SlideShare una empresa de Scribd logo
1 de 19

A DELGADO DESIGN/BUILD CONCEPT
Matthew Poché
Adam Goldstein
Patricia Andia Jara
Enrique
Garcia
Keith T. Daggett
Professor P. Victor
Mirzai
 VERRADO COMMUNITY
 in 1999 the Verrado Community Master Plan was approved
by the Town Council. The community was annexed to the city
of Buckeye, Arizona.
 In 2007, the Buckeye General Plan designated this property
as a Master Planned Community.
 Of the 7 Phases of development southwest of Phoenix, our
project is situated in Phase 3 South.
 This Preliminary Plat consists of 11 development parcels
(2.101-106 and 2.201-205).
 A single family house located
in Verrado, just 25 miles
outside Phoenix, Arizona.
 Verrado is anchored by a
pedestrian-friendly Main
Street and offers residents
miles of parks and trails,
educational and recreational
facilities, a championship golf
course as well as a variety of
clubs and activities.
 Has a hot desert climate.
The hottest month is August, with an average daily high temperature
of 105°F
 The average low temperature is 43°F in January .
 Elevation: 869 Ft
 Excellent access to
transportation, with
access to Interstate 10
just one mile south and
Loop 303 just five
miles to the east.
GOOGLE EARTH VIDEO
 Our parcel, contains
80 lots, of which we
have chosen lot 157,
oriented lengthwise
north to south.
 The context is predominantly single
family detached dwellings. Duplex
residential buildings are located along
the street.
 The street hierarchy includes a main
north-south avenue: Verrado Way, and
secondary local residential streets.
 The site is located on an east-west
local residential street: E. Delaney
Drive. which has low traffic.
 A view corridor from the street to the
east terminates at a pleasant green
open area, which reduces the effect of
heat gain and brings a microclimate to
the surroundings.
• The contour slopes from the north-west
to the south-east.
• Prevailing winds originating from the
north support the natural ventilation.
• Front landscape set back. Rear gardens
and open area characterize the open
space.
Master bedroom, great room and kitchen
have areas facing north and receive
suitable access to daylight.
Covered patio facing north has daylight
and it is cooler during most part of the day.
Game room and secondary bedroom have
areas facing north and receive access to
daylight.
Second floor has cross ventilation.
c
o
c
o
DUAL FLUSH TOILET
• REQUIRES LESS WATER TO OPERATE.
• PRICE COMPARISON:
COLONY- W TOILET (1.6 GPF) $147
DUAL FLUSH TOILET (1.6 & 1 GPF)
$200
PROFILE SMART 305 ROUND FRONT PLUS–
CAROMA
• HIGH EFFICIENCY DUAL FLUSH TOILET 1.28 & 0.8 GPF
• INTEGRATED SINK FOR GREATER WATER SAVINGS
SOLAR HOT WATER HEATING
• Uses heat from the sun to work
alongside a conventional water
heater.
• The average domestic system
reduces carbon dioxide emissions
by around 400kg per year,
depending on the fuel replaced.
• It is preferable to have a minimum
roof area of 43 sqft. facing south-
east to south-west.
• COST: $5,000 - $7,000
• Savings + Incentives
Division 2 - Earthwork
Division 3 - Concrete
Division 6 - Framing
Division 9 - Finishes
Division 7 - Thermal and
Moisture Protection
Division 8 - Doors and Windows
Division 6 - Wood/Plastic/Composites, & Supplies
Description Unit Quantity
Material Cost,
per Unit
Labor Cost Equipment Cost Total Cost Category Total
Wood and Plastic Fasteners
Framing Nails, Grip-Rite, 3" x 0.120-Guage
Smooth Shank Galvanized, 2000 per Box
Each 20 $28.65 $573.00
Rough Carpentry
Wood Framing Unit Quantity
Material Cost,
per Unit
Labor Cost Equipment Cost Total Cost Category Total
Fascia
2x6, SPF, #2, Subfascia Linear Ft. 418 $0.64 $267.10
