Site Electrical Earthing System
Introduction
One of the most misunderstood and confused concept is
difference between Bonding, Grounding and Earthing. Bonding is more
clear word compare to Grounding and Earthing, but there is a micro
difference between Grounding and Earthing.
Bonding is simply the act of joining two electrical conductors
together.
Grounding means connecting the live part (it means the part
which carries current under normal condition) to the earth for example
neutral of power transformer. It is done for the protections of power system
equipment and to provide an effective return path from the machine to the
power source.
Earthing means connecting the dead part (it means the part which
does not carries current under normal condition) to the earth for example
electrical equipment’s frames, enclosures, supports etc.
People use an earthing system mainly for these
applications



Main Requirements.
Mechanical Connections and Exothermic Connections
Comparison of Mechanical Connection and Exothermic Connections
Exothermic Welding for Connections
Provides a Molecular Bond Between Conductors or Rods
 Current Carrying Capacity Equal to
that of the Conductor
 Permanent - Cannot Loosen or
Corrode to Cause a High-Resistance
Connection
 Requires No External Source of
Power or Heat
 Can be Visually Checked for Quality
Exothermic Welding Process
Aluminum Reduces Copper Oxide, Forming Super Heated Copper and
Aluminum Oxide (Slag).
3Cu2O +2Al --> 6Cu + Al2O3 + HEAT
Bonding System
• Interconnecting of all Ground Electrode Systems
– Electrical Power Grounding System
– Lightning Grounding System
– Telecommunications Grounding System
– Cable Grounding System
• Connect all conductive objects together both
internal and external to the facility
• Provides near zero voltage difference during
ground potential rise
Earthing System Materials
Earthing System Materials
Working Process Of Best Grounding System For Our Project
Do
All Engineers must control to Time , Economical, Technical and
Quality. If we can control to these four parts for the best condition, we will
receive good management skill.
Therefore we must learn to do for working process before start
work. While doing working process, we must check of quality requirement
during SOP and DDD. Finally, we should check completely of Quality result
by shaking connection cable joint connections , Cable way to connection,
etc…
Working Process
Working Process
1. Check to materials quality , accessories and tools for grounding process
.
3. Explain to supporting team for excavation work for cabling by requirement
design references.
4. Supervise to Working process.
5. Check to Working condition and Working result . Compare to Working result
by Design Requirement.( Max distance between fence to Ring is 250mm.)
6. Prepare for earth rods points ,pit point and pit point housing.
7. One by one fitting on point by some length remain properly for jointing process.
8. Jointing between Earth Cable and Rod , which process type depend on DDD and
SOP.
9. Check to physical condition and actual condition for future.
10. If any require to fulfill, prepare for good condition by cleaning , repair , etc..
11. Refit to Earth Rod on requirement level of specific design without damage.
12. Earth pit Housing and Earth Pit ( Test Point ) install at specific design point.
13. Earth Rod top level of Test point is need to handle for checking.( Distance Between
top of rod and top of housing. 250mm ≤ x ≤ 400mm. If it has special design , follow to
his instruction. And more good level has high level from drain pipe level.)
Doing For Earth Rod Fitting and Connection
14. Connect conductor for interconnection by Specific Design.( Cable size/type and Join type)
15. Check to usage type/size , working condition , and usage tools and supervise for good
process.
16. Check to joint fitting result condition , (check to loose point, damage point, wrong point)
17. Check to cover of over all part of FGL.
18. Check to Cable way direction to connect equipment.( Smooth/ flexible shape and close
space between ground port and connection joint)
19. Cable lugs installation at the end of cable requirement terminals. ( Use
Crimping Tools )
20. Check to use PVC Tape on flexible Pipe end of Cable lug terminal. ( Tape &
Flex Pipe Colour )
21. Cable Lugs size/ hole and connection bolt . Check to fitting consist washer
complete accessories.
22. Check to paint cover, don’t use paint cover before connecting point.
 If Earth Ring conductor is Busbar type,
-Check to Connection Welding ( Earth Welding ) points ,
Connection Accessories type and Connection Fitting points
( loose , tighten nuts ).
-Check Drilling hole for fitting point. ( compare bolt and earth
bar hole )
-Check to Earth busbar conductor has external ( no usage hole)
or damage point.
-Check to incoming busbar way to connection points.
23. If first items checking are complete, can start the backfilling process by compacting.
24.Connect to remaining part of equipment fitting .
25.If all completely finished , Check again to all system. ( to all connection points and all
interconnection cable by reference drawing. And check to cabling and connection
design.)
26. Check and test Result resistance of system to compare with requirement value of SOP.
27. Fill actual result in check form of installation.
Usage of Earth Tester
Selector and Switch of Earth Tester.
**SOP showed distance between each of auxiliary rod is 3M for red and
yellow point.
Note;
Minimum Requirement for Earthing Accessories size,
Numbers and Placement
Ø 0.5 inch , L=6 feet , Covered from rust (For Rods )
2feet x 2 feet , 4mm thk , Copper Plate, conductor tail with
weld connection. ( For Plate )
50 sq-mm, String copper cable (For Grounding place
conductor or main parts cable)
4Nos gauge HDBC pass for some condition place.
One system has two earth points for floating. ( separate ,
multi ring , grid )
Displacement between Each point is larger than 10 feet.
 Create earth point has good ground than additional rod of
old point. 30percent decrease from 10 percent of holding
result.
Grounding,Earthing,Bonding

