Agenda
Importance of fire prevention during hot work
operations
Regulatory background
OSHA’s welding, cutting, and brazing
standard
NFPA’s standard for fire prevention during
welding, cutting, and other hot work
AHEC’s Hot Work Program
Implementation assistance
5/30/2023 2
Hot Work Policy
• Purpose is to protect personnel and property from
fire.
• This policy defines the responsibilities and
requirement for performing hot work
• This policy establishes the work area and
planned hot work activity to put in place controls
to prevent fires.
5/30/2023 3
Importance of Fire Prevention During Hot
Work Operations
5/30/2023 4
Hot Work is any work involving burning, welding, or similar
operations that are capable of initiating fires or explosions.
This program shall cover the following hot work processes:
• Welding and Allied Processes
• Heat Treating
• Grinding
• Thawing Pipe
• Powder-Driven Fasteners
• Hot Riveting
• Similar Applications Producing a Spark, Flame or Heat
OSHA’s and NFPA’s Welding, Cutting and
Brazing Standards
5/30/2023 5
• Required basic precautions including:
̄ responsibility for hot work;
̄ protection of personnel;
̄ removing, guarding, or shielding combustibles;
̄ trained and equipped fire watch/es;
̄ designated welding areas;
̄ authorized written hot work permits and;
̄ training and communication.
AHEC’s Hot Work Program
Responsibilities
 Environmental Health and Safety
 Life Safety Shop
 Project Management and O & M
 Outside Contractors
 Management
 Permit Authorizing Individual (PAI)
 Fire Watch
 Supervisors
 Employees (Hot Work Operators)
5/30/2023 6
Environmental Health and Safety Shop
Responsibilities
• coordinating the Hot Work Program;
• assisting departments and areas with training;
• maintaining copies of the hot work permits and;
• updating and evaluating AHEC’s Hot Work
Program.
• Providing any personal protective equipment
(PPE) as needed
assisting in determining the suitability of
designated areas for hot work and;
performing or arranging fire extinguisher training.
5/30/2023 7
Project Management's Responsibilities
Authorized Person responsible for compliance of
the policy
Will be the Authorized person for contracted
work
Advising contractors about flammable materials
or hazardous conditions of which they may not
be aware and ensuring that they are familiar with
the provisions of Denver Fire Department Policy
IFC-2601-1and 29 CFR 1910.252
5/30/2023 8
Outside Contractors Responsibilities
5/30/2023 9
• following the provisions of Denver Fire
Department Policy IFC-2601-1 and 29 CFR
1910.252
• 3rd party contractors must acquire a hot work
permit directly from the jurisdiction
Management Responsibilities
• providing employees with adequate training
including the inherent risks involved, the
emergency procedures in the event of a fire,
instructions on all equipment and processes, as
well as the provisions of this program;
• recognizing responsibility for the safe usage of
cutting and welding equipment on AHEC property
and ensuring only approved equipment is used;
• establishing permissible areas for hot work and
procedures for cutting and welding in other areas;
• designating a permit authorizing individual (PAI)
5/30/2023 10
Management Responsibilities Cont.
• advising contractors about flammable
materials or hazardous conditions of which
they may not be aware and ensuring that they
are familiar with the provisions of Denver Fire
Department Policy IFC-2601-1 and 29 CFR
1910.252 and;
• providing fire extinguishing equipment.
5/30/2023 11
Fire Watch Responsibilities
 Being alert to the safety involved with the cutter or
welder
 Being trained to the requirements of this policy
 Have fire extinguisher available
 Being familiar with the facility and know how to
sound the alarm if necessary
 Calling Campus Police if needed
 Completing the Closeout section of the AHEC Hot
Work Authorization form
 Follow all fire protection procedures established by
the AHEC Life Safety Services and this policy
5/30/2023 12
When a Fire Watch is required
• hot work is performed in an area where other than minor
fires might develop;
• combustible materials in building construction or contents
are closer than 35 ft (11m) to the point of operation;
• combustible materials are more than 35 ft (11m) away, but
are easily ignited by sparks;
• wall or floor openings within a 35 ft (11m) radius expose
combustible materials in adjacent areas, including
concealed spaces in walls or floors or;
• combustible materials are adjacent to the opposite side of
partitions, walls, ceilings, or roofs and are likely to be
ignited.
5/30/2023 13
When a Fire Watch is required
 A fire watch must be maintained for 60 min. after
completion of hot work.
 More than one fire watch is required when combustible
material that could be ignited by hot work cannot be
directly observed by only one fire watch.
5/30/2023 14
Authorized Person
• Project Manager will be the Authorized Person for
contracted work.
• Shop Supervisor will be the Authorized Person for
Operation and Maintenance work.
• Institutional hot work operations, the Authorized Person
will be the contact listed on the DFD permit.
5/30/2023 15
Authorized Person Responsibilities
• Ensuring hot work is identified and performed in accordance
with this policy
• Ensuring appropriate DFD hot work permit is active and on file
• Approving AHEC Hot Work Authorization form for the
