MAIN FUNCTIONS, PROBLEMS, CONSTRIANS
AND CHALLENGES
Presented at GPA Retreat at Sindola-Kanilai
from 2nd to 5th Dec 2014
By
L Jawara
A S Camara
- Policy issues
L Jawara
- Maint planning
- Projects
- Modernization
and Conversions
F S Gomez
- Breakdown
Maintenance
- Mech Repairs
M F Gassama
- Electrical
Repairs &
Maintenance
Thomas Taylor
(Head of Electrical
Maintenance)
K Manneh
- Tech Operations
- Routine Maint.
- Logistics
Mbai Jallow
(Head of
Technical
Operations)
Lamarana Jallow
(Estate Officer)
A Sisawo
- Provincial
Technical Ops
- Routine maint.
of Provincial fleet
Bakary Baise
Darboe
(Head of
Provincial
Maintenance)
Modou Lamin
Camara
(Marine Engineer)
Musa Jallow
(Head of
Mintnenance)
Alagie Modou
Njie
(Marine Engineer)
Solomon King
(Mechanical
Engineer)
Bakary Jammeh
(Head - Welding
& Fabrication)
 Participate in and provide expert advice on
long-range development planning relating to
engineering and operational requirements
 Provide expert technical advice on overall
policies, procedures and guidelines for major
technical projects
 Maintenances of the ferry fleet across the
country
 Provide technical support to other departments
through sharing of knowledge and expertise
 Advise procurement department on technical
requirements of critical parts, equipments and
engineering services
 Increase ferry fleet Availability across the
country
 Increase Reliability of the ferry fleet
 Reduce Downtime of the ferry fleet
 Minimize Breakdown
 Reduce Cost relating to maintenance
 Logistics and lead time management
 Availability- Through Opportunity
maintenance
 Reliability- Through periodic and Routine
maintenance
 Downtime- By scheduling overnight
maintenances and off-peak periods (See photo)
 Breakdown- Through condition monitoring
and effective inspection programs
 Cost- Cost analysis (see graph)
y = 120000x
R² = 1
y = 23400xy = 23400x
y = 40765
,0.00
200,000.00
400,000.00
600,000.00
800,000.00
1000,000.00
1200,000.00
1400,000.00
0 1 2 3 4 5 6 7 8 9 10
Cost(dalasis)
No. of crankshafts
Cost as a function of number of crankshafts
cost of new
Logistics and repair cost
cost of repair
logistics cost
LESS THAN ADEQUATE
MAINTENANCE FACILITIES
CONSTANT CRISIS
MANAGEMENT
ENVIRONMENTAL PROBLEMS
RELATING TO IMPROPER WASTE
DISPOSAL
ENVIRONMENTAL PROBLEMS
RELATING TO MARINE GROWTHS
TEAM WORK, DEDICATION
AND COMMITMENT
WE HAVE THE SKILLS AND THE
COMPETENCE TO PERFORM WORK
CUSTOMER FOCUS
WE ARE COMMITTED TO
SERVING OUR CUSTOMERS
GOING THE EXTRA MILE
TO GET THE WORK DONE
WE HAVE SUPPORT
FROM OUR PARTNERS
WE ENSURE THAT PROJECTS
ARE DELIVERED AS AGREED
WE CHALLENGE CONTRACTORS
TO DELIVER ON TIME
PAYING ATTENTION TO DETAILS
ENSURES THAT PERFORMANCE
IS NOT COMPROMISED EVEN
IN VERY TIGHT CORNERS
We always confirm
WE HAVE A STRONG MANAGEMENT SUPPORT AND WE ARE
ALWAYS GUIDED
GPA FERRIES TECHNICAL PROBLEMS CONSTRIANS AND CHALLENGES

Más contenido relacionado

Destacado

Republica bolivariana de venezuela 2
Republica bolivariana de venezuela 2Republica bolivariana de venezuela 2
Republica bolivariana de venezuela 2yoxdan
 
Best holiday destination
Best holiday destinationBest holiday destination
Best holiday destinationreyvathi
 
Las tic nadia liliana mina bedoya.pptx28
Las  tic nadia liliana mina bedoya.pptx28Las  tic nadia liliana mina bedoya.pptx28
Las tic nadia liliana mina bedoya.pptx28nadialilianaminabedoya
 
Es posible la revolución educativa sin la integración de herramientas tecnoló...
Es posible la revolución educativa sin la integración de herramientas tecnoló...Es posible la revolución educativa sin la integración de herramientas tecnoló...
Es posible la revolución educativa sin la integración de herramientas tecnoló...Aurarosario02
 