2x4, SPF, #2, Outlooks & Nailers Linear Ft. 836 $0.43 $355.92
1st Floor Walls
Beams & Headers
2x12, SPF, #2 Each
2 @ 20', 4 @
16', 17 @ 14', 6
@ 12', 6 @ 10',
9 @ 8'
By Quote $818.59
Plywood, 1/2", OSB/CD, 4X8 sheets Each 9 $11.90 $107.14
Plates
2x4 Plate, Top, SPF Linear Ft 3110 $0.43 $1,323.73
2x6 Plate, Top, SPF* Each 3 @ 8', 3 @ 10' By Quote $34.34
2x4 (Treated) Bottom Plate, at Slab, SPF* Linear Ft 622 $0.50 $309.50
2x4, (Treated) Bottom Plate, at slab Each 3 @ 8', 3 @ 10' By Quote $53.56
2x6 (Treated) Bottom Plate, at Slab, SPF* Each 1 @ 8', 1 @ 10' By Quote $65.47
Arches
5/8" OSB, 4x8* Each 33 $20.36 $671.72
Studs
2x4 Precut @ 116 5/8", SPF Each 704 $4.32 $3,041.28
2x6, precut@ 116 5/8", SPF* Each 18 $6.48 $116.64
2nd Floor Walls
Beams & Headers
2x12, SPF, #2 Each 9 @ 14', 1 @ 10' By Quote $201.89
Plywood, 1/2", OSB/CD, 4X8 sheets Each 3 $11.90 $35.71
Plates
2x4, SPF Linear Ft 2364 $0.42 $997.25
2x6, SPF* Each 4 @ 10’, 4 @ 14’ By Quote $61.06
Studs
2x4, SPF, precut @ 104-5/8" Each 426 $4 $1,656.29
2x6, SPF, precut @ 104-5/8" Each 24 $5.83 $139.97
Stairs:
2x12, SPF Each 11 @ 12', 4 @ 8' By Quote $242.50
Flooring
Subflooring:
3/4" Underlayment, X-Band, "C" Grade, 4X8, UL Plywood,
Tongue & Groove
Each 57 $30.30 $1,727.10
Adhesive, CAQ Type Each 10 $55.00 $550.00
#10 Ring Shank Nails, Pneumatic Strips Each 3 $224.00 $672.00
Exterior Wall sheathing
Windstorm, 7/16", 4'x11', OSB Sheathing Each 158 $19.49 $3,079.42
Tyvek Home Wrap, 9'x150', by Roll Each 5 $137.00 $685.00
Tyvek Stucco Wrap, 5'x200'', by Roll Each 4 $183.63 $734.52
Plastic-Hed Yellowcap Nails, 1", 2000 ct. Carton Each 1 $49.30 $49.30
Roof Decking
Plywood, OSB Techshield, 5/8"*, 4x8 Each 165 $20.35 $3,358.08
Plywood Clips, 5/8, by Carton Each 4 $6.47 $25.88
Rough Carpentry, Total $45,044.97
THROUGH 6/13/2014
ION
UCTION
MING
MING
NG
T. ROUGH-INS
S
ECTIONS
DOOR INSTALLATION
H MATERIALS
STALLATION
TALLATION/FINISHES
NG
ALKWAY CONCRETE
S
S
INISH
ISH
G
AL
SHES
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11THROUGH 6/13/2014
ION
UCTION
MING
MING
NG
T. ROUGH-INS
S
ECTIONS
DOOR INSTALLATION
MATERIALS
STALLATION
TALLATION/FINISHES
NG
ALKWAY CONCRETE
S
S
INISH
ISH
G
AL
SHES
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
INITIAL
CONSTRUCTION
BEGINFOUNDATION
EXCAVATIO
N
HROUGH 6/13/2014
ON
CTION
ING
MING
G
T. ROUGH-INS
ECTIONS
OOR INSTALLATION
MATERIALS
STALLATION
ALLATION/FINISHES
NG
LKWAY CONCRETE
NISH
SH
G
L
SHES
UGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11HROUGH 6/13/2014
ON
CTION
NG
MING
G
. ROUGH-INS
CTIONS
OOR INSTALLATION
MATERIALS
TALLATION
ALLATION/FINISHES
NG
LKWAY CONCRETE
NISH
SH
G
L
HES
UGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11OUGH 6/13/2014
N
TION
G
NG
ROUGH-INS
TIONS
OR INSTALLATION
ATERIALS
ALLATION
LATION/FINISHES
G
WAY CONCRETE
SH
ES
GH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11OUGH 6/13/2014
N
ION
G
G
OUGH-INS
TIONS
OR INSTALLATION
ATERIALS
ALLATION
LATION/FINISHES
WAY CONCRETE
SH
ES
GH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11UGH 6/13/2014
ON
G
OUGH-INS
ONS
R INSTALLATION
TERIALS
LLATION
ATION/FINISHES
WAY CONCRETE
H
S
H
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11GH 6/13/2014
N
UGH-INS
NS
INSTALLATION
ERIALS
ATION
TION/FINISHES
AY CONCRETE
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
VATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
VATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
CONSTRUCTION
ATION
ATION
OOR FRAMING
RAMING
OOR FRAMING
RAMING
SHEATHING
ING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
ROOFING
OR FINISH MATERIALS
TON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
OR PAINTING
