Policy Deployment

Lean Enterprise Academy
Lean Enterprise AcademyCEO en Lean Enterprise Academy
1
POLICY (STRATEGY) DEPLOYMENT
A proven process for strategy execution.
2
PRESENTATION AGENDA
1. A FEW COMMENTS ON STRATEGY DEVELOPMENT.
2. THE POLICY DEPLOYMENT PROCESS EXPLAINED.
3. A CASE STUDY ; BORAL Ltd.
3
WHAT IS STRATEGY ALL ABOUT?
STRATEGY EXPLAINS HOW AN ORGANISATION, FACED WITH COMPETITION, WILL
ACHIEVE SUPERIOR PERFORMANCE.
•WHAT VALUE WILL THE ORGANISATION CREATE?
•HOW WILL THE ORGANISATION OFFER A UNIQUE
PRODUCT OR SERVICE TO CUSTOMERS?
4
Research consistently identifies reasons for failure include:
1. People cannot implement what they do not know.
2. People do not implement properly what they do not understand.
3. People do not implement what they are not committed to.
4. People give up on a strategy, the implications of which, have not been
anticipated and thought through.
5. Management overlook the importance of the “HOWS” of executing the strategy.
WHY DO SOME BRILLIANT STRATEGIES FAIL?
“Policy deployment will help Management identify and practically manage the
implementation of a strategy of the Company’s products, markets, customers,
organisation structure, systems, processes, personnel and culture”
5
 The key to success is to focus on doing the right things and getting the right results.
 Problems in operations often originate in other functional areas. P.D. provides the
means to cement all functions together by aligning objectives. (This is equally
applicable to any process, in any industry wherever there is a customer)
 There are so many things to do, we need to de-select some worthy initiatives!
 It starts with correctly identifying the business critical issues.
 Then it’s about developing the plan to resolve the issues and deliver the strategy.
 Policy (strategy) Deployment keeps everyone focused on the real prize ; creating
value for the customer. All our lean tools are means to this end and not ends in
themselves.
 Lean must be supported from the top of the organisation. Anything less will not be
sustained.
Policy Deployment directs people to do what they should do, rather than what they want to do
by aligning all activities to the top level Strategic Vision
THE LEAN CONNECTION
What has Policy Deployment got to do with Lean and continuous improvement?
6
POLICY DEPLOYMENT ISSUES
Because;
• It is dealing with a multitude of complex issues.
• It addresses the many conflicting goals which can arise between functions.
• It puts people and culture centre stage.
However, once mastered, the benefits are significant and include;
• It aligns people and actions to the true “North Star”
• It generates synergies via teamwork.
• It helps each part of the organisation become aware of the effect of its own actions on
every other part.
• Cross functional learning is fast tracked.
• It builds confidence in the plan knowing every facet has been empirically considered.
• It identifies and prioritises the business critical issues and deselects the unimportant.
POLICY DEPLOYMENT IS THE PIECE THAT
IS THE MOST DIFFICULT TO MASTER;
7
THE PROCESS EXPLAINED
8
Purpose
 To support the achievement of the business strategy through the alignment of all
employees, functions and divisions to the business goals
 To execute the strategic plan, identifying and focusing on the business critical issues
and de-selecting non essential activities.
 To achieve ownership, focus, direction and commitment through the involvement of
everyone
The Foundation Stone
 W Edwards Deming’s PLAN, DO, CHECK, ACT (P.D.C.A.) cycle is at the heart of
Policy (Strategy) Deployment.
(The planning normally gets done well but the Do, Check and Act don't!)
WHAT IS IT ALL ABOUT?
9
 We assemble the entire top team. This must include all the people that contribute to
the business performance : Engineering, Sales, Marketing, Divisional Heads,
Production, Purchasing, Legal, Finance, HR, IT, Logistics, etc.
 The first analysis is focused entirely on what the customer
really, really wants. (which may be different from what we think he wants!)
 We must insist on reality
Agree Debate
Challenge
THE PROCESS STARTS BY CONSIDERATION OF THE WHOLE VALUE STREAM
Co. A
10
TIME
Procurement
Engineering
Manufacture
Design
Contracts
Sales
Test
Peoples objectives
Inconsistent
Working hard achieving
Departmental goals
Peoples objectives
aligned
Working hard achieving
Business goals
Policy
Deployment
Process
THE POLICY DEPLOYMENT PROCESS
11
Business Long Term Plan
1 Year Plan
Company Objectives
Divisional Objectives
Site Objectives
Individual Objectives
Purpose & Values
Strategic Vision
Cascade
Power of processPower of process
STAGES OF POLICY DEPLOYMENT
12
CORPORATE
STRATEGY
DIVISIONAL
STRATEGY
COMPANY/
PLANT
STRATEGIC
PLAN
THE BIG PICTURE; STRATEGIC FIT & ALIGNMENT
Function /
Departmental
Objectives
Individual
s
Objectives
13
…SO, WHAT IS THE DIFFERENCE BETWEEN BEING
“INVOLVED” AND BEING “COMMITTED”?
Well think of a nice breakfast of Eggs and Bacon
THE CHICKEN IS INVOLVED, BUT THE PIG IS COMMITTED!
14
THE MOST ADMIRED COMPANIES;
What do they do? How do they do it? What do they measure?
15
Requirements
Criteria (examples)
Improvement
Measure
Current Group
Perform. 2013 2014 2015
Best in Class
Measures
Where we
need to be
in 2016
Safety and Environment
Quality
Cost
Market Share
Profit
Cost
On Time Delivery
Working Capital
Innovation
Management and Organization
etc. etc.
LONG TERM PLAN WALLCHART
16
Criteria
“Measures that matter”
Improvement Measure
Current Group
performance
Reqt. in
2013 Gap Statement
Safety & Environment LTIFR 2 1.5
The i care programme must be implemented across all sites by end
2012. We must eliminate all accidents on the front line and back offices.
The root causes of muscular stress need to be determined
Internal auditing 5 issues 2 issues
We should strive to obtain ISO 18001 in year 1.
We should record all scrap and disposal bin details
Green house gas
emissions 3.2 2.9 Evaluate alternative fuels
PIN 5 2 Dust controls required
Quality Process ppm 10,000
Cost $ per c.m. $ 5 $ 4
We must improve process efficiency through value stream mapping.
