1. Scope & Purpose:

   The procedure is applicable to manufacturing process, maintenance, project
   activities & mining in Calcom Cement India Limited & B. K. Group for
   reporting, immediate action & investigation.

2. Internal Reporting:

   Based on severity the accident will be communicated & a necessary
   action will be taken as follows:

      •   “First Aid” will be communicated to GM-EHS, GM-Ops.
      •   “Reportable case/Lost Time Injury” will be communicated to GM-EHS,
          GM-Ops & Managing Director.
      •   “Fatality” will be communicated to GM-EHS, GM-Ops, Managing
          Director & Chairman.

   In case of an accident:

      •   The site in -charge/ line Engineer will immediate inform to safety
          officer , plant head , HR head & simultaneously he will inform to time
          office.
      •   Within the same day / 12 hrs the site in -charge/ line Engineer will
          summit dully signed accident prelim report in the prescribed format
          (Annexure-2) to Safety deptt.
      •   Time office personnel & Head-HR will arrange vehicle, if required.
      •   GM Operation & GM EHS will communicate to Managing Director &
          Chairman.
      •   Overall administration/internal Law & Order will be maintained by
          Head-HR.

3. External Reporting:

      •   Reportable accident will be communicated to Chief Inspector of
          Factories & Inspector of factories
      •   Fatality will be communicated to Chief Inspector of Factories,
          Inspector of factories, Local Police station, SDM/DM, Relative of
          victim, DEG-FMO.

   In case of fatal & reportable case:

      •   Rule – 95 of Assam Factories Rule will be followed.
      •   Head- HR / GM-EHS will communicate to Chief Inspector of factories
          & Inspector factory inspector after consultation with GM-OPS.
      •   Within 04 hrs the site in –charge will summit dully signed accident
          prelim report in the prescribed format (Annexure-1) to Safety deptt.
•   The accident will be reported thru Form no 18 (Under rule 95) to Chief
                Inspector of Factories & Inspector of factories by Factory Manager
                within 48hrs after consultation with GM-EHS/Safety Officer/ Head-HR .
            •   Head- HR will communicate the accident to local authorities, Govt
                officials & relative of victim & other, if any like as media / union
                representative/ panchayet.
            •   The report will be communicated to DEG-FMO by GM-EHS/MD.
            •   Overall administration/internal Law & Order will be maintained by
                Head-HR.


      4. Investigation:

            •   Basis on the Accident Prelim Report & interview of witness, the
                accident will be investigated as below committee.
            •   The report will be prepared by team leader / member (s) as below in
                the prescribed format (Annexure-3).
            •   The report will be communicated by safety officer to concerned HOD,
                GM-EHS, GM-OPS, HR-Head, MD & Chairman.
            •   Overall investigation will be co-ordinated by safety officer.


                             INVESTIGATION COMMITTEE

Investigation committee is constituted as below:

S.N         Type of Accident                Investigation committee member (s)

   1        First aid                       Safety officer & concerned HOD
   2        Lost time injury / Reportable   Safety officer & HOD from other deptt
            case
   3        Fatality                        Safety officer, GM- EHS, GM –Ops from
                                            other location, Head- HR, Safety
                                            Committee member.



      5. Compliance:

            •   Recommendations will be implemented by concerned HOD & a report
                will be sent to safety officer.
            •   Implementation-status will be reviewed by GM-OPS.
            •   Status will be discussed in safety committee meeting.

      6. Others:

            •   Compensation, Medical expenses & other settlement shall be
                coordinated by HR department as per contract.
            •   Shifting of injured person for medical treatment will co-ordinated by
                Head- HR.
            •   For a better compliance, Flow chart may refer for accident reporting as
                annexure-1.
Annexure-1



                   Flow Chart for Accident Reporting




  Departmental                Site In charge /                 Time Office
     HOD                         Line Engr



                                 Inform to
                                                              Ambulance will
                               Safety officer
                                                               be arranged
 GM -OPS/ GM-
 EHS/HR-Head



                           Inform to GM-EHS &                First aid centre
                             Co-ordinating the
                               investigation
 Factory
Inspector, Local
authorities, MD,
Chairman

                          Report to be send to                   Hospital
                          all concerned



                             Safety committee
                                 meeting




       Note: For detail information, refer to Accident Reporting Procedure.
Annexure-2


                        Calcom Cement India Limited

                        ACCIDENT PRELIM REPORT

                  (To be filled by Site Engineer/ Shift in-charge)

