1 INTRODUCTION 6
2 BRIEF PRODUCT RANGE 7
3 MANUFACTURING FACILITIES 10
4 PLANT & MACHINERY 11
5 QUALITY ASSURANCE PLAN FOR STRUCTURES 12
6 GALVANISING PLANT AND PROCESS 22
7 A LIST OF IN-HOUSE TESTING FACILITY 23
8 OUR INDIAN SATISFIED CUSTOMERS 24
9 OUR ABROAD SATISFIED CUSTOMERS 25
10 LIST OF ABROAD CUSTOMERS 26
11
A LIST OF ORDERS SUCCESSFULY EXECUTED FOR
EXPORTS 28
12 A LIST OF ORDERS SUCCESSFULY EXECUTED FOR
EXPORTS FOR DESIGN CALCULATION & DRAWINGS 37
13 LIST OF INDIAN CUSTOMERS 39
14
A LIST OF MAJOR ORDER SECURED (FOR B.M)
STRUCTURES SUCCESSFULLY EXECUTED 42
15
A LIST OF ORDERS SUCCESFULLY BOOKED AND
EXECUTED FOR PGCIL BY MEI GROUP OF INDUSTRIES 43
16
A LIST OF ORDERS SUCCESFULLY EXECTED FOR WIND
MILL TOWER STRUCTURES (FOR B.M) 53
17
A LIST OF ORDER SUCCESSFULLY EXECTED FOR CABLE
TRAYS & ACCESSORIES 58
►ALL PRODUCTS ARE MANUFACTURED AT OUR ASSOCIATED CONCERNS◄
INTRODUCTION
FOR ALMOST TWO DECADES M/S. TECKNO , A JOINT
STOCK COMPANY HAS BEEN DESIGNING, MANUFACTURING
AND ERECTING THE TRANSMISSION LINE TOWERS,
SUBSTATION / SWITCH YARD STRUCTURES, WINDMILL
TOWERS AND CABLE TRAYS & SOLAR PHOTO VOLTIC
SUPPORT STRUCTURES.
OUR THIS LONG EXPERIENCE GUARANTEES,FUNCTIONALITY
AND COMPLETE OPERATIONAL SAFETY. WE HAVE A SOUND
TECHNO – COMMERCIAL STRENGTH AND THAT PRECISELY
GIVES US AN EDGE OVER OTHERS IN THIS FIELD.
WE ARE IN THE APPROVED VENDOR’ S LIST WITH
SOME OF THE LEADING COMPANIES LIKE ABB.,
SIEMENS LTD., TATA’S, LARSEN & TUBRO., ESSAR
OIL., RELIANCE, NATIONAL THERMAL POWER
CORPOATION. BHEL.,TO NAME A FEW OF OUR PRESTIGIOUS
CLIENTS IN ABROAD LIKE GALFAR ENGINEERING &
CONTRACTING, POWERTECH ENGINEERING, AL-HASSAN
ENGINEERING CO., LARSEN & TOUBRO, GLOBAL CORP
ENTERPRISE, SAUDI NATIONAL CONTRACTING CO., AL-
HASSAN TRADING & CONTRACTING CO. LOCATED IN
SULTANATE OF OMAN.
WE ARE SELF SUFFICIENT IN MANUFACTURING ,
INSPECTION FACILITY. WE HAVE ESTABLISHED SYSTEMS,
PROCEDURES AND DOCUMENTATION.
PROPRIETOR
INTRODUCTION :
MR. NARENDRA SHARMA PASSED B. TECH FROM M.S.
UNIVERSITY, BARODA IN THE YEAR 1980 WITH THE
SECOND POSITION.
JOINT M/S. ASEA BROWN BOVERI LTD IN 1982 AND BY
VITUE OF PERFORMANCE WAS CONFIRMED WITHIN 6
MONTHS INSTEAD OF 1 YEAR. HE WORKED WITH PROJECT
ENGINNERING DEPARTMENT OF M/S. ASEA BROWN
BOVERI UPTOFEBRUARY 1984.
1ST MARCH 2004 ONWARDS, WORKED WITH M/S
CROMPTON GREAVES LTD.,AS A MARKETING ENGINEER.
TWICE IN TENOR OF 6 YEARS, WAS AWARDED MAN OF
THE QUARTER BY THE VIRTUE OF EXCELLENT
PERFORMANCE UNDER 178 MARKETING ENGINEERS.
DURING THE ASSOCIATION WITH M/S CROMPTON
GREAVES LTD, HAD BOOKED ORDER FOR FIRST
INDIGINOUS 11KV FLAME PROOF MOTOR AGAINST STIFF
INTERNATIONAL COMPETITION FOR MGCC (IPCL)
NAGORTHNE PROJECT. LEFT M/S CROMPTON GREAVES
LTD. IN OCT 1991, THAN PLUNGGED INTO THE BUSINESS.
TODAY GIVING CONSULTANCY FOR ELECTRICAL
SUBSTATIONS, DESIGNING OF WIND MILL TOWER AND
DOING PHYSICAL EXPORTS OF ELECTRICAL OVERHEAD
LINE.
We have extensive expierence in the field of Transmission Line
tower, by virtue of this we offer excellent competitive design.
Towers supplied by us are working in vide range of ambient
temperature from -10 C to 50 C. We offer Tower as per the
international standard as desired by our valued customer. To
provide the best available craftmenship, we extensively use CNC
machines for the various operation to churn out the excellent
error free product.
All the material passes through the magnifing eye’s of our well
experienced QC team. Finaly for excelent and long life materials
is hot dip galvanized in the modern plant.
01. TRANSMISSION Line TOWER STRUCTURES :
BRIEF PRODUCT RANGE
02. SWITCHYARD / SUB-STATION STRUCTURES :
All sub station structures are manufactured from very standard steel
procured from approved and reputed Rolling Mill. These steel section
are artequaleted by our craftman with atmost care and under strict
quality control of our Engineers, having couple of clouble experience.
On demand we also provide pipe type support Structure.
We follow International code to satisfy our customers spread
over the world. All crafted material is than treated for corrosive
protection by Hot dip galvanizing.
We also assist our valued cusotmers by providing the total
solution from designing to execution all under one roof.
.
03. WIND MILL TOWER STRUCTURES :
We offer custom made towers for wind Electric genrator from
225 KW to 1250 KW. Height of tower varries from 30 mts to
65 mts. Raw material is sourced from international market
and processed to international standards. The finish of the
product is done as per customer specification from Zn
coating, PU plant to hot dip galvanizing.
The only major alternative available to us after the fossile fuel
is Wind Energy. To keep the place with the trend we started
manufacturing of windmill tower since 1994. Till date we have
successfully manfactured more than 4000 nos. of Wind Mill
Towers.
04. CABLE TRAYS :
We offer extensive range of cable trays, which are
manufactured from stainless steel, CRC, HRC Sheet,
Aluminium or FRP. We also offer extensive range of
accessories for the cable tray, such as Elebow, (Left Right, Up
Down) Tee, cross redusers. On demand of customers even
cable tray with covers are offered.
For the protection of these cable trays against corroesion we
offer, painted or Hot dip Galvanized coating, as per demand of
our valued customers.
05. TELECOM TOWERS LATTICE / PIPE:
We offer a very wide range
to telecom tower approved
by SERC. Starting from
Microwave, GSM roof top,
ground Base (upto 90 mts
and Wind speed of 260
KMPH). It is either from
steel angles or pipe or
even combination of both,
as desired by customer.
For the urban locations
specially narrow base towers
are also offered. Final touch
is galvanized and if required
followed by specific paint.
06. RAILWAY ELECTRIFICATION STRUCTURES:
We cater to request of steel substation used for Railway
electrification. They are mainly the column and Beam
manufactured from high quality of steel sourced from the
approved Rolling Mills. The final touch is given by our
expert work force by way of cutting, drilling, welding e tc.
Finally for a better and long life all structures are Hot dip
galvanized for 130 microns.
07. CROSSARMS
crossarms
We have extensive experience in the field of crossarms. We
offer excellent competitive rates of crossarms to our
customers as per their demand.
We have maintained huge range of products like Tie
Brackets, Crossarms for terminal Poles, Cross arms for
intermidiate poles, Crossarms for field Isolator, Crossarms for
Auto recloser etc.. We follow International code to satisfy our
customers spread over the world.
For excellent and long life, the material is Hot Dip
Galvanized or Painted as per the requirement of customer.
.
08. SOLAR POWER PLANT STEEL SUPPORT
STRUCTURES:
06. SOLAR POWER PLANT STEEL SUPPORT STRUCTURES :
The use of renewable energy resources is increasing rapidly to reduce
the dependency on fossil fuels. We offer extensive range of Support
structures for solar panel PV Module systems.
We offer special steel structures for mounting of solar modules from
lattice, pipe ,hollow section, perlins, sigma profiles to meet the specific
requirements of photovoltaic modules procured from world wide.
The final touch is given by our expert work force by way of
cutting, drilling, welding etc.
Finally for a better and long life all structures are Hot dip galvanized
for 86 to 127 microns.
MANUFACTURING FACILITIES
• TOTAL AREA : 85,000 SQUARE . FEET
• BUILT UP AREA : 20,000 SQUARE . FEET
• MAN – POWER :10 ENGINEERS
22 OFFICE STAFF
52 SKILLED WORKERS
47 SEMI-SKILLED WORKERS
50 CASUAL WORKERS
• CAPACITY : A) 5000 MT. OF FABRICATION
PER MONTH.
B) 6,000 MT. OF GALVANIZING
PER MONTH.
CONSIDERING ALL 3 GALVANIZING PLANTS.
• CONNECTED POWER : 500 KVA.
PLANT & MACHINERY
Sr
No. DESCRIPTION OF MACHINERY
1. Vertical Turret lathe 3000 dia
2. Bench lathe 2500 dia
3. Angle Cutting Machine, make Aman, Capacity 110mm x 110 mm x
10 mm complete with 5 HP Bharat Bijlee make electric motor &
accessories
4. Universal Cutting Machine, make NSIC, Plate cutting 120mm x
12mm , Bar cutting 30mm dia square 28 mm complete with
accessories.
5. Power Press, Malra make Capacity 100 Ton, complete with 7.5 H.P
local make electric motor & accessories- 02 nos.
6. Power Press, Shailesh make Capacity 60 Ton, complete with 5 H.P
local make electric motor & accessories- 01 nos.
7. Power Press, Ambica make Capacity 20 Ton, complete with 5 H.P
local make electric motor & accessories- 01 no.
8. Radial Drill Machine, make Maksons, Capacity 40mm, complete
with 1 H.P Neophase make electric motor & accessories – 04 nos
9. EOT Crane, make AMT International of 5 M.T capacity with 1 M.T
capacity (05 nos) Hoist & accessories
10 Galvanising Plant consisting of 04 Compartments for cleaning,
Water, acid & water flushing covering 10m x 6m area each
compartment having 1.5 m deep, constructed of Acid proof bricks,
Cattle of 8m x 1m x 1.2m water quenching bath, Oil tanks (02 nos)
of 1.4m x 7.62m x 1.6m size burners (04 nos), blowers of 24” size
each with 5 H.P electric motor – Set
11 Electrical Control Panel
12 Welding Column & Boom Memco make 6m vertical length & 6m
Horizontal length, wheel mounted, REMI make electric motor 5 H.P
with Elecon make gear box ratio 20:13 set complete with
accessories.
13 EOT Crane, make AMT International of 10 MT capacity with
auxiliary crane of 3MT capacity complete with accessories-Set
14 Rotators (motorised), make V Weld Equipments with 1HP DC motor
Elco make and Ratio Gear Box Elecon make – 10 Set
15 Hydraulic Pre Punching Rolling Machine, make “” capacity 3000mm
x 25mm, complete with 25 H.P Bharat Bijlee make electric motor.
And inbuilt gear box & accessories
Sr
No DESCRIPTION OF MACHINERY
16 Compressor, make Ingersoll- Sr. no: 389. Model : L 40 ASB, 163
cfm, 7Kg/cm2, complete with 40 H.P electric motor & accessories.
17 Weigh Bridge, make Avery Capacity 60 MT
18 Transformer, make Danke, Capacity 315 KVA, with main panel &
change over switch.
19 Electrical Contract to M/s Shreeji Elec. Corporaton of entire
premise, which includes work of cabling , wiring, street lights,
high day fittings etc.
20 Bench Grinder Local make Cap 2 HP with double grinding wheel
size10”diax1”thick (2002)
21 Bench Grinder Local make Cap 1 HP with double grinding wheel
size 6” dia x 3/4” thick 2 nos (2003)
22 Radial Drill „ Sargodha „ Ludhiana make Cap 30mm, with Bharat
Bijlee make 3HP electric motor 2 nos (2002)
23 Radial Drill „ Sargodha „ Ludhiana make Cap 50mm, with Bharat
Bijlee make 3HP electric motor (2002)
24.
Radial Drill „ Siddhpura‟ make Cap 40mm with Neophase make 3
HP electric Motor 4 no (2002
25. OH Crane AMT Intl. make Cap 12 ton. Long Travel 78MT x Cross
Travel 12.5 MT with make 15 HP hoist, 10 HP 2 no, and 5 HP
Delhi make inbuilt motors (2002)
26. Radial Drill‟ Prabhat‟ make Cap 38mm with 3 HP Neophase make
electric motor 15 no (2003)
27. Radial Drill‟ Prabhat‟ make Cap 38mm with 3 HP Neophase make
electric motor 15 no (2002)
28. Welding Machine „Standard‟ make. Cap 400 amp. Air Cooled.
Wheel Mounted. 4 nos (2003)
29. Pillar drill „SIDDHAPURA‟ make . SR. No. S1/3/6/95 Cap 40 MM
with 3 hp Neophase Make electric motor 10 nos (2003)
30. Radial Drill „Perfect‟ make. Mc no 867 Sr. no 35/1000. Cap 40
mm, with 2 HP Megha make electric motors (2003)
31. Radial Drill „KMT‟ make. Cap 40mm, automatic, with 2 HP
Amgo make & 1 HP Megha make electric motor (2003)
32. Welding Boom „ Vandana Equipment‟ make. Wheel mounted.
Vertical boom 3MT cross boom 3 MT with 2 HP local make 2
no, with Gear box Elecon make ratio30:1 with Job Rotator
machine, 10HP DC motorinbuilt and 10 HP local make electric
motor with Elecon make gear
33. Power Press Malara Punjab make. Cap 50 ton. With 7.5 HP
local make electric motor 2 no. (2000)
34. Power Press „Mankoo‟ make. Cap 40 ton. With 7.5 HP local
make electric motor (2000)
35. Shaping Machine „Sagar Ludhiana make Sr no 2386, Strike
24‟, with 5 HP EIE „ make electric motor (2001)
36. Mig Welding Machine „ Advani‟ make Sr. no 82/763, Model
VCG –B31 /51 cap 400 amp with wire reel and stand , Torch ,
Cable etc, with control panel inbuilt (2001)
37. Mig Welding Machine „Quality Engg. „ make Mc. No: GCM 4
cap 400 amp. With wire reel and stand Torch, cable etc, with
control panel inbuilt (2003)
38. Hyd.Power Press „Perfect Engg. ‟ make cap 40 ton & 15 ton,
with common Power pack Sr. no.9508317. Combined unit
inter coneected. (2002)
39. Angle cutting Power Press „‟ make cap 300 ton. To cut MS
Angles 150 mm x 150mm x 20 thick with power pack unit &
7.5 HP make electric motor (2001)
40. Hyd. Power Press cap 300 ton with Power pack & 20 HP
Crompton make electric motor. (2001)
41. Hyd. Power Press cap 500 ton with Power pack & 10 HP
Crompton make electric motor. (2001)
42. Bore well „Lubi‟ make Submersible pump cap 12.5 HP, 280
feet deep, housing 200mm dia with necessary fittings (2000)
43. Power Supply system complete.
Sr No DESCRIPTION OF MACHINERY
QUALITY ASSURANCE PLAN FOR
STRUCTURE
PARTICULARS CHARACTRISTICS
CLASSIFIC
ATION
QUANTUM REFERENCE ACCEPT
NORMS
AGENCY
A] PROCUREMENT
v STEEL SPECIFICATION MAJOR - AS PER AS PER Q C
CONFORMATION SPN. SPN. DEPARTMENT
v HARDWARE SPECIFICATION MAJOR - AS PER AS PER Q C
CONFORMATION SPN. SPN. DEPARTMENT
v ZINC SPECIFICATION MAJOR - AS PER AS PER Q C
CONFORMATION SPN. SPN. DEPARTMENT
v CHEMICAL SPECIFICATION MAJOR - AS PER AS PER Q C
CONFORMATION REQ. REQ. DEPARTMENT
B] INCOMING / STORES
v STEEL
P.O. CONFORMITY MAJOR 1% AS PER AS PER Q C
P.O. P.O. DEPARTMENT
v HARDWARE
P.O. CONFORMITY MAJOR 1% AS PER
AS
PER
Q C
P.O. P.O. DEPARTMENT
v ZINC
P.O. CONFORMITY MAJOR 1% AS PER AS PER Q C
P.O. P.O. DEPARTMENT
C] PREPARATION OF SHOP FLOOR DRG.
D] PROTO ASSEMBLY PROCESS.
E] PROTO ASSEMBLY INSPECTION.
F] LOAD TEST OF PROTO MODEL ( IF REQUIRED )
G] MANUFACTURING PROCESS.
H] CONFORMITY CHECK WITH PROCESS DRAWING.
I ] RANDOM INSPECTION BEFORE GALVANIZING.
J] GALVANIZING PROCESS :
DEGREASING/RINSING/ PICKLING/RINSING /PRE-FLUXING/PRE-
HEATING/ ZINC COATING/QUENCHING/ DICHROMATING.
K] CONF0RMITY CHECK OF GALVANIZING AS PER THE REQUIREMENT.
L] INSPECTION / TESTING.
M] PACKING/DESPATCH.
DETAILED QAP BEING SUBMITTED SEPARATELY.
Sr.
No.
Component /
Operation &
Description of Test
Sampling
Plan
Ref. Document
&
Acceptance
Norm
Testing
Agency
Remarks
1.
1.1
1.1.1
(a)
(b)
(c)
RAW MATERIAL
Structural Steel
( Angle Sections,
Plates & Bars )
Physical Properties
Test for Ultimate
Tensile Strength
Test for Ultimate
Tensile Strength
Percentage
Elongation Test
One sample
for 40 MT or
part thereof
for each size
One sample
for 40 MT or
part thereof
for each size
One sample
for 40 MT or
part thereof
for each size
IS : 2062 Grade
A / 410 N/mm2
min.
IS : 2062 Grade
A /
< 20 mm thick
250 N/mm2 min.
20 to 40 mm
thick
240 N/mm2 min.
> 40 mm thick
230 N/mm2 min.
IS : 2062 Grade
A /
23 %
QC
Department.
/
Third Party
lab
QC
Department.
Third Party
lab
QC
Department.
/
Third Party
lab
Steel as per IS :
2062 to be
procured from
Main Producers
Verification of
Manufacturer‟s
Test Certificate
Verification of
Manufacturer‟s
Test Certificate
Verification of
Manufacturer‟s
Test Certificate
1.1.2. Chemical
Composition
One sample
for 40 MT or
part thereof
for each size
Is : 2062 Grade
A/ Carbon 0.23
% max.
Manganese 1.5 %
max. Sulphur
0.05 % max.
Phosphourus
.05%.Silicon
0.4% max.
Permissible
limits of variation
in products
analysis from
limits specified
above. Cabon
0.02 % max.
Manganese 0.05
% max. Sulphur
0.005 % max.
Phophorus 0.005
% max. Silicon
0.05 % max.
Manufactu
Rers works/
QC
Department.
/ Third party
lab.
Verification of
Manufacturer‟s
Test Certificate
SECTION : R MATERIAL INSPECTION
SECTION : RAW MATERIAL INSPECTION
Sr.
No.
Component /
Operation &
Description of
Test
Sampling
Plan
Ref.
Document &
Acceptance
Norm
Testi
ng
Agenc
y
Remarks
1.1.3.
1.1.4.
(a)
1.1.5.
Dimensional
checks
Tolerances for leg
length of Angles.
Equal angles
Upto 45 mm leg
length
> 45 to 100 mm
leg length
> 100 mm leg
length
Diameter
Tolerance for
Round Bars.
IS 2500,
level II,
AQL- 1.5
as per
Table I
enclosed
IS 2500
level II
AQL 1.5
as per
Table I
enclosed.
IS 2500,
level II,
AQL- 1.5
as per
Table I
enclosed
IS 2500,
level II,
AQL- 1.5
as per
Table I
enclosed
IS 2500,
level II,
AQL- 1.5
as per
Table I
enclosed
IS 2062, IS
808,
IS 1730, IS
1732
+ 1.5 mm
+ 2.0 mm
+ 2.0 mm
Difference
between leg
length of equal
angles shall be
limited to 75%
of total
tolerence (plus
& minus)
IS 2062 Grade
A, IS 1732, IS
1852
Upto + 0.5
mm
25 mm
>25 mm + 0.6
mm
to 35 mm
>35 mm + 0.8
mm
to 50 mm
> 50 mm + 1.0
mm
to 80 mm
> 80 mm + 1.3
mm
to 100 mm
>100 mm + 0.6
%
of dia
QC
Depar
tment.
QC
Depar
tment.
QC
Depar
tment.
QC
Depar
tment.
QC
Depar
tment.
Records review
at the time of
final
inspection.
Records review
at the time of
final
inspection.
Records review
at the time of
final
inspection.
Records review
at the time of
final
inspection.
SECTION : R MATERIAL INSPECTION
SECTION : RAW MATERIAL INSPECTION
Sr.
No.
Component /
Operation &
Description of
Test
Sampling
Plan
Ref. Document &
Acceptance Norm
Testing
Agency
Remarks
1.1.6.
(a)
(b)
(c)
1.1.7
1.2.
1.2.1.
1.2.2.
Weight Tolerance-
For angle sections
Upto 3 mm thick
More than 3 mm
thick
Weight Tolerance
for Plates
Weight Tolerance
for Bars
Thickness
Tolerance for Plates
Zinc
(To be procured
from Hindustan
Zinc Ltd. or
imported through
MMTC or sources
approved)
Chemical
Composition For
Zinc Ingot
Chemical
Composition for
molten Zinc in the
bath
One
sample for
40 MT/
Section or
part
thereof.
One
sample for
40 MT/
Section or
part
thereof.
One
sample for
40 MT/
Section or
part
thereof.
IS 2500
level II
AQL 1.5
as per
Table I
enclosed.
One
sample for
50 MT or
part
thereof.
One
sample
every
fortnightly
IS 2062, IS 808,
IS 1730, IS 1852
+ 5%
+ 5 % & - 3 %
Overweight
specified in IS 808
IS 2062, IS 808, IS
1730, IS 1852,.
+5% & -2.5% over
weights specified in
IS 1730
IS 1732, IS 1852
Upto + 7 %
10mm
> 10 mm + 5 %
to 16 mm
> 16 mm + 3 %
Overweight
specified in IS
1730
IS 2062 , IS 1730,
IS 1852.
< 8 mm
+ 12.5 %, - 5.0 %
8 mm to 12 mm
+ 7.5 %, - 5.0 %
> 12 mm
+ 5.0 %
IS 209, IS 2629, IS
4699, IS 4759
Zinc required for
galvanizing shall
be of purity 98.5%
as per IS 209.
Molten metal in the
galvanizing bath
shall not contain
zinc less than 97%
by mass.
QC
Depart
ment.
QC
Depart
ment.
QC
Depart
ment.
QC
Depart
ment.
QC
Depart
ment.
Third
party
Indepen
d-
-ent
lab.
Third
party
Indepen
d-
-ent
lab.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Verification of
Manufacturer‟
s Test
Certificate
Review of lab
test certificate
at the time of
final
inspection.
SECTION : R MATERIAL INSPECTION
SECTION : RAW MATERIAL INSPECTION
Sr.
No.
Component /
Operation &
Description of Test
Sampling
Plan
Ref. Document &
Acceptance Norm
Testing
Agency
Remarks
1.1.6.
(a)
(b)
(c)
1.1.7
1.2.
1.2.1.
1.2.2.
Weight Tolerance-
For angle sections
Upto 3 mm thick
More than 3 mm thick
Weight Tolerance for
Plates
Weight Tolerance for
Bars
Thickness Tolerance
for Plates
Zinc
(To be procured from
Hindustan Zinc Ltd. or
imported through
MMTC or sources
approved)
Chemical Composition
For Zinc Ingot
Chemical Composition
for molten Zinc in the
bath
One sample
for 40 MT/
Section or
part thereof.
One sample
for 40 MT/
Section or
part thereof.
One sample
for 40 MT/
Section or
part thereof.
IS 2500 level
II AQL 1.5
as per Table
I enclosed.
One sample
for 50 MT or
part
thereof.
One sample
every
fortnightly
IS 2062, IS 808,
IS 1730, IS 1852
+ 5%
+ 5 % & - 3 %
Overweight
specified in IS 808
IS 2062, IS 808, IS
1730, IS 1852,.
+5% & -2.5% over
weights specified
in IS 1730
IS 1732, IS 1852
Upto + 7 %
10mm
> 10 mm + 5 %
to 16 mm
> 16 mm + 3 %
Overweight
specified in IS
1730
IS 2062 , IS 1730,
IS 1852.
< 8 mm
+ 12.5 %, - 5.0 %
8 mm to 12 mm
+ 7.5 %, - 5.0 %
> 12 mm
+ 5.0 %
IS 209, IS 2629, IS
4699, IS 4759
Zinc required for
galvanizing shall
be of purity 98.5%
as per IS 209.
Molten metal in
the galvanizing
bath shall not
contain zinc less
than 97% by mass.
QC
Department
.
QC
Department
.
QC
Department
.
QC
Department
.
QC
Department
.
Third party
Independ-
-ent lab.
Third party
Independ-
-ent lab.
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
Verification of
Manufacturer‟s
Test Certificate
Review of lab
test certificate at
the time of final
inspection
SECTION : INPROCESS INSPECTION
Sr.
No.
Component /
Operation &
Description of Test
Sampling
Plan
Ref. Document &
Acceptance Norm
Testing
Agency
Remarks
2.0
2.1.
2.1.1.
2.1.2.
2.1.3.
2.1.4.
2.1.5.
(a)
(b)
(c)
(d)
2.1.6
INPROCESS
INSPECTION
Fabrication of
structure parts
Straightening
Cropping (Cutting)
Stamping
Punching / Drilling
Edge Security
For 13.5 mm dia
hole
For 17.5 mm dia
hole
For 21.5 mm dia
hole
For 25 mm dia hole
Drilling & Punching
Hole
To Hole distance.
100 %
1st piece &
every 50th
piece.
1st piece &
every 50th
piece.
1st piece &
every 50th
piece.
1st piece &
every 50th
piece.
1st piece &
every 50th
piece.
IS 802 Part II, IS
7215,shop
sketches.
-
Length tolerance +
2 mm. The cut
surface to be clean,
reasonably square
& free from
distoration.
Letter size
Punching to be
done for thickness
upto 12 mm &
drilling to be done
for thickness above
12 mm. Holes near
bends to be
Punched/drilled
after bending. Holes
should be
prependicular to
surface &difference
in dia on both sides
of flange should not
be more than 0.8
mm.
IS 802 Part – II /
Power Grid Specs.
Sheared 20mm min
Rolled 16 mm min.
Sheared 23mm min
Rolled 20 mm min.
Sheared 28mm min
Rolled 25 mm min.
Sheared 38mm min
Rolled 33 mm min.
Tolerence cumula-
tive & between
consecutive holes
shall be with +2
mm & +2 mm,
respectively.
QC
Departme
nt
QC
Departme
nt
QC
Departme
nt.
QC
Departme
nt.
QC
Departme
nt.
QC
Departme
nt.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
Records
review at the
time of final
inspection.
SECTION : INPROCESS INSPECTION
Sr.
No.
Component /
Operation &
Description of Test
Sampling
Plan
Ref. Document
&
Acceptance
Norm
Testing
Agency
Remarks
2.1.7.
2.1.8.
2.1.9.
(a)
(b)
2.1.1
0
(a)
(b)
(c)
2.1.1
1
Notching, Flange cut,
Corner Cut , Bevel
Cut.
Heel Grinding
Bending
MS Sections
MS Plates
Welding
Welding procedure
including type of
electrode used
Welders‟ qualification
Visual Examination
Final inspection of
Fabricated parts.
1st piece &
every 50th
piece.
1st piece &
every 50th
piece.
10 % pieces
10 % pieces
10 % pieces
-
-
100 %
Random
basis
+ 5 mm on
specified length
of cut operation
by shearing
upto 8mm thick
& by gas cutting
for material
above 8 mm.
For members
>12mm
thick,gas
cutting to be
adopted
followed by
griding
IS 802 Part –
II,IS 7215, shop
sketches
Process
Cold
Cold
Hot
Hot
Cold
Hot
As per
specification
As per
specification
As per
specification
All parameters
from 2.1.1. to
2.1.10 above
are checked
&records
maintained
before
releasing
materials for
galvanizing.
QC
Department
QC
Department
QC
Department
Section
upto 75x6
upto 100x8
above 75x6
above
100x8
upto 12 mm
thick others
QC
Department
QC
Department
QC
Department
QC
Department
Records review at
the time of final
inspection.
Records review at
the time of final
inspection.
Records review at
the time of final
inspection.
Angle
Upto 10o
Upto 5o
Above 10o
Above 5o
Upto 15o .
Records review at
the time of final
inspection. CIP on
random basis at
black stage.
Records review at
the time of final
inspection.
SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION
Sr.
No.
Component /
Operation &
Description of
Test
Sampling
Plan
Ref. Document &
Acceptance Norm
Testing
Agency
Remarks
3.0
4.0.
4.1.
4.1.1.
4.1.1.
(a)
(b)
4.1.2.
4.1.3.
4.2.
4.2.1.
Prototype (Model
) Assembly
as per
requirements of
Customer
Galvanizing
Process Control
Degreasing in
Hydrochloric
Acid solution.
Pickling
Inhibitor to be
added to prevent
over pickling.
Acid content
Iron content
Rinsing
Pre Heating
Dipping (
Galvanizing )
Zinc bath
temperature
continuous
monitory
One structure
of each type.
One sample
daily
One sample
daily.
One sample
daily.
One sample
daily.
-
Hourly checks
To be
assembled &
checked for
dimension
angle size to
verify
Interchangabilit
y of members
etc.
IS 2629, plant
standards.
Strength of
solution
between 4 to
12%.
IS 2629, plant
standards.
40-180
gms/litre.
IS 2629, plant
standards.
120 gms/litre
max.
IS 2629, plant
standards.
PH value shall
be between 5 &
9.
IS 2629, plant
standards.
700 C to 1100 C
IS 2629, plant
standards.
445 to 465o C.
QC
Department
QC
Department
QC
Department
QC
Department
QC
Department
QC
Department
QC
Department
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
-
Records review
at the time of
final inspection.
SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION
Sr.
No.
Component /
Operation &
Description of Test
Sampling
Plan
Ref. Document &
Acceptance Norm
Testing
Agency
Remarks
4.2.2.
4.2.3.
4.2.4.
4.3.
4.3.1.
4.3.2.
Immersion time &
withdrawal time.
Quenching in
Running Water
Dichromating For
Exports
Galvanizing
Checks
Visual Checks
Thickness of zinc
coating
(i) For Angle
Sections & Plates.
-
-
One
sample
daily.
100 %
3 samples
/
shift
IS 2629, plant
standards. Articales
to be immersed till
the reaction takes
place which is
indicated by
stoppage of
bubbling.
Withdrawal to be
controlled so that
zinc drains freely.
-
IS 2629, plant
standards.
Standard strength
of solution to be
maintained at 1% of
Sodium Dichromate
& 0.5% of
Sulphuric Acid.
IS 2629, IS 1367,
IS 4218, Surface to
be free from defects
like bare/black
spots, (except when
small & suitable for
patching) heavy ash
& flux inclusions,
lumps, pimples,
runs etc. For
foundation bolts
visual
Examination shall
be carried out by
thread guage.
Galvanized external
threads shall not be
recut.
IS 2629, IS 4759,
Min. 65 microns for
thickness < 5 mm &
Min. 86 microns for
thickness > 5 mm.
QC
Departme
nt
-
QC
Departme
nt
QC
Departme
nt
QC
Departme
nt
Records review
at the time of
final inspection.
-
Records review at
the time of final
inspection.
Records review at
the time of final
inspection.
Records review at
the time of final
inspection.
SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION
Sr.
No.
Component /
Operation &
Description of Test
Sampling
Plan
Ref. Document &
Acceptance Norm
Testing
Agency
Remarks
4.3.3.
4.3.4.
4.3.5.
Weight of zinc
coating for
Angle sections,
Plates & Anchor
Bolts.
Uniformity of
zinc coating
Adhesion test of
zinc coating
(Pivot Hammer
Test)
samples /
shift
samples /
shift
3 samples
/
shift
IS 2629, IS
4759, IS 6745,
IS 2629, IS
2633, Material
to withstand 4
dips of one
minute each
without showing
signs of copper
deposits
IS 2629, IS
2633, No
removal or lifting
of coating in
areas between
hammer
impressions.
QC
Departm
ent
QC
Departm
ent
QC
Departm
ent
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
Records review
at the time of
final inspection.
SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION
Note: In the event of Export orders the respective codes will get replace with BS Standards.
GALVANISING PLANT AND PROCESS
[A] GALVANISING SHOP:
1. Degreasing Tank
2. Rinsing Tank.
3. Pickling Tank
4. Pre-Fluxing Tank
5. Washing Tank
6. Hot Plate System
7. Zinc Baths
8. Quenching Tank
9. Dichromating Tank
[B] HOT DIP GALVANISING PROCESS :
1.Degreasing
2. Pickling
3.Rinsing
4.Pre-Fluxing
5.Pre-Heating
6.Dipping in molten ZINC
7.Quenching
8.Dichromating
A LIST OF IN - HOUSE TESTING
FACILITY
1.0.DIMENSIONAL CHECKING OF PHYSICAL
PROPERTIES : Vernier, Micrometer,
Gauge etc.
2.0.GALVANISATION TEST FACILITY
2.1.STRIPPING TEST: For Zinc Coating
Thickness as per the
procedure IS – 4759
AND IS – 6745.
2.2.UNIFORMITY OF ZINC COATING TEST:
As per the procedure of
IS-2633
2.3.ADHESION TEST: As per the procedure of
IS-2629
If Purchase desire, third Party Test Report,
M/S. E. R. D. A. and M/S. MET HEAT ENGINEERS
approved and Standard Laboratories located very near
to our workshop.
• Physical & Chemical properties are checked at third
party Laboratory.
OUR INDIAN SATISFIED CUSTOMERS :
OUR ABROAD SATISFIED CUSTOMERS
A LIST OF ABROAD CUSTOMERS :
1. MINISTRY OF ELECTRICITY & WATER, (DUBAI)
2. STRUTHERS WELLS CORPORATION WARREN PENNA (U.S.A.)
3. DULMISON (AUSTRALIA)
4. GENERAL ELECTRONICS & TRADING CO. (OMAN)
5. ABB (U S S R)
6. GHANA ELECTRICITY CO. (GHANA)
7. GOLDEN INTERNATIONAL EST. L.L.C.
8. ALSTOM EXPORT (FRANCE)
9. SEA HAWK CARGO CARRIERS PVT. LTD., (JAPAN)
10. EC EOTECNIA (SPAIN)
11. BONUS (DENMARK)
12. SUDWIND (GERMENY)
13. VESTAS (DENMARK)
14. AL – HASSAN TRADING & CONTRACTING CO. L.L.C. (OMAN)
15. AL – HASSAN ELECTRICAL CO. L.L.C. (OMAN)
16. BLUE STAR ENTERPRISES L.L.C.
17. MASHIRA ELECTRICALS (U.A.E.)
18. MAM INT’L GENERAL TRADING (U.A.E.)
19. NICO INTERNATIONAL FUJAIRAH
A LIST OF ABROAD CUSTOMERS :
20. CEYLON AMBUJA CEMENTS (SRILANKA)
21. SCIENTECHNIC (U.A.E.)
22. SCAN ELECTROMECHANICAL CONT. CO. L.L.C.
23. SKYLIGHT ELECTRIC WARE TRADING LLC
24. AL-HASSAN ENGINEERING CO. S.A.O.G. [OMAN].
25. CIVIL CONTRACTING CO. LLC [OMAN].
26. LARSEN & TOUBRO ELECTROMECH LLC [OMAN].
27. GALFAR ENGINEERING & CONTRACTING L .L. C.
28. LARSEN & TOUBRO [OMAN] L.L.C.
29. SHEIDA INTERNATIONAL LLC [OMAN].
30. AL FALAHY COMPANY LLC.
31. ARABIAN INDUSTRIES LLC.
32. GLOBAL CORP ENTERPRISE LLC.
33. POWERTECH ENGINEERING LLC.
34. SAUDI NATIONAL CONTRACTING CO. LTD.
A LIST OF ORDERS SUCCESSFULLY EXECUTED FOR
EXPORTS
SR
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
1. MAM INT’L GENERAL
TRADING U.A.E.)
112
DT. : 25.07.98
32,800=00 CROSSARM & OVERHEAD
LINE MATERIAL
2. MAM INT’L GENERAL
TRADING (U.A.E.)
114
DT. : 05.12.98
1,320=00 CROSSARM & OVERHEAD
LINE MATERIAL
3. MAM INT’L GENERAL
TRADING (U.A.E.)
115
DT. : 15.12.98
9,174=00 CROSSARM & OVERHEAD
LINE MATERIAL
4. GENERAL ELECTRONICS
(OMAN)
GET/98079/BME
DT. : 08.12.98
39,455=32 33 KV SUB STATION
STRUCTURE
5. GENERAL ELECTRONICS
(OMAN)
GET/99009/BME
DT. : 20.02.98
10,200=00 33 KV SUB STATION
STRUCTURE
6. GENERAL ELECTRONICS
(OMAN)
GET/99012/BME
DT. : 01.03.99
14,560=00 33 KV SUB STATION
STRUCTURE
7. GENERAL ELECTRONICS
(OMAN)
GET/99013/BME
DT. : 04.03.99
1,945=00 33 KV SUB STATION
STRUCTURE
8. A.B.B. LIMITED
(OMAN)
BL/43170
DT. : 03.07.98
16,000=00 132 KV SUBSTATION
STRUCTURE
9. CROMPTON LIMITED
(OMAN)
13495
DT. : 04.06.99
1,40,624=00 132 KV SUBSTATION
STRUCTURE
10. CROMPTON LIMITED
(OMAN)
13499
DT. : 04.06.99
30,450=00 132 KV SUBSTATION
STRUCTURE
11 AL – HASSAN TRADING
(OMAN)
AHC/B 123/PO-21
DT. : 08.12.99
20,839=00 33 KV SUBSTATION
STRUCTURE
12 AL – HASSAN TRADING
(OMAN)
AHC/B 124/PO-20
DT. : 08.12.99
17,830=00 33 KV SUBSTATION
STRUCTURE
13. MAM INT’L GENERAL
TRADING (U.A.E.)
1008
DT. : 06.12.99
5,596=00 GANTRY STRUCTURE
14. AL – HASSAN TRADING
(OMAN)
AHC/B 124/PO-27
DT. : 20.01.2000
2,11,000=00 132 KV SUBSTATION
STRUCTURE
15. AL – HASSAN TRADING
(OMAN)
AHC/B 123/PO-25
DT. : 19.12.2000
4,250=00 SWITCHYARD STRUCTURE
16. AL– HASSAN
ELECTRICAL (OMAN)
786/LC
3369/AHE/98
DT. : 07.03.2000
39,072=05 33 KV SUBSTATION
STRUCTURE
17. MASHIRA ELECTRICAL
(U.A.E.)
METCO/SKS/6269-
B/00
DT. : 19.04.2000
14,799=15 CROSSARM & OVERHEAD
LINE MATERIAL
18. MASHIRA ELECTRICAL
(U.A.E.)
ME/BMEI/246
DT. : 08.06.2000
20,833=00 11/ 33 KV SUBSTATION
STRUCTURE
SR
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
19. MASHIRA
ELECTRICAL
(U.A.E.)
ME/BMEI/290
DT. : 30.08.2000
16,843=00 11/ 33 KV SUBSTATION
STRUCTURE
20. AL– HASSAN
ELECTRICAL (OMAN)
AHE/RKH/OC – 011
DT. : 18.09.2000
64,943=00 HARDWARE
21. AL – HASSAN
ELECTRICAL
786/LC
3432/AHE/00
DT. : 05.10.2000
62,594=00 TANSMISSION LINE
TOWER & PARTS
22. Al– HASSAN
ELECTRICAL(OMAN)
434
DT. : 10.10.2000
30,165=00 33 KV SUBSTATION
STRUCTURE
23. Al– HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO –
017
DT. : 31.10.2000
3,32,940=0
0
132/33/11 KV
SUB STATION
STRUCTURE
24. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
786/CAD-
1588/AHE/00
DT. : 11.11.2000
15,048=50 33 KV SUBSTATION
STRUCTURE
25. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHC 117198
DT. 21.12.2000
1,620=00 FOUNDATION BOLT
26. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/MUK/B127/
PO-04/01
DT. : 25.02.2001
29,173=00 FOUNDATION BOLT /
HARDWARE
27. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
786/CAD-
1624/AHE/01
DT. : 26.03.2001
857=50 SUPPORT CHANNEL
28. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-
062
DT. : 04.07.2001
12,982=00 SUPPORT STRUCTURE
DULY GALVANISED
29. MASHIRA
ELECTRICAL
(U.A.E.)
METCO/ES/6347/0
1
DT. : 10.07.2001
1,942=50 FIXING PLATE
30. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-
062
DT. : 15.07.2001
26,723=00 SUPPORT STRUCTURE
DULY GALVANISED
31. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-
065
DT. : 30.07.2001
1,57,500=0
0
SUBSTATION GANTRY &
EQUIPMENT SUPPORT
STRUCTURE FOR 132 KV
S/S.
32. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-
085
DT. : 15.09.2001
1,354=00 FOUNDATION BOLT & GI
COVER FOR CABLE TRAY
FOR 33 KV S/S.
33. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-
091
DT. : 23.10.2001
22,500=00 SUBSTATION GANTRY &
