SlideShare una empresa de Scribd logo
1 de 7
KEVIN DAVID MORTON
CURRICULUM VITAE
10 Longhurst Drive
Kingston Hill
Stafford
Staffordshire
ST16 3RG
Tel No. 01785 223611 (Home)
01785 825088 (Work)
CURRICULUM VITAE
PERSONAL DETAILS
Name: Kevin David Morton
Address: 10 Longhurst Drive
Kingston Hill
Stafford
Staffordshire
ST16 3RG
Telephone No. 01785 223611
Date of Birth: 19th
October 1962
Nationality: British
Marital Status: Married.
QUALIFICATIONS HNC Electrical/Electronic Engineering.
PROFESSIONAL Membership of Engineering and Technology (MIET)
TRAINING TP141 Principal Designers Representative (NG)
TP141 (Lead Engineer) - National Grid
TP144 (Development Engineer) - National Grid
Competent person NG / BESC.
NEBOSH and IOSHH managing safely
CDM Management Regulations 2007 - ABB
4 Year Electrical Technician Apprenticeship - GEC
City & Guilds Level 3 Auto-Cad (Two dimensional).
Intensive Advanced CAD course Micro-station (Sweden, ABB)
Control and Protection requirements for H.V. substations - GEC
Civil works in HV substations. (Mannheim, Germany, ABB)
CAREER SUMMARY ABB Ltd.
TP141 Lead Engineer/PD representative (NG) 2016 - Present
TP141 Lead Engineer (NG Central Alliance) 2006 - 2016
Senior Primary Applications Engineer 2000 - 2006
Senior Substation Layout Engineer 1999 - 2000
Clough Smith Ltd.
Project Manager (H.V. substations) 1997 - 1999
ESBI Engineering (UK) Ltd.
(Consulting Engineers/Contractors)
Senior Design Engineer 1995 - 1997
ABB Power T & D Ltd.
Design Engineer 1989 - 1995
GEC High Voltage Switchgear Ltd.
Various positions held within the company 1979 - 1989
as detailed more fully in attached pages
CAREER HISTORY
ABB Ltd
Oulton Road
Stone
Staffordshire
ST15 0RS
TP141 Lead Engineer (NG) 2006 - 2016
TP141 Principal Designers Rep/Lead Engineer (NG) 2016 - Present
Presently undertaking the role of Principal Designer Representative (PD Rep) for Canterbury
400kV GIS substation works.
Reporting to the section lead for NG projects my other responsibilities include developing the
design intent document during tender phase with all stakeholders to enable subsequent PMI
award. Developing risk pots for project unknowns. Design coordination between all disciplines
including Primary / Civils / Secondary / HV cables / Commissioning / Engineering Support and
Technology teams.
Engineering design program development, ongoing project delivery phase program updating
and management, engineering discipline budget monitoring. Scope creep management
including QS support to develop compensation events where applicable.
Calling, chairing and producing minutes for both internal / client design and hazid reviews,
ongoing monitoring and closing out of all relevant actions for design deliverables.
Supplier drawing co-ordination and technical alignment monitoring activities to ensure design
process is maintained in line with program. Ensuring all legislative, business management
system and client processes are followed and recorded where relevant. Manage client design
assurance activities in line with client and program requirements.
Supporting operations team in monthly project progress and planning reviews, producing
monthly reports for engineering progress reviews with the interface engineering manager.
Active technical query management and site support during construction phase. Ensuring
project design packages are issued via engineering support to site in line with construction
activity program.
Mentor to new Lead Engineer starters/graduates.
Senior Primary Applications Engineer 2000 - 2006
