SlideShare una empresa de Scribd logo
1 de 21
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
About me
1990 born
2009 – 2014 CTU in Prague, Faculty of Mechanical Engineering
2013 – … Project Double-deck articulated train (D-DART)
2014 Diploma work feasibility study (D-DART)
2014 – … Designer, Škoda Transportation a.s.
2015 – … Independent technical consultant
Interests:
Rolling stock design – bogies
Suburban transport solutions – railway
Motto: Be a part of creating the state-of-the-art.
6 x 26,4 = 158 m
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
Motivation – Prague suburban railway
0
10
20
30
40
2006 2011 2016 2021 2026
Numberofpassengerperdayx103
year
S1
S2
S4
S7
S9
•Prague suburban lines have a limited capacity
• 3 tracks on S1 only, other 2-track lines
• TEN-T lines with IC and freight operation
• 3 kV DC system with limited power
• Minimum achievable headway is 15(10) minutes
• Number of passengers grows significantly
• Todays EMUs can‘t offer the required capacity
• Platform length is limited to 200 m
• Train length can't exceed platform length
• What are the requirements for new EMUs?
8 x 26,4 = 211 m
Line S1
22 717
Line S7
20 630
Main station
Line S4
16 373
120 827 passenger daily
101 761 on 5 main lines
Line S9
25 832
Brno
Vienna
Bratislava
Budapest
Ostrava
Warsaw
Hradec Králové
Line S2
16 209
České Budějovice
Linz
Plzeň
München/Nürnberg
Ústí nad Labem
Dresden/Berlin
200 m
2 x 310 seats
Source: ROPID
Mass transit EMU requirements
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
4
1) Customer need
2) Better economy
e.g S-Bahn Zürich (300 m platforms)
Prague suburban (200 m platforms)
…
Significant parameter in
life-cycle costs (LCC)
Why is the weight so important?
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
5
slightly dependent on train
weight (traction and braking
equipment, about 4%)
strongly dependent on train
weight, according to local
infrastructure manager
(about 50%)
slightly dependent on train
weight (traction and braking
requirements, about 2%)
strongly dependent on train
weight (about 35%)
Train path costs
25%
Invest
25%
Energy
25%
Maintenance
25%
LCC distribution
Single-deck EMUs – “specific capacity” ( )
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
6
The conventional (older) approach
• There is no more space to increase capacity at the same length.
• Reduction of number of bogies can be achieved only with higher axle-load
• 19 m bogie pitch is maximum because of loading gauge (width ≥ 2.8m) and axle-load
C) Jakobs bogie concept – 19 m length of intermediate section
Length 103 m, specific capacity 89% (74% with 8 doors), width 2.82 m, 6 bogies
The most recent approach
A) Separate cars – 26,4 m length of intermediate section
length 106m, specific capacity 90% (75% with 8 doors), width 2.82 m, 8 bogies
B) Jakobs bogie concept – 16,4 m length of intermediate section
Length 106m, specific capacity 89% (74% with 8 doors), width 2.88 m, 7 bogies
total outside length
103 m
106 m
106 m
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
7
The conventional (older) approach
• New solutions (E, F) did not bring any extra useful space - specific capacity
• Each bogie devaluates the double-deck effect
D) Separate DD cars – 26,4 m length of intermediate section
