THE LEBANESE DIPLOMA SUPPLEMENT - LEBPASS
Project Quality Plan
Introduction
This Quality Plan, falling within the workpackage 6 “Quality Assurance” of the LEBPASS Project, will
ensure that the implementation of the project activities and the final results of the project are of the
utmost quality. It aims at ensuring that the project’s stakeholders are satisfied with the management
strategies adopted by the Project Coordinator, and with the activities and deliverables of the project.
The aim of this plan is not only to monitor the quality of the activities and the overall performance of
the project, but also to regularly improve its quality during and after the project lifetime, based on the
consortium, EACEA and stakeholders feedback.
This Quality Assurance Plan has been reviewed and approved by the project consortium in September
2020 through a feedback form.
Plan Components
The LEBPASS Quality Plan consists of the following:
1. Elaboration of fundamental texts and forms: The fundamental texts and forms are the
operational policies, procedures and forms developed in accordance with the Erasmus+ guidelines
for the use of the grant and the project needs and requirements.
2. Periodic review of feedback mechanisms’ outputs: These mechanisms include various ways to
evaluate an activity or a project deliverable, during or at the end of the execution process, to
determine if it satisfies the specified requirements and expectations. There are two sources for
collecting feedback in LEBPASS project: (1) Internal feedback - collected from the partners of the
project; and (2) External Feedback - collected from the stakeholders of the project (Academic
administrators, Faculty, Students, other universities in Lebanon).
Examples of these mechanisms are:
- Evaluation surveys: At the end of each workshop or roundtable or public activity
- Walk-in interviews during major activities: Series of interviews will be conducted by the QA
agency evalag during the project’s major activities
- Focus groups meetings: to gather quality feedback from target groups with special
expectations from the project
- Minutes of public debates: allowing the Project Consortium to instantly evaluate the public
deliverables in a way to consider the national dimension of the project.
3. Monitoring by regular reporting: The project coordinator and the Lebanese partners will be
periodically developing self-reflection reports based on predefined guidelines and questionnaires.
The aim of these reports is to bring all partners to the same level of information and to have the
partners constantly reflecting on the project’s outcomes, and deliverables.
2
LEBPASS Quality Plan | August 2020
4. Monitoring the indicators of progress / Facts and Figures: Based on the Logical Framework Matrix
of the project, this initiative consists of monitoring the indicators of progress and making it
accessible for all the partners (please refer to the list of indicators by workpackge included in the
appendix). In this regard, the Facts and Figures section on the project’s website will be used to
disseminate the results. This will be performed every six months.
5. Improvement actions log: Improvement actions will be taken based on all the above Quality
Assurance Initiatives as well as on the recommendations given by the EACEA, in the feedback from
monitoring visits and in the monitoring exchanges with the Agency.
6. Self-reflection reports on the Simulation for the first Diploma Supplement cohort: This activity
will allow assessing the level of implementation of the project’s core deliverables such as the
Simulation for the first Diploma Supplement cohort. A self-reflection report will be sent online to
assess the performance level of these simulations at the institutional and individual levels. The
results will be taken into consideration for further the exploitation and the sustainability of the
project.
Tasks
Based on the above description, the LEBPASS Quality Assurance shall include at least the following
deliverables:
- Fundamental texts and forms
- Periodic review of feedback mechanisms’ outputs
- Periodic Self-reflection reports from the Lebanese partners
- Monitoring the indicators of progress / Facts and Figures (see appendix)
- Improvement actions log
- Self-reflection reports on the Simulation for the first Diploma Supplement
3
LEBPASS Quality Plan | August 2020
Appendix: List of Indicators by Workpackage
WP 1. Analysis of Current Diploma Supplement Practices
• Quantitative indicators:
- Number of universities / stakeholders involved in the analysis of current practices
- Number of responses
• Qualitative indicators:
- Requirements and needs
- Expectations
- Information on different practices at HEIs in Lebanon
- Information on strategies
WP2. Developing the Diploma Supplement principles and form
• Quantitative indicators:
- Number of universities / faculties elaborating the draft along their special needs
- Number of draft versions
• Qualitative indicators:
- First draft of DS principles
- Draft diploma supplement template(s)
- Feedback on the DS
WP3. Capacity Building, Adaptation and Pilot Year Full Implementation
Quantitative indicators:
- Numbers of expert trainers, workshops, and trained faculty from partner and non- partner
universities
Qualitative indicators:
- Feedback on the DS
- Revised requirements and needs
- Revised Diploma supplement template(s)
WP4 Developing a national sustainable structure for administering DS in Lebanon
Quantitative indicators:
- Number of universities / stakeholders already adopting and implementing the DS
- Number of universities planning to adopt the DS
Qualitative indicators:
- Created Centre
- National recognition / national strategy
- Recognition of centre by EU (if applicable)
4
LEBPASS Quality Plan | August 2020
WP5. Purchase, Customization and Launching of the LEBPASS Platform
• Quantitative indicators:
- Number of universities registered at the platform
- Number of DS issued
• Qualitative indicators:
- Existing network continuously monitoring the DS practice
- Defined responsibilities on the platform
- National recognition and support by the ministry
- Regular updates
WP6. LEBPASS Quality Assurance (across all work packages)
• Quantitative indicators:
- Frequency of feedback loops
• Qualitative indicators:
- Fundamental documents (forms and templates)
- Review practice
- Project progress monitoring strategy and practice
WP7. Project Communication, Dissemination and Sustainability (across all work packages)
• Quantitative indicators:
- Frequency of meetings
- Number of institutions / individuals involved
- Number of workshops and events
- Number of participants in events
- Number of website visitors
• Qualitative indicators:
- Website
- Meeting agenda
- Meeting minutes
- Regular updates on project progress (to partners and the public)
- Dissemination plan
WP8. Project Management (across all work packages)
• Quantitative indicators:
- Frequency of meetings
- Number of partners involved
- Number of reports
• Qualitative indicators:
- Clear responsibilities and distribution of work
- Project plan regularly updated
5
LEBPASS Quality Plan | August 2020
- Working cloud space
- Regular communication and consultation
- Project interim reports
- Project process reports
- Budget process reports

