Performance
Indicators
for Plastic
Manufacturing
Suni Vatnhamar 2016 1
PERFORMANCE INDICATORS FOR PLASTIC PACKAGING
MANUFACTURING
Complete set of performance indicators for
plastic packaging production
Ready for use !
Suni Vatnhamar 2016 2
PERFORMANCE INDICATORS
(PI)
OPERATIONS
FINANCE
SALES EXCELLENCE
HR
Suni Vatnhamar 2016 3
PERFORMANCE INDICATORS
OPERATIONS
 OEE
 Internal Rejects
 Customer complaints
 Capacity Utilisation
 Spoilage
 Materials Variance
 Energy consumption
 Man efficiency
 Delivery precision
Suni Vatnhamar 2016 4
PI Operations
1) OEE% (overall equipment effectiveness)
OEE Availability% x OEE Quality x OEE Performance%
2) Internal Rejects%
number of rejected parts
Total Number Produced (good + rejects)
Suni Vatnhamar 2016 5
3) Customer complaints
3a) Number of total customers complaints
Number of recorded customers complaints (product-related) which are
proven to be a result of our failure or one of our suppliers.
Reported as an absolute number with an annual target to be set
based on improvement versus previous year’s result.
# per month/YTD with target based on improvement versus LY
3b) Number of customer complaints resulting in credit notes
# per month/YTD with target based on improvement versus LY
3c) Value of credit notes from customer complaints
Value per month/YTD with target based on improvement versus LY
PI Operations
Suni Vatnhamar 2016 6
PI Operations
4) Capacity Utilization%
100% - Non-Utilization due to no customer order
Total Theoretical Available Machine Hours
Theoretical Available Machine Hours based on 7days/24hrs
operations system.
5) Spoilage
Using existing definition, but introducing Raw Material Variance
as a more important PI in this field.
Suni Vatnhamar 2016 7
PI Operations
6) Materials Variance
Total good units produced (T)
100% -
Total resins used in Conversion process (T)
Suni Vatnhamar 2016 8
Materials Variance
Measure is A - B = C
Month
Operations
(Conversion process)
Opening
Stock
Resin (T)
Masterbatch
&
Additives (T)
Excluding
‘Flake’
Closing
Stock
Resin (T)
Masterbatch
&
Additives (T)
Excluding
‘Flake’
Stock
Resin
purchased
during
month
AB C
Good bottles
x
StdCut off *
* Same time every month
Cut off *
Suni Vatnhamar 2016 9
Materials Variance
Losses within the Conversion Process
Good bottles
Held stock
Rejects
Purge
Contami-
nation Masterbatch/
additives
over use
Incorrect
std’s
STOCK Materials Variance
90-95 %
Suni Vatnhamar 2016 10
PI Operations
7) Energy
kwh used per tonnage converted (calculated automatically in
Hyperion from reported Kwh and tonnage converted)
8) Man efficiency
Tonnage Converted per average FTE
9) Delivery Precision%
Number of order lines delivered on agreed delivery date against total
number of order lines ordered by the customers in the same period –
expressed in %
Suni Vatnhamar 2016 11
PERFORMANCE INDICATORS
FINANCE
 RM days
 FG days
 Creditor days
 Debtor days
 WC turnover
 EVA
 Overdue receivables
Suni Vatnhamar 2016 12
PI Finance
1) Raw Material days
See definition in Financial handbook
2) Finished Goods days
See definition in Financial handbook
3) Creditors days
See definition in Financial handbook
4) Debtors days
See definition in Financial handbook
Suni Vatnhamar 2016 13
PI Finance
5) Working Capital Turnover
Net sales (S4000) over last 12 months
Average Normalized Working Capital (Norm_WC)over last 4 quarters
6) EVA
See definition in Financial handbook
7) Overdue receivables
Proportion of receivables >30 days overdue expressed as a
percentage of total receivables
Suni Vatnhamar 2016 14
PERFORMANCE INDICATORS
SALES EXCELLENCE
 Sales per employee
 Organic growth
 New order balance
 RMC per tonnage
 # of customer visits
 # of prospect visits
 # and value of quotations
 # of enquiries
Suni Vatnhamar 2016 15
PI Sales Excellence - Hyperion
1) Sales per employee
2) Organic growth
Increase/decrease of tonnage sold compared to previous year, excluding
impact of acquisitions, transferred business, or disposals, expressed as a
percentage.
3) New order balance
Annualized sales value (after ramp up) of new confirmed orders
starting within next 12 months minus value of annualized
confirmed losses expressed as a value.
4) RMC per tonnage
Raw material contribution per sold tonnage of polymers
Suni Vatnhamar 2016 16
PI Sales Excellence to be reported in
CRM system
6) # of total customer visits
7) # of visits to prospects
8) # of quotations
9) Value of quotations
10) # of enquiries from customers
Suni Vatnhamar 2016 17
PERFORMANCE INDICATORS
HR
 Sick leave % direct workers
 Sick Leave % indirect people
 LTA
Suni Vatnhamar 2016 18
PI HR
1)Sick leave direct worker (%)
Sick leave (%)= total number of sick days / (total number of days
worked + days away) for all direct workers
2) Sick leave indirect workers
Sick leave (%)= total number of sick days / (total number of days
worked + days away) for all indirect workers.
3) Lost Time Accidents (LTA)
reported as number of Lost Time Accidents per 1 million working
hours on a rolling 12 months period
Suni Vatnhamar 2016 19

