Clay Bricks Production Line of 100,000. Pcs/day
(Tunnel kiln and dryer of 108*3.7 meters)
Size of solid brick: 10x5x3 inches (254x127x76 mm)
A. Clay brick plan data:
1. Plant area: More than 13200 m2
(the length is more than 130 meters, and the width is more than 100
meters. We can made design based on your actual area);
2. Office area: 240 m2
.
3. Construction area: 4300 m2
;
4. Raw materials area: 1200 m2
;
5. Finished bricks area: 4000 m2
;
6. Raw materials consumption: 300 m3
/day;
7. Workers needed: 20 workers per shift;
B. Tunnel kiln technical data:
1. Tunnel kiln length: 108 meters;
2. Tunnel kiln width: 3.7 meters;
3. Inside Height: 1.56 meters;
4. Kiln car size: 3.6×3.8×0.87 meter;
5. Bricks setting layers in the kiln car: 13 layers
6. Brick setting quantity in the kiln car: 5208 standard bricks (230*115*53 mm);
7. Kiln car quantity in the tunnel kiln: 30;
8. Bricks drying time: 20 hours;
9. Bricks firing time: 42 hours;
10. Firing temperature: 950-1100 ℃;
11. Moisture of green brick: 16-18%;
12. Moisture of bricks after drying: ≤6%;
13. Finished firing bricks ratio: ≥95%;
14. Working time per year: 300 days;
C. Clay bricks producing equipments:
No. Item Power,
KW
Price, USD
FOB
Qingdao
Quantity Sub-total
value
Note
C01 Box feeder, 3.5
meter
7.5 7960 1 7960
China Bangla Engineers & Consultants Ltd.
Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com
Uttara, Dhaka 1230
C02 PG800×600 roller
crusher
37 15870 1 15870
C03 SJ3500×36 double
shaft mixer
45 12870 1 12870
C04 TDS 60 Conveyor 21 210 45
meters
9450
C05 JKY50 / 50-4.0
clay bricks
extruder
(including
vacuum pump and
air compressor)
250 98700 1 98700
C06 Cutter and logo
press
10 25800 1 25800
C07 Automatic bricks
setting machine
(can be deleted,
and operated by
manual)
22 129000 1 129000
C10 Control cabinet 1900 4 7600
C11 Waring parts for
one year
11000
Total value 318,250
China Bangla Engineers & Consultants Ltd.
Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com
Uttara, Dhaka 1230
D. Tunnel kiln (108*3.7 meters, one tunnel kiln and one dryer)
Item Name Quantity Unit price Sub-total Note
D1 Clay brick
(10x5x3 inches,
(254x127x76
mm)
0.7 million Supplied by the client
D2 Cement 420 MT Supplied by the client
D3 Sand 1300 m3 Supplied by the client
D4 Stone 70 m3 Supplied by the client
D5 Wood 4 m3 Supplied by the client
D6 Kiln Car 150 sets 2250 USD 337500
D7 Ferry car 3 12700 38100
D8 Pusher 2 9700 19400
D9 Ground vehicle 5 6500 32500
D10 Wind blower
(Y473-20D)
1 29350 29350
D11 Moisture
removing blower
2 1800 3600
D12 Hydraulic
stepping pusher
1 11000 11000
D13 Refractory bricks 260 MT 210 54600
D14 Refractory clay 60 MT 210 12600
D15 Steel I-beam
(20#)
0.7 MT 920 644
D16 U shape screw 1800 sets 7.0 12600
D17 Rail (18 KG) 23 MT 920 21160
D18 Other steel 8 MT 920 7360
D19 Cement slab for
dryer
440 pcs 35 15400
China Bangla Engineers & Consultants Ltd.
Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com
Uttara, Dhaka 1230
D20 Cement slab for
tunnel kiln
80 pcs 42 3360
D21 Cement slab for
gas flue
460 meters 12 5520
D22 Ceramic fiber
blanket, High
alumina fiber
blanket
28 MT 1760 49280
D23 Anchor 3660 pcs 4.5 16470
D24 U shape nails 2000 pcs 0.45 900
D25 Clip 2000 pcs 0.45 900
D26 High-strength
hardener
500 KG 4.5 2250
D27 High-strength
sealing plate
4480 KG 1.9 8512
D28 Steel I-beam
(12#), angle
steel, steel plate
26.5 MT 920 24380
D29 Steel rebar 480 pcs 12 5760
D30 Fire controller 130 sets 16 2080
D31 Air brake 30 sets 140 4200
D32 Air controller 40 sets 120 4800
D33 De-sulfur system 45700 45700 Can be deleted based on
clients’s choice.
D34 Tunnel kiln
control system
41800 41800 Can be deleted, and operated by
manual
D35 Complete set of
air conducts
16800 16800
D36 Concrete floor
and shed
4680 m2 Including raw materials storage
shad, 600 m2; Wet bricks storage
shad, 18*60=1080m2;
Producing equipments workshop
(15*40=600 m2); Tunnel kiln and
bricks unloading shad,
20*120=2400 m2.
Total value for
tunnel kiln
828526
Total value for
clay bricks
producing
318250
China Bangla Engineers & Consultants Ltd.
Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com
Uttara, Dhaka 1230
equipments
Design cost 65,600.
a Total FOB
Qingdao value
1212376
b Sea freight cost
to Chittagong
65,000.
c Total CFR value
(a+b)
1277376
d Instruction for
the installation,
commissioning,
operators
training and trial
operation cost
61,500. Completed the project
construction within 150 days, and
make trial operation and workers
training for 30 days.
Total value 1338876 USD CFR Chittagong
Note:
1. The final equipments list can be make adjusted based on the client’s brick plant raw materials,
producing capacity, automatic degree, etc.
2. The buyer bear all the cost after goods reaching Chittagong, including customs clearing and
transportation to the buyer’s plant, etc.
3. The buyer bear the cost of related construction materials, including clay brick, sand, cement, stone,
wood, etc.
E. Clay bricks producing process:
China Bangla Engineers & Consultants Ltd.
Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com
Uttara, Dhaka 1230
F. Clay brick plant drawing with tunnel kiln and dryer
China Bangla Engineers & Consultants Ltd.
Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com
Uttara, Dhaka 1230