                                                                     Date-:   / /

   1. Name of Injured person ---
   2. Sex & Age:
   3. Designation ---
   4. Company: M/S
   5. Date &Time of Accident --
   6. Nature of Injury:
   7. Body part Injured:
   8. Location :
   9. Property Damaged (if any) / Cost :
   10. Brief description of the accident ---


   11. Immediate Cause of accident ---


Name & Sign of the Shift in-charge/Site Engr

Name & Sign of the HOD:
Annexure-3

                        Calcom Cement India Limited

                      ACCIDENT Investigation REPORT

                                                                 Date-:   / /

   1. Name of Injured person --
   2. Sex / Age:
   3. Designation ---
   4. Company: M/S
   5. Date &Time of Accident -- / /
   6. Nature of Injury:
   7. Body part Injured:
   8. Location :
   9. Property Damaged, if any/Cost :
   10. Name of witness & interviewed persons :
              • M/s
              • M/s
   11. Description of the accident ---


   12. Cause of accident ---



Name & signature of Investigation team member (s):

Name & sign of sign of safety officer:




Prepared by                                            Approved by




(CHUN CHUN KUMAR)                                     (RITESH BAWRI)

General Manger -EHS                                   Managing Director
Accident reporting procedure

Más contenido relacionado

La actualidad más candente

LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHLIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHBimal Chandra Das
 
Safety committees duties 1
Safety committees duties 1Safety committees duties 1
Safety committees duties 1Roger Maxson
 
Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...
Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...
Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...Ts. Dr. Mohammad Lui Juhari
 
Spill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOMSpill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOMAtlantic Training, LLC.
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management systemgraha katiga
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety InductionJames McCann
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementationDr Madhu Aman Sharma
 
Work permit system
Work permit systemWork permit system
Work permit systemsmithgeigle
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentationRaghunath Patil
 

La actualidad más candente (20)

LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHLIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
 
BREATHING APPARATUS
BREATHING APPARATUSBREATHING APPARATUS
BREATHING APPARATUS
 
Safety committees duties 1
Safety committees duties 1Safety committees duties 1
Safety committees duties 1
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
Mock drill
Mock drillMock drill
Mock drill
 
EHS Presentation
EHS PresentationEHS Presentation
EHS Presentation
 
FIRE MOCK DRILL PPT
FIRE MOCK DRILL PPTFIRE MOCK DRILL PPT
FIRE MOCK DRILL PPT
 
Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...
Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...
Occupational Safety & Health (Noise Exposure) Regulations 2019 Occupational S...
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
HSE PRESENTATION
HSE PRESENTATIONHSE PRESENTATION
HSE PRESENTATION
 
Safety in manufacturing
Safety in manufacturingSafety in manufacturing
Safety in manufacturing
 
Spill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOMSpill Prevention and Response Training by IMCOM
Spill Prevention and Response Training by IMCOM
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management system
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
Chemical handling
Chemical handlingChemical handling
Chemical handling
 
Work permit system
Work permit systemWork permit system
Work permit system
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
 
Surat Kepada Kerajaan (JKKP)
Surat Kepada Kerajaan (JKKP)Surat Kepada Kerajaan (JKKP)
Surat Kepada Kerajaan (JKKP)
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentation
 

Destacado

Brochure goose 2012
Brochure goose 2012Brochure goose 2012
Brochure goose 2012Goose
 
Presentación final sports economics
Presentación final sports economicsPresentación final sports economics
Presentación final sports economicsFélix Brezo
 
PHOTOGRAPHY PORTFOLIO GOOSE 2011
PHOTOGRAPHY PORTFOLIO GOOSE 2011PHOTOGRAPHY PORTFOLIO GOOSE 2011
PHOTOGRAPHY PORTFOLIO GOOSE 2011Goose
 
Renewable energy worldwide preview
Renewable energy worldwide previewRenewable energy worldwide preview
Renewable energy worldwide previewJasabir Arora
 
Newsletter Cj Finished Product
Newsletter   Cj   Finished ProductNewsletter   Cj   Finished Product
Newsletter Cj Finished Productcjwashington
 
Presentation on german renewable energy on 23
Presentation on german renewable energy on 23Presentation on german renewable energy on 23
Presentation on german renewable energy on 23Jasabir Arora
 
Imaginary numbers
Imaginary numbersImaginary numbers
Imaginary numbersSamanthaS13
 