Más contenido relacionado

La actualidad más candente

Supply chain and logistic of adidas
Supply chain and logistic of adidasSupply chain and logistic of adidas
Supply chain and logistic of adidasVarun Shrivastava
 
Lean six sigma and process excellence ppt
Lean six sigma and process excellence pptLean six sigma and process excellence ppt
Lean six sigma and process excellence pptAnexas Consultancy
 
Making It Stick: A Four-Step Process for Creating Sustainable Change
Making It Stick: A Four-Step Process for Creating Sustainable ChangeMaking It Stick: A Four-Step Process for Creating Sustainable Change
Making It Stick: A Four-Step Process for Creating Sustainable ChangeTKMG, Inc.
 
Cost Reduction Strategies
Cost Reduction StrategiesCost Reduction Strategies
Cost Reduction StrategiesAbhishek Raj
 
MINI PROJECT REPORT OF Maruthi Knitterss
MINI PROJECT REPORT OF Maruthi KnitterssMINI PROJECT REPORT OF Maruthi Knitterss
MINI PROJECT REPORT OF Maruthi Knittersskalim k
 
Introduction to Lean Six Sigma
Introduction to Lean Six SigmaIntroduction to Lean Six Sigma
Introduction to Lean Six SigmaGoLeanSixSigma.com
 
Waste Management in Garment Industries
Waste Management in Garment IndustriesWaste Management in Garment Industries
Waste Management in Garment IndustriesShubha Brota Raha
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industryAzmir Latif Beg
 
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis LearningWhat is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis LearningInvensis Learning
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshAriful Islam
 
Organizational Culture and Behaviour - Decathlon India
Organizational Culture and Behaviour - Decathlon IndiaOrganizational Culture and Behaviour - Decathlon India
Organizational Culture and Behaviour - Decathlon IndiaShruti113
 
Plastic Manufacturing company
Plastic Manufacturing companyPlastic Manufacturing company
Plastic Manufacturing companyJason899
 
Entrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-projectEntrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-projectZohaib Ahmed
 
Operations and Supply Chain Management
Operations and Supply Chain Management Operations and Supply Chain Management
Operations and Supply Chain Management Sarang Dani
 

La actualidad más candente (20)

Supply chain and logistic of adidas
Supply chain and logistic of adidasSupply chain and logistic of adidas
Supply chain and logistic of adidas
 
Lean six sigma and process excellence ppt
Lean six sigma and process excellence pptLean six sigma and process excellence ppt
Lean six sigma and process excellence ppt
 
Making It Stick: A Four-Step Process for Creating Sustainable Change
Making It Stick: A Four-Step Process for Creating Sustainable ChangeMaking It Stick: A Four-Step Process for Creating Sustainable Change
Making It Stick: A Four-Step Process for Creating Sustainable Change
 
Cost Reduction Strategies
Cost Reduction StrategiesCost Reduction Strategies
Cost Reduction Strategies
 
Gots manual 01-march2014
Gots manual 01-march2014Gots manual 01-march2014
Gots manual 01-march2014
 
