Contribute to Setting Out
Tutor Copy
SETTING OUT
For measuring when setting out, builders may use a 30
metre setting out tape.
The tape measure can be either made of fabric or metal.
With constant use and pulling the tape tight a fabric tape
could tend to stretch which could give an incorrect reading.
Wipe all tapes clean after use and to maintain a metal tape,
lightly lubricate it with oil
SETTING OUT A 90 DEGREE
ANGLE (SQUARE)
For ease of construction and to keep building costs to a
minimum the majority of buildings are made up of a collection of
squares and rectangles. Squares and rectangles all have
angles/corners at 90 degrees.
There are several ways to set out or check a right angle on site.
BUILDERS SQUARE
Never presume that the square is accurate. It may have been
made faulty or damaged through use or neglect.
To check a square for accuracy lay it on a flat surface and draw
round the 90 degree end. Totally reverse the square and place it on
the lines you have just drawn. If the square follows the lines, it is
accurate, if it shows different it is faulty.
3:4:5 METHOD
This method is also known as Pythagoras. A triangle having
sides measuring 3m, 4m & 5m, creates a perfect 90 degree
angle, at the corner. By using this method builders are able to
set out a square corner using just a tape measure.
A B
C
3m
5m
90
degrees
4m
SETTING OUT OTHER ANGLES
90 degree angles, and other angles, can also be set out using
optical equipment, such as a Site Square or a Theodolite.
Nowadays it is quite commonplace to use equipment
incorporating a laser beam and setting out buildings can now
be achieved with the use of satellite navigation.
SET OUT A 45° / 135° ANGLE
(FROM POINT A)
EQUIPMENT REQUIRED =
STRAIGHT-EDGE / BUILDERS SQUARE
CHALK OR PENCIL / TAPE MEASURE.
1.EXTEND WALL LINE XA TO B.
2.MEASURE ANY DISTANCE FROM A
(600mm) TO FIND POINT B.
3.DRAW LINE BC AT 90° TO LINE XB (USE
BUILDERS SQUARE OR 3:4:5 METHOD)
4.MEASURE FROM B TO C (600mm) –
same distance as in Step 2.
5.JOIN POINTS A TO C.
6.LINE AC CREATES A 45° ANGLE WITH
LINE BX & ALSO CREATES A 135° AT THE
ANGLE AT CAX
SETTING OUT OTHER ANGLES
C
135° 45°
A
X
B
IN A SQUARE ALL THE
ANGLES ARE 90°.
BY DRAWING A LINE
FROM CORNER TO
CORNER THE ANGLES
HAVE BEEN HALVED.
SET OUT A 60° / 120° ANGLE
(FROM POINT A)
EQUIPMENT REQUIRED =
STRAIGHT-EDGE / CHALK OR PENCIL / TAPE MEASURE / TRAMMEL SET
COMPASS OR LINE
STEP 1
1. EXTEND LINE XA.
USING A COMPASS SET AT ANY DISTANCE ((600mm) OR A PIECE OF LINE
AND CHALK SCRIBE AN ARC TO CREATE POINT B.
STEP 1
1. EXTEND LINE XA.
USING A COMPASS SET AT ANY
DISTANCE ((600mm) OR A PIECE OF
LINE AND CHALK SCRIBE AN ARC TO
CREATE POINT B.
X
A
C
B
STEP 2
PLACE COMPASS POINT ON B, WITH COMPASS SET TO SAME
DISTANCE, AND SCRIBE AN ARC, INTERSECTING THE PREVIOUS
ARC TO CREATE POINT C
X BA
STEP 3
DRAW A LINE FROM A TO C. THIS LINE CREATES A 60° & A 120°
ANGLE TO THE BASE LINE
BY JOINING B TO C CREATES AN EQUILATERAL TRIANGLE. THIS
SHAPE HAS ALL 3 ANGLES EQUAL
TO 60°
120° 60°
BAX
C
THE BUILDING LINE
This is an ‘imaginary’ line, determined by the Local Authority Highways
Department. This line is usually a measurement taken back from a
point on the highway – maybe the centre of the nearest road, the kerb
line of the pavement, or a manhole in the roadway.
Its’ function is for any possible future road widening; therefore to
make sure that any new construction will be far enough back from the
highway. Any infringement of this measurement could result in fines
or legal proceedings to remove any construction in front of this set
measurement.
Contacting the Highways Dept. will position this line. Consider that if
the construction faces more than one roadway, there could be more
than one Building Line measurement required.
ROADWAY
KERB
LINE
MEASURED
BACK FROM
KERB LINE
BUILDING
LINE
No permanent part of the construction may overstep the Building Line. You
may build up to the Building Line, behind it, but NOT INFRONT of it.
THE BUILDING LINE
SETTING OUT A RECTANGULAR
BUILDING
Setting out is required to locate the position of a building on the
