FORMULA USED FOR ESTIMATING
Earthworks
Excavation (m3
) = Height x Width x Length
Actual Backfill (m3
) = 1.25 x Theoretical Backfill
Theoretical Backfill (m3
) = VExcavation – VFooting – VGravel Bedding
Slab / Soil Poisoning (m2
) = Area of Building (Length x Width)
Grading (m2
) = Area of Column Footing (Length x Width)
Concrete Works
Volume of Footing (m3
) = Length x Width x Thickness x 1.1 (Height)
Volume of Column (m3
) = Length x Width x Height x 1.05
Volume of Stairs (m3
) = Length x Width x Height x 1.05
Volume of Slab (m3
) = Length x Width x Thickness x 1.05
Volume of Beam (m3
) = Base x Height x Length x 1.05
Number of Class “B” Cement Bags (Qty) = VConcrete x 7.5 bags/m3
Number of Sand (m3
) = VConcrete x 0.5 m3
/m3
Number of Gravel (m3
) = VConcrete x 1 m3
/m3
Formworks
Perimeter for Column (m) = (2 x Length) + (2 x Width)
Perimeter for Beam (m) = (2 x Base) + (2 x Height)
Perimeter for Slab (m) = (2 x Length) + (2 x Width)
Lateral Area for Column (m2
) = Perimeter x Height
Lateral Area for Beam (m2
) = Perimeter x Span
Lateral Area for Slab (m2
) = Perimeter x Thickness
Vertical Support for Column (Lumber Size: 2” x 3”) = Height x (7 Bd Ft/m)
Horizontal Support for Column (Lumber Size: 2” x 2”) = Height x (21 Bd Ft/m)
Diagonal/Brace Support for Column (Lumber Size: 2” x 2”) = Height x (11.7 Bd Ft/m)
Vertical Support for Beam (Lumber Size: 2” x 3”) = Height x (6 Bd Ft/m)
Horizontal Support for Beam (Lumber Size: 2” x 2”) = Height x (4.7 Bd Ft/m)
Number of Board Feet / Vertical Support for Slab (Lumber Size: 2” x 3”) = Lateral Area x (9.1
Bd Ft/m2
)
Number of Plywood (Qty) = Lateral Area / (2.88 m3
/ plywood)
Number of Board Feet (Qty) = Number of Plywood x (22 board feet/plywood)
Number of Form Oil (L) = Lateral Area / (25 m3
/ L)
Number of Nails (kg) = Lateral Area x (0.4 kg/m2
)
Tileworks
Total Number of Tiles along its Length (Qty) = (Length – Wall Thickness)/0.6
Total Number of Tiles along its Width (Qty) = (Width – Wall Thickness)/0.6
Total Number of Tiles (Qty) = (Total Number of Tiles along its Length x Total Number of
Tiles along its Width) – Number of Tiles occupied by stairs
Area (m2
) = Length x Width
Number of Class “A” Cement Bags for Mortar Mix (Qty) = Area x (0.45 bags/m2
)
Number of Sand (m3
) = Area x (0.025 m3
/m2
)
REINFORCE STEEL WORKS
Total Length = Height - concrete cover (2xdiameter)+ main bar end hooks
Total Length of all (m) = Total length x Quantity x No. of Main Bars
No. of 6 m Steel bars = Total Length of all / Length of the steel bar x allowance for splicer
Total Length Tie A B= Column Dimension -(2 x Concrete cover) x No. of sides + ( floor x 6 x
diameter)/1000
Total No of Ties = Total Length / Length of Bar / diamter of ties
No. of Lateral Ties In Columns = 2 + No of ties
Total Length of Lateral Ties = Total Length of Ties x Quantity x No. of Lateral Ties in Columns
Tie Wires (kg) = Quatity x (No of Ties + No of Main bars) x No of Later Ties in Columns x 0.4
/53
Total Length of Web Bars = Span x No. of Web Bars
Total Length of Support = Span x top support + 0.25 + 0.25 + Span x Bot support + 0.25
Total Length of Midspan = Span / 2 x Midspan top support + span/2 x Midspan bottom support
Gross Area = Length x Height x Quantity
Net Area = Gross Area - Opening
Vertical and Horizontal( pcs ) = Net Area x Bars in M per Sq.m / 6
Parallel Length and Width = W or L - 2(concrete cover)+ diameter
Total Cut Bars = pcs x 2 x quantity
Masonry Works
Gross Area (m2
) = Length x Height
Net Area (m2
) = Gross Area – Opening
Number of CHB (Qty) = Net Area x (12.5 CHB/m2
)
Interior (CHB = 4” thick):
Number of Class “A” Cement Bags for Mortar Fillers and Binders (Qty) = Number of CHB x
(0.0411 bags/CHB)
Number of Sand for Mortar Fillers and Binders (m3
) = Net Area x (0.0022 m3
/m2
)
Number of Class “A” Cement Bags for Plaster (Qty) = Net Area x (0.0411 bags/m2
)
Number of Sand for Plaster (m3
) = Net Area x (0.0022 m3
/m2
)
Exterior (CHB = 6” thick):
Number of Class “A” Cement Bags for Mortar Fillers and Binders (Qty) = Number of CHB x
(0.0982 bags/CHB)
Number of Sand for Mortar Fillers and Binders (m3
) = Net Area x (0.053 m3
/m2
)
Number of Class “A” Cement Bags for Plaster (Qty) = Net Area x (0.0982 bags/m2
)
Number of Sand for Plaster (m3
) = Net Area x (0.01 m3
/m2
)
Number of Class “A” Cement Bags for Plaster in Beams and Columns (Qty) = Area x (0.082
bags/m3
)
Number of Sand for Plaster (m3
) = Area x (0.009 m3
/m2
)
Painting Works
Gross Area (m2
) = Length x Height
Net Area (m2
) = Gross Area – Opening
Number of Boysen Epoxy Primer (L) = Net Area x (20 m2
/4L)
Boysen Masonry Putty (L) = Net Area x (10m2
/4L)
Boysen Permacoat Latex (2 coats) (L) = (Net Area x 2) x (25m2
/4L)