Más contenido relacionado

Similar a WP 6. LEBPASS – Quality Plan

PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...Tariq A. Deen
 
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ... PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...NAP Events
 
Introduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / TrialogIntroduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / TrialogInka Pibilova
 
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...OECD Governance
 
Research Week 2014: CIHR: Opportunities, Eligibility, and Strategies for Success
Research Week 2014: CIHR: Opportunities, Eligibility, and Strategies for SuccessResearch Week 2014: CIHR: Opportunities, Eligibility, and Strategies for Success
Research Week 2014: CIHR: Opportunities, Eligibility, and Strategies for SuccessWilfrid Laurier University
 
ETM kick off
ETM kick offETM kick off
ETM kick offImede
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubRichardNowack
 
Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlberto Mico
 
Project planning
Project planningProject planning
Project planningShaikh Zain
 
Presentatio of Evaluation
Presentatio of EvaluationPresentatio of Evaluation
Presentatio of EvaluationOlgaJubany
 
SBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation ManualSBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation ManualZeeshan Shahid
 
Action Plan Workshop Apr 23 2009
Action Plan Workshop Apr 23 2009Action Plan Workshop Apr 23 2009
Action Plan Workshop Apr 23 2009Szymra
 
Presentation Webinar OPSYS_13112018.pptx
Presentation Webinar OPSYS_13112018.pptxPresentation Webinar OPSYS_13112018.pptx
Presentation Webinar OPSYS_13112018.pptxfisaac333
 
Training on NAPs: Developing and applying monitoring, evaluation and learning...
Training on NAPs: Developing and applying monitoring, evaluation and learning...Training on NAPs: Developing and applying monitoring, evaluation and learning...
Training on NAPs: Developing and applying monitoring, evaluation and learning...NAP Global Network
 
Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...
Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...
Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...Trémolet Consulting
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburDr. Md. Taibur Rahman
 

Similar a WP 6. LEBPASS – Quality Plan (20)

PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
 
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ... PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 
Introduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / TrialogIntroduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / Trialog
 
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
 
Research Week 2014: CIHR: Opportunities, Eligibility, and Strategies for Success
Research Week 2014: CIHR: Opportunities, Eligibility, and Strategies for SuccessResearch Week 2014: CIHR: Opportunities, Eligibility, and Strategies for Success
Research Week 2014: CIHR: Opportunities, Eligibility, and Strategies for Success
 