20% reduction is required.
We must negotiate better terms of payment with suppliers.
Cash Generation $750k $1.5m
We must reduce our w.i.p by implementing a pull system, getting better
ontrol of suppliers and forecasting capability.
Delivery DIFOT 78% 95%
We must achieve significant improvement in supplier performance in
support of our requirements for delivery and cost
Lead Time 9 hrs 2 hrs
We must improve our systems to reduce throughput times. Lead times
should be halved in 12 months.
Development
Management Forecast accuracy +/_ 20% +/_ 5%
We must implement a Sales and Operations planning process and
reduce product complexity.
DEVELOPING GAP STATEMENTS ; An example
When determining the Gap statements consider;
What is the gap; what are we trying to improve?
What is preventing us from meeting our target?
What are the root causes in order of importance?
17
COMPANY
OBJECTIVES
FEEDBACK
FROM
CUSTOMERS
STRATEGIC
ISSUES
FROM
LONG TERM
VISION
MANAGEMENT
FEEDBACK
CARRIED
OVER
OBJECTIVES
FEEDBACK
FROM THE
WORKFORCE
BUDGETARY
& BUSINESS
PLAN REQ’TS
DIVISIONAL/
PLANT
OBJECTIVES
SPECIFIC
PROJECT
ALIGNMENT
OUTSTANDING
FUNCTIONAL
OBJECTIVES
RESOURCE
ALLOCATION
FUNCTIONAL
ISSUES
FUNCTIONAL/
DEPART-
MENTAL
OBJECTIVES
PROJECT
ALIGNMENT
RESOURCE
ALLOCATION &
DEPARTMENTAL
ISSUES
INDIVIDUAL
OBJECTIVES
INDIVIDUAL
NEEDS
INDIVIDUAL &
DEPARTMENTAL
ISSUES
ESTABLISHING COMPANY OBJECTIVES - REFERENCES
18
The only daft questions are the ones that don’t get asked!
• Are we facing reality?
• What are the critical issues facing the business?
• Do we understand what our customers really want? (internal and external)
• We need to double our stock-turns. How can it be improved? What help do
you want?
• Do we have the best suppliers? Do we have too many suppliers? How do we
improve them?
• Do we have the best people? Are they suitably rewarded?
• Do you understand the Plant objectives and what are you working on to help
achieve them?
• What keeps you awake at night? (work related of course)
• If you had 3 wishes what would they be?
• If you travel at the speed of light, do your headlights work?
• How do you know when you are out of invisible ink?
“CATCHBALL” DISCUSSIONS UP AND DOWN THE ORGANISATION EXAMPLES
“Outstanding Leaders know how to ask questions – the right questions”
19
people
systems
cost
quality
safety
environment
delivery
innovation
”CATCHBALL” REFERENCES & IDENTIFYING THEMES
20
1. WORK SAFELY
Strive to create a harm free work place and business
environment which is best in class
2. ACHIEVE OUR BUDGET
Meet or exceed financial and efficiency improvement targets
3. GROW THE BUSINESS
Be recognised by our customers as a “World Class” service provider
4. DEVELOP OUR PEOPLE
Plan and execute a Training and Development program to
create customer focused leaders and develop a skill base which
will constantly improve our business
5. CONTINUOUSLY IMPROVE
Become an agile and lean organisation, built upon a foundation
of continuous improvement that is recognised as “Best in Class”
COMPANY / PLANT OBJECTIVES – AN EXAMPLE
21
THE OBJECTIVES MUST BE “SMART”
Specific
Measurable
Agreed/Achievable
Realistic
Time related
TESTING THE OBJECTIVES
22
DETERMINING THE TOP LEVEL COMPANY TARGETS
(THE DASHBOARD ON THE BRIDGE)
Profitability
Safety/Envir. People Customers InnovationOperations
HMAS COMPANY X
Sales
23
 For each objective consider
how it could be achieved
 What actions can we take to
achieve them? These are the
potential projects to be
considered
 We identify the projects
required to achieve each
objective and list them.
 We then prioritise them using
the “seriousness, urgency and
growth” analysis process
 Then we consider the
improvement that each project
will make and set quantifiable
targets and completion dates.
PROJECT SELECTION
24
When determining the Projects ask;
1. What are we trying to improve?
2. What is preventing us from meeting our target?
3. What are the causes in order of importance?
4. What actions will address the most important causes?
PROJECT SELECTION Cont.
25
POLCY DEPLOYMENT MATRIX
PLANT XXX
COMPILED BY; THE MANAGEMENT TEAM
THE POLICY DEPLOYMENT MATRIX EXPLAINED .
26
THE MATRIX EXPLAINED cont.
27
THE MATRIX EXPLAINED cont.
28
POLCY DEPLOYMENT MATRIX
PLANT XXX
COMPILED BY; THE MANAGEMENT TEAM
THE MATRIX EXPLAINED cont.
29
COMPLETING THE MATRIX
Next:
 Decide who, from the senior team, will lead each project, who will support as a cross
functional team member, and who will facilitate it
 Work your way round the matrix completing the boxes to show the alignment of the
Company objectives ( LH envelope) to the Improvement targets (bottom envelope) and the
Company projects, (top envelope) to the project metrics (RH envelope)
 The first cut of the PD matrix can now be completed.
Hint! An important part of policy
deployment is growing strong
deployment leaders who help
develop trust and collaboration
between functions necessary to
acknowledge and address deeply
rooted problems.
30 30
Departmental
Objectives
Personal
Objectives
(held by employee)
Company
Policy Deployment
Matrix
Divisional/
Functional/plant
Deployment Matrix
A POLICY DEPLOYMENT MATRIX EXAMPLE
31
A CASE STUDY; BORAL LTD
32
MONITORING PROGRESS & ACOUNTABILITY
33
Now the entire team can see the
complete landscape and not just the next
mountain.
In the time allowed I have only been able to provide an overview of the
process. There are many related issues including hints and tips regarding
such questions as;
• How best to manage projects using A3s.
• How to deal with non committed bosses.
• How to conduct follow up reviews and at what frequency.
• What if the process does not start at the very top?
I will be covering these and more in the workshop discussion session later.
In summary let me say this is a process, not an event. The key is to develop
commitment through involvement whilst giving people the freedom to make
decisions, but within a framework of a “box”, or “Russian Doll”, aligned to the
top level strategy, focused on the important few projects whilst having the
courage to deselect or defer the less critical.
CONCLUDING COMMENTS
34
THE END
THANK YOU FOR LISTENING.
1 de 34