WAY & WALKWAY CONCRETE
NCES
& GATE
CAPING
OR DOORS
NG STAIRS
OR TRIM
T FLOOR FINISH
LOOR FINISH
PLUMBING
ELECTRICAL
HVAC
ETRY
ERTOPS
OOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
ATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
ATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
OR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
OR DOORS
ING STAIRS
OR TRIM
T FLOOR FINISH
FLOOR FINISH
PLUMBING
ELECTRICAL
HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 11014
TION
SHES
ETE
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
FOUNDATIO
N
1STFLOOR
FRAMING
STAIR
FRAMING
2NDFLOOR
FRAMING
PLUMBING/ELECT.ROUGH-INS
FINISH
SHEATHING
PLUMBING/ELECT.ROUGH-
INS
HVACROUGH-
INS
FINISHSTAIRS
WINDOW/EXT.
DOOR
ROUGH-INS
INSPECTIONS
EXT.FINISH
MATERIALS
GYP.BOARD
INSTALLATION
TUB/SHOWER
INSTALLATION
HROUGH 6/13/2014
ON
CTION
NG
ING
G
. ROUGH-INS
CTIONS
OOR INSTALLATION
MATERIALS
TALLATION
ALLATION/FINISHES
G
KWAY CONCRETE
NISH
H
L
HES
UGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
WK 15
INT. PAINT
WK 17 WK 18
OF DAYS: 94
WK 8 WK 9 WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
2/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
VATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 11
WK 15 WK 17 WK 18
OF DAYS: 94
WK 8 WK 9 WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
INTERIOR
DOORS
LANDSCAPEIN
G
FENCE&
GATE
TRIMFLOOR
FINISH
APPLIANCES
CARPETFLOOR
FINISH
INTERIOR
TRIM
FINISH
STAIRS
CABINET
RY
FINISH
HVAC
FINISH
ELECT.
FINISH
PLUMBING
FINAL
WALKTHROUGH
FINAL
CLEANING
BATHROOM
FINISHES
COUNTERTO
PS
THROUGH 6/13/2014
ION
UCTION
ING
MING
NG
T. ROUGH-INS
S
ECTIONS
DOOR INSTALLATION
MATERIALS
STALLATION
TALLATION/FINISHES
NG
LKWAY CONCRETE
S
S
NISH
SH
G
AL
SHES
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
WK 19WK 15
INT. PAINT
WK 17 WK 18
94
WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
THROUGH 6/13/2014
TION
UCTION
MING
MING
NG
CT. ROUGH-INS
NS
PECTIONS
DOOR INSTALLATION
G
H MATERIALS
NSTALLATION
TALLATION/FINISHES
ING
ALKWAY CONCRETE
S
RS
FINISH
ISH
NG
CAL
ISHES
G
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
STRUCTIONTIMELINE
WK 19WK 15
INT. PAINT
WK 17 WK 18
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
ROOFFRAMING
2NDFLOOR
FRAMING
PRE-
CONSTRUCTION
FOUN`DATIO
N
ISULATION
2/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
ATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
OR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
CAPING
OR DOORS
ING STAIRS
OR TRIM
T FLOOR FINISH
FLOOR FINISH
PLUMBING
ELECTRICAL
HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 11
WK 15 WK 17 WK 18
DAYS: 94
WK 8 WK 9 WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
DRIVEWAY/WALKWAY
CONCRETE
INTERIOR
PAINTING
Provides you, our
clients,
with a visual
advantage.
Different exterior color
schemes as well.
Also with a view at
night,
which gives you an
idea of how the
interior lighting
reflects.
 Trace Ceilings
 10’ Ceilings
 Arch Ways
 Open Floor Plan
 Many Windows
For Natural
Lighting
 Residential Construction Management Competition(RCMC) panel of
judges.
 Professor P. Victor Mirzai
 Home Builders Association of Greater New Orleans
 New Orleans Education League of Construction
 Delgado Community College Student Government Association
 Letterman's Reproduction Company
 City Blueprint and Supply Company
 National Housing Endowment
Without their support and along with funding this project it would have never been
completed.
Our TEAM is very happy to have an opportunity to work on this realistic national
competition project. We are extremely thankful to receive feed back
and constructive criticism from the panel of judges.

