V9                                                                      RISK ASSESSMENT

                                                                                  RISK                                                           IN         REVIEW
             ACTIVITY                                  HAZARD                     H/M/L                    PRECAUTIONS                         PLACE         DATE         REVIEWER
Camera Positioned On Stairs             Camera Falling Off;                                Someone can be monitoring the
                                        smashed, broken, loss of                           camera at all times; holding in hands,
                                        film etc                                           holding the support

Filming in “wooded area on a hill”      Dropping camera, Student’s                         Look where your treading so as not to
                                        Falling down hill                                  tread on uneven ground and slip
                                                                                           down the hill
                                                                                           Have one person assigned to watch
                                                                                           the camera at all times
Smoking                                 Be careful when using                              Make sure you are constantly aware
                                        lighter (don’t burn yourself)                      of the lit cigarette and watch where
                                        HOT ASH WILL BURN                                  you flick ash to avoid burns
Running
                                        When running along                                 Look were you’re going
                                        corridors be careful so you
                                        don’t fall over

Shooting By The River                   People and equipment can                           Ensure someone is looking after the
                                        fall in; damaged camera,                           camera equipment at all time
                                        drowning students                                  Make sure you are aware of how near
                                                                                           the river is

Hanging from the toilet door            Be careful as not to fall from                     Only filming that for a few seconds but
                                        the toilet door                                    others will be ready in case of a fall




Please leave this section blank:
Risk Assessment checked by: Name …………………………………………………..                                        Signed ………………………………………………….                                   Date ……………………

      KEY:    Activity :       Describe the component part of your pursuit.
              Hazard :         List the things you anticipate might cause harm or the things associated with your activity that have the potential to cause harm. Consider the likely
                               harm.
              Risk:            Assess the risk as either H (High), M (Medium) or L (Low). When concluding your assessment consider all of the circumstances.
              Precautions:     Consider what you could do to minimise / negate the risk.
              In Place:        Will the precautionary measures be in place at the time of the activity?
Review Date:   When would it be reasonable to review your assessment? Remember it might be whilst you are undertaking the activity.
                   Reviewer:      Name of the person responsible for completing the risk assessment.
                                                   A copy of this form should be taken on the activity or visit by the Reviewer.
V9/PALL/sspi/reviewedOct2010

Más contenido relacionado

La actualidad más candente

4.2 Risk assessment project (i)
4.2 Risk assessment project (i)4.2 Risk assessment project (i)
4.2 Risk assessment project (i)Md Farid Talif
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptKamran Zafar
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpointJomish John
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templatesDwarika Bhushan Sharma
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Moving equipment around the site
Moving equipment around the site Moving equipment around the site
Moving equipment around the site Larry Riley
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety InductionJames McCann
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templatesDwarika Bhushan Sharma
 
A Realistic Look at the Active Shooter Situation
A Realistic Look at the Active Shooter SituationA Realistic Look at the Active Shooter Situation
A Realistic Look at the Active Shooter SituationLowers & Associates
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Trainingdevan4ru
 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templatesDwarika Bhushan Sharma
 
Flagman-Training.ppt
Flagman-Training.pptFlagman-Training.ppt
Flagman-Training.pptImran Khan
 

La actualidad más candente (20)

4.2 Risk assessment project (i)
4.2 Risk assessment project (i)4.2 Risk assessment project (i)
4.2 Risk assessment project (i)
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
MEWP TRAINING.pptx
MEWP TRAINING.pptxMEWP TRAINING.pptx
MEWP TRAINING.pptx
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Moving equipment around the site
Moving equipment around the site Moving equipment around the site
Moving equipment around the site
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
 
A Realistic Look at the Active Shooter Situation
A Realistic Look at the Active Shooter SituationA Realistic Look at the Active Shooter Situation
A Realistic Look at the Active Shooter Situation
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Training
 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templates
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Lockout Tagout Training
Lockout Tagout TrainingLockout Tagout Training
Lockout Tagout Training
 
Flagman-Training.ppt
Flagman-Training.pptFlagman-Training.ppt
Flagman-Training.ppt
 
Manual_handling
Manual_handlingManual_handling
Manual_handling
 

Similar a Risk assessment form complete

Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment FormJake Kemp
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment formLydiaCharlotteCooke
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessmentdriss123
 