Barbie Calendar
Barbie CalendarBarbie Calendar
Barbie Calendartoinkytuts
 
Construction Site Health & Safety
Construction Site Health & SafetyConstruction Site Health & Safety
Construction Site Health & SafetySAURABH SINGH
 
Incident reporting
Incident reportingIncident reporting
Incident reportingVidya vijay
 
Reporting & Recording Investigations
Reporting & Recording Investigations Reporting & Recording Investigations
Reporting & Recording Investigations GAURAV. H .TANDON
 
Accident reporting and investigation
Accident reporting and investigationAccident reporting and investigation
Accident reporting and investigationHien Dinh
 
Accident Investigation Training by Auburn University
Accident Investigation Training by Auburn UniversityAccident Investigation Training by Auburn University
Accident Investigation Training by Auburn UniversityAtlantic Training, LLC.
 
Accident Investigation-Reporting-Prevention Training by PATHS
Accident Investigation-Reporting-Prevention Training by PATHSAccident Investigation-Reporting-Prevention Training by PATHS
Accident Investigation-Reporting-Prevention Training by PATHSAtlantic Training, LLC.
 

Destacado (18)

All about me
All about meAll about me
All about me
 
Aas
Aas Aas
Aas
 
Resume
ResumeResume
Resume
 
Brochure goose 2012
Brochure goose 2012Brochure goose 2012
Brochure goose 2012
 
Presentación final sports economics
Presentación final sports economicsPresentación final sports economics
Presentación final sports economics
 
PHOTOGRAPHY PORTFOLIO GOOSE 2011
PHOTOGRAPHY PORTFOLIO GOOSE 2011PHOTOGRAPHY PORTFOLIO GOOSE 2011
PHOTOGRAPHY PORTFOLIO GOOSE 2011
 
Renewable energy worldwide preview
Renewable energy worldwide previewRenewable energy worldwide preview
Renewable energy worldwide preview
 
Newsletter Cj Finished Product
Newsletter   Cj   Finished ProductNewsletter   Cj   Finished Product
Newsletter Cj Finished Product
 
Presentation on german renewable energy on 23
Presentation on german renewable energy on 23Presentation on german renewable energy on 23
Presentation on german renewable energy on 23
 
Imaginary numbers
Imaginary numbersImaginary numbers
Imaginary numbers
 
Barbie Calendar
Barbie CalendarBarbie Calendar
Barbie Calendar
 
About me
About meAbout me
About me
 
Construction Site Health & Safety
Construction Site Health & SafetyConstruction Site Health & Safety
Construction Site Health & Safety
 
Incident reporting
Incident reportingIncident reporting
Incident reporting
 
Reporting & Recording Investigations
Reporting & Recording Investigations Reporting & Recording Investigations
Reporting & Recording Investigations
 
Accident reporting and investigation
Accident reporting and investigationAccident reporting and investigation
Accident reporting and investigation
 
Accident Investigation Training by Auburn University
Accident Investigation Training by Auburn UniversityAccident Investigation Training by Auburn University
Accident Investigation Training by Auburn University
 
Accident Investigation-Reporting-Prevention Training by PATHS
Accident Investigation-Reporting-Prevention Training by PATHSAccident Investigation-Reporting-Prevention Training by PATHS
Accident Investigation-Reporting-Prevention Training by PATHS
 

Similar a Accident reporting procedure

IW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docIW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docJohn Gibso
 
IHST - Inadvertent Instrument Meteorological Conditions for Helicopters
IHST - Inadvertent Instrument Meteorological Conditions for HelicoptersIHST - Inadvertent Instrument Meteorological Conditions for Helicopters
IHST - Inadvertent Instrument Meteorological Conditions for HelicoptersIHSTFAA
 
Accident investigation
Accident investigationAccident investigation
Accident investigationKaz Umt
 
MJC Site Safety Management Accident & Incident Module
MJC Site Safety Management Accident & Incident ModuleMJC Site Safety Management Accident & Incident Module
MJC Site Safety Management Accident & Incident ModuleMJ Conroy Group
 
The liability of Air Navigation Service Provider: some lessons from the Ueber...
The liability of Air Navigation Service Provider: some lessons from the Ueber...The liability of Air Navigation Service Provider: some lessons from the Ueber...
The liability of Air Navigation Service Provider: some lessons from the Ueber...ALIAS Network
 
Emergency preparedness plan for mines
Emergency preparedness plan for minesEmergency preparedness plan for mines
Emergency preparedness plan for minesKrishna Deo Prasad
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
300.45 senior animal control officer watch commander duties
300.45 senior animal control officer watch commander duties300.45 senior animal control officer watch commander duties
300.45 senior animal control officer watch commander dutiesNo Kill Shelter Alliance
 