Más contenido relacionado

La actualidad más candente

Southwood flips - Before and After with Pics and Prices
Southwood flips - Before and After with Pics and PricesSouthwood flips - Before and After with Pics and Prices
Southwood flips - Before and After with Pics and PricesJerry Charlton
 
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...Sherryl Jacobs
 
Going Green Without the Greenbacks
Going Green Without the GreenbacksGoing Green Without the Greenbacks
Going Green Without the GreenbacksEleanor Olsen
 
Lakeshore Gardens Launch
Lakeshore Gardens LaunchLakeshore Gardens Launch
Lakeshore Gardens Launchglobalheights
 
Casa Grande Elan Brochure - Zricks.com
Casa Grande Elan Brochure - Zricks.comCasa Grande Elan Brochure - Zricks.com
Casa Grande Elan Brochure - Zricks.comZricks.com
 
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...Lesley Lambert
 
Deacon Commons New Home Brochure
Deacon Commons New Home BrochureDeacon Commons New Home Brochure
Deacon Commons New Home BrochureMatthew Rathbun
 
Acadia, Calgary flips - Before and After
Acadia, Calgary flips - Before and AfterAcadia, Calgary flips - Before and After
Acadia, Calgary flips - Before and AfterJerry Charlton
 
The High Park Floorplans
The High Park FloorplansThe High Park Floorplans
The High Park FloorplansIInsideCondos
 
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel Projects
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel ProjectsResale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel Projects
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel ProjectsNoel Projects
 

La actualidad más candente (14)

Southwood flips - Before and After with Pics and Prices
Southwood flips - Before and After with Pics and PricesSouthwood flips - Before and After with Pics and Prices
Southwood flips - Before and After with Pics and Prices
 
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...
 
83 lighthouse brochue
83 lighthouse brochue83 lighthouse brochue
83 lighthouse brochue
 
Going Green Without the Greenbacks
Going Green Without the GreenbacksGoing Green Without the Greenbacks
Going Green Without the Greenbacks
 
Lakeshore Gardens Launch
Lakeshore Gardens LaunchLakeshore Gardens Launch
Lakeshore Gardens Launch
 
Casa Grande Elan Brochure - Zricks.com
Casa Grande Elan Brochure - Zricks.comCasa Grande Elan Brochure - Zricks.com
Casa Grande Elan Brochure - Zricks.com
 
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...
 
Hillcrest adu houses_pcrg
Hillcrest adu houses_pcrgHillcrest adu houses_pcrg
Hillcrest adu houses_pcrg
 
Available2
Available2Available2
Available2
 
Dsr lotus towers
Dsr lotus towersDsr lotus towers
Dsr lotus towers
 
Deacon Commons New Home Brochure
Deacon Commons New Home BrochureDeacon Commons New Home Brochure
Deacon Commons New Home Brochure
 
Acadia, Calgary flips - Before and After
Acadia, Calgary flips - Before and AfterAcadia, Calgary flips - Before and After
Acadia, Calgary flips - Before and After
 
The High Park Floorplans
The High Park FloorplansThe High Park Floorplans
The High Park Floorplans
 
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel Projects
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel ProjectsResale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel Projects
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel Projects
 

Similar a RCMC PowerPoint Presentation

EX-13 BUILDING SECTION-Arch D
EX-13 BUILDING SECTION-Arch DEX-13 BUILDING SECTION-Arch D
EX-13 BUILDING SECTION-Arch DDwayne Hopkins
 
MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018TE Studio
 
Good Energy Haus
Good Energy HausGood Energy Haus
Good Energy HausTE Studio
 
Drawing set for building complex - Three building and swimming poll
Drawing set for building complex - Three building and swimming pollDrawing set for building complex - Three building and swimming poll
Drawing set for building complex - Three building and swimming pollAripSuhariyanto1
 
Brigade lake front - Luxury Flats in Whitefield, Bangalore
Brigade lake front - Luxury Flats in Whitefield, BangaloreBrigade lake front - Luxury Flats in Whitefield, Bangalore
Brigade lake front - Luxury Flats in Whitefield, BangaloreCredit 'n' Debit Solutions
 
Going Green Without Greenbacks
Going Green Without GreenbacksGoing Green Without Greenbacks
Going Green Without GreenbacksEleanor Olsen
 