EQUIPMENT SUPPORT
STRUCTURE FOR 33 KV
S/S.
34. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-
092
DT. : 27.10.2001
20,796=00 MS CABLE TRAYS.
SR
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
35. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-095
DT. : 08.11.2001
30,235=00 MS CABLE TRAYS
DULY GALVANIZED
36. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-106
DT. : 22.12.2001
13,762=00 MS CABLE TRAYS
DULY GALVANIZED
37. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B127/PO-091
(AMMENDMENT)
DT. : 23.01.2002
10,465=00 SUBSTATION GANTRY
& EQUIPMENT
SUPPORT STRUCTURE
FOR 33 KV S/S.
38. AL – HASSAN
ENGINEERING CO.
S.A.O.G.
AHEC/B126/PO-26
DT. : 26.01.2002
4,420=00 SUBSTATION GANTRY
& EQUIPMENT
SUPPORT STRUCTURE
FOR 33 KV S/S.
39. BIAX METALS [U.K.] BM/JL/2083/01-02
DT. 26.09.01
15,000=00 FIDDER PILLARS
40. BIAX METALS [U.K.] BM/TL/155/02-03
DT. 27.07.02
40,000=00 FIDDER PILLARS
41. BIAX METALS [U.K.] BM/TL/280/03-04
DT. 02.05.03
10,000=00 FIDDER PILLARS
42.
AMBUJA CEMENTS
(SRILANKA)
CACPL/KALINA/FJA
/0301/6765
DT. 16.04.03
22,958=00
SUPPLY OF SPARES
FOR CEMENT
STORAGE & BAGGING
FACILITY AT , -
SRILANKA
43. SCIENTCHNIC [U.A.E.] OBD 83/02 42,000=00 CROSSARMS
44. SCIENTCHNIC [U.A.E.] OBD 77/02 5,607=00 CROSSARMS
45.
SCAN
ELECTROMECHANICA
L CONT. CO. L.L.C
1894
DTD: 19.12.2004
30,500=00
GI STRUCUTE FOR
TRANSMISSON
46.
MOHAN EXPORTS
[INDIA] PVT. LTD
[ELECTRICITY CO. OF
GANA]
PD/GH/14
DTD: 27.11.2004
4,54,863=00 CROSSARMS
47.
AL – HASSAN
ENGINEERING CO.
S.A.O.G
AHEC/BSM/B168/P
O-35 DTD:
24.04.2005
1,36,500=00
220KV OVERHEAD
LINE STRUCTURES
48.
AL-HASSAN ENGG. CO.
S.A.O.G.
AHEC/BSM/B171/P
O-0023
DTD:16.05.2005
28,887=50
132 KV OVERHEAD
LINE STRUCTURES
49.
AL-HASSAN ENGG. CO.
S.A.O.G.
AHEC/BSM/B179/P
O-0011
DTD:08.01.2006
7,25,500=00
132 KV OVERHEAD
LINE STRUCTURES
SR
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
50.
CIVIL CONTRACTING
CO. LLC [OMAN]
C-031/0708/CIV-
BME/L/001/06
DTD: 12.08.06
40,750=00
132 KV OVERHEAD
LINE STRUCTURES
51.
LARSEN & TOUBRO
ELECTROMECH LLC,
[OMAN]
335/ 2110 / KM /
RBM
DTD: 16.07.06
2,00,000=00
SUBSTATON
STRUCTURES
52.
LARSEN & TOUBRO
[OMAN] LLC
LTO/PTD/193/SSSR
M/PO/019
DTD:25.12.06
16,800=00
132/33 KV
OVERHEAD LINE
STRUCTURES
53.
GALFAR
ENGINEERING &
CONTRACTIONG LLC
[OMAN]
010077
DTD: 13.12.06
4,92,551=43
CROSSARM &
OVERHEAD LINE
MATERIAL
54.
GALFAR
ENGINEERING &
CONTRACTIONG LLC
010139
DTD: 06.01.07
44,353=74 STAY ANCHOR
55.
SHEIDA
INTERNATIONAL CO.
LLC [OMAN]
SI/PO-BME/07
DTD:21.03.07
36,249=50
CROSSARM &
OVERHEAD LINE
MATERIAL
56.
GALFAR
ENGINEERING &
CONTRACTIONG LLC
010634
DTD: 18.04.07
1,02,000=00
132 KV SUBSTATON
STRUCTURES
57.
SHEIDA
INTERNATIONAL CO.
LLC [OMAN]
SI/PO-BME/17
DTD:30.05.07
1,72,227=00
CROSSARM &
OVERHEAD LINE
MATERIAL
58.
LARSEN & TOUBRO
[OMAN] LLC,
LTO/PTD/204-A
/PO/014
DTD:25.04.07
42,500=00
132/33 KV OUTDOOR
SWITCHYARD
STRUCTURES
59.
CIVIL CONTRACTING
CO. LLC [OMAN]
PDO CONTRACT
C310708
DTD: 14.07.07
8,601=00
132 KV SUBSTATON
STRUCTURES
60.
LARSEN & TOUBRO
[OMAN] LLC,
LTO/PTD/203/OMIF
CO/PO/042-A-1
DTD:21.08.07
82,950=00
132 KV SUBSTATON
STRUCTURES
61
GLOBAL CORP LLC
[OMAN]
GEC/OR/09-
03/PTE/BM DTD.
19.09.2009
7772.00 POLE BAND
62
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-43/BM
DTD. 31.10.2009
16719.50 CROSS ARMS
63
POWERTECH
ENGINEERING LLC
[OMAN]
PTE/TECKNO/FO/0
59/2009/12 DTD.
10.12.2009
470000.00
HARDWARE /
FASTENERS
64
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
41/TECKNO/AL
TURKI DTD.
28.01.2009
4531.20
CROSS ARMS &
ACCESSORIES
SR
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
65
GLOBAL CORP LLC
[OMAN]
GEC/OR/10-
48/TECKNO/AL
DTD. 06.02.2010
6512.00 POLE BAND
66
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
49A/TECKNO/IECC
DTD. 20.02.2010
14423.68
CROSS ARMS &
ACCESSORIES
67
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
158/TECKNO/IECC
REV 1 DTD.
20.05.2010
52714.97
CONCRETE POLE
ACCESSORIES
68
AL HASSAN
ENGINEERING CO
S.A.O.G [OMAN]
AHEC/PROC/B195/
PO-44 DTD.
24.05.2010
62000.00 SUPPLY OF GANTRIES
69
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
169/TECKNO/AL
TURKI DTD.
27.05.2010
6836.70
CROSS ARMS &
CHANNEL
70
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
185/TK/IECC DTD.
26.06.2010
18773.66 OHLACCESSORIES
71
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
186/TK/IECC DTD.
26.06.2010
4968.98 OHL ACCESSORIES
72
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
205/TECKNO/AL
TURKI DTD.
18.07.2010
23317.00
CROSS ARMS, POLE
BAND & OTHER
ACCESSORIES
73
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
211/TECKNO/IECC
DTD. 25.07.2010
4794.77 OHL ACCESSORIES
74
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
218/TK/WAPI-Rev 1
DTD. 31.07.2010
75872.50 OHL ACCESSORIES
75
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
219/Teckno/IECC
DTD. 01.08.2010
87947.24 OHL ACCESSORIES
76
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
237/Teckno/LNT
DTD. 21.08.2010
7019.80 OHL ACCESSORIES
77
GALFAR
ENGINEERING &
CONTRACTING SAOG
[OMAN]
VP/MMU/3888/10
DTD. 15.09.2010
7150.00
SUPPLY OF
SUPPORTING STEEL
STRUCTURE
SR
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
78
NATIONAL
CONTRACTING CO.
LTD
NCC/OMAN/OETC/3
29/2010/PO/10
DTD. 05.10.2010
17,964.00
132KV GANTRY &
CABLE SEALING END
STRUCTURE
79
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-283/TK
DTD. 24.10.2010
87,86.00 OHL ACCESSORIES
80
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
303/TK/ DTD.
13.11.2010
95,877.73
OHL ACCESSORIES
81
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
304/TK/IECC DTD.
23.11.2010
2,885.34 OHL ACCESSORIES
82
AL HASSAN
ENGINEERING CO.
S.A.O.G [OMAN]
AHEC/PROC/B198/
PO11 DTD.
14.12.2010
74,000.00
GANTRIES &
EQUIPMENT
STRUCTURE
83
LARSEN & TOUBRO
(OMAN) LLC
002830/EPR00072
DTD. 14.12.2010
2,24,246.20
OHLHARDWARE
ACCESSORIES
84
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
330/TK/PTE DTD.
20.12.2010
1,220.00 OHL ACCESSORIES
85
POWERTECH
ENGINEERING LLC
[OMAN]
PTE/TECKNO/FO/0
89/2010/01-REV-1
DTD. 29.12.2010
67,581.38
CROSS ARMS &
ACCESSORIES
86
GLOBAL CORP LLC
[OMAN]
GCE/OR/10-
330/TK/PTE DTD.
20.12.2010
1,220.00 OHL ACCESSORIES
87
LARSEN & TOUBRO
[OMAN] LLC
002830/EPR00082
DTD. 01.01.2011
3,078.27 TIE STRUCTURES
88
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/11-
001/TK/PTE DTD.
02.01.2011
1,876.80 ANGLES & PLATES
89
LARSEN & TOUBRO
[OMAN] LLC
002830/EPR00083
DTD. 02.01.2011
3,85,626.03 CROSS ARMS
90
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-
009/TK/Stk-REV2
DTD. 05.01.2011
41,522.07 ANGLES & PLATES
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
91
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-041/TK
DTD. 02.02.2011
4,050.00 GRID GAIN
92
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-044/TK
DTD. 08.02.2011
47,500.00
33KV SAND ROCK
ANCHOR.
93
GALFAR
ENGINEERING &
CONTRACTING SAOG
[OMAN]
4409295 DTD.
14.02.2011
7,150.00
SUPPORTING
STRUCTURES
94
GALFAR
ENGINEERING &
CONTRACTING SAOG
4409294 DTD.
14.02.2011
17,400.00
SUPPORTING
STRUCTURES
95
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-
059/TK/L&T-Rev 1
DTD. 16.02.2011
28,784.63 HARDWARE
96
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-060/TK
/UEP DTD.
20.02.2011
7,236.00
SUPPORTING
STRUCTURES
97
NATIONAL
CONTRACTING CO.
LTD [OMAN]
NCC/OMAN/OETC/3
29/2010/PO/10/02
DTD. 05.03.2011
30,858.00
GANTRY & CABLE
SEALING END
STRUCTURE
98
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-
041/TK-Rev 1DTD.
09.03.2011
6,250.00 GRID GAIN
99
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-084/TK
DTD. 12.03.2011
2,472.08 CROSS ARMS
100
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-097/TK
DTD. 27.03.2011
38,516.37 OHL ACCESSORIES
101
AL FALAHY
COMPANY LLC
[OMAN]
3414 DTD.
28.03.2011
53,000.00 33KV
102
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/11-
102/TK/PTE DTD.
29.03.2011
12,047.75
EQUIPMENT &
SUPPORT
STRUCTURES
103
POWERTECH
ENGINEERING LLC
[OMAN]
PTE/096/PDO/LOI/
2011 DTD.
25.04.2011
51,762.50
GANTRY &
SWITCHYARD
STRUCTURE
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
103
POWERTECH
ENGINEERING LLC
[OMAN]
PTE/096/PDO/LOI/
2011 DTD.
25.04.2011
51,762.50
GANTRY &
SWITCHYARD
STRUCTURE
104
POWERTECH
ENGINEERING LLC
[OMAN]
1100001605 DTD.
12.05.2011
36,400.00 POLE BANDS
105
GLOBAL CORP LLC
[OMAN]]
GCE/OR/11-
040/TK/CIVILCO-
REV2 DTD.
26.05.2011
2,60,913.30
GANTRY &
EQUIPMENT
STRUCTURES
106
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-
165/TK/Stk DTD.
28.05.2011
15,000.00 EARTH PIT
107
GLOBAL CORP LLC
[OMAN]
GCE/OR/11-
178/TK/Stk DTD.
15.06.2011
49,194.01
CONCRETE POLE
ACCESSORIES
108
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/11-
189/TK/STK DTD.
29.06.2011
1,474.00 POLE BAND
109
SAUDI NATIONAL
CONTRACTING
COMPANY LLC
NCC/OMAN/OETC/8
5/2010/PO/16 DTD.
05.07.2011
8,26,20.00
GANTRY &
EQUIPMENT
SUBSTATION
STRUCTURE
110
SAUDI NATIONAL
CONTRACTING
COMPANY LLC
NCC/OMAN/OETC/7
4/2010/PO/035
DTD. 12.07.2011
1,44,112.50
GANTRY &
EQUIPMENT
SUBSTATION
STRUCTURE
111
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/11-
207/TK/PDO DTD.
16.08.2011
78,692.80
CROSS ARMS & SAND
ANCHORS
112
AL HASSAN
ENGINEERING CO
S.A.O.G [OMAN]
AHEC/PROC/B200/
2011/OPR-2973
DTD. 22.10.2011
17,615.00
SUPPLY OF 132KV GI
SUPPORT STRUCTURE
113
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/11-
269/Teckno/Galfar
DTD. 01.11.2011
41,200.00
SUPPLY OF COWSLIP
CONDUCTOR
114
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/11-304/TK
DTD. 22.12.2011
22,215.00
SUPPLY OF CROSS
ARM
115
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12/016/T
K DTD. 12.01.2012
9,200.00
SUPPLY OF GI SIGN
BOARD
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
116
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-022/TK
DTD. 14.01.2012
5445.94
SUPPLY OF CROSS
ARM & SWITCHRACK
117
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-021/TK
DTD. 14.01.2012
23764.95
SUPPLY OF GI STEEL
STRUCTURE
118
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-034/TK
DTD. 29.01.2012
53674.80
SUPPLY OF
CONCRETE POLE
ACCESSORIES
119
POWERTECH
ENGINEERING LLC
[OMAN]
PTE/117/TECKNO/
PO/2011/16 DTD.
18.02.2012
42,567.00
SUPPLY OF
HARDWARE
120
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
049/Teckno DTD.
15.02.2012
95,850.00
METAL HOUSING
EARTH PIT WITH
COVER
121
LARSEN & TOUBRO
[OMAN] LLC
003020/EPR00406
DTD. 15.02.2012
8236.05
SUPPLY OF
EQUIPMENT
STRUCTURE
123
LARSEN & TOUBRO
[OMAN] LLC
003020/EPR00407
DTD. 15.02.2012
5994.00
SUPPLY OF
EQUIPMENT
STRUCTURE
124
BLUE STAR
ENTERPRISES LLC
[OMAN]
20122 DTD.
21.02.2012
50,560.00
SUPPLY OF
STRUCTURE
125
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-067/TK
DTD. 27.02.2012
58,252.00
SUPPLY OF
CONCRETE POLE
ACCESSORIES
126
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-077/TK
DTD. 03.03.2012
18,798.50
SUPPLY OF
CONCRETE POLE
127
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-099/TK
DTD. 17.03.2012
2,030.50
SUPPLY OF
CONCRETE POLE
ACCESSORIES
128
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-121/TK
DTD. 26.03.2012
8,320.50
SUPPLY OF
CONCRETE POLE
ACCESSORIES &
COVER PLATE
129
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-134/TK
DTD. 14.04.2011
29,820.00
METAL HOUSING
EARTH PIT WITH
COVER
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
130
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-140/TK
DTD. 19.04.2012
146850.21
SUPPLY OF
CONCRETE POLE
ACCESSORIES
131
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-149/TK
DTD. 24.03.2012
11,031.00
CONCRETE POLE
ACCESSORIES &
COVER PLATE
132
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-150/TK
DTD. 24.04.2012
7,891.65
SUPPLY OF 11/33KV
STRUCTURES
133
POWERTECH
ENGINEERING LLC
[OMAN]
PTE/TECKNO/FO/1
17/2012/21 DTD.
30.04.2012
1,62,000.00
SUPPLY OF 132KV
GANTRY & SUPPORT
STRUCTURE
134
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
159/TK/STK DTD.
03.05.2012
16,400.00
SUPPLY OF TINNED
COPPER TUBE
135
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
183/TK/STK DTD.
15.05.2012
21,837.00
SUPPLY OF
CONCRETE POLE
ACCESSORIES
136
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-186/TK
DTD. 19.05.2012
960.00
SUPPLY OF CROSS
ARMS
137
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-201
DTD. 29.05.2012
18,983.64
SUPPLY OF
CONCRETE POLE
ACCESSORIES
138
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-204/TK
DTD. 02.06.2012
19,390.00
SUPPLY OF SUPPORT
STRUCTURE
139
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-205/TK
DTD 03.06.2012
42,094.70
SUPPLY OF
CONCRETE POLE
ACCESSORIES
140
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-217/TK
/Galfar DTD.
06.06.2012
99,919.45
SUPPLY OF
CONCRETE POLE
ACCESSORIES
141
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE//OR/12-
256/TK/STK DTD.
30.06.12
88,347.5
SUPPLY OF CROSS
ARMS
142
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-267/TK
DTD. 07.07.2012
19,390.00
POLE TOP COVER
PLATE
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
143
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR12-
289/TK/PDO/REV1
DTD. 25.07.2012
8,070.00
SUPPLY OF CROSS
ARMS
144
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-295/TK
DTD. 29.07.2012
1,05,120.00
AAC HAWTHORN
CONDUCTOR
145
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-296/TK
DTD. 29.07.2012
8,600.00
AAC HAWTHORN
CONDUCTOR
146
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-319/TK
DTD. 08.08.2012
3,646.20.
SUPPLY OF GANTRY &
SUPPORT
STRUCTURES
147
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-322/TK
DTD. 08.08.2012
16,868.00 DISTANCE PLATE
148
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-337/TK
DTD. 12.08.2012
33,485.00
SUPPLY OF COVER
PLATE & DISTANCE
PLATE
149
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-349/TK
dtd. 28.08.2012
16,050.00
SUPPLY OF SINGLE
LINK & VERNIER
PLATE
150
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12/359/T
K/PTE Dtd.
05.09.2012
44,562.32
SUPPLY OF
CONCRETE POLE
ACCESSORIES
151
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
398/TK/ GCM DTD.
29.09.2012
22,865.18
11/33KV GANTRY &
SUPPORT
STRUCTURES
152
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-408/TK
dtd. 04.10.2012
9,295.00
SUPPLY OF STEEL
PLATE
153
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-430/TK
DTD. 15.10.2012
2,83,390.97
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
154
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-445/TK
DTD. 22.10.2012
58459.45
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
155
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-446/TK
DTD. 22.10.2012
75,000.00
SUPPLY OF
CONCRETE POLE
ACCESSORIES
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
156
POWERTECH
ENGINEERING LLC
[OMAN]
1100007542 &
1100007587 DTD.
13.11.2012
30,217.00
SUPPLY OF GANTRY &
EQUIPMENT SUPPORT
STRUCTURES
157
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-460/TK
– REV1 DTD
04.11.2012
58,397.67
SUPPLY OF
CONCRETE POLE
ACCESSORIES
158
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-464
DTD. 06.11.2012
28,350.00
SUPPLY OF METAL
HOUSING EARTH PIT
WITH COVER
159
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-466/TK
DTD. 06.11.2012
895.41
SUPPLY OF ANGLE
STEEL
160
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-479/TK
DTD. 12.11.2012
26431.20
SUPPLY OF ANGLE &
CLAMP OF CABLE
STANDOFF BRACKET
161
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GEC/OR/12-
494/TK/OXY-REV2
DTD. 24.11.2012
17,289.78
33KV SUPPORT
STRUCTURE
162
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
498/TK/MHEW/Stk
DTD. 25.11.2012
39,283.00
SUPPLY OF CROSS
ARMS
163
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
506/TK-Rev1 DTD.
27.11.2012
4,990.00
SUPPLY OF ANGLE &
CLAMP OF CABLE
STANDOFF BRACKET
164
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-536/TK
DTD. 11.12.2012
58397.67
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
165
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
477/TK-REV-3 DTD.
11.12.2012
65,503.00
SUPPLY OF GANTRY &
EQUIPMENT SUPPORT
STRUCTURE
166
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-544/TK
DTD. 12.12.2012
23,500.00
CLAMP OF CABLE
STAND OF BRACKET
167
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
552/TK/Ray DTD.
17.12.2012
1,12,392.51
SUPPLY OF WOODEN
POLE ACCESSORIES
168
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
551/TK/Ray DTD.
17.12.2012
19,405.70
SUPPLY OF POLE
BAND & GRID GAIN
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
169
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
555/TK/Stk DTD.
18.12.2012
65,085.80
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
170
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-
560/TK/L&T DTD.
18.12.2013
4,192.44 132KV STRUCTURES
171
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/12-568/TK
DTD.22.12.2012
8,500.00
SUPPLY OF VERNIER
PLATE
172
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-038/TK
DTD. 04.01.2013
21,440.00
SUPPLY OF 33KV
STEEL TOWER
173
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-027/TK
DTD. 08.01.2013
16,962.82
SUPPLY OF
UNIVERSAL CROSS
ARMS
174
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-
041/TK/RAY DTD.
15.01.2013
6,849.78
SUPPLY OF CROSS
ARMS
175
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-065/TK
DTD. 30.01.2013
235.00
CLAM OF
CABLESTAND OFF
BRACKET
176
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-069/TK
DTD. 03.02.2013
72,679.06
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
177
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-092/TK
DTD. 16.02.2013
85,437.30
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
178
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-127/TK
DTD. 10.03.2013
9,914.00
SUPPLY OF WOODEN
POLE CROSS ARMS &
VERNIER PLATE
179
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-130/TK
DTD. 12.03.2013
8,200.00
SUPPLY OF CABLE
GUARD & ANTI
CLIMBING
180
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-156/TK
DTD. 26.03.2013
35,200.00 EARTH PIT
181
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-183/TK
DTD. 13.04.2013
34,680.00
SUPPLY OF MHEW
CROSS ARMS
182
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-213/TK
DTD. 29.04.2013
79,449.30
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN
US $
ITEM DESCRIPTION
183
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-228/TK
DTD. 08.05.2013
17,659.00
SUPPLY OF POLE TOP
COVER PLATE &
DISTANCE PLATE
184
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-237/TK
DTD. 13.05.2013
63,682.50
SUPPLY OF
CONCRETE POLE &
ACCESSORIES
185
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-245/TK
DTD. 19.05.2013
5,920.00
11KV INTERMEDIATE
CROSS ARMS
186
GLOBAL CORP
ENTERPRISE LLC
[OMAN]
GCE/OR/13-289/TK
DTD. 11.06.2013
1,946.16
SUPPLY OF CROSS
ARMS
LIST OF ORDERS SUCCESSFULLY EXECUTED FOR EXPORTS
FOR DESIGN CALCULATION & DRAWING
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN US
$
ITEM DESCRIPTION
1. AL – HASSAN TRADING &
CONTRACTING L.L.C.
AHC / B 124 / – 27
DT. : 07.02.2000
12,000=00 132 KV SUBSTATION
STRUCTURE
2. AL – HASSAN TRADING &
CONTRACTING L.L.C.
AHC / B 123 / – 26
DT. : 07.02.2000
4,000=00 33 KV SUBSTATION
STRUCTURE
3. AL – HASSAN ENGINEERING
CO. S.A.O.G.
AHEC/B127/PO –
018
DT. : 31.10.2000
24,000=00 132/33/11 KV
SUB STATION
STRUCTURE
4. AL – HASSAN ENGINEERING
CO. S.A.O.G.
AHEC/TKN/B127/P
O-03/01
DT. : 25.02.2001
13,500=00 132/33/11 KV
SUB STATION
STRUCTURE
5. AL – HASSAN ENGINEERING
CO. S.A.O.G.
AHC/B146/PO-22
DT. : 30.12.2001
5,000=00 132/33/11 KV
SUB STATION
STRUCTURE
6. SCAN ELECTROMECHANICAL
CONT. CO. L.L.C
1895
DTD: 19.12.2004
4,750=00 GI STRUCTURE FOR
TRANSMISSON
7. AL – HASSAN ENGINEERING
CO. S.A.O.G.
AHC/BSM/B168/LO
A-34
DT. : 24.04.2005
4,500=00 132/33/11 KV
SUB STATION
STRUCTURE
8. AL – HASSAN ENGINEERING
CO. S.A.O.G.
AHC/BSM/B179/PO-
0011
DT. : 08.01.2006
4,500=00 LATTICE AND
TUBULAR TYPE SUB
STATION STRUCTURE
9. CIVIL CONTRACTING LLC C-031/0708/CIV-
BME/L/001/06
DT: 12.08.06
25,00=00 132 KV SUBSTATION
STRUCTURE
10. LARSEN & TOUBRO
ELECTROMECH LLC
335/2110/KM/RBM
DT: 16.07.06
5,500=00 132 KV SUBSTATION
STRUCTURE
11. AL- FALAHY CO. LLC
2595
DTD. 11.09.07
RO. 9,100=00 33 KV
12. ARABIAN INDUSTRIES LLC 2008-12-0302 DTD.
21.12.2008
95,568=73
132 KV CROSS ARMS
13. POWERTECH ENGINEERING 2010-03-0040 DTD.
02.03.2010
8,423=70
132 KV EQUIPMENT
SUPPORT STRUCTURE
14.
AL HASSAN ENGINEERING
CO S.A.O.G
AHEC/PROC/B195/
PO-44 DTD.
24.05.2010
6,000.00 SUPPLY OF GANTRIES
15 GLOBAL CORP LLC
GCE/OR/10-
218/TK/WAPI-REV1
DTD. 31.07.2010
13,623.75
SUPPLY OF OHL
ACCESSORIES
16
GALFAR ENGINEERING &
CONTRACTING SAOG
VP/MMU/3888/10
DTD. 15.09.2010
700.00
SUPPLY OF
SUPPORTING STEEL
STRUCTURE
17
GLOBAL CORP ENTERPRISE
LLC (OMAN)
GCE/OR/11-
060/TK/UEP DTD.
20.02.2011
7,236.00 SUPPORT STRUCTURE
18
NATIONAL CONTRACTING
CO. LTD
NCC/OMAN/OETC/3
29/2010/PO/10/02
DTD. 05.03.2011
30,858.00
GANTRY & CABLE
SEALING END
STRUCTURE
19 AL FALAHY COMPANY LLC
3414 DTD.
28.03.2011
53,000.00 33KV STEEL TOWERS
SR.
NO
PARTY’S NAME P.O.NO. & DATE
VALUE IN US
$
ITEM DESCRIPTION
20
GLOBAL CORP
ENTERPRISE LLC (OMAN)
GCE/OR/11-
040/TK/CIVILCO-
REV 2 DTD.
26.05.2011
50,091.78
GANTRY &
EQUIPMENTS
21
GLOBAL CORP
ENTERPRISE LLC (OMAN)
GCE/OR/11-
265/Teckno/Galfar
/R2 DTD.
31.10.2011
26,000.00
132KV
GANTRY &
EQUIPMENTS
22
LARSEN & TOUBRO
(OMAN)LLC
O03020/EPR00406
DTD. 15.02.2012
8,263.05
EQUIPMENT
SUPPORT
STRUCTURE
23
LARSEN & TOUBRO
(OMAN)LLC
O03020/EPR00407
DTD. 15.02.2012
5,994.00
EQUIPMENT
SUPPORT
STRUCTURE
24
SAUDI NATIONAL
CONTRACTING CO. LTD.
NCC/OMAN/OETC/
85/2010/PO/16
DTD. 05.07.2012
10,710.00
GANTRY &
SUBSTATION
EQUIPMENT
STRUCTURE
25
SAUDI NATIONAL
CONTRACTING CO. LTD.
NCC/OMAN/OETC/
74/2010/PO/035
DTD. 12.07.2012
18,681.25
GANTRY &
SUBSTATION
EQUIPMENT
STRUCTURE
26
GLOBAL CORP
ENTERPRISE LLC [OMAN]
GCE/OR/12-
440/TK DTD.
18.10.2012
20,000.00
SUPPLY OF 33KV
STEEL TOWER
A LIST OF INDIAN CUSTOMERS :
1. ASEA BROWN BOVERI LTD.,
2. ALSTHOM
3. ABLETECH ELECTRO ENGINEERS PVT LTD.,
4. AMBUJA CEMENTS LTD.,
5. AREVA T&D INDIA LTD.
6. BAJAJ ELECTRICALS LTD.,
7. BIAX ELECTRIC & CONTROLS PVT. LTD.
8. BHARAT BIJLEE LTD.,
9. BHARAT HEAVY PLATE & VESSELS LTD.,
10. BHARAT PETROLIUM CORPORATION LTD.,
11. BHARAT SANCHAR NIGAM LTD.,
12. BEST & CROMPTON LTD.,
13. BOMBAY SUBARBAN ELECTRIC SUPPLY
14. BLUE STAR
15. BRIGADE GROUP
16. COCHIN REFINARY
17. CROMPTON GREAVES LTD.,
18. CHIRANJJEEVI ENERGY LTD
19. DASLAGER WAYS
20. ESSAR STEEL LTD.,
21. ELECON ENGINEERING CO.
22. FOUR EF CONSTRUCTIONS [FIZA DEVELOPERS]
23. GE PLASTIC INDIA LTD.,
24. GET ENGG. & CONST. LTD.,
25. GUJARAT COMMUNICATION & ELECTRONICS LTD.,
26. GUJARAT AMBUJA CEMENT LTD.,
27. GUJARAT ELECTRICITY BOARD
28. GUJARAT NARMADA VALLEY FERTILIZERS LTD.,
29. GUJARAT STATE FERTILIZERS & CHEMICAL LTD.,
30. GTL LTD.,
31. HITECH ENGINEERS & CONTRACTORS.,
32. INDIAN OIL CORPORATION LTD.,
33. INDIAN PETROCHEMICALS LTD.,
34. INDIA WIND POWER
35. JYOTI LTD.,
36. JUWI INDIA RENEWABLE ENERGIES PVT LTD.,
37. KIRLOSKAR ELECTRIC CO. LTD.,
A LIST OF INDIAN CUSTOMERS :
38. KVAERNER CEMETATION INDIA.
39. LARSEN & TOUBRO LTD.,
40. LINDE PROCESS TECHNO-LOGIES INDIA LTD.,
41. LANCO SOLAR ENERGY PVT LTD.,
42. MADRAS REFINARY
43. MAHAVEER ELECTROMECH PVT LTD.,
44. MOHAN EXPORTS INDIA PVT. LTD.,
45. MAHAVEER ELECTRICALS
46. MADHAV INFRA PROJECTS PVT LTD.,
47. NATIONAL THEMAL POWER CORPORATION LTD.,
48. NICCO CORPORATION LTD.,
49. NUCLEAR POWER CORPORATION OF INDIA.,
50. OMICRON POWER ENGINEERS PVT LTD.,
51. PC INDIA LTD.,
52. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,
53. PIONEER WINCON PVT. LTD
54. PROJECT & DEVELOPMENT INDIA LTD.,
55. PUNJLLOYD LIMITED
56. PADMASHREE ELECTRICALS
57. RELIANCE ENERGY LTD.,
58. RELIANCE INFOCOM LTD.,
59. RUBAMIN LTD.,
60. SIEMENS LTD.,
61. SPIC-SMO
62. SCHALTECH SYSTEMS [INDIA] PVT LTD.,
63. SREE VENKATESHA ELECT. INDS. LTD.,
64. SKILLTECH ENGINEERS & CONTRACTORS PVT. LTD.,
65. TATA CHEMICALS LTD.,
66. THE AHMEDABAD ELECTRICITY CO. LTD.,
67. THE SURAT ELECTRICITY CO. LTD.,
68. TTG INDUSTRIES LTD.,
69. TYCO ELECTRONICS SYSTEMS INDIA PVT LTD.,
70. TORRENT POWER LTD.,
71. UB ENGINEERING LTD.
72. VATECH REYROLLE LTD.,
73. YOKOGAWA BLUE STAR LTD.,
A LIST OF MAJOR ORDER FOR STRUCTURES
SUCCESSFULLY EXECUTED
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTITY
(M.T.)
INSPECTION
O1. THE AHMEDABAD ELEC.
BOARD, MATERIALS
DEPT., JUBILEE HOUSE,
AHMEDABAD.
B69/4/4286
DATED : 12.02.86
LATTICE
STRUCTURE
01.00 A.E.C.
02. THE SURAT ELECT-
RICITY CO. LTD.,
TILAK MAIDAN, 395 005
CE 731
DATED : 25.10.90
66 KV
STRUCUTRE 15.00 S.E.C.
03. ELEC. BOARD
KABILPOR-396 424.
NAVSARI [GUJ.]
TCNS/AC/220/32
70
DT : 14.05.1992
220 KV / 66 KV
SUN-STATION
STRUCTURES
88 G.E.B
04. ELEC. BOARD
SUB-STATION,
LIMBADI -363 421.
CDL/AB/WORK/5
05/3093
DT : 29.06.1992
220 KV D/C
TOWER
STRUCTURE
226 G.E.B.
05. ELEC. BOARD,
SUB-STATION,LIMBADI -
363 421.
CDL/AB/WORK/5
04/3092
DT : 29.06.1992
132 KV SUB-
STATION
STURCTURES
270 G.E.B.
06. CROMPTON GREAVES
LTD., – 600 001
CMJ/93176/864/
13/P-IX/
DT : 19.11.1992
132 KV SWITCH
STRUCTURES. 290 G.G.L.
07. THE ELECT. CO. LTD.,
TILAK MAIDAN– 395 005.
CE/COM/69
DT : 28.08.1992
66 KV
STRUCTURES 21.00
S.E.C.
08. BEST CROMPTON ENGG.
LTD., – 390 005.
BRD-21/676
DT : 27.07.92 26.00 B & C
09. BEST CROMPTON ENGG.
LTD., – 390 005.
BRD-21/676
DT : 27.07.92
TOWER
STRUCTURES 12.00 B & C
10. BEST CROMPTON ENGG.
LTD., – 390 005.
TOWERS
STRUCTURES 35.00 B & C
11. BEST CROMPTON ENGG.
LTD.,– 390 005.
TOWERS
STRUCTURES 15.00 B & C
12. ELEC. BOARD – 390 007. SP/5-
22/V/FI/86/9134
DT : 09.08.1993
66 KV / 132 KV
SUB – STATION
STRUCTURES 107 G.E.B.
13. ELEC. BOARD
KABILPORE – 396 424
NAVASARI, [GUJ.]
TCNS/AC/220/54
70
DT : 09.08.1993
66 KV / 132 KV
SUB-STATION
STRUCTURES.
107 G.E.B.
14. CROMPTON GREAVES
LTD., – 600 001
CROMPTON
GREAVES LTD., –
600 001.
220/132 KV
SWITCH YARD
STRUCTURES.
266
G.G.L. /
K. P. C. L.
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTITY
(M.T.)
INSPECTIO
N
15. CROMPTON GREAVES
LTD., – 600 001
CMJ/94184/881/
P-VIII
DT : 27.10.1993
220 KV SWITCH
YARD
STRUCTURES.
468
C.G.L. /
K. P. C. L
16. CROMPTON GREAVES
LTD., – 600 001
CMJ/94208/893/
8/PIX/
DT : 08.11.1993
66 KV SUB –
STATION
STRUCTURES
415 C. G. L.
17. CROMPTON GREAVES
LTD., – 600 001
CMJ/94192/892/
10/P-VIII
DT : 02.10.1993
66 KV SUB-
STATION
STRUCTURES.
470 G.G.L.
18. ROIMAX CONSTRUC-
TION PVT. LTD.,
KADMBAKKAM,
– 560 024.
RC/P.17/C-51
DATED. :
07.05.1993
220 KV
SWITCHYARD
STRUCTURES
146 R.P.C.L.
19. KIRLOSKAR ELECTRIC
CO. LTD.,
– 560 055.
CPS/LC/94/0056
DT : 07.05.1993
66 / 132 KV
SUB–STATION
STRUCTURES
226 K.E.C.
20. BEST CROMPTON ENGG.
LTD., – 390 005.
BRD-21/832,
DT : 26.02.93
TOWER
STRUCTURES 33 B & C
21. TECKNO , OLD PO/38
DT: 25.07.93
LATTICE
STRUCTURE 107 A.B.B.
22. TECKNO , OLD ALSTHOM 220 KV
STRUCTURES. 47 N.T.PC.
23. TECKNO , OLD A/C SIEMENS
LTD.,
LATTICE
STRUCTURES
500 SIEMENS
24. ELEC. BOARD
– 390 007
TR-IV/BMEI/220
KVS/S/STRU/247
/2217 DT :
26.04.1994
220 KV / 132 KV
SUB-STATION
STRUCTURES. 130 G.E.B.
25. CROMPTON GREAVES
LIMITED., – 600 001.
CMJ/95034/899/
P-II
DT : 19.05.1994
132 / 66KV SUB
–STATION
STRUCTURES
150
C.G.L. /
G.E.B.
26. ASEA BROWN BOVERI
LTD., MANEJA, BARODA
– 13. [GUJ.]
BL/30613/RRC
DT : 21.04.1994
LATTIC
STRUCTURES 175 A.B.B.
27. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
BL/30554/RRC
DT : 21.04.1994
LATTIC
STRUCTURES 130 A.B.B.
28. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
THSSS/RRC
DT : 05.05.1994
LATTIC
STRUCTURES 186 E.I.L.
29. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
BL/30684/RRC
DT : 24.11.1994
LATTIC
STRUCTURES 126 A.B.B.
30. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
BL/30932/RRC
DT : 13.09.1994
LATTIC
STRUCTURES 189 A.B.B.
31. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
THSSS/RRC
DT : 05.10.1994
LATTIC
STRUCTURES 116 A.B.B.
32. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
BL/30685/RRC
DT : 24.11.1994
LATTIC
STRUCTURES 89 A.B.B.
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTI
TY
(M.T.)
INSPECTION
33. THE ELECT. CO. LTD.,
395 005.
CE/COM/60
DT. 23.05.94
66 KV STRUCT.
39.00 S.E.C.
34. SIEMENS LTD., LPO/A/4009/SAA
DATED : 26.10.94 GI STRUCTURES 800.00 TATA
35. SIEMENS LTD., LPO/A/4010/SAA
DATED : 26.10.94
A/C. TECKNO,
GI STRUCTURES
1500.0
0
TATA
36. ELEC. BOARD
– 390 007
TR-IV/220-
132KV/NEW/
5143/12/10/95
220 KV
SUB-STATION
STRUCTURES.
226 G.E.B.
37. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
BL/30039/PIJ
DT : 05.03.1995 LATTIC
STRUCTURES
126 A.B.B.
38. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
BL/30829/PIJ
LATTICE
STRUCTURES
39. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
BL/41103/RRC
DT : 10.10.1995 LATTIC
STRUCTURES
85 A.B.B.
40. TABS ENGINEERS
– 390 010.
TE/BMEI/JUN-
GONDAL / 12/95
DT. : 30.04.95
66KV D/C
22.00 GEB
41. TABS ENGINEERS
– 390 010.
TE/BMEI/ANJAN/
25/95
DT. : 10.01.95
132 KV D/C
LINE TOWER 30.00
GEB
42. TABS ENGINEERS
– 390 010.
TE/BMEI/JYOTI/
5/95
DT. : 10.04.95
66 KV D/C LINE
TOWER FOR
PAINTHER
CONDUCTOR
100.00
JYOTI
43. TABS ENGINEERS
– 390 010.
TE/BMEI/JAMBUA
/13/95
DT. : 15.06.95
66 KV D/C LINE
TOWER 45.00
GEB
44. TABS ENGINEERS
– 390 010.
TE/BMEI/ANJAR/
16/95
DT. : 18.06.95
66 KV D/C LINE
TOWER 30.00
GEB
45. TABS ENGINEERS
– 390 010.
TE/BMEI/ANJAR/
16/95
DT. : 18.06.95
132 KV D/C
LINE TOWER 32.00
GEB
46. PRAKASH INDUSTRIES
LTD., KHANDOLI
GI STRUCTURES
200.00
PI
47. SUBARBAN ELECTIC
SUPPLY
– 400 093.
CON/PWD/GG/19
/97-98
DT : 29.07.97
GI STRUCTURES
300.00
BSES
48. DULMISON W.S. POWER
SYSTEM LTD.,
BANGLORE.
DWS/PO/9-97-48/
DATED : 23.09.97
GI STRUCTURES
300.00
DWS
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTI
TY
(M.T.)
INSPECTION
49. SIEMENS LTD.,
[GURGAON]
[CHITRADURGA SITE]
T & P/T-1/SS-
109/92
DATED : 14.03.01
G.I. LATTICE
STRUCTURE
WITH
HARDWARE
220.00
KPTCL
50. SIEMENS LTD.,
[GURGAON]
[HONNALI SITE]
T & P/T-1/SS-
108/82
DATED : 26.02.01
G.I. LATTICE
STRUCTURE
WITH
HARDWARE
245.00
KPTCL
51. SIEMENS LTD.,
[GURGAON]
[MADHUGIRI SITE]
T & P/T-1/SS-
107/79
DATED : 26.02.01
G.I. LATTICE
STRUCTURE
WITH
HARDWARE
225.00
KPTCL
52. VA TECH PVT. LTD.,
[ SITE]
06P/90351/864
DATED : 29.12.01
G.I. STRUCTURE
160.00
KPTCL
53. CROMPTON GREAVES
LTD,
EPSG/DD – SK (M)
– PCGIL (SOUTH)
DATED : 31.12.01
PIPE
STRUCTURE
APPRX
.
300
PGCIL
54. BSES LTD., BNG/CON/KPTCL/
AVG/01 – 200
DATED : 19.02.02
110KV
486.48
0
KPTCL
55. BSES LTD., BNG/CON/KPTCL/
AVG/01 – 201
DATED : 19.02.02
110KV
486.48
0
KPTCL
56. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
750000022
DATED 31.05.02
GI STRUCTURES
850.00
KPTCL
57. CROMPTON GREAVES
LTD,
EPG/SKJ – NV /
PCGIL (8)
DATED : 01.06.02
MS GALVANIZED
LATTICE
STRUCTURES
TYPE L.M.
APPRX
.
150.00
PGCIL
58. CROMPTON GREAVES
LTD,
EPG/BS/GMDC
DATED 16.07.02
GI STUCTURES
140.00
GMDC
59. BHARAT HEAVY
ELECTRICALS LTD.,
4528073
DATED :
GI STRUCTURES
286.00
PGCIL
60. CROMPTON GREAVES
LTD,
EPG/BS/WBSEB
DATED 24.08.02
GI STUCTURES
150.00
WBSEB
61. ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13. [GUJ.]
140005194
DATED : 11.09.02
GI STRUCTURES
150.00
PGCIL
62. ALSTHOM SYN/7129/CS313
5 [KATHALGURI
220KV/132KV
LATTICE STR. 109.00
PGCIL
63 BHARAT HEAVY
ELECTRICALS LTD.,
4528107
DATED 16.10.02
GI STRUCTURES
435.00
WBSEB
64 ABLETECH ELECTRO
ENGINEERS P. LTD
AEE/Teckno/PO/
125/2003-04
DT. 24.05.03
66 KV DC
TRANSMISSION
LINE & SUB-
STATION STR.
40
KPTCL
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANT
ITY
(M.T.)
INSPECTION
65 SCHALTECH
AUTOMATION PVT LTD.
LOI NO:
E2/NSSK/SS/02
DTD: 25.05.2003
110 KV
TRANSMISSION
LINE & SUB-
STATION STR.
220
RITES
66 GET ENGG. &
CONSTRUCTION PVT.
LTD
GET/KPTCL/132/
PO/003
DTD: 21.08.2003
11 KV/66KV GI
STRUCTURES
15
KPTCL
67 GET ENGG. &
CONSTRUCTION PVT.
LTD
GET/DEV/128/PO
/001
DTD: 21.08.2003
11 KV/66KV GI
STRUCTURES
7
KPTCL
68 GET ENGG. &
CONSTRUCTION PVT.
LTD
GET/KPTCL/133/
PO/001
DTD: 01.09.2003
11 KV & 1.1KV
GALVANISED
CROSS ARM
187
KPTCL
69 SREE VENKATESHA
ELECTRICAL INDUS.
PVT. LTD
153/03-04
DTD: 23.09.2003
GI
STRUCTURE
33
RITES
70. SIEMENS LTD [MUMBAI
PROJECT – BALCO
KORBA
45242488
DTD. 11.12.03
GI
STRUCTURE 400
SIEMENS
71 SIEMENS LTD [MUMBAI
PROJECT-JIJU-SOGI
45258297
DTD. 24.03.2004
GI
STRUCTURE 40
SIEMENS
72 SIEMENS LTD [CHENNAI]
PROJECT –KITCO
45277877
DTD:26.07.2004
GI STRUCTURE
30
SIEMENS
73 SIEMENS LTD [MUMBAI]
PROJECT- GEB
45285969
DTD: 16.09.2004
GI STRUCTURE
30
SIEMENS
74 BHARAT BIJLEE LTD 73454/IGL
DTD: 30.12.2004
GI STRUCTURES
15
BHARAT
BIJLEE
75 SIEMENS LTD [MUMBAI]
PROJECT – SUZLON-
DHULE
45319035
DTD: 24.03.2005
GI
STRUCTURE 400
SIEMENS
76 SIEMENS LTD [MUMBAI]
PROJECT –LANJIGARH
4500430842
DTD:24.05.2005
GI
STRUCTURE 80
SIEMENS
77 FOUR EF
CONSTURCTIONS
[FIZA DEVELOPERS]
FEF/TECKNO/SS-
GAL-
STRU/SPLY/05-06
DT: 29.07.2005
GI
STRUCTURE
30
FIZA
DEVELOPE
RS
78 BRIGADE GROUP BG/BEPL/E/BM/
WO/664/05
DTD: 12.09.2005
GI STRUCTURE
70
BRIGADE
79 SCHALTECH
AUTOMATION PVT LTD.
NIL
DTD: 10.09.2005
66 KV
TRANSMISSION
LINE & SUB-
STATION STR
80
SCHALTEC
H
80 BHARAT BIJLEE LTD 77612/TOYO
DTD: 22.09.2005
GI
STRUCTURES
80
BHARAT
BIJLEE
81 ABB LTD., GI CROSSARMS