scheduled hot work.
• Contacting AHEC Life Safety Services at least 72 hours in
advance in order to coordinate any alarm system bypass that
may be necessary
• reviewing the work area to establish controls and fire watch
requirements (see the procedure section below).
• making sure that persons who will perform hot work have read and
understand this Hot Work Policy.
• assuring that persons who will perform hot work have demonstrated
competency in the use of hot work equipment and are trained in
performing hot work.
5/30/2023 16
Authorized Person Responsibilities
• ensuring that high energy sources are isolated as needed
in accordance with the Lockout/tag out policy.
• following all fire protection system disable/enable
procedures established by AHEC Life Safety Services and
this policy and ensuring the alarm system is reactivated
upon completion of hot work.
• submitting a copy of the completed permit to the records
file here:
• I:Safety OfficeHotWorkPolicyHotWork Authorizations
or email to lifesafetyservices@ahec.edu
5/30/2023 17
Hot Work Employee
• competency in use of hot work equipment and performing hot work.
• performing hot work in accordance with the requirements of this policy.
• being familiar with the facility and how to sound an alarm in the event of a
fire.
• performing and/or reviewing the work area preparation section of the
AHEC Hot Work Authorization form.
• making the work area fire safe and verifying on the permit that work can
start.
• ensuring the required safety precautions per the hot work permit are
followed.
• following all fire protection system disable/enable procedures established
by AHEC Life Safety Services and this policy and ensuring the alarm
system is reactivated upon completion of hot work.
5/30/2023 18
Procedure
 DFD hot work permit and AHEC Hot Work Authorization
form must be completed prior to initiating hot work and
posted at the work area.
 Work Process includes:
1. Assessment of the facility condition
2. Preparing of the work area
3. Hot work activity
4. Closeout
• Authorized Person shall perform a fire safety assessment of the
scheduled hot work where the following conditions exist:
• Fire suppression system is not operable or does not exist
• fire/smoke detection system is localized only or does not exist.
• special potential hazards such as work in a confined area, attic, or
crawlspace in which an increased fire risk may exist.
5/30/2023 19
Welding Areas
Non-permissible welding areas
areas not authorized by management;
sprinklered buildings while such protection is
impaired;
in the presence of an explosive atmosphere,
including improperly prepared drums that once
contained flammable materials and;
areas near storage of large quantities of
exposed, readily ignitable materials.
5/30/2023 20
Welding Areas
Hot work shall not be attempted on
a partition, wall, ceiling or roof that has a
combustible covering or insulation, or on walls
or partitions of combustible sandwich-type
panel construction and;
pipes or other metal that is in contact with
combustible walls, partitions, ceilings or roofs
shall not be done if the work is close enough to
cause ignition by conduction.
5/30/2023 21
Hot Work Program Training
Hot Work training session (This Session)
the inherent risks involved;
the emergency procedures in the event of a fire;
instructions on all equipment and processes
and;
the provisions of this program.
5/30/2023 22
Confined Spaces
• To prevent accidental contact, when arc welding is to be suspended
for any substantial period of time, such as during lunch or overnight,
all electrodes shall be removed from the holders and the holders
carefully located so that accidental contact cannot occur and the
machine be disconnected from the power source.
• In order to eliminate the possibility of gas escaping through leaks or
improperly closed valves, when gas welding or cutting, the torch
valves shall be closed and the gas supply to the torch positively shut
off at some point outside the confined space area whenever the torch
is not to be used for a substantial period of time, such as during lunch
hour or overnight. Where practical, the torch and hose shall also be
removed from the confined space.
5/30/2023 23
Confined Spaces Cont.
• When welding or cutting is being performed in any
confined space, the gas cylinders and welding machines
shall be left on the outside. Before operations are started,
heavy portable equipment mounted on wheels shall be
securely blocked to prevent accidental movement.
5/30/2023 24
AHEC’s Written Hot Work Program
Other Precautions
5/30/2023 25
• The following must be practiced for fall protection
• A welder working on platforms, scaffolds, or runways
shall be protected against falling by the use of railings,
life lines, or some other equally effective means.
• Welders shall also place welding cables and other
equipment so that they are clear of passageways,
ladders and stairways.
Environmental Health and Safety
Implementation Assistance
5/30/2023 26
• Environmental Health and Safety will assist
departments with:
• hot work permit training;
• fire extinguisher training and;
• determining the suitability of designated hot work areas.
• Contact Environmental Health and Safety at 303
556-8397 with any questions.
Resources
• Denver Fire Department Policy IFC-2601-1
• NFPA 51B and ANSI Z49.1
• OSHA 29 CFR 1910.252254
• OSHA 29 CFR1926.352
5/30/2023 27