Más contenido relacionado

La actualidad más candente

Electrical safety
Electrical safetyElectrical safety
Electrical safety1186429
 
Grounding in power system
Grounding in power systemGrounding in power system
Grounding in power systemvardhan k
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePower System Operation
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
Tiga Earth Mat Presentation
Tiga Earth Mat Presentation Tiga Earth Mat Presentation
Tiga Earth Mat Presentation SOURAV GHOSH
 
Electrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution CenterElectrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution Centertrevor_heller
 
Safety rules and earthing
Safety rules and earthingSafety rules and earthing
Safety rules and earthingNikhil Pandit
 
Electrical safety
Electrical safetyElectrical safety
Electrical safetyAnu71
 
Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansLiving Online
 
Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.SARAVANAN A
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthingPraveen Vs
 
Cable Tray Installation 211215
Cable Tray Installation 211215Cable Tray Installation 211215
Cable Tray Installation 211215MUHAMMAD MAJID
 

La actualidad más candente (20)

Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Earthing
EarthingEarthing
Earthing
 
Grounding in power system
Grounding in power systemGrounding in power system
Grounding in power system
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
 
Grounding and techniques
Grounding and techniquesGrounding and techniques
Grounding and techniques
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
Tiga Earth Mat Presentation
Tiga Earth Mat Presentation Tiga Earth Mat Presentation
Tiga Earth Mat Presentation
 
Electrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution CenterElectrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution Center
 
Earthing system
Earthing system   Earthing system
Earthing system
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Safety rules and earthing
Safety rules and earthingSafety rules and earthing
Safety rules and earthing
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and Technicians
 
Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthing
 
Cable Tray Installation 211215
Cable Tray Installation 211215Cable Tray Installation 211215
Cable Tray Installation 211215
 
Vcb ppt.
Vcb ppt.Vcb ppt.
Vcb ppt.
 
Hv grounding final
Hv grounding finalHv grounding final
Hv grounding final
 

Destacado

The Experience Mod
The Experience ModThe Experience Mod
The Experience Modjmlinkster
 
Practical Earthing, Bonding, Lightning and Surge Protection
Practical Earthing, Bonding, Lightning and Surge ProtectionPractical Earthing, Bonding, Lightning and Surge Protection
Practical Earthing, Bonding, Lightning and Surge ProtectionLiving Online
 
House Wiring Diagram
House Wiring DiagramHouse Wiring Diagram
House Wiring DiagramremCAD
 
