Sistemi avanzati di
ricarica rapida
Ing. Giovanni Pede
Dipartimento Tecnologie per l’Energia
Laboratorio Sistemi e Tecnologie Mobilità ed
accumulo
Trasporto merci a breve raggio con
veicoli elettrici
Lucca 10 luglio 2015
Variable
duration
7-10 hours ,
during day
Between
¼ & ½
hour
At
Work
At home
Exchange
Station
Private &
public car
park
During shopping
On a
journey
Fast
charge
In a few
minutes
Battery
exchange
7-10 hours , during
night
< 2 hours
House
Residential
building
Deployment of PEV calls upon a charging infrastructure adapted to its limited range:
• Generalization of charging spots for all parking situations
• Specific features to allow quick battery reffill: fast charge & battery exchange stations
Different kind of needs
3
Battery exchange  in a few minutes
Standard charge (AC)  beetween 8 an 4 hours
Fast & ultra fast charge (AC or DC)  less than 1 hour
Current (A)
Fast
charge
BE
Speed
Fast & ultra
fast charge
BE
Speed
Gyrobus, Oerlikon
Gulliver, Tecnobus
CHAdeMO charging station
(50 kW)
Power range and charging times
4 modi di ricarica
Charging mode 3 (with
communication between
EV and CP) is compulsory
in public areas
Perché e quando la “Fast Charge”?
Perché?
Per moltiplicare per 3-4 volte l’autonomia di un
mezzo elettrico , oppure ridurre di 3-4 volte la taglia
della batteria oppure una combinazione delle due
cose
Quando?
Quando la natura del servizio richiesto al mezzo lo
consente, cioè quando il servizio è ripetitivo e
consente delle soste per una durata pari al 20-25 %
del tempo totale a disposizione
6
12 m.
urban
bus
Charging
power
Battery
size
(750 V)
Nominal
energy
(kWh)
Range
(km)
Pure
Electric 43 kW 650 Ah 457 200
Zero
Filobus 150 kW 212 Ah 153 Unlimited
Un esempio concreto: il TPL
P. Bolognesi, G. Lutzemberger, DESE, Università di Pisa, “Sistema integrato di autobus elettrici con infrastruttura per
ricariche intermedie”, AEIT Annual Conference, Rome , 2012,
I tre pilastri della “Fast Charge”
Per una ricarica veloce occorrono tre
elementi:
•Batterie adatte per la F.G.
•Interfacce di potenza adatte per la F.G.
•Caricabatterie adatti per la F.G.
8
Charging current
(A)
Charged
energy
(Wh)
Discharged
energy
(1C)
Energy efficiency
(%)
15.5 (C/2) 125.3 120.35 96
31 (1 C) 128.44 118.61 92
62 (2 C) 129.58 114.61 88
«C » is the
nominal battery
capacity,
e.g. if C is 50 Ah,
3 C stands for a
charge current:
3 C = 150 A
Even at high
current rates,
charge is possible
with a good
efficiency
Le batterie “simmetriche” in
carica/scarica
Ricarica rapida: moduli batterie
12V auto-gestiti (1)
R. Roncella, R. Saletti, F. Baronti, G. Pede, F. Vellucci, “Moduli auto gestiti Li-Io LFP in un'applicazione "fast charge" per il trasporto pubblico locale”
Convegno annuale AEIT 2014 Trieste 18-19 Settembre 2014
Ricarica rapida: moduli batterie
12V auto-gestiti (2)
Life-cycle test
0
0,5
1
1,5
2
2,5
3
3,5
4
-250
-200
-150
-100
-50
0
50
100
30 530 1030 1530
Tensione
[V]
Corrente
[A]
Tempo [s]
Corrente Tensione
0
10
20
30
40
50
60
290015,7 340015,7 390015,7 440015,7 490015,7 540015,7
Temperatura
[°C]
Temperatura cella Temperatura media amb
Il ciclo elementare è raffigurato a
fianco.
E’ un ciclo bilanciato in termini di
Amperora (rendimento unitario) e
corrisponde a 6.5 km di marcia e
5’ di ricarica rapida a 3C al
capolinea.
G.Pede, V. Sglavo, F.Vellucci, “Life-cycle test on LFP cells simulating a real working profile of a “pure electric charge sustaing” small urban bus ”, IEEE
International Electric Vehicle Conference 2014,
0,88
0,89
0,90
0,91
0,92
0,93
0,94
0,95
0
10
20
30
40
50
60
70
0 1000 2000 3000
Rendimento
energetico
Capacità
erogata
[Ah]
Capacità erogata Rendimento energetico
1.2. Fast electric recharging points for motor vehicles
Alternate Current (AC) fast recharging points for electric vehicles shall
be equipped, for interoperability purposes, with connectors of Type 2
as described in standard EN62196-2.
Fast recharging points for electric vehicles shall comply with the
technical specifications by 31 December 2017 at the latest.
Direct Current (DC) fast recharging points for electric vehicles shall be
equipped, for interoperability purposes, with connectors of Type
"Combo 2" as described in the relevant EN standard, to be adopted by
2014.
DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE
COUNCIL
on the deployment of alternative fuels infrastructure
COM(2013) 18 /2
Fast Charge: colonnine omolog.
Combined Charging System (combo)
Il connettore “universale” combo-2
prevede l’aggiunta al connettore tipo 2
di due contatti di potenza dedicati alla
ricarica in continua ed è in grado di
accettare sia il corrispondente
connettore combo, sia il connettore tipo
2 per la ricarica in alternata.
Fast Charge: connettori omolog.