MINI PROJECT REPORT OF Maruthi Knitterss
MINI PROJECT REPORT OF Maruthi KnitterssMINI PROJECT REPORT OF Maruthi Knitterss
MINI PROJECT REPORT OF Maruthi Knitterss
 
Introduction to Lean Six Sigma
Introduction to Lean Six SigmaIntroduction to Lean Six Sigma
Introduction to Lean Six Sigma
 
Waste Management in Garment Industries
Waste Management in Garment IndustriesWaste Management in Garment Industries
Waste Management in Garment Industries
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
New Product Design and Development
New Product Design and DevelopmentNew Product Design and Development
New Product Design and Development
 
Aluminum Recycling
Aluminum Recycling  Aluminum Recycling
Aluminum Recycling
 
Chapter 07 process_strategy
Chapter 07 process_strategyChapter 07 process_strategy
Chapter 07 process_strategy
 
Adidas
AdidasAdidas
Adidas
 
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis LearningWhat is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
What is Lean Six Sigma? Lean Six Sigma Explained - Invensis Learning
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
Organizational Culture and Behaviour - Decathlon India
Organizational Culture and Behaviour - Decathlon IndiaOrganizational Culture and Behaviour - Decathlon India
Organizational Culture and Behaviour - Decathlon India
 
Plastic Manufacturing company
Plastic Manufacturing companyPlastic Manufacturing company
Plastic Manufacturing company
 
Entrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-projectEntrepreneurship plastic-recycling-project
Entrepreneurship plastic-recycling-project
 
Operations and Supply Chain Management
Operations and Supply Chain Management Operations and Supply Chain Management
Operations and Supply Chain Management
 

Destacado

How to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable ProductsHow to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable ProductsAjjay Kumar Gupta
 
15 Business Plan On Plastics Recycling
15 Business Plan On Plastics Recycling15 Business Plan On Plastics Recycling
15 Business Plan On Plastics RecyclingDr. Trilok Kumar Jain
 
Plastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business PlanPlastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business PlanAyush Man Tamrakar
 
Plastic use as building material ppt
Plastic use as building material pptPlastic use as building material ppt
Plastic use as building material pptDeepak Sharma
 
BUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTICBUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTICAbhishek Mewada
 
Plastic pollution ppt
Plastic pollution pptPlastic pollution ppt
Plastic pollution pptNishant
 

Destacado (8)

How to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable ProductsHow to Start Manufacturing Business of Disposable Products
How to Start Manufacturing Business of Disposable Products
 
Plastic recycling business plan
Plastic recycling business planPlastic recycling business plan
Plastic recycling business plan
 
15 Business Plan On Plastics Recycling
15 Business Plan On Plastics Recycling15 Business Plan On Plastics Recycling
15 Business Plan On Plastics Recycling
 
Plastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business PlanPlastic Manufacturing Company - Business Plan
Plastic Manufacturing Company - Business Plan
 
Plastic use as building material ppt
Plastic use as building material pptPlastic use as building material ppt
Plastic use as building material ppt
 
Plastics .ppt
Plastics .pptPlastics .ppt
Plastics .ppt
 
BUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTICBUILDING MATERIALS AS A PLASTIC
BUILDING MATERIALS AS A PLASTIC
 
Plastic pollution ppt
Plastic pollution pptPlastic pollution ppt
Plastic pollution ppt
 

Similar a Performance Indicators for Plastic Manufacturing

Modelling tool guidance presentation animated version 3 unlocked
Modelling tool guidance presentation animated  version 3   unlockedModelling tool guidance presentation animated  version 3   unlocked
Modelling tool guidance presentation animated version 3 unlockedmaxford1979
 
Business Intelligence in FMCG
Business Intelligence in FMCGBusiness Intelligence in FMCG
Business Intelligence in FMCG09bm8049
 
Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016Barry Crisp
 
Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Farrukh Hasnain
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingJohn William
 
Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018WorldCircularEconomyForum2018
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5DANANG WID
 
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated AnalyticsTanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated AnalyticsChinkiTyagi
 