ground. The setting out determines the positions of the walls,
which in turn determine where the ground is to be excavated and
the concrete poured, to create the foundation trenches.
EQUIPMENT REQUIRED:-
DRAWING / 30M TAPE / 3M TAPE/ STEEL SETTING
OUT PINS / LUMP HAMMER
STEP 1
AFTER DETERMINING THE
POSITION OF THE BUILDING
LINE, SET OUT USING
STEEL PINS AND BUILDING
LINE TO POSITION THE
FRONTAGE LINE (AB) OF
THE NEW BUILDING
STEP 2
DETERMINE ONE OF THE
FRONT CORNERS (A) AND
SET LINE (AC), SQUARE TO
THE FRONTAGE LINE.
FRONTAGE LINE
C
A
B
D
STEP 3
MEASURE THE LENGTH OF
THE BUILDING ( A – B)
AND ESTABLISH POINT B.
STEP 4
ERECT LINE BD, MAKING
SURE THE ANGLE AT B IS
90 DEGREES.
C
A
CHECKING THE DIAGONALS
STEP 5
MEASURE THE WIDTH OF
THE BUILDING, A-C & B-D.
POSITION A LINE FROM
THESE 2 POINTS TO
COMPLETE THE
RECTANGLE.
D
C
B
A
STEP 6
TAKE A MEASUREMENT
FROM CORNER TO CORNER
(A - D & B - C). WHATEVER
A – D MEASURES THEN
B – C MUST MEASURE THE
SAME. IF BOTH
DIMENSIONS ARE THE SAME
THAT MEANS THAT EACH
CORNER IS PERFECTLY
SQUARE. IF DIMENSIONS
DIFFER THEN THE SETTING
OUT PROCESS MUST BE RE-
CHECKED FOR FAULTS.
STEP 7
AS A FINAL CHECK,
RE-CHECK ALL THE
DIMENSIONS FOR
ACCURACY
DC
BA
The next process is to erect CORNER PROFILES, set back from each corner.
As shown above, timber pegs are driven into the ground and a timber profile board
nailed across.
SETTING
OUT LINE
PROFILE
BOARD SIZE
APPROX.
75mm x 30mm
TIMBER PEGS APPROX.
50mm x 50mm
STEEL
SETTING
OUT PIN
SETTING
OUT LINE
CORNER PROFILES
Because the steel setting out pins will need to be removed for
excavation of the building, each timber corner profile, because it is set
back, can remain in position whilst the building foundations are
removed/excavated.
The setting out lines are extended from the steel setting out pins and the
positions of each line marked onto the profile board. When the
bricklayer begins to set out the external walls he/she can attach the lines
onto the relevant marks, without the need for having to set out the
building again.
THE POSITIONING OF SETTING OUT
PROFILES FOR A TYPICAL BUILDING
The setting out profiles are set back from the building so that they will
not get hit by machinery working on the excavation. If excavation was
to be carried out by hand the profiles could be positioned closer to the
works.
When the foundation concrete has set the original setting out lines are fastened to
the setting out profiles, once again.
The bricklayer now needs to transfer the lines positions onto the concrete
foundation.
This is achieved by carefully plumbing down where the lines travel and marking this
onto the concrete. These marks represent the positions of the walls from above
ground to below ground.
LINES PLUMBED DOWN AND POSITIONS
MARKED ON TO THIN SMEAR OF MORTAR.
BRICKWORK CAN THEN BE SET OUT, BELOW
GROUND LEVEL, IN THE CORRECT POSITION.
LEVELLING
Initially all four corners of a building will have to be built up to the same level.
This is usually firstly achieved for the horizontal damp proof level, which is generally 150 mm, above finished
ground level.
All buildings have a levelling DATUM point. This datum would be shown on the working drawing and it is quite
often the ground floor finished floor level, shown as F.F.L. More often than not this level is usually the same as
the D.P.C. level.
To find the F.F.L. / D.P.C. level of a proposed new building it may be necessary to transfer a level from a datum
elsewhere, possibly a long way away. This would be one of the first tasks to be done on a construction site and a
surveyor would set up the SITE DATUM or TEMPORARY BENCH MARK.
site datum or temporary bench mark is a point
where all levels, either above ground, or below
ground are initially taken from. can be a length
of steel angle iron set firmly into the ground
and surrounded by concrete. to protect the
datum from damage, by plant, it would be
positioned away from activities and
surrounded by a fence.
Symbol relating to a datum point
For greater distances more accurate devices
are required, such as :-
DUMPY LEVEL
QUICK SET LEVEL
TILTING LEVEL (AUTOMATIC)
THEODOLITE
LASER LEVEL