TOSA (HESS-ABB, Ginevra)
Capabus (Aowe
Technology
Development
Company &
Sinautec,
Shanghai)
Alè (Rampini-Siemens, Vienna)
Ecoliner (Proterra, California)
F.G.: sistemi automatiz. (1)
OLEV (KAIST, Seoul)
Pro: low infrastructural impact
Con: low efficient, more costly,
safety aspects
F.G.: sistemi automatiz. (2)
G & A Engineering s.r.l.
Ferrari BSN s.r.l.
Inverter reverse: il caso PBI
T. Huria, G. Lutzemberger, G. Pede, G.
Sanna: “Systematic development of
series-hybrid bus through modelling”.
IEEE VPPC 2010, Vehicle Power and
Propulsion Conference, Lille, 1-3/9/2010
17
M
+
-
M1
M2
R1
R2
Contattori
M1, M2: Marcia
R1, R2: Ricarica
Alimentazione in c.c. fino a 500A/1000 V
Ricarica rapida al capolinea:
schema concettuale con uso di “inverter reverse”
Il progetto PBI (2)
18
Il progetto PBI (3)
19
The figure, related to a
first fast-charge test,
shows the current ramp
from 10 to 200 A,
accomplished in 22 sec.
The figure, related to a
first fast-charge test,
shows the current ramp
from 10 to 200 A,
accomplished in 22 sec.
The figure refers to a test
completed operating in
automatic mode with a
maximum battery pack
voltage of 770 V in order to
have a SOC of 90%90%.
Il progetto PBI (4)
Genovese, R.Geracitano, L.Leoncavallo, G. Pede, R.Spazzoli: "Fast charge and local public transport: an italian experience”, ESARS 2015, 3rd
International Conference on Electrical Systems for Aircraft, Railways, Ship Propulsion and road vehicles, 3-5 March 2015, Aachen, Germany
,
FG e smart grid:
i sistemi V2G (vehicle to grid)
Prove vita ed “abuse test” sulle
batterie: laboratorio prova batterie
della Casaccia
Progetto PBI Industria 2015
versioni elettriche
G & A Engineering s.r.l.
Ferrari BSN s.r.l.
Rete elettrica
Batterie
«Stazione di servizio elettrica»
Testing e sviluppi dedicati su
veicoli elettrici nelle
applicazioni V2G:
banchi a rulli e laboratori
della Casaccia
Studi e sperimentazioni sull’integrazione
nella rete: laboratori di Portici e della
Casaccia, anche nell’ambito delle attività
della Ricerca di Sistema Elettrico
Sviluppo di sistemi robotizzati
per la ricarica rapida:
laboratori della Casaccia
System testing: fast charge
Grid connected energy storage prototype:
 lithium battery pack of 16 kWh,
 DC/DC converter of 20 kW
 IGBT bidirectional - inverter of 30 kVA
 Control system of power flows exchange with the grid
 Able to be linked with Active Load (function not
implemented yet)
The battery pack is made by 6 modules
where each module has been made by 12
cells. Battery pack voltage is 270 V.
Battery system: Kokam, 70 Ah
Power electronic System: EEI
Off-board charger with an
active power of 50 kW dc. The
socket-outlet is an Yasaki Plug
(ChadeMo protocol).
M.C. Falvo, L. Martirano, D. Sbordone, A. Vergine -,B. Di Pietra, A. Genovese – “Distributed Active Network Management Strategy
Including DG and Storage Systems “ Convegno annuale AEIT 2014 Trieste 18-19 Settembre 2014
This national research project has been funded by the Italian Ministry of
Economic Development, with the aim of investigating several system aspects
related to the potential mass roll-out of plug-in electric vehicles, and
particularly their technical, environmental end economic impacts:
http://www.enea.it/it/Ricerca_sviluppo/ricerca-sistema-elettrico/efficienza-
nellelettromobilita/report#2013
Report 2012
Deliverable 1: Scenari di elettrificazione della rete di trasporto pubblico a Roma - Il fabbisogno energetico
Deliverable 2: Scenari di elettrificazione della distribuzione urbana delle merci a Roma - Il fabbisogno
energetico
Studio delle interrelazioni tra il sistema elettrico e quello dei trasporti urbani
Studio teorico-sperimentale delle prestazioni di convertitori DC/DC per la ricarica rapida
Realizzazione e sperimentazione di una stazione di ricarica rapida in c.c. nel C.R. Casaccia
Studio di fattibilità per un impianto di ricarica contactless
Report 2013
Progetto e sperimentazione di un caricabatteria contactless per city car elettrica
Progettazione di un convertitore modulare per infrastrutture di ricarica con accumulo integrato
Modellistica per il bilancio energetico di sistemi di ricarica con funzionalità vehicle-to-grid
Studio delle interrelazioni tra il sistema elettrico e quello dei trasporti urbani
Analisi di elettrificazione del TPL in contesti ITC: lo smart ring dell’Aquila
Sperimentazione per la compensazione dell’energia attiva/reattiva con la stazione di ricarica integrata presso il
CR Casaccia
Caricabatterie contactless per city car: caratterizzazione sperimentale e misure radiometriche dei campi
elettromagnetici residui per la valutazione dell'esposizione occupazionale
Per further information
www.enea.it
giovanni.pede@enea.it
Thank you!