1500
UP ELEC.
BOARD
82 ASEA BROWN BOVERI
LTD., MANEJA, BARODA
PROJECT – ENERCON
JAISELMER SITE
500003235
DTD: 19.12.05
LATTIC
STRUCTURES
100 A.B.B.
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM DESCRIPTION
QUANTITY
(M.T.)
INSPEC
TION
83 MAHAVEER
ELECTRICALS
ME/UP/PO/002/
05-06
DTD: 24.12.05
GI CROSARMS
200
UP
ELEC.
BOARD
84 PADMASHREE
ELECRICALS
PA/UP/PO/001/
05-06
DTD: 26.12.05
GI CROSSARMS
200
UP
ELEC.
BOARD
85 SIEMENS LTD [] 4500630203
DTD: 28.12.05
G.I. LATTICE
STRUCTURE &
HARDWARE
175 KPTCL
86 G.E.T. ENGINEERING
CONSTRUCTIONS PVT.
LTD
GET/REL/05-
026/PO-18
DTD: 03.02.06
GI CROSSARMS
WITH HARDWARE 200
UP
ELEC.
BOARD
87 CHIRANJJEEVI WIND
ENERGY LTD
145/2005-2006
DTD: 09.02.06
G.I. LATTICE
STRUCTURE 500
88 SIEMENS LTD [MUMBAI]
PROJECT – SUZLON-
SUTHRI
4500708384
DTD: 22.03.2006
GI
STRUCTURE 250
SUZLO
N
89 SIEMENS LTD [CHENNAI]
PROJECT – TAMILNADU
4500719826
DTD: 03.04.2006
GI
STRUCTURE 4
SIEME
NS
90 SIEMENS LTD [CHENNAI]
PROJECT – BIAL
4500761023
DTD: 15.05.2006
GI STRUCTURE
WITH HARDWARE 25
SIEME
NS
91 ASEA BROWN BOVERI
LTD., MANEJA, BARODA
– 13. PROJECT –
ENERCON SAGHALISITE
500003527
DTD: 16.03.06
LATTICE
STRUCTURES
WITH HARDWARES
125 A.B.B.
92 ASEA BROWN BOVERI
LTD., MANEJA, BARODA
– 13. PROJECT –
ENERCON NASHIK
500003267
DTD: 27.12.05
LATTICE
STRUCTURES
WITH HARDWARES
135 A.B.B.
93 ASEA BROWN BOVERI
LTD., MANEJA, BARODA
– 13. PROJECT –
HINDUSTAN ZINC LTD
500003552
DTD: 21.03.06
LATTICE
STRUCTURES
WITH HARDWARES
150 A.B.B.
94 BSNL
ITI LTD.,
LATTICE TYPE
TELECOMMUNICAT
ION TOWER
STRUCTURES
15000 ITI
95 RELIANCE INFOCOM
LTD.,NAVI MUMBAI 400
710
XM5/13097126
DTD: 14.06.06
LATTICE TYPE
TELECOMMUNICAT
ION TOWER
STRUCTURES
400 RIL
96 ASEA BROWN BOVERI
LTD., MANEJA, BARODA
– 13. PROJECT –
JHALAP, CSEB
500003951 DTD:
08.07.06
LATTICE
STRUCTURES
WITH HARDWARES
58 A.B.B.
97 SKILLTECH ENGINEERS
& CONTRACTORS PVT.
LTD.,
SK/KPTCL/TKN/0
6-07/2202
DTD: 23.09.06
LATTICE
STRUCTURES,
TRANSMISSION
LINE TOWERS &
HARDWARES
400/500 KPTCL
98 SIEMENS LTD
[GURGAON]
PROJECT – WBSEB
PTD/HA/3000407
506/C15/Bm-
0001
DTD: 07.11.06
LATTICE
STRUCTURES
124 WBSEB
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANT
ITY
(M.T.)
INSPECTION
99 SIEMENS LTD
[GURGAON]
PROJECT – WBSEB
PTD/HA/30005296
47/C15/Bm-0001
DTD: 07.11.06
LATTICE
STRUCTURES 324 WBSEB
100 SIEMENS LTD
[GURGAON]
PROJECT – WBSEB
PTD/HA/30005338
51/C15/Bm-0001
DTD: 07.11.06
LATTICE
STRUCTURES 149 WBSEB
101 SIEMENS LTD
[GURGAON]
PROJECT – WBSEB
PTD/HA/30005336
88/C15/Bm-0001
DTD: 07.11.06
LATTICE
STRUCTURES 137 WBSEB
102 SIEMENS LTD
[GURGAON]
PROJECT – WBSEB
PTD/HA/30005339
51/C15/Bm-0001
DTD: 07.11.06
LATTICE
STRUCTURES 49 WBSEB
103 ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13.
PROJECT – WELSPUN,
500004557 DTD:
24.11.06
LATTICE
STRUCTURES
WITH
HARDWARES
279 A.B.B.
104 ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13.
PROJECT –
KHARASIYA, CSEB
500004782 DTD:
04.01.07
LATTICE
STRUCTURES
WITH
HARDWARES
75 A.B.B.
105 ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13.
PROJECT –
KANAKAPURA, KPTCL
140008504 DTD:
12.04.07
GI PIPE
STRUCTURES
38 A.B.B.
106 MAHAVEER
ELECTROMECH (P)
LTD.
MEMPL/KPTCL-
53/PO/074/2006-
07DTD: 22.01.07
200 KPTCL
107 ABLETECH ELECTRO
ENGINEERS (P) LTD.
AEE/GUJ-
TECKNO/1087/200
6-07
DTD: 25.01.07
GI STRUCTURE
41 ABLETECH
108 SCHALTECH SYSTEMS
(INDIA) PVT. LTD.
SSIPL/YVR/072/20
06-07
DTD: 30.01.07
33/66 KV OHE
LINE MATERIAL 41 SCHALTECH
109 ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13.
PROJECT – JAUNPUR,
PUVVNL
750006892 DTD:
08.02.07
GI CROSSARMS
37 A.B.B.
110 EXCELL ASSOCIATES EA/TEK/PO/05/20
06-07
DTD: 14.02.07
33/66 KV OHE
LINE MATERIAL 60 EXCELL
111 UNIVERSAL POWER
SYSTEMS ENGINEERS
& CONTRACTORS
UPS/TEC/GUJRAT/
PO/F-03/2006-
2007
DTD: 19.02.07
33/66 KV OHE
LINE MATERIAL
35
UNIVERSAL
POWER
112 ABLETECH ELECTRO
ENGINEERS (P) LTD.
AEE/GUJ-
TECKNO/1168/200
6-07
DTD: 21.02.07
33/66 KV OHE
LINE MATERIAL
76 ABLETECH
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANT
ITY
(M.T.)
INSPECTION
113 SCHALTECH SYSTEMS
(INDIA) PVT. LTD.
SSIPL/YVR/075/20
06-07
DTD: 05.03.07
33/66 KV OHE
LINE MATERIAL 35 SCHALTECH
114 SIEMENS LTD [INDIA]
PROJECT
4500761023
DTD: 06.04.07
GI STRUCTURES
WITH
HARDWARES
5 SIEMENS
115 BEST & CROMPTON
ENGG PROJECTS LTD,
CHENNAI, PROJECT-
WESTERN RAILWAY
LOI-RE/157/6/BM
DTD:08.06.07
GI WELDED
PARTS, MASTS,
PORTALS,
STRUCTURES &
ACCESSORIES
1000 RITES
116 RUBAMIN LIMITED, CO/PD/200706014
6 DTD:12.06.07
LATTICE
STRUCTURES
WITH
HARDWARES
15 RUBAMIN
117 GUJARAT ENERGY
TRANSMISSION CORP
LTD .
LOI,CE(P)/PROC/12
06/IV/BM/3756
DTD: 22.06.07
GI EARTHING
STRIPS 150 GETCO
118 GUJARAT ENERGY
TRANSMISSION CORP
LTD .
LOI-
CE(P)/PROC/1220/
IV/4213 DTD:
11.07.07
LATTICE
STRUCTURES
WITH
HARDWARES
695 GETCO
119 RUBAMIN LIMITED, CO/PD/200706016
3 DTD:17.07.07
LATTICE
STRUCTURES
WITH
HARDWARES
10 RUBAMIN
120 ASEA BROWN BOVERI
LTD., MANEJA,
BARODA – 13.
PROJECT – RAJPAR &
DUDHREJ, GETCO
140008801 DTD:
25.07.07
LATTICE
STRUCTURES
WITH
HARDWARES
375 A.B.B.
121 RUBAMIN LIMITED, CO/PD/200706015
2 DTD:26.07.07
LATTICE
STRUCTURES
WITH
HARDWARES
13 RUBAMIN
122 HEC INFRA PROJECTS
PVT LTD,
AHMEDABAD.
HIPPL/PUR/PO/SV
K/BMEI-083/07
DTD: 11.08.07
LATTICE
STRUCTURES,
HARDWARES, GI
STRIPS
100 HIPL
123 BEST & CROMPTON
ENGG PROJECTS LTD,
CHENNAI, PROJECT-
HOSPET, KPTCL
SS/HOSPET/07/10
1 DTD:16.08.07
50 BCEPL
124 TORRENT POWER
LIMITED,
20070919
DTD:22.08.07
LATTICE
STRUCTURES
WITH
HARDWARES
35 TORRENT
125 AREVA T&D INDIA LTD. 7700001918
DTD. 10.12.07
EQUIPMENT
58 SIEMENS
126 BEST & CROMPTON
ENGG PROJECTS LTD,
CHENNAI, PROJECT-
WEST RAILWAY
32/162/953/07/R-
B
DTD:10.12.07
GI WELDED SPS
& DROP ARMS
182 RITES
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTI
TY
(M.T.)
INSPECTION
127 BEST & CROMPTON
ENGG PROJECTS LTD,
CHENNAI, PROJECT-
WESTERN RAILWAY
32/163/961/07/E-
M
DTD:12.12.07
GI WELDED
PARTS, MASTS,
PORTALS,
STRUCTURES
90 RITES
128 SIEMENS LTD(MUMBAI) LOI DTD. 13.12.07 GI STRUCTURE 12 SIEMENS
129 SCHALTECH SYSTEMS
(INDIA) PVT. LTD.
LOI REF.
E2/DR622
DTD: 13.12.07
66 KV OHE LINE
MATERIAL 288
SCHALTEC
H
130 SCHALTECH
AUTOMATION PVT.
LTD.
LOI REF.
E2/DR/634/2007-
08 DTD:
23.12.2007
66 KV
LINE MATERIAL
288
SCHALTEC
H
132 UB ENGINEERING LTD
(DELHI)
UBEL/DEL/REC-
080&81/WO-
026/08-09/2678
DTD. 16.01.2009
SUB STATION,
TOWER, BEAM
HVPNL
133 UB ENGINEERING LTD
(DELHI))
UBEL/DEL/REC-
080&81/PO-
037/09-10/0052
EARTHING
MATERIAL 129 HVPNL
134 BIAX ELECTRIC &
CONTROLS PVT LTD.
BEC/UN/182/09-10
DTD. 23.09.2009
BRIGHT BAR
50
135 UB ENGINEERING LTD
(DELHI)
UBEL/DEL/E-
144/092/PO-
009/09-10/1797
dtd. 14.10.2009
HOT DIP
GALVANIZED
FOUNDATION
BOLT
5044 HPNL
136 UB ENGINEERING LTD
(DELHI)
UBEL/DEL/E-
143/094ª/PO-
009/09-10/1813
dtd. 15.10.2009
HOT DIP
GALVANIZED
FOUNDATION
BOLT
3156 HPNL
137 UB ENGINEERING LTD
(INDIA)
UBEL/DEL/E-
145/094B/PO-
009/09-10/1814
dtd. 15.10.2009
HOT DIP
GALVANIZED
FOUNDATION
BOLT
2216 HPNL
138 UB ENGINEERING LTD
(DELHI)
UBEL/DEL/E-
140/PO-027/09-
10/1832 dtd.
15.10.2009
MS GI FLAT
80 HPNL
139 SIEMENS LTD
(CHENNAI)
450294593 DTD.
14.10.2010
GI STEEL
STRUCTURE 14.46
STAR
PANEL
140 JUWI INDIA
RENEWABLE
ENERGIES PVT LTD
(BANGALORE)
PO/1011/SCM0004
DTD. 25.02.2011
SUPPORT
STRUCTURE
(SOLAR
PHOTOVOLTAIC)
122.33
JUWI INDIA
RENEWBLE
ENERGIES
PVT LTD
141 JUWI INDIA
RENEWABLE
ENERGIES PVT LTD
(BANGALORE)
PO/1011/SCM0052
DTD. 25.04.2011
SIGMA POST
FOR SOLAR
PHOTOVOLTAIC
171.52
JUWI INDIA
RENEWBLE
ENERGIES
PVT LTD
142
MADHAV INFRA
PROJECTS PVT LTD.
MIPPL/2011-
12/AUGUST/05
DTD. 09.08.2011
GI EARTHING
STRIP
330.00
MADHAV
GROUPS
143
MADHAV INFRA
PROJECTS PVT LTD.
MIPPL/PO/240512
/SW005 DTD.
12.08.2011
SUPPLY OF
MOUNTING
STRUCTURES
150.00
MADHAV
GROUPS
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTI
TY
(M.T.)
INSPECTION
144
SURYA
ENGINEERING
CORP
SEC/Teckno/IPL/4/11-
12 DTD. 01.11.2011
GI EARTHING
MATERIAL
17 MT
SURYA
ENGINEERI
NG CORP
145 JYOTI LTD
2/SR0/T1133/12342/20
11-2012 DTD.
21.11.2012
HEAT
SHRINKABLE
TUBES
117
MTR
JYOTI LTD
146
SURYA
ENGINEERING
CORP
SEC/TECKNO/IPL/7/11-
12 DTD. 14.12.2011
GI EARTHING
MATERIAL
24.6
MT
SURYA
ENGINEERI
NG CORP
147 JYOTI LTD
T/T72/T1133/300449/2
4157/2011-12 DTD.
27.12.2012
33KV
TERMINATION
KIT
16
NOS
JYOTI LTD
148
LANCO SOLAR
ENERGY PVT LTD
LSEPL/PSG/PO/GSECL/
024 TD. 30.12.2012
GI EARTHING
STRIPS
4.862
MT
LANCO
SOLAR
ENERGY
PVT LTD
149
OMICRON POWER
ENGINEERS PVT
LTD
OPEPL/PUR/11-12/115
DTD. 07.01.2012
220KV DC
TRANSMISSION
LINE TOWERS
33.785
MT
GETCO
150 JYOTI LTD
7/T72/T1133/300457/2
4252/2011-2012 DTD.
17.03.2012
SUPPLY OF
EARTHING
MATERIAL
1112
MTR
JYOTI LTD
151 JYOTI LTD
7/T72/T1133/300446
/24238/2011-2012 DTD.
17.03.2012
SUPPLY OF
EARTHING
MATERIAL
1112
MTR
JYOTI LTD
152 JYOTI LTD
7/T72/T1133/300447
/24239/2011-2012 DTD.
17.03.2012
SUPPLY OF
EARTHING
MATERIAL
1112
MTR
JYOTI LTD
153 JYOTI LTD
7/T72/T1133/300457/2
4252/2011-2012 DTD.
23.03.2012
SUPPLY OF
EARTHING
MATERIAL
6.00 JYOTI LTD
154 JYOTI LTD
7/T72/T1133/300458/2
4253/2011-2012 DTD.
23.03.2012
SUPPLY OF
EARTHING
MATERIAL
5.00 JYOTI LTD
155 JYOTI LTD
2/SR0/T1133/58214/20
12-2013 DTD.
30.06.2012
HEAT
SHRINKABLE
TUBES
117
MTR
JYOTI LTD
156 JYOTI LTD
2/SR0/T1133/58338/20
12-13 DTD. 29.08.2012
HEAT
SHRINKABLE
TUBES
180
MTR
JYOTI LTD
157
HITECH
ENGINEERS &
CONTRACTORS
09/019-12-2012 DTD.
19.12.2012
220KV D/C
TOWERS
172.40
MT
HITECH
ENGINEES &
CONTRACTR
A LIST OF ORDERS SUCCESSFULLY BOOKED AND EXECUTED
FOR PGCIL BY MEI GROUP OF INDUSTRIES
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTITY
(M.T.)
INSPECTION
1. CROMPTON
GREAVES LTD,
EPSG/DD/PGCIL
DT. 31.12.01
PIPE
STRUCTURE
325.00 PGCIL
2. CROMPTON
GREAVES LTD,
EPSG/DD/PGCIL
-A
DT. 31.12.01
LIGHTNING
MAST
150.00 PGCIL
3.
CROMPTON
GREAVES LTD.
EPSG/DD-SK(M)-
PGCIL (S)
DT. 04.02.02
EARTHING
FLAT
65.00 PGCIL
4. ASEA BROWN
BOVERI
LTD., MANEJA,
BARODA – 13.
[GUJ.]
140005194
DT. 11.09.02
PIPE
STRUCTRUE,
HIRYUR
130.00 PGCIL
5. BHARAT HEAVY
ELECTRICALS LTD.,
4518110
DT. 20.09.01
SUB-STATION
STRUCTURE
150.00 PGCIL
6. ALSTHOM SYN/7129/CS31
35
[KATHALGURI]
220KV/132K
V LATTICE
STR.
30.00 PGCIL
7. BHARAT HEAVY
ELECTRICALS LTD.,
4528073
DT. 20.08.03
GI
STRUCTURE
286.00 PGCIL
A LIST OF ORDERS SUCCESSFULLY EXECUTED FOR
WIND MILL TOWER STRUCTURE.
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM DESCRIPTION
QUANTITY
(M.T.)
1. GURU VERDAN GV/94/V-27/VESTAS
RRB DT. 06.10.94
225 KV WIND MILL
TOWER
STRUCTURE
545.00
2. MACHINERY PVT. LTD., VERBAL 225 KV WIND MILL
TOWER
STRUCTURE
300.00
3. ABAN LLOYADS OF
SHORES LTD.,
ALCO/WE0/PV/5129
DT. 11.12.94
6 MTRS.
SUPPORTING
STRUCTURES
126.00
4. REPL ENGINEERING
LTD.,
REPL/SYN/PO/95-
96/4003
DT. 12.04.95
225 KV WIND MILL
TOWER
STRUCTURE
264.00
5. REPL ENGINEERING
LTD.,
AMMENMENT -1
REPL/SYN/PO/95-96/
4003
DT. 12.04.95
225 KV WIND MILL
TOWER
STRUCTURE
300.00
6. REPL ENGINEERING
LTD.,
AMMENMENT -1
DT. 27.11.95
225 KV WIND MILL
TOWER
STRUCTURE
200.00
7. VESTAS RRB INDIA LTD., VRRB/BMEI/95/ PO-
1/22
DT. 28.08.95
225 KV WIND MILL
TOWER
STRUCTURE
350.00
8. SUZLON ENERGY LTD., SEL/PROD/POM/120/
96-97 DT.
20.08.95
WIND MILL TOWER
STRUCTURE
256.00
9. JMP ECOTECHNIA LTD. JEL/TWR/PO/95-
96/001 DT. 23.03.96
WIND MILL TOWER
STRUCTURE
560.00
10. REPL ENGINEERING
LTD.,
REPL/SYN-PO/95-
96/057
DT. 25.07.96
225 KV WIND MILL
TOWER
STRUCTURE
152.00
11. ABAN LLOYADS OF
SHORES LTD.,
15-10419-01
DT. 21.02.96
6 MTRS.
SUPPORTING
STRUCTURE
120.00
12. SUZLON ENERGY LTD., SEL/PROD/POM/044/
96-97 DT.
30.01.97
WIND MILL TOWER
STRUCTURES
500.00
13. DAS LAGARWAY
WINDTURBINES LTD.,
DLWL/PO/AM/97-
98/125
DT. : 28.07.97
WIND MILL TOWER
STRUCTURES
200.00
14. SUZLON ENERGY LTD., SEL/PROD/POM/044/
96-97
DT. 20.08.97
WIND MILL TOWER
STRUCTURES
338.00
15. SUZLON ENERGY LTD., SEL/PROD/POM/159/
97-98
DT. 20.12.97
WIND MILL TOWER
STRUCTURES
200.00
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM DESCRIPTION
QUANTITY
(M.T.)
16. DAS LAGARWAY
WINDTURBINES LTD.,
616
DT. 13.02.98
WIND MILL
TOWER
STRUCTURES
131.00
17. VESTAS RRB INDIA LTD., VRRB/PROJ/056/
DT. 13.02.98
225 KV WIND
MILL TOWER
STRUCTURES
500.00
18. VESTAS RRB INDIA LTD., VRRB/PROJ/007
DT. 03.06.98
WIND MILL
TOWER
STRUCTURE
55.00
19. VESTAS RRB INDIA LTD., VRRB/PROJ/020
DT. 08.08.98
WIND MILL
TOWER
STRUCTURE
81.00
20. DAS LAGARWAY
WINDTURBINES LTD.,
39
DT. 02.09.98
WIND MILL
TOWER
STRUCTURE
131.00
21. VESTAS RRB INDIA LTD., VRRB/PROJ/078
DT. 09.08.98
WIND MILL
TOWER
STRUCTURE
68.00
22. DAS LAGARWAY
WINDTURBINES LTD.,
64/98-99
DT. 05.01.99
WIND MILL
TOWER
STRUCTURE
131.00
23. VESTAS RRB INDIA LTD., VRRB/PROJ/045
DT. 09.01.99
WIND MILL
TOWER
STRUCTURE
54.00
24. REPL ENGINEERING
LTD.,
REPL/PO/GUJ/1999/
04
DT. 27.02.99
WIND MILL
TOWER
STRUCTURE
66.00
25. REPL ENGINEERING
LTD.,
REPL/PO/GUJ/1999/
05
DT. 04.03.99
WIND MILL
TOWER
STRUCTURE
66.00
26. VESTAS RRB INDIA LTD., VRRB/PROJ/089
DT. 27.03.99
WIND MILL
TOWER
STRUCTURE
27.00
27. VESTAS RRB INDIA LTD., VRRB/PROJ/009
DT. 11.05.99
WIND MILL
TOWER
STRUCTURE
95.00
28. VESTAS RRB INDIA LTD., VRRB/PROJ/024
DT. 03.06.99
WIND MILL
TOWER
STRUCTURE
95.00
29. DAS LAGARWAY
WINDTURBINES LTD.,
033
DT. 30.08.99
WIND MILL
TOWER
STRUCTURE
131.00
30. DAS LAGARWAY
WINDTURBINES LTD.,
DLWL/BK/RCI/002
DT. 08.12.99.
WIND MILL
TOWER
STRUCTURE
65.50
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM DESCRIPTION
QUANTITY
(M.T.)
16. DAS LAGARWAY
WINDTURBINES LTD.,
616
DT. 13.02.98
WIND MILL TOWER
STRUCTURES
131.00
17. VESTAS RRB INDIA LTD., VRRB/PROJ/056/
DT. 13.02.98
225 KV WIND MILL
TOWER
STRUCTURES
500.00
18. VESTAS RRB INDIA LTD., VRRB/PROJ/007
DT. 03.06.98
WIND MILL TOWER
STRUCTURE
55.00
19. VESTAS RRB INDIA LTD., VRRB/PROJ/020
DT. 08.08.98
WIND MILL TOWER
STRUCTURE
81.00
20. DAS LAGARWAY
WINDTURBINES LTD.,
39
DT. 02.09.98
WIND MILL TOWER
STRUCTURE
131.00
21. VESTAS RRB INDIA LTD., VRRB/PROJ/078
DT. 09.08.98
WIND MILL TOWER
STRUCTURE
68.00
22. DAS LAGARWAY
WINDTURBINES LTD.,
64/98-99
DT. 05.01.99
WIND MILL TOWER
STRUCTURE
131.00
23. VESTAS RRB INDIA LTD., VRRB/PROJ/045
DT. 09.01.99
WIND MILL TOWER
STRUCTURE
54.00
24. REPL ENGINEERING
LTD.,
REPL/PO/GUJ/1999/
04
DT. 27.02.99
WIND MILL TOWER
STRUCTURE
66.00
25. REPL ENGINEERING
LTD.,
REPL/PO/GUJ/1999/
05
DT. 04.03.99
WIND MILL TOWER
STRUCTURE
66.00
26. VESTAS RRB INDIA LTD., VRRB/PROJ/089
DT. 27.03.99
WIND MILL TOWER
STRUCTURE
27.00
27. VESTAS RRB INDIA LTD., VRRB/PROJ/009
DT. 11.05.99
WIND MILL TOWER
STRUCTURE
95.00
28. VESTAS RRB INDIA LTD., VRRB/PROJ/024
DT. 03.06.99
WIND MILL TOWER
STRUCTURE
95.00
29. DAS LAGARWAY
WINDTURBINES LTD.,
033
DT. 30.08.99
WIND MILL TOWER
STRUCTURE
131.00
30. DAS LAGARWAY
WINDTURBINES LTD.,
DLWL/BK/RCI/002
DT. 08.12.99.
WIND MILL TOWER
STRUCTURE
65.50
31. SUZLON ENERGY LTD., SEL/PROD/LC/004/9
9-2000
DT. 20.12.99
WIND MILL TOWER
STRUCTURE
1340.00
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
ITEM DESCRIPTION
QUANTITY
(M.T.)
32. VESTAS RRB INDIA LTD., VRRB/PROJ/141
DT. 28.12.99
30 MTRS. TOWER
MATERIALS
35.00
33. VESTAS RRB INDIA LTD., VRRB/PROJ/145
DT. 07.01.2000
50 MTRS.
EXTN.TOWER
MATERIALS
176.60
34. DAS LAGARWAY
WINDTURBINES LTD.,
DLWL/BK/RCI/030
DT. 20.01.2000
WIND MILL TOWER
STRUCTURE
277.20
35. VESTAS RRB INDIA LTD., VRRB/PROJ/161
DT. 25.01.2000
50 MTRS.
EXTN.TOWER
MATERIALS
67.50
36. VESTAS RRB INDIA LTD., VRRB/PROJ/183
DT. 02.02.2000
50 MTRS.
EXTN.TOWER
MATERIALS
40.50
37. VESTAS RRB INDIA LTD., VRRB/PROJ/216
DT. 26.02.2000
50 MTRS.
EXTN.TOWER
MATERIALS
40.50
38. SUZLON ENERGY LTD., SEL/DMN/LC/PCM02
/99-2000
DT. 09.03.2000
WIND MILL TOWER
STRUCTURE
335.00
39. SUZLON ENERGY LTD., SEL/DMN/PROD/053
/99-2000
3488.00
40 SUZLON ENERGY LTD., SEL/DMN/PROD/080
/99-2000
DT. 07.04.2000
1670.00
41. VESTAS RRB INDIA LTD., VRRB/VED/045
DT. 18.05.2000
TUBULAR TOWER 4 SETS
42. VESTAS RRB INDIA LTD., VRRB/PROJ/56
DT. 06.06.2000
30 MTRS. TOWER
MATERIALS
8.00
43. VESTAS RRB INDIA LTD., VRRB/PROJ/95
DT. 19.07.2000
30 MTRS. TOWER
MATERIALS
46.80
44. VESTAS RRB INDIA LTD., VRRB/PROJ/137
DT. 22.08.2000
11 SETS
45. VESTAS RRB INDIA LTD., VRRB/PROJ/153
DT. 30.08.2000
40 MTRS. TOWER
MATERIALS
41.20
46. VESTAS RRB INDIA LTD., VRRB/PROJ/172
DT. 14.09.2000
LATTICE TYPE
TOWER
MATERIALS
286.80
47. VESTAS RRB INDIA LTD., VRRB/PROJ/335
DT. 29.12.2000 STRUCTURE
288 MT
48. VESTAS RRB INDIA LTD., VRRB/PROJ/245
DT. 01.01.2001 STRUCTURE
800 MT
49. VESTAS RRB INDIA LTD., VRRB/PROJ/351
DT. 18.01.2001 STRUCTURE
288 MT
SR.
NO.
PARTY’S NAME & ADDRESS
P.O.REFRENCE
& DATE
ITEM DESCRIPTION
QUANTITY
(M.T.)
50. GOLDEN NON-
CONVENTIONAL ENERGY
STS. PVT. LTD.,
VERBAL
DTD: 22.03.02
WIND MILL TOWER
STRUCTURE
175 MT
51. PIONEER WINCON LTD., 007/2002-2003
DT. 04.04.2002
WIND MILL TOWER
STRUCTURE
560 MT
52. VESTAS RRB INDIA LTD., VRRB/PROJ/038
DT. 14.05.2002 STRUCTURE
600 MT
53. SUZLON ENERGY LTD., SEL/DMN/1000/000207
/2002-2003
DT. : 04.07.2002
STRUCTURE
37.50
54. SUZLON ENERGY LTD., SEL/DMN/LC –
1MW/008/2002 – 2003
DT. : 04.07.2002
WIND MILL TOWER
STRUCTURE
710.00
55. SUZLON ENERGY LTD., SEL/DMN/1250000290/
2002 – 2003
DT. : 13.07.2002
WIND MILL TOWER
STRUCTURE
1200 MT
56. SUZLON ENERGY LTD., SEL/DMN/LC –
1.25MW/002/2002 –
2003, DT. : 17.10.2002
WIND MILL TOWER
STRUCTURE
3500 MT
57. VESTAS RRB INDIA LTD., VRRB/PROJ/200212040
407, DT. 04.12.2002 STRUCTURE
230 MT
58. PIONEER WINCON LTD., 056/2003-2004
DT. 02.01.2003
WIND MILL TOWER
STRUCTURE
300 MT
59. SUZLON ENERGY LTD., SEL/DMN/LC –
1.25MW/001/2003 –
2004, DT. : 11.04.2003
WIND MILL TOWER
STRUCTURE
6766 MT
60. VESTAS RRB INDIA LTD., VRRB/PROJ/053
DT. 30.04.2003
WIND MILL TOWER
STRUCTURE
2200 MT
61 GOLDEN NON-
CONVENTIONAL ENERGY
STS. PVT. LTD.,
VERBAL
DTD: 06.08.2003
WIND MILL TOWER
STRUCTURE
150 MT
62. VESTAS RRB INDIA LTD., VRRB/PROJ/515
DT. 09.09.2003
WIND MILL TOWER
STRUCTURE
1800 MT
63. GOLDEN NON-
CONVENTIONAL ENERGY
STS. PVT. LTD.,
VERBAL
DTD: 20.02.2004
WIND MILL TOWER
STRUCTURE
50 MT
64. VESTAS RRB INDIA LTD., VRRB/PROJ/028
DT. 19.04.04
WIND MILL TOWER
STRUCTURE
4000 MT
65. SUZLON ENERGY LTD., SEL/DMN/LC/1250/AM/
000003/2004-2005
DT. 30.04.04
WIND MILL TOWER
STRUCTURE
6532 MT
66. NEPC INDIA LTD NEPC/IL/BMEI-LT/PR-
SK/3346
DT. 15.05.04
WIND MILL TOWER
STRUCTURE
6000 MT
67. PIONEER WINCON LTD 43
DT. 13.07.04
WIND MILL TOWER
STRUCTURE
150 MT
68. VESTAS RRB INDIA LTD., VRRB/PROJ/333
DT. 30.07.2004
WIND MILL TOWER
STRUCTURE
2000 MT
69. TTG INDUSTRIES LTD WE-PUR 001
DTD: 19.04.2005
WIND MILL TOWER
STRUCTURE
605 MT
SR.
NO.
PARTY’S NAME & ADDRESS
P.O.REFRENCE
& DATE
ITEM
DESCRIPTION
QUANTITY
(M.T.)
70. INDIA WIND POWER LTD IWPL/BME/05-06/1
DTD: 01.08.2005
50 MT
71. VESTAS RRB INDIA LTD VRRB/PROJ/028
DTD: 29.04.05
4100 MT
73. SHRIRAM EPC LTD WE-SEPC-PONDY-0001-A5
DTD: 10.04.06
WIND MILL
TOWER
STRUCTURE
795 MT
74. SHRIRAM EPC LTD 200604023
DTD: 10.04.06
WIND MILL
TOWER
STRUCTURE
685 MT
75. PIONEER WINCON LTD 072/06-07
DT. 26.04.06
WIND MILL
TOWER
STRUCTURE
1500 MT
76. VESTAS RRB INDIA LTD VRRB/PROJ/1023
DTD: 12.08.06
6848 MT
77. VESTAS RRB INDIA LTD VRRB/PROJ/1024
DTD: 12.08.06
6420 MT
78. VESTAS RRB INDIA LTD VRRB/PROJ/1025
DTD: 12.08.06
765 MT
79. VESTAS RRB INDIA LTD VRRB/PROJ/1026
DTD: 12.08.06
510 MT
80. SHRIRAM EPC LTD 200604023 A-3
DTD: 27.09.06
WIND MILL
TOWER
STRUCTURE
1845 MT
81. SHRIRAM EPC LTD 200609039
DTD: 27.09.06
WIND MILL
TOWER
STRUCTURE
1365 MT
82. PIONEER WINCON LTD 316/06-07
DT. 29.12.06
WIND MILL
TOWER
STRUCTURE
710 MT
83. PIONEER WINCON LTD 0708041
DT. 19.05.07
WIND MILL
TOWER
STRUCTURE
11 MT
84. SHRIRAM EPC LTD 200705005
DTD: 03.05.07
WIND MILL
TOWER
STRUCTURE
910 MT
85. PIONEER WINCON LTD 0708129
DT. 27.07.07
WIND MILL
TOWER
STRUCTURE
2380 MT
83 CHETTINAD ENERGY
PVT. LTD
CHE/026/07-08
DT. 02.01.08
WIND MILL
TOWER
STRUCTURE
260 MT
84 RRB ENERGY LIMITED 4609100426 DTD.
08.07.2009
125 MT
85 PIONEER WINCON LTD 0910030 DTD.
17.08.2009
596.33
MT
A LIST OF ORDER SUCCESSFULLY EXECUTED FOR CABLE
TRAYS & ACCESSORIES
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
INSPECTION
QUANTITY
(M.T.)
01. KELTRON CONTROLS
DIVN.,AROOR 688 534
[ KERALA ]
KSA/FC/GFN/8111-3180
DT : 09.01.88 KELTRON 8.50
02. KELTRON CONTROLS
DIVN.,AROOR 688 534
[ KERALA ]
KSA/FC/VSP/8111-3285
DT : 25.05.88 KELTRON 17.50
03. KELTRONCONTROLS
DIVN.,AROOR 688 534
[ KERALA ]
KSA/FC/VSP/900-835 DT :
16.08.88
KELTRON 05.06
04. BHARAT HEAVY PLATE &
VESSELS LTD.
MM/4/7844-54-016/BG/AE
DT : 09.04.88 BHPV 15.75
05. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR
G/851414
DT : 24.05.1988 GIL 12.00
06. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR
G/851653
DT : 24.11.1988
GIL
NYLON
13.00
07. JYOTI LIMITED.,
CONTRACT DIVISION,
– 390 009.
H/CONTRACT/600
222/NPC - 142/88
DATED : 23.09.88
JYOTI 1.00
08. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
PPCL/471/94/88/5701
DT : 02.11.1988
PPCL/EIL
[IPCL-
NAGOTHANE]
26.35
09. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
PPCL/473/93/5884 DT :
07.01.1988
PPCL/EIL
[PETROFILS]
2.35
10. KELTRON CONTROLS
DIVN.,AROOR 688 534
[ KERALA ]
KCA/EC/EMR/900 161
DT : 05.01.89 KELTRON 03.33
11. KELTRON CONTROLS
DIVN.,AROOR 688 534
[ KERALA ]
KCA/EC/EMR/800 227
DATED : 06.04.89 KELTRON 05.85
12. KELTRON CONTROLS
DIVN.,AROOR 688 534
[ KERALA ]
KCA/EC/ONGC/800 345
DATED : 22.09.89 KELTRON 05.60
13. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
PPCL/471/INST/89/1149
DATED : 07.02.89
PPCL/EIL
ONGC
8.00
14. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
PPCL/471/INST/89/4424
DATED : 11.08.89
PPCL/EIL
ONGC
16.65
15. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
PPCL/475/INST/93/95/48
33 PPCL/EIL 10.95
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
INSPECTION
QUANTITY
(M.T.)
16. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
.
PPCL/474/97/89/3703
DATED : 14.07.89 PPCL/GFC/UDH
E
4.00
17. TYLORE INSTRUMENTS
CO. LTD.,
E-88720/A30L881
DATED : 16.02.89
EIL
[ PETROFILES ]
58.85
18. TYLORE INSTRUMENTS
CO. LTD.,
E-890 461/ A30L 881 DT :
15.01.89
EIL
[ PETROFILES ]
1.50
19.
TYLORE INSTRUMENTS
CO. LTD.,
E-900247/ A30L 881 DT :
19.07.89
TAYLOR/EIL
[ PETROFILES ]
4.65
20.
ESSAR STEEL LTD.,
HAZIRA.
DATED : 08.06.89
L & T 35.00
21. GUJARAT NARMADA
VALLEY FERTILIZERS
LTD., BHARUCH.
PROJ/MPP/9652/ALV/4320
DATED : 04.08.89 GNFC 3.00
22. GUJARAT INSTRUMENTS
LTD.,GANDHINAGAR.
G 852 815
DATED : 17.04.90
GIL/GEB
GANDHINAGAR
2.70
23. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 852 818
DATED : 17.04.90
GIL
[ IPCL/GOP ]
3.00
24. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 852 820
DATED : 17.04.90
GIL
[ ONGC ]
3.60
25. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 852 953
DATED : 20.04.90
GIL
[ GEB KLIPS ]
4.85
26. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 852 630
DATED : 20.04.90
GIL
[ GEB KLIPS ]
3.75
27. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 852 628
DATED : 24.04.90
GIL
GANDHINAGAR
5.75
28. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 853 021
DATED : 01.09.90
GIL
[ AECO ]
8.60
29. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 853 025
DATED : 01.09.90
GIL
GEB
GANDHINAGAR
4.35
30. GUJARAT INSTRUMENTS
LTD., GANDHINAGAR.
G 853 087
DATED : 24.09.90
GIL
[ ONGC ]
2.00
31. REUNION ENGINEERING
CO. LTD., .
BRD/129/SMD/10/90 DT :
24.05.90
1.00
32.
CONSTRUCTIONS
.
PC/121/94/694
DATED : 23.08.90 EIL/PDIL
ONGC GANDHAR
4.95
33. PROJECT &
DEVELOPMENT INDIA
LTD., .
PDS/2394/20/20/2229
DATED : 03.09.90
EIL/PDIL
[ IOCL/HCP ]
6.95
34. SPIC – SMO
.
SMO/933/I/003
DATED : 27.09.90
SPIC/EIL
[ IOCL/HCP ]
45.00
35. SPIC – SMO
.
SMO/CAP/I/014
DATED : 27.09.90
SPIC/EIL
[ IOCL/HCP ]
35.00
36. SPIC – SMO SMO/CAP/I/014
DATED : 12.12.90
SPIC 1.00
37. LINDE PROCESS TECHNO-
LOGIES INDIA LTD., .
HA01/0021/0026
DATED : 11.12.90
LPT 7.00
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
INSPECTION
QUANTITY
(M.T.)
38. SYSCON ENGINEERS
PVT. LTD., .
SEPL/PO/90/500
DATED : 17.12.90
EIL
[ IOCL-GHP ]
1.75
39. BHARAT HEAVY PLATE &
VESSELS LTD.,
MM/4/1509-41-008/9951
DATED : 09.04.91 BHPV 01.70
40. BHARAT HEAVY PLATE &
VESSELS LTD.,
MM/4/5390/CP-42/2231
565 DATED : 20.07.91 BHPV 10.50
41. BHARAT HEAVY PLATE &
VESSELS LTD.,
MM/4/710149 040/CSG/81
/ 2331576 BHPV 02.75
42. BHARAT HEAVY PLATE &
VESSELS LTD.,
MM/4/5441/CP42/2231964
DATED : 12.10.91 BHPV 04.25
43. SPIC – SMO SMO/933/1/003
DATED : 07.01.91
EIL
[ IOCL-GHP ]
8.50
44. SPIC – SMO SMO/933/1/003
DATED : 14.03.91
EIL/SPIC
[ IOCL-GHP ]
6.50
45. SPIC – SMO SMO/933/1/004
DATED : 22.07.91
EIL/SPIC
[ IOCL-GHP ]
13.50
46. SPIC – SMO SMO/933/1/003
DATED : 08.08.91
EIL/SPIC
[ IOCL-GHP ]
2.00
47. SYSCON ENGINEERS
PVT. LTD., .
SEPL/PO/ME/90/263
DATED : 24.04.91
EIL
[ PETROFILS ]
2.70
48. THE AHMEDABAD
ELECT-RICITY CO. LTD.,
AHMEDABAD.
B/227/4/4984
DATED : 16.02.91 AECO 176.50
49. THE AHMEDABAD
ELECT-RICITY CO. LTD.,
AHMEDABAD.
B/227/4/4984
DATED : 13.06.91 AECO 139.00
50. THE AHMEDABAD
ELECT-RICITY CO. LTD.,
AHMEDABAD.
B/227/4/2972
DATED : 25.09.91 AECO 17.40
51. STEELWORKS
CONSTRUCTION LTD.,
SRV/TVM/242/91/432
DATED : 16.07.91
HACL/NM
DASTOR
100.00
52. STEELWORKS
CONSTRUCTION LTD.,
SRV/TVM/242/91/712
DATED : 19.08.91
HACL/NM
DASTOR
10.00
53. BHARAT HEAVY PLATE &
VESSELS LTD.,
MM / 4 / 4004- 41-
016/PP51 / 3131548
DATED : 03.08.92
EIL 2.60
54. BHARAT HEAVY PLATE &
VESSELS LTD.,
MM/4/4405/PP91/3131980
DATED : 30.10.92 BHPV 2.00
55. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
PPCL/483/484/94/92/348
DATED : 16.01.92
PPCL
[ JOB ]
2.00
56. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
.
PPCL/477/INSTRUMANTATI
ON/92/1948
DATED : 06.04.92
PPCL 20.00
57. SPIC SMO SMO/INST/GHP/BARODA/
002 DATED : 29.09.92
EIL/SPIC
[ IOCL ]
4.80
SR.
NO.
PARTY’S NAME &
ADDRESS
P.O.REFRENCE
& DATE
INSPECTION
QUANTITY
(M.T.)
58. SPIC SMO SMO/933/TRAY/003
DATED : 29.09.92
EIL/SPIC
[ IOCL ]
6.50
59. SYSCON ENGINEERS
PVT. LTD.,
SEPL/BME/PO/92/123
DATED : 31.03.92
EIL
[ GAIL-LPG ]
21.50
60. SEA HAWK CARGO
CARRIERS PVT. LTD., DATED : 16.02.92
SEA HAWK
[ ANPARA-TPS ]
UP-GOVT
DESIGN
800.00
61. THE AHMEDABD
ELECTRICITY CO. LTD.,
AHMEDABD.
IB/227/4/2972
DATED : 30.06.92
AEICO
[ GEB -
GANDHINAGAR
]
7.50
62. NUCLEAR POWER
CORPN. OF ANUSHAKTI
NAGAR,
MEQ/KAIGA 182 2462 / /
330
DATED : 03.06.92
NPC 167.00
63. BEST & CROMPTON
ENGINEE-RING LTD., .
BRD/21/716
DATED : 25.08.92
B & C
[ ONGC CTF
NAVASARI ]
8.60
64. BEST & CROMPTON
ENGINEE-RING LTD., .
BRD/21/759
DATED : 21.10.92
B & C
[ ONC
NAVAGAM ]
4.00
65. KELTRON CONTROLS
DIVN.
AROOR
CRL/3/301134
DATED : 04.02.93
KELTRON
[ CRL ]
12.50
66. BHARAT HEAVY PLATE &
VESSELS LTD., .
MM / 4 / 7112 / CSG / 81 /
4331298
DATED : 10.06.93
BHPV 05.00
67. BHARAT HEAVY PLATE &
VESSELS LTD., .
MM / 4/ 4013 / CSG / 81 /
43317011
DATED : 08.09.93
BHPV
[ ONGC-
NAVAGAM ]
20.00
68. BHARAT HEAVY PLATE &
VESSELS LTD., .
MM/4/5497-41/CP-51
2321925
DATED : 15.10.93
BHPV 10.00
69. BHARAT HEAVY PLATE &
VESSELS LTD., .
MM/4/7143 72 006 /CSG
51 4331932
DATED : 18.10.93
BHPV 04.00
70. ESSAR LIMITED.,
HAZIRA [SURAT].
P13/2,102.1/L/207
DATED : 05.05.93
ESSAR 150.00
71. ESSAR LIMITED.,
HAZIRA [SURAT].
P13/2,102.1/L/310
DATED : 01.09.93 ESSAR 105.00
72. ESSAR LIMITED.,
HAZIRA [SURAT].
P13/3,35.21/L/394
DATED : 01.09.93
ESSAR 65.00
73. ESSAR LIMITED.,
HAZIRA [SURAT].
P13/1,58.10/L/398
DATED : 03.09.93
ESSAR 300.00
74. ESSAR LIMITED.,
HAZIRA [SURAT].
P13/1,58.10/L/706
DATED : 04.12.93 ESSAR
63.00
75. ESSAR LIMITED.,
HAZIRA [SURAT].
P13/2,102.1/L/740
DATED : 05.12.93
ESSAR 20.00
76. ESSAR LIMITED.,
HAZIRA [ ].
P13/1,58.10/L/800
DATED : 27.12.93
ESSAR 25.00
SR.
NO.
PARTY’S NAME & ADDRESS
P.O.REFRENCE
& DATE
INSPECTION
QUANTITY
(M.T.)
77. BEST & CROMPTON
ENGINEE-RING LTD., .
BRD/21/802
DATED : 07.01.93
B & C
[ MIDC ]
5.60
78. BEST & CROMPTON
ENGINEE-RING LTD., .
BRD/21/810
DATED : 20.01.93
B & C
[ STEL CO. ]
50.00
79. BEST & CROMPTON
ENGINEE-RING LTD., .
BRD/21/821
DATED : 08.02.93
B & C
[ STEL CO. ]
6.00
80. ARVIND COTSPIN LTD.,
[ E.O.U. UNIT ] AHMEDABAD
ACL/ENG/035/SUPPLIM
ENTARY DATED :
07.01.93
ARVIND 6.25
81. ARVIND COTSPIN LTD.,
[ E.O.U. UNIT ] AHMEDABAD
ACL/ENG/038
DATED : 20.01.93 ARVIND 30.00
82. ARVIND COTSPIN LTD.,
[ E.O.U. UNIT ] AHMEDABAD
ACL/ENG/050
DATED : 07.04.93 ARVIND 5.00
83. ARVIND INTEX LTD.,
AHMEDABAD.
CAP/ORD/93-43
DATED : 13.03.93
ARVIND 25.00
84. ARVIND MILLS LTD.,
AHMEDABAD.
D-BA/215
DATED : 27.04.93
ARVIND 6.75
85. TATA CHEMICAL LTD.,
BOMBAY..
WOC/67M274/ELEC/C-
4254/9 DATED :
03.11.93
TATA 6.00
86. BHARAT HEAVY PLATE &
VESSELS LTD.,
VISHAKHAPATNAM.
MM/4/4013/CSG/81/
4332436
DATED : 09.02.94
BHPV 5.20
87. BHARAT HEAVY PLATE &
VESSELS LTD.,
VISHAKHAPATNAM.
MM/4/4011/CSG/81/
4332572
DATED : 19.03.94
BHPV 5.60
88. ESSAR LIMITED.,
HAZIRA [ ].
P13/1,61.10/L/955
DATED : 04.08.94
ESSAR 6.00
89. ARVIND COTSPIN LTD.,
[ E.O.U. UNIT ] AHMEDABAD
ACL/ENG/0038
DATED : 03.01.94
ARVIND 19.00
90. ARVIND COTSPIN LTD.,
[ E.O.U. UNIT ] AHMEDABAD
ACL/ENG/010/94
DATED : 25.05.94 ARVIND 20.00
91. ARVIND COTSPIN LTD.,
[ E.O.U. UNIT ] AHMEDABAD
ACL/ENG/065/93-94
DATED : 25.01.94
ARVIND 2.00
92. ARVIND COTSPIN LTD.,
[ E.O.U. UNIT ] AHMEDABAD
ACL/K/71
DATED : 22.10.94
ARVIND 5.00
93. ARVIND MILLS LTD.,
AHMEDABAD.
D-BA/DDP/3851
DATED : 27.01.94 ARVIND 4.00
94. BHARAT HEAVY PLATE &
VESSELS LTD.,
VISHAKHAPATNAM.
MM/4/40215 4707/CP-
51/5232256
DATED : 17.01.95
EIL 40.00
95. BHARAT HEAVY PLATE &
VESSELS LTD.,
VISHAKHAPATNAM.
MM/4/402155030/CP-
91 / 5232548
DATED : 28.03.95
EIL/BHPV 10.00
SR.
NO.
PARTY’S NAME & ADDRESS
P.O.REFRENCE
& DATE
INSPECTION
QUANTITY
(M.T.)
96. BHARAT HEAVY PLATE
& VESSELS LTD., .
MM/4/716459009/CCS-
91/ 6231783
DATED : 20.09.95
EIL/BHPV 10.00
97. BHARAT HEAVY PLATE
& VESSELS LTD., .
MM/4/5517/40002/CP-
51/
DATED : 27.10.95
EIL/BHPV 20.00
98. THE AHMEDABD
ELECTRICITY CO. LTD.,
AHMEDABD.
B-227/4/1278
DATED : 30.06.95
AEC
5.00
99. THE AHMEDABD
ELECTRICITY CO. LTD.,
AHMEDABD.
B-227/4/2552
DATED : 31.08.95 AEC 5.00
100. THE AHMEDABD
ELECTRICITY CO. LTD.,
AHMEDABD.
B-227/4/1278
DATED : 11.02.95 AEICO 50.00
101. ARVIND MILLS LTD.,
AHMEDABAD.
CG/95/00047
DATED : 11.02.95 AML 1.00
102. ARVIND MILLS LTD.,
AHMEDABAD.
CG/95/00073
DATED : 06.03.95
AML 2.00
103. ARVIND MILLS LTD.,
AHMEDABAD.
CG/95/00117
DATED : 21.04.95
AML 2.00
104. TATA CHEMICAL LTD.,
.
MYPCC/P/851/39M055/I
NS -3039/C.4862 DT
: 11.01.95
TATA 6.00
105. INGERSOLL-RAND
AHMEDABAD.
UUB/B0595/287
DATED : 09.08.95
INGERSOLL 5.00
106. INGERSOLL-RAND
AHMEDABAD.
UUB/B0595/287
DATED : 09.08.95
INGERSOLL 2.00
107. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
,RACE COURSE, .
PPCL/AP/328/CABLE
TRAY/ 96/741
DATED : 25.01.96 PPCL
10.00
108. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
, RACE COURSE, .
PPCL/AP/500/CABLE
TRAY/ 96/741
DATED : 13.04.96 PPCL
05.00
109. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
, RACE COURSE, .
PPCL/503/CT/ 96/5129
DATED : 14.06.96
PPCL
10.00
110. TATA CHEMICAL LTD., 769/WOC/GENCAP/71M
115/ING20019 C.553
DATED : 04.11.96
TATA 5.00
111. PASCHIM PETRO CHEM
LTD., .
LOI/PPL/TRAY/96/87
DATED : 11.06.96
PPL/EIL 5.00
112. AIR LIQUIDE ENGINEERING
INDIA LTD., 3-5.874, PLOT
NO. 15, HYDERGUDA,
LAEI/1006/08/863/PUR
/113
DATED : 29.01.96
ALEI/EIL 75.00
113. AIR LIQUIDE ENGINEERING
INDIA LTD., 3-5.874, PLOT
NO. 15, HYDERGUDA,
LAEI/1007/08/863/PUR
/082
DATED : 29.01.96
ALEI/EIL 80.00
114. AIR LIQUIDE ENGINEERING
INDIA LTD., 3-5.874, PLOT
NO. 15, HYDERGUDA,
.
LAEI/1008/07/764/PUR
/074
DATED : 12.04.96
ALEI/EIL 5.00
SR.
NO.
PARTY’S NAME & ADDRESS
P.O.REFRENCE
& DATE
INSPECTION
QUANTITY
(M.T.)
115. AIR LIQUIDE ENGINEERING
INDIA LTD., 3-5.874, PLOT
NO. 15, HYDERGUDA,
LAEI/1008/07/764/PU
R/074
DATED : 12.04.96
ALEI/EIL 5.00
116. AIR LIQUIDE ENGINEERING
INDIA LTD., 3-5.874, PLOT
NO. 15, HYDERGUDA,
LAEI/011/1008/074/9
6/7888
DATED : 10.05.96
ALEI/EIL 10.00
117. AIR LIQUIDE ENGINEERING
INDIA LTD., 3-5.874, PLOT
NO. 15, HYDERGUDA,
LAEI/1008/08/863/PU
R/096
DATED : 28.08.96
ALEI/EIL 10.00
118. SPIC-JEL ENGINEERING
CONSTRUCTION LTD.,
S – 7 THIRUVIKA
INDUSTRIAL ESTATE,
GUNDY, .
SJCL/BWE/CT/997
DATED : 05.03.96
SJCL 10.00
119. SPIC-JEL ENGINEERING
CONSTRUCTION LTD.,
S – 7 THIRUVIKA
INDUSTRIAL ESTATE,
GUNDY,
SJCL/BWE/CT/1042
DATED : 23.03.96
SJCL 5.00
120. STRUTHERS WELLS CORP –
ORATION PENNA U. S. A.
95-2830350/619
DATED : 16.08.96 SWC/EIL/BHEL 10.00
121. GE PLASTIC INDIA LTD.,
PLASTIC AVENUE
P. O. JAWAHAR NAGAR
VADODARA.
GEPI/ED/200/
DATED : 10.04.96
GEP 05.00
122. GE PLASTIC INDIA LTD.,
PLASTIC AVENUE
P. O. JAWAHAR NAGAR
VADODARA.
GEPI/ED/408/200
DATED : 27.05.96
GEP 05.00
123. BHARAT HEAVY PLATE &
VESSELS LTD.,
MM/4/7166/SE-
81/73311430
DATED : 04.05.96
BHPV 20.00
124. PARAMOUNT POLLUTION
CONTROLS PVT. LTD.,
, RACE COURSE, .
P/0500/P.O./
510/04/971460
DATED : 15.05.97 PPCL
10.00
125. INGERSOLL-RAND
AHMEDABAD.
UB/DSK/45128
DATED : 05.09.96
INGERSOLL 5.00
126. AIR LIQUIDE ENGINEERING
INDIA LTD., 3-5.874, PLOT
NO. 15, HYDERGUDA,
ALEI/1013/86300/97-
98/3060
DATED : 03.12.97
ALEI/EIL 10.00
127. GE PLASTIC INDIA LTD.,
PLASTIC AVENUE
P. O. JAWAHAR NAGAR
VADODARA.
GEPI/ED/97/908
DATED : 16.01.97
GEP 05.00
128. NICCO CORPORATION LTD.,
505, A & B STERLING
CENTRE, ALKAPURI,
VADODARA.
C-142/P/E/0293
DATED : 29.05.97
NICCO
20.00
129. METRO TRANSLEC PVT.
LTD., PANCHARATNA, 2ND
FLOOR ALKAPURI,
VADODARA.
VERBLE
DT. 05.10.97
METRO 25.00
Final power point teckno profile
Final power point teckno profile
Final power point teckno profile