Recomendados

Hoshin Kanri Strategy Deployment by Operational Excellence Consulting por
Hoshin Kanri Strategy Deployment by Operational Excellence ConsultingHoshin Kanri Strategy Deployment by Operational Excellence Consulting
Hoshin Kanri Strategy Deployment by Operational Excellence ConsultingOperational Excellence Consulting (Singapore)
32.9K vistas40 diapositivas
Hoshin planning presentation por
Hoshin planning presentationHoshin planning presentation
Hoshin planning presentationLightconsulting
91.6K vistas15 diapositivas
Kaizen training por
Kaizen trainingKaizen training
Kaizen trainingSukin Shetty
68.2K vistas31 diapositivas
Kaizen Events Blitz & Lean Projects por
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean ProjectsAnand Subramaniam
42.3K vistas69 diapositivas
Kaizen por
KaizenKaizen
KaizenShaurya Dhalwalkar
3.1K vistas19 diapositivas
Kaizen por
KaizenKaizen
KaizenNikhil Goyal
1.7K vistas26 diapositivas

Más contenido relacionado

La actualidad más candente

Lean Management por
Lean ManagementLean Management
Lean ManagementAndreas Hägglund
3.3K vistas40 diapositivas
Kaizen por
KaizenKaizen
KaizenNaeem Hassan
43.8K vistas22 diapositivas
Kaizen by anurag por
Kaizen  by anuragKaizen  by anurag
Kaizen by anuragAnurag Verma
1.1K vistas49 diapositivas
Lean Standard or Standardized Work Training Module por
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleFrank-G. Adler
25K vistas67 diapositivas
Lean Mindsets and Behaviors por
Lean Mindsets and BehaviorsLean Mindsets and Behaviors
Lean Mindsets and BehaviorsTKMG, Inc.
39.5K vistas128 diapositivas
Value Stream Mapping Process por
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
122.5K vistas45 diapositivas

La actualidad más candente(20)