June 2016 till date colour profile.
June 2016 till date  colour  profile.June 2016 till date  colour  profile.
June 2016 till date colour profile.GOPI NATHAN
 
june 2016 till date- colour profile.
june 2016 till date- colour  profile.june 2016 till date- colour  profile.
june 2016 till date- colour profile.GOPI NATHAN
 
Synergi Plant - Intro.pptx
Synergi Plant - Intro.pptxSynergi Plant - Intro.pptx
Synergi Plant - Intro.pptxAmaraGillani1
 
Kpi basics construction _building material_industry 2009
Kpi basics  construction _building material_industry 2009Kpi basics  construction _building material_industry 2009
Kpi basics construction _building material_industry 2009Venkat Subbu
 
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...QueBIT Consulting
 
Mba om 08_inventory_management
Mba om 08_inventory_managementMba om 08_inventory_management
Mba om 08_inventory_managementNiranjana K.R.
 
Cluster Programme for MSME_Nov16
Cluster Programme for MSME_Nov16Cluster Programme for MSME_Nov16
Cluster Programme for MSME_Nov16Suhas_gokhale
 

Similar a Performance Indicators for Plastic Manufacturing (20)

SIMA Strategy Final
SIMA Strategy FinalSIMA Strategy Final
SIMA Strategy Final
 
Modelling tool guidance presentation animated version 3 unlocked
Modelling tool guidance presentation animated  version 3   unlockedModelling tool guidance presentation animated  version 3   unlocked
Modelling tool guidance presentation animated version 3 unlocked
 
Business Intelligence in FMCG
Business Intelligence in FMCGBusiness Intelligence in FMCG
Business Intelligence in FMCG
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Proposal Final
Proposal FinalProposal Final
Proposal Final
 
Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016Mwwb csw benchmark free report 2016
Mwwb csw benchmark free report 2016
 
Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coating
 
Resume Victor Gonzalez
Resume Victor GonzalezResume Victor Gonzalez
Resume Victor Gonzalez
 
Feasibility studies
Feasibility studiesFeasibility studies
Feasibility studies
 
Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018Circular economys frontier of knowledge Nabil Nasr wcef2018
Circular economys frontier of knowledge Nabil Nasr wcef2018
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5
 
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated AnalyticsTanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
Tanespimycin Production Plant Cost Analysis 2021-2026 | Syndicated Analytics
 
June 2016 till date colour profile.
June 2016 till date  colour  profile.June 2016 till date  colour  profile.
June 2016 till date colour profile.
 
june 2016 till date- colour profile.
june 2016 till date- colour  profile.june 2016 till date- colour  profile.
june 2016 till date- colour profile.
 
Synergi Plant - Intro.pptx
Synergi Plant - Intro.pptxSynergi Plant - Intro.pptx
Synergi Plant - Intro.pptx
 
Kpi basics construction _building material_industry 2009
Kpi basics  construction _building material_industry 2009Kpi basics  construction _building material_industry 2009
Kpi basics construction _building material_industry 2009
 
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
NAPA Auto Parts Builds Better Assortments with Predictive Analytics - World o...
 
Mba om 08_inventory_management
Mba om 08_inventory_managementMba om 08_inventory_management
Mba om 08_inventory_management
 
Cluster Programme for MSME_Nov16
Cluster Programme for MSME_Nov16Cluster Programme for MSME_Nov16
Cluster Programme for MSME_Nov16
 

Último

Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 

Último (20)

Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 

Performance Indicators for Plastic Manufacturing

  • 2. PERFORMANCE INDICATORS FOR PLASTIC PACKAGING MANUFACTURING Complete set of performance indicators for plastic packaging production Ready for use ! Suni Vatnhamar 2016 2
  • 4. PERFORMANCE INDICATORS OPERATIONS  OEE  Internal Rejects  Customer complaints  Capacity Utilisation  Spoilage  Materials Variance  Energy consumption  Man efficiency  Delivery precision Suni Vatnhamar 2016 4
  • 5. PI Operations 1) OEE% (overall equipment effectiveness) OEE Availability% x OEE Quality x OEE Performance% 2) Internal Rejects% number of rejected parts Total Number Produced (good + rejects) Suni Vatnhamar 2016 5
  • 6. 3) Customer complaints 3a) Number of total customers complaints Number of recorded customers complaints (product-related) which are proven to be a result of our failure or one of our suppliers. Reported as an absolute number with an annual target to be set based on improvement versus previous year’s result. # per month/YTD with target based on improvement versus LY 3b) Number of customer complaints resulting in credit notes # per month/YTD with target based on improvement versus LY 3c) Value of credit notes from customer complaints Value per month/YTD with target based on improvement versus LY PI Operations Suni Vatnhamar 2016 6
  • 7. PI Operations 4) Capacity Utilization% 100% - Non-Utilization due to no customer order Total Theoretical Available Machine Hours Theoretical Available Machine Hours based on 7days/24hrs operations system. 5) Spoilage Using existing definition, but introducing Raw Material Variance as a more important PI in this field. Suni Vatnhamar 2016 7
  • 8. PI Operations 6) Materials Variance Total good units produced (T) 100% - Total resins used in Conversion process (T) Suni Vatnhamar 2016 8
  • 9. Materials Variance Measure is A - B = C Month Operations (Conversion process) Opening Stock Resin (T) Masterbatch & Additives (T) Excluding ‘Flake’ Closing Stock Resin (T) Masterbatch & Additives (T) Excluding ‘Flake’ Stock Resin purchased during month AB C Good bottles x StdCut off * * Same time every month Cut off * Suni Vatnhamar 2016 9
  • 10. Materials Variance Losses within the Conversion Process Good bottles Held stock Rejects Purge Contami- nation Masterbatch/ additives over use Incorrect std’s STOCK Materials Variance 90-95 % Suni Vatnhamar 2016 10
  • 11. PI Operations 7) Energy kwh used per tonnage converted (calculated automatically in Hyperion from reported Kwh and tonnage converted) 8) Man efficiency Tonnage Converted per average FTE 9) Delivery Precision% Number of order lines delivered on agreed delivery date against total number of order lines ordered by the customers in the same period – expressed in % Suni Vatnhamar 2016 11
  • 12. PERFORMANCE INDICATORS FINANCE  RM days  FG days  Creditor days  Debtor days  WC turnover  EVA  Overdue receivables Suni Vatnhamar 2016 12
  • 13. PI Finance 1) Raw Material days See definition in Financial handbook 2) Finished Goods days See definition in Financial handbook 3) Creditors days See definition in Financial handbook 4) Debtors days See definition in Financial handbook Suni Vatnhamar 2016 13
  • 14. PI Finance 5) Working Capital Turnover Net sales (S4000) over last 12 months Average Normalized Working Capital (Norm_WC)over last 4 quarters 6) EVA See definition in Financial handbook 7) Overdue receivables Proportion of receivables >30 days overdue expressed as a percentage of total receivables Suni Vatnhamar 2016 14
  • 15. PERFORMANCE INDICATORS SALES EXCELLENCE  Sales per employee  Organic growth  New order balance  RMC per tonnage  # of customer visits  # of prospect visits  # and value of quotations  # of enquiries Suni Vatnhamar 2016 15
  • 16. PI Sales Excellence - Hyperion 1) Sales per employee 2) Organic growth Increase/decrease of tonnage sold compared to previous year, excluding impact of acquisitions, transferred business, or disposals, expressed as a percentage. 3) New order balance Annualized sales value (after ramp up) of new confirmed orders starting within next 12 months minus value of annualized confirmed losses expressed as a value. 4) RMC per tonnage Raw material contribution per sold tonnage of polymers Suni Vatnhamar 2016 16
  • 17. PI Sales Excellence to be reported in CRM system 6) # of total customer visits 7) # of visits to prospects 8) # of quotations 9) Value of quotations 10) # of enquiries from customers Suni Vatnhamar 2016 17
  • 18. PERFORMANCE INDICATORS HR  Sick leave % direct workers  Sick Leave % indirect people  LTA Suni Vatnhamar 2016 18
  • 19. PI HR 1)Sick leave direct worker (%) Sick leave (%)= total number of sick days / (total number of days worked + days away) for all direct workers 2) Sick leave indirect workers Sick leave (%)= total number of sick days / (total number of days worked + days away) for all indirect workers. 3) Lost Time Accidents (LTA) reported as number of Lost Time Accidents per 1 million working hours on a rolling 12 months period Suni Vatnhamar 2016 19