Más contenido relacionado

La actualidad más candente

Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdfHSEXINYIPROJECT
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1debandleigh
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenancePrasadroshan Mythin
 
Comprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation PresentationComprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation PresentationBedazzled Media
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit SystemGagan Tanwar
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingKJP Consulting
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overviewzz_bedee
 

La actualidad más candente (20)

Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Confined Space Entry
Confined Space EntryConfined Space Entry
Confined Space Entry
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenance
 
Comprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation PresentationComprehensive Employee Safety Orientation Presentation
Comprehensive Employee Safety Orientation Presentation
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
HSE Fire Prevention & Protection Plan
HSE Fire Prevention & Protection PlanHSE Fire Prevention & Protection Plan
HSE Fire Prevention & Protection Plan
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 

Similar a Hot Work

Hot welding cutting
Hot welding cuttingHot welding cutting
Hot welding cuttingtheblues2708
 
Step 3 duties and fire watch
Step 3 duties and fire watchStep 3 duties and fire watch
Step 3 duties and fire watchfqf383
 
4-Hot-Work-Fire-Watch.ppt
4-Hot-Work-Fire-Watch.ppt4-Hot-Work-Fire-Watch.ppt
4-Hot-Work-Fire-Watch.pptAbheekDebnath2
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11fireawareness
 
rt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdfrt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdfssuserc4aee4
 
English_EHS13A_Hot_Work_English_Rev1.1.pdf
English_EHS13A_Hot_Work_English_Rev1.1.pdfEnglish_EHS13A_Hot_Work_English_Rev1.1.pdf
English_EHS13A_Hot_Work_English_Rev1.1.pdfvisioneersolution
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptxssuserb8f3fd2
 
Hot Work Training by Bowling Green State University
Hot Work Training by Bowling Green State UniversityHot Work Training by Bowling Green State University
Hot Work Training by Bowling Green State UniversityAtlantic Training, LLC.
 
Step 2 preparation & safety starters
Step 2 preparation & safety startersStep 2 preparation & safety starters
Step 2 preparation & safety startersfqf383
 
4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan4.6 working at heights and fall protection plan
4.6 working at heights and fall protection planDwarika Bhushan Sharma
 
fire safety guide in nuclear powerplants.pptx
fire safety guide in nuclear powerplants.pptxfire safety guide in nuclear powerplants.pptx
fire safety guide in nuclear powerplants.pptxkiavash1
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptAndreAntWilliams
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitalsKomal Gupta
 
010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.pptGamingHero6
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptGkMechanical
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfRazFazwan
 

Similar a Hot Work (20)

Hot welding cutting
Hot welding cuttingHot welding cutting
Hot welding cutting
 
Step 3 duties and fire watch
Step 3 duties and fire watchStep 3 duties and fire watch
Step 3 duties and fire watch
 