Más contenido relacionado

La actualidad más candente

Autoclaved aerated concrete blocks plant
Autoclaved aerated concrete blocks plantAutoclaved aerated concrete blocks plant
Autoclaved aerated concrete blocks plantEvita Lee
 
Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction  Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction Bethany Fan
 
Fly ash brick industry deepak tijare
Fly ash brick industry deepak tijareFly ash brick industry deepak tijare
Fly ash brick industry deepak tijareANIKET KULKARNI
 
Break even-point
Break even-point Break even-point
Break even-point Aditi Gadia
 
Dry separation
Dry separationDry separation
Dry separationEvita Lee
 
Jinyun machinery catalogues
Jinyun machinery cataloguesJinyun machinery catalogues
Jinyun machinery cataloguesjiang12707070
 
Proposal of Fiberglass wagon movable roofs
Proposal of Fiberglass wagon movable roofsProposal of Fiberglass wagon movable roofs
Proposal of Fiberglass wagon movable roofsFarhan Ali
 
Design of automatic wall plastering machine
Design of automatic wall plastering machineDesign of automatic wall plastering machine
Design of automatic wall plastering machineLaukik Raut
 
600 rotary dryer
600 rotary dryer600 rotary dryer
600 rotary dryerEvita Lee
 
4.5 tph wood chips
4.5 tph wood chips4.5 tph wood chips
4.5 tph wood chipsEvita Lee
 
Presentation slide of act 333 final
Presentation slide of act 333 finalPresentation slide of act 333 final
Presentation slide of act 333 finalWilliam Banarjee
 
Using Diamond Tools for Floor Work
Using Diamond Tools for Floor WorkUsing Diamond Tools for Floor Work
Using Diamond Tools for Floor Workmarcpoirier57
 

La actualidad más candente (19)

Autoclaved aerated concrete blocks plant
Autoclaved aerated concrete blocks plantAutoclaved aerated concrete blocks plant
Autoclaved aerated concrete blocks plant
 
Cost accounting
Cost accounting Cost accounting
Cost accounting
 
LinkedIn-JHS
LinkedIn-JHSLinkedIn-JHS
LinkedIn-JHS
 
Qtj4 26 c block machine quotation cbecl
Qtj4 26 c block machine quotation cbeclQtj4 26 c block machine quotation cbecl
Qtj4 26 c block machine quotation cbecl
 
Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction  Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction
 
Qtj4 25 c block machine quotation-cbecl
Qtj4 25 c block machine quotation-cbeclQtj4 25 c block machine quotation-cbecl
Qtj4 25 c block machine quotation-cbecl
 
Introduction
IntroductionIntroduction
Introduction
 
Fly ash brick industry deepak tijare
Fly ash brick industry deepak tijareFly ash brick industry deepak tijare
Fly ash brick industry deepak tijare
 
Break even-point
Break even-point Break even-point
Break even-point
 
Dry separation
Dry separationDry separation
Dry separation
 
Jinyun machinery catalogues
Jinyun machinery cataloguesJinyun machinery catalogues
Jinyun machinery catalogues
 
Proposal of Fiberglass wagon movable roofs
Proposal of Fiberglass wagon movable roofsProposal of Fiberglass wagon movable roofs
Proposal of Fiberglass wagon movable roofs
 
Design of automatic wall plastering machine
Design of automatic wall plastering machineDesign of automatic wall plastering machine
Design of automatic wall plastering machine
 
600 rotary dryer
600 rotary dryer600 rotary dryer
600 rotary dryer
 
4.5 tph wood chips
4.5 tph wood chips4.5 tph wood chips
4.5 tph wood chips
 
Alfa Peb Ltd
Alfa Peb Ltd Alfa Peb Ltd
Alfa Peb Ltd
 
Cost accounting project
Cost accounting projectCost accounting project
Cost accounting project
 
Presentation slide of act 333 final
Presentation slide of act 333 finalPresentation slide of act 333 final
Presentation slide of act 333 final
 
Using Diamond Tools for Floor Work
Using Diamond Tools for Floor WorkUsing Diamond Tools for Floor Work
Using Diamond Tools for Floor Work
 

Similar a Cbecl tunnel kiln and dryer auto brick machinery-100000pcs

Environment friendly building_material_technologies_for_low_cost_housing
Environment friendly building_material_technologies_for_low_cost_housingEnvironment friendly building_material_technologies_for_low_cost_housing
Environment friendly building_material_technologies_for_low_cost_housingkunal singh
 
Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine Ammy Cheng
 
50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYI
50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYI50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYI
50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYIJimmy Ma
 
150 tpd rice bran producing line cbecl
150 tpd rice bran producing line cbecl150 tpd rice bran producing line cbecl
150 tpd rice bran producing line cbeclLucky Meme
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary ReportNatalie Reid
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Fence BOQ with Materials.pdf
Fence BOQ with Materials.pdfFence BOQ with Materials.pdf
Fence BOQ with Materials.pdfMutha Morgan
 
Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...IRJET Journal
 
92795289 building-data
92795289 building-data92795289 building-data
92795289 building-dataimaduddin91
 
Introduction of terrazzo tile machine from SD Group
Introduction of terrazzo tile machine from SD GroupIntroduction of terrazzo tile machine from SD Group
Introduction of terrazzo tile machine from SD GroupMichael Zhang
 
Silica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingSilica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingLiGary3
 
Hqty3 25 price list block making machine cbecl
Hqty3 25 price list block making machine cbeclHqty3 25 price list block making machine cbecl
Hqty3 25 price list block making machine cbeclAlibaba Construction Ltd.
 
Road work construction proxy(1)
Road work   construction proxy(1)Road work   construction proxy(1)
Road work construction proxy(1)FeteneBefekadu
 
Buddha international circuit material
Buddha international circuit materialBuddha international circuit material
Buddha international circuit materialUtkarsh Rastogi
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
Clay production line
Clay production lineClay production line
Clay production lineGary Li
 

Similar a Cbecl tunnel kiln and dryer auto brick machinery-100000pcs (20)

Environment friendly building_material_technologies_for_low_cost_housing
Environment friendly building_material_technologies_for_low_cost_housingEnvironment friendly building_material_technologies_for_low_cost_housing
Environment friendly building_material_technologies_for_low_cost_housing
 
Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine
 
50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYI
50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYI50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYI
50,000 m3 AAC Line Technical Introduction of Zhengzhou DEYI
 
150 tpd rice bran producing line cbecl
150 tpd rice bran producing line cbecl150 tpd rice bran producing line cbecl
150 tpd rice bran producing line cbecl
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Fence BOQ with Materials.pdf
Fence BOQ with Materials.pdfFence BOQ with Materials.pdf
Fence BOQ with Materials.pdf
 
FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12
 
Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...
 
