Nicholas Resume (1)
 
Ruban-Profile updated
Ruban-Profile updatedRuban-Profile updated
Ruban-Profile updated
 
resume
resumeresume
resume
 
Mike Rantala - Resume Current
Mike Rantala - Resume CurrentMike Rantala - Resume Current
Mike Rantala - Resume Current
 
parth resume
parth resumeparth resume
parth resume
 
Resume_geetha
Resume_geethaResume_geetha
Resume_geetha
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Arun_Resume ca pdf
Arun_Resume ca pdfArun_Resume ca pdf
Arun_Resume ca pdf
 
Carlos A. Gonzalez - Continuous Improvement Agent 8-16
Carlos A. Gonzalez - Continuous Improvement Agent 8-16Carlos A. Gonzalez - Continuous Improvement Agent 8-16
Carlos A. Gonzalez - Continuous Improvement Agent 8-16
 

Destacado

Pro questdocuments 2014-10-25(4)
Pro questdocuments 2014-10-25(4)Pro questdocuments 2014-10-25(4)
Pro questdocuments 2014-10-25(4)
ifamur
 
Pro questdocuments 2014-10-25(2)
Pro questdocuments 2014-10-25(2)Pro questdocuments 2014-10-25(2)
Pro questdocuments 2014-10-25(2)
ifamur
 
Shoaib siddiqui CV For Consumer Asset Sales
Shoaib siddiqui CV For Consumer Asset SalesShoaib siddiqui CV For Consumer Asset Sales
Shoaib siddiqui CV For Consumer Asset Sales
Shoaib Siddiqui
 
Pro questdocuments 2014-10-25 1
Pro questdocuments 2014-10-25 1Pro questdocuments 2014-10-25 1
Pro questdocuments 2014-10-25 1
ifamur
 
tugasuntuk TIK
tugasuntuk TIKtugasuntuk TIK
tugasuntuk TIK
ifamur
 
Pro questdocuments 2014-10-25(3)
Pro questdocuments 2014-10-25(3)Pro questdocuments 2014-10-25(3)
Pro questdocuments 2014-10-25(3)
ifamur
 
Vindecarea psi-alexandra-mosneaga
Vindecarea psi-alexandra-mosneagaVindecarea psi-alexandra-mosneaga
Vindecarea psi-alexandra-mosneaga
graceland77
 
N.Neville_Design_Portfolio_lowres
N.Neville_Design_Portfolio_lowresN.Neville_Design_Portfolio_lowres
N.Neville_Design_Portfolio_lowres
Nick Neville
 
Homecoming Banner design 44 FINAL
Homecoming Banner design 44 FINALHomecoming Banner design 44 FINAL
Homecoming Banner design 44 FINAL
Kelsey Worthington
 

Destacado (20)

Pro questdocuments 2014-10-25(4)
Pro questdocuments 2014-10-25(4)Pro questdocuments 2014-10-25(4)
Pro questdocuments 2014-10-25(4)
 
Pro questdocuments 2014-10-25(2)
Pro questdocuments 2014-10-25(2)Pro questdocuments 2014-10-25(2)
Pro questdocuments 2014-10-25(2)
 
IN-8 Wellness
IN-8 WellnessIN-8 Wellness
IN-8 Wellness
 
LT.B Week 3 Goodwill International and Services
LT.B Week 3 Goodwill International and Services LT.B Week 3 Goodwill International and Services
LT.B Week 3 Goodwill International and Services
 
Shoaib siddiqui CV For Consumer Asset Sales
Shoaib siddiqui CV For Consumer Asset SalesShoaib siddiqui CV For Consumer Asset Sales
Shoaib siddiqui CV For Consumer Asset Sales
 
Certificates
CertificatesCertificates
Certificates
 
Pro questdocuments 2014-10-25 1
Pro questdocuments 2014-10-25 1Pro questdocuments 2014-10-25 1
Pro questdocuments 2014-10-25 1
 
tugasuntuk TIK
tugasuntuk TIKtugasuntuk TIK
tugasuntuk TIK
 
IN-8 Presentation
IN-8 PresentationIN-8 Presentation
IN-8 Presentation
 
Pro questdocuments 2014-10-25(3)
Pro questdocuments 2014-10-25(3)Pro questdocuments 2014-10-25(3)
Pro questdocuments 2014-10-25(3)
 
sosiologi
sosiologisosiologi
sosiologi
 
Sppu fe 2015 pattern syllabus
Sppu fe 2015 pattern syllabusSppu fe 2015 pattern syllabus
Sppu fe 2015 pattern syllabus
 
sosilogi
sosilogisosilogi
sosilogi
 
ENGL 2140 Final Paper DONE
ENGL 2140 Final Paper DONEENGL 2140 Final Paper DONE
ENGL 2140 Final Paper DONE
 
jurnal sosiologi Antropologi
jurnal sosiologi Antropologijurnal sosiologi Antropologi
jurnal sosiologi Antropologi
 