MODULE 4.pptx
MODULE 4.pptxMODULE 4.pptx
MODULE 4.pptx
 
4-Hot-Work-Fire-Watch.ppt
4-Hot-Work-Fire-Watch.ppt4-Hot-Work-Fire-Watch.ppt
4-Hot-Work-Fire-Watch.ppt
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11
 
rt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdfrt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdf
 
English_EHS13A_Hot_Work_English_Rev1.1.pdf
English_EHS13A_Hot_Work_English_Rev1.1.pdfEnglish_EHS13A_Hot_Work_English_Rev1.1.pdf
English_EHS13A_Hot_Work_English_Rev1.1.pdf
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
 
Hot Work Training by Bowling Green State University
Hot Work Training by Bowling Green State UniversityHot Work Training by Bowling Green State University
Hot Work Training by Bowling Green State University
 
Step 2 preparation & safety starters
Step 2 preparation & safety startersStep 2 preparation & safety starters
Step 2 preparation & safety starters
 
4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan
 
fire safety guide in nuclear powerplants.pptx
fire safety guide in nuclear powerplants.pptxfire safety guide in nuclear powerplants.pptx
fire safety guide in nuclear powerplants.pptx
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.ppt
 
Presentation on safety
Presentation on safetyPresentation on safety
Presentation on safety
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitals
 
010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.ppt
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.ppt
 
Contractor Safety Orientation by Sappi
Contractor Safety Orientation by SappiContractor Safety Orientation by Sappi
Contractor Safety Orientation by Sappi
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdf
 

Más de JulieMaeuser

Asbestos Awareness_08022022.pptx
Asbestos Awareness_08022022.pptxAsbestos Awareness_08022022.pptx
Asbestos Awareness_08022022.pptxJulieMaeuser
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)JulieMaeuser
 
Bloodborne Pathogen Safety
Bloodborne Pathogen SafetyBloodborne Pathogen Safety
Bloodborne Pathogen SafetyJulieMaeuser
 
Stormwater Awareness Training
Stormwater Awareness TrainingStormwater Awareness Training
Stormwater Awareness TrainingJulieMaeuser
 
Confined Space Entry
Confined Space EntryConfined Space Entry
Confined Space EntryJulieMaeuser
 

Más de JulieMaeuser (6)

Mold
MoldMold
Mold
 
Asbestos Awareness_08022022.pptx
Asbestos Awareness_08022022.pptxAsbestos Awareness_08022022.pptx
Asbestos Awareness_08022022.pptx
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)
 
Bloodborne Pathogen Safety
Bloodborne Pathogen SafetyBloodborne Pathogen Safety
Bloodborne Pathogen Safety
 
Stormwater Awareness Training
Stormwater Awareness TrainingStormwater Awareness Training
Stormwater Awareness Training
 
Confined Space Entry
Confined Space EntryConfined Space Entry
Confined Space Entry
 

Último

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 

Último (20)