Complete primary layout design responsibility for a new 33kV Substation for Channel Tunnel
Rail Link (CTRL Phase 1) at Sellindge including all civil design interfaces. Successful
completion.
Overall responsibility for all aspects of primary layout design for Phase 2 Channel Tunnel Rail
sites. Successful completion.
Complete primary design responsibility as above, for 2 off new 400kV / 25kV-0-25kV circuits
(2 off transformers) at Wymondley / Corey’s Mill Substation. Successful completion.
Involved in numerous other small projects 132kV – 400kV:
Examples:
(Surge arrester replacements)
Nursling 132kV
Lister drive 132kV
Beddington 275kV
Iver 275kV
Walham 400kV
Padiham 400kV
(Reactor replacements)
Newcoss 275kV Substation
Wimbledon 275kV Substation
Tottenham 275kV Substation
Involved in various tendering activities.
Senior Substation Layout Engineer 1999 - 2000
Conceptual and detail design responsibility for a new 132kV / 11kV Substation at Birmingham
University (2 off transformers).
Responsible for all primary layout design works including civil interfaces.
Extremely tight design constraints. Successful completion.
Clough Smith Ltd.
Brickyard Road
Aldridge
West Midlands
WS9 8TA
Project Manager (HV Substations) June 1997 – 1999
Overall control i.e. financial; engineering; construction of HV substation projects.
Project managed - Lydney Local 132kV/33kV contract for MEB.
Contract included the installation of a 132kV/33kV (90MVA) transformer and associated
switchgear; Protection; SCADA; LVAC./Building services; D.C. battery system etc.
Along with 132kV O/H line modifications and the installation of 33kV cable.
Included all associated civil works.
Managed the preparation of tenders for various other REC’s. Project managed 11kV
refurbishment works for Norweb.
Fully conversant with CDM regulations and quality requirements for H.V. substation projects;
along with all relevant British and international standards.
Extensive experience in the power engineering field from 11kV to 400kV.
“Hands on approach”: able to carry out detailed engineering duties when required, with
confidence.
ESBI Engineering (UK) Ltd.
(Consulting engineers/contractors)
122 London Road
Kingston upon Thames
Surrey
KT2 6QJ
Senior Design Engineer Feb 1995 – June 1997
Complete primary design responsibility for all HV switchyards from 33kV up to 400kV. My job
involved engineering/co-ordinating all aspects of projects from tendering through to final
commissioning. This involved:
♦ Reviewing and completing tenders.
♦ Liaising with clients/sub-contractors on financial/technical matters.
♦ Overseeing and approving all works associated with outdoor switchyard layout.
♦ Outdoor switchyard design using CAD (Micro-station).
♦ Engineering/specifying: Busbars, Connectors, Insulators, Structures/Steelwork, Cable
routing, Earthing, and Interlocking.
♦ Liaising with civil works engineer on all aspects associated with outdoor switchyard
design.
♦ Overhead line work (within the substation) engineering/co-ordinating.
♦ Static/Dynamic load verification of all switchgear and foundations.
Engineered ESBI’s first 132kV/66kV project for London Electricity. Also, engineered large
132kV contract for MEB. Heavily involved in securing a large contract from Yorkshire
electricity (132kV/ 66kV s/s).
Carried out consultancy works for Yorkshire electricity. This involved feasibility studies with a
view to replacing a number of primary substations.
Consultancy work successfully completed – Aldham 66kV Substation.