length 106m, specific capacity 118% (103% with 8 doors), width 2.82 m, 8 bogies
F) Separate SD and DD cars – 26,4 m length of intermediate section
Length 106 m, specific capacity 109% (94% with 8 doors), width 2.82 m, 8 bogies
The most recent approach
E) Jakobs bogie concept – various lengths of intermediate section
Length 95m, specific capacity 111% (94% with 8 doors), width ca. 3 m, 8 bogies
Double-deck EMUs – “specific capacity” ( )total outside length
106 m
106 m
95 m
How to achieve greater “specific capacity” ?
Greater proportion of double-deck sections
To reduce number of bogies through common bogies
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
8
Common bogies
with greater
load capacity
Longer sections
than standard
bogie pitch
Has anybody tried to solve this problem before?
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
9
Common bogies with greater load capacity Longer sections than standard bogie pitch
Design from 1950‘s (partly 1930‘s)
More than 180 units built
Why don‘t we use it anymore?
•High track forces caused by outdated
bogie design with nearly rigid axle guidance
Why don‘t we use it anymore?
• Low reliability resulting from high
number of innovative elements used
throughout the whole train
The main principle was not the reason to abandon these concepts!
Design from 1960‘s
3 APT-P units 8 years in test service
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
10
3-axle bogie of DBz/DBv
DR from Görlitz (1950‘s)
2- axle common bogie of
the APT-P train (1960‘s)
The FEBA “bogie“ of NSB
Class 72 EMU (1990‘s)
The new 3-axle common bogie
The three-axle common bogie design
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
11
Outpulled pivot
(socket)
Fully suspended
traction motor
Dampers
Radial steering system
(passive)
Axle-guide bearing
Primary suspension spring
Coupling push-pull rod
Deformation element
Bogie
frame
Air suspension systems
Anti-roll bars
The use of the three-axle common bogie
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
12
540 kg
547 kg
491 kg
469 kg
572 kg
446 kg
385 kg
3,3/m
3,0/m
3,3/m
4,2/m
4,0/m
4,2/m
5,1/m
2 3 4 5 6
200 300 400 500 600
Seats per meter
Mass per seat in kg
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
13
A) Separate cars – 26,4 m length of intermediate section
C) Jakobs bogie concept – 19 m length of intermediate section
B) Jakobs bogie concept – 16,4 m length of intermediate
section
D) Separate DD cars – 26,4 m length of intermediate section
F) Separate SD and DD cars – 26,4 m length of intermediate section
E) Jakobs bogie concept – various length of intermediate section
G) D-DART concept
100mlength
For comparability are all trainsets calculated
without multi-purpose areas or toilets and
have 8 double-leaf doors
Basic layout of 4-car trainset
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
14
2 x
Parameters
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
15
Parameter Value Unit
Max. operational speed 160 160 160 200 200km/h
Number of sections 2 3 4 5 6
Length over couplings 50 74 98 122 146m
Height above rail level 4 630 mm
Width 2 800 mm
Mass 100 149 191 233 275t
Number of seats (2nd class only, tip-up incl.) 202 329 471 607 746pcs
Number of wheelchair places 2 pcs
Number of toilets (standard + universal) 1+1 2+1 3+1 4+1 5+1pcs
Loading gauge DE2 acc. to EN 15273
