SlideShare una empresa de Scribd logo
1 de 16
1
SCHOOL OF ARCHITECTURE, BUILDING AND
DESIGN
Bachelor of Quantity Surveying (Honours)
Integrated Assignment:
Measurement I (QSB60104)
Construction Technology I (BLD 60104)
Building Materials (BLD 62003)
Site Visit Report
STUDENT NAME: Wong Qin Kai
STUDENT ID NO: 0320024
DATE OF SUBMISSION: 27th
November 2015
Content
1. Cover Page 1
Wong Qin Kai 0320024
2
2. Introduction 3
3. Project Summary 4
4. Technical Observations 5
5. Objectives 6
6. Contents 7-10
7. Photos and Description 11-14
8. Conclusion 15
Introduction
A construction site visit is organized by Sr.Ang Fuey Lin on 19th
of November 2015
which located at Antara Gapi ,Hulu Selangor.This project was started in 6th
July 2014 and
will be completed in 4th
July 2016.
First of all, we are required to produce a report that combined with Measurement I ,
Construction Technology and Building Material. The main content of this report is about
Wong Qin Kai 0320024
3
the pad footing which assigned by the lecturers.
From what I saw in the notice board ,the entire architect is from Zain Hamzah
Architect film , the main contractor is from AJ-CORP Sdn Bhd ,the supplier of the
materials is from MCM Associates Sdn Bhd and the property developer is from
Perbadanan Kemajuan Negeri Selangor (PKNS).
Project Summary
Layout Plan of footing
Wong Qin Kai 0320024
4
Project name : Cadangan membina dan meyiapkan 96 units rumah berkembar (40’x80’)
serta infrastructure yang berkaitan di Seksyen 2A , Antara Gapi , Mukim Serendah , Hulu
Selangor , Selangor Darul Ehsan.
Details of the company:
Wawasan Bersatu SDN BHD
Jurutera Perunding - Consulting Engineers (327887-D)
Unit 36-2 , 2nd
Floor , Petaling Utama Avenue,
Jalan PJS 1/50 , Petaling Utama,
46150 Petaling Jaya
Selangor Darul Ehsan.
TEL:(03)77850966 & (03)77812132
Email:wawasanbersatu@yahoo.com
Technical Observation
Before going to the site , we are required to pass up the idemnity form and each of us
need to pay RM15 for the bus fares. In the early morning, we gathered at the bus waiting
area which located at Block B. However, we also need to buy a safety helmet in order to
protect us against the impact by falling objects and struck by swinging objects.We
separated into 2 buses and we took about one hour to reach the destination.
When we reached at the construction site , I felt like very excited because this is my
Wong Qin Kai 0320024
5
first time to enter the site.In order to take time,the safety officer gave us a very short
briefing about the safety precautions to ensure that we can visit the construction site
safely.The project manager also explained to us about the whole construction process and
which company is involved into this project.
The first thing that I observed from site is pile. It is used to build the multi storey of
building. At the top of the pile is connected with the pile caps.Pile usually forced into the
ground to transfer the load to underlying soil or rock layers when the surface soils at a
proposal site are too weak or to provide enough support.
Next is the pad footing.I have a clearer vision of how pad footing look like and also
how to remove the formwork when the concrete had gained in sufficient strength.Pad
footing is suitable for all types of soil and it supported individual point load.The
advantages of it are requires little excavation , easy to construct ,minimize the cost of the
concrete and add the reinforcement bar according to the load.On the other hand , pad
footing is more expensive than strip and trench foundation.
Wong Qin Kai 0320024
6
Objective of the assignment
 To understand the basics of the construction process.
 To witness the usage of construction equipment on site including mechanical plants.
 To explore and identify various types of building materials and technology on site.
 To explain the construction of buildings and the scientific principles that underpin the
design and construction.
 To give awareness and the importance of safety in the construction site.
 Ability to communicate with construction team members and to get more
understanding about the importance of teamwork.
Wong Qin Kai 0320024
7
How a pad footing being constructed ?
1) We need to do site clearance such as removal of soil to reduce level, removal of
trees,bushes,stump of the tree and so on)
2) Next stage is site setting
out .The position of the pad
footings are being set out
according to the layout plan and normally they measured by a steel tape.
Wong Qin Kai 0320024
8
3) After finished marking and setting out of the site , the workers use the cement powder
to mark the size of the pad footing and to make it more easy to identify.
4) Excavation is now required and excavate from the earth’s surface to the specific depth
by using a excavator.
5) Hardcore is now placed at the
top of the surface.The purpose of
the hardcore is to fill hollows and to raise the finished level of an over-site concrete slab
after removal of turf. However ,it should be used in a layer which at least 150mm thick.
After placed the hardcore ,we need to compact down to a layer with a plate compactor.
Wong Qin Kai 0320024
9
6) Next is to build the formwork. To build a formwork , we need to follow a specific size
that have been measured in the plan such as adjust to fit the position and size. After that ,
