                                      Update – Week of
                                      4/12/2010



 Current Activities this Week:

 Mass Excavation:
 Remaining Mass Excavation Activities are ongoing
 and are nearling completion. Removal of the Haul Road
 to Area C is complete and restoration of the Speedway
 Property is ongoing.

 Site Utilities:                                               Speedway Property – Sod and seeding
 Installation of the new electrical ductbank is ongoing.       installation has commenced.
 Approximately 150 linear feet is installed. Awaiting
 BPU resolution on manhole tie-in.

 Boring of the service line and Sanitary Main Line
 D is complete, installation of the steel casing is ongoing.

 Foundations:
 Area 1 Field Level – Column Pad placement in Area 1
 is nearly complete. Installation of Field Walls has
 started.                                                      Concourse Level Area 2 – Waterline
                                                               relocation piping is nearly complete and
 Area 1 Mezzanine Level – E-Line Footing installation          backfill of line has started.
 is complete. E-Line Wall installation is ongoing.

 Area 1 Concourse Level – E-Line Footing installation
 Has started at Column Line 23.2.

 Area 2 Field Level – Excavation for the footings has
 started.


                                                               Field Level Area 2 – Soil nail wall installation
                                                               on remaining section (east of Column Line
                                                               14) has commenced.
Building the Future
Soil Nail Wall:
 Area 2 – Shotcrete installation on the remaining sections
 has begun.

 Structural Steel Erection:

 Field Bowl – 300 Ton Crane has been mobilized and
 assembled (230’ Boom Length).

 Projected Activities occurring next Week:                      Field Level Area 2 – Excavation for A-Line
                                                                footing has started.
 Mass Excavation:
 Removal of the ledges for soil nail wall installation will
 continue to be removed.

 Site Utilities:
 Waterline relocation will be complete.

 Installation of the Sanitary Manhole at the North end of
 Area 1 will begin.
                                                                Field Level Bowl – Crane assembly
 Installation of the Storm Line on the East Side (France        underway.
 Family Drive) of the site will begin.

 Deep Underground Sanitary in Area 1/2 will continue.

 Foundations:
 Area 2 Field Level – Placement of footings around stage
 will begin.

 Area 1 Mezzanine Level – Drilled Pier installation at D-Line
 will begin.
                                                                Field Level Area 1 – Shot looking north from
 Area 1 Concourse Level – E-Line footing will be completed.     Concourse Level showing column pads and
                                                                deep underground sanitary line installation.
 Soil Nail Wall:
 Area 2 – Shotcrete wall installation east of Column 13
 will continue.

 Structural Steel Erection:
 Erection of Structural Steel Sequence 1-1 will begin.


Building the Future
Additional Photos:




Field Level Area 1 – Field Wall installation is
ongoing at the base of the north section of       Field Level Area 1 – Placement of Elevator
on-grade seating.                                 F1 Pit Walls.




Mezzanine Level Area 1 – Placement of
concrete for D-Line Wall and Rebar set in         Concourse Level Area 1 – E-Line Footing
place for E-Line Wall at VIP Entrance.            Placement at Column Line 23.2




Mezzanine Level Area 1 – Steel Casing
installation under Village West Parkway for       Field Level Area 1/2 – Making the turn from
Sanitary Main Line.                               Area 1 into Area 2 with Foundations.




Building the Future

Más contenido relacionado

La actualidad más candente

PM.12-EXAMPLE-PME-Quarry Plan-101.b
PM.12-EXAMPLE-PME-Quarry Plan-101.bPM.12-EXAMPLE-PME-Quarry Plan-101.b
PM.12-EXAMPLE-PME-Quarry Plan-101.bPhilip Martinson
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFairfax County
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationFairfax County
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFairfax County
 
Peyton Run POD Presentation_5_12_21
 Peyton Run POD Presentation_5_12_21 Peyton Run POD Presentation_5_12_21
Peyton Run POD Presentation_5_12_21Fairfax County
 
Paul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationPaul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationFairfax County
 
Pohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration ProjectPohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration ProjectFairfax County
 
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...Fairfax County
 
Paul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community MeetingPaul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community MeetingFairfax County
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 

La actualidad más candente (13)

PM.12-EXAMPLE-PME-Quarry Plan-101.b
PM.12-EXAMPLE-PME-Quarry Plan-101.bPM.12-EXAMPLE-PME-Quarry Plan-101.b
PM.12-EXAMPLE-PME-Quarry Plan-101.b
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
 
Peyton Run POD Presentation_5_12_21
 Peyton Run POD Presentation_5_12_21 Peyton Run POD Presentation_5_12_21
Peyton Run POD Presentation_5_12_21
 
Paul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationPaul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream Restoration
 
Pohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration ProjectPohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration Project
 
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...
Paul Spring Segment 2 at Hollin Hills Stream Restoration Community Meeting Ma...
 