Floor height at entrance doors ARL 550 - 760 mm
Wheel diameter (new/worn) 920/860 mm
Max. axle load 210 kN
Number of driven/all wheelsets 2/7 4/10 6/13 8/16 8/19pcs
Continous output at wheel 1 300 2 600 3900 5 200 5 200kW
Starting tractive effort 100 200 300 320 320kN
Feasibility study
• Mass and payload decomposition
• Dynamic model compilation
• Simulations (EN 14 363):
– Quasistatic safety against derailment
– Running safety
– Running behavior
– Suspension (sway) coefficient
• Gauge calculation
• Applicable on many configurations
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
16
How can the D-DART help Prague?
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
17
6 x 26,4 = 158 m
2 x 98 = 196 m
200 m
0
10
20
30
40
2006 2011 2016 2021 2026
Numberofpassengerperdayx103
year
S1
S2
S4
S7
S9
Line S1
22 717
Line S7
20 630
Main station
Line S4
16 373
120 827 passenger daily
101 761 on 5 main lines
Line S9
25 832
Brno
Vienna
Bratislava
Budapest
Ostrava
Warsaw
Hradec Králové
Line S2
16 209
České Budějovice
Linz
Plzeň
München/Nürnberg
Ústí nad Labem
Dresden/Berlin
Source: ROPID
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
2
4
6
8
10
12
14
16
18
20
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
Cumulativedistributionofcapacitydemand
Occurenceofcapacitydemand
Number of passengers
Capacity demand in rush hours 6:00 - 9:00 when the maximal route capacity is fully exploited
2016
2021
2026
2036
2 x D-DART - 942 seats2 x 471 - 620 seats
471, year 2036: 50% trains
with sufficient capacity
2016: Capacity demand on
70% of trains is 450 seats
D-DART, year 2036: 85% trains
with sufficient capacity
Double-deck trains in London suburban?
• Many studies were done, but all with standard double-deck coach
with 4-axle arrangement (limited distance between pivots)
• In 2015 the Tata Steel Halcrow JV tried to evaluate the CP6 study
with double-deck train with a specific axle arrangement
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
18
Single deck EMU
Concept with single-axle running gears
D-DART UK
Classic DD EMU
Jacobs bogie DD EMU
The D-DART UK
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
19
Parameter Required value Designed value Unit
Max. operational speed 200 200km/h
Number of sections 5 (optionally 6) 5 (optionally 6)
Max. length of 5-car/ 6-car rake 125 / 146 122,3 / 145,6 m
Number of seats (2nd class only, tip-up incl.) > 600 / > 700 660 / 806 pcs
Number of wheelchair places 4 4pcs
Number of toilets (standard+universal) 2+2 2+2 pcs
Max. height above rail level ≤ 4 500 4 500 mm
Max. width acc. to loading gauge 2 800 mm
Floor height at entrance doors ARL 1 050 - 1 100 1 100 mm
Wheel diameter (new/worn) 920/860 920/860 mm
Max. axle load 224 213kN
Min. operational braking mean deceleration 9%g (0,88) 1,09 m/s2
Min. emergency braking mean deceleration 12%g (1,15) 1,17m/s2
Min. mean acceleration 0 - 200 km/h* 6%g(0,59) 0,77 m/s2
*) all seats occupied, max.power, adhesion µ=0,25
Benefits of the D-DART concept
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
20
 Lower weight:
 lower energy consumption
 lower train-path costs
 Higher capacity
 Less wear
Standard capacity tiers
 Modularity
EMUs
PUSH-PULLs
Schienenfahrzeugetagung Graz
11.9.2017, Jan Plomer
Further questions:
jplomer@seznam.cz