we need to have two stages that to prevent the formwork falling down and to ensure that
the formwork is strong enough to support the horizontal forces of the concrete when it
poured which are to add studs and bracing.
7) After finished to build a formwork , we are required to pour a lean concrete inside the
formwork because it used to prevent direct contact of foundation concrete from the soils
and provide a uniform surface to the foundation concrete.
8) Next is to place the reinforcement bar inside the formwork. Before laying the
reinforcement bar , we need to have some spacer blocks which used to maintain
reinforcement . Hence , it also can help to protect from the fire and prevent from the
Wong Qin Kai 0320024
10
corrosion of reinforcement bar.
10) Therefore , we need to have some tiles while install the reinforcement for stump as it
has a weak tension strength even though there was a good compression strength for
concrete. Next is placing the starter bar.The reason that we need to place starter bar is
because starter bars are the reinforcement bar that cast into a member to give a lapped
connection to further reinforcement in another concrete element to be cast against it.
11) Last ,the concrete is being poured into the formwork. At this stage ,the vibrator
compactor is required as it allows for compaction in confined spaces and remove it when
the concrete had gained in sufficient strength.
What are the materials that involved in constructing a pad footing?
Concrete , steel and timber are the materials that used to construct a pad footing.
 Timber normally is for temporary work and the construction site always use it to
build formwork is because it is cheap & light weight , economical , easy to handling ,
damage part can easy to repair , reusable , doesn’t need any special equipment &
tools and also available in different size.
 Steel is permanent work. The advantages of it are strong building material for
Wong Qin Kai 0320024
11
superstructure , high melting point , recyclable , durability and high performance.
 Concrete is the world’s widely used building material.It produced from local
resources which with many grades of fine and coarse aggregate to meet standard &
special mix needs. Therefore the key ingredient of the concrete is cement which
made by limestone , shale and clay.
Photos and Description
Wong Qin Kai 0320024
The contractors are introducing the entire site to us so that we can get more information for the
whole construction process and they also told us about the safety precautions to ensure that we
can visit the site safely.
Pile and the pilecap which made by concrete
12Wong Qin Kai 0320024
Reinforcement bars and stirrups are being used to build the column and pad footing.
This is independent scaffolding which doesn’t require any buildings to support it.
Base plates and cross braces are made by the timber,steel and tubular aluminium.
13Wong Qin Kai 0320024
This is ground floor beam
which is connected between
two columns.
Cement as a binding material,it
is the most important building
material because almost every
construction requires cement.
This is the item that used to
build the roof.
Precaution on the site to avoid
the unnecessary troubles
Temporary office for contractors
and manager
The worker is sticking two masonry
units together which is the stuff that we
can see between the bricks.It belongs to
strecher bond.
Sand is putting aside which to be
used for any types of construction.
14Wong Qin Kai 0320024
Steel that used for roof which is fire
resistant, does not burn and will not
contribute fuel to the spread of fire.
This is the only pad footing area from
site. As you can see,some of the
formwork have already been removed
by workers.
Workers are adding links to the bar.
This is common brick which used
widely and it also available in
many sizes and finishes
This is the formwork of roof beam.
Roof tiles are being used.
15
Conclusion
After visiting the construction site, I realized that working at the site is much more
laborious when compare to the person who working in the office because of the existing
risks and weather condition. However , I also gained a lot of new experiences and extra
knowledge about the pad footing that I had never ever learn in class.
Throughout this project, I found out that communication between workers and project
manager are very important because it is the only way to ensure that they can overcome
the problems together and make the process of construction more efficiency. Beside that,
I also have a better understanding and clearer vision of what I had never seem before
such as pad footing , pilecap , stirrups , reinforcement bars and so forth.
Besides that , I also get better understanding about the safety in the construction site
because it is really important and that is we need a safety helmet.Other than that , there
are also some obvious dangerous things surrounding us which is not easily to find such as
nails , fragment ,holes and so forth.
Last but not least , I would like to say millions of thanks to our lecturers because this
site visit had given me a better understanding about the construction process which may
Wong Qin Kai 0320024
One of the proposal of Wawasan Bersatu
Sdn Bhd company.
Reinforced concrete frame for the
building including beams ,slab and
columns
16
use in the future.
Wong Qin Kai 0320024