Más contenido relacionado

La actualidad más candente

Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequenceRanjith Kumar
 
Slipform construction
Slipform constructionSlipform construction
Slipform constructiontivar rose
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveyingMujeeb Muji
 
Jointing & Pointing Brick & Blockwork
Jointing & Pointing Brick & BlockworkJointing & Pointing Brick & Blockwork
Jointing & Pointing Brick & BlockworkSteve Jarvis
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - LevellingKai Yun Pang
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignmentSze Ting Kuek
 
Building construction layout
Building construction layoutBuilding construction layout
Building construction layoutAliRaza1767
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structuressanjanam9
 
Contour lines - Survey & Levelling
Contour lines - Survey & LevellingContour lines - Survey & Levelling
Contour lines - Survey & LevellingAr. Avitesh
 
Building Construction Details
Building Construction DetailsBuilding Construction Details
Building Construction Detailscocongkening
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of buildingARUN KUMAR
 
HOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATES
HOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATESHOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATES
HOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATESSANJEEV Wazir
 
BUILDING LAYOUT ppt Ravi.pptx
BUILDING LAYOUT ppt Ravi.pptxBUILDING LAYOUT ppt Ravi.pptx
BUILDING LAYOUT ppt Ravi.pptxRavi Shastri
 
SITEWORKS & SETTING OUT
SITEWORKS & SETTING OUT SITEWORKS & SETTING OUT
SITEWORKS & SETTING OUT Saurav Shrestha
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 

La actualidad más candente (20)

Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
Jointing & Pointing Brick & Blockwork
Jointing & Pointing Brick & BlockworkJointing & Pointing Brick & Blockwork
Jointing & Pointing Brick & Blockwork
 
Levelling
LevellingLevelling
Levelling
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
 
Building construction layout
Building construction layoutBuilding construction layout
Building construction layout
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structures
 
Contour lines - Survey & Levelling
Contour lines - Survey & LevellingContour lines - Survey & Levelling
Contour lines - Survey & Levelling
 
Building Construction Details
Building Construction DetailsBuilding Construction Details
Building Construction Details
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
HOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATES
HOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATESHOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATES
HOW TO CALCULATE THE QUANTITY FOR CEMENT,SAND, AND AGGREGATES
 
Formwork
FormworkFormwork
Formwork
 
BUILDING LAYOUT ppt Ravi.pptx
BUILDING LAYOUT ppt Ravi.pptxBUILDING LAYOUT ppt Ravi.pptx
BUILDING LAYOUT ppt Ravi.pptx
 
SITEWORKS & SETTING OUT
SITEWORKS & SETTING OUT SITEWORKS & SETTING OUT
SITEWORKS & SETTING OUT
 
Formwork
FormworkFormwork
Formwork
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 

Destacado

Tutor l1 brick technology
Tutor l1 brick technologyTutor l1 brick technology
Tutor l1 brick technologyLuke D'Arcy
 
setting out & column marking plan-09.02
setting out & column marking plan-09.02setting out & column marking plan-09.02
setting out & column marking plan-09.02goutam mondal
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Construction Survey
Construction SurveyConstruction Survey
Construction Surveyhalmifaizol
 
Tutor l1 cavity wall construction
Tutor l1 cavity wall constructionTutor l1 cavity wall construction
Tutor l1 cavity wall constructionLuke D'Arcy
 
Set Out and Build Masonry Structures
Set Out and Build Masonry StructuresSet Out and Build Masonry Structures
Set Out and Build Masonry StructuresDjCurrie
 