SOP for Emergency response plan..pdf
SOP for Emergency response plan..pdfSOP for Emergency response plan..pdf
SOP for Emergency response plan..pdfSunil Shukla
 
Ag Hwy Trans Emerg02 02 08 Av4
Ag Hwy Trans Emerg02 02 08 Av4Ag Hwy Trans Emerg02 02 08 Av4
Ag Hwy Trans Emerg02 02 08 Av4bgsuvinc
 
Documented procedures under Emergency preparedness- Main engine failure.docx
Documented procedures under Emergency preparedness- Main engine failure.docxDocumented procedures under Emergency preparedness- Main engine failure.docx
Documented procedures under Emergency preparedness- Main engine failure.docxBhalchandra Chandakkar
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureShaileshPal24
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfsursh2
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfsursh2
 
Rapid Response Article Ftd December 2011
Rapid Response Article Ftd December 2011Rapid Response Article Ftd December 2011
Rapid Response Article Ftd December 2011Durward Casteel
 
SHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docxSHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docxdesmond37129
 

Similar a Accident reporting procedure (20)

IW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docIW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.doc
 
IHST - Inadvertent Instrument Meteorological Conditions for Helicopters
IHST - Inadvertent Instrument Meteorological Conditions for HelicoptersIHST - Inadvertent Instrument Meteorological Conditions for Helicopters
IHST - Inadvertent Instrument Meteorological Conditions for Helicopters
 
Accident investigation
Accident investigationAccident investigation
Accident investigation
 
MJC Site Safety Management Accident & Incident Module
MJC Site Safety Management Accident & Incident ModuleMJC Site Safety Management Accident & Incident Module
MJC Site Safety Management Accident & Incident Module
 
The liability of Air Navigation Service Provider: some lessons from the Ueber...
The liability of Air Navigation Service Provider: some lessons from the Ueber...The liability of Air Navigation Service Provider: some lessons from the Ueber...
The liability of Air Navigation Service Provider: some lessons from the Ueber...
 
Airport Emergency
Airport EmergencyAirport Emergency
Airport Emergency
 
Emergency preparedness plan for mines
Emergency preparedness plan for minesEmergency preparedness plan for mines
Emergency preparedness plan for mines
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
Emergency evocation plan
Emergency evocation planEmergency evocation plan
Emergency evocation plan
 
300.45 senior animal control officer watch commander duties
300.45 senior animal control officer watch commander duties300.45 senior animal control officer watch commander duties
300.45 senior animal control officer watch commander duties
 
SOP for Emergency response plan..pdf
SOP for Emergency response plan..pdfSOP for Emergency response plan..pdf
SOP for Emergency response plan..pdf
 
RUI ERP Workshop.pptx
RUI ERP Workshop.pptxRUI ERP Workshop.pptx
RUI ERP Workshop.pptx
 
Ag Hwy Trans Emerg02 02 08 Av4
Ag Hwy Trans Emerg02 02 08 Av4Ag Hwy Trans Emerg02 02 08 Av4
Ag Hwy Trans Emerg02 02 08 Av4
 
Emergency response (Reporting Line)
Emergency response (Reporting Line)Emergency response (Reporting Line)
Emergency response (Reporting Line)
 
Documented procedures under Emergency preparedness- Main engine failure.docx
Documented procedures under Emergency preparedness- Main engine failure.docxDocumented procedures under Emergency preparedness- Main engine failure.docx
Documented procedures under Emergency preparedness- Main engine failure.docx
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secure
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Rapid Response Article Ftd December 2011
Rapid Response Article Ftd December 2011Rapid Response Article Ftd December 2011
Rapid Response Article Ftd December 2011
 
SHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docxSHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docx
 