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Slab site report
Slab site reportSlab site report
Slab site report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Site visit report
Site visit reportSite visit report
Site visit report
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
High volume fly ash concrete
High volume fly ash concreteHigh volume fly ash concrete
High volume fly ash concrete
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Site visit report.
Site visit report.Site visit report.
Site visit report.
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Sheet piles; advantages, types and methods
Sheet piles; advantages, types and methodsSheet piles; advantages, types and methods
Sheet piles; advantages, types and methods
 
Finishing work,Construction workshop.
Finishing work,Construction workshop.Finishing work,Construction workshop.
Finishing work,Construction workshop.
 
Mivan shuttering
Mivan shutteringMivan shuttering
Mivan shuttering
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Formwork
FormworkFormwork
Formwork
 
Gabion ppt
Gabion pptGabion ppt
Gabion ppt
 
High strength concrete
High strength concrete  High strength concrete
High strength concrete
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 

Destacado

Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter Report
JoyeeLee0131
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
Daniel Yap
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
Yap Xin
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 report
Amos Tan
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
ZIyeeTan
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshul
Anshul Shakya
 

Destacado (20)

Fifth year report bc
Fifth year report bcFifth year report bc
Fifth year report bc
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 report
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter Report
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 report
 
Site visit report
Site visit report Site visit report
Site visit report
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Assignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreAssignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping Centre
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit Report
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 report
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshul
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 

Similar a Site visit report (20)

Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Site report
Site reportSite report
Site report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report
Site reportSite report
Site report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site report
Site reportSite report
Site report
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Ez
EzEz
Ez
 
Site report
Site reportSite report
Site report
 
Report
ReportReport
Report
 
Site report
Site reportSite report
Site report
 
Site report algel
Site report algelSite report algel
Site report algel
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
 
Site report
Site reportSite report
Site report
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docx
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Site visit report
Site visit reportSite visit report
Site visit report
 

Más de Jordon Wong

Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892
Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892
Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892
Jordon Wong
 
Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01
Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01
Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01
Jordon Wong
 
Advertising2 150625125807-lva1-app6891
Advertising2 150625125807-lva1-app6891Advertising2 150625125807-lva1-app6891
Advertising2 150625125807-lva1-app6891
Jordon Wong
 
Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891
Jordon Wong
 
Social-Psychology.ppt
Social-Psychology.pptSocial-Psychology.ppt
Social-Psychology.ppt
Jordon Wong
 
Journal Assignment ONE.pdf
Journal Assignment ONE.pdfJournal Assignment ONE.pdf
Journal Assignment ONE.pdf
Jordon Wong
 
ICI_Final_Project.pdf
ICI_Final_Project.pdfICI_Final_Project.pdf
ICI_Final_Project.pdf
Jordon Wong
 

Más de Jordon Wong (20)

Business report.doc(2)
Business report.doc(2)Business report.doc(2)
Business report.doc(2)
 
Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892
Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892
Bus30104introtobizfinalproject jan2015-150624035031-lva1-app6892
 
Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01
Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01
Bus30104introtobizassignment businessplanjan2015-150324235815-conversion-gate01
 
Advertising2 150625125807-lva1-app6891
Advertising2 150625125807-lva1-app6891Advertising2 150625125807-lva1-app6891
Advertising2 150625125807-lva1-app6891
 
Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891
 
Financial ration analysis
Financial ration analysisFinancial ration analysis
Financial ration analysis
 
Psychlogy report
Psychlogy reportPsychlogy report
Psychlogy report
 
5 concepts-in-our-story
5 concepts-in-our-story5 concepts-in-our-story
5 concepts-in-our-story
 
Social-Psychology.ppt
Social-Psychology.pptSocial-Psychology.ppt
Social-Psychology.ppt
 
Social psychology comic strip
Social psychology comic stripSocial psychology comic strip
Social psychology comic strip
 