Más contenido relacionado

Destacado

LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettriciLUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE
 
Avenues power point presentation
Avenues power point presentationAvenues power point presentation
Avenues power point presentation
Aseem Tewari
 

Destacado (15)

Flexible Storage for Rwa Material
Flexible Storage for Rwa MaterialFlexible Storage for Rwa Material
Flexible Storage for Rwa Material
 
Profitmakers Oy
Profitmakers OyProfitmakers Oy
Profitmakers Oy
 
Publication1
Publication1Publication1
Publication1
 
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettriciLUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
 
LSFaulkner CV
LSFaulkner CVLSFaulkner CV
LSFaulkner CV
 
Gulf of Saint Lawrence Presentation
Gulf of Saint Lawrence PresentationGulf of Saint Lawrence Presentation
Gulf of Saint Lawrence Presentation
 
Métodos de Integración
Métodos de IntegraciónMétodos de Integración
Métodos de Integración
 
ME
MEME
ME
 
Avenues power point presentation
Avenues power point presentationAvenues power point presentation
Avenues power point presentation
 
Особенности проектирования объектов распределенной генерации
Особенности проектирования объектов распределенной генерацииОсобенности проектирования объектов распределенной генерации
Особенности проектирования объектов распределенной генерации
 
A New “Forest Town” Community Transforms Urban Planning in Singapore
A New “Forest Town” Community Transforms Urban Planning in SingaporeA New “Forest Town” Community Transforms Urban Planning in Singapore
A New “Forest Town” Community Transforms Urban Planning in Singapore
 