Fango termal
Fango termalFango termal
Fango termalsabrilo
 

Destacado (7)

Republica bolivariana de venezuela 2
Republica bolivariana de venezuela 2Republica bolivariana de venezuela 2
Republica bolivariana de venezuela 2
 
Best holiday destination
Best holiday destinationBest holiday destination
Best holiday destination
 
Las tic nadia liliana mina bedoya.pptx28
Las  tic nadia liliana mina bedoya.pptx28Las  tic nadia liliana mina bedoya.pptx28
Las tic nadia liliana mina bedoya.pptx28
 
Es posible la revolución educativa sin la integración de herramientas tecnoló...
Es posible la revolución educativa sin la integración de herramientas tecnoló...Es posible la revolución educativa sin la integración de herramientas tecnoló...
Es posible la revolución educativa sin la integración de herramientas tecnoló...
 
Fango termal
Fango termalFango termal
Fango termal
 
ITMAM Profile-English v1.19
ITMAM Profile-English v1.19ITMAM Profile-English v1.19
ITMAM Profile-English v1.19
 
Jafaruddin
JafaruddinJafaruddin
Jafaruddin
 

Similar a GPA FERRIES TECHNICAL PROBLEMS CONSTRIANS AND CHALLENGES

PROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVY
PROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVYPROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVY
PROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVYwarrenedge
 
Doug raber cv 8 1-16
Doug raber cv 8 1-16Doug raber cv 8 1-16
Doug raber cv 8 1-16Doug Raber
 
PD213 Introduction to Subsea Inspection, Maintenance & Repairs
PD213 Introduction to Subsea Inspection, Maintenance & RepairsPD213 Introduction to Subsea Inspection, Maintenance & Repairs
PD213 Introduction to Subsea Inspection, Maintenance & RepairspetroEDGE
 
Maltman Wayne Resume Defence
Maltman Wayne Resume DefenceMaltman Wayne Resume Defence
Maltman Wayne Resume DefenceWayne Maltman
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16Rick Smith
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16Rick Smith
 
STEVEN KERSEYS TECH. RESUME REV 1
STEVEN KERSEYS TECH. RESUME REV 1STEVEN KERSEYS TECH. RESUME REV 1
STEVEN KERSEYS TECH. RESUME REV 1Steven Kersey
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonKTN
 
Emily_Plummer_Resume
Emily_Plummer_ResumeEmily_Plummer_Resume
Emily_Plummer_ResumeEmily Plummer
 
Gary Ressel CV -New
Gary Ressel CV -NewGary Ressel CV -New
Gary Ressel CV -NewGary Ressel
 
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...LandorLINKS
 
Deepening cost analysis for Onshore Wind Technology
Deepening cost analysis for Onshore Wind TechnologyDeepening cost analysis for Onshore Wind Technology
Deepening cost analysis for Onshore Wind TechnologyIEA-ETSAP
 

Similar a GPA FERRIES TECHNICAL PROBLEMS CONSTRIANS AND CHALLENGES (20)

Resume 7
Resume 7Resume 7
Resume 7
 
PROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVY
PROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVYPROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVY
PROGRAMMES, SUCCESSES AND CHALLENGES FACING LOGISTICS IN THE ITALIAN NAVY
 
Doug raber cv 8 1-16
Doug raber cv 8 1-16Doug raber cv 8 1-16
Doug raber cv 8 1-16
 
Leacock steven resume
Leacock steven   resumeLeacock steven   resume
Leacock steven resume
 
Leacock steven resume
Leacock steven   resumeLeacock steven   resume
Leacock steven resume
 
PD213 Introduction to Subsea Inspection, Maintenance & Repairs
PD213 Introduction to Subsea Inspection, Maintenance & RepairsPD213 Introduction to Subsea Inspection, Maintenance & Repairs
PD213 Introduction to Subsea Inspection, Maintenance & Repairs
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
Doug Caley1
Doug Caley1Doug Caley1
Doug Caley1
 
Billd76 resume
Billd76 resumeBilld76 resume
Billd76 resume
 
Maltman Wayne Resume Defence
Maltman Wayne Resume DefenceMaltman Wayne Resume Defence
Maltman Wayne Resume Defence
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16
 
STEVEN KERSEYS TECH. RESUME REV 1
STEVEN KERSEYS TECH. RESUME REV 1STEVEN KERSEYS TECH. RESUME REV 1
STEVEN KERSEYS TECH. RESUME REV 1
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - London
 
Emily_Plummer_Resume
Emily_Plummer_ResumeEmily_Plummer_Resume
Emily_Plummer_Resume
 
Gary Ressel CV -New
Gary Ressel CV -NewGary Ressel CV -New
Gary Ressel CV -New
 
Resume.
Resume.Resume.
Resume.
 