ETM kick off
ETM kick offETM kick off
ETM kick off
 
IFPRI - Results and Impact Management System (RIMS)
IFPRI - Results and Impact Management System (RIMS)IFPRI - Results and Impact Management System (RIMS)
IFPRI - Results and Impact Management System (RIMS)
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHub
 
Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revised
 
Project planning
Project planningProject planning
Project planning
 
Presentatio of Evaluation
Presentatio of EvaluationPresentatio of Evaluation
Presentatio of Evaluation
 
SBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation ManualSBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation Manual
 
Action Plan Workshop Apr 23 2009
Action Plan Workshop Apr 23 2009Action Plan Workshop Apr 23 2009
Action Plan Workshop Apr 23 2009
 
Presentation Webinar OPSYS_13112018.pptx
Presentation Webinar OPSYS_13112018.pptxPresentation Webinar OPSYS_13112018.pptx
Presentation Webinar OPSYS_13112018.pptx
 
Training on NAPs: Developing and applying monitoring, evaluation and learning...
Training on NAPs: Developing and applying monitoring, evaluation and learning...Training on NAPs: Developing and applying monitoring, evaluation and learning...
Training on NAPs: Developing and applying monitoring, evaluation and learning...
 
Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...
Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...
Sanitation Microfinance in Tanzania_Overview of research activities (Nov 2013...
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Risk management in_the_ESS_Vision_2020v3
Risk management in_the_ESS_Vision_2020v3Risk management in_the_ESS_Vision_2020v3
Risk management in_the_ESS_Vision_2020v3
 
Getting To Outcomes CSAP
Getting To Outcomes CSAPGetting To Outcomes CSAP
Getting To Outcomes CSAP
 
European project management
European project managementEuropean project management
European project management
 

Más de LEBPass Project

4.2 Benchmarking with European partners on Diploma Supplement Centre structur...
4.2 Benchmarking with European partners on Diploma Supplement Centre structur...4.2 Benchmarking with European partners on Diploma Supplement Centre structur...
4.2 Benchmarking with European partners on Diploma Supplement Centre structur...LEBPass Project
 
3.1 Workshop: Guidelines & Notes for DS Implementation
3.1 Workshop: Guidelines & Notes for DS Implementation3.1 Workshop: Guidelines & Notes for DS Implementation
3.1 Workshop: Guidelines & Notes for DS ImplementationLEBPass Project
 
2.4 2nd Roundtable hosted by DGHE
2.4 2nd Roundtable hosted by DGHE2.4 2nd Roundtable hosted by DGHE
2.4 2nd Roundtable hosted by DGHELEBPass Project
 
2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...
2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...
2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...LEBPass Project
 
3.2 Implementation of DS: USEK Experience and Approach
3.2 Implementation of DS: USEK Experience and Approach3.2 Implementation of DS: USEK Experience and Approach
3.2 Implementation of DS: USEK Experience and ApproachLEBPass Project
 
3.2 Implementation of DS: LAU Experience and Approach
3.2 Implementation of DS: LAU Experience and Approach3.2 Implementation of DS: LAU Experience and Approach
3.2 Implementation of DS: LAU Experience and ApproachLEBPass Project
 
3.2 Implementation of DS: Wrapping Up Our Experiences and Approaches
3.2 Implementation of DS: Wrapping Up Our Experiences and Approaches3.2 Implementation of DS: Wrapping Up Our Experiences and Approaches
3.2 Implementation of DS: Wrapping Up Our Experiences and ApproachesLEBPass Project
 
WP5.1: LEBPASS Platform requirements
WP5.1: LEBPASS Platform requirementsWP5.1: LEBPASS Platform requirements
WP5.1: LEBPASS Platform requirementsLEBPass Project
 
WP3.1 Review of Cyprus Workshop
WP3.1 Review of Cyprus WorkshopWP3.1 Review of Cyprus Workshop
WP3.1 Review of Cyprus WorkshopLEBPass Project
 
Diploma Supplement - Current Status: Germany, Russia and Albania
Diploma Supplement - Current Status: Germany, Russia and AlbaniaDiploma Supplement - Current Status: Germany, Russia and Albania
Diploma Supplement - Current Status: Germany, Russia and AlbaniaLEBPass Project
 