Actively involved in the company’s business development plans which was rewarded with
ESBI’s first contract with Scottish Power (132kV).
Good understanding of all the protection/control requirements for HV substations.
Used to working with software packages i.e. Project, Excel, Word, Micro-station to achieve
main tasks.
Used to working on my own initiative with a lot of responsibility.
ABB Power T & D Ltd.
Darby House
Lawn Central
Telford
Shropshire
TF3 4JB
Design Engineer April 1989 – Feb 1995
In 1989 ABB Power T & D Ltd. set up their Substation Projects Dept. in Telford. I had
complete primary layout design responsibility for all HV switchyard design from 132kV to
400kV. Projects which I engineered from tender stage through to final commissioning where
as follows:
NATIONAL GRID:
Landulph 400kV substation (First ABB CB to be installed in the UK)
Watford 275kV substation
Redbridge 275kV substation
West Thurrock 275kV substation (First ABB CB to be installed in the UK)
Littlebrook 132kV substation (First ABB CB to be installed in the UK)
Iver 132kV substation
Capenhurst 132kV substation
SCOTTISH POWER:
Dalmarnock/Charlotte St. substations.
GEC High Voltage Switchgear Ltd.
Instrument transformer division
New Road
Hixon
Staffordshire
ST18 0PE
Design Engineer April 1986 – April 1989
Worked on contracts for NGC, REC’s, Overseas markets engineering the following products.
(33kV – 400kV):
♦ Current transformer: Post type; Neutral; Cable primary; Slipover; Generator pit.
♦ Voltage transformers: Capacitor; Cascade; Rubber clad. Cont’d
Design Draughtsman
Designed/developed various types of HV Instrument Transformers using computer aided
design (CAD).
Test Technician
Gained valuable experience in HV testing of the above mentioned switchgear.
♦ Type testing to customer specifications.
♦ Routine testing.
Lot of responsibility owing to high voltage and currents used.
Electrical Apprenticeship (4 Year) July 1979 – June 1983
Learnt basic skills in electrical/mechanical engineering in the following departments of the
company.
Training School HV Contracts
CB Assembly, Inspection, Testing Estimating
Advanced Development Engineering Planning
Production Control Insulation Engineering
Disconnector Design/Installation Layout & Diagram Draughting
Instrument Transformer Design/Testing HV Control/Protection Engineering.
Project Experience:
Canterbury 400kV (GIS) - NG
St Johns Wood 400kV (GIS) - NG
City Road 400kV (GIS) – NG
Carrington 400kV (GIS) – NG
Kensal Green 400kV (GIS) – NG
Canterbury 400kV (GIS) – NG
Frodsham 400kV (AIS) - NG
Grendon 400kV (AIS) - NG
Norwich Main 400kV (AIS) - NG
Wymondley 400kV (AIS) - NG
South Manchester – 275kV (AIS) - NG
West Thurrock 275kV (AIS) - NG
Dalmarnock / Charlotte Street 275kV (AIS) - Scottish Power
Various CB replacements 132/275/400kV - NG
Surge arrester replacements 132/275/400kV (AIS) – NG
Norton 132kV (GIS) - NG
Capenhurst 132kV (AIS) - NG
Littlebrook 132kV (AIS - NG
Birmingham University 132kV (AIS) - Birmingham University
Newcastle / Stagefields 132kV (AIS) – MEB
Wimbledon / Wandsworth 132kV (AIS) - London Electricity
Lydney 132kV (AIS) - MEB (Project manager)
Aldham 66kV (AIS) - Yorkshire Electricity (Feasibly Study)
Hunshelf 66/132kV (AIS) - Yorkshire Electricity
Castries 66kV (AIS) - LUCELEC, St Lucia Electricity
Wandsworth 66kV (AIS) - London Electricity
Channel Tunnel Rail Link 33kV (AIS) - London Electricity
Channel Tunnel Rail Link 25kV (AIS) - EDF Energy (8 Sites - 5 year project).
Oxenholme 25kV (AIS) - NG
Weaver Junction 25kV (AIS) - NG
RMU Replacements 11kV - Norweb (Project Manager)