Journal Assignment ONE.pdf
Journal Assignment ONE.pdfJournal Assignment ONE.pdf
Journal Assignment ONE.pdf
 
Journal assignment one
Journal assignment oneJournal assignment one
Journal assignment one
 
Epc.pptx(1)
Epc.pptx(1)Epc.pptx(1)
Epc.pptx(1)
 
EPC.pptx(1).pdf
EPC.pptx(1).pdfEPC.pptx(1).pdf
EPC.pptx(1).pdf
 
English research report
English research reportEnglish research report
English research report
 
Captain america & the hunger games
Captain america & the hunger gamesCaptain america & the hunger games
Captain america & the hunger games
 
English 2 & epc presentation
English 2 & epc presentationEnglish 2 & epc presentation
English 2 & epc presentation
 
Captain america & the hunger games
Captain america & the hunger gamesCaptain america & the hunger games
Captain america & the hunger games
 
Assignment 1 compare - contrast
Assignment 1   compare - contrastAssignment 1   compare - contrast
Assignment 1 compare - contrast
 
ICI_Final_Project.pdf
ICI_Final_Project.pdfICI_Final_Project.pdf
ICI_Final_Project.pdf
 

Último

Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetBareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetraisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Bhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetBhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetNanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
mahaiklolahd
 
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMuzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near MeVIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
mriyagarg453
 
Russian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near Me
Russian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near MeRussian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near Me
Russian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near Me
mriyagarg453
 
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in AnantapurCall Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
gragmanisha42
 
Sambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Sambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetSambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Sambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetHubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
9316020077📞Goa Call Girls Numbers, Call Girls Whatsapp Numbers Goa
9316020077📞Goa  Call Girls  Numbers, Call Girls  Whatsapp Numbers Goa9316020077📞Goa  Call Girls  Numbers, Call Girls  Whatsapp Numbers Goa
9316020077📞Goa Call Girls Numbers, Call Girls Whatsapp Numbers Goa
russian goa call girl and escorts service
 
jabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
jabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetjabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
jabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Sheetaleventcompany
 
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in LahoreBest Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Deny Daniel
 

Último (20)

Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetBareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetraisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
❤️Call girls in Jalandhar ☎️9876848877☎️ Call Girl service in Jalandhar☎️ Jal...
❤️Call girls in Jalandhar ☎️9876848877☎️ Call Girl service in Jalandhar☎️ Jal...❤️Call girls in Jalandhar ☎️9876848877☎️ Call Girl service in Jalandhar☎️ Jal...
❤️Call girls in Jalandhar ☎️9876848877☎️ Call Girl service in Jalandhar☎️ Jal...
 
Bhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetBhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bhagalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Kochi call girls Mallu escort girls available 7877702510
Kochi call girls Mallu escort girls available 7877702510Kochi call girls Mallu escort girls available 7877702510
Kochi call girls Mallu escort girls available 7877702510
 
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Krishnagiri call girls Tamil Actress sex service 7877702510
Krishnagiri call girls Tamil Actress sex service 7877702510Krishnagiri call girls Tamil Actress sex service 7877702510
Krishnagiri call girls Tamil Actress sex service 7877702510
 
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetNanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
 
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMuzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near MeVIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
 
Russian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near Me
Russian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near MeRussian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near Me
Russian Call Girls in Noida Pallavi 9711199171 High Class Call Girl Near Me
 
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in AnantapurCall Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
 
Kolkata Call Girls Miss Inaaya ❤️ at @30% discount Everyday Call girl
Kolkata Call Girls Miss Inaaya ❤️ at @30% discount Everyday Call girlKolkata Call Girls Miss Inaaya ❤️ at @30% discount Everyday Call girl
Kolkata Call Girls Miss Inaaya ❤️ at @30% discount Everyday Call girl
 
Sambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Sambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetSambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Sambalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetHubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
9316020077📞Goa Call Girls Numbers, Call Girls Whatsapp Numbers Goa
9316020077📞Goa  Call Girls  Numbers, Call Girls  Whatsapp Numbers Goa9316020077📞Goa  Call Girls  Numbers, Call Girls  Whatsapp Numbers Goa
9316020077📞Goa Call Girls Numbers, Call Girls Whatsapp Numbers Goa
 
jabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
jabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetjabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
jabalpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
 
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in LahoreBest Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
 

