Sample Monthly Reporting
                         Form

                         Plant:

                         Superintendent Filing Report:

                         Date:

                         (report due by 5th of each month)




                         1. Maintenance
Helpful Guidance
This form                   a) Describe in a few sentences all major preventive maintenance work
assembles a set of             carried out during the month.
questions designed
to improve                  b) Describe any emergency repairs that were required during the month.
communication                  Explain cause.
between plant staff
and local officials.        c) Describe any preventive maintenance projects planned for the next
By gathering this              month.
information each
month, the plant            d) Describe the potential for possible emergency failures of equipment
superintendent has             or systems in the near future.
an opportunity to
identify the utility’s
needs, problem
                         2. Energy usage at the treatment plant
areas, and
successes. When
local officials know        a) From master meter, kWh at beginning of month
what is happening
at the plant they                 From master meter, kWh at end of month
are able to better
manage, plan, and                 Daily average
budget for the
system.                           Previous month’s daily average

                                  From annual budget, projected average daily kWh

                            b) List here any possible energy efficiency equipment replacements
                               whose energy savings would have a ten-year or less payback.




                                                                   Sample Monthly Reporting Form   L–1
3. (For wastewater treatment plants) BOD removal goal (in pounds) for
   month:

   Actual pounds removed

   If less than goal, state reason here.

   If goal was exceeded, state how achieved and whether greater removal
   rates are possible over the long term.

   At what percentage of design organic loading did the plant operate
   during the month?

   At what percentage of design hydraulic loading did the plant operate
   during the month?


4. (For water treatment plants) Finished water production goal for
   month, millions of gallons:
   Actual production of finished water for month

   At what percentage of production capacity did the water plant operate
   for the month?


5. List all violations for the month, whether or not reported to state
   regulators. As best as possible, state seriousness of each.

   Describe all corrective actions taken for each violation.


6. Describe briefly any professional development, certification, or train-
   ing activities undertaken by staff during the month, either as trainers
   or trainees. Give contact hours.

   Was the plant the beneficiary of any technical assistance from “outside”
   sources during the month, either contracted for or given free of charge?
   Describe briefly.


7. During the upcoming month, will there be any special cash needs for
   one-time expenditures in excess of $1000? If so, describe below.


8. Give names and position titles of all new hires made during the month.


9. Briefly describe below any other events, needs, or “news” from the
   treatment plant not specifically called for above.




L–2    Local Officials Handbook

Más contenido relacionado

La actualidad más candente

8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPA
8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPA8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPA
8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPAEnvironmental Protection Agency, Ireland
 
Wildfire-Workshop-Presentation-Matthew-Eagle
Wildfire-Workshop-Presentation-Matthew-EagleWildfire-Workshop-Presentation-Matthew-Eagle
Wildfire-Workshop-Presentation-Matthew-EagleOECD Environment
 
Scoring Example - English
Scoring Example - EnglishScoring Example - English
Scoring Example - EnglishUNDP Climate
 
Sectoral approaches for NDC implementation
Sectoral approaches for NDC implementationSectoral approaches for NDC implementation
Sectoral approaches for NDC implementationNewClimate Institute
 
Applying a green lens -- Cornelius Rhein, EC
Applying a green lens -- Cornelius Rhein, ECApplying a green lens -- Cornelius Rhein, EC
Applying a green lens -- Cornelius Rhein, ECOECD Governance
 
CCXG Global Forum October 2018 Breakout Group 3 by Mary Awad
CCXG Global Forum October 2018 Breakout Group 3 by Mary AwadCCXG Global Forum October 2018 Breakout Group 3 by Mary Awad
CCXG Global Forum October 2018 Breakout Group 3 by Mary AwadOECD Environment
 
Calculating the environmental impacts of public action - Ian Thom, United Kin...
Calculating the environmental impacts of public action - Ian Thom, United Kin...Calculating the environmental impacts of public action - Ian Thom, United Kin...
Calculating the environmental impacts of public action - Ian Thom, United Kin...OECD Governance
 
