Stage 2 Trillium Line
Independent Peer Review
Light Rail Sub-Committee
May 26, 2023
Background
2
Discussion
Quality of
railway
design,
construction,
and
installation on
the TLE
City
Council
Third-party
Peer Review
Objectives
● Analyze & validate
TNEXT's strategies
& methodologies
● Identify any
potential issues
Procurement
SYSTRA Canada
Inc. and RATP
Dev. Canada
Final
Report
Oct 2021 Dec 2021 May 2022 Feb 2023
Company profile
3
RATP
Group
SYSTRA
Canada
Relevant
Projects
- ARTM Blue Line Extension Peer
Review
Montreal, Canada
- Lusail Light Rail Transit
Doha, Qatar
- Al Sufouh Tramway System Project
Dubai, United Arab Emirates
Certified ISO
9001:2015
History
Over 60 years of experience
7,500 employees worldwide
Services
Transportation Solutions
Advise, Design and Build New
Mobility Systems
History
Over 120 years of experience
3rd largest public transport entity
worldwide
Services
Operations & Maintenance Services
Design, Build, Operate, Maintain,
and Modernize Urban Rail Systems
Process
4
Review
Extensive Review of various documentation from project management,
design, construction, testing, operation and Maintenance.
Interviews Series of interviews and workshops with the TransitNEXT team.
Site Visit
A site visit to various project locations, including the Main Server Room, the
Test Lab, the Main Control Centre, the MSF, and the Walkley Station.
Discussion
Several rounds of constructive discussions with TransitNEXT and the City
to arrive at a shared understanding of the strategies employed based on
the work completed to date.
Final Review
Final report identifies project risks and offers recommendations, based on
final review of document updates and feedback from City/TransitNEXT.
Action Plan
City has taken active steps to address any identified shortfalls by
implementing an action plan throughout the ongoing project development
47 action Items
5
Operations & Maintenance (9)
Rail Systems (20)
Project Management (3)
Rail Infrastructure (5)
Safety Processes (10)
• Trackwork
• Tunnel Ventilation System
• Construction Control
• Trains and Systems
• Rail Communication
Systems
• Testing & Commissioning
• System Engineering
Management
Status of action Items
6
In Progress (7)
• Post Concrete Placement Verification
• On-site Systems Integration
Addressed in an Alternative Format (13) Future Consideration (4)
To be explored further based on
System Performance
Fully Addressed (23)
• Revisions to various documents
• Issuance of Documents Following
Peer Review
• Completed Testing
• Ongoing Report Updates
• Recurring Meetings
• Future Testing
Project management
7
New Baseline Schedule
Lessons-learned Document
Training Schedule
Rail infrastructure
8
Direct Fixation Track - Methodology & Tests
Limebank Crossover Rail (StructureInteractionAnalysis)
Tunnel Temperature & Trains HVAC
Tunnel Ventilation documentation
Post Concrete Placement Verification
Rail systems (1 of 2)
9
Cold Weather Test (Door Operator)
Cold Weather Test (Engine Startup)
Interior & Exterior Noise Tests
Bogie Rotational Resistive Test
Vehicle Vertical Gaps at the Platform
Train Control System Test (GEBR Test)
Testing & Commissioning Test Plan
Systems Testing & Documentation
Testing & Commissioning Schedule
Rail systems (2 of 2)
10
Considerations for the Future Electrification
Accountability for Systems Configuration Management
System Breakdown Structure & Functional Breakdown Structure
EMC Control Plan update
Operating Requirements for 98.5% Service Delivery
Operations & maintenance
11
2048 Ridership Forecast
MinimumAchievable Headway
South Keys Turnaround Time
8th Stadler Train
Maintenance Mobilization Plan
Maintenance Software
Additional Incident Simulations
Maintenance Schedule
Obsolescence Management Plan
Safety processes
12
RAMS Activities (V-Model Life Cycle)
RAMS Team (Autonomy/Authority/Independence)
RAMS Terms (Definitions)
RAM Apportionment (from top level down to the LRU)
RAMS Data Collection and Verification
Risk Reduction (Safety/RAMS Related Risks)
Common Cause FailureAnalysis
Hazards & Mitigations
Alstom LINT Functional Interfaces
CENELEC Complience
Questions?
13