Contractor Prequalification Presentation
Contractor Prequalification PresentationContractor Prequalification Presentation
Contractor Prequalification Presentationcimone
 
Basic Burn Safety Training
Basic Burn Safety TrainingBasic Burn Safety Training
Basic Burn Safety TrainingDan Junkins
 
Grounding, neutral & earthing
Grounding, neutral & earthingGrounding, neutral & earthing
Grounding, neutral & earthingEngr Muhammad Imran
 
A report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar gomaA report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar gomaravindragoma
 
Medical Electrical Safety
Medical Electrical SafetyMedical Electrical Safety
Medical Electrical SafetyIsmail Yusof
 

Destacado (13)

The Experience Mod
The Experience ModThe Experience Mod
The Experience Mod
 
Electrical safety principles
Electrical safety principlesElectrical safety principles
Electrical safety principles
 
Practical Earthing, Bonding, Lightning and Surge Protection
Practical Earthing, Bonding, Lightning and Surge ProtectionPractical Earthing, Bonding, Lightning and Surge Protection
Practical Earthing, Bonding, Lightning and Surge Protection
 
Intro to Tech City
Intro to Tech CityIntro to Tech City
Intro to Tech City
 
House Wiring Diagram
House Wiring DiagramHouse Wiring Diagram
House Wiring Diagram
 
Contractor Prequalification Presentation
Contractor Prequalification PresentationContractor Prequalification Presentation
Contractor Prequalification Presentation
 
Basic Burn Safety Training
Basic Burn Safety TrainingBasic Burn Safety Training
Basic Burn Safety Training
 
Earthing
EarthingEarthing
Earthing
 
Dc motor ppt
Dc motor pptDc motor ppt
Dc motor ppt
 
Grounding, neutral & earthing
Grounding, neutral & earthingGrounding, neutral & earthing
Grounding, neutral & earthing
 
Dc motor
Dc motorDc motor
Dc motor
 
A report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar gomaA report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
A report on 220 kv gss mansarovar, jaipur by ravindra kumar goma
 
Medical Electrical Safety
Medical Electrical SafetyMedical Electrical Safety
Medical Electrical Safety
 

Similar a Grounding,Earthing,Bonding

Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyMahesh Chandra Manav
 
Ef installation procedure_manual
Ef installation procedure_manualEf installation procedure_manual
Ef installation procedure_manualphilmora
 
VG check list for OHE bonding and earthing 002
VG check list for OHE bonding and earthing    002 VG check list for OHE bonding and earthing    002
VG check list for OHE bonding and earthing 002 Varadharajalu Gopal
 
VG Railway S & T wiring check list rev 00
VG  Railway S & T wiring check list rev 00VG  Railway S & T wiring check list rev 00
VG Railway S & T wiring check list rev 00Varadharajalu Gopal
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 
Adjustable Differential type Vacuum Switch MA series
Adjustable Differential type Vacuum Switch MA seriesAdjustable Differential type Vacuum Switch MA series
Adjustable Differential type Vacuum Switch MA seriesNK Instruments Pvt. Ltd.
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS LtdMahesh Chandra Manav
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1Mahesh Chandra Manav
 
REDCATT TECH PAPER== Speaker Transducer Dome bonding
REDCATT TECH PAPER== Speaker Transducer Dome bondingREDCATT TECH PAPER== Speaker Transducer Dome bonding
REDCATT TECH PAPER== Speaker Transducer Dome bondingHTCS LLC
 
Bonding Dilemmas In Pipeline Facilities - Mike Tachick
Bonding Dilemmas In Pipeline Facilities - Mike TachickBonding Dilemmas In Pipeline Facilities - Mike Tachick
Bonding Dilemmas In Pipeline Facilities - Mike Tachicknacetwincities
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochureYanyan Wu
 
Experimental Investigation to Determine Influence of Process Parameters on Su...
Experimental Investigation to Determine Influence of Process Parameters on Su...Experimental Investigation to Determine Influence of Process Parameters on Su...
Experimental Investigation to Determine Influence of Process Parameters on Su...IRJET Journal
 
ELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMING
ELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMINGELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMING
ELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMINGMNNIT Allahabad
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvAlexander Decker
 

Similar a Grounding,Earthing,Bonding (20)

E&C-elearn.pdf
E&C-elearn.pdfE&C-elearn.pdf
E&C-elearn.pdf
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 
Robotic welding
Robotic weldingRobotic welding
Robotic welding
 
Resume
ResumeResume
Resume
 
Ef installation procedure_manual
Ef installation procedure_manualEf installation procedure_manual
Ef installation procedure_manual
 
VG check list for OHE bonding and earthing 002
VG check list for OHE bonding and earthing    002 VG check list for OHE bonding and earthing    002
VG check list for OHE bonding and earthing 002
 
VG Railway S & T wiring check list rev 00
VG  Railway S & T wiring check list rev 00VG  Railway S & T wiring check list rev 00
VG Railway S & T wiring check list rev 00
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
Adjustable Differential type Vacuum Switch MA series
Adjustable Differential type Vacuum Switch MA seriesAdjustable Differential type Vacuum Switch MA series
Adjustable Differential type Vacuum Switch MA series
 
Field Test Kits and Hot Socket Repair Kits
Field Test Kits and Hot Socket Repair KitsField Test Kits and Hot Socket Repair Kits
Field Test Kits and Hot Socket Repair Kits
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
REDCATT TECH PAPER== Speaker Transducer Dome bonding
REDCATT TECH PAPER== Speaker Transducer Dome bondingREDCATT TECH PAPER== Speaker Transducer Dome bonding
REDCATT TECH PAPER== Speaker Transducer Dome bonding
 
Bonding Dilemmas In Pipeline Facilities - Mike Tachick
Bonding Dilemmas In Pipeline Facilities - Mike TachickBonding Dilemmas In Pipeline Facilities - Mike Tachick
Bonding Dilemmas In Pipeline Facilities - Mike Tachick
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochure
 
Experimental Investigation to Determine Influence of Process Parameters on Su...
Experimental Investigation to Determine Influence of Process Parameters on Su...Experimental Investigation to Determine Influence of Process Parameters on Su...
Experimental Investigation to Determine Influence of Process Parameters on Su...
 
PCB fabrication.pptx
PCB fabrication.pptxPCB fabrication.pptx
PCB fabrication.pptx
 
ELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMING
ELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMINGELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMING
ELECTROHYDRAULIC FORMING AND ELECTROMAGNETIC FORMING
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 

Último

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Último (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Grounding,Earthing,Bonding