Más contenido relacionado

La actualidad más candente

05120 steel &amp; structure
05120 steel &amp; structure05120 steel &amp; structure
05120 steel &amp; structureVinay Yadav
 
Andrew Trilford CV - 2015
Andrew Trilford CV - 2015Andrew Trilford CV - 2015
Andrew Trilford CV - 2015Andy Trilford
 
RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)roncan1
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)atiq amin
 
Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16Jeremy Hardin
 
CV Riaz Khan
CV Riaz KhanCV Riaz Khan
CV Riaz KhanRiaz Khan
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsIndiaMART InterMESH Limited
 

La actualidad más candente (20)

Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
JAECO Brochure- 2017
JAECO Brochure- 2017JAECO Brochure- 2017
JAECO Brochure- 2017
 
05120 steel &amp; structure
05120 steel &amp; structure05120 steel &amp; structure
05120 steel &amp; structure
 
Garry Hursts CV
Garry Hursts CVGarry Hursts CV
Garry Hursts CV
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
Steel Tube Mill Instrument by K s-electromech-private-limited
Steel Tube Mill Instrument by K s-electromech-private-limitedSteel Tube Mill Instrument by K s-electromech-private-limited
Steel Tube Mill Instrument by K s-electromech-private-limited
 
Gabriel Gichinga Gen tech
Gabriel Gichinga Gen techGabriel Gichinga Gen tech
Gabriel Gichinga Gen tech
 
RyanResumeUpdated (2015
RyanResumeUpdated (2015RyanResumeUpdated (2015
RyanResumeUpdated (2015
 
Andrew Trilford CV - 2015
Andrew Trilford CV - 2015Andrew Trilford CV - 2015
Andrew Trilford CV - 2015
 
RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)
 
Kptl final report
Kptl final reportKptl final report
Kptl final report
 
CHRIS ROBINSON'S CV
CHRIS ROBINSON'S CVCHRIS ROBINSON'S CV
CHRIS ROBINSON'S CV
 
Ddj welding
Ddj weldingDdj welding
Ddj welding
 
Viswanath_AMD
Viswanath_AMDViswanath_AMD
Viswanath_AMD
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
 
Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16
 
ENG SAID C.V...
ENG SAID   C.V...ENG SAID   C.V...
ENG SAID C.V...
 
