1305-TT –Myanmar –
Pipe Roof Construction in Singapore
Trisha Sun
Trenchless Technology Seminar
-Myanmar 5 to 7 June 2013
Pipe Roof Construction
in Singapore
Trisha Sun
Principal W& M Consutlants
wnmconsultants@gmail.com
1 of 38.
1 of 38. -Pipe Roof In Singapore-Sun
2 of 38.
2 of 38. -Pipe Roof In Singapore-Sun
3 of 38.
3 of 38. -Pipe Roof In Singapore-Sun
4 of 38.
4 of 38. -Pipe Roof In Singapore-Sun
5 of 38.
5 of 38. -Pipe Roof In Singapore-Sun
6 of 38.
6 of 38. -Pipe Roof In Singapore-Sun
7 of 38.
7 of 38. -Pipe Roof In Singapore-Sun
8 of 38.
8 of 38. -Pipe Roof In Singapore-Sun
9 of 38.
9 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
1
PIPE Roof
• Exepereince in Singapore –
Pipe roof costruction
•Sun , email: wnmconsultants@gmail.com
1Pipe Roof Singapore-Sun, OKP
Topics 1-2
•Introduction
•Pipe roof concept
•Design issues
•Machine and problems
•Problems of jacking
•Constrction process 2Pipe Roof Singapore- Sun
10 of 38.
10 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
2
Tpoics-2-2
• Jacking and receiving shafts
•Jacking ,mining
•Monitoring
•Risk
•Tender- design
•and documentations
Pipe Roof Singapore- Sun 3
Introduction
•Trenchless Methods for providing “No dig “
solution to installation of large culverts/pipes
•Alternatives:
•Pipe ramming / pipe roof by ramming/auger
machine
•Pipe roof by microtunnelling
•Pipe pushing/box culvert direct jacking
•Open cut
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 4
11 of 38.
11 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
3
Various shapes
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 5
Construction Sequence
1. Execution of sheet piles
2. Execution of the pipe arch microtunnelling
3. Mined excavation of tunnel with steel ribs with reinforced shotcrete & fibre glass elements
4. Casting of permanent concrete lining
Pipe Arch Tunnel – Concept
Site picture of project by Metropolitan Atlanta Rapid Transit Authority in USA
6
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
12 of 38.
12 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
4
pipe roof Plan view (1-2)
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 7
Pipe roof -Plan view(2-2)
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
8
13 of 38.
13 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
5
Pipe roof
SG ,Pipe roof Tunnel
•Long section view
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 9
• Design Issues
10IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
14 of 38.
14 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
6
Design Issues- 1
•Physical site constraints
Close to MRT CCL-central
circular Line
Close to Viaduct foundation E
west line ,Sewer line ,services
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 11
Design Issues -2
Physical site constraints-mining below
joint bay cables
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 12
15 of 38.
15 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
7
Design Issues- 3
critical issues
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP
13
Design Issues -4-
geological profile
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 14
16 of 38.
16 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
8
Design 5-
during break out-soil treatment, steel
portal frame
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 15
Design 6-
during break through at exit
-soil treatment( soft alluvial), steel portal
frame
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 16
17 of 38.
17 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
9
Design 7 -stage excavation
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 17
Design 8 -Face Stability
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 18
18 of 38.
18 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
10
Design 9 -Design Model
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 19
Adopted Solution 1-3
The pipe jacking method adopted
-jacking from one end (jacking Shaft)
to the other end(receiving shaft)
using steel pipes to form a horizontal
and vertical temporary structure (
around the proposed reinforced box
culvert.)
•
20IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
19 of 38.
19 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
11
Adopted Solution 2-3
The pipe roof (see below Sketch
)comprises rows of 780mm dia Steel pipes
(10 on top and bottom and 6 rows on each
sides to form the vertical wall.
Each row of the steel pipes -interlock
together using steel T- clutches prefabricated
together with the pipes.
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP -22
Adopted Solution 2-3
Each row of the pipe which is
approximately 54m is formed
by welding together 9 to 10 number (
6 m long ) of steel pipe using the full
butt penetration welds
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
22
20 of 38.
20 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
12
SKETCH – CONFIGURATION OF THE PIPE
ROOF -drilling sequence
23IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
•Machine and
problems
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 24
21 of 38.