Kaizen by anurag por Anurag Verma
Kaizen  by anuragKaizen  by anurag
Kaizen by anurag
Anurag Verma1.1K vistas
Lean Standard or Standardized Work Training Module por Frank-G. Adler
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
Frank-G. Adler25K vistas
Lean Mindsets and Behaviors por TKMG, Inc.
Lean Mindsets and BehaviorsLean Mindsets and Behaviors
Lean Mindsets and Behaviors
TKMG, Inc.39.5K vistas
Lean Leadership: Part 2 of 3 por TKMG, Inc.
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
TKMG, Inc.18.2K vistas
Lean management por Ahmed Ebaied
Lean management Lean management
Lean management
Ahmed Ebaied7.6K vistas
Kaizen Seminar Presentation por Orange Slides
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
Orange Slides144.2K vistas
Kanban Pull System por Dorina Grossu
Kanban Pull SystemKanban Pull System
Kanban Pull System
Dorina Grossu64.5K vistas
Conducting Kaizen Events por Stephen Depoe
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
Stephen Depoe32.9K vistas

Destacado

Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results por
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results TKMG, Inc.
57.2K vistas47 diapositivas
Policy Deployment Example por
Policy Deployment ExamplePolicy Deployment Example
Policy Deployment ExampleDMajors
4.6K vistas20 diapositivas
Introduction to strategy deployment por
Introduction to strategy deploymentIntroduction to strategy deployment
Introduction to strategy deploymentLightconsulting
28K vistas14 diapositivas
Strategy deployment por
Strategy deploymentStrategy deployment
Strategy deploymentRoy Rudolf Musapu
15.2K vistas57 diapositivas
Hoshin Kanri Strategic Planning por
Hoshin Kanri Strategic PlanningHoshin Kanri Strategic Planning
Hoshin Kanri Strategic Planningavscully
2.4K vistas15 diapositivas
A3 Thinking Applied to Policy Deployment por
A3 Thinking Applied to Policy DeploymentA3 Thinking Applied to Policy Deployment
A3 Thinking Applied to Policy DeploymentDidier Rabino, Lbc
15.6K vistas63 diapositivas

Destacado(8)

Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results por TKMG, Inc.
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
TKMG, Inc.57.2K vistas
Policy Deployment Example por DMajors
Policy Deployment ExamplePolicy Deployment Example
Policy Deployment Example
DMajors4.6K vistas
Introduction to strategy deployment por Lightconsulting
Introduction to strategy deploymentIntroduction to strategy deployment
Introduction to strategy deployment
Lightconsulting28K vistas
Hoshin Kanri Strategic Planning por avscully
Hoshin Kanri Strategic PlanningHoshin Kanri Strategic Planning
Hoshin Kanri Strategic Planning
avscully2.4K vistas
A3 Thinking Applied to Policy Deployment por Didier Rabino, Lbc
A3 Thinking Applied to Policy DeploymentA3 Thinking Applied to Policy Deployment
A3 Thinking Applied to Policy Deployment
Didier Rabino, Lbc15.6K vistas
Deploying Hoshin Kanri as a Competitive Weapon por Grant Crow
Deploying Hoshin Kanri as a Competitive WeaponDeploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive Weapon
Grant Crow10.1K vistas

Similar a Policy Deployment

Policy Deployment por
Policy DeploymentPolicy Deployment
Policy DeploymentLean Enterprise Academy
8.9K vistas37 diapositivas
Business Strategy & Alignment to Project Management por
Business Strategy & Alignment to Project ManagementBusiness Strategy & Alignment to Project Management
Business Strategy & Alignment to Project ManagementJonathan Donado
11.5K vistas172 diapositivas
bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app... por
bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app...bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app...
bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app...IIBA-IT
3 vistas21 diapositivas
Strategic Planning Toolkit - Framework, Best Practices and Templates por
Strategic Planning Toolkit - Framework, Best Practices and TemplatesStrategic Planning Toolkit - Framework, Best Practices and Templates
Strategic Planning Toolkit - Framework, Best Practices and TemplatesAurelien Domont, MBA
2.2K vistas31 diapositivas
Slides99 Strategy & Organization por
Slides99 Strategy & OrganizationSlides99 Strategy & Organization
Slides99 Strategy & Organizationguestf32b7
973 vistas66 diapositivas
OE -2013.ppt por
OE -2013.pptOE -2013.ppt
OE -2013.pptSaritaJoshi5
6 vistas18 diapositivas

Similar a Policy Deployment(20)