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 

Hot Work

  • 1. HOT WORK TRAINING Environmental Health and Safety 5/30/2023 1
  • 2. Agenda Importance of fire prevention during hot work operations Regulatory background OSHA’s welding, cutting, and brazing standard NFPA’s standard for fire prevention during welding, cutting, and other hot work AHEC’s Hot Work Program Implementation assistance 5/30/2023 2
  • 3. Hot Work Policy • Purpose is to protect personnel and property from fire. • This policy defines the responsibilities and requirement for performing hot work • This policy establishes the work area and planned hot work activity to put in place controls to prevent fires. 5/30/2023 3
  • 4. Importance of Fire Prevention During Hot Work Operations 5/30/2023 4 Hot Work is any work involving burning, welding, or similar operations that are capable of initiating fires or explosions. This program shall cover the following hot work processes: • Welding and Allied Processes • Heat Treating • Grinding • Thawing Pipe • Powder-Driven Fasteners • Hot Riveting • Similar Applications Producing a Spark, Flame or Heat
  • 5. OSHA’s and NFPA’s Welding, Cutting and Brazing Standards 5/30/2023 5 • Required basic precautions including: ̄ responsibility for hot work; ̄ protection of personnel; ̄ removing, guarding, or shielding combustibles; ̄ trained and equipped fire watch/es; ̄ designated welding areas; ̄ authorized written hot work permits and; ̄ training and communication.
  • 6. AHEC’s Hot Work Program Responsibilities  Environmental Health and Safety  Life Safety Shop  Project Management and O & M  Outside Contractors  Management  Permit Authorizing Individual (PAI)  Fire Watch  Supervisors  Employees (Hot Work Operators) 5/30/2023 6
  • 7. Environmental Health and Safety Shop Responsibilities • coordinating the Hot Work Program; • assisting departments and areas with training; • maintaining copies of the hot work permits and; • updating and evaluating AHEC’s Hot Work Program. • Providing any personal protective equipment (PPE) as needed assisting in determining the suitability of designated areas for hot work and; performing or arranging fire extinguisher training. 5/30/2023 7
  • 8. Project Management's Responsibilities Authorized Person responsible for compliance of the policy Will be the Authorized person for contracted work Advising contractors about flammable materials or hazardous conditions of which they may not be aware and ensuring that they are familiar with the provisions of Denver Fire Department Policy IFC-2601-1and 29 CFR 1910.252 5/30/2023 8
  • 9. Outside Contractors Responsibilities 5/30/2023 9 • following the provisions of Denver Fire Department Policy IFC-2601-1 and 29 CFR 1910.252 • 3rd party contractors must acquire a hot work permit directly from the jurisdiction
  • 10. Management Responsibilities • providing employees with adequate training including the inherent risks involved, the emergency procedures in the event of a fire, instructions on all equipment and processes, as well as the provisions of this program; • recognizing responsibility for the safe usage of cutting and welding equipment on AHEC property and ensuring only approved equipment is used; • establishing permissible areas for hot work and procedures for cutting and welding in other areas; • designating a permit authorizing individual (PAI) 5/30/2023 10
  • 11. Management Responsibilities Cont. • advising contractors about flammable materials or hazardous conditions of which they may not be aware and ensuring that they are familiar with the provisions of Denver Fire Department Policy IFC-2601-1 and 29 CFR 1910.252 and; • providing fire extinguishing equipment. 5/30/2023 11
  • 12. Fire Watch Responsibilities  Being alert to the safety involved with the cutter or welder  Being trained to the requirements of this policy  Have fire extinguisher available  Being familiar with the facility and know how to sound the alarm if necessary  Calling Campus Police if needed  Completing the Closeout section of the AHEC Hot Work Authorization form  Follow all fire protection procedures established by the AHEC Life Safety Services and this policy 5/30/2023 12
  • 13. When a Fire Watch is required • hot work is performed in an area where other than minor fires might develop; • combustible materials in building construction or contents are closer than 35 ft (11m) to the point of operation; • combustible materials are more than 35 ft (11m) away, but are easily ignited by sparks; • wall or floor openings within a 35 ft (11m) radius expose combustible materials in adjacent areas, including concealed spaces in walls or floors or; • combustible materials are adjacent to the opposite side of partitions, walls, ceilings, or roofs and are likely to be ignited. 5/30/2023 13
  • 14. When a Fire Watch is required  A fire watch must be maintained for 60 min. after completion of hot work.  More than one fire watch is required when combustible material that could be ignited by hot work cannot be directly observed by only one fire watch. 5/30/2023 14
  • 15. Authorized Person • Project Manager will be the Authorized Person for contracted work. • Shop Supervisor will be the Authorized Person for Operation and Maintenance work. • Institutional hot work operations, the Authorized Person will be the contact listed on the DFD permit. 5/30/2023 15