Risk assessment form - Working to a brief
Risk assessment form - Working to a briefRisk assessment form - Working to a brief
Risk assessment form - Working to a briefelliotnjones
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment formskyeeneel
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentconner3326
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessmentmillerj1
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessmentmillerj1
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment formRoseBishay
 

Similar a Risk assessment form complete (16)

Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment Form
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk assesment new
Risk assesment   newRisk assesment   new
Risk assesment new
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment form - Working to a brief
Risk assessment form - Working to a briefRisk assessment form - Working to a brief
Risk assessment form - Working to a brief
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
 
Musicvideorisk
MusicvideoriskMusicvideorisk
Musicvideorisk
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 

Más de JoshGmanMcLean (20)

Cubase instruction guide
Cubase instruction guideCubase instruction guide
Cubase instruction guide
 
Evaluation unit 6
Evaluation unit 6Evaluation unit 6
Evaluation unit 6
 
Final major project
Final major projectFinal major project
Final major project
 
Work log
Work logWork log
Work log
 
Prsmusiclogsheet
PrsmusiclogsheetPrsmusiclogsheet
Prsmusiclogsheet
 
Poster Design Process
Poster Design ProcessPoster Design Process
Poster Design Process
 
T-Shirt Making Process
T-Shirt Making ProcessT-Shirt Making Process
T-Shirt Making Process
 
2
22
2
 
1
11
1
 
Recce
RecceRecce
Recce
 
Production schedule
Production scheduleProduction schedule
Production schedule
 
Korg D1200mkii manual
Korg D1200mkii manualKorg D1200mkii manual
Korg D1200mkii manual
 
MIX 3 Printscreens
MIX 3 PrintscreensMIX 3 Printscreens
MIX 3 Printscreens
 
MIX 2 printscreens
MIX 2 printscreensMIX 2 printscreens
MIX 2 printscreens
 
MIX 1 screen shots
MIX 1 screen shotsMIX 1 screen shots
MIX 1 screen shots
 
Proposal
ProposalProposal
Proposal
 
Moodboard
MoodboardMoodboard
Moodboard
 
Research into market
Research into marketResearch into market
Research into market
 
Questionaire
QuestionaireQuestionaire
Questionaire
 
Audience research
Audience researchAudience research
Audience research
 

Risk assessment form complete

  • 1. V9 RISK ASSESSMENT RISK IN REVIEW ACTIVITY HAZARD H/M/L PRECAUTIONS PLACE DATE REVIEWER Camera Positioned On Stairs Camera Falling Off; Someone can be monitoring the smashed, broken, loss of camera at all times; holding in hands, film etc holding the support Filming in “wooded area on a hill” Dropping camera, Student’s Look where your treading so as not to Falling down hill tread on uneven ground and slip down the hill Have one person assigned to watch the camera at all times Smoking Be careful when using Make sure you are constantly aware lighter (don’t burn yourself) of the lit cigarette and watch where HOT ASH WILL BURN you flick ash to avoid burns Running When running along Look were you’re going corridors be careful so you don’t fall over Shooting By The River People and equipment can Ensure someone is looking after the fall in; damaged camera, camera equipment at all time drowning students Make sure you are aware of how near the river is Hanging from the toilet door Be careful as not to fall from Only filming that for a few seconds but the toilet door others will be ready in case of a fall Please leave this section blank: Risk Assessment checked by: Name ………………………………………………….. Signed …………………………………………………. Date …………………… KEY: Activity : Describe the component part of your pursuit. Hazard : List the things you anticipate might cause harm or the things associated with your activity that have the potential to cause harm. Consider the likely harm. Risk: Assess the risk as either H (High), M (Medium) or L (Low). When concluding your assessment consider all of the circumstances. Precautions: Consider what you could do to minimise / negate the risk. In Place: Will the precautionary measures be in place at the time of the activity?
  • 2. Review Date: When would it be reasonable to review your assessment? Remember it might be whilst you are undertaking the activity. Reviewer: Name of the person responsible for completing the risk assessment. A copy of this form should be taken on the activity or visit by the Reviewer. V9/PALL/sspi/reviewedOct2010