Presentation - Measuring progress in implementing national adaptation policie...
Presentation - Measuring progress in implementing national adaptation policie...Presentation - Measuring progress in implementing national adaptation policie...
Presentation - Measuring progress in implementing national adaptation policie...OECD Environment
 
Climate Finance Tracking in Indonesia, by Syamsidar Thamrin
Climate Finance Tracking in Indonesia, by Syamsidar ThamrinClimate Finance Tracking in Indonesia, by Syamsidar Thamrin
Climate Finance Tracking in Indonesia, by Syamsidar ThamrinOECD Environment
 
PPP05 - Creating Preventive Maintenance Schedules (MCU)
PPP05 - Creating Preventive Maintenance Schedules (MCU)PPP05 - Creating Preventive Maintenance Schedules (MCU)
PPP05 - Creating Preventive Maintenance Schedules (MCU)Maintenance Connection
 
Welcome Presentation | Sue Roaf
Welcome Presentation | Sue RoafWelcome Presentation | Sue Roaf
Welcome Presentation | Sue Roaficarb
 
Updated analysis of current climate policies and mitigation pledges
Updated analysis of current climate policies and mitigation pledgesUpdated analysis of current climate policies and mitigation pledges
Updated analysis of current climate policies and mitigation pledgesNewClimate Institute
 
Towards green budgeting: a roadmap -- Alexandre Godzinksi, France
Towards green budgeting: a roadmap -- Alexandre Godzinksi, FranceTowards green budgeting: a roadmap -- Alexandre Godzinksi, France
Towards green budgeting: a roadmap -- Alexandre Godzinksi, FranceOECD Governance
 
CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...
CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...
CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...OECD Environment
 
Guidance for accounting: emissions intensity goals and goals relative to BAU ...
Guidance for accounting: emissions intensity goals and goals relative to BAU ...Guidance for accounting: emissions intensity goals and goals relative to BAU ...
Guidance for accounting: emissions intensity goals and goals relative to BAU ...OECD Environment
 
Challenges and Opportunities in Implementing Higher Tiers in the National GHG...
Challenges and Opportunities in Implementing Higher Tiers in the National GHG...Challenges and Opportunities in Implementing Higher Tiers in the National GHG...
Challenges and Opportunities in Implementing Higher Tiers in the National GHG...ipcc-media
 

La actualidad más candente (18)

8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPA
8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPA8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPA
8. Proposed approach for tracking implementation of the RBMP - Eva Mockler, EPA
 
Wildfire-Workshop-Presentation-Matthew-Eagle
Wildfire-Workshop-Presentation-Matthew-EagleWildfire-Workshop-Presentation-Matthew-Eagle
Wildfire-Workshop-Presentation-Matthew-Eagle
 
Scoring Example - English
Scoring Example - EnglishScoring Example - English
Scoring Example - English
 
Sectoral approaches for NDC implementation
Sectoral approaches for NDC implementationSectoral approaches for NDC implementation
Sectoral approaches for NDC implementation
 
Applying a green lens -- Cornelius Rhein, EC
Applying a green lens -- Cornelius Rhein, ECApplying a green lens -- Cornelius Rhein, EC
Applying a green lens -- Cornelius Rhein, EC
 
CCXG Global Forum October 2018 Breakout Group 3 by Mary Awad
CCXG Global Forum October 2018 Breakout Group 3 by Mary AwadCCXG Global Forum October 2018 Breakout Group 3 by Mary Awad
CCXG Global Forum October 2018 Breakout Group 3 by Mary Awad
 
Calculating the environmental impacts of public action - Ian Thom, United Kin...
Calculating the environmental impacts of public action - Ian Thom, United Kin...Calculating the environmental impacts of public action - Ian Thom, United Kin...
Calculating the environmental impacts of public action - Ian Thom, United Kin...
 
Presentation - Measuring progress in implementing national adaptation policie...
Presentation - Measuring progress in implementing national adaptation policie...Presentation - Measuring progress in implementing national adaptation policie...
Presentation - Measuring progress in implementing national adaptation policie...
 