Paul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community MeetingPaul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community Meeting
 
Report 2
Report 2Report 2
Report 2
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream Restoration
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 

Similar a Construction Update 4-14-2010

Memo wizards 05-12-2010
Memo wizards 05-12-2010Memo wizards 05-12-2010
Memo wizards 05-12-2010KyleLRogers
 
Feb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress ReportFeb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress ReportHonolulu Civil Beat
 
Feb. 10 Waste Management Daily Progress Report
Feb. 10 Waste Management Daily Progress ReportFeb. 10 Waste Management Daily Progress Report
Feb. 10 Waste Management Daily Progress ReportHonolulu Civil Beat
 
Feb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress ReportFeb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress ReportHonolulu Civil Beat
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
 
Feb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress ReportFeb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress ReportHonolulu Civil Beat
 
Feb. 16 Waste Management Daily Progress Report
Feb. 16 Waste Management Daily Progress Report Feb. 16 Waste Management Daily Progress Report
Feb. 16 Waste Management Daily Progress Report Honolulu Civil Beat
 
Feb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily ReportFeb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily ReportHonolulu Civil Beat
 

Similar a Construction Update 4-14-2010 (13)

Construction Update 7-6-2010
Construction Update 7-6-2010Construction Update 7-6-2010
Construction Update 7-6-2010
 
KC Soccer Stadium
KC Soccer Stadium KC Soccer Stadium
KC Soccer Stadium
 
Construction Update 5-12-2010
Construction Update 5-12-2010Construction Update 5-12-2010
Construction Update 5-12-2010
 
Memo wizards 05-12-2010
Memo wizards 05-12-2010Memo wizards 05-12-2010
Memo wizards 05-12-2010
 
Construction Update 07-28-2010
Construction Update 07-28-2010Construction Update 07-28-2010
Construction Update 07-28-2010
 
Memo wizards 08-25-2010
Memo wizards 08-25-2010Memo wizards 08-25-2010
Memo wizards 08-25-2010
 
Feb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress ReportFeb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress Report
 
Feb. 10 Waste Management Daily Progress Report
Feb. 10 Waste Management Daily Progress ReportFeb. 10 Waste Management Daily Progress Report
Feb. 10 Waste Management Daily Progress Report
 
Feb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress ReportFeb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress Report
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2
 
Feb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress ReportFeb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress Report
 
Feb. 16 Waste Management Daily Progress Report
Feb. 16 Waste Management Daily Progress Report Feb. 16 Waste Management Daily Progress Report
Feb. 16 Waste Management Daily Progress Report
 
Feb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily ReportFeb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily Report
 

Construction Update 4-14-2010

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 4/14/2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 4/12/2010 Current Activities this Week: Mass Excavation: Remaining Mass Excavation Activities are ongoing and are nearling completion. Removal of the Haul Road to Area C is complete and restoration of the Speedway Property is ongoing. Site Utilities: Speedway Property – Sod and seeding Installation of the new electrical ductbank is ongoing. installation has commenced. Approximately 150 linear feet is installed. Awaiting BPU resolution on manhole tie-in. Boring of the service line and Sanitary Main Line D is complete, installation of the steel casing is ongoing. Foundations: Area 1 Field Level – Column Pad placement in Area 1 is nearly complete. Installation of Field Walls has started. Concourse Level Area 2 – Waterline relocation piping is nearly complete and Area 1 Mezzanine Level – E-Line Footing installation backfill of line has started. is complete. E-Line Wall installation is ongoing. Area 1 Concourse Level – E-Line Footing installation Has started at Column Line 23.2. Area 2 Field Level – Excavation for the footings has started. Field Level Area 2 – Soil nail wall installation on remaining section (east of Column Line 14) has commenced. Building the Future
  • 2. Soil Nail Wall: Area 2 – Shotcrete installation on the remaining sections has begun. Structural Steel Erection: Field Bowl – 300 Ton Crane has been mobilized and assembled (230’ Boom Length). Projected Activities occurring next Week: Field Level Area 2 – Excavation for A-Line footing has started. Mass Excavation: Removal of the ledges for soil nail wall installation will continue to be removed. Site Utilities: Waterline relocation will be complete. Installation of the Sanitary Manhole at the North end of Area 1 will begin. Field Level Bowl – Crane assembly Installation of the Storm Line on the East Side (France underway. Family Drive) of the site will begin. Deep Underground Sanitary in Area 1/2 will continue. Foundations: Area 2 Field Level – Placement of footings around stage will begin. Area 1 Mezzanine Level – Drilled Pier installation at D-Line will begin. Field Level Area 1 – Shot looking north from Area 1 Concourse Level – E-Line footing will be completed. Concourse Level showing column pads and deep underground sanitary line installation. Soil Nail Wall: Area 2 – Shotcrete wall installation east of Column 13 will continue. Structural Steel Erection: Erection of Structural Steel Sequence 1-1 will begin. Building the Future
  • 3. Additional Photos: Field Level Area 1 – Field Wall installation is ongoing at the base of the north section of Field Level Area 1 – Placement of Elevator on-grade seating. F1 Pit Walls. Mezzanine Level Area 1 – Placement of concrete for D-Line Wall and Rebar set in Concourse Level Area 1 – E-Line Footing place for E-Line Wall at VIP Entrance. Placement at Column Line 23.2 Mezzanine Level Area 1 – Steel Casing installation under Village West Parkway for Field Level Area 1/2 – Making the turn from Sanitary Main Line. Area 1 into Area 2 with Foundations. Building the Future