Más contenido relacionado

Similar a Formula.pdf

25. volume & surface area
25. volume & surface area25. volume & surface area
25. volume & surface area
Akhilesh Sharma
 
Construction engineering formula sheet
Construction engineering formula sheetConstruction engineering formula sheet
Construction engineering formula sheet
Prionath Roy
 
Construction engineering formula sheet
Construction engineering formula sheetConstruction engineering formula sheet
Construction engineering formula sheet
Prionath Roy
 

Similar a Formula.pdf (20)

Perform-Calculation-ppt-dbm.pptx
Perform-Calculation-ppt-dbm.pptxPerform-Calculation-ppt-dbm.pptx
Perform-Calculation-ppt-dbm.pptx
 
B structure power point
B structure power pointB structure power point
B structure power point
 
9Maths 13 Surface Areas and Volumes.pdf
9Maths 13 Surface Areas and Volumes.pdf9Maths 13 Surface Areas and Volumes.pdf
9Maths 13 Surface Areas and Volumes.pdf
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
24. area
24. area24. area
24. area
 
C21 21.1
C21 21.1C21 21.1
C21 21.1
 
C21 21.4
C21 21.4C21 21.4
C21 21.4
 
Slab panel desing sheet (1) (2)
Slab panel desing sheet (1) (2)Slab panel desing sheet (1) (2)
Slab panel desing sheet (1) (2)
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
 
Bill of Quantity Tabulation
Bill of Quantity TabulationBill of Quantity Tabulation
Bill of Quantity Tabulation
 
Ex 6 a field density by core cutter
Ex 6 a field density by core cutterEx 6 a field density by core cutter
Ex 6 a field density by core cutter
 
Class 7 PHYSICAL QUANTITY & MEASUREMENT
Class 7 PHYSICAL QUANTITY & MEASUREMENTClass 7 PHYSICAL QUANTITY & MEASUREMENT
Class 7 PHYSICAL QUANTITY & MEASUREMENT
 
Massarsch uevos desarrollos en pilotes de fundación
Massarsch    uevos desarrollos en pilotes de fundaciónMassarsch    uevos desarrollos en pilotes de fundación
Massarsch uevos desarrollos en pilotes de fundación
 
25. volume & surface area
25. volume & surface area25. volume & surface area
25. volume & surface area
 
Mensuration.pptx
Mensuration.pptxMensuration.pptx
Mensuration.pptx
 
Bstruc final report
Bstruc final reportBstruc final report
Bstruc final report
 
Construction engineering formula sheet
Construction engineering formula sheetConstruction engineering formula sheet
Construction engineering formula sheet
 
Construction engineering formula sheet
Construction engineering formula sheetConstruction engineering formula sheet
Construction engineering formula sheet
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
Plate load test observation and calculation Plate load test image (usefulsear...
Plate load test observation and calculation Plate load test image (usefulsear...Plate load test observation and calculation Plate load test image (usefulsear...
Plate load test observation and calculation Plate load test image (usefulsear...
 