Más contenido relacionado

La actualidad más candente

locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.Mukesh Maurya
 
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...Hossam Shafiq I
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadVishal Dubey
 
History of great indian railways
History of great indian railwaysHistory of great indian railways
History of great indian railwaysAish Warya
 
Indian railway history ppt
Indian railway history pptIndian railway history ppt
Indian railway history pptRajesh Kumar
 
"Road safety and Improvements in India"
"Road safety and Improvements in India""Road safety and Improvements in India"
"Road safety and Improvements in India"Virendra Uppalwar
 
ppt on bullet trains
ppt on bullet trains ppt on bullet trains
ppt on bullet trains kohinoor md
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor Joseph Jincy
 
Roadway condition presentation grp 04
Roadway condition presentation grp 04Roadway condition presentation grp 04
Roadway condition presentation grp 04Stone Rayhan
 
Hydraulic & disc braking systems
Hydraulic & disc braking systems Hydraulic & disc braking systems
Hydraulic & disc braking systems Abhishek Babu
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARBhavik khakhkhar
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition surveyStone Rayhan
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTgangadhar7907
 
The great indian railways
The great indian railwaysThe great indian railways
The great indian railwaysKashyap Shah
 

La actualidad más candente (20)

locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.
 
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
 
Indian railway
Indian railwayIndian railway
Indian railway
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Indian railways
Indian railwaysIndian railways
Indian railways
 
History of great indian railways
History of great indian railwaysHistory of great indian railways
History of great indian railways
 
Indian railway history ppt
Indian railway history pptIndian railway history ppt
Indian railway history ppt
 
"Road safety and Improvements in India"
"Road safety and Improvements in India""Road safety and Improvements in India"
"Road safety and Improvements in India"
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
ppt on bullet trains
ppt on bullet trains ppt on bullet trains
ppt on bullet trains
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Roadway condition presentation grp 04
Roadway condition presentation grp 04Roadway condition presentation grp 04
Roadway condition presentation grp 04
 
Hydraulic & disc braking systems
Hydraulic & disc braking systems Hydraulic & disc braking systems
Hydraulic & disc braking systems
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
 
RAILWAYS
RAILWAYSRAILWAYS
RAILWAYS
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
The great indian railways
The great indian railwaysThe great indian railways
The great indian railways
 

Similar a Double-deck EMU with a specific bogie arrangement

Parking System analysis
Parking System analysisParking System analysis
Parking System analysisKaiserin Tania
 
Slidescreen of the D-DART Concept presentation at Bogie '19 Conference
Slidescreen of the D-DART Concept presentation at Bogie '19 ConferenceSlidescreen of the D-DART Concept presentation at Bogie '19 Conference
Slidescreen of the D-DART Concept presentation at Bogie '19 ConferenceJan Plomer (III.)
 
Basics final engl
Basics final englBasics final engl
Basics final englesregroup
 
D ESIGN AND A NALYSIS OF D UMP B ODY ON T HREE W HEELED A UTO V EHICLE
D ESIGN AND  A NALYSIS OF  D UMP  B ODY ON  T HREE  W HEELED  A UTO  V EHICLED ESIGN AND  A NALYSIS OF  D UMP  B ODY ON  T HREE  W HEELED  A UTO  V EHICLE
D ESIGN AND A NALYSIS OF D UMP B ODY ON T HREE W HEELED A UTO V EHICLEIJCI JOURNAL
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILESarnath R
 
Pavement thickness design
Pavement thickness designPavement thickness design
Pavement thickness designSohail Khan
 
Volgren_Optimus_Brochure - FINAL AND COMPLETE
Volgren_Optimus_Brochure - FINAL AND COMPLETEVolgren_Optimus_Brochure - FINAL AND COMPLETE
Volgren_Optimus_Brochure - FINAL AND COMPLETEJonathan Rivett
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysApeksha Shrivastav
 
Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismIRJET Journal
 
history of automobile
history of automobilehistory of automobile
history of automobileRajesh Kumar
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Iveco Jon Stokes
Iveco Jon StokesIveco Jon Stokes
Iveco Jon StokesEggfuel
 
Milojevic simterm 2015
Milojevic simterm 2015Milojevic simterm 2015
Milojevic simterm 2015Abcabczyz
 
Dynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while CorneringDynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while CorneringSiddharth Maniyar
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 

Similar a Double-deck EMU with a specific bogie arrangement (20)

The Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk RoadThe Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk Road
 
Parking System analysis
Parking System analysisParking System analysis
Parking System analysis
 
vibrationsd
vibrationsdvibrationsd
vibrationsd
 
Slidescreen of the D-DART Concept presentation at Bogie '19 Conference
Slidescreen of the D-DART Concept presentation at Bogie '19 ConferenceSlidescreen of the D-DART Concept presentation at Bogie '19 Conference
Slidescreen of the D-DART Concept presentation at Bogie '19 Conference
 
Basics final engl
Basics final englBasics final engl
Basics final engl
 
D ESIGN AND A NALYSIS OF D UMP B ODY ON T HREE W HEELED A UTO V EHICLE
D ESIGN AND  A NALYSIS OF  D UMP  B ODY ON  T HREE  W HEELED  A UTO  V EHICLED ESIGN AND  A NALYSIS OF  D UMP  B ODY ON  T HREE  W HEELED  A UTO  V EHICLE
D ESIGN AND A NALYSIS OF D UMP B ODY ON T HREE W HEELED A UTO V EHICLE
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILE
 