Climate Finance Tracking in Indonesia, by Syamsidar Thamrin
Climate Finance Tracking in Indonesia, by Syamsidar ThamrinClimate Finance Tracking in Indonesia, by Syamsidar Thamrin
Climate Finance Tracking in Indonesia, by Syamsidar Thamrin
 
PPP05 - Creating Preventive Maintenance Schedules (MCU)
PPP05 - Creating Preventive Maintenance Schedules (MCU)PPP05 - Creating Preventive Maintenance Schedules (MCU)
PPP05 - Creating Preventive Maintenance Schedules (MCU)
 
Welcome Presentation | Sue Roaf
Welcome Presentation | Sue RoafWelcome Presentation | Sue Roaf
Welcome Presentation | Sue Roaf
 
Cbp Seminar Presentation
Cbp Seminar PresentationCbp Seminar Presentation
Cbp Seminar Presentation
 
Updated analysis of current climate policies and mitigation pledges
Updated analysis of current climate policies and mitigation pledgesUpdated analysis of current climate policies and mitigation pledges
Updated analysis of current climate policies and mitigation pledges
 
Cape Town
Cape TownCape Town
Cape Town
 
Towards green budgeting: a roadmap -- Alexandre Godzinksi, France
Towards green budgeting: a roadmap -- Alexandre Godzinksi, FranceTowards green budgeting: a roadmap -- Alexandre Godzinksi, France
Towards green budgeting: a roadmap -- Alexandre Godzinksi, France
 
CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...
CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...
CCXG Global Forum March 2018, Accounting for baseline targerts-1 by Luis Pani...
 
Guidance for accounting: emissions intensity goals and goals relative to BAU ...
Guidance for accounting: emissions intensity goals and goals relative to BAU ...Guidance for accounting: emissions intensity goals and goals relative to BAU ...
Guidance for accounting: emissions intensity goals and goals relative to BAU ...
 
Challenges and Opportunities in Implementing Higher Tiers in the National GHG...
Challenges and Opportunities in Implementing Higher Tiers in the National GHG...Challenges and Opportunities in Implementing Higher Tiers in the National GHG...
Challenges and Opportunities in Implementing Higher Tiers in the National GHG...
 

Similar a Sample Reporting Forms

CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...OECD Environment
 
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...OECD Environment
 
ACC 251 Intro to Managerial AccountingChapters 9 through 12 .docx
ACC 251 Intro to Managerial AccountingChapters 9 through 12 .docxACC 251 Intro to Managerial AccountingChapters 9 through 12 .docx
ACC 251 Intro to Managerial AccountingChapters 9 through 12 .docxnettletondevon
 
6 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 0705096 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 070509scottri
 
Zimmerman.marybeth
Zimmerman.marybethZimmerman.marybeth
Zimmerman.marybethNASAPMC
 
Acc 421 final exam
Acc 421 final examAcc 421 final exam
Acc 421 final examgiquickly
 
Acc 421 final exam
Acc 421 final examAcc 421 final exam
Acc 421 final examginistays
 
Acc 421 final exam
Acc 421 final examAcc 421 final exam
Acc 421 final exambubyslyke
 
ACC 207 Final Project Guidelines and Rubric Overview .docx
ACC 207 Final Project Guidelines and Rubric  Overview .docxACC 207 Final Project Guidelines and Rubric  Overview .docx
ACC 207 Final Project Guidelines and Rubric Overview .docxnettletondevon
 
Acc 421 acc/421 final exam 100% correct answers
Acc 421 acc/421 final exam 100% correct answersAcc 421 acc/421 final exam 100% correct answers
Acc 421 acc/421 final exam 100% correct answersGliven
 
Acc 421 final exam 36 36 correct answers 100%
Acc 421 final exam 36 36 correct answers 100%Acc 421 final exam 36 36 correct answers 100%
Acc 421 final exam 36 36 correct answers 100%eriks23
 