Último

一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
bd2c5966a56d
 
Abortion pills Dubai (+918133066128) Cytotec 200mg pills UAE Abudhabi
Abortion pills Dubai (+918133066128) Cytotec 200mg pills UAE AbudhabiAbortion pills Dubai (+918133066128) Cytotec 200mg pills UAE Abudhabi
Abortion pills Dubai (+918133066128) Cytotec 200mg pills UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
gajnagarg
 
一比一原版伯明翰城市大学毕业证成绩单留信学历认证
一比一原版伯明翰城市大学毕业证成绩单留信学历认证一比一原版伯明翰城市大学毕业证成绩单留信学历认证
一比一原版伯明翰城市大学毕业证成绩单留信学历认证
62qaf0hi
 
如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一
如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一
如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一
opyff
 
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
9352852248 Call Girls Gota Escort Service Available 24×7 In Gota
9352852248 Call Girls  Gota Escort Service Available 24×7 In Gota9352852248 Call Girls  Gota Escort Service Available 24×7 In Gota
9352852248 Call Girls Gota Escort Service Available 24×7 In Gota
gargpaaro
 
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一
如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一
如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一
avy6anjnd
 
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
avy6anjnd
 
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
62qaf0hi
 
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
ezgenuh
 
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
nirzagarg
 

Último (20)

一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
 
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best ServiceMarathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
 
Abortion pills Dubai (+918133066128) Cytotec 200mg pills UAE Abudhabi
Abortion pills Dubai (+918133066128) Cytotec 200mg pills UAE AbudhabiAbortion pills Dubai (+918133066128) Cytotec 200mg pills UAE Abudhabi
Abortion pills Dubai (+918133066128) Cytotec 200mg pills UAE Abudhabi
 
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
 
一比一原版伯明翰城市大学毕业证成绩单留信学历认证
一比一原版伯明翰城市大学毕业证成绩单留信学历认证一比一原版伯明翰城市大学毕业证成绩单留信学历认证
一比一原版伯明翰城市大学毕业证成绩单留信学历认证
 
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
 
West Bengal Factories Rules, 1958.bfpptx
West Bengal Factories Rules, 1958.bfpptxWest Bengal Factories Rules, 1958.bfpptx
West Bengal Factories Rules, 1958.bfpptx
 
如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一
如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一
如何办理多伦多大学毕业证(UofT毕业证书)成绩单原版一比一
 
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
 
9352852248 Call Girls Gota Escort Service Available 24×7 In Gota
9352852248 Call Girls  Gota Escort Service Available 24×7 In Gota9352852248 Call Girls  Gota Escort Service Available 24×7 In Gota
9352852248 Call Girls Gota Escort Service Available 24×7 In Gota
 
Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...
Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...
Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...
 
T.L.E 5S's (Seiri, Seiton, Seiso, Seiketsu, Shitsuke).pptx
T.L.E 5S's (Seiri, Seiton, Seiso, Seiketsu, Shitsuke).pptxT.L.E 5S's (Seiri, Seiton, Seiso, Seiketsu, Shitsuke).pptx
T.L.E 5S's (Seiri, Seiton, Seiso, Seiketsu, Shitsuke).pptx
 
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset ItIs Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
 
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
 
如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一
如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一
如何办理莱斯大学毕业证(Rice毕业证)毕业证成绩单原版一比一
 
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
 
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
 
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
 
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's WhyIs Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
 