Pavement thickness design
Pavement thickness designPavement thickness design
Pavement thickness design
 
Volgren_Optimus_Brochure - FINAL AND COMPLETE
Volgren_Optimus_Brochure - FINAL AND COMPLETEVolgren_Optimus_Brochure - FINAL AND COMPLETE
Volgren_Optimus_Brochure - FINAL AND COMPLETE
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
 
Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading Mechanism
 
FULLTEXT01
FULLTEXT01FULLTEXT01
FULLTEXT01
 
history of automobile
history of automobilehistory of automobile
history of automobile
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Iveco Jon Stokes
Iveco Jon StokesIveco Jon Stokes
Iveco Jon Stokes
 
Documento: LRT-Trolebuses Vossloh Kiepe - Alamys
Documento: LRT-Trolebuses Vossloh Kiepe - AlamysDocumento: LRT-Trolebuses Vossloh Kiepe - Alamys
Documento: LRT-Trolebuses Vossloh Kiepe - Alamys
 
Narrow or wide tyres for your steer axle
Narrow or wide tyres for your steer axleNarrow or wide tyres for your steer axle
Narrow or wide tyres for your steer axle
 
Milojevic simterm 2015
Milojevic simterm 2015Milojevic simterm 2015
Milojevic simterm 2015
 
Dynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while CorneringDynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while Cornering
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 

Último

AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfSkillCertProExams
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatmentnswingard
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalFabian de Rijk
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Delhi Call girls
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Pooja Nehwal
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCamilleBoulbin1
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...amilabibi1
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Baileyhlharris
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIINhPhngng3
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoKayode Fayemi
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lodhisaajjda
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedDelhi Call girls
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 

Último (18)

AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
 
ICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdfICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdf
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptx
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 