Tutor l1 core 02 knowledge of technical information quantities and communicat...
Tutor l1 core 02 knowledge of technical information quantities and communicat...Tutor l1 core 02 knowledge of technical information quantities and communicat...
Tutor l1 core 02 knowledge of technical information quantities and communicat...Luke D'Arcy
 
Tutor site clearance
Tutor site clearance Tutor site clearance
Tutor site clearance Luke D'Arcy
 
Tutor l1 brickwork bonding
Tutor l1 brickwork bondingTutor l1 brickwork bonding
Tutor l1 brickwork bondingLuke D'Arcy
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
K12 09 survey_konstruksi
K12 09 survey_konstruksiK12 09 survey_konstruksi
K12 09 survey_konstruksiNoeri Nurisra
 
joinery setting out and marking out
joinery setting out and marking outjoinery setting out and marking out
joinery setting out and marking outkevin porter
 
How much courage you have in courage or
How much courage you have in courage orHow much courage you have in courage or
How much courage you have in courage orArindam Pande
 
RAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNAN
RAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNANRAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNAN
RAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNANMOSES HADUN
 

Destacado (20)

Setting out a building
Setting out a buildingSetting out a building
Setting out a building
 
Tutor l1 brick technology
Tutor l1 brick technologyTutor l1 brick technology
Tutor l1 brick technology
 
setting out & column marking plan-09.02
setting out & column marking plan-09.02setting out & column marking plan-09.02
setting out & column marking plan-09.02
 
Surveying
Surveying Surveying
Surveying
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Construction Survey
Construction SurveyConstruction Survey
Construction Survey
 
Tutor l1 cavity wall construction
Tutor l1 cavity wall constructionTutor l1 cavity wall construction
Tutor l1 cavity wall construction
 
Levelling
LevellingLevelling
Levelling
 
Set Out and Build Masonry Structures
Set Out and Build Masonry StructuresSet Out and Build Masonry Structures
Set Out and Build Masonry Structures
 
Tutor l1 core 02 knowledge of technical information quantities and communicat...
Tutor l1 core 02 knowledge of technical information quantities and communicat...Tutor l1 core 02 knowledge of technical information quantities and communicat...
Tutor l1 core 02 knowledge of technical information quantities and communicat...
 
Tutor site clearance
Tutor site clearance Tutor site clearance
Tutor site clearance
 
Tutor l1 brickwork bonding
Tutor l1 brickwork bondingTutor l1 brickwork bonding
Tutor l1 brickwork bonding
 
Construction process
Construction processConstruction process
Construction process
 
K12 09 survey_konstruksi
K12 09 survey_konstruksiK12 09 survey_konstruksi
K12 09 survey_konstruksi
 
joinery setting out and marking out
joinery setting out and marking outjoinery setting out and marking out
joinery setting out and marking out
 
How much courage you have in courage or
How much courage you have in courage orHow much courage you have in courage or
How much courage you have in courage or
 
site preparation
 site preparation site preparation
site preparation
 
Site preparation
Site preparationSite preparation
Site preparation
 
RAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNAN
RAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNANRAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNAN
RAB TAHAP PEKERJAAN PEMBUATAN BANGUNAN DAN UNSUR-UNSUR PEMBANGUNAN
 

Similar a Tutor l1 setting out

S2 8 construction surveys
S2 8 construction surveysS2 8 construction surveys
S2 8 construction surveysEst
 
Plinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protectionPlinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protectionAkshayKamble94
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyRione Drevale
 
Measuring instructions for curved shapes
Measuring instructions for curved shapesMeasuring instructions for curved shapes
Measuring instructions for curved shapesCes Ebuenga Uap
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insituLingWei11
 
procedures-for-mivan-formwork
procedures-for-mivan-formworkprocedures-for-mivan-formwork
procedures-for-mivan-formworkAmrish Tyagi
 
Setting out construction works 01
Setting out construction works 01Setting out construction works 01
Setting out construction works 01Rajesh Rajguru
 
SLK Carpentry 9 Quarter 2
SLK Carpentry 9 Quarter 2SLK Carpentry 9 Quarter 2
SLK Carpentry 9 Quarter 2Nhatz Marticio
 
Integrated project.pptx
Integrated project.pptxIntegrated project.pptx
Integrated project.pptxGabrielBentil1
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURINGANAND JIBHKATE
 