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
 

Formula.pdf

  • 1. FORMULA USED FOR ESTIMATING Earthworks Excavation (m3 ) = Height x Width x Length Actual Backfill (m3 ) = 1.25 x Theoretical Backfill Theoretical Backfill (m3 ) = VExcavation – VFooting – VGravel Bedding Slab / Soil Poisoning (m2 ) = Area of Building (Length x Width) Grading (m2 ) = Area of Column Footing (Length x Width) Concrete Works Volume of Footing (m3 ) = Length x Width x Thickness x 1.1 (Height) Volume of Column (m3 ) = Length x Width x Height x 1.05 Volume of Stairs (m3 ) = Length x Width x Height x 1.05 Volume of Slab (m3 ) = Length x Width x Thickness x 1.05 Volume of Beam (m3 ) = Base x Height x Length x 1.05 Number of Class “B” Cement Bags (Qty) = VConcrete x 7.5 bags/m3 Number of Sand (m3 ) = VConcrete x 0.5 m3 /m3 Number of Gravel (m3 ) = VConcrete x 1 m3 /m3
  • 2. Formworks Perimeter for Column (m) = (2 x Length) + (2 x Width) Perimeter for Beam (m) = (2 x Base) + (2 x Height) Perimeter for Slab (m) = (2 x Length) + (2 x Width) Lateral Area for Column (m2 ) = Perimeter x Height Lateral Area for Beam (m2 ) = Perimeter x Span Lateral Area for Slab (m2 ) = Perimeter x Thickness Vertical Support for Column (Lumber Size: 2” x 3”) = Height x (7 Bd Ft/m) Horizontal Support for Column (Lumber Size: 2” x 2”) = Height x (21 Bd Ft/m) Diagonal/Brace Support for Column (Lumber Size: 2” x 2”) = Height x (11.7 Bd Ft/m) Vertical Support for Beam (Lumber Size: 2” x 3”) = Height x (6 Bd Ft/m) Horizontal Support for Beam (Lumber Size: 2” x 2”) = Height x (4.7 Bd Ft/m) Number of Board Feet / Vertical Support for Slab (Lumber Size: 2” x 3”) = Lateral Area x (9.1 Bd Ft/m2 ) Number of Plywood (Qty) = Lateral Area / (2.88 m3 / plywood) Number of Board Feet (Qty) = Number of Plywood x (22 board feet/plywood) Number of Form Oil (L) = Lateral Area / (25 m3 / L) Number of Nails (kg) = Lateral Area x (0.4 kg/m2 ) Tileworks Total Number of Tiles along its Length (Qty) = (Length – Wall Thickness)/0.6 Total Number of Tiles along its Width (Qty) = (Width – Wall Thickness)/0.6 Total Number of Tiles (Qty) = (Total Number of Tiles along its Length x Total Number of Tiles along its Width) – Number of Tiles occupied by stairs Area (m2 ) = Length x Width Number of Class “A” Cement Bags for Mortar Mix (Qty) = Area x (0.45 bags/m2 ) Number of Sand (m3 ) = Area x (0.025 m3 /m2 )
  • 3. REINFORCE STEEL WORKS Total Length = Height - concrete cover (2xdiameter)+ main bar end hooks Total Length of all (m) = Total length x Quantity x No. of Main Bars No. of 6 m Steel bars = Total Length of all / Length of the steel bar x allowance for splicer Total Length Tie A B= Column Dimension -(2 x Concrete cover) x No. of sides + ( floor x 6 x diameter)/1000 Total No of Ties = Total Length / Length of Bar / diamter of ties No. of Lateral Ties In Columns = 2 + No of ties Total Length of Lateral Ties = Total Length of Ties x Quantity x No. of Lateral Ties in Columns Tie Wires (kg) = Quatity x (No of Ties + No of Main bars) x No of Later Ties in Columns x 0.4 /53 Total Length of Web Bars = Span x No. of Web Bars Total Length of Support = Span x top support + 0.25 + 0.25 + Span x Bot support + 0.25 Total Length of Midspan = Span / 2 x Midspan top support + span/2 x Midspan bottom support Gross Area = Length x Height x Quantity Net Area = Gross Area - Opening Vertical and Horizontal( pcs ) = Net Area x Bars in M per Sq.m / 6 Parallel Length and Width = W or L - 2(concrete cover)+ diameter Total Cut Bars = pcs x 2 x quantity Masonry Works Gross Area (m2 ) = Length x Height Net Area (m2 ) = Gross Area – Opening Number of CHB (Qty) = Net Area x (12.5 CHB/m2 )
  • 4. Interior (CHB = 4” thick): Number of Class “A” Cement Bags for Mortar Fillers and Binders (Qty) = Number of CHB x (0.0411 bags/CHB) Number of Sand for Mortar Fillers and Binders (m3 ) = Net Area x (0.0022 m3 /m2 ) Number of Class “A” Cement Bags for Plaster (Qty) = Net Area x (0.0411 bags/m2 ) Number of Sand for Plaster (m3 ) = Net Area x (0.0022 m3 /m2 ) Exterior (CHB = 6” thick): Number of Class “A” Cement Bags for Mortar Fillers and Binders (Qty) = Number of CHB x (0.0982 bags/CHB) Number of Sand for Mortar Fillers and Binders (m3 ) = Net Area x (0.053 m3 /m2 ) Number of Class “A” Cement Bags for Plaster (Qty) = Net Area x (0.0982 bags/m2 ) Number of Sand for Plaster (m3 ) = Net Area x (0.01 m3 /m2 ) Number of Class “A” Cement Bags for Plaster in Beams and Columns (Qty) = Area x (0.082 bags/m3 ) Number of Sand for Plaster (m3 ) = Area x (0.009 m3 /m2 ) Painting Works Gross Area (m2 ) = Length x Height
  • 5. Net Area (m2 ) = Gross Area – Opening Number of Boysen Epoxy Primer (L) = Net Area x (20 m2 /4L) Boysen Masonry Putty (L) = Net Area x (10m2 /4L) Boysen Permacoat Latex (2 coats) (L) = (Net Area x 2) x (25m2 /4L)