Site visit report

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) Integrated Assignment: Measurement I (QSB60104) Construction Technology I (BLD 60104) Building Materials (BLD 62003) Site Visit Report STUDENT NAME: Wong Qin Kai STUDENT ID NO: 0320024 DATE OF SUBMISSION: 27th November 2015 Content 1. Cover Page 1 Wong Qin Kai 0320024
  • 2. 2 2. Introduction 3 3. Project Summary 4 4. Technical Observations 5 5. Objectives 6 6. Contents 7-10 7. Photos and Description 11-14 8. Conclusion 15 Introduction A construction site visit is organized by Sr.Ang Fuey Lin on 19th of November 2015 which located at Antara Gapi ,Hulu Selangor.This project was started in 6th July 2014 and will be completed in 4th July 2016. First of all, we are required to produce a report that combined with Measurement I , Construction Technology and Building Material. The main content of this report is about Wong Qin Kai 0320024
  • 3. 3 the pad footing which assigned by the lecturers. From what I saw in the notice board ,the entire architect is from Zain Hamzah Architect film , the main contractor is from AJ-CORP Sdn Bhd ,the supplier of the materials is from MCM Associates Sdn Bhd and the property developer is from Perbadanan Kemajuan Negeri Selangor (PKNS). Project Summary Layout Plan of footing Wong Qin Kai 0320024
  • 4. 4 Project name : Cadangan membina dan meyiapkan 96 units rumah berkembar (40’x80’) serta infrastructure yang berkaitan di Seksyen 2A , Antara Gapi , Mukim Serendah , Hulu Selangor , Selangor Darul Ehsan. Details of the company: Wawasan Bersatu SDN BHD Jurutera Perunding - Consulting Engineers (327887-D) Unit 36-2 , 2nd Floor , Petaling Utama Avenue, Jalan PJS 1/50 , Petaling Utama, 46150 Petaling Jaya Selangor Darul Ehsan. TEL:(03)77850966 & (03)77812132 Email:wawasanbersatu@yahoo.com Technical Observation Before going to the site , we are required to pass up the idemnity form and each of us need to pay RM15 for the bus fares. In the early morning, we gathered at the bus waiting area which located at Block B. However, we also need to buy a safety helmet in order to protect us against the impact by falling objects and struck by swinging objects.We separated into 2 buses and we took about one hour to reach the destination. When we reached at the construction site , I felt like very excited because this is my Wong Qin Kai 0320024
  • 5. 5 first time to enter the site.In order to take time,the safety officer gave us a very short briefing about the safety precautions to ensure that we can visit the construction site safely.The project manager also explained to us about the whole construction process and which company is involved into this project. The first thing that I observed from site is pile. It is used to build the multi storey of building. At the top of the pile is connected with the pile caps.Pile usually forced into the ground to transfer the load to underlying soil or rock layers when the surface soils at a proposal site are too weak or to provide enough support. Next is the pad footing.I have a clearer vision of how pad footing look like and also how to remove the formwork when the concrete had gained in sufficient strength.Pad footing is suitable for all types of soil and it supported individual point load.The advantages of it are requires little excavation , easy to construct ,minimize the cost of the concrete and add the reinforcement bar according to the load.On the other hand , pad footing is more expensive than strip and trench foundation. Wong Qin Kai 0320024
  • 6. 6 Objective of the assignment  To understand the basics of the construction process.  To witness the usage of construction equipment on site including mechanical plants.  To explore and identify various types of building materials and technology on site.  To explain the construction of buildings and the scientific principles that underpin the design and construction.  To give awareness and the importance of safety in the construction site.  Ability to communicate with construction team members and to get more understanding about the importance of teamwork. Wong Qin Kai 0320024
  • 7. 7 How a pad footing being constructed ? 1) We need to do site clearance such as removal of soil to reduce level, removal of trees,bushes,stump of the tree and so on) 2) Next stage is site setting out .The position of the pad footings are being set out according to the layout plan and normally they measured by a steel tape. Wong Qin Kai 0320024
  • 8. 8 3) After finished marking and setting out of the site , the workers use the cement powder to mark the size of the pad footing and to make it more easy to identify. 4) Excavation is now required and excavate from the earth’s surface to the specific depth by using a excavator. 5) Hardcore is now placed at the top of the surface.The purpose of the hardcore is to fill hollows and to raise the finished level of an over-site concrete slab after removal of turf. However ,it should be used in a layer which at least 150mm thick. After placed the hardcore ,we need to compact down to a layer with a plate compactor. Wong Qin Kai 0320024