Setting out of bridges unit 6
Setting out of bridges unit 6Setting out of bridges unit 6
Setting out of bridges unit 6SachinGunjal7
 

Similar a Tutor l1 setting out (20)

S2 8 construction surveys
S2 8 construction surveysS2 8 construction surveys
S2 8 construction surveys
 
Bridge survey
Bridge surveyBridge survey
Bridge survey
 
Plinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protectionPlinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protection
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
 
Measuring instructions for curved shapes
Measuring instructions for curved shapesMeasuring instructions for curved shapes
Measuring instructions for curved shapes
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
 
Testing of bored_pile_inclination
Testing of bored_pile_inclinationTesting of bored_pile_inclination
Testing of bored_pile_inclination
 
procedures-for-mivan-formwork
procedures-for-mivan-formworkprocedures-for-mivan-formwork
procedures-for-mivan-formwork
 
Setting out construction works 01
Setting out construction works 01Setting out construction works 01
Setting out construction works 01
 
Testing of bored_pile_inclination
Testing of bored_pile_inclinationTesting of bored_pile_inclination
Testing of bored_pile_inclination
 
Unit 5
Unit 5Unit 5
Unit 5
 
SLK Carpentry 9 Quarter 2
SLK Carpentry 9 Quarter 2SLK Carpentry 9 Quarter 2
SLK Carpentry 9 Quarter 2
 
Integrated project.pptx
Integrated project.pptxIntegrated project.pptx
Integrated project.pptx
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
chain surveying
chain surveyingchain surveying
chain surveying
 
Work check list
Work check listWork check list
Work check list
 
G03-Topografia-de-Obras.pdf
G03-Topografia-de-Obras.pdfG03-Topografia-de-Obras.pdf
G03-Topografia-de-Obras.pdf
 
Camber design
Camber designCamber design
Camber design
 
Setting out of bridges unit 6
Setting out of bridges unit 6Setting out of bridges unit 6
Setting out of bridges unit 6
 

Más de Luke D'Arcy

Tutor types of foundation
Tutor types of foundation Tutor types of foundation
Tutor types of foundation Luke D'Arcy
 
Tutor transferring levels
Tutor transferring levels Tutor transferring levels
Tutor transferring levels Luke D'Arcy
 
Tutor sustainability
Tutor sustainabilityTutor sustainability
Tutor sustainabilityLuke D'Arcy
 
Tutor stability
Tutor stability Tutor stability
Tutor stability Luke D'Arcy
 
Tutor solid ground floors
Tutor solid ground floors Tutor solid ground floors
Tutor solid ground floors Luke D'Arcy
 
Tutor site clearance
Tutor site clearance Tutor site clearance
Tutor site clearance Luke D'Arcy
 
Tutor retaining reinforced brickwork
Tutor retaining reinforced brickwork Tutor retaining reinforced brickwork
Tutor retaining reinforced brickwork Luke D'Arcy
 
Tutor brickwork below ground level
Tutor brickwork below ground level Tutor brickwork below ground level
Tutor brickwork below ground level Luke D'Arcy
 
Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015Luke D'Arcy
 
Health and safety c and g
Health and safety c and gHealth and safety c and g
Health and safety c and gLuke D'Arcy
 
Tutor solid walls c and g level2
Tutor solid walls c and g level2Tutor solid walls c and g level2
Tutor solid walls c and g level2Luke D'Arcy
 
Tutor masonry cladding ppt 2
Tutor masonry cladding ppt 2Tutor masonry cladding ppt 2
Tutor masonry cladding ppt 2Luke D'Arcy
 
Tutor methods of communication ppt2
Tutor methods of communication ppt2Tutor methods of communication ppt2
Tutor methods of communication ppt2Luke D'Arcy
 
Tutor construction administration documents ppt3
Tutor construction administration documents ppt3Tutor construction administration documents ppt3
Tutor construction administration documents ppt3Luke D'Arcy
 
Tutor construction activity documents ppt4
Tutor construction activity documents ppt4Tutor construction activity documents ppt4
Tutor construction activity documents ppt4Luke D'Arcy
 
Tutor communication skills ppt1
Tutor communication skills ppt1Tutor communication skills ppt1
Tutor communication skills ppt1Luke D'Arcy
 