Diploma Supplements – Responsibilities, Processes, Practice at FAU
Diploma Supplements – Responsibilities, Processes, Practice at FAUDiploma Supplements – Responsibilities, Processes, Practice at FAU
Diploma Supplements – Responsibilities, Processes, Practice at FAULEBPass Project
 
General principles of Diploma Supplement
General principles of Diploma SupplementGeneral principles of Diploma Supplement
General principles of Diploma SupplementLEBPass Project
 
Lebanese Qualifications Framework
Lebanese Qualifications FrameworkLebanese Qualifications Framework
Lebanese Qualifications FrameworkLEBPass Project
 
Higher Education System in Lebanon
Higher Education System in LebanonHigher Education System in Lebanon
Higher Education System in LebanonLEBPass Project
 
The diploma supplement as a tool of higher education policy in Europe and beyond
The diploma supplement as a tool of higher education policy in Europe and beyondThe diploma supplement as a tool of higher education policy in Europe and beyond
The diploma supplement as a tool of higher education policy in Europe and beyondLEBPass Project
 
General Principles of the Lebanese Diploma Supplement (DS)
General Principles of the Lebanese Diploma Supplement (DS)General Principles of the Lebanese Diploma Supplement (DS)
General Principles of the Lebanese Diploma Supplement (DS)LEBPass Project
 
The Lebanese Diploma Supplement - LEBPASS Project: An Introduction
The Lebanese Diploma Supplement - LEBPASS Project: An IntroductionThe Lebanese Diploma Supplement - LEBPASS Project: An Introduction
The Lebanese Diploma Supplement - LEBPASS Project: An IntroductionLEBPass Project
 
EUROPass and the Cypriot Experience
EUROPass and the Cypriot ExperienceEUROPass and the Cypriot Experience
EUROPass and the Cypriot ExperienceLEBPass Project
 
Lebanese Diploma Supplement Needs Assessment Survey
Lebanese Diploma Supplement Needs Assessment SurveyLebanese Diploma Supplement Needs Assessment Survey
Lebanese Diploma Supplement Needs Assessment SurveyLEBPass Project
 

Más de LEBPass Project (20)

4.2 Benchmarking with European partners on Diploma Supplement Centre structur...
4.2 Benchmarking with European partners on Diploma Supplement Centre structur...4.2 Benchmarking with European partners on Diploma Supplement Centre structur...
4.2 Benchmarking with European partners on Diploma Supplement Centre structur...
 
3.1 Workshop: Guidelines & Notes for DS Implementation
3.1 Workshop: Guidelines & Notes for DS Implementation3.1 Workshop: Guidelines & Notes for DS Implementation
3.1 Workshop: Guidelines & Notes for DS Implementation
 
2.4 2nd Roundtable hosted by DGHE
2.4 2nd Roundtable hosted by DGHE2.4 2nd Roundtable hosted by DGHE
2.4 2nd Roundtable hosted by DGHE
 
2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...
2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...
2.4 Arranging a public Roundtable and discussion of outcomes hosted by the ME...
 
3.2 Implementation of DS: USEK Experience and Approach
3.2 Implementation of DS: USEK Experience and Approach3.2 Implementation of DS: USEK Experience and Approach
3.2 Implementation of DS: USEK Experience and Approach
 
3.2 Implementation of DS: LAU Experience and Approach
3.2 Implementation of DS: LAU Experience and Approach3.2 Implementation of DS: LAU Experience and Approach
3.2 Implementation of DS: LAU Experience and Approach
 
3.2 Implementation of DS: Wrapping Up Our Experiences and Approaches
3.2 Implementation of DS: Wrapping Up Our Experiences and Approaches3.2 Implementation of DS: Wrapping Up Our Experiences and Approaches
3.2 Implementation of DS: Wrapping Up Our Experiences and Approaches
 
WP5.1: LEBPASS Platform requirements
WP5.1: LEBPASS Platform requirementsWP5.1: LEBPASS Platform requirements
WP5.1: LEBPASS Platform requirements
 
WP3.1 Journey of FAU
WP3.1 Journey of FAUWP3.1 Journey of FAU
WP3.1 Journey of FAU
 