Más contenido relacionado

La actualidad más candente

La actualidad más candente (19)

Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Ashraf Suleiman.
Ashraf Suleiman.Ashraf Suleiman.
Ashraf Suleiman.
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
TBResume 2016 update
TBResume 2016 updateTBResume 2016 update
TBResume 2016 update
 
cv umar
cv umarcv umar
cv umar
 
Muhammad Danish Rafiq
Muhammad Danish RafiqMuhammad Danish Rafiq
Muhammad Danish Rafiq
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
CV2014
CV2014CV2014
CV2014
 
Resume_Vijayakumar M
Resume_Vijayakumar MResume_Vijayakumar M
Resume_Vijayakumar M
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 

Destacado (8)

Ferris buellar's day off title research
Ferris buellar's day off title researchFerris buellar's day off title research
Ferris buellar's day off title research
 
Juno title research
Juno title researchJuno title research
Juno title research
 
The breakfast club title research
The breakfast club title researchThe breakfast club title research
The breakfast club title research
 
Task 6
Task 6 Task 6
Task 6
 
Media task 2 presentation.
Media task 2 presentation.Media task 2 presentation.
Media task 2 presentation.
 
Audience profile
Audience profileAudience profile
Audience profile
 
Final concept
Final conceptFinal concept
Final concept
 
Ferris Bueller's Day off
Ferris Bueller's Day off Ferris Bueller's Day off
Ferris Bueller's Day off
 

Similar a KEVIN DAVID MORTON cv

Similar a KEVIN DAVID MORTON cv (20)

M Adel CV 2016
M Adel CV 2016M Adel CV 2016
M Adel CV 2016
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
MujibCV
MujibCVMujibCV
MujibCV
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
The Power Behind The Power
The Power Behind The PowerThe Power Behind The Power
The Power Behind The Power
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
CV8thApril 2015
CV8thApril 2015CV8thApril 2015
CV8thApril 2015
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 