CV Riaz Khan
CV Riaz KhanCV Riaz Khan
CV Riaz Khan
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
 

Similar a Final power point teckno profile

resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
Company profile.
Company profile.Company profile.
Company profile.Ankur Patel
 
20150721 epd structural_tube_postverifica_02 (2) (1)
20150721 epd structural_tube_postverifica_02 (2) (1)20150721 epd structural_tube_postverifica_02 (2) (1)
20150721 epd structural_tube_postverifica_02 (2) (1)Bahaa Eldin Mahmoud
 
Edifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentationEdifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentationRajib Ghosh
 
Presentacion exco (ingles) dec 19 11
Presentacion exco (ingles) dec 19 11Presentacion exco (ingles) dec 19 11
Presentacion exco (ingles) dec 19 11minotta
 
Constant Power Solutions Company Profile
Constant Power Solutions Company ProfileConstant Power Solutions Company Profile
Constant Power Solutions Company ProfileStephen Lucas
 
power transformers in india, Earthing Transformers
power transformers in india, Earthing Transformerspower transformers in india, Earthing Transformers
power transformers in india, Earthing TransformersB and C Energy Infra Pvt Ltd
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 newRamez Nasr
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiaseo27poogle
 
Introduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. LtdIntroduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. LtdPrasanta Adhikary
 
Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)SKLP1905
 
BROCHURE_SKLP
BROCHURE_SKLPBROCHURE_SKLP
BROCHURE_SKLPRony AS
 
Shyam cable catalogue
Shyam cable catalogueShyam cable catalogue
Shyam cable catalogueuibsamit87
 
Transpower Switchgear Industries, Mumbai, Electrical Products
Transpower Switchgear Industries, Mumbai, Electrical ProductsTranspower Switchgear Industries, Mumbai, Electrical Products
Transpower Switchgear Industries, Mumbai, Electrical ProductsIndiaMART InterMESH Limited
 

Similar a Final power point teckno profile (20)

Sei ppt
Sei pptSei ppt
Sei ppt
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Company profile.
Company profile.Company profile.
Company profile.
 
20150721 epd structural_tube_postverifica_02 (2) (1)
20150721 epd structural_tube_postverifica_02 (2) (1)20150721 epd structural_tube_postverifica_02 (2) (1)
20150721 epd structural_tube_postverifica_02 (2) (1)
 
Company brochure
Company brochureCompany brochure
Company brochure
 
Edifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentationEdifice engineering enterprise pvt. ltd. presentation
Edifice engineering enterprise pvt. ltd. presentation
 
Presentacion exco (ingles) dec 19 11
Presentacion exco (ingles) dec 19 11Presentacion exco (ingles) dec 19 11
Presentacion exco (ingles) dec 19 11
 
Constant Power Solutions Company Profile
Constant Power Solutions Company ProfileConstant Power Solutions Company Profile
Constant Power Solutions Company Profile
 
Makpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in IndiaMakpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in India
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
 
power transformers in india, Earthing Transformers
power transformers in india, Earthing Transformerspower transformers in india, Earthing Transformers
power transformers in india, Earthing Transformers
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in India
 
Introduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. LtdIntroduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. Ltd
 
Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)
 
BROCHURE_SKLP
BROCHURE_SKLPBROCHURE_SKLP
BROCHURE_SKLP
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
Shyam cable catalogue
Shyam cable catalogueShyam cable catalogue
Shyam cable catalogue
 
CV 2016 .
CV 2016 .CV 2016 .
CV 2016 .
 
Transpower Switchgear Industries, Mumbai, Electrical Products
Transpower Switchgear Industries, Mumbai, Electrical ProductsTranspower Switchgear Industries, Mumbai, Electrical Products
Transpower Switchgear Industries, Mumbai, Electrical Products
 

Último

India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 

Último (20)

Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 

Final power point teckno profile

  • 2.
  • 3. OFFICE : TECKNO A-216, RAJLAXMI APPT. OPP. HARIBHAKTI EXTN. OLD PADRA ROAD, VADODARA – 390 007 GUJARAT, INDIA. MOBILE NO: 0091 98250 07851 PH.NO: 0091 265-2335621/2310880 FAX NO: 0091 265-2310880 MO. NO: 0091 9712997852 E-MAIL : sales@teckno.co.in tecknoindia@gmail.com Web Site: www.teckno.co.in
  • 4. INDEX SR. NO. DESCRIPTION PAGE NO. 1 INTRODUCTION 6 2 BRIEF PRODUCT RANGE 7 3 MANUFACTURING FACILITIES 10 4 PLANT & MACHINERY 11 5 QUALITY ASSURANCE PLAN FOR STRUCTURES 12 6 GALVANISING PLANT AND PROCESS 22 7 A LIST OF IN-HOUSE TESTING FACILITY 23 8 OUR INDIAN SATISFIED CUSTOMERS 24 9 OUR ABROAD SATISFIED CUSTOMERS 25 10 LIST OF ABROAD CUSTOMERS 26 11 A LIST OF ORDERS SUCCESSFULY EXECUTED FOR EXPORTS 28 12 A LIST OF ORDERS SUCCESSFULY EXECUTED FOR EXPORTS FOR DESIGN CALCULATION & DRAWINGS 37 13 LIST OF INDIAN CUSTOMERS 39 14 A LIST OF MAJOR ORDER SECURED (FOR B.M) STRUCTURES SUCCESSFULLY EXECUTED 42 15 A LIST OF ORDERS SUCCESFULLY BOOKED AND EXECUTED FOR PGCIL BY MEI GROUP OF INDUSTRIES 43 16 A LIST OF ORDERS SUCCESFULLY EXECTED FOR WIND MILL TOWER STRUCTURES (FOR B.M) 53 17 A LIST OF ORDER SUCCESSFULLY EXECTED FOR CABLE TRAYS & ACCESSORIES 58 ►ALL PRODUCTS ARE MANUFACTURED AT OUR ASSOCIATED CONCERNS◄
  • 5. INTRODUCTION FOR ALMOST TWO DECADES M/S. TECKNO , A JOINT STOCK COMPANY HAS BEEN DESIGNING, MANUFACTURING AND ERECTING THE TRANSMISSION LINE TOWERS, SUBSTATION / SWITCH YARD STRUCTURES, WINDMILL TOWERS AND CABLE TRAYS & SOLAR PHOTO VOLTIC SUPPORT STRUCTURES. OUR THIS LONG EXPERIENCE GUARANTEES,FUNCTIONALITY AND COMPLETE OPERATIONAL SAFETY. WE HAVE A SOUND TECHNO – COMMERCIAL STRENGTH AND THAT PRECISELY GIVES US AN EDGE OVER OTHERS IN THIS FIELD. WE ARE IN THE APPROVED VENDOR’ S LIST WITH SOME OF THE LEADING COMPANIES LIKE ABB., SIEMENS LTD., TATA’S, LARSEN & TUBRO., ESSAR OIL., RELIANCE, NATIONAL THERMAL POWER CORPOATION. BHEL.,TO NAME A FEW OF OUR PRESTIGIOUS CLIENTS IN ABROAD LIKE GALFAR ENGINEERING & CONTRACTING, POWERTECH ENGINEERING, AL-HASSAN ENGINEERING CO., LARSEN & TOUBRO, GLOBAL CORP ENTERPRISE, SAUDI NATIONAL CONTRACTING CO., AL- HASSAN TRADING & CONTRACTING CO. LOCATED IN SULTANATE OF OMAN. WE ARE SELF SUFFICIENT IN MANUFACTURING , INSPECTION FACILITY. WE HAVE ESTABLISHED SYSTEMS, PROCEDURES AND DOCUMENTATION.
  • 6. PROPRIETOR INTRODUCTION : MR. NARENDRA SHARMA PASSED B. TECH FROM M.S. UNIVERSITY, BARODA IN THE YEAR 1980 WITH THE SECOND POSITION. JOINT M/S. ASEA BROWN BOVERI LTD IN 1982 AND BY VITUE OF PERFORMANCE WAS CONFIRMED WITHIN 6 MONTHS INSTEAD OF 1 YEAR. HE WORKED WITH PROJECT ENGINNERING DEPARTMENT OF M/S. ASEA BROWN BOVERI UPTOFEBRUARY 1984. 1ST MARCH 2004 ONWARDS, WORKED WITH M/S CROMPTON GREAVES LTD.,AS A MARKETING ENGINEER. TWICE IN TENOR OF 6 YEARS, WAS AWARDED MAN OF THE QUARTER BY THE VIRTUE OF EXCELLENT PERFORMANCE UNDER 178 MARKETING ENGINEERS. DURING THE ASSOCIATION WITH M/S CROMPTON GREAVES LTD, HAD BOOKED ORDER FOR FIRST INDIGINOUS 11KV FLAME PROOF MOTOR AGAINST STIFF INTERNATIONAL COMPETITION FOR MGCC (IPCL) NAGORTHNE PROJECT. LEFT M/S CROMPTON GREAVES LTD. IN OCT 1991, THAN PLUNGGED INTO THE BUSINESS. TODAY GIVING CONSULTANCY FOR ELECTRICAL SUBSTATIONS, DESIGNING OF WIND MILL TOWER AND DOING PHYSICAL EXPORTS OF ELECTRICAL OVERHEAD LINE.
  • 7. We have extensive expierence in the field of Transmission Line tower, by virtue of this we offer excellent competitive design. Towers supplied by us are working in vide range of ambient temperature from -10 C to 50 C. We offer Tower as per the international standard as desired by our valued customer. To provide the best available craftmenship, we extensively use CNC machines for the various operation to churn out the excellent error free product. All the material passes through the magnifing eye’s of our well experienced QC team. Finaly for excelent and long life materials is hot dip galvanized in the modern plant. 01. TRANSMISSION Line TOWER STRUCTURES : BRIEF PRODUCT RANGE
  • 8. 02. SWITCHYARD / SUB-STATION STRUCTURES : All sub station structures are manufactured from very standard steel procured from approved and reputed Rolling Mill. These steel section are artequaleted by our craftman with atmost care and under strict quality control of our Engineers, having couple of clouble experience. On demand we also provide pipe type support Structure. We follow International code to satisfy our customers spread over the world. All crafted material is than treated for corrosive protection by Hot dip galvanizing. We also assist our valued cusotmers by providing the total solution from designing to execution all under one roof.
  • 9. . 03. WIND MILL TOWER STRUCTURES : We offer custom made towers for wind Electric genrator from 225 KW to 1250 KW. Height of tower varries from 30 mts to 65 mts. Raw material is sourced from international market and processed to international standards. The finish of the product is done as per customer specification from Zn coating, PU plant to hot dip galvanizing. The only major alternative available to us after the fossile fuel is Wind Energy. To keep the place with the trend we started manufacturing of windmill tower since 1994. Till date we have successfully manfactured more than 4000 nos. of Wind Mill Towers.
  • 10. 04. CABLE TRAYS : We offer extensive range of cable trays, which are manufactured from stainless steel, CRC, HRC Sheet, Aluminium or FRP. We also offer extensive range of accessories for the cable tray, such as Elebow, (Left Right, Up Down) Tee, cross redusers. On demand of customers even cable tray with covers are offered. For the protection of these cable trays against corroesion we offer, painted or Hot dip Galvanized coating, as per demand of our valued customers.
  • 11. 05. TELECOM TOWERS LATTICE / PIPE: We offer a very wide range to telecom tower approved by SERC. Starting from Microwave, GSM roof top, ground Base (upto 90 mts and Wind speed of 260 KMPH). It is either from steel angles or pipe or even combination of both, as desired by customer. For the urban locations specially narrow base towers are also offered. Final touch is galvanized and if required followed by specific paint.
  • 12. 06. RAILWAY ELECTRIFICATION STRUCTURES: We cater to request of steel substation used for Railway electrification. They are mainly the column and Beam manufactured from high quality of steel sourced from the approved Rolling Mills. The final touch is given by our expert work force by way of cutting, drilling, welding e tc. Finally for a better and long life all structures are Hot dip galvanized for 130 microns.
  • 13. 07. CROSSARMS crossarms We have extensive experience in the field of crossarms. We offer excellent competitive rates of crossarms to our customers as per their demand. We have maintained huge range of products like Tie Brackets, Crossarms for terminal Poles, Cross arms for intermidiate poles, Crossarms for field Isolator, Crossarms for Auto recloser etc.. We follow International code to satisfy our customers spread over the world. For excellent and long life, the material is Hot Dip Galvanized or Painted as per the requirement of customer.
  • 14. . 08. SOLAR POWER PLANT STEEL SUPPORT STRUCTURES: 06. SOLAR POWER PLANT STEEL SUPPORT STRUCTURES : The use of renewable energy resources is increasing rapidly to reduce the dependency on fossil fuels. We offer extensive range of Support structures for solar panel PV Module systems. We offer special steel structures for mounting of solar modules from lattice, pipe ,hollow section, perlins, sigma profiles to meet the specific requirements of photovoltaic modules procured from world wide. The final touch is given by our expert work force by way of cutting, drilling, welding etc. Finally for a better and long life all structures are Hot dip galvanized for 86 to 127 microns.
  • 15. MANUFACTURING FACILITIES • TOTAL AREA : 85,000 SQUARE . FEET • BUILT UP AREA : 20,000 SQUARE . FEET • MAN – POWER :10 ENGINEERS 22 OFFICE STAFF 52 SKILLED WORKERS 47 SEMI-SKILLED WORKERS 50 CASUAL WORKERS • CAPACITY : A) 5000 MT. OF FABRICATION PER MONTH. B) 6,000 MT. OF GALVANIZING PER MONTH. CONSIDERING ALL 3 GALVANIZING PLANTS. • CONNECTED POWER : 500 KVA.
  • 16. PLANT & MACHINERY Sr No. DESCRIPTION OF MACHINERY 1. Vertical Turret lathe 3000 dia 2. Bench lathe 2500 dia 3. Angle Cutting Machine, make Aman, Capacity 110mm x 110 mm x 10 mm complete with 5 HP Bharat Bijlee make electric motor & accessories 4. Universal Cutting Machine, make NSIC, Plate cutting 120mm x 12mm , Bar cutting 30mm dia square 28 mm complete with accessories. 5. Power Press, Malra make Capacity 100 Ton, complete with 7.5 H.P local make electric motor & accessories- 02 nos. 6. Power Press, Shailesh make Capacity 60 Ton, complete with 5 H.P local make electric motor & accessories- 01 nos. 7. Power Press, Ambica make Capacity 20 Ton, complete with 5 H.P local make electric motor & accessories- 01 no. 8. Radial Drill Machine, make Maksons, Capacity 40mm, complete with 1 H.P Neophase make electric motor & accessories – 04 nos 9. EOT Crane, make AMT International of 5 M.T capacity with 1 M.T capacity (05 nos) Hoist & accessories 10 Galvanising Plant consisting of 04 Compartments for cleaning, Water, acid & water flushing covering 10m x 6m area each compartment having 1.5 m deep, constructed of Acid proof bricks, Cattle of 8m x 1m x 1.2m water quenching bath, Oil tanks (02 nos) of 1.4m x 7.62m x 1.6m size burners (04 nos), blowers of 24” size each with 5 H.P electric motor – Set 11 Electrical Control Panel 12 Welding Column & Boom Memco make 6m vertical length & 6m Horizontal length, wheel mounted, REMI make electric motor 5 H.P with Elecon make gear box ratio 20:13 set complete with accessories. 13 EOT Crane, make AMT International of 10 MT capacity with auxiliary crane of 3MT capacity complete with accessories-Set 14 Rotators (motorised), make V Weld Equipments with 1HP DC motor Elco make and Ratio Gear Box Elecon make – 10 Set 15 Hydraulic Pre Punching Rolling Machine, make “” capacity 3000mm x 25mm, complete with 25 H.P Bharat Bijlee make electric motor. And inbuilt gear box & accessories
  • 17. Sr No DESCRIPTION OF MACHINERY 16 Compressor, make Ingersoll- Sr. no: 389. Model : L 40 ASB, 163 cfm, 7Kg/cm2, complete with 40 H.P electric motor & accessories. 17 Weigh Bridge, make Avery Capacity 60 MT 18 Transformer, make Danke, Capacity 315 KVA, with main panel & change over switch. 19 Electrical Contract to M/s Shreeji Elec. Corporaton of entire premise, which includes work of cabling , wiring, street lights, high day fittings etc. 20 Bench Grinder Local make Cap 2 HP with double grinding wheel size10”diax1”thick (2002) 21 Bench Grinder Local make Cap 1 HP with double grinding wheel size 6” dia x 3/4” thick 2 nos (2003) 22 Radial Drill „ Sargodha „ Ludhiana make Cap 30mm, with Bharat Bijlee make 3HP electric motor 2 nos (2002) 23 Radial Drill „ Sargodha „ Ludhiana make Cap 50mm, with Bharat Bijlee make 3HP electric motor (2002) 24. Radial Drill „ Siddhpura‟ make Cap 40mm with Neophase make 3 HP electric Motor 4 no (2002 25. OH Crane AMT Intl. make Cap 12 ton. Long Travel 78MT x Cross Travel 12.5 MT with make 15 HP hoist, 10 HP 2 no, and 5 HP Delhi make inbuilt motors (2002) 26. Radial Drill‟ Prabhat‟ make Cap 38mm with 3 HP Neophase make electric motor 15 no (2003) 27. Radial Drill‟ Prabhat‟ make Cap 38mm with 3 HP Neophase make electric motor 15 no (2002) 28. Welding Machine „Standard‟ make. Cap 400 amp. Air Cooled. Wheel Mounted. 4 nos (2003) 29. Pillar drill „SIDDHAPURA‟ make . SR. No. S1/3/6/95 Cap 40 MM with 3 hp Neophase Make electric motor 10 nos (2003) 30. Radial Drill „Perfect‟ make. Mc no 867 Sr. no 35/1000. Cap 40 mm, with 2 HP Megha make electric motors (2003)
  • 18. 31. Radial Drill „KMT‟ make. Cap 40mm, automatic, with 2 HP Amgo make & 1 HP Megha make electric motor (2003) 32. Welding Boom „ Vandana Equipment‟ make. Wheel mounted. Vertical boom 3MT cross boom 3 MT with 2 HP local make 2 no, with Gear box Elecon make ratio30:1 with Job Rotator machine, 10HP DC motorinbuilt and 10 HP local make electric motor with Elecon make gear 33. Power Press Malara Punjab make. Cap 50 ton. With 7.5 HP local make electric motor 2 no. (2000) 34. Power Press „Mankoo‟ make. Cap 40 ton. With 7.5 HP local make electric motor (2000) 35. Shaping Machine „Sagar Ludhiana make Sr no 2386, Strike 24‟, with 5 HP EIE „ make electric motor (2001) 36. Mig Welding Machine „ Advani‟ make Sr. no 82/763, Model VCG –B31 /51 cap 400 amp with wire reel and stand , Torch , Cable etc, with control panel inbuilt (2001) 37. Mig Welding Machine „Quality Engg. „ make Mc. No: GCM 4 cap 400 amp. With wire reel and stand Torch, cable etc, with control panel inbuilt (2003) 38. Hyd.Power Press „Perfect Engg. ‟ make cap 40 ton & 15 ton, with common Power pack Sr. no.9508317. Combined unit inter coneected. (2002) 39. Angle cutting Power Press „‟ make cap 300 ton. To cut MS Angles 150 mm x 150mm x 20 thick with power pack unit & 7.5 HP make electric motor (2001) 40. Hyd. Power Press cap 300 ton with Power pack & 20 HP Crompton make electric motor. (2001) 41. Hyd. Power Press cap 500 ton with Power pack & 10 HP Crompton make electric motor. (2001) 42. Bore well „Lubi‟ make Submersible pump cap 12.5 HP, 280 feet deep, housing 200mm dia with necessary fittings (2000) 43. Power Supply system complete. Sr No DESCRIPTION OF MACHINERY
  • 19. QUALITY ASSURANCE PLAN FOR STRUCTURE PARTICULARS CHARACTRISTICS CLASSIFIC ATION QUANTUM REFERENCE ACCEPT NORMS AGENCY A] PROCUREMENT v STEEL SPECIFICATION MAJOR - AS PER AS PER Q C CONFORMATION SPN. SPN. DEPARTMENT v HARDWARE SPECIFICATION MAJOR - AS PER AS PER Q C CONFORMATION SPN. SPN. DEPARTMENT v ZINC SPECIFICATION MAJOR - AS PER AS PER Q C CONFORMATION SPN. SPN. DEPARTMENT v CHEMICAL SPECIFICATION MAJOR - AS PER AS PER Q C CONFORMATION REQ. REQ. DEPARTMENT B] INCOMING / STORES v STEEL P.O. CONFORMITY MAJOR 1% AS PER AS PER Q C P.O. P.O. DEPARTMENT v HARDWARE P.O. CONFORMITY MAJOR 1% AS PER AS PER Q C P.O. P.O. DEPARTMENT v ZINC P.O. CONFORMITY MAJOR 1% AS PER AS PER Q C P.O. P.O. DEPARTMENT C] PREPARATION OF SHOP FLOOR DRG. D] PROTO ASSEMBLY PROCESS. E] PROTO ASSEMBLY INSPECTION. F] LOAD TEST OF PROTO MODEL ( IF REQUIRED ) G] MANUFACTURING PROCESS. H] CONFORMITY CHECK WITH PROCESS DRAWING. I ] RANDOM INSPECTION BEFORE GALVANIZING. J] GALVANIZING PROCESS : DEGREASING/RINSING/ PICKLING/RINSING /PRE-FLUXING/PRE- HEATING/ ZINC COATING/QUENCHING/ DICHROMATING. K] CONF0RMITY CHECK OF GALVANIZING AS PER THE REQUIREMENT. L] INSPECTION / TESTING. M] PACKING/DESPATCH. DETAILED QAP BEING SUBMITTED SEPARATELY.
  • 20. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 1. 1.1 1.1.1 (a) (b) (c) RAW MATERIAL Structural Steel ( Angle Sections, Plates & Bars ) Physical Properties Test for Ultimate Tensile Strength Test for Ultimate Tensile Strength Percentage Elongation Test One sample for 40 MT or part thereof for each size One sample for 40 MT or part thereof for each size One sample for 40 MT or part thereof for each size IS : 2062 Grade A / 410 N/mm2 min. IS : 2062 Grade A / < 20 mm thick 250 N/mm2 min. 20 to 40 mm thick 240 N/mm2 min. > 40 mm thick 230 N/mm2 min. IS : 2062 Grade A / 23 % QC Department. / Third Party lab QC Department. Third Party lab QC Department. / Third Party lab Steel as per IS : 2062 to be procured from Main Producers Verification of Manufacturer‟s Test Certificate Verification of Manufacturer‟s Test Certificate Verification of Manufacturer‟s Test Certificate 1.1.2. Chemical Composition One sample for 40 MT or part thereof for each size Is : 2062 Grade A/ Carbon 0.23 % max. Manganese 1.5 % max. Sulphur 0.05 % max. Phosphourus .05%.Silicon 0.4% max. Permissible limits of variation in products analysis from limits specified above. Cabon 0.02 % max. Manganese 0.05 % max. Sulphur 0.005 % max. Phophorus 0.005 % max. Silicon 0.05 % max. Manufactu Rers works/ QC Department. / Third party lab. Verification of Manufacturer‟s Test Certificate SECTION : R MATERIAL INSPECTION SECTION : RAW MATERIAL INSPECTION
  • 21. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testi ng Agenc y Remarks 1.1.3. 1.1.4. (a) 1.1.5. Dimensional checks Tolerances for leg length of Angles. Equal angles Upto 45 mm leg length > 45 to 100 mm leg length > 100 mm leg length Diameter Tolerance for Round Bars. IS 2500, level II, AQL- 1.5 as per Table I enclosed IS 2500 level II AQL 1.5 as per Table I enclosed. IS 2500, level II, AQL- 1.5 as per Table I enclosed IS 2500, level II, AQL- 1.5 as per Table I enclosed IS 2500, level II, AQL- 1.5 as per Table I enclosed IS 2062, IS 808, IS 1730, IS 1732 + 1.5 mm + 2.0 mm + 2.0 mm Difference between leg length of equal angles shall be limited to 75% of total tolerence (plus & minus) IS 2062 Grade A, IS 1732, IS 1852 Upto + 0.5 mm 25 mm >25 mm + 0.6 mm to 35 mm >35 mm + 0.8 mm to 50 mm > 50 mm + 1.0 mm to 80 mm > 80 mm + 1.3 mm to 100 mm >100 mm + 0.6 % of dia QC Depar tment. QC Depar tment. QC Depar tment. QC Depar tment. QC Depar tment. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. SECTION : R MATERIAL INSPECTION SECTION : RAW MATERIAL INSPECTION
  • 22. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 1.1.6. (a) (b) (c) 1.1.7 1.2. 1.2.1. 1.2.2. Weight Tolerance- For angle sections Upto 3 mm thick More than 3 mm thick Weight Tolerance for Plates Weight Tolerance for Bars Thickness Tolerance for Plates Zinc (To be procured from Hindustan Zinc Ltd. or imported through MMTC or sources approved) Chemical Composition For Zinc Ingot Chemical Composition for molten Zinc in the bath One sample for 40 MT/ Section or part thereof. One sample for 40 MT/ Section or part thereof. One sample for 40 MT/ Section or part thereof. IS 2500 level II AQL 1.5 as per Table I enclosed. One sample for 50 MT or part thereof. One sample every fortnightly IS 2062, IS 808, IS 1730, IS 1852 + 5% + 5 % & - 3 % Overweight specified in IS 808 IS 2062, IS 808, IS 1730, IS 1852,. +5% & -2.5% over weights specified in IS 1730 IS 1732, IS 1852 Upto + 7 % 10mm > 10 mm + 5 % to 16 mm > 16 mm + 3 % Overweight specified in IS 1730 IS 2062 , IS 1730, IS 1852. < 8 mm + 12.5 %, - 5.0 % 8 mm to 12 mm + 7.5 %, - 5.0 % > 12 mm + 5.0 % IS 209, IS 2629, IS 4699, IS 4759 Zinc required for galvanizing shall be of purity 98.5% as per IS 209. Molten metal in the galvanizing bath shall not contain zinc less than 97% by mass. QC Depart ment. QC Depart ment. QC Depart ment. QC Depart ment. QC Depart ment. Third party Indepen d- -ent lab. Third party Indepen d- -ent lab. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Verification of Manufacturer‟ s Test Certificate Review of lab test certificate at the time of final inspection. SECTION : R MATERIAL INSPECTION SECTION : RAW MATERIAL INSPECTION
  • 23. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 1.1.6. (a) (b) (c) 1.1.7 1.2. 1.2.1. 1.2.2. Weight Tolerance- For angle sections Upto 3 mm thick More than 3 mm thick Weight Tolerance for Plates Weight Tolerance for Bars Thickness Tolerance for Plates Zinc (To be procured from Hindustan Zinc Ltd. or imported through MMTC or sources approved) Chemical Composition For Zinc Ingot Chemical Composition for molten Zinc in the bath One sample for 40 MT/ Section or part thereof. One sample for 40 MT/ Section or part thereof. One sample for 40 MT/ Section or part thereof. IS 2500 level II AQL 1.5 as per Table I enclosed. One sample for 50 MT or part thereof. One sample every fortnightly IS 2062, IS 808, IS 1730, IS 1852 + 5% + 5 % & - 3 % Overweight specified in IS 808 IS 2062, IS 808, IS 1730, IS 1852,. +5% & -2.5% over weights specified in IS 1730 IS 1732, IS 1852 Upto + 7 % 10mm > 10 mm + 5 % to 16 mm > 16 mm + 3 % Overweight specified in IS 1730 IS 2062 , IS 1730, IS 1852. < 8 mm + 12.5 %, - 5.0 % 8 mm to 12 mm + 7.5 %, - 5.0 % > 12 mm + 5.0 % IS 209, IS 2629, IS 4699, IS 4759 Zinc required for galvanizing shall be of purity 98.5% as per IS 209. Molten metal in the galvanizing bath shall not contain zinc less than 97% by mass. QC Department . QC Department . QC Department . QC Department . QC Department . Third party Independ- -ent lab. Third party Independ- -ent lab. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Verification of Manufacturer‟s Test Certificate Review of lab test certificate at the time of final inspection SECTION : INPROCESS INSPECTION
  • 24. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 2.0 2.1. 2.1.1. 2.1.2. 2.1.3. 2.1.4. 2.1.5. (a) (b) (c) (d) 2.1.6 INPROCESS INSPECTION Fabrication of structure parts Straightening Cropping (Cutting) Stamping Punching / Drilling Edge Security For 13.5 mm dia hole For 17.5 mm dia hole For 21.5 mm dia hole For 25 mm dia hole Drilling & Punching Hole To Hole distance. 100 % 1st piece & every 50th piece. 1st piece & every 50th piece. 1st piece & every 50th piece. 1st piece & every 50th piece. 1st piece & every 50th piece. IS 802 Part II, IS 7215,shop sketches. - Length tolerance + 2 mm. The cut surface to be clean, reasonably square & free from distoration. Letter size Punching to be done for thickness upto 12 mm & drilling to be done for thickness above 12 mm. Holes near bends to be Punched/drilled after bending. Holes should be prependicular to surface &difference in dia on both sides of flange should not be more than 0.8 mm. IS 802 Part – II / Power Grid Specs. Sheared 20mm min Rolled 16 mm min. Sheared 23mm min Rolled 20 mm min. Sheared 28mm min Rolled 25 mm min. Sheared 38mm min Rolled 33 mm min. Tolerence cumula- tive & between consecutive holes shall be with +2 mm & +2 mm, respectively. QC Departme nt QC Departme nt QC Departme nt. QC Departme nt. QC Departme nt. QC Departme nt. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. SECTION : INPROCESS INSPECTION
  • 25. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 2.1.7. 2.1.8. 2.1.9. (a) (b) 2.1.1 0 (a) (b) (c) 2.1.1 1 Notching, Flange cut, Corner Cut , Bevel Cut. Heel Grinding Bending MS Sections MS Plates Welding Welding procedure including type of electrode used Welders‟ qualification Visual Examination Final inspection of Fabricated parts. 1st piece & every 50th piece. 1st piece & every 50th piece. 10 % pieces 10 % pieces 10 % pieces - - 100 % Random basis + 5 mm on specified length of cut operation by shearing upto 8mm thick & by gas cutting for material above 8 mm. For members >12mm thick,gas cutting to be adopted followed by griding IS 802 Part – II,IS 7215, shop sketches Process Cold Cold Hot Hot Cold Hot As per specification As per specification As per specification All parameters from 2.1.1. to 2.1.10 above are checked &records maintained before releasing materials for galvanizing. QC Department QC Department QC Department Section upto 75x6 upto 100x8 above 75x6 above 100x8 upto 12 mm thick others QC Department QC Department QC Department QC Department Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Angle Upto 10o Upto 5o Above 10o Above 5o Upto 15o . Records review at the time of final inspection. CIP on random basis at black stage. Records review at the time of final inspection. SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION
  • 26. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 3.0 4.0. 4.1. 4.1.1. 4.1.1. (a) (b) 4.1.2. 4.1.3. 4.2. 4.2.1. Prototype (Model ) Assembly as per requirements of Customer Galvanizing Process Control Degreasing in Hydrochloric Acid solution. Pickling Inhibitor to be added to prevent over pickling. Acid content Iron content Rinsing Pre Heating Dipping ( Galvanizing ) Zinc bath temperature continuous monitory One structure of each type. One sample daily One sample daily. One sample daily. One sample daily. - Hourly checks To be assembled & checked for dimension angle size to verify Interchangabilit y of members etc. IS 2629, plant standards. Strength of solution between 4 to 12%. IS 2629, plant standards. 40-180 gms/litre. IS 2629, plant standards. 120 gms/litre max. IS 2629, plant standards. PH value shall be between 5 & 9. IS 2629, plant standards. 700 C to 1100 C IS 2629, plant standards. 445 to 465o C. QC Department QC Department QC Department QC Department QC Department QC Department QC Department Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. - Records review at the time of final inspection. SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION
  • 27. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 4.2.2. 4.2.3. 4.2.4. 4.3. 4.3.1. 4.3.2. Immersion time & withdrawal time. Quenching in Running Water Dichromating For Exports Galvanizing Checks Visual Checks Thickness of zinc coating (i) For Angle Sections & Plates. - - One sample daily. 100 % 3 samples / shift IS 2629, plant standards. Articales to be immersed till the reaction takes place which is indicated by stoppage of bubbling. Withdrawal to be controlled so that zinc drains freely. - IS 2629, plant standards. Standard strength of solution to be maintained at 1% of Sodium Dichromate & 0.5% of Sulphuric Acid. IS 2629, IS 1367, IS 4218, Surface to be free from defects like bare/black spots, (except when small & suitable for patching) heavy ash & flux inclusions, lumps, pimples, runs etc. For foundation bolts visual Examination shall be carried out by thread guage. Galvanized external threads shall not be recut. IS 2629, IS 4759, Min. 65 microns for thickness < 5 mm & Min. 86 microns for thickness > 5 mm. QC Departme nt - QC Departme nt QC Departme nt QC Departme nt Records review at the time of final inspection. - Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION
  • 28. Sr. No. Component / Operation & Description of Test Sampling Plan Ref. Document & Acceptance Norm Testing Agency Remarks 4.3.3. 4.3.4. 4.3.5. Weight of zinc coating for Angle sections, Plates & Anchor Bolts. Uniformity of zinc coating Adhesion test of zinc coating (Pivot Hammer Test) samples / shift samples / shift 3 samples / shift IS 2629, IS 4759, IS 6745, IS 2629, IS 2633, Material to withstand 4 dips of one minute each without showing signs of copper deposits IS 2629, IS 2633, No removal or lifting of coating in areas between hammer impressions. QC Departm ent QC Departm ent QC Departm ent Records review at the time of final inspection. Records review at the time of final inspection. Records review at the time of final inspection. SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION Note: In the event of Export orders the respective codes will get replace with BS Standards.
  • 29. GALVANISING PLANT AND PROCESS [A] GALVANISING SHOP: 1. Degreasing Tank 2. Rinsing Tank. 3. Pickling Tank 4. Pre-Fluxing Tank 5. Washing Tank 6. Hot Plate System 7. Zinc Baths 8. Quenching Tank 9. Dichromating Tank [B] HOT DIP GALVANISING PROCESS : 1.Degreasing 2. Pickling 3.Rinsing 4.Pre-Fluxing 5.Pre-Heating 6.Dipping in molten ZINC 7.Quenching 8.Dichromating
  • 30. A LIST OF IN - HOUSE TESTING FACILITY 1.0.DIMENSIONAL CHECKING OF PHYSICAL PROPERTIES : Vernier, Micrometer, Gauge etc. 2.0.GALVANISATION TEST FACILITY 2.1.STRIPPING TEST: For Zinc Coating Thickness as per the procedure IS – 4759 AND IS – 6745. 2.2.UNIFORMITY OF ZINC COATING TEST: As per the procedure of IS-2633 2.3.ADHESION TEST: As per the procedure of IS-2629 If Purchase desire, third Party Test Report, M/S. E. R. D. A. and M/S. MET HEAT ENGINEERS approved and Standard Laboratories located very near to our workshop. • Physical & Chemical properties are checked at third party Laboratory.
  • 31. OUR INDIAN SATISFIED CUSTOMERS :
  • 32. OUR ABROAD SATISFIED CUSTOMERS
  • 33. A LIST OF ABROAD CUSTOMERS : 1. MINISTRY OF ELECTRICITY & WATER, (DUBAI) 2. STRUTHERS WELLS CORPORATION WARREN PENNA (U.S.A.) 3. DULMISON (AUSTRALIA) 4. GENERAL ELECTRONICS & TRADING CO. (OMAN) 5. ABB (U S S R) 6. GHANA ELECTRICITY CO. (GHANA) 7. GOLDEN INTERNATIONAL EST. L.L.C. 8. ALSTOM EXPORT (FRANCE) 9. SEA HAWK CARGO CARRIERS PVT. LTD., (JAPAN) 10. EC EOTECNIA (SPAIN) 11. BONUS (DENMARK) 12. SUDWIND (GERMENY) 13. VESTAS (DENMARK) 14. AL – HASSAN TRADING & CONTRACTING CO. L.L.C. (OMAN) 15. AL – HASSAN ELECTRICAL CO. L.L.C. (OMAN) 16. BLUE STAR ENTERPRISES L.L.C. 17. MASHIRA ELECTRICALS (U.A.E.) 18. MAM INT’L GENERAL TRADING (U.A.E.) 19. NICO INTERNATIONAL FUJAIRAH
  • 34. A LIST OF ABROAD CUSTOMERS : 20. CEYLON AMBUJA CEMENTS (SRILANKA) 21. SCIENTECHNIC (U.A.E.) 22. SCAN ELECTROMECHANICAL CONT. CO. L.L.C. 23. SKYLIGHT ELECTRIC WARE TRADING LLC 24. AL-HASSAN ENGINEERING CO. S.A.O.G. [OMAN]. 25. CIVIL CONTRACTING CO. LLC [OMAN]. 26. LARSEN & TOUBRO ELECTROMECH LLC [OMAN]. 27. GALFAR ENGINEERING & CONTRACTING L .L. C. 28. LARSEN & TOUBRO [OMAN] L.L.C. 29. SHEIDA INTERNATIONAL LLC [OMAN]. 30. AL FALAHY COMPANY LLC. 31. ARABIAN INDUSTRIES LLC. 32. GLOBAL CORP ENTERPRISE LLC. 33. POWERTECH ENGINEERING LLC. 34. SAUDI NATIONAL CONTRACTING CO. LTD.
  • 35. A LIST OF ORDERS SUCCESSFULLY EXECUTED FOR EXPORTS SR NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 1. MAM INT’L GENERAL TRADING U.A.E.) 112 DT. : 25.07.98 32,800=00 CROSSARM & OVERHEAD LINE MATERIAL 2. MAM INT’L GENERAL TRADING (U.A.E.) 114 DT. : 05.12.98 1,320=00 CROSSARM & OVERHEAD LINE MATERIAL 3. MAM INT’L GENERAL TRADING (U.A.E.) 115 DT. : 15.12.98 9,174=00 CROSSARM & OVERHEAD LINE MATERIAL 4. GENERAL ELECTRONICS (OMAN) GET/98079/BME DT. : 08.12.98 39,455=32 33 KV SUB STATION STRUCTURE 5. GENERAL ELECTRONICS (OMAN) GET/99009/BME DT. : 20.02.98 10,200=00 33 KV SUB STATION STRUCTURE 6. GENERAL ELECTRONICS (OMAN) GET/99012/BME DT. : 01.03.99 14,560=00 33 KV SUB STATION STRUCTURE 7. GENERAL ELECTRONICS (OMAN) GET/99013/BME DT. : 04.03.99 1,945=00 33 KV SUB STATION STRUCTURE 8. A.B.B. LIMITED (OMAN) BL/43170 DT. : 03.07.98 16,000=00 132 KV SUBSTATION STRUCTURE 9. CROMPTON LIMITED (OMAN) 13495 DT. : 04.06.99 1,40,624=00 132 KV SUBSTATION STRUCTURE 10. CROMPTON LIMITED (OMAN) 13499 DT. : 04.06.99 30,450=00 132 KV SUBSTATION STRUCTURE 11 AL – HASSAN TRADING (OMAN) AHC/B 123/PO-21 DT. : 08.12.99 20,839=00 33 KV SUBSTATION STRUCTURE 12 AL – HASSAN TRADING (OMAN) AHC/B 124/PO-20 DT. : 08.12.99 17,830=00 33 KV SUBSTATION STRUCTURE 13. MAM INT’L GENERAL TRADING (U.A.E.) 1008 DT. : 06.12.99 5,596=00 GANTRY STRUCTURE 14. AL – HASSAN TRADING (OMAN) AHC/B 124/PO-27 DT. : 20.01.2000 2,11,000=00 132 KV SUBSTATION STRUCTURE 15. AL – HASSAN TRADING (OMAN) AHC/B 123/PO-25 DT. : 19.12.2000 4,250=00 SWITCHYARD STRUCTURE 16. AL– HASSAN ELECTRICAL (OMAN) 786/LC 3369/AHE/98 DT. : 07.03.2000 39,072=05 33 KV SUBSTATION STRUCTURE 17. MASHIRA ELECTRICAL (U.A.E.) METCO/SKS/6269- B/00 DT. : 19.04.2000 14,799=15 CROSSARM & OVERHEAD LINE MATERIAL 18. MASHIRA ELECTRICAL (U.A.E.) ME/BMEI/246 DT. : 08.06.2000 20,833=00 11/ 33 KV SUBSTATION STRUCTURE
  • 36. SR NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 19. MASHIRA ELECTRICAL (U.A.E.) ME/BMEI/290 DT. : 30.08.2000 16,843=00 11/ 33 KV SUBSTATION STRUCTURE 20. AL– HASSAN ELECTRICAL (OMAN) AHE/RKH/OC – 011 DT. : 18.09.2000 64,943=00 HARDWARE 21. AL – HASSAN ELECTRICAL 786/LC 3432/AHE/00 DT. : 05.10.2000 62,594=00 TANSMISSION LINE TOWER & PARTS 22. Al– HASSAN ELECTRICAL(OMAN) 434 DT. : 10.10.2000 30,165=00 33 KV SUBSTATION STRUCTURE 23. Al– HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO – 017 DT. : 31.10.2000 3,32,940=0 0 132/33/11 KV SUB STATION STRUCTURE 24. AL – HASSAN ENGINEERING CO. S.A.O.G. 786/CAD- 1588/AHE/00 DT. : 11.11.2000 15,048=50 33 KV SUBSTATION STRUCTURE 25. AL – HASSAN ENGINEERING CO. S.A.O.G. AHC 117198 DT. 21.12.2000 1,620=00 FOUNDATION BOLT 26. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/MUK/B127/ PO-04/01 DT. : 25.02.2001 29,173=00 FOUNDATION BOLT / HARDWARE 27. AL – HASSAN ENGINEERING CO. S.A.O.G. 786/CAD- 1624/AHE/01 DT. : 26.03.2001 857=50 SUPPORT CHANNEL 28. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO- 062 DT. : 04.07.2001 12,982=00 SUPPORT STRUCTURE DULY GALVANISED 29. MASHIRA ELECTRICAL (U.A.E.) METCO/ES/6347/0 1 DT. : 10.07.2001 1,942=50 FIXING PLATE 30. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO- 062 DT. : 15.07.2001 26,723=00 SUPPORT STRUCTURE DULY GALVANISED 31. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO- 065 DT. : 30.07.2001 1,57,500=0 0 SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 132 KV S/S. 32. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO- 085 DT. : 15.09.2001 1,354=00 FOUNDATION BOLT & GI COVER FOR CABLE TRAY FOR 33 KV S/S. 33. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO- 091 DT. : 23.10.2001 22,500=00 SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 33 KV S/S. 34. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO- 092 DT. : 27.10.2001 20,796=00 MS CABLE TRAYS.
  • 37. SR NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 35. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO-095 DT. : 08.11.2001 30,235=00 MS CABLE TRAYS DULY GALVANIZED 36. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO-106 DT. : 22.12.2001 13,762=00 MS CABLE TRAYS DULY GALVANIZED 37. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO-091 (AMMENDMENT) DT. : 23.01.2002 10,465=00 SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 33 KV S/S. 38. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B126/PO-26 DT. : 26.01.2002 4,420=00 SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 33 KV S/S. 39. BIAX METALS [U.K.] BM/JL/2083/01-02 DT. 26.09.01 15,000=00 FIDDER PILLARS 40. BIAX METALS [U.K.] BM/TL/155/02-03 DT. 27.07.02 40,000=00 FIDDER PILLARS 41. BIAX METALS [U.K.] BM/TL/280/03-04 DT. 02.05.03 10,000=00 FIDDER PILLARS 42. AMBUJA CEMENTS (SRILANKA) CACPL/KALINA/FJA /0301/6765 DT. 16.04.03 22,958=00 SUPPLY OF SPARES FOR CEMENT STORAGE & BAGGING FACILITY AT , - SRILANKA 43. SCIENTCHNIC [U.A.E.] OBD 83/02 42,000=00 CROSSARMS 44. SCIENTCHNIC [U.A.E.] OBD 77/02 5,607=00 CROSSARMS 45. SCAN ELECTROMECHANICA L CONT. CO. L.L.C 1894 DTD: 19.12.2004 30,500=00 GI STRUCUTE FOR TRANSMISSON 46. MOHAN EXPORTS [INDIA] PVT. LTD [ELECTRICITY CO. OF GANA] PD/GH/14 DTD: 27.11.2004 4,54,863=00 CROSSARMS 47. AL – HASSAN ENGINEERING CO. S.A.O.G AHEC/BSM/B168/P O-35 DTD: 24.04.2005 1,36,500=00 220KV OVERHEAD LINE STRUCTURES 48. AL-HASSAN ENGG. CO. S.A.O.G. AHEC/BSM/B171/P O-0023 DTD:16.05.2005 28,887=50 132 KV OVERHEAD LINE STRUCTURES 49. AL-HASSAN ENGG. CO. S.A.O.G. AHEC/BSM/B179/P O-0011 DTD:08.01.2006 7,25,500=00 132 KV OVERHEAD LINE STRUCTURES
  • 38. SR NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 50. CIVIL CONTRACTING CO. LLC [OMAN] C-031/0708/CIV- BME/L/001/06 DTD: 12.08.06 40,750=00 132 KV OVERHEAD LINE STRUCTURES 51. LARSEN & TOUBRO ELECTROMECH LLC, [OMAN] 335/ 2110 / KM / RBM DTD: 16.07.06 2,00,000=00 SUBSTATON STRUCTURES 52. LARSEN & TOUBRO [OMAN] LLC LTO/PTD/193/SSSR M/PO/019 DTD:25.12.06 16,800=00 132/33 KV OVERHEAD LINE STRUCTURES 53. GALFAR ENGINEERING & CONTRACTIONG LLC [OMAN] 010077 DTD: 13.12.06 4,92,551=43 CROSSARM & OVERHEAD LINE MATERIAL 54. GALFAR ENGINEERING & CONTRACTIONG LLC 010139 DTD: 06.01.07 44,353=74 STAY ANCHOR 55. SHEIDA INTERNATIONAL CO. LLC [OMAN] SI/PO-BME/07 DTD:21.03.07 36,249=50 CROSSARM & OVERHEAD LINE MATERIAL 56. GALFAR ENGINEERING & CONTRACTIONG LLC 010634 DTD: 18.04.07 1,02,000=00 132 KV SUBSTATON STRUCTURES 57. SHEIDA INTERNATIONAL CO. LLC [OMAN] SI/PO-BME/17 DTD:30.05.07 1,72,227=00 CROSSARM & OVERHEAD LINE MATERIAL 58. LARSEN & TOUBRO [OMAN] LLC, LTO/PTD/204-A /PO/014 DTD:25.04.07 42,500=00 132/33 KV OUTDOOR SWITCHYARD STRUCTURES 59. CIVIL CONTRACTING CO. LLC [OMAN] PDO CONTRACT C310708 DTD: 14.07.07 8,601=00 132 KV SUBSTATON STRUCTURES 60. LARSEN & TOUBRO [OMAN] LLC, LTO/PTD/203/OMIF CO/PO/042-A-1 DTD:21.08.07 82,950=00 132 KV SUBSTATON STRUCTURES 61 GLOBAL CORP LLC [OMAN] GEC/OR/09- 03/PTE/BM DTD. 19.09.2009 7772.00 POLE BAND 62 GLOBAL CORP LLC [OMAN] GCE/OR/10-43/BM DTD. 31.10.2009 16719.50 CROSS ARMS 63 POWERTECH ENGINEERING LLC [OMAN] PTE/TECKNO/FO/0 59/2009/12 DTD. 10.12.2009 470000.00 HARDWARE / FASTENERS 64 GLOBAL CORP LLC [OMAN] GCE/OR/10- 41/TECKNO/AL TURKI DTD. 28.01.2009 4531.20 CROSS ARMS & ACCESSORIES
  • 39. SR NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 65 GLOBAL CORP LLC [OMAN] GEC/OR/10- 48/TECKNO/AL DTD. 06.02.2010 6512.00 POLE BAND 66 GLOBAL CORP LLC [OMAN] GCE/OR/10- 49A/TECKNO/IECC DTD. 20.02.2010 14423.68 CROSS ARMS & ACCESSORIES 67 GLOBAL CORP LLC [OMAN] GCE/OR/10- 158/TECKNO/IECC REV 1 DTD. 20.05.2010 52714.97 CONCRETE POLE ACCESSORIES 68 AL HASSAN ENGINEERING CO S.A.O.G [OMAN] AHEC/PROC/B195/ PO-44 DTD. 24.05.2010 62000.00 SUPPLY OF GANTRIES 69 GLOBAL CORP LLC [OMAN] GCE/OR/10- 169/TECKNO/AL TURKI DTD. 27.05.2010 6836.70 CROSS ARMS & CHANNEL 70 GLOBAL CORP LLC [OMAN] GCE/OR/10- 185/TK/IECC DTD. 26.06.2010 18773.66 OHLACCESSORIES 71 GLOBAL CORP LLC [OMAN] GCE/OR/10- 186/TK/IECC DTD. 26.06.2010 4968.98 OHL ACCESSORIES 72 GLOBAL CORP LLC [OMAN] GCE/OR/10- 205/TECKNO/AL TURKI DTD. 18.07.2010 23317.00 CROSS ARMS, POLE BAND & OTHER ACCESSORIES 73 GLOBAL CORP LLC [OMAN] GCE/OR/10- 211/TECKNO/IECC DTD. 25.07.2010 4794.77 OHL ACCESSORIES 74 GLOBAL CORP LLC [OMAN] GCE/OR/10- 218/TK/WAPI-Rev 1 DTD. 31.07.2010 75872.50 OHL ACCESSORIES 75 GLOBAL CORP LLC [OMAN] GCE/OR/10- 219/Teckno/IECC DTD. 01.08.2010 87947.24 OHL ACCESSORIES 76 GLOBAL CORP LLC [OMAN] GCE/OR/10- 237/Teckno/LNT DTD. 21.08.2010 7019.80 OHL ACCESSORIES 77 GALFAR ENGINEERING & CONTRACTING SAOG [OMAN] VP/MMU/3888/10 DTD. 15.09.2010 7150.00 SUPPLY OF SUPPORTING STEEL STRUCTURE
  • 40. SR NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 78 NATIONAL CONTRACTING CO. LTD NCC/OMAN/OETC/3 29/2010/PO/10 DTD. 05.10.2010 17,964.00 132KV GANTRY & CABLE SEALING END STRUCTURE 79 GLOBAL CORP LLC [OMAN] GCE/OR/10-283/TK DTD. 24.10.2010 87,86.00 OHL ACCESSORIES 80 GLOBAL CORP LLC [OMAN] GCE/OR/10- 303/TK/ DTD. 13.11.2010 95,877.73 OHL ACCESSORIES 81 GLOBAL CORP LLC [OMAN] GCE/OR/10- 304/TK/IECC DTD. 23.11.2010 2,885.34 OHL ACCESSORIES 82 AL HASSAN ENGINEERING CO. S.A.O.G [OMAN] AHEC/PROC/B198/ PO11 DTD. 14.12.2010 74,000.00 GANTRIES & EQUIPMENT STRUCTURE 83 LARSEN & TOUBRO (OMAN) LLC 002830/EPR00072 DTD. 14.12.2010 2,24,246.20 OHLHARDWARE ACCESSORIES 84 GLOBAL CORP LLC [OMAN] GCE/OR/10- 330/TK/PTE DTD. 20.12.2010 1,220.00 OHL ACCESSORIES 85 POWERTECH ENGINEERING LLC [OMAN] PTE/TECKNO/FO/0 89/2010/01-REV-1 DTD. 29.12.2010 67,581.38 CROSS ARMS & ACCESSORIES 86 GLOBAL CORP LLC [OMAN] GCE/OR/10- 330/TK/PTE DTD. 20.12.2010 1,220.00 OHL ACCESSORIES 87 LARSEN & TOUBRO [OMAN] LLC 002830/EPR00082 DTD. 01.01.2011 3,078.27 TIE STRUCTURES 88 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/11- 001/TK/PTE DTD. 02.01.2011 1,876.80 ANGLES & PLATES 89 LARSEN & TOUBRO [OMAN] LLC 002830/EPR00083 DTD. 02.01.2011 3,85,626.03 CROSS ARMS 90 GLOBAL CORP LLC [OMAN] GCE/OR/11- 009/TK/Stk-REV2 DTD. 05.01.2011 41,522.07 ANGLES & PLATES
  • 41. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 91 GLOBAL CORP LLC [OMAN] GCE/OR/11-041/TK DTD. 02.02.2011 4,050.00 GRID GAIN 92 GLOBAL CORP LLC [OMAN] GCE/OR/11-044/TK DTD. 08.02.2011 47,500.00 33KV SAND ROCK ANCHOR. 93 GALFAR ENGINEERING & CONTRACTING SAOG [OMAN] 4409295 DTD. 14.02.2011 7,150.00 SUPPORTING STRUCTURES 94 GALFAR ENGINEERING & CONTRACTING SAOG 4409294 DTD. 14.02.2011 17,400.00 SUPPORTING STRUCTURES 95 GLOBAL CORP LLC [OMAN] GCE/OR/11- 059/TK/L&T-Rev 1 DTD. 16.02.2011 28,784.63 HARDWARE 96 GLOBAL CORP LLC [OMAN] GCE/OR/11-060/TK /UEP DTD. 20.02.2011 7,236.00 SUPPORTING STRUCTURES 97 NATIONAL CONTRACTING CO. LTD [OMAN] NCC/OMAN/OETC/3 29/2010/PO/10/02 DTD. 05.03.2011 30,858.00 GANTRY & CABLE SEALING END STRUCTURE 98 GLOBAL CORP LLC [OMAN] GCE/OR/11- 041/TK-Rev 1DTD. 09.03.2011 6,250.00 GRID GAIN 99 GLOBAL CORP LLC [OMAN] GCE/OR/11-084/TK DTD. 12.03.2011 2,472.08 CROSS ARMS 100 GLOBAL CORP LLC [OMAN] GCE/OR/11-097/TK DTD. 27.03.2011 38,516.37 OHL ACCESSORIES 101 AL FALAHY COMPANY LLC [OMAN] 3414 DTD. 28.03.2011 53,000.00 33KV 102 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/11- 102/TK/PTE DTD. 29.03.2011 12,047.75 EQUIPMENT & SUPPORT STRUCTURES 103 POWERTECH ENGINEERING LLC [OMAN] PTE/096/PDO/LOI/ 2011 DTD. 25.04.2011 51,762.50 GANTRY & SWITCHYARD STRUCTURE
  • 42. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 103 POWERTECH ENGINEERING LLC [OMAN] PTE/096/PDO/LOI/ 2011 DTD. 25.04.2011 51,762.50 GANTRY & SWITCHYARD STRUCTURE 104 POWERTECH ENGINEERING LLC [OMAN] 1100001605 DTD. 12.05.2011 36,400.00 POLE BANDS 105 GLOBAL CORP LLC [OMAN]] GCE/OR/11- 040/TK/CIVILCO- REV2 DTD. 26.05.2011 2,60,913.30 GANTRY & EQUIPMENT STRUCTURES 106 GLOBAL CORP LLC [OMAN] GCE/OR/11- 165/TK/Stk DTD. 28.05.2011 15,000.00 EARTH PIT 107 GLOBAL CORP LLC [OMAN] GCE/OR/11- 178/TK/Stk DTD. 15.06.2011 49,194.01 CONCRETE POLE ACCESSORIES 108 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/11- 189/TK/STK DTD. 29.06.2011 1,474.00 POLE BAND 109 SAUDI NATIONAL CONTRACTING COMPANY LLC NCC/OMAN/OETC/8 5/2010/PO/16 DTD. 05.07.2011 8,26,20.00 GANTRY & EQUIPMENT SUBSTATION STRUCTURE 110 SAUDI NATIONAL CONTRACTING COMPANY LLC NCC/OMAN/OETC/7 4/2010/PO/035 DTD. 12.07.2011 1,44,112.50 GANTRY & EQUIPMENT SUBSTATION STRUCTURE 111 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/11- 207/TK/PDO DTD. 16.08.2011 78,692.80 CROSS ARMS & SAND ANCHORS 112 AL HASSAN ENGINEERING CO S.A.O.G [OMAN] AHEC/PROC/B200/ 2011/OPR-2973 DTD. 22.10.2011 17,615.00 SUPPLY OF 132KV GI SUPPORT STRUCTURE 113 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/11- 269/Teckno/Galfar DTD. 01.11.2011 41,200.00 SUPPLY OF COWSLIP CONDUCTOR 114 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/11-304/TK DTD. 22.12.2011 22,215.00 SUPPLY OF CROSS ARM 115 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12/016/T K DTD. 12.01.2012 9,200.00 SUPPLY OF GI SIGN BOARD
  • 43. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 116 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-022/TK DTD. 14.01.2012 5445.94 SUPPLY OF CROSS ARM & SWITCHRACK 117 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-021/TK DTD. 14.01.2012 23764.95 SUPPLY OF GI STEEL STRUCTURE 118 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-034/TK DTD. 29.01.2012 53674.80 SUPPLY OF CONCRETE POLE ACCESSORIES 119 POWERTECH ENGINEERING LLC [OMAN] PTE/117/TECKNO/ PO/2011/16 DTD. 18.02.2012 42,567.00 SUPPLY OF HARDWARE 120 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 049/Teckno DTD. 15.02.2012 95,850.00 METAL HOUSING EARTH PIT WITH COVER 121 LARSEN & TOUBRO [OMAN] LLC 003020/EPR00406 DTD. 15.02.2012 8236.05 SUPPLY OF EQUIPMENT STRUCTURE 123 LARSEN & TOUBRO [OMAN] LLC 003020/EPR00407 DTD. 15.02.2012 5994.00 SUPPLY OF EQUIPMENT STRUCTURE 124 BLUE STAR ENTERPRISES LLC [OMAN] 20122 DTD. 21.02.2012 50,560.00 SUPPLY OF STRUCTURE 125 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-067/TK DTD. 27.02.2012 58,252.00 SUPPLY OF CONCRETE POLE ACCESSORIES 126 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-077/TK DTD. 03.03.2012 18,798.50 SUPPLY OF CONCRETE POLE 127 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-099/TK DTD. 17.03.2012 2,030.50 SUPPLY OF CONCRETE POLE ACCESSORIES 128 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-121/TK DTD. 26.03.2012 8,320.50 SUPPLY OF CONCRETE POLE ACCESSORIES & COVER PLATE 129 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-134/TK DTD. 14.04.2011 29,820.00 METAL HOUSING EARTH PIT WITH COVER
  • 44. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 130 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-140/TK DTD. 19.04.2012 146850.21 SUPPLY OF CONCRETE POLE ACCESSORIES 131 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-149/TK DTD. 24.03.2012 11,031.00 CONCRETE POLE ACCESSORIES & COVER PLATE 132 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-150/TK DTD. 24.04.2012 7,891.65 SUPPLY OF 11/33KV STRUCTURES 133 POWERTECH ENGINEERING LLC [OMAN] PTE/TECKNO/FO/1 17/2012/21 DTD. 30.04.2012 1,62,000.00 SUPPLY OF 132KV GANTRY & SUPPORT STRUCTURE 134 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 159/TK/STK DTD. 03.05.2012 16,400.00 SUPPLY OF TINNED COPPER TUBE 135 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 183/TK/STK DTD. 15.05.2012 21,837.00 SUPPLY OF CONCRETE POLE ACCESSORIES 136 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-186/TK DTD. 19.05.2012 960.00 SUPPLY OF CROSS ARMS 137 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-201 DTD. 29.05.2012 18,983.64 SUPPLY OF CONCRETE POLE ACCESSORIES 138 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-204/TK DTD. 02.06.2012 19,390.00 SUPPLY OF SUPPORT STRUCTURE 139 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-205/TK DTD 03.06.2012 42,094.70 SUPPLY OF CONCRETE POLE ACCESSORIES 140 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-217/TK /Galfar DTD. 06.06.2012 99,919.45 SUPPLY OF CONCRETE POLE ACCESSORIES 141 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE//OR/12- 256/TK/STK DTD. 30.06.12 88,347.5 SUPPLY OF CROSS ARMS 142 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-267/TK DTD. 07.07.2012 19,390.00 POLE TOP COVER PLATE
  • 45. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 143 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR12- 289/TK/PDO/REV1 DTD. 25.07.2012 8,070.00 SUPPLY OF CROSS ARMS 144 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-295/TK DTD. 29.07.2012 1,05,120.00 AAC HAWTHORN CONDUCTOR 145 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-296/TK DTD. 29.07.2012 8,600.00 AAC HAWTHORN CONDUCTOR 146 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-319/TK DTD. 08.08.2012 3,646.20. SUPPLY OF GANTRY & SUPPORT STRUCTURES 147 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-322/TK DTD. 08.08.2012 16,868.00 DISTANCE PLATE 148 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-337/TK DTD. 12.08.2012 33,485.00 SUPPLY OF COVER PLATE & DISTANCE PLATE 149 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-349/TK dtd. 28.08.2012 16,050.00 SUPPLY OF SINGLE LINK & VERNIER PLATE 150 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12/359/T K/PTE Dtd. 05.09.2012 44,562.32 SUPPLY OF CONCRETE POLE ACCESSORIES 151 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 398/TK/ GCM DTD. 29.09.2012 22,865.18 11/33KV GANTRY & SUPPORT STRUCTURES 152 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-408/TK dtd. 04.10.2012 9,295.00 SUPPLY OF STEEL PLATE 153 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-430/TK DTD. 15.10.2012 2,83,390.97 SUPPLY OF CONCRETE POLE & ACCESSORIES 154 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-445/TK DTD. 22.10.2012 58459.45 SUPPLY OF CONCRETE POLE & ACCESSORIES 155 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-446/TK DTD. 22.10.2012 75,000.00 SUPPLY OF CONCRETE POLE ACCESSORIES
  • 46. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 156 POWERTECH ENGINEERING LLC [OMAN] 1100007542 & 1100007587 DTD. 13.11.2012 30,217.00 SUPPLY OF GANTRY & EQUIPMENT SUPPORT STRUCTURES 157 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-460/TK – REV1 DTD 04.11.2012 58,397.67 SUPPLY OF CONCRETE POLE ACCESSORIES 158 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-464 DTD. 06.11.2012 28,350.00 SUPPLY OF METAL HOUSING EARTH PIT WITH COVER 159 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-466/TK DTD. 06.11.2012 895.41 SUPPLY OF ANGLE STEEL 160 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-479/TK DTD. 12.11.2012 26431.20 SUPPLY OF ANGLE & CLAMP OF CABLE STANDOFF BRACKET 161 GLOBAL CORP ENTERPRISE LLC [OMAN] GEC/OR/12- 494/TK/OXY-REV2 DTD. 24.11.2012 17,289.78 33KV SUPPORT STRUCTURE 162 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 498/TK/MHEW/Stk DTD. 25.11.2012 39,283.00 SUPPLY OF CROSS ARMS 163 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 506/TK-Rev1 DTD. 27.11.2012 4,990.00 SUPPLY OF ANGLE & CLAMP OF CABLE STANDOFF BRACKET 164 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-536/TK DTD. 11.12.2012 58397.67 SUPPLY OF CONCRETE POLE & ACCESSORIES 165 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 477/TK-REV-3 DTD. 11.12.2012 65,503.00 SUPPLY OF GANTRY & EQUIPMENT SUPPORT STRUCTURE 166 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-544/TK DTD. 12.12.2012 23,500.00 CLAMP OF CABLE STAND OF BRACKET 167 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 552/TK/Ray DTD. 17.12.2012 1,12,392.51 SUPPLY OF WOODEN POLE ACCESSORIES 168 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 551/TK/Ray DTD. 17.12.2012 19,405.70 SUPPLY OF POLE BAND & GRID GAIN