Projecte curs
Projecte cursProjecte curs
Projecte curs
 
internship report final body parts
internship report final body partsinternship report final body parts
internship report final body parts
 
Vindecarea psi-alexandra-mosneaga
Vindecarea psi-alexandra-mosneagaVindecarea psi-alexandra-mosneaga
Vindecarea psi-alexandra-mosneaga
 
N.Neville_Design_Portfolio_lowres
N.Neville_Design_Portfolio_lowresN.Neville_Design_Portfolio_lowres
N.Neville_Design_Portfolio_lowres
 
Homecoming Banner design 44 FINAL
Homecoming Banner design 44 FINALHomecoming Banner design 44 FINAL
Homecoming Banner design 44 FINAL
 

Similar a CV Ivan Sofyan_Oct 2016

Curriculum Vitae + Photo 02.2015
Curriculum Vitae + Photo 02.2015Curriculum Vitae + Photo 02.2015
Curriculum Vitae + Photo 02.2015
Rizal Fahmi
 
CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3
Handri Susanto
 
Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo
 
Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416
lenin venugopal
 
CV - Utari Meitridasari - Section Head PPIC (2)
CV - Utari Meitridasari - Section Head PPIC (2)CV - Utari Meitridasari - Section Head PPIC (2)
CV - Utari Meitridasari - Section Head PPIC (2)
Utari Meitridasari
 
Harry CV (Dtl-Updated 130716)
Harry CV (Dtl-Updated 130716)Harry CV (Dtl-Updated 130716)
Harry CV (Dtl-Updated 130716)
Hari Setiawan
 
Dan Lewis Resume 2015
Dan Lewis Resume 2015Dan Lewis Resume 2015
Dan Lewis Resume 2015
Dan Lewis
 
CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016
Sherif Rady
 
Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)
shi weihua
 

Similar a CV Ivan Sofyan_Oct 2016 (20)

Curriculum Vitae + Photo 02.2015
Curriculum Vitae + Photo 02.2015Curriculum Vitae + Photo 02.2015
Curriculum Vitae + Photo 02.2015
 
CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3
 
Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016
 
Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416
 
CV - Utari Meitridasari - Section Head PPIC (2)
CV - Utari Meitridasari - Section Head PPIC (2)CV - Utari Meitridasari - Section Head PPIC (2)
CV - Utari Meitridasari - Section Head PPIC (2)
 
gokul REV (1)
gokul REV (1)gokul REV (1)
gokul REV (1)
 
Anandha CV.pdf
Anandha CV.pdfAnandha CV.pdf
Anandha CV.pdf
 
Harry CV (Dtl-Updated 130716)
Harry CV (Dtl-Updated 130716)Harry CV (Dtl-Updated 130716)
Harry CV (Dtl-Updated 130716)
 
Updated CV Jan. 2017
Updated CV Jan. 2017Updated CV Jan. 2017
Updated CV Jan. 2017
 
CV-MASRURI
CV-MASRURI CV-MASRURI
CV-MASRURI
 
Mahesh Patil
Mahesh PatilMahesh Patil
Mahesh Patil
 
GVK- Resume
GVK- ResumeGVK- Resume
GVK- Resume
 
Resume
ResumeResume
Resume
 
Abiodun cv update. coca cola updated.doc updated
Abiodun cv update. coca cola updated.doc updatedAbiodun cv update. coca cola updated.doc updated
Abiodun cv update. coca cola updated.doc updated
 
ECLaVictoria CV
ECLaVictoria CVECLaVictoria CV
ECLaVictoria CV
 
Dan Lewis Resume 2015
Dan Lewis Resume 2015Dan Lewis Resume 2015
Dan Lewis Resume 2015
 
CV Nasim Zegarra Yasha
CV Nasim Zegarra YashaCV Nasim Zegarra Yasha
CV Nasim Zegarra Yasha
 
Resume Muniandy Sundram
Resume Muniandy SundramResume Muniandy Sundram
Resume Muniandy Sundram
 
CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016CV-Sherif Rady- Mngr-Nestle Jan-2016
CV-Sherif Rady- Mngr-Nestle Jan-2016
 
Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)
 