Double-deck EMU with a specific bogie arrangement

  • 2. Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer About me 1990 born 2009 – 2014 CTU in Prague, Faculty of Mechanical Engineering 2013 – … Project Double-deck articulated train (D-DART) 2014 Diploma work feasibility study (D-DART) 2014 – … Designer, Škoda Transportation a.s. 2015 – … Independent technical consultant Interests: Rolling stock design – bogies Suburban transport solutions – railway Motto: Be a part of creating the state-of-the-art.
  • 3. 6 x 26,4 = 158 m Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer Motivation – Prague suburban railway 0 10 20 30 40 2006 2011 2016 2021 2026 Numberofpassengerperdayx103 year S1 S2 S4 S7 S9 •Prague suburban lines have a limited capacity • 3 tracks on S1 only, other 2-track lines • TEN-T lines with IC and freight operation • 3 kV DC system with limited power • Minimum achievable headway is 15(10) minutes • Number of passengers grows significantly • Todays EMUs can‘t offer the required capacity • Platform length is limited to 200 m • Train length can't exceed platform length • What are the requirements for new EMUs? 8 x 26,4 = 211 m Line S1 22 717 Line S7 20 630 Main station Line S4 16 373 120 827 passenger daily 101 761 on 5 main lines Line S9 25 832 Brno Vienna Bratislava Budapest Ostrava Warsaw Hradec Králové Line S2 16 209 České Budějovice Linz Plzeň München/Nürnberg Ústí nad Labem Dresden/Berlin 200 m 2 x 310 seats Source: ROPID
  • 4. Mass transit EMU requirements Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 4 1) Customer need 2) Better economy e.g S-Bahn Zürich (300 m platforms) Prague suburban (200 m platforms) … Significant parameter in life-cycle costs (LCC)
  • 5. Why is the weight so important? Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 5 slightly dependent on train weight (traction and braking equipment, about 4%) strongly dependent on train weight, according to local infrastructure manager (about 50%) slightly dependent on train weight (traction and braking requirements, about 2%) strongly dependent on train weight (about 35%) Train path costs 25% Invest 25% Energy 25% Maintenance 25% LCC distribution
  • 6. Single-deck EMUs – “specific capacity” ( ) Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 6 The conventional (older) approach • There is no more space to increase capacity at the same length. • Reduction of number of bogies can be achieved only with higher axle-load • 19 m bogie pitch is maximum because of loading gauge (width ≥ 2.8m) and axle-load C) Jakobs bogie concept – 19 m length of intermediate section Length 103 m, specific capacity 89% (74% with 8 doors), width 2.82 m, 6 bogies The most recent approach A) Separate cars – 26,4 m length of intermediate section length 106m, specific capacity 90% (75% with 8 doors), width 2.82 m, 8 bogies B) Jakobs bogie concept – 16,4 m length of intermediate section Length 106m, specific capacity 89% (74% with 8 doors), width 2.88 m, 7 bogies total outside length 103 m 106 m 106 m
  • 7. Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 7 The conventional (older) approach • New solutions (E, F) did not bring any extra useful space - specific capacity • Each bogie devaluates the double-deck effect D) Separate DD cars – 26,4 m length of intermediate section length 106m, specific capacity 118% (103% with 8 doors), width 2.82 m, 8 bogies F) Separate SD and DD cars – 26,4 m length of intermediate section Length 106 m, specific capacity 109% (94% with 8 doors), width 2.82 m, 8 bogies The most recent approach E) Jakobs bogie concept – various lengths of intermediate section Length 95m, specific capacity 111% (94% with 8 doors), width ca. 3 m, 8 bogies Double-deck EMUs – “specific capacity” ( )total outside length 106 m 106 m 95 m
  • 8. How to achieve greater “specific capacity” ? Greater proportion of double-deck sections To reduce number of bogies through common bogies Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 8 Common bogies with greater load capacity Longer sections than standard bogie pitch Has anybody tried to solve this problem before?
  • 9. Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 9 Common bogies with greater load capacity Longer sections than standard bogie pitch Design from 1950‘s (partly 1930‘s) More than 180 units built Why don‘t we use it anymore? •High track forces caused by outdated bogie design with nearly rigid axle guidance Why don‘t we use it anymore? • Low reliability resulting from high number of innovative elements used throughout the whole train The main principle was not the reason to abandon these concepts! Design from 1960‘s 3 APT-P units 8 years in test service
  • 10. Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 10 3-axle bogie of DBz/DBv DR from Görlitz (1950‘s) 2- axle common bogie of the APT-P train (1960‘s) The FEBA “bogie“ of NSB Class 72 EMU (1990‘s) The new 3-axle common bogie