92795289 building-data
92795289 building-data92795289 building-data
92795289 building-data
 
Introduction of terrazzo tile machine from SD Group
Introduction of terrazzo tile machine from SD GroupIntroduction of terrazzo tile machine from SD Group
Introduction of terrazzo tile machine from SD Group
 
Silica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingSilica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extracting
 
Hqty3 25 price list block making machine cbecl
Hqty3 25 price list block making machine cbeclHqty3 25 price list block making machine cbecl
Hqty3 25 price list block making machine cbecl
 
Hospital wd
Hospital wdHospital wd
Hospital wd
 
Road work construction proxy(1)
Road work   construction proxy(1)Road work   construction proxy(1)
Road work construction proxy(1)
 
Drawing_ R0.pdf
Drawing_ R0.pdfDrawing_ R0.pdf
Drawing_ R0.pdf
 
Buddha international circuit material
Buddha international circuit materialBuddha international circuit material
Buddha international circuit material
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Clay production line
Clay production lineClay production line
Clay production line
 

Más de Lucky Meme

Mini dal mill Price list
Mini dal mill Price listMini dal mill Price list
Mini dal mill Price listLucky Meme
 
Feed mills quotation 3 t cbecl
Feed mills quotation 3 t cbeclFeed mills quotation 3 t cbecl
Feed mills quotation 3 t cbeclLucky Meme
 
140tpd steel frame wheat flour mill plant cbecl
140tpd steel frame wheat flour mill plant cbecl140tpd steel frame wheat flour mill plant cbecl
140tpd steel frame wheat flour mill plant cbeclLucky Meme
 
120tpd steel frame wheat flour mill plant cbecl
120tpd steel frame wheat flour mill plant cbecl120tpd steel frame wheat flour mill plant cbecl
120tpd steel frame wheat flour mill plant cbeclLucky Meme
 
85tpd steel frame wheat flour mill plant cbecl
85tpd steel frame wheat flour mill plant cbecl85tpd steel frame wheat flour mill plant cbecl
85tpd steel frame wheat flour mill plant cbeclLucky Meme
 
Company profile cbecl
Company profile cbeclCompany profile cbecl
Company profile cbeclLucky Meme
 
Company registration cost
Company registration costCompany registration cost
Company registration costLucky Meme
 
Quation of rice bran oil plant cbecl huatai
Quation of rice bran oil plant cbecl huataiQuation of rice bran oil plant cbecl huatai
Quation of rice bran oil plant cbecl huataiLucky Meme
 
Mini rice mill plant cbecl
Mini rice mill plant cbeclMini rice mill plant cbecl
Mini rice mill plant cbeclLucky Meme
 
Auto bricks making equpments and process
Auto bricks making equpments and processAuto bricks making equpments and process
Auto bricks making equpments and processLucky Meme
 
Cbecl acme 120 tpd parboiled rice mill plant
Cbecl acme 120 tpd parboiled rice mill plantCbecl acme 120 tpd parboiled rice mill plant
Cbecl acme 120 tpd parboiled rice mill plantLucky Meme
 
Cbecl acme 50 tpd parboiled rice mill plant
Cbecl acme 50 tpd parboiled rice mill plantCbecl acme 50 tpd parboiled rice mill plant
Cbecl acme 50 tpd parboiled rice mill plantLucky Meme
 
Block making machine catalogue CBECL
Block making machine catalogue CBECLBlock making machine catalogue CBECL
Block making machine catalogue CBECLLucky Meme
 
Permanent prayer times, Dhaka, Bangladesh
Permanent prayer times, Dhaka, BangladeshPermanent prayer times, Dhaka, Bangladesh
Permanent prayer times, Dhaka, BangladeshLucky Meme
 

Más de Lucky Meme (15)

Mini dal mill Price list
Mini dal mill Price listMini dal mill Price list
Mini dal mill Price list
 
Feed mills quotation 3 t cbecl
Feed mills quotation 3 t cbeclFeed mills quotation 3 t cbecl
Feed mills quotation 3 t cbecl
 