Accident reporting procedure

  • 1. Calcom Cement India Limited. Accident Reporting Procedure 1. Scope & Purpose: The procedure is applicable to manufacturing process, maintenance, project activities & mining in Calcom Cement India Limited & B. K. Group for reporting, immediate action & investigation. 2. Internal Reporting: Based on severity the accident will be communicated & a necessary action will be taken as follows: • “First Aid” will be communicated to GM-EHS, GM-Ops. • “Reportable case/Lost Time Injury” will be communicated to GM-EHS, GM-Ops & Managing Director. • “Fatality” will be communicated to GM-EHS, GM-Ops, Managing Director & Chairman. In case of an accident: • The site in -charge/ line Engineer will immediate inform to safety officer , plant head , HR head & simultaneously he will inform to time office. • Within the same day / 12 hrs the site in -charge/ line Engineer will summit dully signed accident prelim report in the prescribed format (Annexure-2) to Safety deptt. • Time office personnel & Head-HR will arrange vehicle, if required. • GM Operation & GM EHS will communicate to Managing Director & Chairman. • Overall administration/internal Law & Order will be maintained by Head-HR. 3. External Reporting: • Reportable accident will be communicated to Chief Inspector of Factories & Inspector of factories • Fatality will be communicated to Chief Inspector of Factories, Inspector of factories, Local Police station, SDM/DM, Relative of victim, DEG-FMO. In case of fatal & reportable case: • Rule – 95 of Assam Factories Rule will be followed. • Head- HR / GM-EHS will communicate to Chief Inspector of factories & Inspector factory inspector after consultation with GM-OPS. • Within 04 hrs the site in –charge will summit dully signed accident prelim report in the prescribed format (Annexure-1) to Safety deptt.
  • 2. The accident will be reported thru Form no 18 (Under rule 95) to Chief Inspector of Factories & Inspector of factories by Factory Manager within 48hrs after consultation with GM-EHS/Safety Officer/ Head-HR . • Head- HR will communicate the accident to local authorities, Govt officials & relative of victim & other, if any like as media / union representative/ panchayet. • The report will be communicated to DEG-FMO by GM-EHS/MD. • Overall administration/internal Law & Order will be maintained by Head-HR. 4. Investigation: • Basis on the Accident Prelim Report & interview of witness, the accident will be investigated as below committee. • The report will be prepared by team leader / member (s) as below in the prescribed format (Annexure-3). • The report will be communicated by safety officer to concerned HOD, GM-EHS, GM-OPS, HR-Head, MD & Chairman. • Overall investigation will be co-ordinated by safety officer. INVESTIGATION COMMITTEE Investigation committee is constituted as below: S.N Type of Accident Investigation committee member (s) 1 First aid Safety officer & concerned HOD 2 Lost time injury / Reportable Safety officer & HOD from other deptt case 3 Fatality Safety officer, GM- EHS, GM –Ops from other location, Head- HR, Safety Committee member. 5. Compliance: • Recommendations will be implemented by concerned HOD & a report will be sent to safety officer. • Implementation-status will be reviewed by GM-OPS. • Status will be discussed in safety committee meeting. 6. Others: • Compensation, Medical expenses & other settlement shall be coordinated by HR department as per contract. • Shifting of injured person for medical treatment will co-ordinated by Head- HR. • For a better compliance, Flow chart may refer for accident reporting as annexure-1.
  • 3. Annexure-1 Flow Chart for Accident Reporting Departmental Site In charge / Time Office HOD Line Engr Inform to Ambulance will Safety officer be arranged GM -OPS/ GM- EHS/HR-Head Inform to GM-EHS & First aid centre Co-ordinating the investigation Factory Inspector, Local authorities, MD, Chairman Report to be send to Hospital all concerned Safety committee meeting Note: For detail information, refer to Accident Reporting Procedure.
  • 4. Annexure-2 Calcom Cement India Limited ACCIDENT PRELIM REPORT (To be filled by Site Engineer/ Shift in-charge) Date-: / / 1. Name of Injured person --- 2. Sex & Age: 3. Designation --- 4. Company: M/S 5. Date &Time of Accident -- 6. Nature of Injury: 7. Body part Injured: 8. Location : 9. Property Damaged (if any) / Cost : 10. Brief description of the accident --- 11. Immediate Cause of accident --- Name & Sign of the Shift in-charge/Site Engr Name & Sign of the HOD:
  • 5. Annexure-3 Calcom Cement India Limited ACCIDENT Investigation REPORT Date-: / / 1. Name of Injured person -- 2. Sex / Age: 3. Designation --- 4. Company: M/S 5. Date &Time of Accident -- / / 6. Nature of Injury: 7. Body part Injured: 8. Location : 9. Property Damaged, if any/Cost : 10. Name of witness & interviewed persons : • M/s • M/s 11. Description of the accident --- 12. Cause of accident --- Name & signature of Investigation team member (s): Name & sign of sign of safety officer: Prepared by Approved by (CHUN CHUN KUMAR) (RITESH BAWRI) General Manger -EHS Managing Director