Pom project ppt
Pom project pptPom project ppt
Pom project ppt
 
Three of Rome's Best Bernini Fountains
Three of Rome's Best Bernini FountainsThree of Rome's Best Bernini Fountains
Three of Rome's Best Bernini Fountains
 
Gulf of Saint Lawrence
Gulf of Saint Lawrence Gulf of Saint Lawrence
Gulf of Saint Lawrence
 
Owura's CV
Owura's CVOwura's CV
Owura's CV
 

Similar a LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici

SMART CITY 3 novembre
SMART CITY 3 novembre SMART CITY 3 novembre
SMART CITY 3 novembre
canaleenergia
 
ABB @ Smart Mobility World 2015
ABB @ Smart Mobility World 2015ABB @ Smart Mobility World 2015
ABB @ Smart Mobility World 2015
Gianluca Donato
 
Brochure Enel Drive
Brochure Enel DriveBrochure Enel Drive
Brochure Enel Drive
Enel S.p.A.
 
Fairchild partecipa a PCIM 2013
Fairchild partecipa a PCIM 2013Fairchild partecipa a PCIM 2013
Fairchild partecipa a PCIM 2013
SEIGRADI
 
Smart Grids: l’esperienza e la strategia Enel
Smart Grids: l’esperienza e la strategia Enel Smart Grids: l’esperienza e la strategia Enel
Smart Grids: l’esperienza e la strategia Enel
Enel S.p.A.
 
Aeeg il mercato energetico dinamiche evolutive e regolamentazione
Aeeg   il mercato energetico dinamiche evolutive e regolamentazioneAeeg   il mercato energetico dinamiche evolutive e regolamentazione
Aeeg il mercato energetico dinamiche evolutive e regolamentazione
GIFI
 

Similar a LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici (20)

SMART CITY 3 novembre
SMART CITY 3 novembre SMART CITY 3 novembre
SMART CITY 3 novembre
 
Bp Energy Charge Rev50 101024 Xxxxx Short Non Anonima
Bp Energy Charge Rev50 101024 Xxxxx  Short Non AnonimaBp Energy Charge Rev50 101024 Xxxxx  Short Non Anonima
Bp Energy Charge Rev50 101024 Xxxxx Short Non Anonima
 
Zet mote presentation
Zet mote presentationZet mote presentation
Zet mote presentation
 
ABB @ Smart Mobility World 2015
ABB @ Smart Mobility World 2015ABB @ Smart Mobility World 2015
ABB @ Smart Mobility World 2015
 
Brochure Enel Drive
Brochure Enel DriveBrochure Enel Drive
Brochure Enel Drive
 
Progetto POSEIDON.pdf
Progetto POSEIDON.pdfProgetto POSEIDON.pdf
Progetto POSEIDON.pdf
 
Presentazione_tesi
Presentazione_tesiPresentazione_tesi
Presentazione_tesi
 
PoliMI - Delfanti - Il sistema elettrico nazionale verso le smart grids
PoliMI -  Delfanti - Il sistema elettrico nazionale verso le smart gridsPoliMI -  Delfanti - Il sistema elettrico nazionale verso le smart grids
PoliMI - Delfanti - Il sistema elettrico nazionale verso le smart grids
 
Fairchild partecipa a PCIM 2013
Fairchild partecipa a PCIM 2013Fairchild partecipa a PCIM 2013
Fairchild partecipa a PCIM 2013
 
Urban Data Center&Urban Control Center: dalla gestione dei flussi energetici ...
Urban Data Center&Urban Control Center: dalla gestione dei flussi energetici ...Urban Data Center&Urban Control Center: dalla gestione dei flussi energetici ...
Urban Data Center&Urban Control Center: dalla gestione dei flussi energetici ...
 
CEIm Magazine-aprile 2022
CEIm Magazine-aprile 2022CEIm Magazine-aprile 2022
CEIm Magazine-aprile 2022
 
Smart Grids: l’esperienza e la strategia Enel
Smart Grids: l’esperienza e la strategia Enel Smart Grids: l’esperienza e la strategia Enel
Smart Grids: l’esperienza e la strategia Enel
 
Abbiamo bisogno di una svolta, di una Svolta Elettrica - Monza 6 settembre ...
Abbiamo bisogno di una svolta,  di una Svolta Elettrica -  Monza 6 settembre ...Abbiamo bisogno di una svolta,  di una Svolta Elettrica -  Monza 6 settembre ...
Abbiamo bisogno di una svolta, di una Svolta Elettrica - Monza 6 settembre ...
 
