International leaders in the fields of optics and optoelectronics, Carl Zeiss, installed a 531.7kW Kingspan Energy solar photovoltaic system on their manufacturing facility in Thornwood, USA in September 2014. This project is part of Carl Zeiss’ plans to expand their commitment to sustainability across all its global operations.
2. 2014
The Vision
International leaders in the fields
of optics and optoelectronics, Carl
Zeiss, installed a 531.7kW Kingspan
Energy solar photovoltaic system
on their manufacturing facility
in Thornwood, USA in September
2014.
This project is part of Carl Zeiss’
plans to expand their commitment
to sustainability across all its
global operations.
Carl Zeiss Thornwood, United States of America 2
3. 2014
Superior
Energy
Solutions
The energy installation for this
project consists of an energy-
efficient LED lighting upgrade,
a building energy management
system and the Rooftop Solar PV.
All these elements combined will
yield a total annual energy saving
of nearly 1,040,864 kWh.
Carl Zeiss Thornwood, United States of America 3
4. 2014
Speed of
Construction
Rooftop Solar PV systems can be
installed extremely quickly. This
new build project covers an area
of 50 000sq ft and the entire
energy system was installed in
90 days. This quick installation
process meant site attendance
costs were also reduced.
Carl Zeiss Thornwood, United States of America 4
5. Be Inspired
To explore projects like this and many others,
visit Kingspan’s 2016 Global Case Study Book at:
http://bit.ly/29QCoZY
E-mail: marketing@kingspanpanels.com