Accounting1) As Plant Controller, you are trying to determine .docx
Accounting1) As Plant Controller, you are trying to determine .docxAccounting1) As Plant Controller, you are trying to determine .docx
Accounting1) As Plant Controller, you are trying to determine .docxannetnash8266
 
5. qus bank energy action planning revised (table format)
5. qus bank  energy action planning   revised (table format)5. qus bank  energy action planning   revised (table format)
5. qus bank energy action planning revised (table format)Dr. Bikram Jit Singh
 
5. qus bank energy action planning revised (table format)
5. qus bank  energy action planning   revised (table format)5. qus bank  energy action planning   revised (table format)
5. qus bank energy action planning revised (table format)Dr. Bikram Jit Singh
 
1..acc 421 acc421 final exam correct 100%
1..acc 421 acc421 final exam correct 100%1..acc 421 acc421 final exam correct 100%
1..acc 421 acc421 final exam correct 100%Euroday
 
Acc 421 acc421 final exam correct 100%
Acc 421 acc421 final exam correct 100%Acc 421 acc421 final exam correct 100%
Acc 421 acc421 final exam correct 100%flyperhan
 
(New) acc 421 acc421 final exam entire answers with questions correct 100%
(New) acc 421 acc421 final exam entire answers with questions correct  100%(New) acc 421 acc421 final exam entire answers with questions correct  100%
(New) acc 421 acc421 final exam entire answers with questions correct 100%twiter343r
 

Similar a Sample Reporting Forms (20)

CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
 
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
CCXG Global Forum March 2018, Capacity-Building Needed and Received – Lebanon...
 
ACC 251 Intro to Managerial AccountingChapters 9 through 12 .docx
ACC 251 Intro to Managerial AccountingChapters 9 through 12 .docxACC 251 Intro to Managerial AccountingChapters 9 through 12 .docx
ACC 251 Intro to Managerial AccountingChapters 9 through 12 .docx
 
6 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 0705096 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 070509
 
ICF_Report_Gas_Conservation_Potential_Study
ICF_Report_Gas_Conservation_Potential_StudyICF_Report_Gas_Conservation_Potential_Study
ICF_Report_Gas_Conservation_Potential_Study
 
Zimmerman.marybeth
Zimmerman.marybethZimmerman.marybeth
Zimmerman.marybeth
 
Acc 421 final exam
Acc 421 final examAcc 421 final exam
Acc 421 final exam
 
Acc 421 final exam
Acc 421 final examAcc 421 final exam
Acc 421 final exam
 
Acc 421 final exam
Acc 421 final examAcc 421 final exam
Acc 421 final exam
 
ACC 207 Final Project Guidelines and Rubric Overview .docx
ACC 207 Final Project Guidelines and Rubric  Overview .docxACC 207 Final Project Guidelines and Rubric  Overview .docx
ACC 207 Final Project Guidelines and Rubric Overview .docx
 
Acc 421 acc/421 final exam 100% correct answers
Acc 421 acc/421 final exam 100% correct answersAcc 421 acc/421 final exam 100% correct answers
Acc 421 acc/421 final exam 100% correct answers
 
Acc 421 final exam 36 36 correct answers 100%
Acc 421 final exam 36 36 correct answers 100%Acc 421 final exam 36 36 correct answers 100%
Acc 421 final exam 36 36 correct answers 100%
 
Accounting1) As Plant Controller, you are trying to determine .docx
Accounting1) As Plant Controller, you are trying to determine .docxAccounting1) As Plant Controller, you are trying to determine .docx
Accounting1) As Plant Controller, you are trying to determine .docx
 
Ppt22
Ppt22Ppt22
Ppt22
 
Acc 421 final exam
Acc 421 final examAcc 421 final exam
Acc 421 final exam
 
5. qus bank energy action planning revised (table format)
5. qus bank  energy action planning   revised (table format)5. qus bank  energy action planning   revised (table format)
5. qus bank energy action planning revised (table format)
 