Residential Energy Audit Report
Residential Energy Audit ReportResidential Energy Audit Report
Residential Energy Audit ReportMichael Clarke
 
Arch202.Villa.E - Sheet - A4 - SECTION
Arch202.Villa.E - Sheet - A4 - SECTIONArch202.Villa.E - Sheet - A4 - SECTION
Arch202.Villa.E - Sheet - A4 - SECTIONMarcia Berg
 
Moderate climate
Moderate climateModerate climate
Moderate climateHugoCopire2
 
Passive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI ConferencePassive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI ConferenceTE Studio
 
Lexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusLexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusTE Studio
 
Housing and Finance Presentation
Housing and Finance PresentationHousing and Finance Presentation
Housing and Finance PresentationDon Buchanan
 
2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone
2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone 2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone
2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone ZED
 
Better Buildings by Design Vermont: Joslin Hill House
Better Buildings by Design Vermont: Joslin Hill HouseBetter Buildings by Design Vermont: Joslin Hill House
Better Buildings by Design Vermont: Joslin Hill Housekaplanthompson
 

Similar a RCMC PowerPoint Presentation (20)

EX-13 BUILDING SECTION-Arch D
EX-13 BUILDING SECTION-Arch DEX-13 BUILDING SECTION-Arch D
EX-13 BUILDING SECTION-Arch D
 
MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018
 
Stealth Passive House
Stealth Passive HouseStealth Passive House
Stealth Passive House
 
Construction Document set
Construction Document setConstruction Document set
Construction Document set
 
Haddonfield Facilities Overview
Haddonfield Facilities OverviewHaddonfield Facilities Overview
Haddonfield Facilities Overview
 
Good Energy Haus
Good Energy HausGood Energy Haus
Good Energy Haus
 
Drawing set for building complex - Three building and swimming poll
Drawing set for building complex - Three building and swimming pollDrawing set for building complex - Three building and swimming poll
Drawing set for building complex - Three building and swimming poll
 
QTO Sample
QTO SampleQTO Sample
QTO Sample
 
Brigade lake front - Luxury Flats in Whitefield, Bangalore
Brigade lake front - Luxury Flats in Whitefield, BangaloreBrigade lake front - Luxury Flats in Whitefield, Bangalore
Brigade lake front - Luxury Flats in Whitefield, Bangalore
 
Portfolio
PortfolioPortfolio
Portfolio
 
Going Green Without Greenbacks
Going Green Without GreenbacksGoing Green Without Greenbacks
Going Green Without Greenbacks
 
Residential Energy Audit Report
Residential Energy Audit ReportResidential Energy Audit Report
Residential Energy Audit Report
 
Arch202.Villa.E - Sheet - A4 - SECTION
Arch202.Villa.E - Sheet - A4 - SECTIONArch202.Villa.E - Sheet - A4 - SECTION
Arch202.Villa.E - Sheet - A4 - SECTION
 
Moderate climate
Moderate climateModerate climate
Moderate climate
 
Passive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI ConferencePassive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI Conference
 
Lexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusLexington Pkwy Passive House Plus
Lexington Pkwy Passive House Plus
 
What Makes Us Green
What Makes Us GreenWhat Makes Us Green
What Makes Us Green
 
Housing and Finance Presentation
Housing and Finance PresentationHousing and Finance Presentation
Housing and Finance Presentation
 
2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone
2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone 2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone
2 and 3 BHK Luxury Apartments Yelahanka, Bangalore-Zed zone
 
Better Buildings by Design Vermont: Joslin Hill House
Better Buildings by Design Vermont: Joslin Hill HouseBetter Buildings by Design Vermont: Joslin Hill House
Better Buildings by Design Vermont: Joslin Hill House
 

Más de Keith Daggett

ICC Certificate-Keith Daggett
ICC Certificate-Keith DaggettICC Certificate-Keith Daggett
ICC Certificate-Keith DaggettKeith Daggett
 
ICC Certificate-Keith Daggett
ICC Certificate-Keith DaggettICC Certificate-Keith Daggett
ICC Certificate-Keith DaggettKeith Daggett
 
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)Keith Daggett
 
NAHB IBC-RCMC Certificate
NAHB IBC-RCMC CertificateNAHB IBC-RCMC Certificate
NAHB IBC-RCMC CertificateKeith Daggett
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1Keith Daggett
 

Más de Keith Daggett (6)