Smart plug
Smart plugSmart plug
Smart plug
 
Aeeg il mercato energetico dinamiche evolutive e regolamentazione
Aeeg   il mercato energetico dinamiche evolutive e regolamentazioneAeeg   il mercato energetico dinamiche evolutive e regolamentazione
Aeeg il mercato energetico dinamiche evolutive e regolamentazione
 
Abb Giulio Capocaccia
Abb Giulio CapocacciaAbb Giulio Capocaccia
Abb Giulio Capocaccia
 
La mobilità elettrica e gli italiani
La mobilità elettrica e gli italianiLa mobilità elettrica e gli italiani
La mobilità elettrica e gli italiani
 
Mobilis 2008 - TR3 : HYDROGEN THE ITALIAN EXPERIENCE
Mobilis 2008 - TR3 : HYDROGEN THE ITALIAN EXPERIENCEMobilis 2008 - TR3 : HYDROGEN THE ITALIAN EXPERIENCE
Mobilis 2008 - TR3 : HYDROGEN THE ITALIAN EXPERIENCE
 
Presentazione Tesi Magistrale Francesca Abbattista
Presentazione Tesi Magistrale Francesca AbbattistaPresentazione Tesi Magistrale Francesca Abbattista
Presentazione Tesi Magistrale Francesca Abbattista
 
Reti intelligenti per la gestione efficiente dell'energia - Luigi Mazzocchi (...
Reti intelligenti per la gestione efficiente dell'energia - Luigi Mazzocchi (...Reti intelligenti per la gestione efficiente dell'energia - Luigi Mazzocchi (...
Reti intelligenti per la gestione efficiente dell'energia - Luigi Mazzocchi (...
 

LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici

  • 1. Sistemi avanzati di ricarica rapida Ing. Giovanni Pede Dipartimento Tecnologie per l’Energia Laboratorio Sistemi e Tecnologie Mobilità ed accumulo Trasporto merci a breve raggio con veicoli elettrici Lucca 10 luglio 2015
  • 2. Variable duration 7-10 hours , during day Between ¼ & ½ hour At Work At home Exchange Station Private & public car park During shopping On a journey Fast charge In a few minutes Battery exchange 7-10 hours , during night < 2 hours House Residential building Deployment of PEV calls upon a charging infrastructure adapted to its limited range: • Generalization of charging spots for all parking situations • Specific features to allow quick battery reffill: fast charge & battery exchange stations Different kind of needs
  • 3. 3 Battery exchange  in a few minutes Standard charge (AC)  beetween 8 an 4 hours Fast & ultra fast charge (AC or DC)  less than 1 hour Current (A) Fast charge BE Speed Fast & ultra fast charge BE Speed Gyrobus, Oerlikon Gulliver, Tecnobus CHAdeMO charging station (50 kW) Power range and charging times
  • 4. 4 modi di ricarica Charging mode 3 (with communication between EV and CP) is compulsory in public areas
  • 5. Perché e quando la “Fast Charge”? Perché? Per moltiplicare per 3-4 volte l’autonomia di un mezzo elettrico , oppure ridurre di 3-4 volte la taglia della batteria oppure una combinazione delle due cose Quando? Quando la natura del servizio richiesto al mezzo lo consente, cioè quando il servizio è ripetitivo e consente delle soste per una durata pari al 20-25 % del tempo totale a disposizione
  • 6. 6 12 m. urban bus Charging power Battery size (750 V) Nominal energy (kWh) Range (km) Pure Electric 43 kW 650 Ah 457 200 Zero Filobus 150 kW 212 Ah 153 Unlimited Un esempio concreto: il TPL P. Bolognesi, G. Lutzemberger, DESE, Università di Pisa, “Sistema integrato di autobus elettrici con infrastruttura per ricariche intermedie”, AEIT Annual Conference, Rome , 2012,
  • 7. I tre pilastri della “Fast Charge” Per una ricarica veloce occorrono tre elementi: •Batterie adatte per la F.G. •Interfacce di potenza adatte per la F.G. •Caricabatterie adatti per la F.G.
  • 8. 8 Charging current (A) Charged energy (Wh) Discharged energy (1C) Energy efficiency (%) 15.5 (C/2) 125.3 120.35 96 31 (1 C) 128.44 118.61 92 62 (2 C) 129.58 114.61 88 «C » is the nominal battery capacity, e.g. if C is 50 Ah, 3 C stands for a charge current: 3 C = 150 A Even at high current rates, charge is possible with a good efficiency Le batterie “simmetriche” in carica/scarica
  • 9. Ricarica rapida: moduli batterie 12V auto-gestiti (1) R. Roncella, R. Saletti, F. Baronti, G. Pede, F. Vellucci, “Moduli auto gestiti Li-Io LFP in un'applicazione "fast charge" per il trasporto pubblico locale” Convegno annuale AEIT 2014 Trieste 18-19 Settembre 2014
  • 10. Ricarica rapida: moduli batterie 12V auto-gestiti (2)
  • 11. Life-cycle test 0 0,5 1 1,5 2 2,5 3 3,5 4 -250 -200 -150 -100 -50 0 50 100 30 530 1030 1530 Tensione [V] Corrente [A] Tempo [s] Corrente Tensione 0 10 20 30 40 50 60 290015,7 340015,7 390015,7 440015,7 490015,7 540015,7 Temperatura [°C] Temperatura cella Temperatura media amb Il ciclo elementare è raffigurato a fianco. E’ un ciclo bilanciato in termini di Amperora (rendimento unitario) e corrisponde a 6.5 km di marcia e 5’ di ricarica rapida a 3C al capolinea. G.Pede, V. Sglavo, F.Vellucci, “Life-cycle test on LFP cells simulating a real working profile of a “pure electric charge sustaing” small urban bus ”, IEEE International Electric Vehicle Conference 2014, 0,88 0,89 0,90 0,91 0,92 0,93 0,94 0,95 0 10 20 30 40 50 60 70 0 1000 2000 3000 Rendimento energetico Capacità erogata [Ah] Capacità erogata Rendimento energetico
  • 12. 1.2. Fast electric recharging points for motor vehicles Alternate Current (AC) fast recharging points for electric vehicles shall be equipped, for interoperability purposes, with connectors of Type 2 as described in standard EN62196-2. Fast recharging points for electric vehicles shall comply with the technical specifications by 31 December 2017 at the latest. Direct Current (DC) fast recharging points for electric vehicles shall be equipped, for interoperability purposes, with connectors of Type "Combo 2" as described in the relevant EN standard, to be adopted by 2014. DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the deployment of alternative fuels infrastructure COM(2013) 18 /2 Fast Charge: colonnine omolog.
  • 13. Combined Charging System (combo) Il connettore “universale” combo-2 prevede l’aggiunta al connettore tipo 2 di due contatti di potenza dedicati alla ricarica in continua ed è in grado di accettare sia il corrispondente connettore combo, sia il connettore tipo 2 per la ricarica in alternata. Fast Charge: connettori omolog.