WP3.1 Review of Cyprus Workshop
WP3.1 Review of Cyprus WorkshopWP3.1 Review of Cyprus Workshop
WP3.1 Review of Cyprus Workshop
 
Diploma Supplement - Current Status: Germany, Russia and Albania
Diploma Supplement - Current Status: Germany, Russia and AlbaniaDiploma Supplement - Current Status: Germany, Russia and Albania
Diploma Supplement - Current Status: Germany, Russia and Albania
 
Diploma Supplements – Responsibilities, Processes, Practice at FAU
Diploma Supplements – Responsibilities, Processes, Practice at FAUDiploma Supplements – Responsibilities, Processes, Practice at FAU
Diploma Supplements – Responsibilities, Processes, Practice at FAU
 
General principles of Diploma Supplement
General principles of Diploma SupplementGeneral principles of Diploma Supplement
General principles of Diploma Supplement
 
Lebanese Qualifications Framework
Lebanese Qualifications FrameworkLebanese Qualifications Framework
Lebanese Qualifications Framework
 
Higher Education System in Lebanon
Higher Education System in LebanonHigher Education System in Lebanon
Higher Education System in Lebanon
 
The diploma supplement as a tool of higher education policy in Europe and beyond
The diploma supplement as a tool of higher education policy in Europe and beyondThe diploma supplement as a tool of higher education policy in Europe and beyond
The diploma supplement as a tool of higher education policy in Europe and beyond
 
General Principles of the Lebanese Diploma Supplement (DS)
General Principles of the Lebanese Diploma Supplement (DS)General Principles of the Lebanese Diploma Supplement (DS)
General Principles of the Lebanese Diploma Supplement (DS)
 
The Lebanese Diploma Supplement - LEBPASS Project: An Introduction
The Lebanese Diploma Supplement - LEBPASS Project: An IntroductionThe Lebanese Diploma Supplement - LEBPASS Project: An Introduction
The Lebanese Diploma Supplement - LEBPASS Project: An Introduction
 
EUROPass and the Cypriot Experience
EUROPass and the Cypriot ExperienceEUROPass and the Cypriot Experience
EUROPass and the Cypriot Experience
 
Lebanese Diploma Supplement Needs Assessment Survey
Lebanese Diploma Supplement Needs Assessment SurveyLebanese Diploma Supplement Needs Assessment Survey
Lebanese Diploma Supplement Needs Assessment Survey
 

Último

UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Último (20)

UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

WP 6. LEBPASS – Quality Plan

  • 1. THE LEBANESE DIPLOMA SUPPLEMENT - LEBPASS Project Quality Plan Introduction This Quality Plan, falling within the workpackage 6 “Quality Assurance” of the LEBPASS Project, will ensure that the implementation of the project activities and the final results of the project are of the utmost quality. It aims at ensuring that the project’s stakeholders are satisfied with the management strategies adopted by the Project Coordinator, and with the activities and deliverables of the project. The aim of this plan is not only to monitor the quality of the activities and the overall performance of the project, but also to regularly improve its quality during and after the project lifetime, based on the consortium, EACEA and stakeholders feedback. This Quality Assurance Plan has been reviewed and approved by the project consortium in September 2020 through a feedback form. Plan Components The LEBPASS Quality Plan consists of the following: 1. Elaboration of fundamental texts and forms: The fundamental texts and forms are the operational policies, procedures and forms developed in accordance with the Erasmus+ guidelines for the use of the grant and the project needs and requirements. 2. Periodic review of feedback mechanisms’ outputs: These mechanisms include various ways to evaluate an activity or a project deliverable, during or at the end of the execution process, to determine if it satisfies the specified requirements and expectations. There are two sources for collecting feedback in LEBPASS project: (1) Internal feedback - collected from the partners of the project; and (2) External Feedback - collected from the stakeholders of the project (Academic administrators, Faculty, Students, other universities in Lebanon). Examples of these mechanisms are: - Evaluation surveys: At the end of each workshop or roundtable or public activity - Walk-in interviews during major activities: Series of interviews will be conducted by the QA agency evalag during the project’s major activities - Focus groups meetings: to gather quality feedback from target groups with special expectations from the project - Minutes of public debates: allowing the Project Consortium to instantly evaluate the public deliverables in a way to consider the national dimension of the project. 3. Monitoring by regular reporting: The project coordinator and the Lebanese partners will be periodically developing self-reflection reports based on predefined guidelines and questionnaires. The aim of these reports is to bring all partners to the same level of information and to have the partners constantly reflecting on the project’s outcomes, and deliverables.
  • 2. 2 LEBPASS Quality Plan | August 2020 4. Monitoring the indicators of progress / Facts and Figures: Based on the Logical Framework Matrix of the project, this initiative consists of monitoring the indicators of progress and making it accessible for all the partners (please refer to the list of indicators by workpackge included in the appendix). In this regard, the Facts and Figures section on the project’s website will be used to disseminate the results. This will be performed every six months. 5. Improvement actions log: Improvement actions will be taken based on all the above Quality Assurance Initiatives as well as on the recommendations given by the EACEA, in the feedback from monitoring visits and in the monitoring exchanges with the Agency. 6. Self-reflection reports on the Simulation for the first Diploma Supplement cohort: This activity will allow assessing the level of implementation of the project’s core deliverables such as the Simulation for the first Diploma Supplement cohort. A self-reflection report will be sent online to assess the performance level of these simulations at the institutional and individual levels. The results will be taken into consideration for further the exploitation and the sustainability of the project. Tasks Based on the above description, the LEBPASS Quality Assurance shall include at least the following deliverables: - Fundamental texts and forms - Periodic review of feedback mechanisms’ outputs - Periodic Self-reflection reports from the Lebanese partners - Monitoring the indicators of progress / Facts and Figures (see appendix) - Improvement actions log - Self-reflection reports on the Simulation for the first Diploma Supplement
  • 3. 3 LEBPASS Quality Plan | August 2020 Appendix: List of Indicators by Workpackage WP 1. Analysis of Current Diploma Supplement Practices • Quantitative indicators: - Number of universities / stakeholders involved in the analysis of current practices - Number of responses • Qualitative indicators: - Requirements and needs - Expectations - Information on different practices at HEIs in Lebanon - Information on strategies WP2. Developing the Diploma Supplement principles and form • Quantitative indicators: - Number of universities / faculties elaborating the draft along their special needs - Number of draft versions • Qualitative indicators: - First draft of DS principles - Draft diploma supplement template(s) - Feedback on the DS WP3. Capacity Building, Adaptation and Pilot Year Full Implementation Quantitative indicators: - Numbers of expert trainers, workshops, and trained faculty from partner and non- partner universities Qualitative indicators: - Feedback on the DS - Revised requirements and needs - Revised Diploma supplement template(s) WP4 Developing a national sustainable structure for administering DS in Lebanon Quantitative indicators: - Number of universities / stakeholders already adopting and implementing the DS - Number of universities planning to adopt the DS Qualitative indicators: - Created Centre - National recognition / national strategy - Recognition of centre by EU (if applicable)
  • 4. 4 LEBPASS Quality Plan | August 2020 WP5. Purchase, Customization and Launching of the LEBPASS Platform • Quantitative indicators: - Number of universities registered at the platform - Number of DS issued • Qualitative indicators: - Existing network continuously monitoring the DS practice - Defined responsibilities on the platform - National recognition and support by the ministry - Regular updates WP6. LEBPASS Quality Assurance (across all work packages) • Quantitative indicators: - Frequency of feedback loops • Qualitative indicators: - Fundamental documents (forms and templates) - Review practice - Project progress monitoring strategy and practice WP7. Project Communication, Dissemination and Sustainability (across all work packages) • Quantitative indicators: - Frequency of meetings - Number of institutions / individuals involved - Number of workshops and events - Number of participants in events - Number of website visitors • Qualitative indicators: - Website - Meeting agenda - Meeting minutes - Regular updates on project progress (to partners and the public) - Dissemination plan WP8. Project Management (across all work packages) • Quantitative indicators: - Frequency of meetings - Number of partners involved - Number of reports • Qualitative indicators: - Clear responsibilities and distribution of work - Project plan regularly updated
  • 5. 5 LEBPASS Quality Plan | August 2020 - Working cloud space - Regular communication and consultation - Project interim reports - Project process reports - Budget process reports