ICC Certificate-Keith Daggett
ICC Certificate-Keith DaggettICC Certificate-Keith Daggett
ICC Certificate-Keith Daggett
 
ICC Certificate-Keith Daggett
ICC Certificate-Keith DaggettICC Certificate-Keith Daggett
ICC Certificate-Keith Daggett
 
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)
 
NAHB IBC-RCMC Certificate
NAHB IBC-RCMC CertificateNAHB IBC-RCMC Certificate
NAHB IBC-RCMC Certificate
 
Diploma-DCC AAS
Diploma-DCC AASDiploma-DCC AAS
Diploma-DCC AAS
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1
 

Último

Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 

Último (20)

Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 

RCMC PowerPoint Presentation

  • 2. Matthew Poché Adam Goldstein Patricia Andia Jara Enrique Garcia Keith T. Daggett Professor P. Victor Mirzai
  • 3.  VERRADO COMMUNITY  in 1999 the Verrado Community Master Plan was approved by the Town Council. The community was annexed to the city of Buckeye, Arizona.  In 2007, the Buckeye General Plan designated this property as a Master Planned Community.  Of the 7 Phases of development southwest of Phoenix, our project is situated in Phase 3 South.  This Preliminary Plat consists of 11 development parcels (2.101-106 and 2.201-205).
  • 4.  A single family house located in Verrado, just 25 miles outside Phoenix, Arizona.  Verrado is anchored by a pedestrian-friendly Main Street and offers residents miles of parks and trails, educational and recreational facilities, a championship golf course as well as a variety of clubs and activities.
  • 5.  Has a hot desert climate. The hottest month is August, with an average daily high temperature of 105°F  The average low temperature is 43°F in January .  Elevation: 869 Ft
  • 6.  Excellent access to transportation, with access to Interstate 10 just one mile south and Loop 303 just five miles to the east. GOOGLE EARTH VIDEO  Our parcel, contains 80 lots, of which we have chosen lot 157, oriented lengthwise north to south.
  • 7.  The context is predominantly single family detached dwellings. Duplex residential buildings are located along the street.  The street hierarchy includes a main north-south avenue: Verrado Way, and secondary local residential streets.  The site is located on an east-west local residential street: E. Delaney Drive. which has low traffic.  A view corridor from the street to the east terminates at a pleasant green open area, which reduces the effect of heat gain and brings a microclimate to the surroundings.
  • 8. • The contour slopes from the north-west to the south-east. • Prevailing winds originating from the north support the natural ventilation. • Front landscape set back. Rear gardens and open area characterize the open space.
  • 9. Master bedroom, great room and kitchen have areas facing north and receive suitable access to daylight. Covered patio facing north has daylight and it is cooler during most part of the day. Game room and secondary bedroom have areas facing north and receive access to daylight. Second floor has cross ventilation. c o c o
  • 10. DUAL FLUSH TOILET • REQUIRES LESS WATER TO OPERATE. • PRICE COMPARISON: COLONY- W TOILET (1.6 GPF) $147 DUAL FLUSH TOILET (1.6 & 1 GPF) $200 PROFILE SMART 305 ROUND FRONT PLUS– CAROMA • HIGH EFFICIENCY DUAL FLUSH TOILET 1.28 & 0.8 GPF • INTEGRATED SINK FOR GREATER WATER SAVINGS
  • 11. SOLAR HOT WATER HEATING • Uses heat from the sun to work alongside a conventional water heater. • The average domestic system reduces carbon dioxide emissions by around 400kg per year, depending on the fuel replaced. • It is preferable to have a minimum roof area of 43 sqft. facing south- east to south-west. • COST: $5,000 - $7,000 • Savings + Incentives
  • 12. Division 2 - Earthwork Division 3 - Concrete Division 6 - Framing Division 9 - Finishes Division 7 - Thermal and Moisture Protection Division 8 - Doors and Windows