  • 16. Authorized Person Responsibilities • Ensuring hot work is identified and performed in accordance with this policy • Ensuring appropriate DFD hot work permit is active and on file • Approving AHEC Hot Work Authorization form for the scheduled hot work. • Contacting AHEC Life Safety Services at least 72 hours in advance in order to coordinate any alarm system bypass that may be necessary • reviewing the work area to establish controls and fire watch requirements (see the procedure section below). • making sure that persons who will perform hot work have read and understand this Hot Work Policy. • assuring that persons who will perform hot work have demonstrated competency in the use of hot work equipment and are trained in performing hot work. 5/30/2023 16
  • 17. Authorized Person Responsibilities • ensuring that high energy sources are isolated as needed in accordance with the Lockout/tag out policy. • following all fire protection system disable/enable procedures established by AHEC Life Safety Services and this policy and ensuring the alarm system is reactivated upon completion of hot work. • submitting a copy of the completed permit to the records file here: • I:Safety OfficeHotWorkPolicyHotWork Authorizations or email to lifesafetyservices@ahec.edu 5/30/2023 17
  • 18. Hot Work Employee • competency in use of hot work equipment and performing hot work. • performing hot work in accordance with the requirements of this policy. • being familiar with the facility and how to sound an alarm in the event of a fire. • performing and/or reviewing the work area preparation section of the AHEC Hot Work Authorization form. • making the work area fire safe and verifying on the permit that work can start. • ensuring the required safety precautions per the hot work permit are followed. • following all fire protection system disable/enable procedures established by AHEC Life Safety Services and this policy and ensuring the alarm system is reactivated upon completion of hot work. 5/30/2023 18
  • 19. Procedure  DFD hot work permit and AHEC Hot Work Authorization form must be completed prior to initiating hot work and posted at the work area.  Work Process includes: 1. Assessment of the facility condition 2. Preparing of the work area 3. Hot work activity 4. Closeout • Authorized Person shall perform a fire safety assessment of the scheduled hot work where the following conditions exist: • Fire suppression system is not operable or does not exist • fire/smoke detection system is localized only or does not exist. • special potential hazards such as work in a confined area, attic, or crawlspace in which an increased fire risk may exist. 5/30/2023 19
  • 20. Welding Areas Non-permissible welding areas areas not authorized by management; sprinklered buildings while such protection is impaired; in the presence of an explosive atmosphere, including improperly prepared drums that once contained flammable materials and; areas near storage of large quantities of exposed, readily ignitable materials. 5/30/2023 20
  • 21. Welding Areas Hot work shall not be attempted on a partition, wall, ceiling or roof that has a combustible covering or insulation, or on walls or partitions of combustible sandwich-type panel construction and; pipes or other metal that is in contact with combustible walls, partitions, ceilings or roofs shall not be done if the work is close enough to cause ignition by conduction. 5/30/2023 21
  • 22. Hot Work Program Training Hot Work training session (This Session) the inherent risks involved; the emergency procedures in the event of a fire; instructions on all equipment and processes and; the provisions of this program. 5/30/2023 22
  • 23. Confined Spaces • To prevent accidental contact, when arc welding is to be suspended for any substantial period of time, such as during lunch or overnight, all electrodes shall be removed from the holders and the holders carefully located so that accidental contact cannot occur and the machine be disconnected from the power source. • In order to eliminate the possibility of gas escaping through leaks or improperly closed valves, when gas welding or cutting, the torch valves shall be closed and the gas supply to the torch positively shut off at some point outside the confined space area whenever the torch is not to be used for a substantial period of time, such as during lunch hour or overnight. Where practical, the torch and hose shall also be removed from the confined space. 5/30/2023 23
  • 24. Confined Spaces Cont. • When welding or cutting is being performed in any confined space, the gas cylinders and welding machines shall be left on the outside. Before operations are started, heavy portable equipment mounted on wheels shall be securely blocked to prevent accidental movement. 5/30/2023 24
  • 25. AHEC’s Written Hot Work Program Other Precautions 5/30/2023 25 • The following must be practiced for fall protection • A welder working on platforms, scaffolds, or runways shall be protected against falling by the use of railings, life lines, or some other equally effective means. • Welders shall also place welding cables and other equipment so that they are clear of passageways, ladders and stairways.
  • 26. Environmental Health and Safety Implementation Assistance 5/30/2023 26 • Environmental Health and Safety will assist departments with: • hot work permit training; • fire extinguisher training and; • determining the suitability of designated hot work areas. • Contact Environmental Health and Safety at 303 556-8397 with any questions.
  • 27. Resources • Denver Fire Department Policy IFC-2601-1 • NFPA 51B and ANSI Z49.1 • OSHA 29 CFR 1910.252254 • OSHA 29 CFR1926.352 5/30/2023 27