Tutor solid wall and arches
Tutor solid wall and archesTutor solid wall and arches
Tutor solid wall and archesLuke D'Arcy
 
Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Luke D'Arcy
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Luke D'Arcy
 
Tutor cavity insulation .ppt 4
Tutor cavity insulation .ppt 4Tutor cavity insulation .ppt 4
Tutor cavity insulation .ppt 4Luke D'Arcy
 

Más de Luke D'Arcy (20)

Tutor types of foundation
Tutor types of foundation Tutor types of foundation
Tutor types of foundation
 
Tutor transferring levels
Tutor transferring levels Tutor transferring levels
Tutor transferring levels
 
Tutor sustainability
Tutor sustainabilityTutor sustainability
Tutor sustainability
 
Tutor stability
Tutor stability Tutor stability
Tutor stability
 
Tutor solid ground floors
Tutor solid ground floors Tutor solid ground floors
Tutor solid ground floors
 
Tutor site clearance
Tutor site clearance Tutor site clearance
Tutor site clearance
 
Tutor retaining reinforced brickwork
Tutor retaining reinforced brickwork Tutor retaining reinforced brickwork
Tutor retaining reinforced brickwork
 
Tutor brickwork below ground level
Tutor brickwork below ground level Tutor brickwork below ground level
Tutor brickwork below ground level
 
Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015Basic bricklaying skills power point 2015
Basic bricklaying skills power point 2015
 
Health and safety c and g
Health and safety c and gHealth and safety c and g
Health and safety c and g
 
Tutor solid walls c and g level2
Tutor solid walls c and g level2Tutor solid walls c and g level2
Tutor solid walls c and g level2
 
Tutor masonry cladding ppt 2
Tutor masonry cladding ppt 2Tutor masonry cladding ppt 2
Tutor masonry cladding ppt 2
 
Tutor methods of communication ppt2
Tutor methods of communication ppt2Tutor methods of communication ppt2
Tutor methods of communication ppt2
 
Tutor construction administration documents ppt3
Tutor construction administration documents ppt3Tutor construction administration documents ppt3
Tutor construction administration documents ppt3
 
Tutor construction activity documents ppt4
Tutor construction activity documents ppt4Tutor construction activity documents ppt4
Tutor construction activity documents ppt4
 
Tutor communication skills ppt1
Tutor communication skills ppt1Tutor communication skills ppt1
Tutor communication skills ppt1
 
Tutor solid wall and arches
Tutor solid wall and archesTutor solid wall and arches
Tutor solid wall and arches
 
Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2
 
Tutor cavity insulation .ppt 4
Tutor cavity insulation .ppt 4Tutor cavity insulation .ppt 4
Tutor cavity insulation .ppt 4
 

Último

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 

Último (20)