  • 13. Division 6 - Wood/Plastic/Composites, & Supplies Description Unit Quantity Material Cost, per Unit Labor Cost Equipment Cost Total Cost Category Total Wood and Plastic Fasteners Framing Nails, Grip-Rite, 3" x 0.120-Guage Smooth Shank Galvanized, 2000 per Box Each 20 $28.65 $573.00 Rough Carpentry Wood Framing Unit Quantity Material Cost, per Unit Labor Cost Equipment Cost Total Cost Category Total Fascia 2x6, SPF, #2, Subfascia Linear Ft. 418 $0.64 $267.10 2x4, SPF, #2, Outlooks & Nailers Linear Ft. 836 $0.43 $355.92 1st Floor Walls Beams & Headers 2x12, SPF, #2 Each 2 @ 20', 4 @ 16', 17 @ 14', 6 @ 12', 6 @ 10', 9 @ 8' By Quote $818.59 Plywood, 1/2", OSB/CD, 4X8 sheets Each 9 $11.90 $107.14 Plates 2x4 Plate, Top, SPF Linear Ft 3110 $0.43 $1,323.73 2x6 Plate, Top, SPF* Each 3 @ 8', 3 @ 10' By Quote $34.34 2x4 (Treated) Bottom Plate, at Slab, SPF* Linear Ft 622 $0.50 $309.50 2x4, (Treated) Bottom Plate, at slab Each 3 @ 8', 3 @ 10' By Quote $53.56 2x6 (Treated) Bottom Plate, at Slab, SPF* Each 1 @ 8', 1 @ 10' By Quote $65.47 Arches 5/8" OSB, 4x8* Each 33 $20.36 $671.72 Studs 2x4 Precut @ 116 5/8", SPF Each 704 $4.32 $3,041.28 2x6, precut@ 116 5/8", SPF* Each 18 $6.48 $116.64
  • 14. 2nd Floor Walls Beams & Headers 2x12, SPF, #2 Each 9 @ 14', 1 @ 10' By Quote $201.89 Plywood, 1/2", OSB/CD, 4X8 sheets Each 3 $11.90 $35.71 Plates 2x4, SPF Linear Ft 2364 $0.42 $997.25 2x6, SPF* Each 4 @ 10’, 4 @ 14’ By Quote $61.06 Studs 2x4, SPF, precut @ 104-5/8" Each 426 $4 $1,656.29 2x6, SPF, precut @ 104-5/8" Each 24 $5.83 $139.97 Stairs: 2x12, SPF Each 11 @ 12', 4 @ 8' By Quote $242.50 Flooring Subflooring: 3/4" Underlayment, X-Band, "C" Grade, 4X8, UL Plywood, Tongue & Groove Each 57 $30.30 $1,727.10 Adhesive, CAQ Type Each 10 $55.00 $550.00 #10 Ring Shank Nails, Pneumatic Strips Each 3 $224.00 $672.00 Exterior Wall sheathing Windstorm, 7/16", 4'x11', OSB Sheathing Each 158 $19.49 $3,079.42 Tyvek Home Wrap, 9'x150', by Roll Each 5 $137.00 $685.00 Tyvek Stucco Wrap, 5'x200'', by Roll Each 4 $183.63 $734.52 Plastic-Hed Yellowcap Nails, 1", 2000 ct. Carton Each 1 $49.30 $49.30 Roof Decking Plywood, OSB Techshield, 5/8"*, 4x8 Each 165 $20.35 $3,358.08 Plywood Clips, 5/8, by Carton Each 4 $6.47 $25.88 Rough Carpentry, Total $45,044.97
  • 15. THROUGH 6/13/2014 ION UCTION MING MING NG T. ROUGH-INS S ECTIONS DOOR INSTALLATION H MATERIALS STALLATION TALLATION/FINISHES NG ALKWAY CONCRETE S S INISH ISH G AL SHES OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11THROUGH 6/13/2014 ION UCTION MING MING NG T. ROUGH-INS S ECTIONS DOOR INSTALLATION MATERIALS STALLATION TALLATION/FINISHES NG ALKWAY CONCRETE S S INISH ISH G AL SHES OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 INITIAL CONSTRUCTION BEGINFOUNDATION EXCAVATIO N HROUGH 6/13/2014 ON CTION ING MING G T. ROUGH-INS ECTIONS OOR INSTALLATION MATERIALS STALLATION ALLATION/FINISHES NG LKWAY CONCRETE NISH SH G L SHES UGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11HROUGH 6/13/2014 ON CTION NG MING G . ROUGH-INS CTIONS OOR INSTALLATION MATERIALS TALLATION ALLATION/FINISHES NG LKWAY CONCRETE NISH SH G L HES UGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11OUGH 6/13/2014 N TION G NG ROUGH-INS TIONS OR INSTALLATION ATERIALS ALLATION LATION/FINISHES G WAY CONCRETE SH ES GH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11OUGH 6/13/2014 N ION G G OUGH-INS TIONS OR INSTALLATION ATERIALS ALLATION LATION/FINISHES WAY CONCRETE SH ES GH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11UGH 6/13/2014 ON G OUGH-INS ONS R INSTALLATION TERIALS LLATION ATION/FINISHES WAY CONCRETE H S H WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11GH 6/13/2014 N UGH-INS NS INSTALLATION ERIALS ATION TION/FINISHES AY CONCRETE WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION VATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION VATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION CONSTRUCTION ATION