  • 47. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 169 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 555/TK/Stk DTD. 18.12.2012 65,085.80 SUPPLY OF CONCRETE POLE & ACCESSORIES 170 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 560/TK/L&T DTD. 18.12.2013 4,192.44 132KV STRUCTURES 171 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12-568/TK DTD.22.12.2012 8,500.00 SUPPLY OF VERNIER PLATE 172 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-038/TK DTD. 04.01.2013 21,440.00 SUPPLY OF 33KV STEEL TOWER 173 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-027/TK DTD. 08.01.2013 16,962.82 SUPPLY OF UNIVERSAL CROSS ARMS 174 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13- 041/TK/RAY DTD. 15.01.2013 6,849.78 SUPPLY OF CROSS ARMS 175 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-065/TK DTD. 30.01.2013 235.00 CLAM OF CABLESTAND OFF BRACKET 176 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-069/TK DTD. 03.02.2013 72,679.06 SUPPLY OF CONCRETE POLE & ACCESSORIES 177 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-092/TK DTD. 16.02.2013 85,437.30 SUPPLY OF CONCRETE POLE & ACCESSORIES 178 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-127/TK DTD. 10.03.2013 9,914.00 SUPPLY OF WOODEN POLE CROSS ARMS & VERNIER PLATE 179 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-130/TK DTD. 12.03.2013 8,200.00 SUPPLY OF CABLE GUARD & ANTI CLIMBING 180 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-156/TK DTD. 26.03.2013 35,200.00 EARTH PIT 181 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-183/TK DTD. 13.04.2013 34,680.00 SUPPLY OF MHEW CROSS ARMS 182 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-213/TK DTD. 29.04.2013 79,449.30 SUPPLY OF CONCRETE POLE & ACCESSORIES
  • 48. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 183 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-228/TK DTD. 08.05.2013 17,659.00 SUPPLY OF POLE TOP COVER PLATE & DISTANCE PLATE 184 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-237/TK DTD. 13.05.2013 63,682.50 SUPPLY OF CONCRETE POLE & ACCESSORIES 185 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-245/TK DTD. 19.05.2013 5,920.00 11KV INTERMEDIATE CROSS ARMS 186 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/13-289/TK DTD. 11.06.2013 1,946.16 SUPPLY OF CROSS ARMS
  • 49. LIST OF ORDERS SUCCESSFULLY EXECUTED FOR EXPORTS FOR DESIGN CALCULATION & DRAWING SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 1. AL – HASSAN TRADING & CONTRACTING L.L.C. AHC / B 124 / – 27 DT. : 07.02.2000 12,000=00 132 KV SUBSTATION STRUCTURE 2. AL – HASSAN TRADING & CONTRACTING L.L.C. AHC / B 123 / – 26 DT. : 07.02.2000 4,000=00 33 KV SUBSTATION STRUCTURE 3. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/B127/PO – 018 DT. : 31.10.2000 24,000=00 132/33/11 KV SUB STATION STRUCTURE 4. AL – HASSAN ENGINEERING CO. S.A.O.G. AHEC/TKN/B127/P O-03/01 DT. : 25.02.2001 13,500=00 132/33/11 KV SUB STATION STRUCTURE 5. AL – HASSAN ENGINEERING CO. S.A.O.G. AHC/B146/PO-22 DT. : 30.12.2001 5,000=00 132/33/11 KV SUB STATION STRUCTURE 6. SCAN ELECTROMECHANICAL CONT. CO. L.L.C 1895 DTD: 19.12.2004 4,750=00 GI STRUCTURE FOR TRANSMISSON 7. AL – HASSAN ENGINEERING CO. S.A.O.G. AHC/BSM/B168/LO A-34 DT. : 24.04.2005 4,500=00 132/33/11 KV SUB STATION STRUCTURE 8. AL – HASSAN ENGINEERING CO. S.A.O.G. AHC/BSM/B179/PO- 0011 DT. : 08.01.2006 4,500=00 LATTICE AND TUBULAR TYPE SUB STATION STRUCTURE 9. CIVIL CONTRACTING LLC C-031/0708/CIV- BME/L/001/06 DT: 12.08.06 25,00=00 132 KV SUBSTATION STRUCTURE 10. LARSEN & TOUBRO ELECTROMECH LLC 335/2110/KM/RBM DT: 16.07.06 5,500=00 132 KV SUBSTATION STRUCTURE 11. AL- FALAHY CO. LLC 2595 DTD. 11.09.07 RO. 9,100=00 33 KV 12. ARABIAN INDUSTRIES LLC 2008-12-0302 DTD. 21.12.2008 95,568=73 132 KV CROSS ARMS 13. POWERTECH ENGINEERING 2010-03-0040 DTD. 02.03.2010 8,423=70 132 KV EQUIPMENT SUPPORT STRUCTURE 14. AL HASSAN ENGINEERING CO S.A.O.G AHEC/PROC/B195/ PO-44 DTD. 24.05.2010 6,000.00 SUPPLY OF GANTRIES 15 GLOBAL CORP LLC GCE/OR/10- 218/TK/WAPI-REV1 DTD. 31.07.2010 13,623.75 SUPPLY OF OHL ACCESSORIES 16 GALFAR ENGINEERING & CONTRACTING SAOG VP/MMU/3888/10 DTD. 15.09.2010 700.00 SUPPLY OF SUPPORTING STEEL STRUCTURE 17 GLOBAL CORP ENTERPRISE LLC (OMAN) GCE/OR/11- 060/TK/UEP DTD. 20.02.2011 7,236.00 SUPPORT STRUCTURE 18 NATIONAL CONTRACTING CO. LTD NCC/OMAN/OETC/3 29/2010/PO/10/02 DTD. 05.03.2011 30,858.00 GANTRY & CABLE SEALING END STRUCTURE 19 AL FALAHY COMPANY LLC 3414 DTD. 28.03.2011 53,000.00 33KV STEEL TOWERS
  • 50. SR. NO PARTY’S NAME P.O.NO. & DATE VALUE IN US $ ITEM DESCRIPTION 20 GLOBAL CORP ENTERPRISE LLC (OMAN) GCE/OR/11- 040/TK/CIVILCO- REV 2 DTD. 26.05.2011 50,091.78 GANTRY & EQUIPMENTS 21 GLOBAL CORP ENTERPRISE LLC (OMAN) GCE/OR/11- 265/Teckno/Galfar /R2 DTD. 31.10.2011 26,000.00 132KV GANTRY & EQUIPMENTS 22 LARSEN & TOUBRO (OMAN)LLC O03020/EPR00406 DTD. 15.02.2012 8,263.05 EQUIPMENT SUPPORT STRUCTURE 23 LARSEN & TOUBRO (OMAN)LLC O03020/EPR00407 DTD. 15.02.2012 5,994.00 EQUIPMENT SUPPORT STRUCTURE 24 SAUDI NATIONAL CONTRACTING CO. LTD. NCC/OMAN/OETC/ 85/2010/PO/16 DTD. 05.07.2012 10,710.00 GANTRY & SUBSTATION EQUIPMENT STRUCTURE 25 SAUDI NATIONAL CONTRACTING CO. LTD. NCC/OMAN/OETC/ 74/2010/PO/035 DTD. 12.07.2012 18,681.25 GANTRY & SUBSTATION EQUIPMENT STRUCTURE 26 GLOBAL CORP ENTERPRISE LLC [OMAN] GCE/OR/12- 440/TK DTD. 18.10.2012 20,000.00 SUPPLY OF 33KV STEEL TOWER
  • 51. A LIST OF INDIAN CUSTOMERS : 1. ASEA BROWN BOVERI LTD., 2. ALSTHOM 3. ABLETECH ELECTRO ENGINEERS PVT LTD., 4. AMBUJA CEMENTS LTD., 5. AREVA T&D INDIA LTD. 6. BAJAJ ELECTRICALS LTD., 7. BIAX ELECTRIC & CONTROLS PVT. LTD. 8. BHARAT BIJLEE LTD., 9. BHARAT HEAVY PLATE & VESSELS LTD., 10. BHARAT PETROLIUM CORPORATION LTD., 11. BHARAT SANCHAR NIGAM LTD., 12. BEST & CROMPTON LTD., 13. BOMBAY SUBARBAN ELECTRIC SUPPLY 14. BLUE STAR 15. BRIGADE GROUP 16. COCHIN REFINARY 17. CROMPTON GREAVES LTD., 18. CHIRANJJEEVI ENERGY LTD 19. DASLAGER WAYS 20. ESSAR STEEL LTD., 21. ELECON ENGINEERING CO. 22. FOUR EF CONSTRUCTIONS [FIZA DEVELOPERS] 23. GE PLASTIC INDIA LTD., 24. GET ENGG. & CONST. LTD., 25. GUJARAT COMMUNICATION & ELECTRONICS LTD., 26. GUJARAT AMBUJA CEMENT LTD., 27. GUJARAT ELECTRICITY BOARD 28. GUJARAT NARMADA VALLEY FERTILIZERS LTD., 29. GUJARAT STATE FERTILIZERS & CHEMICAL LTD., 30. GTL LTD., 31. HITECH ENGINEERS & CONTRACTORS., 32. INDIAN OIL CORPORATION LTD., 33. INDIAN PETROCHEMICALS LTD., 34. INDIA WIND POWER 35. JYOTI LTD., 36. JUWI INDIA RENEWABLE ENERGIES PVT LTD., 37. KIRLOSKAR ELECTRIC CO. LTD.,
  • 52. A LIST OF INDIAN CUSTOMERS : 38. KVAERNER CEMETATION INDIA. 39. LARSEN & TOUBRO LTD., 40. LINDE PROCESS TECHNO-LOGIES INDIA LTD., 41. LANCO SOLAR ENERGY PVT LTD., 42. MADRAS REFINARY 43. MAHAVEER ELECTROMECH PVT LTD., 44. MOHAN EXPORTS INDIA PVT. LTD., 45. MAHAVEER ELECTRICALS 46. MADHAV INFRA PROJECTS PVT LTD., 47. NATIONAL THEMAL POWER CORPORATION LTD., 48. NICCO CORPORATION LTD., 49. NUCLEAR POWER CORPORATION OF INDIA., 50. OMICRON POWER ENGINEERS PVT LTD., 51. PC INDIA LTD., 52. PARAMOUNT POLLUTION CONTROLS PVT. LTD., 53. PIONEER WINCON PVT. LTD 54. PROJECT & DEVELOPMENT INDIA LTD., 55. PUNJLLOYD LIMITED 56. PADMASHREE ELECTRICALS 57. RELIANCE ENERGY LTD., 58. RELIANCE INFOCOM LTD., 59. RUBAMIN LTD., 60. SIEMENS LTD., 61. SPIC-SMO 62. SCHALTECH SYSTEMS [INDIA] PVT LTD., 63. SREE VENKATESHA ELECT. INDS. LTD., 64. SKILLTECH ENGINEERS & CONTRACTORS PVT. LTD., 65. TATA CHEMICALS LTD., 66. THE AHMEDABAD ELECTRICITY CO. LTD., 67. THE SURAT ELECTRICITY CO. LTD., 68. TTG INDUSTRIES LTD., 69. TYCO ELECTRONICS SYSTEMS INDIA PVT LTD., 70. TORRENT POWER LTD., 71. UB ENGINEERING LTD. 72. VATECH REYROLLE LTD., 73. YOKOGAWA BLUE STAR LTD.,
  • 53. A LIST OF MAJOR ORDER FOR STRUCTURES SUCCESSFULLY EXECUTED SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) INSPECTION O1. THE AHMEDABAD ELEC. BOARD, MATERIALS DEPT., JUBILEE HOUSE, AHMEDABAD. B69/4/4286 DATED : 12.02.86 LATTICE STRUCTURE 01.00 A.E.C. 02. THE SURAT ELECT- RICITY CO. LTD., TILAK MAIDAN, 395 005 CE 731 DATED : 25.10.90 66 KV STRUCUTRE 15.00 S.E.C. 03. ELEC. BOARD KABILPOR-396 424. NAVSARI [GUJ.] TCNS/AC/220/32 70 DT : 14.05.1992 220 KV / 66 KV SUN-STATION STRUCTURES 88 G.E.B 04. ELEC. BOARD SUB-STATION, LIMBADI -363 421. CDL/AB/WORK/5 05/3093 DT : 29.06.1992 220 KV D/C TOWER STRUCTURE 226 G.E.B. 05. ELEC. BOARD, SUB-STATION,LIMBADI - 363 421. CDL/AB/WORK/5 04/3092 DT : 29.06.1992 132 KV SUB- STATION STURCTURES 270 G.E.B. 06. CROMPTON GREAVES LTD., – 600 001 CMJ/93176/864/ 13/P-IX/ DT : 19.11.1992 132 KV SWITCH STRUCTURES. 290 G.G.L. 07. THE ELECT. CO. LTD., TILAK MAIDAN– 395 005. CE/COM/69 DT : 28.08.1992 66 KV STRUCTURES 21.00 S.E.C. 08. BEST CROMPTON ENGG. LTD., – 390 005. BRD-21/676 DT : 27.07.92 26.00 B & C 09. BEST CROMPTON ENGG. LTD., – 390 005. BRD-21/676 DT : 27.07.92 TOWER STRUCTURES 12.00 B & C 10. BEST CROMPTON ENGG. LTD., – 390 005. TOWERS STRUCTURES 35.00 B & C 11. BEST CROMPTON ENGG. LTD.,– 390 005. TOWERS STRUCTURES 15.00 B & C 12. ELEC. BOARD – 390 007. SP/5- 22/V/FI/86/9134 DT : 09.08.1993 66 KV / 132 KV SUB – STATION STRUCTURES 107 G.E.B. 13. ELEC. BOARD KABILPORE – 396 424 NAVASARI, [GUJ.] TCNS/AC/220/54 70 DT : 09.08.1993 66 KV / 132 KV SUB-STATION STRUCTURES. 107 G.E.B. 14. CROMPTON GREAVES LTD., – 600 001 CROMPTON GREAVES LTD., – 600 001. 220/132 KV SWITCH YARD STRUCTURES. 266 G.G.L. / K. P. C. L.
  • 54. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) INSPECTIO N 15. CROMPTON GREAVES LTD., – 600 001 CMJ/94184/881/ P-VIII DT : 27.10.1993 220 KV SWITCH YARD STRUCTURES. 468 C.G.L. / K. P. C. L 16. CROMPTON GREAVES LTD., – 600 001 CMJ/94208/893/ 8/PIX/ DT : 08.11.1993 66 KV SUB – STATION STRUCTURES 415 C. G. L. 17. CROMPTON GREAVES LTD., – 600 001 CMJ/94192/892/ 10/P-VIII DT : 02.10.1993 66 KV SUB- STATION STRUCTURES. 470 G.G.L. 18. ROIMAX CONSTRUC- TION PVT. LTD., KADMBAKKAM, – 560 024. RC/P.17/C-51 DATED. : 07.05.1993 220 KV SWITCHYARD STRUCTURES 146 R.P.C.L. 19. KIRLOSKAR ELECTRIC CO. LTD., – 560 055. CPS/LC/94/0056 DT : 07.05.1993 66 / 132 KV SUB–STATION STRUCTURES 226 K.E.C. 20. BEST CROMPTON ENGG. LTD., – 390 005. BRD-21/832, DT : 26.02.93 TOWER STRUCTURES 33 B & C 21. TECKNO , OLD PO/38 DT: 25.07.93 LATTICE STRUCTURE 107 A.B.B. 22. TECKNO , OLD ALSTHOM 220 KV STRUCTURES. 47 N.T.PC. 23. TECKNO , OLD A/C SIEMENS LTD., LATTICE STRUCTURES 500 SIEMENS 24. ELEC. BOARD – 390 007 TR-IV/BMEI/220 KVS/S/STRU/247 /2217 DT : 26.04.1994 220 KV / 132 KV SUB-STATION STRUCTURES. 130 G.E.B. 25. CROMPTON GREAVES LIMITED., – 600 001. CMJ/95034/899/ P-II DT : 19.05.1994 132 / 66KV SUB –STATION STRUCTURES 150 C.G.L. / G.E.B. 26. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/30613/RRC DT : 21.04.1994 LATTIC STRUCTURES 175 A.B.B. 27. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/30554/RRC DT : 21.04.1994 LATTIC STRUCTURES 130 A.B.B. 28. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] THSSS/RRC DT : 05.05.1994 LATTIC STRUCTURES 186 E.I.L. 29. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/30684/RRC DT : 24.11.1994 LATTIC STRUCTURES 126 A.B.B. 30. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/30932/RRC DT : 13.09.1994 LATTIC STRUCTURES 189 A.B.B. 31. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] THSSS/RRC DT : 05.10.1994 LATTIC STRUCTURES 116 A.B.B. 32. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/30685/RRC DT : 24.11.1994 LATTIC STRUCTURES 89 A.B.B.
  • 55. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTI TY (M.T.) INSPECTION 33. THE ELECT. CO. LTD., 395 005. CE/COM/60 DT. 23.05.94 66 KV STRUCT. 39.00 S.E.C. 34. SIEMENS LTD., LPO/A/4009/SAA DATED : 26.10.94 GI STRUCTURES 800.00 TATA 35. SIEMENS LTD., LPO/A/4010/SAA DATED : 26.10.94 A/C. TECKNO, GI STRUCTURES 1500.0 0 TATA 36. ELEC. BOARD – 390 007 TR-IV/220- 132KV/NEW/ 5143/12/10/95 220 KV SUB-STATION STRUCTURES. 226 G.E.B. 37. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/30039/PIJ DT : 05.03.1995 LATTIC STRUCTURES 126 A.B.B. 38. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/30829/PIJ LATTICE STRUCTURES 39. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] BL/41103/RRC DT : 10.10.1995 LATTIC STRUCTURES 85 A.B.B. 40. TABS ENGINEERS – 390 010. TE/BMEI/JUN- GONDAL / 12/95 DT. : 30.04.95 66KV D/C 22.00 GEB 41. TABS ENGINEERS – 390 010. TE/BMEI/ANJAN/ 25/95 DT. : 10.01.95 132 KV D/C LINE TOWER 30.00 GEB 42. TABS ENGINEERS – 390 010. TE/BMEI/JYOTI/ 5/95 DT. : 10.04.95 66 KV D/C LINE TOWER FOR PAINTHER CONDUCTOR 100.00 JYOTI 43. TABS ENGINEERS – 390 010. TE/BMEI/JAMBUA /13/95 DT. : 15.06.95 66 KV D/C LINE TOWER 45.00 GEB 44. TABS ENGINEERS – 390 010. TE/BMEI/ANJAR/ 16/95 DT. : 18.06.95 66 KV D/C LINE TOWER 30.00 GEB 45. TABS ENGINEERS – 390 010. TE/BMEI/ANJAR/ 16/95 DT. : 18.06.95 132 KV D/C LINE TOWER 32.00 GEB 46. PRAKASH INDUSTRIES LTD., KHANDOLI GI STRUCTURES 200.00 PI 47. SUBARBAN ELECTIC SUPPLY – 400 093. CON/PWD/GG/19 /97-98 DT : 29.07.97 GI STRUCTURES 300.00 BSES 48. DULMISON W.S. POWER SYSTEM LTD., BANGLORE. DWS/PO/9-97-48/ DATED : 23.09.97 GI STRUCTURES 300.00 DWS
  • 56. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTI TY (M.T.) INSPECTION 49. SIEMENS LTD., [GURGAON] [CHITRADURGA SITE] T & P/T-1/SS- 109/92 DATED : 14.03.01 G.I. LATTICE STRUCTURE WITH HARDWARE 220.00 KPTCL 50. SIEMENS LTD., [GURGAON] [HONNALI SITE] T & P/T-1/SS- 108/82 DATED : 26.02.01 G.I. LATTICE STRUCTURE WITH HARDWARE 245.00 KPTCL 51. SIEMENS LTD., [GURGAON] [MADHUGIRI SITE] T & P/T-1/SS- 107/79 DATED : 26.02.01 G.I. LATTICE STRUCTURE WITH HARDWARE 225.00 KPTCL 52. VA TECH PVT. LTD., [ SITE] 06P/90351/864 DATED : 29.12.01 G.I. STRUCTURE 160.00 KPTCL 53. CROMPTON GREAVES LTD, EPSG/DD – SK (M) – PCGIL (SOUTH) DATED : 31.12.01 PIPE STRUCTURE APPRX . 300 PGCIL 54. BSES LTD., BNG/CON/KPTCL/ AVG/01 – 200 DATED : 19.02.02 110KV 486.48 0 KPTCL 55. BSES LTD., BNG/CON/KPTCL/ AVG/01 – 201 DATED : 19.02.02 110KV 486.48 0 KPTCL 56. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] 750000022 DATED 31.05.02 GI STRUCTURES 850.00 KPTCL 57. CROMPTON GREAVES LTD, EPG/SKJ – NV / PCGIL (8) DATED : 01.06.02 MS GALVANIZED LATTICE STRUCTURES TYPE L.M. APPRX . 150.00 PGCIL 58. CROMPTON GREAVES LTD, EPG/BS/GMDC DATED 16.07.02 GI STUCTURES 140.00 GMDC 59. BHARAT HEAVY ELECTRICALS LTD., 4528073 DATED : GI STRUCTURES 286.00 PGCIL 60. CROMPTON GREAVES LTD, EPG/BS/WBSEB DATED 24.08.02 GI STUCTURES 150.00 WBSEB 61. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] 140005194 DATED : 11.09.02 GI STRUCTURES 150.00 PGCIL 62. ALSTHOM SYN/7129/CS313 5 [KATHALGURI 220KV/132KV LATTICE STR. 109.00 PGCIL 63 BHARAT HEAVY ELECTRICALS LTD., 4528107 DATED 16.10.02 GI STRUCTURES 435.00 WBSEB 64 ABLETECH ELECTRO ENGINEERS P. LTD AEE/Teckno/PO/ 125/2003-04 DT. 24.05.03 66 KV DC TRANSMISSION LINE & SUB- STATION STR. 40 KPTCL
  • 57. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANT ITY (M.T.) INSPECTION 65 SCHALTECH AUTOMATION PVT LTD. LOI NO: E2/NSSK/SS/02 DTD: 25.05.2003 110 KV TRANSMISSION LINE & SUB- STATION STR. 220 RITES 66 GET ENGG. & CONSTRUCTION PVT. LTD GET/KPTCL/132/ PO/003 DTD: 21.08.2003 11 KV/66KV GI STRUCTURES 15 KPTCL 67 GET ENGG. & CONSTRUCTION PVT. LTD GET/DEV/128/PO /001 DTD: 21.08.2003 11 KV/66KV GI STRUCTURES 7 KPTCL 68 GET ENGG. & CONSTRUCTION PVT. LTD GET/KPTCL/133/ PO/001 DTD: 01.09.2003 11 KV & 1.1KV GALVANISED CROSS ARM 187 KPTCL 69 SREE VENKATESHA ELECTRICAL INDUS. PVT. LTD 153/03-04 DTD: 23.09.2003 GI STRUCTURE 33 RITES 70. SIEMENS LTD [MUMBAI PROJECT – BALCO KORBA 45242488 DTD. 11.12.03 GI STRUCTURE 400 SIEMENS 71 SIEMENS LTD [MUMBAI PROJECT-JIJU-SOGI 45258297 DTD. 24.03.2004 GI STRUCTURE 40 SIEMENS 72 SIEMENS LTD [CHENNAI] PROJECT –KITCO 45277877 DTD:26.07.2004 GI STRUCTURE 30 SIEMENS 73 SIEMENS LTD [MUMBAI] PROJECT- GEB 45285969 DTD: 16.09.2004 GI STRUCTURE 30 SIEMENS 74 BHARAT BIJLEE LTD 73454/IGL DTD: 30.12.2004 GI STRUCTURES 15 BHARAT BIJLEE 75 SIEMENS LTD [MUMBAI] PROJECT – SUZLON- DHULE 45319035 DTD: 24.03.2005 GI STRUCTURE 400 SIEMENS 76 SIEMENS LTD [MUMBAI] PROJECT –LANJIGARH 4500430842 DTD:24.05.2005 GI STRUCTURE 80 SIEMENS 77 FOUR EF CONSTURCTIONS [FIZA DEVELOPERS] FEF/TECKNO/SS- GAL- STRU/SPLY/05-06 DT: 29.07.2005 GI STRUCTURE 30 FIZA DEVELOPE RS 78 BRIGADE GROUP BG/BEPL/E/BM/ WO/664/05 DTD: 12.09.2005 GI STRUCTURE 70 BRIGADE 79 SCHALTECH AUTOMATION PVT LTD. NIL DTD: 10.09.2005 66 KV TRANSMISSION LINE & SUB- STATION STR 80 SCHALTEC H 80 BHARAT BIJLEE LTD 77612/TOYO DTD: 22.09.2005 GI STRUCTURES 80 BHARAT BIJLEE 81 ABB LTD., GI CROSSARMS 1500 UP ELEC. BOARD 82 ASEA BROWN BOVERI LTD., MANEJA, BARODA PROJECT – ENERCON JAISELMER SITE 500003235 DTD: 19.12.05 LATTIC STRUCTURES 100 A.B.B.
  • 58. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) INSPEC TION 83 MAHAVEER ELECTRICALS ME/UP/PO/002/ 05-06 DTD: 24.12.05 GI CROSARMS 200 UP ELEC. BOARD 84 PADMASHREE ELECRICALS PA/UP/PO/001/ 05-06 DTD: 26.12.05 GI CROSSARMS 200 UP ELEC. BOARD 85 SIEMENS LTD [] 4500630203 DTD: 28.12.05 G.I. LATTICE STRUCTURE & HARDWARE 175 KPTCL 86 G.E.T. ENGINEERING CONSTRUCTIONS PVT. LTD GET/REL/05- 026/PO-18 DTD: 03.02.06 GI CROSSARMS WITH HARDWARE 200 UP ELEC. BOARD 87 CHIRANJJEEVI WIND ENERGY LTD 145/2005-2006 DTD: 09.02.06 G.I. LATTICE STRUCTURE 500 88 SIEMENS LTD [MUMBAI] PROJECT – SUZLON- SUTHRI 4500708384 DTD: 22.03.2006 GI STRUCTURE 250 SUZLO N 89 SIEMENS LTD [CHENNAI] PROJECT – TAMILNADU 4500719826 DTD: 03.04.2006 GI STRUCTURE 4 SIEME NS 90 SIEMENS LTD [CHENNAI] PROJECT – BIAL 4500761023 DTD: 15.05.2006 GI STRUCTURE WITH HARDWARE 25 SIEME NS 91 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – ENERCON SAGHALISITE 500003527 DTD: 16.03.06 LATTICE STRUCTURES WITH HARDWARES 125 A.B.B. 92 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – ENERCON NASHIK 500003267 DTD: 27.12.05 LATTICE STRUCTURES WITH HARDWARES 135 A.B.B. 93 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – HINDUSTAN ZINC LTD 500003552 DTD: 21.03.06 LATTICE STRUCTURES WITH HARDWARES 150 A.B.B. 94 BSNL ITI LTD., LATTICE TYPE TELECOMMUNICAT ION TOWER STRUCTURES 15000 ITI 95 RELIANCE INFOCOM LTD.,NAVI MUMBAI 400 710 XM5/13097126 DTD: 14.06.06 LATTICE TYPE TELECOMMUNICAT ION TOWER STRUCTURES 400 RIL 96 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – JHALAP, CSEB 500003951 DTD: 08.07.06 LATTICE STRUCTURES WITH HARDWARES 58 A.B.B. 97 SKILLTECH ENGINEERS & CONTRACTORS PVT. LTD., SK/KPTCL/TKN/0 6-07/2202 DTD: 23.09.06 LATTICE STRUCTURES, TRANSMISSION LINE TOWERS & HARDWARES 400/500 KPTCL 98 SIEMENS LTD [GURGAON] PROJECT – WBSEB PTD/HA/3000407 506/C15/Bm- 0001 DTD: 07.11.06 LATTICE STRUCTURES 124 WBSEB
  • 59. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANT ITY (M.T.) INSPECTION 99 SIEMENS LTD [GURGAON] PROJECT – WBSEB PTD/HA/30005296 47/C15/Bm-0001 DTD: 07.11.06 LATTICE STRUCTURES 324 WBSEB 100 SIEMENS LTD [GURGAON] PROJECT – WBSEB PTD/HA/30005338 51/C15/Bm-0001 DTD: 07.11.06 LATTICE STRUCTURES 149 WBSEB 101 SIEMENS LTD [GURGAON] PROJECT – WBSEB PTD/HA/30005336 88/C15/Bm-0001 DTD: 07.11.06 LATTICE STRUCTURES 137 WBSEB 102 SIEMENS LTD [GURGAON] PROJECT – WBSEB PTD/HA/30005339 51/C15/Bm-0001 DTD: 07.11.06 LATTICE STRUCTURES 49 WBSEB 103 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – WELSPUN, 500004557 DTD: 24.11.06 LATTICE STRUCTURES WITH HARDWARES 279 A.B.B. 104 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – KHARASIYA, CSEB 500004782 DTD: 04.01.07 LATTICE STRUCTURES WITH HARDWARES 75 A.B.B. 105 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – KANAKAPURA, KPTCL 140008504 DTD: 12.04.07 GI PIPE STRUCTURES 38 A.B.B. 106 MAHAVEER ELECTROMECH (P) LTD. MEMPL/KPTCL- 53/PO/074/2006- 07DTD: 22.01.07 200 KPTCL 107 ABLETECH ELECTRO ENGINEERS (P) LTD. AEE/GUJ- TECKNO/1087/200 6-07 DTD: 25.01.07 GI STRUCTURE 41 ABLETECH 108 SCHALTECH SYSTEMS (INDIA) PVT. LTD. SSIPL/YVR/072/20 06-07 DTD: 30.01.07 33/66 KV OHE LINE MATERIAL 41 SCHALTECH 109 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – JAUNPUR, PUVVNL 750006892 DTD: 08.02.07 GI CROSSARMS 37 A.B.B. 110 EXCELL ASSOCIATES EA/TEK/PO/05/20 06-07 DTD: 14.02.07 33/66 KV OHE LINE MATERIAL 60 EXCELL 111 UNIVERSAL POWER SYSTEMS ENGINEERS & CONTRACTORS UPS/TEC/GUJRAT/ PO/F-03/2006- 2007 DTD: 19.02.07 33/66 KV OHE LINE MATERIAL 35 UNIVERSAL POWER 112 ABLETECH ELECTRO ENGINEERS (P) LTD. AEE/GUJ- TECKNO/1168/200 6-07 DTD: 21.02.07 33/66 KV OHE LINE MATERIAL 76 ABLETECH
  • 60. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANT ITY (M.T.) INSPECTION 113 SCHALTECH SYSTEMS (INDIA) PVT. LTD. SSIPL/YVR/075/20 06-07 DTD: 05.03.07 33/66 KV OHE LINE MATERIAL 35 SCHALTECH 114 SIEMENS LTD [INDIA] PROJECT 4500761023 DTD: 06.04.07 GI STRUCTURES WITH HARDWARES 5 SIEMENS 115 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- WESTERN RAILWAY LOI-RE/157/6/BM DTD:08.06.07 GI WELDED PARTS, MASTS, PORTALS, STRUCTURES & ACCESSORIES 1000 RITES 116 RUBAMIN LIMITED, CO/PD/200706014 6 DTD:12.06.07 LATTICE STRUCTURES WITH HARDWARES 15 RUBAMIN 117 GUJARAT ENERGY TRANSMISSION CORP LTD . LOI,CE(P)/PROC/12 06/IV/BM/3756 DTD: 22.06.07 GI EARTHING STRIPS 150 GETCO 118 GUJARAT ENERGY TRANSMISSION CORP LTD . LOI- CE(P)/PROC/1220/ IV/4213 DTD: 11.07.07 LATTICE STRUCTURES WITH HARDWARES 695 GETCO 119 RUBAMIN LIMITED, CO/PD/200706016 3 DTD:17.07.07 LATTICE STRUCTURES WITH HARDWARES 10 RUBAMIN 120 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – RAJPAR & DUDHREJ, GETCO 140008801 DTD: 25.07.07 LATTICE STRUCTURES WITH HARDWARES 375 A.B.B. 121 RUBAMIN LIMITED, CO/PD/200706015 2 DTD:26.07.07 LATTICE STRUCTURES WITH HARDWARES 13 RUBAMIN 122 HEC INFRA PROJECTS PVT LTD, AHMEDABAD. HIPPL/PUR/PO/SV K/BMEI-083/07 DTD: 11.08.07 LATTICE STRUCTURES, HARDWARES, GI STRIPS 100 HIPL 123 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- HOSPET, KPTCL SS/HOSPET/07/10 1 DTD:16.08.07 50 BCEPL 124 TORRENT POWER LIMITED, 20070919 DTD:22.08.07 LATTICE STRUCTURES WITH HARDWARES 35 TORRENT 125 AREVA T&D INDIA LTD. 7700001918 DTD. 10.12.07 EQUIPMENT 58 SIEMENS 126 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- WEST RAILWAY 32/162/953/07/R- B DTD:10.12.07 GI WELDED SPS & DROP ARMS 182 RITES
  • 61. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTI TY (M.T.) INSPECTION 127 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- WESTERN RAILWAY 32/163/961/07/E- M DTD:12.12.07 GI WELDED PARTS, MASTS, PORTALS, STRUCTURES 90 RITES 128 SIEMENS LTD(MUMBAI) LOI DTD. 13.12.07 GI STRUCTURE 12 SIEMENS 129 SCHALTECH SYSTEMS (INDIA) PVT. LTD. LOI REF. E2/DR622 DTD: 13.12.07 66 KV OHE LINE MATERIAL 288 SCHALTEC H 130 SCHALTECH AUTOMATION PVT. LTD. LOI REF. E2/DR/634/2007- 08 DTD: 23.12.2007 66 KV LINE MATERIAL 288 SCHALTEC H 132 UB ENGINEERING LTD (DELHI) UBEL/DEL/REC- 080&81/WO- 026/08-09/2678 DTD. 16.01.2009 SUB STATION, TOWER, BEAM HVPNL 133 UB ENGINEERING LTD (DELHI)) UBEL/DEL/REC- 080&81/PO- 037/09-10/0052 EARTHING MATERIAL 129 HVPNL 134 BIAX ELECTRIC & CONTROLS PVT LTD. BEC/UN/182/09-10 DTD. 23.09.2009 BRIGHT BAR 50 135 UB ENGINEERING LTD (DELHI) UBEL/DEL/E- 144/092/PO- 009/09-10/1797 dtd. 14.10.2009 HOT DIP GALVANIZED FOUNDATION BOLT 5044 HPNL 136 UB ENGINEERING LTD (DELHI) UBEL/DEL/E- 143/094ª/PO- 009/09-10/1813 dtd. 15.10.2009 HOT DIP GALVANIZED FOUNDATION BOLT 3156 HPNL 137 UB ENGINEERING LTD (INDIA) UBEL/DEL/E- 145/094B/PO- 009/09-10/1814 dtd. 15.10.2009 HOT DIP GALVANIZED FOUNDATION BOLT 2216 HPNL 138 UB ENGINEERING LTD (DELHI) UBEL/DEL/E- 140/PO-027/09- 10/1832 dtd. 15.10.2009 MS GI FLAT 80 HPNL 139 SIEMENS LTD (CHENNAI) 450294593 DTD. 14.10.2010 GI STEEL STRUCTURE 14.46 STAR PANEL 140 JUWI INDIA RENEWABLE ENERGIES PVT LTD (BANGALORE) PO/1011/SCM0004 DTD. 25.02.2011 SUPPORT STRUCTURE (SOLAR PHOTOVOLTAIC) 122.33 JUWI INDIA RENEWBLE ENERGIES PVT LTD 141 JUWI INDIA RENEWABLE ENERGIES PVT LTD (BANGALORE) PO/1011/SCM0052 DTD. 25.04.2011 SIGMA POST FOR SOLAR PHOTOVOLTAIC 171.52 JUWI INDIA RENEWBLE ENERGIES PVT LTD 142 MADHAV INFRA PROJECTS PVT LTD. MIPPL/2011- 12/AUGUST/05 DTD. 09.08.2011 GI EARTHING STRIP 330.00 MADHAV GROUPS 143 MADHAV INFRA PROJECTS PVT LTD. MIPPL/PO/240512 /SW005 DTD. 12.08.2011 SUPPLY OF MOUNTING STRUCTURES 150.00 MADHAV GROUPS
  • 62. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTI TY (M.T.) INSPECTION 144 SURYA ENGINEERING CORP SEC/Teckno/IPL/4/11- 12 DTD. 01.11.2011 GI EARTHING MATERIAL 17 MT SURYA ENGINEERI NG CORP 145 JYOTI LTD 2/SR0/T1133/12342/20 11-2012 DTD. 21.11.2012 HEAT SHRINKABLE TUBES 117 MTR JYOTI LTD 146 SURYA ENGINEERING CORP SEC/TECKNO/IPL/7/11- 12 DTD. 14.12.2011 GI EARTHING MATERIAL 24.6 MT SURYA ENGINEERI NG CORP 147 JYOTI LTD T/T72/T1133/300449/2 4157/2011-12 DTD. 27.12.2012 33KV TERMINATION KIT 16 NOS JYOTI LTD 148 LANCO SOLAR ENERGY PVT LTD LSEPL/PSG/PO/GSECL/ 024 TD. 30.12.2012 GI EARTHING STRIPS 4.862 MT LANCO SOLAR ENERGY PVT LTD 149 OMICRON POWER ENGINEERS PVT LTD OPEPL/PUR/11-12/115 DTD. 07.01.2012 220KV DC TRANSMISSION LINE TOWERS 33.785 MT GETCO 150 JYOTI LTD 7/T72/T1133/300457/2 4252/2011-2012 DTD. 17.03.2012 SUPPLY OF EARTHING MATERIAL 1112 MTR JYOTI LTD 151 JYOTI LTD 7/T72/T1133/300446 /24238/2011-2012 DTD. 17.03.2012 SUPPLY OF EARTHING MATERIAL 1112 MTR JYOTI LTD 152 JYOTI LTD 7/T72/T1133/300447 /24239/2011-2012 DTD. 17.03.2012 SUPPLY OF EARTHING MATERIAL 1112 MTR JYOTI LTD 153 JYOTI LTD 7/T72/T1133/300457/2 4252/2011-2012 DTD. 23.03.2012 SUPPLY OF EARTHING MATERIAL 6.00 JYOTI LTD 154 JYOTI LTD 7/T72/T1133/300458/2 4253/2011-2012 DTD. 23.03.2012 SUPPLY OF EARTHING MATERIAL 5.00 JYOTI LTD 155 JYOTI LTD 2/SR0/T1133/58214/20 12-2013 DTD. 30.06.2012 HEAT SHRINKABLE TUBES 117 MTR JYOTI LTD 156 JYOTI LTD 2/SR0/T1133/58338/20 12-13 DTD. 29.08.2012 HEAT SHRINKABLE TUBES 180 MTR JYOTI LTD 157 HITECH ENGINEERS & CONTRACTORS 09/019-12-2012 DTD. 19.12.2012 220KV D/C TOWERS 172.40 MT HITECH ENGINEES & CONTRACTR
  • 63. A LIST OF ORDERS SUCCESSFULLY BOOKED AND EXECUTED FOR PGCIL BY MEI GROUP OF INDUSTRIES SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) INSPECTION 1. CROMPTON GREAVES LTD, EPSG/DD/PGCIL DT. 31.12.01 PIPE STRUCTURE 325.00 PGCIL 2. CROMPTON GREAVES LTD, EPSG/DD/PGCIL -A DT. 31.12.01 LIGHTNING MAST 150.00 PGCIL 3. CROMPTON GREAVES LTD. EPSG/DD-SK(M)- PGCIL (S) DT. 04.02.02 EARTHING FLAT 65.00 PGCIL 4. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.] 140005194 DT. 11.09.02 PIPE STRUCTRUE, HIRYUR 130.00 PGCIL 5. BHARAT HEAVY ELECTRICALS LTD., 4518110 DT. 20.09.01 SUB-STATION STRUCTURE 150.00 PGCIL 6. ALSTHOM SYN/7129/CS31 35 [KATHALGURI] 220KV/132K V LATTICE STR. 30.00 PGCIL 7. BHARAT HEAVY ELECTRICALS LTD., 4528073 DT. 20.08.03 GI STRUCTURE 286.00 PGCIL
  • 64. A LIST OF ORDERS SUCCESSFULLY EXECUTED FOR WIND MILL TOWER STRUCTURE. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) 1. GURU VERDAN GV/94/V-27/VESTAS RRB DT. 06.10.94 225 KV WIND MILL TOWER STRUCTURE 545.00 2. MACHINERY PVT. LTD., VERBAL 225 KV WIND MILL TOWER STRUCTURE 300.00 3. ABAN LLOYADS OF SHORES LTD., ALCO/WE0/PV/5129 DT. 11.12.94 6 MTRS. SUPPORTING STRUCTURES 126.00 4. REPL ENGINEERING LTD., REPL/SYN/PO/95- 96/4003 DT. 12.04.95 225 KV WIND MILL TOWER STRUCTURE 264.00 5. REPL ENGINEERING LTD., AMMENMENT -1 REPL/SYN/PO/95-96/ 4003 DT. 12.04.95 225 KV WIND MILL TOWER STRUCTURE 300.00 6. REPL ENGINEERING LTD., AMMENMENT -1 DT. 27.11.95 225 KV WIND MILL TOWER STRUCTURE 200.00 7. VESTAS RRB INDIA LTD., VRRB/BMEI/95/ PO- 1/22 DT. 28.08.95 225 KV WIND MILL TOWER STRUCTURE 350.00 8. SUZLON ENERGY LTD., SEL/PROD/POM/120/ 96-97 DT. 20.08.95 WIND MILL TOWER STRUCTURE 256.00 9. JMP ECOTECHNIA LTD. JEL/TWR/PO/95- 96/001 DT. 23.03.96 WIND MILL TOWER STRUCTURE 560.00 10. REPL ENGINEERING LTD., REPL/SYN-PO/95- 96/057 DT. 25.07.96 225 KV WIND MILL TOWER STRUCTURE 152.00 11. ABAN LLOYADS OF SHORES LTD., 15-10419-01 DT. 21.02.96 6 MTRS. SUPPORTING STRUCTURE 120.00 12. SUZLON ENERGY LTD., SEL/PROD/POM/044/ 96-97 DT. 30.01.97 WIND MILL TOWER STRUCTURES 500.00 13. DAS LAGARWAY WINDTURBINES LTD., DLWL/PO/AM/97- 98/125 DT. : 28.07.97 WIND MILL TOWER STRUCTURES 200.00 14. SUZLON ENERGY LTD., SEL/PROD/POM/044/ 96-97 DT. 20.08.97 WIND MILL TOWER STRUCTURES 338.00 15. SUZLON ENERGY LTD., SEL/PROD/POM/159/ 97-98 DT. 20.12.97 WIND MILL TOWER STRUCTURES 200.00
  • 65. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) 16. DAS LAGARWAY WINDTURBINES LTD., 616 DT. 13.02.98 WIND MILL TOWER STRUCTURES 131.00 17. VESTAS RRB INDIA LTD., VRRB/PROJ/056/ DT. 13.02.98 225 KV WIND MILL TOWER STRUCTURES 500.00 18. VESTAS RRB INDIA LTD., VRRB/PROJ/007 DT. 03.06.98 WIND MILL TOWER STRUCTURE 55.00 19. VESTAS RRB INDIA LTD., VRRB/PROJ/020 DT. 08.08.98 WIND MILL TOWER STRUCTURE 81.00 20. DAS LAGARWAY WINDTURBINES LTD., 39 DT. 02.09.98 WIND MILL TOWER STRUCTURE 131.00 21. VESTAS RRB INDIA LTD., VRRB/PROJ/078 DT. 09.08.98 WIND MILL TOWER STRUCTURE 68.00 22. DAS LAGARWAY WINDTURBINES LTD., 64/98-99 DT. 05.01.99 WIND MILL TOWER STRUCTURE 131.00 23. VESTAS RRB INDIA LTD., VRRB/PROJ/045 DT. 09.01.99 WIND MILL TOWER STRUCTURE 54.00 24. REPL ENGINEERING LTD., REPL/PO/GUJ/1999/ 04 DT. 27.02.99 WIND MILL TOWER STRUCTURE 66.00 25. REPL ENGINEERING LTD., REPL/PO/GUJ/1999/ 05 DT. 04.03.99 WIND MILL TOWER STRUCTURE 66.00 26. VESTAS RRB INDIA LTD., VRRB/PROJ/089 DT. 27.03.99 WIND MILL TOWER STRUCTURE 27.00 27. VESTAS RRB INDIA LTD., VRRB/PROJ/009 DT. 11.05.99 WIND MILL TOWER STRUCTURE 95.00 28. VESTAS RRB INDIA LTD., VRRB/PROJ/024 DT. 03.06.99 WIND MILL TOWER STRUCTURE 95.00 29. DAS LAGARWAY WINDTURBINES LTD., 033 DT. 30.08.99 WIND MILL TOWER STRUCTURE 131.00 30. DAS LAGARWAY WINDTURBINES LTD., DLWL/BK/RCI/002 DT. 08.12.99. WIND MILL TOWER STRUCTURE 65.50
  • 66. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) 16. DAS LAGARWAY WINDTURBINES LTD., 616 DT. 13.02.98 WIND MILL TOWER STRUCTURES 131.00 17. VESTAS RRB INDIA LTD., VRRB/PROJ/056/ DT. 13.02.98 225 KV WIND MILL TOWER STRUCTURES 500.00 18. VESTAS RRB INDIA LTD., VRRB/PROJ/007 DT. 03.06.98 WIND MILL TOWER STRUCTURE 55.00 19. VESTAS RRB INDIA LTD., VRRB/PROJ/020 DT. 08.08.98 WIND MILL TOWER STRUCTURE 81.00 20. DAS LAGARWAY WINDTURBINES LTD., 39 DT. 02.09.98 WIND MILL TOWER STRUCTURE 131.00 21. VESTAS RRB INDIA LTD., VRRB/PROJ/078 DT. 09.08.98 WIND MILL TOWER STRUCTURE 68.00 22. DAS LAGARWAY WINDTURBINES LTD., 64/98-99 DT. 05.01.99 WIND MILL TOWER STRUCTURE 131.00 23. VESTAS RRB INDIA LTD., VRRB/PROJ/045 DT. 09.01.99 WIND MILL TOWER STRUCTURE 54.00 24. REPL ENGINEERING LTD., REPL/PO/GUJ/1999/ 04 DT. 27.02.99 WIND MILL TOWER STRUCTURE 66.00 25. REPL ENGINEERING LTD., REPL/PO/GUJ/1999/ 05 DT. 04.03.99 WIND MILL TOWER STRUCTURE 66.00 26. VESTAS RRB INDIA LTD., VRRB/PROJ/089 DT. 27.03.99 WIND MILL TOWER STRUCTURE 27.00 27. VESTAS RRB INDIA LTD., VRRB/PROJ/009 DT. 11.05.99 WIND MILL TOWER STRUCTURE 95.00 28. VESTAS RRB INDIA LTD., VRRB/PROJ/024 DT. 03.06.99 WIND MILL TOWER STRUCTURE 95.00 29. DAS LAGARWAY WINDTURBINES LTD., 033 DT. 30.08.99 WIND MILL TOWER STRUCTURE 131.00 30. DAS LAGARWAY WINDTURBINES LTD., DLWL/BK/RCI/002 DT. 08.12.99. WIND MILL TOWER STRUCTURE 65.50 31. SUZLON ENERGY LTD., SEL/PROD/LC/004/9 9-2000 DT. 20.12.99 WIND MILL TOWER STRUCTURE 1340.00
  • 67. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) 32. VESTAS RRB INDIA LTD., VRRB/PROJ/141 DT. 28.12.99 30 MTRS. TOWER MATERIALS 35.00 33. VESTAS RRB INDIA LTD., VRRB/PROJ/145 DT. 07.01.2000 50 MTRS. EXTN.TOWER MATERIALS 176.60 34. DAS LAGARWAY WINDTURBINES LTD., DLWL/BK/RCI/030 DT. 20.01.2000 WIND MILL TOWER STRUCTURE 277.20 35. VESTAS RRB INDIA LTD., VRRB/PROJ/161 DT. 25.01.2000 50 MTRS. EXTN.TOWER MATERIALS 67.50 36. VESTAS RRB INDIA LTD., VRRB/PROJ/183 DT. 02.02.2000 50 MTRS. EXTN.TOWER MATERIALS 40.50 37. VESTAS RRB INDIA LTD., VRRB/PROJ/216 DT. 26.02.2000 50 MTRS. EXTN.TOWER MATERIALS 40.50 38. SUZLON ENERGY LTD., SEL/DMN/LC/PCM02 /99-2000 DT. 09.03.2000 WIND MILL TOWER STRUCTURE 335.00 39. SUZLON ENERGY LTD., SEL/DMN/PROD/053 /99-2000 3488.00 40 SUZLON ENERGY LTD., SEL/DMN/PROD/080 /99-2000 DT. 07.04.2000 1670.00 41. VESTAS RRB INDIA LTD., VRRB/VED/045 DT. 18.05.2000 TUBULAR TOWER 4 SETS 42. VESTAS RRB INDIA LTD., VRRB/PROJ/56 DT. 06.06.2000 30 MTRS. TOWER MATERIALS 8.00 43. VESTAS RRB INDIA LTD., VRRB/PROJ/95 DT. 19.07.2000 30 MTRS. TOWER MATERIALS 46.80 44. VESTAS RRB INDIA LTD., VRRB/PROJ/137 DT. 22.08.2000 11 SETS 45. VESTAS RRB INDIA LTD., VRRB/PROJ/153 DT. 30.08.2000 40 MTRS. TOWER MATERIALS 41.20 46. VESTAS RRB INDIA LTD., VRRB/PROJ/172 DT. 14.09.2000 LATTICE TYPE TOWER MATERIALS 286.80 47. VESTAS RRB INDIA LTD., VRRB/PROJ/335 DT. 29.12.2000 STRUCTURE 288 MT 48. VESTAS RRB INDIA LTD., VRRB/PROJ/245 DT. 01.01.2001 STRUCTURE 800 MT 49. VESTAS RRB INDIA LTD., VRRB/PROJ/351 DT. 18.01.2001 STRUCTURE 288 MT
  • 68. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) 50. GOLDEN NON- CONVENTIONAL ENERGY STS. PVT. LTD., VERBAL DTD: 22.03.02 WIND MILL TOWER STRUCTURE 175 MT 51. PIONEER WINCON LTD., 007/2002-2003 DT. 04.04.2002 WIND MILL TOWER STRUCTURE 560 MT 52. VESTAS RRB INDIA LTD., VRRB/PROJ/038 DT. 14.05.2002 STRUCTURE 600 MT 53. SUZLON ENERGY LTD., SEL/DMN/1000/000207 /2002-2003 DT. : 04.07.2002 STRUCTURE 37.50 54. SUZLON ENERGY LTD., SEL/DMN/LC – 1MW/008/2002 – 2003 DT. : 04.07.2002 WIND MILL TOWER STRUCTURE 710.00 55. SUZLON ENERGY LTD., SEL/DMN/1250000290/ 2002 – 2003 DT. : 13.07.2002 WIND MILL TOWER STRUCTURE 1200 MT 56. SUZLON ENERGY LTD., SEL/DMN/LC – 1.25MW/002/2002 – 2003, DT. : 17.10.2002 WIND MILL TOWER STRUCTURE 3500 MT 57. VESTAS RRB INDIA LTD., VRRB/PROJ/200212040 407, DT. 04.12.2002 STRUCTURE 230 MT 58. PIONEER WINCON LTD., 056/2003-2004 DT. 02.01.2003 WIND MILL TOWER STRUCTURE 300 MT 59. SUZLON ENERGY LTD., SEL/DMN/LC – 1.25MW/001/2003 – 2004, DT. : 11.04.2003 WIND MILL TOWER STRUCTURE 6766 MT 60. VESTAS RRB INDIA LTD., VRRB/PROJ/053 DT. 30.04.2003 WIND MILL TOWER STRUCTURE 2200 MT 61 GOLDEN NON- CONVENTIONAL ENERGY STS. PVT. LTD., VERBAL DTD: 06.08.2003 WIND MILL TOWER STRUCTURE 150 MT 62. VESTAS RRB INDIA LTD., VRRB/PROJ/515 DT. 09.09.2003 WIND MILL TOWER STRUCTURE 1800 MT 63. GOLDEN NON- CONVENTIONAL ENERGY STS. PVT. LTD., VERBAL DTD: 20.02.2004 WIND MILL TOWER STRUCTURE 50 MT 64. VESTAS RRB INDIA LTD., VRRB/PROJ/028 DT. 19.04.04 WIND MILL TOWER STRUCTURE 4000 MT 65. SUZLON ENERGY LTD., SEL/DMN/LC/1250/AM/ 000003/2004-2005 DT. 30.04.04 WIND MILL TOWER STRUCTURE 6532 MT 66. NEPC INDIA LTD NEPC/IL/BMEI-LT/PR- SK/3346 DT. 15.05.04 WIND MILL TOWER STRUCTURE 6000 MT 67. PIONEER WINCON LTD 43 DT. 13.07.04 WIND MILL TOWER STRUCTURE 150 MT 68. VESTAS RRB INDIA LTD., VRRB/PROJ/333 DT. 30.07.2004 WIND MILL TOWER STRUCTURE 2000 MT 69. TTG INDUSTRIES LTD WE-PUR 001 DTD: 19.04.2005 WIND MILL TOWER STRUCTURE 605 MT
  • 69. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE ITEM DESCRIPTION QUANTITY (M.T.) 70. INDIA WIND POWER LTD IWPL/BME/05-06/1 DTD: 01.08.2005 50 MT 71. VESTAS RRB INDIA LTD VRRB/PROJ/028 DTD: 29.04.05 4100 MT 73. SHRIRAM EPC LTD WE-SEPC-PONDY-0001-A5 DTD: 10.04.06 WIND MILL TOWER STRUCTURE 795 MT 74. SHRIRAM EPC LTD 200604023 DTD: 10.04.06 WIND MILL TOWER STRUCTURE 685 MT 75. PIONEER WINCON LTD 072/06-07 DT. 26.04.06 WIND MILL TOWER STRUCTURE 1500 MT 76. VESTAS RRB INDIA LTD VRRB/PROJ/1023 DTD: 12.08.06 6848 MT 77. VESTAS RRB INDIA LTD VRRB/PROJ/1024 DTD: 12.08.06 6420 MT 78. VESTAS RRB INDIA LTD VRRB/PROJ/1025 DTD: 12.08.06 765 MT 79. VESTAS RRB INDIA LTD VRRB/PROJ/1026 DTD: 12.08.06 510 MT 80. SHRIRAM EPC LTD 200604023 A-3 DTD: 27.09.06 WIND MILL TOWER STRUCTURE 1845 MT 81. SHRIRAM EPC LTD 200609039 DTD: 27.09.06 WIND MILL TOWER STRUCTURE 1365 MT 82. PIONEER WINCON LTD 316/06-07 DT. 29.12.06 WIND MILL TOWER STRUCTURE 710 MT 83. PIONEER WINCON LTD 0708041 DT. 19.05.07 WIND MILL TOWER STRUCTURE 11 MT 84. SHRIRAM EPC LTD 200705005 DTD: 03.05.07 WIND MILL TOWER STRUCTURE 910 MT 85. PIONEER WINCON LTD 0708129 DT. 27.07.07 WIND MILL TOWER STRUCTURE 2380 MT 83 CHETTINAD ENERGY PVT. LTD CHE/026/07-08 DT. 02.01.08 WIND MILL TOWER STRUCTURE 260 MT 84 RRB ENERGY LIMITED 4609100426 DTD. 08.07.2009 125 MT 85 PIONEER WINCON LTD 0910030 DTD. 17.08.2009 596.33 MT
  • 70. A LIST OF ORDER SUCCESSFULLY EXECUTED FOR CABLE TRAYS & ACCESSORIES SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE INSPECTION QUANTITY (M.T.) 01. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ] KSA/FC/GFN/8111-3180 DT : 09.01.88 KELTRON 8.50 02. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ] KSA/FC/VSP/8111-3285 DT : 25.05.88 KELTRON 17.50 03. KELTRONCONTROLS DIVN.,AROOR 688 534 [ KERALA ] KSA/FC/VSP/900-835 DT : 16.08.88 KELTRON 05.06 04. BHARAT HEAVY PLATE & VESSELS LTD. MM/4/7844-54-016/BG/AE DT : 09.04.88 BHPV 15.75 05. GUJARAT INSTRUMENTS LTD., GANDHINAGAR G/851414 DT : 24.05.1988 GIL 12.00 06. GUJARAT INSTRUMENTS LTD., GANDHINAGAR G/851653 DT : 24.11.1988 GIL NYLON 13.00 07. JYOTI LIMITED., CONTRACT DIVISION, – 390 009. H/CONTRACT/600 222/NPC - 142/88 DATED : 23.09.88 JYOTI 1.00 08. PARAMOUNT POLLUTION CONTROLS PVT. LTD., PPCL/471/94/88/5701 DT : 02.11.1988 PPCL/EIL [IPCL- NAGOTHANE] 26.35 09. PARAMOUNT POLLUTION CONTROLS PVT. LTD., PPCL/473/93/5884 DT : 07.01.1988 PPCL/EIL [PETROFILS] 2.35 10. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ] KCA/EC/EMR/900 161 DT : 05.01.89 KELTRON 03.33 11. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ] KCA/EC/EMR/800 227 DATED : 06.04.89 KELTRON 05.85 12. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ] KCA/EC/ONGC/800 345 DATED : 22.09.89 KELTRON 05.60 13. PARAMOUNT POLLUTION CONTROLS PVT. LTD., PPCL/471/INST/89/1149 DATED : 07.02.89 PPCL/EIL ONGC 8.00 14. PARAMOUNT POLLUTION CONTROLS PVT. LTD., PPCL/471/INST/89/4424 DATED : 11.08.89 PPCL/EIL ONGC 16.65 15. PARAMOUNT POLLUTION CONTROLS PVT. LTD., PPCL/475/INST/93/95/48 33 PPCL/EIL 10.95
  • 71. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE INSPECTION QUANTITY (M.T.) 16. PARAMOUNT POLLUTION CONTROLS PVT. LTD., . PPCL/474/97/89/3703 DATED : 14.07.89 PPCL/GFC/UDH E 4.00 17. TYLORE INSTRUMENTS CO. LTD., E-88720/A30L881 DATED : 16.02.89 EIL [ PETROFILES ] 58.85 18. TYLORE INSTRUMENTS CO. LTD., E-890 461/ A30L 881 DT : 15.01.89 EIL [ PETROFILES ] 1.50 19. TYLORE INSTRUMENTS CO. LTD., E-900247/ A30L 881 DT : 19.07.89 TAYLOR/EIL [ PETROFILES ] 4.65 20. ESSAR STEEL LTD., HAZIRA. DATED : 08.06.89 L & T 35.00 21. GUJARAT NARMADA VALLEY FERTILIZERS LTD., BHARUCH. PROJ/MPP/9652/ALV/4320 DATED : 04.08.89 GNFC 3.00 22. GUJARAT INSTRUMENTS LTD.,GANDHINAGAR. G 852 815 DATED : 17.04.90 GIL/GEB GANDHINAGAR 2.70 23. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 852 818 DATED : 17.04.90 GIL [ IPCL/GOP ] 3.00 24. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 852 820 DATED : 17.04.90 GIL [ ONGC ] 3.60 25. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 852 953 DATED : 20.04.90 GIL [ GEB KLIPS ] 4.85 26. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 852 630 DATED : 20.04.90 GIL [ GEB KLIPS ] 3.75 27. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 852 628 DATED : 24.04.90 GIL GANDHINAGAR 5.75 28. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 853 021 DATED : 01.09.90 GIL [ AECO ] 8.60 29. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 853 025 DATED : 01.09.90 GIL GEB GANDHINAGAR 4.35 30. GUJARAT INSTRUMENTS LTD., GANDHINAGAR. G 853 087 DATED : 24.09.90 GIL [ ONGC ] 2.00 31. REUNION ENGINEERING CO. LTD., . BRD/129/SMD/10/90 DT : 24.05.90 1.00 32. CONSTRUCTIONS . PC/121/94/694 DATED : 23.08.90 EIL/PDIL ONGC GANDHAR 4.95 33. PROJECT & DEVELOPMENT INDIA LTD., . PDS/2394/20/20/2229 DATED : 03.09.90 EIL/PDIL [ IOCL/HCP ] 6.95 34. SPIC – SMO . SMO/933/I/003 DATED : 27.09.90 SPIC/EIL [ IOCL/HCP ] 45.00 35. SPIC – SMO . SMO/CAP/I/014 DATED : 27.09.90 SPIC/EIL [ IOCL/HCP ] 35.00 36. SPIC – SMO SMO/CAP/I/014 DATED : 12.12.90 SPIC 1.00 37. LINDE PROCESS TECHNO- LOGIES INDIA LTD., . HA01/0021/0026 DATED : 11.12.90 LPT 7.00
  • 72. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE INSPECTION QUANTITY (M.T.) 38. SYSCON ENGINEERS PVT. LTD., . SEPL/PO/90/500 DATED : 17.12.90 EIL [ IOCL-GHP ] 1.75 39. BHARAT HEAVY PLATE & VESSELS LTD., MM/4/1509-41-008/9951 DATED : 09.04.91 BHPV 01.70 40. BHARAT HEAVY PLATE & VESSELS LTD., MM/4/5390/CP-42/2231 565 DATED : 20.07.91 BHPV 10.50 41. BHARAT HEAVY PLATE & VESSELS LTD., MM/4/710149 040/CSG/81 / 2331576 BHPV 02.75 42. BHARAT HEAVY PLATE & VESSELS LTD., MM/4/5441/CP42/2231964 DATED : 12.10.91 BHPV 04.25 43. SPIC – SMO SMO/933/1/003 DATED : 07.01.91 EIL [ IOCL-GHP ] 8.50 44. SPIC – SMO SMO/933/1/003 DATED : 14.03.91 EIL/SPIC [ IOCL-GHP ] 6.50 45. SPIC – SMO SMO/933/1/004 DATED : 22.07.91 EIL/SPIC [ IOCL-GHP ] 13.50 46. SPIC – SMO SMO/933/1/003 DATED : 08.08.91 EIL/SPIC [ IOCL-GHP ] 2.00 47. SYSCON ENGINEERS PVT. LTD., . SEPL/PO/ME/90/263 DATED : 24.04.91 EIL [ PETROFILS ] 2.70 48. THE AHMEDABAD ELECT-RICITY CO. LTD., AHMEDABAD. B/227/4/4984 DATED : 16.02.91 AECO 176.50 49. THE AHMEDABAD ELECT-RICITY CO. LTD., AHMEDABAD. B/227/4/4984 DATED : 13.06.91 AECO 139.00 50. THE AHMEDABAD ELECT-RICITY CO. LTD., AHMEDABAD. B/227/4/2972 DATED : 25.09.91 AECO 17.40 51. STEELWORKS CONSTRUCTION LTD., SRV/TVM/242/91/432 DATED : 16.07.91 HACL/NM DASTOR 100.00 52. STEELWORKS CONSTRUCTION LTD., SRV/TVM/242/91/712 DATED : 19.08.91 HACL/NM DASTOR 10.00 53. BHARAT HEAVY PLATE & VESSELS LTD., MM / 4 / 4004- 41- 016/PP51 / 3131548 DATED : 03.08.92 EIL 2.60 54. BHARAT HEAVY PLATE & VESSELS LTD., MM/4/4405/PP91/3131980 DATED : 30.10.92 BHPV 2.00 55. PARAMOUNT POLLUTION CONTROLS PVT. LTD., PPCL/483/484/94/92/348 DATED : 16.01.92 PPCL [ JOB ] 2.00 56. PARAMOUNT POLLUTION CONTROLS PVT. LTD., . PPCL/477/INSTRUMANTATI ON/92/1948 DATED : 06.04.92 PPCL 20.00 57. SPIC SMO SMO/INST/GHP/BARODA/ 002 DATED : 29.09.92 EIL/SPIC [ IOCL ] 4.80
  • 73. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE INSPECTION QUANTITY (M.T.) 58. SPIC SMO SMO/933/TRAY/003 DATED : 29.09.92 EIL/SPIC [ IOCL ] 6.50 59. SYSCON ENGINEERS PVT. LTD., SEPL/BME/PO/92/123 DATED : 31.03.92 EIL [ GAIL-LPG ] 21.50 60. SEA HAWK CARGO CARRIERS PVT. LTD., DATED : 16.02.92 SEA HAWK [ ANPARA-TPS ] UP-GOVT DESIGN 800.00 61. THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD. IB/227/4/2972 DATED : 30.06.92 AEICO [ GEB - GANDHINAGAR ] 7.50 62. NUCLEAR POWER CORPN. OF ANUSHAKTI NAGAR, MEQ/KAIGA 182 2462 / / 330 DATED : 03.06.92 NPC 167.00 63. BEST & CROMPTON ENGINEE-RING LTD., . BRD/21/716 DATED : 25.08.92 B & C [ ONGC CTF NAVASARI ] 8.60 64. BEST & CROMPTON ENGINEE-RING LTD., . BRD/21/759 DATED : 21.10.92 B & C [ ONC NAVAGAM ] 4.00 65. KELTRON CONTROLS DIVN. AROOR CRL/3/301134 DATED : 04.02.93 KELTRON [ CRL ] 12.50 66. BHARAT HEAVY PLATE & VESSELS LTD., . MM / 4 / 7112 / CSG / 81 / 4331298 DATED : 10.06.93 BHPV 05.00 67. BHARAT HEAVY PLATE & VESSELS LTD., . MM / 4/ 4013 / CSG / 81 / 43317011 DATED : 08.09.93 BHPV [ ONGC- NAVAGAM ] 20.00 68. BHARAT HEAVY PLATE & VESSELS LTD., . MM/4/5497-41/CP-51 2321925 DATED : 15.10.93 BHPV 10.00 69. BHARAT HEAVY PLATE & VESSELS LTD., . MM/4/7143 72 006 /CSG 51 4331932 DATED : 18.10.93 BHPV 04.00 70. ESSAR LIMITED., HAZIRA [SURAT]. P13/2,102.1/L/207 DATED : 05.05.93 ESSAR 150.00 71. ESSAR LIMITED., HAZIRA [SURAT]. P13/2,102.1/L/310 DATED : 01.09.93 ESSAR 105.00 72. ESSAR LIMITED., HAZIRA [SURAT]. P13/3,35.21/L/394 DATED : 01.09.93 ESSAR 65.00 73. ESSAR LIMITED., HAZIRA [SURAT]. P13/1,58.10/L/398 DATED : 03.09.93 ESSAR 300.00 74. ESSAR LIMITED., HAZIRA [SURAT]. P13/1,58.10/L/706 DATED : 04.12.93 ESSAR 63.00 75. ESSAR LIMITED., HAZIRA [SURAT]. P13/2,102.1/L/740 DATED : 05.12.93 ESSAR 20.00 76. ESSAR LIMITED., HAZIRA [ ]. P13/1,58.10/L/800 DATED : 27.12.93 ESSAR 25.00
  • 74. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE INSPECTION QUANTITY (M.T.) 77. BEST & CROMPTON ENGINEE-RING LTD., . BRD/21/802 DATED : 07.01.93 B & C [ MIDC ] 5.60 78. BEST & CROMPTON ENGINEE-RING LTD., . BRD/21/810 DATED : 20.01.93 B & C [ STEL CO. ] 50.00 79. BEST & CROMPTON ENGINEE-RING LTD., . BRD/21/821 DATED : 08.02.93 B & C [ STEL CO. ] 6.00 80. ARVIND COTSPIN LTD., [ E.O.U. UNIT ] AHMEDABAD ACL/ENG/035/SUPPLIM ENTARY DATED : 07.01.93 ARVIND 6.25 81. ARVIND COTSPIN LTD., [ E.O.U. UNIT ] AHMEDABAD ACL/ENG/038 DATED : 20.01.93 ARVIND 30.00 82. ARVIND COTSPIN LTD., [ E.O.U. UNIT ] AHMEDABAD ACL/ENG/050 DATED : 07.04.93 ARVIND 5.00 83. ARVIND INTEX LTD., AHMEDABAD. CAP/ORD/93-43 DATED : 13.03.93 ARVIND 25.00 84. ARVIND MILLS LTD., AHMEDABAD. D-BA/215 DATED : 27.04.93 ARVIND 6.75 85. TATA CHEMICAL LTD., BOMBAY.. WOC/67M274/ELEC/C- 4254/9 DATED : 03.11.93 TATA 6.00 86. BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM. MM/4/4013/CSG/81/ 4332436 DATED : 09.02.94 BHPV 5.20 87. BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM. MM/4/4011/CSG/81/ 4332572 DATED : 19.03.94 BHPV 5.60 88. ESSAR LIMITED., HAZIRA [ ]. P13/1,61.10/L/955 DATED : 04.08.94 ESSAR 6.00 89. ARVIND COTSPIN LTD., [ E.O.U. UNIT ] AHMEDABAD ACL/ENG/0038 DATED : 03.01.94 ARVIND 19.00 90. ARVIND COTSPIN LTD., [ E.O.U. UNIT ] AHMEDABAD ACL/ENG/010/94 DATED : 25.05.94 ARVIND 20.00 91. ARVIND COTSPIN LTD., [ E.O.U. UNIT ] AHMEDABAD ACL/ENG/065/93-94 DATED : 25.01.94 ARVIND 2.00 92. ARVIND COTSPIN LTD., [ E.O.U. UNIT ] AHMEDABAD ACL/K/71 DATED : 22.10.94 ARVIND 5.00 93. ARVIND MILLS LTD., AHMEDABAD. D-BA/DDP/3851 DATED : 27.01.94 ARVIND 4.00 94. BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM. MM/4/40215 4707/CP- 51/5232256 DATED : 17.01.95 EIL 40.00 95. BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM. MM/4/402155030/CP- 91 / 5232548 DATED : 28.03.95 EIL/BHPV 10.00
  • 75. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE INSPECTION QUANTITY (M.T.) 96. BHARAT HEAVY PLATE & VESSELS LTD., . MM/4/716459009/CCS- 91/ 6231783 DATED : 20.09.95 EIL/BHPV 10.00 97. BHARAT HEAVY PLATE & VESSELS LTD., . MM/4/5517/40002/CP- 51/ DATED : 27.10.95 EIL/BHPV 20.00 98. THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD. B-227/4/1278 DATED : 30.06.95 AEC 5.00 99. THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD. B-227/4/2552 DATED : 31.08.95 AEC 5.00 100. THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD. B-227/4/1278 DATED : 11.02.95 AEICO 50.00 101. ARVIND MILLS LTD., AHMEDABAD. CG/95/00047 DATED : 11.02.95 AML 1.00 102. ARVIND MILLS LTD., AHMEDABAD. CG/95/00073 DATED : 06.03.95 AML 2.00 103. ARVIND MILLS LTD., AHMEDABAD. CG/95/00117 DATED : 21.04.95 AML 2.00 104. TATA CHEMICAL LTD., . MYPCC/P/851/39M055/I NS -3039/C.4862 DT : 11.01.95 TATA 6.00 105. INGERSOLL-RAND AHMEDABAD. UUB/B0595/287 DATED : 09.08.95 INGERSOLL 5.00 106. INGERSOLL-RAND AHMEDABAD. UUB/B0595/287 DATED : 09.08.95 INGERSOLL 2.00 107. PARAMOUNT POLLUTION CONTROLS PVT. LTD., ,RACE COURSE, . PPCL/AP/328/CABLE TRAY/ 96/741 DATED : 25.01.96 PPCL 10.00 108. PARAMOUNT POLLUTION CONTROLS PVT. LTD., , RACE COURSE, . PPCL/AP/500/CABLE TRAY/ 96/741 DATED : 13.04.96 PPCL 05.00 109. PARAMOUNT POLLUTION CONTROLS PVT. LTD., , RACE COURSE, . PPCL/503/CT/ 96/5129 DATED : 14.06.96 PPCL 10.00 110. TATA CHEMICAL LTD., 769/WOC/GENCAP/71M 115/ING20019 C.553 DATED : 04.11.96 TATA 5.00 111. PASCHIM PETRO CHEM LTD., . LOI/PPL/TRAY/96/87 DATED : 11.06.96 PPL/EIL 5.00 112. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA, LAEI/1006/08/863/PUR /113 DATED : 29.01.96 ALEI/EIL 75.00 113. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA, LAEI/1007/08/863/PUR /082 DATED : 29.01.96 ALEI/EIL 80.00 114. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA, . LAEI/1008/07/764/PUR /074 DATED : 12.04.96 ALEI/EIL 5.00
  • 76. SR. NO. PARTY’S NAME & ADDRESS P.O.REFRENCE & DATE INSPECTION QUANTITY (M.T.) 115. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA, LAEI/1008/07/764/PU R/074 DATED : 12.04.96 ALEI/EIL 5.00 116. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA, LAEI/011/1008/074/9 6/7888 DATED : 10.05.96 ALEI/EIL 10.00 117. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA, LAEI/1008/08/863/PU R/096 DATED : 28.08.96 ALEI/EIL 10.00 118. SPIC-JEL ENGINEERING CONSTRUCTION LTD., S – 7 THIRUVIKA INDUSTRIAL ESTATE, GUNDY, . SJCL/BWE/CT/997 DATED : 05.03.96 SJCL 10.00 119. SPIC-JEL ENGINEERING CONSTRUCTION LTD., S – 7 THIRUVIKA INDUSTRIAL ESTATE, GUNDY, SJCL/BWE/CT/1042 DATED : 23.03.96 SJCL 5.00 120. STRUTHERS WELLS CORP – ORATION PENNA U. S. A. 95-2830350/619 DATED : 16.08.96 SWC/EIL/BHEL 10.00 121. GE PLASTIC INDIA LTD., PLASTIC AVENUE P. O. JAWAHAR NAGAR VADODARA. GEPI/ED/200/ DATED : 10.04.96 GEP 05.00 122. GE PLASTIC INDIA LTD., PLASTIC AVENUE P. O. JAWAHAR NAGAR VADODARA. GEPI/ED/408/200 DATED : 27.05.96 GEP 05.00 123. BHARAT HEAVY PLATE & VESSELS LTD., MM/4/7166/SE- 81/73311430 DATED : 04.05.96 BHPV 20.00 124. PARAMOUNT POLLUTION CONTROLS PVT. LTD., , RACE COURSE, . P/0500/P.O./ 510/04/971460 DATED : 15.05.97 PPCL 10.00 125. INGERSOLL-RAND AHMEDABAD. UB/DSK/45128 DATED : 05.09.96 INGERSOLL 5.00 126. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA, ALEI/1013/86300/97- 98/3060 DATED : 03.12.97 ALEI/EIL 10.00 127. GE PLASTIC INDIA LTD., PLASTIC AVENUE P. O. JAWAHAR NAGAR VADODARA. GEPI/ED/97/908 DATED : 16.01.97 GEP 05.00 128. NICCO CORPORATION LTD., 505, A & B STERLING CENTRE, ALKAPURI, VADODARA. C-142/P/E/0293 DATED : 29.05.97 NICCO 20.00 129. METRO TRANSLEC PVT. LTD., PANCHARATNA, 2ND FLOOR ALKAPURI, VADODARA. VERBLE DT. 05.10.97 METRO 25.00