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
Mike Notman, Part 2: Vision for Highways Maintenance and Management in Birmin...
 
Deepening cost analysis for Onshore Wind Technology
Deepening cost analysis for Onshore Wind TechnologyDeepening cost analysis for Onshore Wind Technology
Deepening cost analysis for Onshore Wind Technology
 
FAHAD CV 2016
FAHAD CV 2016FAHAD CV 2016
FAHAD CV 2016
 

GPA FERRIES TECHNICAL PROBLEMS CONSTRIANS AND CHALLENGES

  • 1. MAIN FUNCTIONS, PROBLEMS, CONSTRIANS AND CHALLENGES Presented at GPA Retreat at Sindola-Kanilai from 2nd to 5th Dec 2014 By L Jawara
  • 2. A S Camara - Policy issues L Jawara - Maint planning - Projects - Modernization and Conversions F S Gomez - Breakdown Maintenance - Mech Repairs M F Gassama - Electrical Repairs & Maintenance Thomas Taylor (Head of Electrical Maintenance) K Manneh - Tech Operations - Routine Maint. - Logistics Mbai Jallow (Head of Technical Operations) Lamarana Jallow (Estate Officer) A Sisawo - Provincial Technical Ops - Routine maint. of Provincial fleet Bakary Baise Darboe (Head of Provincial Maintenance) Modou Lamin Camara (Marine Engineer) Musa Jallow (Head of Mintnenance) Alagie Modou Njie (Marine Engineer) Solomon King (Mechanical Engineer) Bakary Jammeh (Head - Welding & Fabrication)
  • 3.  Participate in and provide expert advice on long-range development planning relating to engineering and operational requirements  Provide expert technical advice on overall policies, procedures and guidelines for major technical projects  Maintenances of the ferry fleet across the country
  • 4.  Provide technical support to other departments through sharing of knowledge and expertise  Advise procurement department on technical requirements of critical parts, equipments and engineering services
  • 5.  Increase ferry fleet Availability across the country  Increase Reliability of the ferry fleet  Reduce Downtime of the ferry fleet  Minimize Breakdown  Reduce Cost relating to maintenance  Logistics and lead time management
  • 6.  Availability- Through Opportunity maintenance  Reliability- Through periodic and Routine maintenance  Downtime- By scheduling overnight maintenances and off-peak periods (See photo)  Breakdown- Through condition monitoring and effective inspection programs  Cost- Cost analysis (see graph)
  • 7.
  • 8. y = 120000x R² = 1 y = 23400xy = 23400x y = 40765 ,0.00 200,000.00 400,000.00 600,000.00 800,000.00 1000,000.00 1200,000.00 1400,000.00 0 1 2 3 4 5 6 7 8 9 10 Cost(dalasis) No. of crankshafts Cost as a function of number of crankshafts cost of new Logistics and repair cost cost of repair logistics cost
  • 9. LESS THAN ADEQUATE MAINTENANCE FACILITIES CONSTANT CRISIS MANAGEMENT
  • 10. ENVIRONMENTAL PROBLEMS RELATING TO IMPROPER WASTE DISPOSAL ENVIRONMENTAL PROBLEMS RELATING TO MARINE GROWTHS
  • 11. TEAM WORK, DEDICATION AND COMMITMENT WE HAVE THE SKILLS AND THE COMPETENCE TO PERFORM WORK
  • 12. CUSTOMER FOCUS WE ARE COMMITTED TO SERVING OUR CUSTOMERS
  • 13. GOING THE EXTRA MILE TO GET THE WORK DONE WE HAVE SUPPORT FROM OUR PARTNERS
  • 14. WE ENSURE THAT PROJECTS ARE DELIVERED AS AGREED WE CHALLENGE CONTRACTORS TO DELIVER ON TIME
  • 15. PAYING ATTENTION TO DETAILS ENSURES THAT PERFORMANCE IS NOT COMPROMISED EVEN IN VERY TIGHT CORNERS
  • 17. WE HAVE A STRONG MANAGEMENT SUPPORT AND WE ARE ALWAYS GUIDED