140tpd steel frame wheat flour mill plant cbecl
140tpd steel frame wheat flour mill plant cbecl140tpd steel frame wheat flour mill plant cbecl
140tpd steel frame wheat flour mill plant cbecl
 
120tpd steel frame wheat flour mill plant cbecl
120tpd steel frame wheat flour mill plant cbecl120tpd steel frame wheat flour mill plant cbecl
120tpd steel frame wheat flour mill plant cbecl
 
85tpd steel frame wheat flour mill plant cbecl
85tpd steel frame wheat flour mill plant cbecl85tpd steel frame wheat flour mill plant cbecl
85tpd steel frame wheat flour mill plant cbecl
 
CBECL
CBECLCBECL
CBECL
 
Company profile cbecl
Company profile cbeclCompany profile cbecl
Company profile cbecl
 
Company registration cost
Company registration costCompany registration cost
Company registration cost
 
Quation of rice bran oil plant cbecl huatai
Quation of rice bran oil plant cbecl huataiQuation of rice bran oil plant cbecl huatai
Quation of rice bran oil plant cbecl huatai
 
Mini rice mill plant cbecl
Mini rice mill plant cbeclMini rice mill plant cbecl
Mini rice mill plant cbecl
 
Auto bricks making equpments and process
Auto bricks making equpments and processAuto bricks making equpments and process
Auto bricks making equpments and process
 
Cbecl acme 120 tpd parboiled rice mill plant
Cbecl acme 120 tpd parboiled rice mill plantCbecl acme 120 tpd parboiled rice mill plant
Cbecl acme 120 tpd parboiled rice mill plant
 
Cbecl acme 50 tpd parboiled rice mill plant
Cbecl acme 50 tpd parboiled rice mill plantCbecl acme 50 tpd parboiled rice mill plant
Cbecl acme 50 tpd parboiled rice mill plant
 
Block making machine catalogue CBECL
Block making machine catalogue CBECLBlock making machine catalogue CBECL
Block making machine catalogue CBECL
 
Permanent prayer times, Dhaka, Bangladesh
Permanent prayer times, Dhaka, BangladeshPermanent prayer times, Dhaka, Bangladesh
Permanent prayer times, Dhaka, Bangladesh
 

Último

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 

Último (20)

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Cbecl tunnel kiln and dryer auto brick machinery-100000pcs