  • 1. Site Electrical Earthing System Introduction One of the most misunderstood and confused concept is difference between Bonding, Grounding and Earthing. Bonding is more clear word compare to Grounding and Earthing, but there is a micro difference between Grounding and Earthing. Bonding is simply the act of joining two electrical conductors together. Grounding means connecting the live part (it means the part which carries current under normal condition) to the earth for example neutral of power transformer. It is done for the protections of power system equipment and to provide an effective return path from the machine to the power source. Earthing means connecting the dead part (it means the part which does not carries current under normal condition) to the earth for example electrical equipment’s frames, enclosures, supports etc.
  • 2. People use an earthing system mainly for these applications   
  • 4.
  • 5. Mechanical Connections and Exothermic Connections
  • 6. Comparison of Mechanical Connection and Exothermic Connections
  • 7. Exothermic Welding for Connections Provides a Molecular Bond Between Conductors or Rods  Current Carrying Capacity Equal to that of the Conductor  Permanent - Cannot Loosen or Corrode to Cause a High-Resistance Connection  Requires No External Source of Power or Heat  Can be Visually Checked for Quality Exothermic Welding Process Aluminum Reduces Copper Oxide, Forming Super Heated Copper and Aluminum Oxide (Slag). 3Cu2O +2Al --> 6Cu + Al2O3 + HEAT
  • 8. Bonding System • Interconnecting of all Ground Electrode Systems – Electrical Power Grounding System – Lightning Grounding System – Telecommunications Grounding System – Cable Grounding System • Connect all conductive objects together both internal and external to the facility • Provides near zero voltage difference during ground potential rise
  • 11. Working Process Of Best Grounding System For Our Project Do All Engineers must control to Time , Economical, Technical and Quality. If we can control to these four parts for the best condition, we will receive good management skill. Therefore we must learn to do for working process before start work. While doing working process, we must check of quality requirement during SOP and DDD. Finally, we should check completely of Quality result by shaking connection cable joint connections , Cable way to connection, etc…
  • 13. Working Process 1. Check to materials quality , accessories and tools for grounding process .
  • 14.
  • 15. 3. Explain to supporting team for excavation work for cabling by requirement design references. 4. Supervise to Working process. 5. Check to Working condition and Working result . Compare to Working result by Design Requirement.( Max distance between fence to Ring is 250mm.)
  • 16. 6. Prepare for earth rods points ,pit point and pit point housing. 7. One by one fitting on point by some length remain properly for jointing process. 8. Jointing between Earth Cable and Rod , which process type depend on DDD and SOP. 9. Check to physical condition and actual condition for future. 10. If any require to fulfill, prepare for good condition by cleaning , repair , etc.. 11. Refit to Earth Rod on requirement level of specific design without damage. 12. Earth pit Housing and Earth Pit ( Test Point ) install at specific design point. 13. Earth Rod top level of Test point is need to handle for checking.( Distance Between top of rod and top of housing. 250mm ≤ x ≤ 400mm. If it has special design , follow to his instruction. And more good level has high level from drain pipe level.)
  • 17. Doing For Earth Rod Fitting and Connection
  • 18. 14. Connect conductor for interconnection by Specific Design.( Cable size/type and Join type) 15. Check to usage type/size , working condition , and usage tools and supervise for good process. 16. Check to joint fitting result condition , (check to loose point, damage point, wrong point) 17. Check to cover of over all part of FGL. 18. Check to Cable way direction to connect equipment.( Smooth/ flexible shape and close space between ground port and connection joint)
  • 19. 19. Cable lugs installation at the end of cable requirement terminals. ( Use Crimping Tools ) 20. Check to use PVC Tape on flexible Pipe end of Cable lug terminal. ( Tape & Flex Pipe Colour ) 21. Cable Lugs size/ hole and connection bolt . Check to fitting consist washer complete accessories. 22. Check to paint cover, don’t use paint cover before connecting point.
  • 20.  If Earth Ring conductor is Busbar type, -Check to Connection Welding ( Earth Welding ) points , Connection Accessories type and Connection Fitting points ( loose , tighten nuts ). -Check Drilling hole for fitting point. ( compare bolt and earth bar hole ) -Check to Earth busbar conductor has external ( no usage hole) or damage point. -Check to incoming busbar way to connection points.
  • 21. 23. If first items checking are complete, can start the backfilling process by compacting. 24.Connect to remaining part of equipment fitting . 25.If all completely finished , Check again to all system. ( to all connection points and all interconnection cable by reference drawing. And check to cabling and connection design.) 26. Check and test Result resistance of system to compare with requirement value of SOP. 27. Fill actual result in check form of installation.
  • 22. Usage of Earth Tester Selector and Switch of Earth Tester.
  • 23. **SOP showed distance between each of auxiliary rod is 3M for red and yellow point.
  • 24. Note; Minimum Requirement for Earthing Accessories size, Numbers and Placement Ø 0.5 inch , L=6 feet , Covered from rust (For Rods ) 2feet x 2 feet , 4mm thk , Copper Plate, conductor tail with weld connection. ( For Plate ) 50 sq-mm, String copper cable (For Grounding place conductor or main parts cable) 4Nos gauge HDBC pass for some condition place. One system has two earth points for floating. ( separate , multi ring , grid ) Displacement between Each point is larger than 10 feet.  Create earth point has good ground than additional rod of old point. 30percent decrease from 10 percent of holding result.