  • 9. 9 6) Next is to build the formwork. To build a formwork , we need to follow a specific size that have been measured in the plan such as adjust to fit the position and size. After that , we need to have two stages that to prevent the formwork falling down and to ensure that the formwork is strong enough to support the horizontal forces of the concrete when it poured which are to add studs and bracing. 7) After finished to build a formwork , we are required to pour a lean concrete inside the formwork because it used to prevent direct contact of foundation concrete from the soils and provide a uniform surface to the foundation concrete. 8) Next is to place the reinforcement bar inside the formwork. Before laying the reinforcement bar , we need to have some spacer blocks which used to maintain reinforcement . Hence , it also can help to protect from the fire and prevent from the Wong Qin Kai 0320024
  • 10. 10 corrosion of reinforcement bar. 10) Therefore , we need to have some tiles while install the reinforcement for stump as it has a weak tension strength even though there was a good compression strength for concrete. Next is placing the starter bar.The reason that we need to place starter bar is because starter bars are the reinforcement bar that cast into a member to give a lapped connection to further reinforcement in another concrete element to be cast against it. 11) Last ,the concrete is being poured into the formwork. At this stage ,the vibrator compactor is required as it allows for compaction in confined spaces and remove it when the concrete had gained in sufficient strength. What are the materials that involved in constructing a pad footing? Concrete , steel and timber are the materials that used to construct a pad footing.  Timber normally is for temporary work and the construction site always use it to build formwork is because it is cheap & light weight , economical , easy to handling , damage part can easy to repair , reusable , doesn’t need any special equipment & tools and also available in different size.  Steel is permanent work. The advantages of it are strong building material for Wong Qin Kai 0320024
  • 11. 11 superstructure , high melting point , recyclable , durability and high performance.  Concrete is the world’s widely used building material.It produced from local resources which with many grades of fine and coarse aggregate to meet standard & special mix needs. Therefore the key ingredient of the concrete is cement which made by limestone , shale and clay. Photos and Description Wong Qin Kai 0320024 The contractors are introducing the entire site to us so that we can get more information for the whole construction process and they also told us about the safety precautions to ensure that we can visit the site safely. Pile and the pilecap which made by concrete
  • 12. 12Wong Qin Kai 0320024 Reinforcement bars and stirrups are being used to build the column and pad footing. This is independent scaffolding which doesn’t require any buildings to support it. Base plates and cross braces are made by the timber,steel and tubular aluminium.
  • 13. 13Wong Qin Kai 0320024 This is ground floor beam which is connected between two columns. Cement as a binding material,it is the most important building material because almost every construction requires cement. This is the item that used to build the roof. Precaution on the site to avoid the unnecessary troubles Temporary office for contractors and manager The worker is sticking two masonry units together which is the stuff that we can see between the bricks.It belongs to strecher bond. Sand is putting aside which to be used for any types of construction.
  • 14. 14Wong Qin Kai 0320024 Steel that used for roof which is fire resistant, does not burn and will not contribute fuel to the spread of fire. This is the only pad footing area from site. As you can see,some of the formwork have already been removed by workers. Workers are adding links to the bar. This is common brick which used widely and it also available in many sizes and finishes This is the formwork of roof beam. Roof tiles are being used.
  • 15. 15 Conclusion After visiting the construction site, I realized that working at the site is much more laborious when compare to the person who working in the office because of the existing risks and weather condition. However , I also gained a lot of new experiences and extra knowledge about the pad footing that I had never ever learn in class. Throughout this project, I found out that communication between workers and project manager are very important because it is the only way to ensure that they can overcome the problems together and make the process of construction more efficiency. Beside that, I also have a better understanding and clearer vision of what I had never seem before such as pad footing , pilecap , stirrups , reinforcement bars and so forth. Besides that , I also get better understanding about the safety in the construction site because it is really important and that is we need a safety helmet.Other than that , there are also some obvious dangerous things surrounding us which is not easily to find such as nails , fragment ,holes and so forth. Last but not least , I would like to say millions of thanks to our lecturers because this site visit had given me a better understanding about the construction process which may Wong Qin Kai 0320024 One of the proposal of Wawasan Bersatu Sdn Bhd company. Reinforced concrete frame for the building including beams ,slab and columns
  • 16. 16 use in the future. Wong Qin Kai 0320024