21 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
13
Machine 2-2 -Layout
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
25
PIPE JAKCING PROCESS -
Problems- jacking
•Obstruction
•Alignment
•Clutch
•Soil information
•Settlement
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 26
22 of 38.
22 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
14
•Construction process
27IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
Construction process 1-
Jacking shaft –typical
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 28
23 of 38.
23 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
15
Construction process 2
Construction of Jacking & Receiving Shaft
29IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
Construction 7
Setting of Jacks
30IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
24 of 38.
24 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
16
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 31
Construction process 8
Steel pipes
Construction process 9
Sample clutch details
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 32
25 of 38.
25 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
17
Construction process 14
Pipe Jacking in Progress
33-
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP
Construction process 16
Ultrasonic Test to welded joint
34-IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP
26 of 38.
26 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
18
Construction process 19
TBM Through at Receiving Shaft
35
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
Construction process 21
Completed Horizontal Row of Pipe
Roof
36IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
27 of 38.
27 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
19
Construction process 22
Completed pipe roof
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP
37
•Mining of Tunnel
India No Dig-Dec 9,2010 -
Pipe Roof , cheng
38
28 of 38.
28 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
20
Construction –Mining of tunnel 3 -
Installing portal frame at jacking shaft
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 39
Construction –Mining of tunnel 4
Installing portal frame at jacking shaft
India No Dig-Dec 9,2010 -
Pipe Roof , cheng
40
29 of 38.
29 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
21
Construction –Mining of tunnel 6
install entrance frame before
mining
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
41
Construction –Mining of tunnel 8A
EXCAVATON
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, 42
30 of 38.
30 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
22
•Monitoring
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, 43
Monitoring 1-
Services –need for monitoring
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
44
31 of 38.
31 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
23
Monitoring 3 A
Sample-installations of
instrumentations
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 45
Monitoring 3 B
Installations of instrumentations –Joint
Bay
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 46
32 of 38.
32 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
24
Instrumentation – Monitoring 4
INSTALL PRISM INSIDE THE STEEL PIPE –for
monitoring settlements
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
47
Monitoring 5 A
MRT Line below project
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 48
33 of 38.
33 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
25
Monitoring 5B
MRT-FIXING PRISMS
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 49
Monitoring 6
- Predictions
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
50
34 of 38.
34 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
26
Monitoring 7
Readings
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
51
• Completion
52IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
35 of 38.
35 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
27
Completion
Final stage
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP cheng
53
• Risk Assessment
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
54
36 of 38.
36 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
28
Risk Assessment
Risk factors (1)
•Risk from Soil information, services
•Settlement control and damages
•Insurance cover on adjacent structures
•Pre con survey
•Sharing of risks
•Design and build contract
•Allowance of claimIEM Conf Mar 2011- Pipe Roof
Singapore-Sun, OKP
55
Risk Assessment
Risk factors (2)
•Client risks
•Contractors
•Stakeholders
•3rd party client ( Authorities)
•Selection- method, main contractor ,specialist ( soil
treatment , shaft, pipe jacking , structures )
•Selecting –machine & skilled operators
•Luck /planningIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 56
37 of 38.
37 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
29
Preparing for contract
•Contract documentation
•Design/drawings
•Specifications
•Bills /Lump sum/VO
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 57
Thank you ,
58IIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
38 of 38.
38 of 38. -Pipe Roof In Singapore-Sun