Business Strategy & Alignment to Project Management por Jonathan Donado
Business Strategy & Alignment to Project ManagementBusiness Strategy & Alignment to Project Management
Business Strategy & Alignment to Project Management
Jonathan Donado11.5K vistas
bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app... por IIBA-IT
bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app...bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app...
bawi201504fromstrategytobusinessresults-thebabokguidev3-151018102541-lva1-app...
IIBA-IT3 vistas
Strategic Planning Toolkit - Framework, Best Practices and Templates por Aurelien Domont, MBA
Strategic Planning Toolkit - Framework, Best Practices and TemplatesStrategic Planning Toolkit - Framework, Best Practices and Templates
Strategic Planning Toolkit - Framework, Best Practices and Templates
Aurelien Domont, MBA2.2K vistas
Slides99 Strategy & Organization por guestf32b7
Slides99 Strategy & OrganizationSlides99 Strategy & Organization
Slides99 Strategy & Organization
guestf32b7973 vistas
5. Comprehensive Strategic Business Plan Template por Earl Stevens
5. Comprehensive Strategic Business Plan Template5. Comprehensive Strategic Business Plan Template
5. Comprehensive Strategic Business Plan Template
Earl Stevens63.1K vistas
Lunch& Learn - Bridging the gap between strategy design and delivery por The PNR
Lunch& Learn  - Bridging the gap between strategy design and deliveryLunch& Learn  - Bridging the gap between strategy design and delivery
Lunch& Learn - Bridging the gap between strategy design and delivery
The PNR205 vistas
What-is-a-Balanced-Scorecard-V3.pdf por ssuserc9150d
What-is-a-Balanced-Scorecard-V3.pdfWhat-is-a-Balanced-Scorecard-V3.pdf
What-is-a-Balanced-Scorecard-V3.pdf
ssuserc9150d9 vistas
Pearson principles of business implementing strategy lecture 2 por moduledesign
Pearson principles of business implementing strategy lecture 2Pearson principles of business implementing strategy lecture 2
Pearson principles of business implementing strategy lecture 2
moduledesign1.1K vistas
Leadership, Business Process Improvement, & Process Mapping! por Ben Wann
Leadership, Business Process Improvement, & Process Mapping!Leadership, Business Process Improvement, & Process Mapping!
Leadership, Business Process Improvement, & Process Mapping!
Ben Wann102 vistas
3 Proven Methods to Optimize Your 2018 Strategy and Goals through Culture and... por Paige Pulaski
3 Proven Methods to Optimize Your 2018 Strategy and Goals through Culture and...3 Proven Methods to Optimize Your 2018 Strategy and Goals through Culture and...
3 Proven Methods to Optimize Your 2018 Strategy and Goals through Culture and...
Paige Pulaski256 vistas
Strategic management process por Sajjad Qadri
Strategic management processStrategic management process
Strategic management process
Sajjad Qadri1.3K vistas
5-Levers-of-Corporate-Entrepreneurship-Rainmaking-Transport por femifala
5-Levers-of-Corporate-Entrepreneurship-Rainmaking-Transport5-Levers-of-Corporate-Entrepreneurship-Rainmaking-Transport
5-Levers-of-Corporate-Entrepreneurship-Rainmaking-Transport
femifala19 vistas

Más de Lean Enterprise Academy

Uk lean summit 2015 lean transformation developing the capability to improv... por
Uk lean summit 2015   lean transformation developing the capability to improv...Uk lean summit 2015   lean transformation developing the capability to improv...
Uk lean summit 2015 lean transformation developing the capability to improv...Lean Enterprise Academy
2.5K vistas26 diapositivas
What have we learnt about Lean? por
What have we learnt about Lean?What have we learnt about Lean?
What have we learnt about Lean?Lean Enterprise Academy
1.9K vistas13 diapositivas
Lean green stream in surgery por
Lean green stream in surgery  Lean green stream in surgery
Lean green stream in surgery Lean Enterprise Academy
2.5K vistas1 diapositiva
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka por
The Basics of Oobeya by Sharon Tanner and Takashi TanakaThe Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi TanakaLean Enterprise Academy
5.8K vistas8 diapositivas
Building a Lean Management System by Daniel T Jones por
Building a Lean Management System by Daniel T JonesBuilding a Lean Management System by Daniel T Jones
Building a Lean Management System by Daniel T JonesLean Enterprise Academy
3K vistas8 diapositivas
Toyota Management System by Takashi Tanaka and Sharon Tanner por
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerLean Enterprise Academy
14.7K vistas28 diapositivas

Más de Lean Enterprise Academy(20)

Uk lean summit 2015 lean transformation developing the capability to improv... por Lean Enterprise Academy
Uk lean summit 2015   lean transformation developing the capability to improv...Uk lean summit 2015   lean transformation developing the capability to improv...
Uk lean summit 2015 lean transformation developing the capability to improv...
Toyota Management System by Takashi Tanaka and Sharon Tanner por Lean Enterprise Academy
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon Tanner
How to develop managers able to lean and sustain end to-end value streams por Lean Enterprise Academy
How to develop managers able to lean and sustain end to-end value streamsHow to develop managers able to lean and sustain end to-end value streams
How to develop managers able to lean and sustain end to-end value streams
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis por Lean Enterprise Academy
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisDelivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Leadership Lessons from Sports Coaching by Dr Peter Treadwell por Lean Enterprise Academy
Leadership Lessons from Sports Coaching by Dr Peter TreadwellLeadership Lessons from Sports Coaching by Dr Peter Treadwell
Leadership Lessons from Sports Coaching by Dr Peter Treadwell
Lean Leadership for Executives: Initial findings from LGN Research por Lean Enterprise Academy
Lean Leadership for Executives: Initial findings from LGN ResearchLean Leadership for Executives: Initial findings from LGN Research
Lean Leadership for Executives: Initial findings from LGN Research