  • 1. China Bangla Engineers & Consultants Ltd. Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com Uttara, Dhaka 1230 Clay Bricks Production Line of 100,000. Pcs/day (Tunnel kiln and dryer of 108*3.7 meters) Size of solid brick: 10x5x3 inches (254x127x76 mm) A. Clay brick plan data: 1. Plant area: More than 13200 m2 (the length is more than 130 meters, and the width is more than 100 meters. We can made design based on your actual area); 2. Office area: 240 m2 . 3. Construction area: 4300 m2 ; 4. Raw materials area: 1200 m2 ; 5. Finished bricks area: 4000 m2 ; 6. Raw materials consumption: 300 m3 /day; 7. Workers needed: 20 workers per shift; B. Tunnel kiln technical data: 1. Tunnel kiln length: 108 meters; 2. Tunnel kiln width: 3.7 meters; 3. Inside Height: 1.56 meters; 4. Kiln car size: 3.6×3.8×0.87 meter; 5. Bricks setting layers in the kiln car: 13 layers 6. Brick setting quantity in the kiln car: 5208 standard bricks (230*115*53 mm); 7. Kiln car quantity in the tunnel kiln: 30; 8. Bricks drying time: 20 hours; 9. Bricks firing time: 42 hours; 10. Firing temperature: 950-1100 ℃; 11. Moisture of green brick: 16-18%; 12. Moisture of bricks after drying: ≤6%; 13. Finished firing bricks ratio: ≥95%; 14. Working time per year: 300 days; C. Clay bricks producing equipments: No. Item Power, KW Price, USD FOB Qingdao Quantity Sub-total value Note C01 Box feeder, 3.5 meter 7.5 7960 1 7960
  • 2. China Bangla Engineers & Consultants Ltd. Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com Uttara, Dhaka 1230 C02 PG800×600 roller crusher 37 15870 1 15870 C03 SJ3500×36 double shaft mixer 45 12870 1 12870 C04 TDS 60 Conveyor 21 210 45 meters 9450 C05 JKY50 / 50-4.0 clay bricks extruder (including vacuum pump and air compressor) 250 98700 1 98700 C06 Cutter and logo press 10 25800 1 25800 C07 Automatic bricks setting machine (can be deleted, and operated by manual) 22 129000 1 129000 C10 Control cabinet 1900 4 7600 C11 Waring parts for one year 11000 Total value 318,250
  • 3. China Bangla Engineers & Consultants Ltd. Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com Uttara, Dhaka 1230 D. Tunnel kiln (108*3.7 meters, one tunnel kiln and one dryer) Item Name Quantity Unit price Sub-total Note D1 Clay brick (10x5x3 inches, (254x127x76 mm) 0.7 million Supplied by the client D2 Cement 420 MT Supplied by the client D3 Sand 1300 m3 Supplied by the client D4 Stone 70 m3 Supplied by the client D5 Wood 4 m3 Supplied by the client D6 Kiln Car 150 sets 2250 USD 337500 D7 Ferry car 3 12700 38100 D8 Pusher 2 9700 19400 D9 Ground vehicle 5 6500 32500 D10 Wind blower (Y473-20D) 1 29350 29350 D11 Moisture removing blower 2 1800 3600 D12 Hydraulic stepping pusher 1 11000 11000 D13 Refractory bricks 260 MT 210 54600 D14 Refractory clay 60 MT 210 12600 D15 Steel I-beam (20#) 0.7 MT 920 644 D16 U shape screw 1800 sets 7.0 12600 D17 Rail (18 KG) 23 MT 920 21160 D18 Other steel 8 MT 920 7360 D19 Cement slab for dryer 440 pcs 35 15400
  • 4. China Bangla Engineers & Consultants Ltd. Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com Uttara, Dhaka 1230 D20 Cement slab for tunnel kiln 80 pcs 42 3360 D21 Cement slab for gas flue 460 meters 12 5520 D22 Ceramic fiber blanket, High alumina fiber blanket 28 MT 1760 49280 D23 Anchor 3660 pcs 4.5 16470 D24 U shape nails 2000 pcs 0.45 900 D25 Clip 2000 pcs 0.45 900 D26 High-strength hardener 500 KG 4.5 2250 D27 High-strength sealing plate 4480 KG 1.9 8512 D28 Steel I-beam (12#), angle steel, steel plate 26.5 MT 920 24380 D29 Steel rebar 480 pcs 12 5760 D30 Fire controller 130 sets 16 2080 D31 Air brake 30 sets 140 4200 D32 Air controller 40 sets 120 4800 D33 De-sulfur system 45700 45700 Can be deleted based on clients’s choice. D34 Tunnel kiln control system 41800 41800 Can be deleted, and operated by manual D35 Complete set of air conducts 16800 16800 D36 Concrete floor and shed 4680 m2 Including raw materials storage shad, 600 m2; Wet bricks storage shad, 18*60=1080m2; Producing equipments workshop (15*40=600 m2); Tunnel kiln and bricks unloading shad, 20*120=2400 m2. Total value for tunnel kiln 828526 Total value for clay bricks producing 318250
  • 5. China Bangla Engineers & Consultants Ltd. Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com Uttara, Dhaka 1230 equipments Design cost 65,600. a Total FOB Qingdao value 1212376 b Sea freight cost to Chittagong 65,000. c Total CFR value (a+b) 1277376 d Instruction for the installation, commissioning, operators training and trial operation cost 61,500. Completed the project construction within 150 days, and make trial operation and workers training for 30 days. Total value 1338876 USD CFR Chittagong Note: 1. The final equipments list can be make adjusted based on the client’s brick plant raw materials, producing capacity, automatic degree, etc. 2. The buyer bear all the cost after goods reaching Chittagong, including customs clearing and transportation to the buyer’s plant, etc. 3. The buyer bear the cost of related construction materials, including clay brick, sand, cement, stone, wood, etc. E. Clay bricks producing process:
  • 6. China Bangla Engineers & Consultants Ltd. Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com Uttara, Dhaka 1230 F. Clay brick plant drawing with tunnel kiln and dryer
  • 7. China Bangla Engineers & Consultants Ltd. Phone: +8801716752370, email: cbecl.info@gmail.com Web: www.cbecl.info www.cbecl.com Uttara, Dhaka 1230