ATION OOR FRAMING RAMING OOR FRAMING RAMING SHEATHING ING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION ROOFING OR FINISH MATERIALS TON HOWER INSTALLATION OARD INSTALLATION/FINISHES OR PAINTING WAY & WALKWAY CONCRETE NCES & GATE CAPING OR DOORS NG STAIRS OR TRIM T FLOOR FINISH LOOR FINISH PLUMBING ELECTRICAL HVAC ETRY ERTOPS OOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION ATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION ATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES OR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING OR DOORS ING STAIRS OR TRIM T FLOOR FINISH FLOOR FINISH PLUMBING ELECTRICAL HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 11014 TION SHES ETE WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 FOUNDATIO N 1STFLOOR FRAMING STAIR FRAMING 2NDFLOOR FRAMING PLUMBING/ELECT.ROUGH-INS FINISH SHEATHING PLUMBING/ELECT.ROUGH- INS HVACROUGH- INS FINISHSTAIRS WINDOW/EXT. DOOR ROUGH-INS INSPECTIONS EXT.FINISH MATERIALS GYP.BOARD INSTALLATION TUB/SHOWER INSTALLATION HROUGH 6/13/2014 ON CTION NG ING G . ROUGH-INS CTIONS OOR INSTALLATION MATERIALS TALLATION ALLATION/FINISHES G KWAY CONCRETE NISH H L HES UGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 WK 15 INT. PAINT WK 17 WK 18 OF DAYS: 94 WK 8 WK 9 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 2/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION VATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 11 WK 15 WK 17 WK 18 OF DAYS: 94 WK 8 WK 9 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 INTERIOR DOORS LANDSCAPEIN G FENCE& GATE TRIMFLOOR FINISH APPLIANCES CARPETFLOOR FINISH INTERIOR TRIM FINISH STAIRS CABINET RY FINISH HVAC FINISH ELECT. FINISH PLUMBING FINAL WALKTHROUGH FINAL CLEANING BATHROOM FINISHES COUNTERTO PS THROUGH 6/13/2014 ION UCTION ING MING NG T. ROUGH-INS S ECTIONS DOOR INSTALLATION MATERIALS STALLATION TALLATION/FINISHES NG LKWAY CONCRETE S S NISH SH G AL SHES OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 WK 19WK 15 INT. PAINT WK 17 WK 18 94 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 THROUGH 6/13/2014 TION UCTION MING MING NG CT. ROUGH-INS NS PECTIONS DOOR INSTALLATION G H MATERIALS NSTALLATION TALLATION/FINISHES ING ALKWAY CONCRETE S RS FINISH ISH NG CAL ISHES G OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 STRUCTIONTIMELINE WK 19WK 15 INT. PAINT WK 17 WK 18 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 ROOFFRAMING 2NDFLOOR FRAMING PRE- CONSTRUCTION FOUN`DATIO N ISULATION 2/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION ATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES OR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE CAPING OR DOORS ING STAIRS OR TRIM T FLOOR FINISH FLOOR FINISH PLUMBING ELECTRICAL HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 11 WK 15 WK 17 WK 18 DAYS: 94 WK 8 WK 9 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 DRIVEWAY/WALKWAY CONCRETE INTERIOR PAINTING
  • 16. Provides you, our clients, with a visual advantage. Different exterior color schemes as well.
  • 17. Also with a view at night, which gives you an idea of how the interior lighting reflects.
  • 18.  Trace Ceilings  10’ Ceilings  Arch Ways  Open Floor Plan  Many Windows For Natural Lighting
  • 19.  Residential Construction Management Competition(RCMC) panel of judges.  Professor P. Victor Mirzai  Home Builders Association of Greater New Orleans  New Orleans Education League of Construction  Delgado Community College Student Government Association  Letterman's Reproduction Company  City Blueprint and Supply Company  National Housing Endowment Without their support and along with funding this project it would have never been completed. Our TEAM is very happy to have an opportunity to work on this realistic national competition project. We are extremely thankful to receive feed back and constructive criticism from the panel of judges.