Último

MercerJesse2.1Doc.pdf por
MercerJesse2.1Doc.pdfMercerJesse2.1Doc.pdf
MercerJesse2.1Doc.pdfjessemercerail
273 vistas5 diapositivas
Relationship of psychology with other subjects. por
Relationship of psychology with other subjects.Relationship of psychology with other subjects.
Relationship of psychology with other subjects.palswagata2003
52 vistas16 diapositivas
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively por
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyPECB
623 vistas18 diapositivas
Ch. 7 Political Participation and Elections.pptx por
Ch. 7 Political Participation and Elections.pptxCh. 7 Political Participation and Elections.pptx
Ch. 7 Political Participation and Elections.pptxRommel Regala
111 vistas11 diapositivas
MIXING OF PHARMACEUTICALS.pptx por
MIXING OF PHARMACEUTICALS.pptxMIXING OF PHARMACEUTICALS.pptx
MIXING OF PHARMACEUTICALS.pptxAnupkumar Sharma
95 vistas35 diapositivas
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB... por
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...Nguyen Thanh Tu Collection
88 vistas113 diapositivas

Último(20)

Relationship of psychology with other subjects. por palswagata2003
Relationship of psychology with other subjects.Relationship of psychology with other subjects.
Relationship of psychology with other subjects.
palswagata200352 vistas
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively por PECB
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
PECB 623 vistas
Ch. 7 Political Participation and Elections.pptx por Rommel Regala
Ch. 7 Political Participation and Elections.pptxCh. 7 Political Participation and Elections.pptx
Ch. 7 Political Participation and Elections.pptx
Rommel Regala111 vistas
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB... por Nguyen Thanh Tu Collection
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
Use of Probiotics in Aquaculture.pptx por AKSHAY MANDAL
Use of Probiotics in Aquaculture.pptxUse of Probiotics in Aquaculture.pptx
Use of Probiotics in Aquaculture.pptx
AKSHAY MANDAL119 vistas
11.28.23 Social Capital and Social Exclusion.pptx por mary850239
11.28.23 Social Capital and Social Exclusion.pptx11.28.23 Social Capital and Social Exclusion.pptx
11.28.23 Social Capital and Social Exclusion.pptx
mary850239312 vistas
Sociology KS5 por WestHatch
Sociology KS5Sociology KS5
Sociology KS5
WestHatch85 vistas
Drama KS5 Breakdown por WestHatch
Drama KS5 BreakdownDrama KS5 Breakdown
Drama KS5 Breakdown
WestHatch98 vistas
Psychology KS5 por WestHatch
Psychology KS5Psychology KS5
Psychology KS5
WestHatch119 vistas
AUDIENCE - BANDURA.pptx por iammrhaywood
AUDIENCE - BANDURA.pptxAUDIENCE - BANDURA.pptx
AUDIENCE - BANDURA.pptx
iammrhaywood117 vistas
CUNY IT Picciano.pptx por apicciano
CUNY IT Picciano.pptxCUNY IT Picciano.pptx
CUNY IT Picciano.pptx
apicciano54 vistas
Class 9 lesson plans por TARIQ KHAN
Class 9 lesson plansClass 9 lesson plans
Class 9 lesson plans
TARIQ KHAN51 vistas