KEVIN DAVID MORTON cv

  • 1. KEVIN DAVID MORTON CURRICULUM VITAE 10 Longhurst Drive Kingston Hill Stafford Staffordshire ST16 3RG Tel No. 01785 223611 (Home) 01785 825088 (Work)
  • 2. CURRICULUM VITAE PERSONAL DETAILS Name: Kevin David Morton Address: 10 Longhurst Drive Kingston Hill Stafford Staffordshire ST16 3RG Telephone No. 01785 223611 Date of Birth: 19th October 1962 Nationality: British Marital Status: Married. QUALIFICATIONS HNC Electrical/Electronic Engineering. PROFESSIONAL Membership of Engineering and Technology (MIET) TRAINING TP141 Principal Designers Representative (NG) TP141 (Lead Engineer) - National Grid TP144 (Development Engineer) - National Grid Competent person NG / BESC. NEBOSH and IOSHH managing safely CDM Management Regulations 2007 - ABB 4 Year Electrical Technician Apprenticeship - GEC City & Guilds Level 3 Auto-Cad (Two dimensional). Intensive Advanced CAD course Micro-station (Sweden, ABB) Control and Protection requirements for H.V. substations - GEC Civil works in HV substations. (Mannheim, Germany, ABB) CAREER SUMMARY ABB Ltd. TP141 Lead Engineer/PD representative (NG) 2016 - Present TP141 Lead Engineer (NG Central Alliance) 2006 - 2016 Senior Primary Applications Engineer 2000 - 2006 Senior Substation Layout Engineer 1999 - 2000 Clough Smith Ltd. Project Manager (H.V. substations) 1997 - 1999 ESBI Engineering (UK) Ltd. (Consulting Engineers/Contractors) Senior Design Engineer 1995 - 1997 ABB Power T & D Ltd. Design Engineer 1989 - 1995 GEC High Voltage Switchgear Ltd. Various positions held within the company 1979 - 1989 as detailed more fully in attached pages
  • 3. CAREER HISTORY ABB Ltd Oulton Road Stone Staffordshire ST15 0RS TP141 Lead Engineer (NG) 2006 - 2016 TP141 Principal Designers Rep/Lead Engineer (NG) 2016 - Present Presently undertaking the role of Principal Designer Representative (PD Rep) for Canterbury 400kV GIS substation works. Reporting to the section lead for NG projects my other responsibilities include developing the design intent document during tender phase with all stakeholders to enable subsequent PMI award. Developing risk pots for project unknowns. Design coordination between all disciplines including Primary / Civils / Secondary / HV cables / Commissioning / Engineering Support and Technology teams. Engineering design program development, ongoing project delivery phase program updating and management, engineering discipline budget monitoring. Scope creep management including QS support to develop compensation events where applicable. Calling, chairing and producing minutes for both internal / client design and hazid reviews, ongoing monitoring and closing out of all relevant actions for design deliverables. Supplier drawing co-ordination and technical alignment monitoring activities to ensure design process is maintained in line with program. Ensuring all legislative, business management system and client processes are followed and recorded where relevant. Manage client design assurance activities in line with client and program requirements. Supporting operations team in monthly project progress and planning reviews, producing monthly reports for engineering progress reviews with the interface engineering manager. Active technical query management and site support during construction phase. Ensuring project design packages are issued via engineering support to site in line with construction activity program. Mentor to new Lead Engineer starters/graduates. Senior Primary Applications Engineer 2000 - 2006 Complete primary layout design responsibility for a new 33kV Substation for Channel Tunnel Rail Link (CTRL Phase 1) at Sellindge including all civil design interfaces. Successful completion. Overall responsibility for all aspects of primary layout design for Phase 2 Channel Tunnel Rail sites. Successful completion. Complete primary design responsibility as above, for 2 off new 400kV / 25kV-0-25kV circuits (2 off transformers) at Wymondley / Corey’s Mill Substation. Successful completion. Involved in numerous other small projects 132kV – 400kV: Examples: (Surge arrester replacements)
  • 4. Nursling 132kV Lister drive 132kV Beddington 275kV Iver 275kV Walham 400kV Padiham 400kV (Reactor replacements) Newcoss 275kV Substation Wimbledon 275kV Substation Tottenham 275kV Substation Involved in various tendering activities. Senior Substation Layout Engineer 1999 - 2000 Conceptual and detail design responsibility for a new 132kV / 11kV Substation at Birmingham University (2 off transformers). Responsible for all primary layout design works including civil interfaces. Extremely tight design constraints. Successful completion. Clough Smith Ltd. Brickyard Road Aldridge West Midlands WS9 8TA Project Manager (HV Substations) June 1997 – 1999 Overall control i.e. financial; engineering; construction of HV substation projects. Project managed - Lydney Local 132kV/33kV contract for MEB. Contract included the installation of a 132kV/33kV (90MVA) transformer and associated switchgear; Protection; SCADA; LVAC./Building services; D.C. battery system etc. Along with 132kV O/H line modifications and the installation of 33kV cable. Included all associated civil works. Managed the preparation of tenders for various other REC’s. Project managed 11kV refurbishment works for Norweb. Fully conversant with CDM regulations and quality requirements for H.V. substation projects; along with all relevant British and international standards. Extensive experience in the power engineering field from 11kV to 400kV. “Hands on approach”: able to carry out detailed engineering duties when required, with confidence. ESBI Engineering (UK) Ltd. (Consulting engineers/contractors) 122 London Road Kingston upon Thames Surrey KT2 6QJ Senior Design Engineer Feb 1995 – June 1997 Complete primary design responsibility for all HV switchyards from 33kV up to 400kV. My job involved engineering/co-ordinating all aspects of projects from tendering through to final commissioning. This involved:
  • 5. ♦ Reviewing and completing tenders. ♦ Liaising with clients/sub-contractors on financial/technical matters. ♦ Overseeing and approving all works associated with outdoor switchyard layout. ♦ Outdoor switchyard design using CAD (Micro-station). ♦ Engineering/specifying: Busbars, Connectors, Insulators, Structures/Steelwork, Cable routing, Earthing, and Interlocking. ♦ Liaising with civil works engineer on all aspects associated with outdoor switchyard design. ♦ Overhead line work (within the substation) engineering/co-ordinating. ♦ Static/Dynamic load verification of all switchgear and foundations. Engineered ESBI’s first 132kV/66kV project for London Electricity. Also, engineered large 132kV contract for MEB. Heavily involved in securing a large contract from Yorkshire electricity (132kV/ 66kV s/s). Carried out consultancy works for Yorkshire electricity. This involved feasibility studies with a view to replacing a number of primary substations. Consultancy work successfully completed – Aldham 66kV Substation. Actively involved in the company’s business development plans which was rewarded with ESBI’s first contract with Scottish Power (132kV). Good understanding of all the protection/control requirements for HV substations. Used to working with software packages i.e. Project, Excel, Word, Micro-station to achieve main tasks. Used to working on my own initiative with a lot of responsibility. ABB Power T & D Ltd. Darby House Lawn Central Telford Shropshire TF3 4JB Design Engineer April 1989 – Feb 1995 In 1989 ABB Power T & D Ltd. set up their Substation Projects Dept. in Telford. I had complete primary layout design responsibility for all HV switchyard design from 132kV to 400kV. Projects which I engineered from tender stage through to final commissioning where as follows: NATIONAL GRID: Landulph 400kV substation (First ABB CB to be installed in the UK) Watford 275kV substation Redbridge 275kV substation West Thurrock 275kV substation (First ABB CB to be installed in the UK) Littlebrook 132kV substation (First ABB CB to be installed in the UK) Iver 132kV substation Capenhurst 132kV substation SCOTTISH POWER: Dalmarnock/Charlotte St. substations. GEC High Voltage Switchgear Ltd. Instrument transformer division New Road Hixon Staffordshire ST18 0PE
  • 6. Design Engineer April 1986 – April 1989 Worked on contracts for NGC, REC’s, Overseas markets engineering the following products. (33kV – 400kV): ♦ Current transformer: Post type; Neutral; Cable primary; Slipover; Generator pit. ♦ Voltage transformers: Capacitor; Cascade; Rubber clad. Cont’d Design Draughtsman Designed/developed various types of HV Instrument Transformers using computer aided design (CAD). Test Technician Gained valuable experience in HV testing of the above mentioned switchgear. ♦ Type testing to customer specifications. ♦ Routine testing. Lot of responsibility owing to high voltage and currents used. Electrical Apprenticeship (4 Year) July 1979 – June 1983 Learnt basic skills in electrical/mechanical engineering in the following departments of the company. Training School HV Contracts CB Assembly, Inspection, Testing Estimating Advanced Development Engineering Planning Production Control Insulation Engineering Disconnector Design/Installation Layout & Diagram Draughting Instrument Transformer Design/Testing HV Control/Protection Engineering. Project Experience: Canterbury 400kV (GIS) - NG St Johns Wood 400kV (GIS) - NG City Road 400kV (GIS) – NG Carrington 400kV (GIS) – NG Kensal Green 400kV (GIS) – NG Canterbury 400kV (GIS) – NG Frodsham 400kV (AIS) - NG Grendon 400kV (AIS) - NG Norwich Main 400kV (AIS) - NG Wymondley 400kV (AIS) - NG South Manchester – 275kV (AIS) - NG West Thurrock 275kV (AIS) - NG Dalmarnock / Charlotte Street 275kV (AIS) - Scottish Power Various CB replacements 132/275/400kV - NG Surge arrester replacements 132/275/400kV (AIS) – NG Norton 132kV (GIS) - NG Capenhurst 132kV (AIS) - NG Littlebrook 132kV (AIS - NG Birmingham University 132kV (AIS) - Birmingham University Newcastle / Stagefields 132kV (AIS) – MEB Wimbledon / Wandsworth 132kV (AIS) - London Electricity Lydney 132kV (AIS) - MEB (Project manager) Aldham 66kV (AIS) - Yorkshire Electricity (Feasibly Study)
  • 7. Hunshelf 66/132kV (AIS) - Yorkshire Electricity Castries 66kV (AIS) - LUCELEC, St Lucia Electricity Wandsworth 66kV (AIS) - London Electricity Channel Tunnel Rail Link 33kV (AIS) - London Electricity Channel Tunnel Rail Link 25kV (AIS) - EDF Energy (8 Sites - 5 year project). Oxenholme 25kV (AIS) - NG Weaver Junction 25kV (AIS) - NG RMU Replacements 11kV - Norweb (Project Manager)