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
 
Pipe lines in sewage system
Pipe lines in sewage systemPipe lines in sewage system
Pipe lines in sewage system
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Dewatering
DewateringDewatering
Dewatering
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
 
Che 4 house drainage system
Che 4 house drainage systemChe 4 house drainage system
Che 4 house drainage system
 
Presentation1
Presentation1Presentation1
Presentation1
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concrete
 
Reinforced earth walls
Reinforced earth wallsReinforced earth walls
Reinforced earth walls
 
SOIL NAILING
SOIL NAILINGSOIL NAILING
SOIL NAILING
 
Slipform
SlipformSlipform
Slipform
 
Design of two-way slab
Design of two-way slabDesign of two-way slab
Design of two-way slab
 
Water Appurtenances
Water AppurtenancesWater Appurtenances
Water Appurtenances
 
Raft
RaftRaft
Raft
 
Unit 1 anchorage systems
Unit 1   anchorage systemsUnit 1   anchorage systems
Unit 1 anchorage systems
 
Plumbing and drainage services
Plumbing and drainage servicesPlumbing and drainage services
Plumbing and drainage services
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structures
 
Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.
 
SANITARY AND WATER SUPPLY
SANITARY AND WATER SUPPLYSANITARY AND WATER SUPPLY
SANITARY AND WATER SUPPLY
 

Similar a F1 1103-pipe roof singapore sun -all ,38 pg

Presentation on Railway Industry Application
Presentation on Railway Industry ApplicationPresentation on Railway Industry Application
Presentation on Railway Industry Application
Ryan Li
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
Water Birds (Ali)
 
ALTINYALDIZ dome-vault space frame PQ.pdf
ALTINYALDIZ dome-vault space frame  PQ.pdfALTINYALDIZ dome-vault space frame  PQ.pdf
ALTINYALDIZ dome-vault space frame PQ.pdf
Ersu2
 
Eme slide gioi thieu version tieng anh_2-01-2014
Eme  slide gioi thieu version tieng anh_2-01-2014Eme  slide gioi thieu version tieng anh_2-01-2014
Eme slide gioi thieu version tieng anh_2-01-2014
xncd
 
Eme slide gioi thieu version tieng anh_02-01-2014
Eme  slide gioi thieu version tieng anh_02-01-2014Eme  slide gioi thieu version tieng anh_02-01-2014
Eme slide gioi thieu version tieng anh_02-01-2014
xncd
 
Finite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connectionFinite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connection
Quang Huy Nguyen
 

Similar a F1 1103-pipe roof singapore sun -all ,38 pg (20)

Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Jembatan kali kuto ( udjang irfan maualan t. sipil c 171003222010717 )
Jembatan kali kuto ( udjang irfan maualan t. sipil c 171003222010717 )Jembatan kali kuto ( udjang irfan maualan t. sipil c 171003222010717 )
Jembatan kali kuto ( udjang irfan maualan t. sipil c 171003222010717 )
 
Presentation on Railway Industry Application
Presentation on Railway Industry ApplicationPresentation on Railway Industry Application
Presentation on Railway Industry Application
 
Engineering and Design Webinar - September
Engineering and Design Webinar - SeptemberEngineering and Design Webinar - September
Engineering and Design Webinar - September
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
 
manoj cv planning
manoj cv planningmanoj cv planning
manoj cv planning
 
Summer training presentation from BRPNNL by Randhir Kumar(1503050)
Summer training presentation from BRPNNL by Randhir Kumar(1503050)Summer training presentation from BRPNNL by Randhir Kumar(1503050)
Summer training presentation from BRPNNL by Randhir Kumar(1503050)
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
CV_Piyapol
CV_PiyapolCV_Piyapol
CV_Piyapol
 
ALTINYALDIZ dome-vault space frame PQ.pdf
ALTINYALDIZ dome-vault space frame  PQ.pdfALTINYALDIZ dome-vault space frame  PQ.pdf
ALTINYALDIZ dome-vault space frame PQ.pdf
 
SomkiatC
SomkiatCSomkiatC
SomkiatC
 
Eme slide gioi thieu version tieng anh_2-01-2014
Eme  slide gioi thieu version tieng anh_2-01-2014Eme  slide gioi thieu version tieng anh_2-01-2014
Eme slide gioi thieu version tieng anh_2-01-2014
 
Eme slide gioi thieu version tieng anh_02-01-2014
Eme  slide gioi thieu version tieng anh_02-01-2014Eme  slide gioi thieu version tieng anh_02-01-2014
Eme slide gioi thieu version tieng anh_02-01-2014
 
IRJET- Concrete Solar Collector
IRJET- Concrete Solar CollectorIRJET- Concrete Solar Collector
IRJET- Concrete Solar Collector
 
Finalbtech 1
Finalbtech 1Finalbtech 1
Finalbtech 1
 
Finite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connectionFinite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connection
 
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
 
Tin's cv
Tin's cvTin's cv
Tin's cv
 
Cables in ducts and tunnels
Cables in ducts and tunnelsCables in ducts and tunnels
Cables in ducts and tunnels
 

Último

一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
wpkuukw
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
Isadora Agency
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
nirzagarg
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
eqaqen
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
ZurliaSoop
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
nirzagarg
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Nitya salvi
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
210303105569
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
wpkuukw
 

Último (20)

一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
Hackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdfHackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdf
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
 