Policy Deployment

  • 1. 1 POLICY (STRATEGY) DEPLOYMENT A proven process for strategy execution.
  • 2. 2 PRESENTATION AGENDA 1. A FEW COMMENTS ON STRATEGY DEVELOPMENT. 2. THE POLICY DEPLOYMENT PROCESS EXPLAINED. 3. A CASE STUDY ; BORAL Ltd.
  • 3. 3 WHAT IS STRATEGY ALL ABOUT? STRATEGY EXPLAINS HOW AN ORGANISATION, FACED WITH COMPETITION, WILL ACHIEVE SUPERIOR PERFORMANCE. •WHAT VALUE WILL THE ORGANISATION CREATE? •HOW WILL THE ORGANISATION OFFER A UNIQUE PRODUCT OR SERVICE TO CUSTOMERS?
  • 4. 4 Research consistently identifies reasons for failure include: 1. People cannot implement what they do not know. 2. People do not implement properly what they do not understand. 3. People do not implement what they are not committed to. 4. People give up on a strategy, the implications of which, have not been anticipated and thought through. 5. Management overlook the importance of the “HOWS” of executing the strategy. WHY DO SOME BRILLIANT STRATEGIES FAIL? “Policy deployment will help Management identify and practically manage the implementation of a strategy of the Company’s products, markets, customers, organisation structure, systems, processes, personnel and culture”
  • 5. 5  The key to success is to focus on doing the right things and getting the right results.  Problems in operations often originate in other functional areas. P.D. provides the means to cement all functions together by aligning objectives. (This is equally applicable to any process, in any industry wherever there is a customer)  There are so many things to do, we need to de-select some worthy initiatives!  It starts with correctly identifying the business critical issues.  Then it’s about developing the plan to resolve the issues and deliver the strategy.  Policy (strategy) Deployment keeps everyone focused on the real prize ; creating value for the customer. All our lean tools are means to this end and not ends in themselves.  Lean must be supported from the top of the organisation. Anything less will not be sustained. Policy Deployment directs people to do what they should do, rather than what they want to do by aligning all activities to the top level Strategic Vision THE LEAN CONNECTION What has Policy Deployment got to do with Lean and continuous improvement?
  • 6. 6 POLICY DEPLOYMENT ISSUES Because; • It is dealing with a multitude of complex issues. • It addresses the many conflicting goals which can arise between functions. • It puts people and culture centre stage. However, once mastered, the benefits are significant and include; • It aligns people and actions to the true “North Star” • It generates synergies via teamwork. • It helps each part of the organisation become aware of the effect of its own actions on every other part. • Cross functional learning is fast tracked. • It builds confidence in the plan knowing every facet has been empirically considered. • It identifies and prioritises the business critical issues and deselects the unimportant. POLICY DEPLOYMENT IS THE PIECE THAT IS THE MOST DIFFICULT TO MASTER;
  • 8. 8 Purpose  To support the achievement of the business strategy through the alignment of all employees, functions and divisions to the business goals  To execute the strategic plan, identifying and focusing on the business critical issues and de-selecting non essential activities.  To achieve ownership, focus, direction and commitment through the involvement of everyone The Foundation Stone  W Edwards Deming’s PLAN, DO, CHECK, ACT (P.D.C.A.) cycle is at the heart of Policy (Strategy) Deployment. (The planning normally gets done well but the Do, Check and Act don't!) WHAT IS IT ALL ABOUT?
  • 9. 9  We assemble the entire top team. This must include all the people that contribute to the business performance : Engineering, Sales, Marketing, Divisional Heads, Production, Purchasing, Legal, Finance, HR, IT, Logistics, etc.  The first analysis is focused entirely on what the customer really, really wants. (which may be different from what we think he wants!)  We must insist on reality Agree Debate Challenge THE PROCESS STARTS BY CONSIDERATION OF THE WHOLE VALUE STREAM Co. A
  • 10. 10 TIME Procurement Engineering Manufacture Design Contracts Sales Test Peoples objectives Inconsistent Working hard achieving Departmental goals Peoples objectives aligned Working hard achieving Business goals Policy Deployment Process THE POLICY DEPLOYMENT PROCESS
  • 11. 11 Business Long Term Plan 1 Year Plan Company Objectives Divisional Objectives Site Objectives Individual Objectives Purpose & Values Strategic Vision Cascade Power of processPower of process STAGES OF POLICY DEPLOYMENT
  • 12. 12 CORPORATE STRATEGY DIVISIONAL STRATEGY COMPANY/ PLANT STRATEGIC PLAN THE BIG PICTURE; STRATEGIC FIT & ALIGNMENT Function / Departmental Objectives Individual s Objectives
  • 13. 13 …SO, WHAT IS THE DIFFERENCE BETWEEN BEING “INVOLVED” AND BEING “COMMITTED”? Well think of a nice breakfast of Eggs and Bacon THE CHICKEN IS INVOLVED, BUT THE PIG IS COMMITTED!
  • 14. 14 THE MOST ADMIRED COMPANIES; What do they do? How do they do it? What do they measure?
  • 15. 15 Requirements Criteria (examples) Improvement Measure Current Group Perform. 2013 2014 2015 Best in Class Measures Where we need to be in 2016 Safety and Environment Quality Cost Market Share Profit Cost On Time Delivery Working Capital Innovation Management and Organization etc. etc. LONG TERM PLAN WALLCHART