CV Ivan Sofyan_Oct 2016

  • 1. 1 of 3 CURRICULUM VITAE PERSONAL DATA Name : Ivan Sofyan Place / Date of Birth : Jakarta / January 23, 1976 Sex / Marital Status : Male / Married Address : • Bumi Baja Sejahtera (BBS) III Blok C6 No 8, RT 18 RW 09, Ciwaduk, Cilegon, Banten – Indonesia, 42400 • Pisangan Lama II No 25 RT 001/02, Pulogadung, Jakarta Phones : +62 812 9494841 (mobile) E-mail address : sofyan.ivan@yahoo.com SUMMARY I am a professional in production/operation management with excellence experience and achievement of sixteen years in chemical multinational company. Possessing experience in production and operation management, project management, lean saving initiatives, restructuring, budget and cost controlling, inventory, process safety management and quality management. I am a self starter, able to work as team either as individual player and familiar with international environment. ACHIEVEMENT (No. 1 – 5 at Foseco; No. 6 – 10 at DyStar) 1. Increase OTIF (On Time In Full) from 73% into 97% based on customer demand. 2. Certification of ISO 9001; ISO 14001 and OHSAS 18001 3. Alternating raw material sourcing to lead cost reduction. 4. Increase productivity by 20% with less manpower in production. 5. Initiate HSE awareness, HSE improvements, standards and 5S implementation. 6. Restructuring organization of Synthesis Production Department. 7. Successfully manage Six Sigma + Lean Project in reducing waste water generation up to 80% with 10% saving from total site budget. 8. Successfully manage transfer product project (from German to Indonesia) for transferring 40 products with cost saving up to 1,3 million € from 4 million € budget. 9. Increase production output in year 2003 by 17%, increasing quality and decreasing overtime. 10. Establishment of quality management system and safety deputy in Synthesis Production Department.
  • 2. 2 of 3 WORKING EXPERIENCE May 2013 - present : Production & Operations Manager at Foseco Indonesia Description : • Starting on Jan 2015, I have responsibility to lead, direct and control all activities related to manufacturing operations of the company to achieve the operational objectives set by the company. Scope of responsibility are HSE, Quality, Purchasing, Production planning, Manufacturing, Maintenance / Engineering, Logistic / Distribution • Leading in safety culture and house keeping improvement • Responsible for production planning, raw materials ordering and inventory control • Responsible of implementing company standards within factory • Initiate continuous improvement (Safety improvement and General Improvement/Kaizen) within factory Dec 2011 – May 2013 : PPIC Manager and Site cost Controller at DyStar Description : • Coordinate production planning based on net demand from SCM • Responsible for inventory of materials • Responsible for maintaining MRP parameters • Act as interface among SCM, Production and Procurement • Responsible to monitor and control production performance • Responsible for preparing annual site budget and on monthly basis controlling and reporting site cost • Monitor and reporting site’s performance to Headquarter Jan 2008 – Nov 2011 : Synthesis Production Manager and Site cost Controller at DyStar Description : • Lead, plan & organize Synthesis Production Department • Release production planning and controlling the execution of planning • Responsible of implementing company strategy within department • Responsible for day to day operation within department • Monitor and improve production yield and quality performance for every product • Initiate continuous improvement on every aspect within department Sep 2006 – Dec 2007 : Project Manager for waste water reduction at DyStar Description : Reducing operational cost for waste water treatment by reducing waste
  • 3. 3 of 3 water generation Feb 2005 – Sep 2006 : Project Manager for transfer product at DyStar Description : • Implement Product Transfer Schedule 2005-2007 • Prepare and execute production planning for Production Department • Coordinate all departments involved to the project • Control and monitor all activities related to the project to meet time target Apr 2000 – Sep 2006 : Production Supervisor at DyStar (incl. as Sr. Supervisor) Description : • Supervising and lead groups for production • Create and release Monthly/Weekly Production Plan • Plan and conduct internal training for subordinates • Control and analyze variances for all products • Develop safety awareness and quality management EDUCATIONAL ATTAINMENT FORMAL 1995 - 2000 : Chemistry Dept., Padjadjaran University (UNPAD) Bandung, GPA 3.27 (Scale 4.0) NON FORMAL February 2014 : 8D Practical Problem Solving by Foseco, Jakarta June 2010 : Operation/Production Management by PPM, Jakarta April 2007 : Leadership Training by ILM, Karawaci Sep 2006 – Jan 2007 : Black Belt Six Sigma + Lean Training by UMS Consultant, Germany November 2006 : Production Training at DyStar Leverkusen, Germany January 2006 : 5 S Socialization and Workshop by Responsible Care, Jakarta April, August 2003 : Leadership Training, Team Building Training by Centrek, Lido Certain periods in Feb – Aug 2002, May 2003 : Quality Management System ISO 9000:2000, at PT DyStar Colours Indonesia (DyStar) November 2000, March 2002 : SAP R/3 System, PP-PI Module, at DyStar Reference is on request Jakarta, October 2016 Ivan Sofyan