F1 1103-pipe roof singapore sun -all ,38 pg

  • 1. 1305-TT –Myanmar – Pipe Roof Construction in Singapore Trisha Sun Trenchless Technology Seminar -Myanmar 5 to 7 June 2013 Pipe Roof Construction in Singapore Trisha Sun Principal W& M Consutlants wnmconsultants@gmail.com 1 of 38. 1 of 38. -Pipe Roof In Singapore-Sun
  • 2. 2 of 38. 2 of 38. -Pipe Roof In Singapore-Sun
  • 3. 3 of 38. 3 of 38. -Pipe Roof In Singapore-Sun
  • 4. 4 of 38. 4 of 38. -Pipe Roof In Singapore-Sun
  • 5. 5 of 38. 5 of 38. -Pipe Roof In Singapore-Sun
  • 6. 6 of 38. 6 of 38. -Pipe Roof In Singapore-Sun
  • 7. 7 of 38. 7 of 38. -Pipe Roof In Singapore-Sun
  • 8. 8 of 38. 8 of 38. -Pipe Roof In Singapore-Sun
  • 9. 9 of 38. 9 of 38. -Pipe Roof In Singapore-Sun
  • 10. 25/10/2012 1 PIPE Roof • Exepereince in Singapore – Pipe roof costruction •Sun , email: wnmconsultants@gmail.com 1Pipe Roof Singapore-Sun, OKP Topics 1-2 •Introduction •Pipe roof concept •Design issues •Machine and problems •Problems of jacking •Constrction process 2Pipe Roof Singapore- Sun 10 of 38. 10 of 38. -Pipe Roof In Singapore-Sun
  • 11. 25/10/2012 2 Tpoics-2-2 • Jacking and receiving shafts •Jacking ,mining •Monitoring •Risk •Tender- design •and documentations Pipe Roof Singapore- Sun 3 Introduction •Trenchless Methods for providing “No dig “ solution to installation of large culverts/pipes •Alternatives: •Pipe ramming / pipe roof by ramming/auger machine •Pipe roof by microtunnelling •Pipe pushing/box culvert direct jacking •Open cut IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 4 11 of 38. 11 of 38. -Pipe Roof In Singapore-Sun
  • 12. 25/10/2012 3 Various shapes IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 5 Construction Sequence 1. Execution of sheet piles 2. Execution of the pipe arch microtunnelling 3. Mined excavation of tunnel with steel ribs with reinforced shotcrete & fibre glass elements 4. Casting of permanent concrete lining Pipe Arch Tunnel – Concept Site picture of project by Metropolitan Atlanta Rapid Transit Authority in USA 6 IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 12 of 38. 12 of 38. -Pipe Roof In Singapore-Sun
  • 13. 25/10/2012 4 pipe roof Plan view (1-2) IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 7 Pipe roof -Plan view(2-2) IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 8 13 of 38. 13 of 38. -Pipe Roof In Singapore-Sun
  • 14. 25/10/2012 5 Pipe roof SG ,Pipe roof Tunnel •Long section view IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 9 • Design Issues 10IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 14 of 38. 14 of 38. -Pipe Roof In Singapore-Sun
  • 15. 25/10/2012 6 Design Issues- 1 •Physical site constraints Close to MRT CCL-central circular Line Close to Viaduct foundation E west line ,Sewer line ,services IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 11 Design Issues -2 Physical site constraints-mining below joint bay cables IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 12 15 of 38. 15 of 38. -Pipe Roof In Singapore-Sun
  • 16. 25/10/2012 7 Design Issues- 3 critical issues IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 13 Design Issues -4- geological profile IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 14 16 of 38. 16 of 38. -Pipe Roof In Singapore-Sun
  • 17. 25/10/2012 8 Design 5- during break out-soil treatment, steel portal frame IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 15 Design 6- during break through at exit -soil treatment( soft alluvial), steel portal frame IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 16 17 of 38. 17 of 38. -Pipe Roof In Singapore-Sun
  • 18. 25/10/2012 9 Design 7 -stage excavation IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 17 Design 8 -Face Stability IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 18 18 of 38. 18 of 38. -Pipe Roof In Singapore-Sun
  • 19. 25/10/2012 10 Design 9 -Design Model IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 19 Adopted Solution 1-3 The pipe jacking method adopted -jacking from one end (jacking Shaft) to the other end(receiving shaft) using steel pipes to form a horizontal and vertical temporary structure ( around the proposed reinforced box culvert.) • 20IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 19 of 38. 19 of 38. -Pipe Roof In Singapore-Sun
  • 20. 25/10/2012 11 Adopted Solution 2-3 The pipe roof (see below Sketch )comprises rows of 780mm dia Steel pipes (10 on top and bottom and 6 rows on each sides to form the vertical wall. Each row of the steel pipes -interlock together using steel T- clutches prefabricated together with the pipes. IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP -22 Adopted Solution 2-3 Each row of the pipe which is approximately 54m is formed by welding together 9 to 10 number ( 6 m long ) of steel pipe using the full butt penetration welds IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 22 20 of 38. 20 of 38. -Pipe Roof In Singapore-Sun
  • 21. 25/10/2012 12 SKETCH – CONFIGURATION OF THE PIPE ROOF -drilling sequence 23IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP •Machine and problems IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 24 21 of 38. 21 of 38. -Pipe Roof In Singapore-Sun