Más contenido relacionado

Similar a May 26 LRSC - Trillium Stage 2_Peer Review.pdf

Tammy Clark Resume - Final
Tammy Clark Resume - FinalTammy Clark Resume - Final
Tammy Clark Resume - Final
Tammy Clark
 
MUKUL PATEL 21042016
MUKUL PATEL 21042016MUKUL PATEL 21042016
MUKUL PATEL 21042016
Mukul Patel
 
RCSS Capabilities
RCSS CapabilitiesRCSS Capabilities
RCSS Capabilities
stevefinnie
 
General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_Engineering
Fred Strijbos
 

Similar a May 26 LRSC - Trillium Stage 2_Peer Review.pdf (20)

Leadec conveyor integration 2019
Leadec conveyor integration 2019Leadec conveyor integration 2019
Leadec conveyor integration 2019
 
Tammy Clark Resume - Final
Tammy Clark Resume - FinalTammy Clark Resume - Final
Tammy Clark Resume - Final
 
WMATA and Amtrak Discuss Maximo Mobile Success
WMATA and Amtrak Discuss Maximo Mobile Success WMATA and Amtrak Discuss Maximo Mobile Success
WMATA and Amtrak Discuss Maximo Mobile Success
 
AITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony JohnstoneAITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony Johnstone
 
Progressive Assurance, APM Programme Management SIG Conference 2017, 02 March...
Progressive Assurance, APM Programme Management SIG Conference 2017, 02 March...Progressive Assurance, APM Programme Management SIG Conference 2017, 02 March...
Progressive Assurance, APM Programme Management SIG Conference 2017, 02 March...
 
Culver Test Track
Culver Test TrackCulver Test Track
Culver Test Track
 
Trafficshifting: Avoiding Disasters & Improving Performance at Scale
Trafficshifting: Avoiding Disasters & Improving Performance at ScaleTrafficshifting: Avoiding Disasters & Improving Performance at Scale
Trafficshifting: Avoiding Disasters & Improving Performance at Scale
 
APRICOT 2017: Trafficshifting: Avoiding Disasters & Improving Performance at ...
APRICOT 2017: Trafficshifting: Avoiding Disasters & Improving Performance at ...APRICOT 2017: Trafficshifting: Avoiding Disasters & Improving Performance at ...
APRICOT 2017: Trafficshifting: Avoiding Disasters & Improving Performance at ...
 
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
 
MUKUL PATEL 21042016
MUKUL PATEL 21042016MUKUL PATEL 21042016
MUKUL PATEL 21042016
 
suyesh resume 2 july 16
suyesh resume 2 july 16suyesh resume 2 july 16
suyesh resume 2 july 16
 
RCSS Capabilities
RCSS CapabilitiesRCSS Capabilities
RCSS Capabilities
 
Tim gray
Tim grayTim gray
Tim gray
 
General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_Engineering
 
Post Processing
Post Processing Post Processing
Post Processing
 
Automated traffic control system
Automated traffic control systemAutomated traffic control system
Automated traffic control system
 
Local Agency Asphalt Specification
Local Agency Asphalt SpecificationLocal Agency Asphalt Specification
Local Agency Asphalt Specification
 
City & County of Denver's MuleSoft Journey
City & County of Denver's MuleSoft JourneyCity & County of Denver's MuleSoft Journey
City & County of Denver's MuleSoft Journey
 
2018 MATC Fall Webinar Series - Dwight Clark
2018 MATC Fall Webinar Series - Dwight Clark2018 MATC Fall Webinar Series - Dwight Clark
2018 MATC Fall Webinar Series - Dwight Clark
 
Daniel Irwin - Crossrail: Future-Proofing Railway Asset Management
Daniel Irwin - Crossrail: Future-Proofing Railway Asset ManagementDaniel Irwin - Crossrail: Future-Proofing Railway Asset Management
Daniel Irwin - Crossrail: Future-Proofing Railway Asset Management
 

Último

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 

Último (20)

Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 

May 26 LRSC - Trillium Stage 2_Peer Review.pdf

  • 1. Stage 2 Trillium Line Independent Peer Review Light Rail Sub-Committee May 26, 2023
  • 2. Background 2 Discussion Quality of railway design, construction, and installation on the TLE City Council Third-party Peer Review Objectives ● Analyze & validate TNEXT's strategies & methodologies ● Identify any potential issues Procurement SYSTRA Canada Inc. and RATP Dev. Canada Final Report Oct 2021 Dec 2021 May 2022 Feb 2023
  • 3. Company profile 3 RATP Group SYSTRA Canada Relevant Projects - ARTM Blue Line Extension Peer Review Montreal, Canada - Lusail Light Rail Transit Doha, Qatar - Al Sufouh Tramway System Project Dubai, United Arab Emirates Certified ISO 9001:2015 History Over 60 years of experience 7,500 employees worldwide Services Transportation Solutions Advise, Design and Build New Mobility Systems History Over 120 years of experience 3rd largest public transport entity worldwide Services Operations & Maintenance Services Design, Build, Operate, Maintain, and Modernize Urban Rail Systems
  • 4. Process 4 Review Extensive Review of various documentation from project management, design, construction, testing, operation and Maintenance. Interviews Series of interviews and workshops with the TransitNEXT team. Site Visit A site visit to various project locations, including the Main Server Room, the Test Lab, the Main Control Centre, the MSF, and the Walkley Station. Discussion Several rounds of constructive discussions with TransitNEXT and the City to arrive at a shared understanding of the strategies employed based on the work completed to date. Final Review Final report identifies project risks and offers recommendations, based on final review of document updates and feedback from City/TransitNEXT. Action Plan City has taken active steps to address any identified shortfalls by implementing an action plan throughout the ongoing project development
  • 5. 47 action Items 5 Operations & Maintenance (9) Rail Systems (20) Project Management (3) Rail Infrastructure (5) Safety Processes (10) • Trackwork • Tunnel Ventilation System • Construction Control • Trains and Systems • Rail Communication Systems • Testing & Commissioning • System Engineering Management
  • 6. Status of action Items 6 In Progress (7) • Post Concrete Placement Verification • On-site Systems Integration Addressed in an Alternative Format (13) Future Consideration (4) To be explored further based on System Performance Fully Addressed (23) • Revisions to various documents • Issuance of Documents Following Peer Review • Completed Testing • Ongoing Report Updates • Recurring Meetings • Future Testing
  • 7. Project management 7 New Baseline Schedule Lessons-learned Document Training Schedule
  • 8. Rail infrastructure 8 Direct Fixation Track - Methodology & Tests Limebank Crossover Rail (StructureInteractionAnalysis) Tunnel Temperature & Trains HVAC Tunnel Ventilation documentation Post Concrete Placement Verification
  • 9. Rail systems (1 of 2) 9 Cold Weather Test (Door Operator) Cold Weather Test (Engine Startup) Interior & Exterior Noise Tests Bogie Rotational Resistive Test Vehicle Vertical Gaps at the Platform Train Control System Test (GEBR Test) Testing & Commissioning Test Plan Systems Testing & Documentation Testing & Commissioning Schedule
  • 10. Rail systems (2 of 2) 10 Considerations for the Future Electrification Accountability for Systems Configuration Management System Breakdown Structure & Functional Breakdown Structure EMC Control Plan update Operating Requirements for 98.5% Service Delivery
  • 11. Operations & maintenance 11 2048 Ridership Forecast MinimumAchievable Headway South Keys Turnaround Time 8th Stadler Train Maintenance Mobilization Plan Maintenance Software Additional Incident Simulations Maintenance Schedule Obsolescence Management Plan
  • 12. Safety processes 12 RAMS Activities (V-Model Life Cycle) RAMS Team (Autonomy/Authority/Independence) RAMS Terms (Definitions) RAM Apportionment (from top level down to the LRU) RAMS Data Collection and Verification Risk Reduction (Safety/RAMS Related Risks) Common Cause FailureAnalysis Hazards & Mitigations Alstom LINT Functional Interfaces CENELEC Complience