  • 16. 16 Criteria “Measures that matter” Improvement Measure Current Group performance Reqt. in 2013 Gap Statement Safety & Environment LTIFR 2 1.5 The i care programme must be implemented across all sites by end 2012. We must eliminate all accidents on the front line and back offices. The root causes of muscular stress need to be determined Internal auditing 5 issues 2 issues We should strive to obtain ISO 18001 in year 1. We should record all scrap and disposal bin details Green house gas emissions 3.2 2.9 Evaluate alternative fuels PIN 5 2 Dust controls required Quality Process ppm 10,000 Cost $ per c.m. $ 5 $ 4 We must improve process efficiency through value stream mapping. 20% reduction is required. We must negotiate better terms of payment with suppliers. Cash Generation $750k $1.5m We must reduce our w.i.p by implementing a pull system, getting better ontrol of suppliers and forecasting capability. Delivery DIFOT 78% 95% We must achieve significant improvement in supplier performance in support of our requirements for delivery and cost Lead Time 9 hrs 2 hrs We must improve our systems to reduce throughput times. Lead times should be halved in 12 months. Development Management Forecast accuracy +/_ 20% +/_ 5% We must implement a Sales and Operations planning process and reduce product complexity. DEVELOPING GAP STATEMENTS ; An example When determining the Gap statements consider; What is the gap; what are we trying to improve? What is preventing us from meeting our target? What are the root causes in order of importance?
  • 17. 17 COMPANY OBJECTIVES FEEDBACK FROM CUSTOMERS STRATEGIC ISSUES FROM LONG TERM VISION MANAGEMENT FEEDBACK CARRIED OVER OBJECTIVES FEEDBACK FROM THE WORKFORCE BUDGETARY & BUSINESS PLAN REQ’TS DIVISIONAL/ PLANT OBJECTIVES SPECIFIC PROJECT ALIGNMENT OUTSTANDING FUNCTIONAL OBJECTIVES RESOURCE ALLOCATION FUNCTIONAL ISSUES FUNCTIONAL/ DEPART- MENTAL OBJECTIVES PROJECT ALIGNMENT RESOURCE ALLOCATION & DEPARTMENTAL ISSUES INDIVIDUAL OBJECTIVES INDIVIDUAL NEEDS INDIVIDUAL & DEPARTMENTAL ISSUES ESTABLISHING COMPANY OBJECTIVES - REFERENCES
  • 18. 18 The only daft questions are the ones that don’t get asked! • Are we facing reality? • What are the critical issues facing the business? • Do we understand what our customers really want? (internal and external) • We need to double our stock-turns. How can it be improved? What help do you want? • Do we have the best suppliers? Do we have too many suppliers? How do we improve them? • Do we have the best people? Are they suitably rewarded? • Do you understand the Plant objectives and what are you working on to help achieve them? • What keeps you awake at night? (work related of course) • If you had 3 wishes what would they be? • If you travel at the speed of light, do your headlights work? • How do you know when you are out of invisible ink? “CATCHBALL” DISCUSSIONS UP AND DOWN THE ORGANISATION EXAMPLES “Outstanding Leaders know how to ask questions – the right questions”
  • 20. 20 1. WORK SAFELY Strive to create a harm free work place and business environment which is best in class 2. ACHIEVE OUR BUDGET Meet or exceed financial and efficiency improvement targets 3. GROW THE BUSINESS Be recognised by our customers as a “World Class” service provider 4. DEVELOP OUR PEOPLE Plan and execute a Training and Development program to create customer focused leaders and develop a skill base which will constantly improve our business 5. CONTINUOUSLY IMPROVE Become an agile and lean organisation, built upon a foundation of continuous improvement that is recognised as “Best in Class” COMPANY / PLANT OBJECTIVES – AN EXAMPLE
  • 21. 21 THE OBJECTIVES MUST BE “SMART” Specific Measurable Agreed/Achievable Realistic Time related TESTING THE OBJECTIVES
  • 22. 22 DETERMINING THE TOP LEVEL COMPANY TARGETS (THE DASHBOARD ON THE BRIDGE) Profitability Safety/Envir. People Customers InnovationOperations HMAS COMPANY X Sales
  • 23. 23  For each objective consider how it could be achieved  What actions can we take to achieve them? These are the potential projects to be considered  We identify the projects required to achieve each objective and list them.  We then prioritise them using the “seriousness, urgency and growth” analysis process  Then we consider the improvement that each project will make and set quantifiable targets and completion dates. PROJECT SELECTION
  • 24. 24 When determining the Projects ask; 1. What are we trying to improve? 2. What is preventing us from meeting our target? 3. What are the causes in order of importance? 4. What actions will address the most important causes? PROJECT SELECTION Cont.
  • 25. 25 POLCY DEPLOYMENT MATRIX PLANT XXX COMPILED BY; THE MANAGEMENT TEAM THE POLICY DEPLOYMENT MATRIX EXPLAINED .
  • 28. 28 POLCY DEPLOYMENT MATRIX PLANT XXX COMPILED BY; THE MANAGEMENT TEAM THE MATRIX EXPLAINED cont.
  • 29. 29 COMPLETING THE MATRIX Next:  Decide who, from the senior team, will lead each project, who will support as a cross functional team member, and who will facilitate it  Work your way round the matrix completing the boxes to show the alignment of the Company objectives ( LH envelope) to the Improvement targets (bottom envelope) and the Company projects, (top envelope) to the project metrics (RH envelope)  The first cut of the PD matrix can now be completed. Hint! An important part of policy deployment is growing strong deployment leaders who help develop trust and collaboration between functions necessary to acknowledge and address deeply rooted problems.
  • 30. 30 30 Departmental Objectives Personal Objectives (held by employee) Company Policy Deployment Matrix Divisional/ Functional/plant Deployment Matrix A POLICY DEPLOYMENT MATRIX EXAMPLE
  • 31. 31 A CASE STUDY; BORAL LTD
  • 32. 32 MONITORING PROGRESS & ACOUNTABILITY
  • 33. 33 Now the entire team can see the complete landscape and not just the next mountain. In the time allowed I have only been able to provide an overview of the process. There are many related issues including hints and tips regarding such questions as; • How best to manage projects using A3s. • How to deal with non committed bosses. • How to conduct follow up reviews and at what frequency. • What if the process does not start at the very top? I will be covering these and more in the workshop discussion session later. In summary let me say this is a process, not an event. The key is to develop commitment through involvement whilst giving people the freedom to make decisions, but within a framework of a “box”, or “Russian Doll”, aligned to the top level strategy, focused on the important few projects whilst having the courage to deselect or defer the less critical. CONCLUDING COMMENTS
  • 34. 34 THE END THANK YOU FOR LISTENING.