5. qus bank energy action planning revised (table format)
5. qus bank  energy action planning   revised (table format)5. qus bank  energy action planning   revised (table format)
5. qus bank energy action planning revised (table format)
 
1..acc 421 acc421 final exam correct 100%
1..acc 421 acc421 final exam correct 100%1..acc 421 acc421 final exam correct 100%
1..acc 421 acc421 final exam correct 100%
 
Acc 421 acc421 final exam correct 100%
Acc 421 acc421 final exam correct 100%Acc 421 acc421 final exam correct 100%
Acc 421 acc421 final exam correct 100%
 
(New) acc 421 acc421 final exam entire answers with questions correct 100%
(New) acc 421 acc421 final exam entire answers with questions correct  100%(New) acc 421 acc421 final exam entire answers with questions correct  100%
(New) acc 421 acc421 final exam entire answers with questions correct 100%
 

Más de Maryland Center for Environmental Training (13)

2 21 Part46
2 21 Part462 21 Part46
2 21 Part46
 
Cover
CoverCover
Cover
 
Introduction
IntroductionIntroduction
Introduction
 
Regulatory Setting
Regulatory SettingRegulatory Setting
Regulatory Setting
 
Legal Responsibilities
Legal ResponsibilitiesLegal Responsibilities
Legal Responsibilities
 
Operations
OperationsOperations
Operations
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Personnel
PersonnelPersonnel
Personnel
 
Public Relations
Public RelationsPublic Relations
Public Relations
 
Financial Management And Business Planning
Financial Management And Business PlanningFinancial Management And Business Planning
Financial Management And Business Planning
 
Bibliography
BibliographyBibliography
Bibliography
 
Contacts And Resources
Contacts And ResourcesContacts And Resources
Contacts And Resources
 
Glossary
GlossaryGlossary
Glossary
 

Último

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Último (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 

Sample Reporting Forms

  • 1. Sample Monthly Reporting Form Plant: Superintendent Filing Report: Date: (report due by 5th of each month) 1. Maintenance Helpful Guidance This form a) Describe in a few sentences all major preventive maintenance work assembles a set of carried out during the month. questions designed to improve b) Describe any emergency repairs that were required during the month. communication Explain cause. between plant staff and local officials. c) Describe any preventive maintenance projects planned for the next By gathering this month. information each month, the plant d) Describe the potential for possible emergency failures of equipment superintendent has or systems in the near future. an opportunity to identify the utility’s needs, problem 2. Energy usage at the treatment plant areas, and successes. When local officials know a) From master meter, kWh at beginning of month what is happening at the plant they From master meter, kWh at end of month are able to better manage, plan, and Daily average budget for the system. Previous month’s daily average From annual budget, projected average daily kWh b) List here any possible energy efficiency equipment replacements whose energy savings would have a ten-year or less payback. Sample Monthly Reporting Form L–1
  • 2. 3. (For wastewater treatment plants) BOD removal goal (in pounds) for month: Actual pounds removed If less than goal, state reason here. If goal was exceeded, state how achieved and whether greater removal rates are possible over the long term. At what percentage of design organic loading did the plant operate during the month? At what percentage of design hydraulic loading did the plant operate during the month? 4. (For water treatment plants) Finished water production goal for month, millions of gallons: Actual production of finished water for month At what percentage of production capacity did the water plant operate for the month? 5. List all violations for the month, whether or not reported to state regulators. As best as possible, state seriousness of each. Describe all corrective actions taken for each violation. 6. Describe briefly any professional development, certification, or train- ing activities undertaken by staff during the month, either as trainers or trainees. Give contact hours. Was the plant the beneficiary of any technical assistance from “outside” sources during the month, either contracted for or given free of charge? Describe briefly. 7. During the upcoming month, will there be any special cash needs for one-time expenditures in excess of $1000? If so, describe below. 8. Give names and position titles of all new hires made during the month. 9. Briefly describe below any other events, needs, or “news” from the treatment plant not specifically called for above. L–2 Local Officials Handbook