  • 11. The three-axle common bogie design Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 11 Outpulled pivot (socket) Fully suspended traction motor Dampers Radial steering system (passive) Axle-guide bearing Primary suspension spring Coupling push-pull rod Deformation element Bogie frame Air suspension systems Anti-roll bars
  • 12. The use of the three-axle common bogie Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 12
  • 13. 540 kg 547 kg 491 kg 469 kg 572 kg 446 kg 385 kg 3,3/m 3,0/m 3,3/m 4,2/m 4,0/m 4,2/m 5,1/m 2 3 4 5 6 200 300 400 500 600 Seats per meter Mass per seat in kg Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 13 A) Separate cars – 26,4 m length of intermediate section C) Jakobs bogie concept – 19 m length of intermediate section B) Jakobs bogie concept – 16,4 m length of intermediate section D) Separate DD cars – 26,4 m length of intermediate section F) Separate SD and DD cars – 26,4 m length of intermediate section E) Jakobs bogie concept – various length of intermediate section G) D-DART concept 100mlength For comparability are all trainsets calculated without multi-purpose areas or toilets and have 8 double-leaf doors
  • 14. Basic layout of 4-car trainset Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 14 2 x
  • 15. Parameters Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 15 Parameter Value Unit Max. operational speed 160 160 160 200 200km/h Number of sections 2 3 4 5 6 Length over couplings 50 74 98 122 146m Height above rail level 4 630 mm Width 2 800 mm Mass 100 149 191 233 275t Number of seats (2nd class only, tip-up incl.) 202 329 471 607 746pcs Number of wheelchair places 2 pcs Number of toilets (standard + universal) 1+1 2+1 3+1 4+1 5+1pcs Loading gauge DE2 acc. to EN 15273 Floor height at entrance doors ARL 550 - 760 mm Wheel diameter (new/worn) 920/860 mm Max. axle load 210 kN Number of driven/all wheelsets 2/7 4/10 6/13 8/16 8/19pcs Continous output at wheel 1 300 2 600 3900 5 200 5 200kW Starting tractive effort 100 200 300 320 320kN
  • 16. Feasibility study • Mass and payload decomposition • Dynamic model compilation • Simulations (EN 14 363): – Quasistatic safety against derailment – Running safety – Running behavior – Suspension (sway) coefficient • Gauge calculation • Applicable on many configurations Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 16
  • 17. How can the D-DART help Prague? Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 17 6 x 26,4 = 158 m 2 x 98 = 196 m 200 m 0 10 20 30 40 2006 2011 2016 2021 2026 Numberofpassengerperdayx103 year S1 S2 S4 S7 S9 Line S1 22 717 Line S7 20 630 Main station Line S4 16 373 120 827 passenger daily 101 761 on 5 main lines Line S9 25 832 Brno Vienna Bratislava Budapest Ostrava Warsaw Hradec Králové Line S2 16 209 České Budějovice Linz Plzeň München/Nürnberg Ústí nad Labem Dresden/Berlin Source: ROPID 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0 2 4 6 8 10 12 14 16 18 20 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 Cumulativedistributionofcapacitydemand Occurenceofcapacitydemand Number of passengers Capacity demand in rush hours 6:00 - 9:00 when the maximal route capacity is fully exploited 2016 2021 2026 2036 2 x D-DART - 942 seats2 x 471 - 620 seats 471, year 2036: 50% trains with sufficient capacity 2016: Capacity demand on 70% of trains is 450 seats D-DART, year 2036: 85% trains with sufficient capacity
  • 18. Double-deck trains in London suburban? • Many studies were done, but all with standard double-deck coach with 4-axle arrangement (limited distance between pivots) • In 2015 the Tata Steel Halcrow JV tried to evaluate the CP6 study with double-deck train with a specific axle arrangement Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 18 Single deck EMU Concept with single-axle running gears D-DART UK Classic DD EMU Jacobs bogie DD EMU
  • 19. The D-DART UK Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 19 Parameter Required value Designed value Unit Max. operational speed 200 200km/h Number of sections 5 (optionally 6) 5 (optionally 6) Max. length of 5-car/ 6-car rake 125 / 146 122,3 / 145,6 m Number of seats (2nd class only, tip-up incl.) > 600 / > 700 660 / 806 pcs Number of wheelchair places 4 4pcs Number of toilets (standard+universal) 2+2 2+2 pcs Max. height above rail level ≤ 4 500 4 500 mm Max. width acc. to loading gauge 2 800 mm Floor height at entrance doors ARL 1 050 - 1 100 1 100 mm Wheel diameter (new/worn) 920/860 920/860 mm Max. axle load 224 213kN Min. operational braking mean deceleration 9%g (0,88) 1,09 m/s2 Min. emergency braking mean deceleration 12%g (1,15) 1,17m/s2 Min. mean acceleration 0 - 200 km/h* 6%g(0,59) 0,77 m/s2 *) all seats occupied, max.power, adhesion µ=0,25
  • 20. Benefits of the D-DART concept Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer 20  Lower weight:  lower energy consumption  lower train-path costs  Higher capacity  Less wear Standard capacity tiers  Modularity EMUs PUSH-PULLs
  • 21. Schienenfahrzeugetagung Graz 11.9.2017, Jan Plomer Further questions: jplomer@seznam.cz