  • 14. TOSA (HESS-ABB, Ginevra) Capabus (Aowe Technology Development Company & Sinautec, Shanghai) Alè (Rampini-Siemens, Vienna) Ecoliner (Proterra, California) F.G.: sistemi automatiz. (1)
  • 15. OLEV (KAIST, Seoul) Pro: low infrastructural impact Con: low efficient, more costly, safety aspects F.G.: sistemi automatiz. (2)
  • 16. G & A Engineering s.r.l. Ferrari BSN s.r.l. Inverter reverse: il caso PBI T. Huria, G. Lutzemberger, G. Pede, G. Sanna: “Systematic development of series-hybrid bus through modelling”. IEEE VPPC 2010, Vehicle Power and Propulsion Conference, Lille, 1-3/9/2010
  • 17. 17 M + - M1 M2 R1 R2 Contattori M1, M2: Marcia R1, R2: Ricarica Alimentazione in c.c. fino a 500A/1000 V Ricarica rapida al capolinea: schema concettuale con uso di “inverter reverse” Il progetto PBI (2)
  • 19. 19 The figure, related to a first fast-charge test, shows the current ramp from 10 to 200 A, accomplished in 22 sec. The figure, related to a first fast-charge test, shows the current ramp from 10 to 200 A, accomplished in 22 sec. The figure refers to a test completed operating in automatic mode with a maximum battery pack voltage of 770 V in order to have a SOC of 90%90%. Il progetto PBI (4) Genovese, R.Geracitano, L.Leoncavallo, G. Pede, R.Spazzoli: "Fast charge and local public transport: an italian experience”, ESARS 2015, 3rd International Conference on Electrical Systems for Aircraft, Railways, Ship Propulsion and road vehicles, 3-5 March 2015, Aachen, Germany ,
  • 20. FG e smart grid: i sistemi V2G (vehicle to grid) Prove vita ed “abuse test” sulle batterie: laboratorio prova batterie della Casaccia Progetto PBI Industria 2015 versioni elettriche G & A Engineering s.r.l. Ferrari BSN s.r.l. Rete elettrica Batterie «Stazione di servizio elettrica» Testing e sviluppi dedicati su veicoli elettrici nelle applicazioni V2G: banchi a rulli e laboratori della Casaccia Studi e sperimentazioni sull’integrazione nella rete: laboratori di Portici e della Casaccia, anche nell’ambito delle attività della Ricerca di Sistema Elettrico Sviluppo di sistemi robotizzati per la ricarica rapida: laboratori della Casaccia
  • 21. System testing: fast charge Grid connected energy storage prototype:  lithium battery pack of 16 kWh,  DC/DC converter of 20 kW  IGBT bidirectional - inverter of 30 kVA  Control system of power flows exchange with the grid  Able to be linked with Active Load (function not implemented yet) The battery pack is made by 6 modules where each module has been made by 12 cells. Battery pack voltage is 270 V. Battery system: Kokam, 70 Ah Power electronic System: EEI Off-board charger with an active power of 50 kW dc. The socket-outlet is an Yasaki Plug (ChadeMo protocol). M.C. Falvo, L. Martirano, D. Sbordone, A. Vergine -,B. Di Pietra, A. Genovese – “Distributed Active Network Management Strategy Including DG and Storage Systems “ Convegno annuale AEIT 2014 Trieste 18-19 Settembre 2014
  • 22. This national research project has been funded by the Italian Ministry of Economic Development, with the aim of investigating several system aspects related to the potential mass roll-out of plug-in electric vehicles, and particularly their technical, environmental end economic impacts: http://www.enea.it/it/Ricerca_sviluppo/ricerca-sistema-elettrico/efficienza- nellelettromobilita/report#2013 Report 2012 Deliverable 1: Scenari di elettrificazione della rete di trasporto pubblico a Roma - Il fabbisogno energetico Deliverable 2: Scenari di elettrificazione della distribuzione urbana delle merci a Roma - Il fabbisogno energetico Studio delle interrelazioni tra il sistema elettrico e quello dei trasporti urbani Studio teorico-sperimentale delle prestazioni di convertitori DC/DC per la ricarica rapida Realizzazione e sperimentazione di una stazione di ricarica rapida in c.c. nel C.R. Casaccia Studio di fattibilità per un impianto di ricarica contactless Report 2013 Progetto e sperimentazione di un caricabatteria contactless per city car elettrica Progettazione di un convertitore modulare per infrastrutture di ricarica con accumulo integrato Modellistica per il bilancio energetico di sistemi di ricarica con funzionalità vehicle-to-grid Studio delle interrelazioni tra il sistema elettrico e quello dei trasporti urbani Analisi di elettrificazione del TPL in contesti ITC: lo smart ring dell’Aquila Sperimentazione per la compensazione dell’energia attiva/reattiva con la stazione di ricarica integrata presso il CR Casaccia Caricabatterie contactless per city car: caratterizzazione sperimentale e misure radiometriche dei campi elettromagnetici residui per la valutazione dell'esposizione occupazionale