  • 22. 25/10/2012 13 Machine 2-2 -Layout IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 25 PIPE JAKCING PROCESS - Problems- jacking •Obstruction •Alignment •Clutch •Soil information •Settlement IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 26 22 of 38. 22 of 38. -Pipe Roof In Singapore-Sun
  • 23. 25/10/2012 14 •Construction process 27IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP Construction process 1- Jacking shaft –typical IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 28 23 of 38. 23 of 38. -Pipe Roof In Singapore-Sun
  • 24. 25/10/2012 15 Construction process 2 Construction of Jacking & Receiving Shaft 29IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP Construction 7 Setting of Jacks 30IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 24 of 38. 24 of 38. -Pipe Roof In Singapore-Sun
  • 25. 25/10/2012 16 IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 31 Construction process 8 Steel pipes Construction process 9 Sample clutch details IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 32 25 of 38. 25 of 38. -Pipe Roof In Singapore-Sun
  • 26. 25/10/2012 17 Construction process 14 Pipe Jacking in Progress 33- IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP Construction process 16 Ultrasonic Test to welded joint 34-IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 26 of 38. 26 of 38. -Pipe Roof In Singapore-Sun
  • 27. 25/10/2012 18 Construction process 19 TBM Through at Receiving Shaft 35 IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP Construction process 21 Completed Horizontal Row of Pipe Roof 36IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 27 of 38. 27 of 38. -Pipe Roof In Singapore-Sun
  • 28. 25/10/2012 19 Construction process 22 Completed pipe roof IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 37 •Mining of Tunnel India No Dig-Dec 9,2010 - Pipe Roof , cheng 38 28 of 38. 28 of 38. -Pipe Roof In Singapore-Sun
  • 29. 25/10/2012 20 Construction –Mining of tunnel 3 - Installing portal frame at jacking shaft IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 39 Construction –Mining of tunnel 4 Installing portal frame at jacking shaft India No Dig-Dec 9,2010 - Pipe Roof , cheng 40 29 of 38. 29 of 38. -Pipe Roof In Singapore-Sun
  • 30. 25/10/2012 21 Construction –Mining of tunnel 6 install entrance frame before mining IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 41 Construction –Mining of tunnel 8A EXCAVATON IEM Conf Mar 2011- Pipe Roof Singapore-Sun, 42 30 of 38. 30 of 38. -Pipe Roof In Singapore-Sun
  • 31. 25/10/2012 22 •Monitoring IEM Conf Mar 2011- Pipe Roof Singapore-Sun, 43 Monitoring 1- Services –need for monitoring IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 44 31 of 38. 31 of 38. -Pipe Roof In Singapore-Sun
  • 32. 25/10/2012 23 Monitoring 3 A Sample-installations of instrumentations IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 45 Monitoring 3 B Installations of instrumentations –Joint Bay IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 46 32 of 38. 32 of 38. -Pipe Roof In Singapore-Sun
  • 33. 25/10/2012 24 Instrumentation – Monitoring 4 INSTALL PRISM INSIDE THE STEEL PIPE –for monitoring settlements IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 47 Monitoring 5 A MRT Line below project IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 48 33 of 38. 33 of 38. -Pipe Roof In Singapore-Sun
  • 34. 25/10/2012 25 Monitoring 5B MRT-FIXING PRISMS IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 49 Monitoring 6 - Predictions IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 50 34 of 38. 34 of 38. -Pipe Roof In Singapore-Sun
  • 35. 25/10/2012 26 Monitoring 7 Readings IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 51 • Completion 52IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 35 of 38. 35 of 38. -Pipe Roof In Singapore-Sun
  • 36. 25/10/2012 27 Completion Final stage IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP cheng 53 • Risk Assessment IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 54 36 of 38. 36 of 38. -Pipe Roof In Singapore-Sun
  • 37. 25/10/2012 28 Risk Assessment Risk factors (1) •Risk from Soil information, services •Settlement control and damages •Insurance cover on adjacent structures •Pre con survey •Sharing of risks •Design and build contract •Allowance of claimIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 55 Risk Assessment Risk factors (2) •Client risks •Contractors •Stakeholders •3rd party client ( Authorities) •Selection- method, main contractor ,specialist ( soil treatment , shaft, pipe jacking , structures ) •Selecting –machine & skilled operators •Luck /planningIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 56 37 of 38. 37 of 38. -Pipe Roof In Singapore-Sun
  • 38. 25/10/2012 29 Preparing for contract •Contract documentation •Design/drawings •Specifications •Bills /Lump sum/VO IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 57 Thank you , 58IIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 38 of 38. 38 of 38. -Pipe Roof In Singapore-Sun