Notas del editor

  1. TECKNO TOUCHING THE HEIGHTS
  2. We have extensive expierence in the field of Transmission Line tower, by virtue of this we offer excellent competitive design. Towers supplied by us are working in vide range of temperature from -10 °C to 50 °C ambient temperature. We offer Tower as per the international standard as designed by our valued customer.To provide the best available craftmenship,we extensively use CNC machines for the various operation to churn out the excellent error free product. All the material passes through the magnifing eye’s of our well experienced QC team. Finaly ofexcelent and low life materials is hot dip galvanized in the modern plant.
  3. We offer a very vide range of structure to meet the request of all kind of utility and colection. Our structure are suitable from 11000Volt to 750000 Volt. All station are manufactured from very standard steel procured from approved and reputed Rolling Mill. These steel section are treated by our craftman with almost care and under strict quality control of our Engineers, having couple of clouble experience. On demand we also provide pipe type support Structure
  4. The only alternative available to us after the fossile fuel is Wind Mill. .To keep the place with the trend we started manufacturing of windmill tower since 1994. Till date we have successfully manfactured more than 4000 nos. of Wind mill Towers. We offer custom made towers for wind Electric genrator from 225 KW to 1250 KW. Height of tower various from 30 mts to 65 mts. Raw material is sourced from international market and processed to international standards. The finish of the product is done as per customer specification from Zn coating, PU plant to hot dip galvanizing.
  5. We offer extensive range of cable trays, which are manufactured from stainless steel, CRC of HRC Sheet, Aluminium or FRP. We laso offer extensive range of accessories for the cable tray, such as Elebow, (Left Right, Up Down) Tee, cross redusers. On demand of customers even cable tray with covers are offered. For the prevention of these cable tray we offer, painted or Hot dip Galvanized coating, as per demand of our valued customers.
  6. We offer a very wide range to telecom tower approved by SERE, starting from Microwave, GSM roof top, ground Base (upto 90 mts and Wind speed of 260 KMPH). It is either fromsteel angles or pipr or even combination of both, as desired by customer. For the urban locations specially narrow base towers are also offered. Final touch is galvanized and if required followed by specific points.
  7. We cater to request of steel substation used for Railway electrification. They are mainly the column and Beam manufactured from high quality of steel sourced from the approved Rolling Mills. The final touch is given by our expert work force by way of cutting, drilling, welding etc.Finally for a better and long life all structures are Hot dip galvanized for 130 microns.
  8. We have extensive experience in the field of crossarms. We offer excellent competitive design of crossarms to our customers as per their demand.We have maintained huge range of products like Tie Brackets, Crossarms for terminal Poles, Cross arms for intermidiate poles, Crossarms for field Isolator, Crossarms for Auto recloser etc..
  9. The use of renewable energy resources is increasing rapidly.We offer extensive range of Support structures for solar panel PV Module mainataing systems. We offer special steel structures for fastening of solar modules and fabrication of photovoltaic power stations. Structures are offered according to customers´ requirements and adjusted to modules dimensions, which will be mounted on the structure..