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 

Tutor l1 setting out

  • 3. SETTING OUT For measuring when setting out, builders may use a 30 metre setting out tape. The tape measure can be either made of fabric or metal. With constant use and pulling the tape tight a fabric tape could tend to stretch which could give an incorrect reading. Wipe all tapes clean after use and to maintain a metal tape, lightly lubricate it with oil
  • 4. SETTING OUT A 90 DEGREE ANGLE (SQUARE) For ease of construction and to keep building costs to a minimum the majority of buildings are made up of a collection of squares and rectangles. Squares and rectangles all have angles/corners at 90 degrees. There are several ways to set out or check a right angle on site.
  • 5. BUILDERS SQUARE Never presume that the square is accurate. It may have been made faulty or damaged through use or neglect. To check a square for accuracy lay it on a flat surface and draw round the 90 degree end. Totally reverse the square and place it on the lines you have just drawn. If the square follows the lines, it is accurate, if it shows different it is faulty.
  • 6. 3:4:5 METHOD This method is also known as Pythagoras. A triangle having sides measuring 3m, 4m & 5m, creates a perfect 90 degree angle, at the corner. By using this method builders are able to set out a square corner using just a tape measure. A B C 3m 5m 90 degrees 4m
  • 7. SETTING OUT OTHER ANGLES 90 degree angles, and other angles, can also be set out using optical equipment, such as a Site Square or a Theodolite. Nowadays it is quite commonplace to use equipment incorporating a laser beam and setting out buildings can now be achieved with the use of satellite navigation.
  • 8. SET OUT A 45° / 135° ANGLE (FROM POINT A) EQUIPMENT REQUIRED = STRAIGHT-EDGE / BUILDERS SQUARE CHALK OR PENCIL / TAPE MEASURE. 1.EXTEND WALL LINE XA TO B. 2.MEASURE ANY DISTANCE FROM A (600mm) TO FIND POINT B. 3.DRAW LINE BC AT 90° TO LINE XB (USE BUILDERS SQUARE OR 3:4:5 METHOD) 4.MEASURE FROM B TO C (600mm) – same distance as in Step 2. 5.JOIN POINTS A TO C. 6.LINE AC CREATES A 45° ANGLE WITH LINE BX & ALSO CREATES A 135° AT THE ANGLE AT CAX SETTING OUT OTHER ANGLES C 135° 45° A X B IN A SQUARE ALL THE ANGLES ARE 90°. BY DRAWING A LINE FROM CORNER TO CORNER THE ANGLES HAVE BEEN HALVED.
  • 9. SET OUT A 60° / 120° ANGLE (FROM POINT A) EQUIPMENT REQUIRED = STRAIGHT-EDGE / CHALK OR PENCIL / TAPE MEASURE / TRAMMEL SET COMPASS OR LINE STEP 1 1. EXTEND LINE XA. USING A COMPASS SET AT ANY DISTANCE ((600mm) OR A PIECE OF LINE AND CHALK SCRIBE AN ARC TO CREATE POINT B. STEP 1 1. EXTEND LINE XA. USING A COMPASS SET AT ANY DISTANCE ((600mm) OR A PIECE OF LINE AND CHALK SCRIBE AN ARC TO CREATE POINT B. X A C B
  • 10. STEP 2 PLACE COMPASS POINT ON B, WITH COMPASS SET TO SAME DISTANCE, AND SCRIBE AN ARC, INTERSECTING THE PREVIOUS ARC TO CREATE POINT C X BA
  • 11. STEP 3 DRAW A LINE FROM A TO C. THIS LINE CREATES A 60° & A 120° ANGLE TO THE BASE LINE BY JOINING B TO C CREATES AN EQUILATERAL TRIANGLE. THIS SHAPE HAS ALL 3 ANGLES EQUAL TO 60° 120° 60° BAX C
  • 12. THE BUILDING LINE This is an ‘imaginary’ line, determined by the Local Authority Highways Department. This line is usually a measurement taken back from a point on the highway – maybe the centre of the nearest road, the kerb line of the pavement, or a manhole in the roadway. Its’ function is for any possible future road widening; therefore to make sure that any new construction will be far enough back from the highway. Any infringement of this measurement could result in fines or legal proceedings to remove any construction in front of this set measurement. Contacting the Highways Dept. will position this line. Consider that if the construction faces more than one roadway, there could be more than one Building Line measurement required.
  • 13. ROADWAY KERB LINE MEASURED BACK FROM KERB LINE BUILDING LINE No permanent part of the construction may overstep the Building Line. You may build up to the Building Line, behind it, but NOT INFRONT of it. THE BUILDING LINE
  • 14. SETTING OUT A RECTANGULAR BUILDING Setting out is required to locate the position of a building on the ground. The setting out determines the positions of the walls, which in turn determine where the ground is to be excavated and the concrete poured, to create the foundation trenches. EQUIPMENT REQUIRED:- DRAWING / 30M TAPE / 3M TAPE/ STEEL SETTING OUT PINS / LUMP HAMMER
  • 15. STEP 1 AFTER DETERMINING THE POSITION OF THE BUILDING LINE, SET OUT USING STEEL PINS AND BUILDING LINE TO POSITION THE FRONTAGE LINE (AB) OF THE NEW BUILDING STEP 2 DETERMINE ONE OF THE FRONT CORNERS (A) AND SET LINE (AC), SQUARE TO THE FRONTAGE LINE. FRONTAGE LINE C A B D STEP 3 MEASURE THE LENGTH OF THE BUILDING ( A – B) AND ESTABLISH POINT B. STEP 4 ERECT LINE BD, MAKING SURE THE ANGLE AT B IS 90 DEGREES. C A
  • 16. CHECKING THE DIAGONALS STEP 5 MEASURE THE WIDTH OF THE BUILDING, A-C & B-D. POSITION A LINE FROM THESE 2 POINTS TO COMPLETE THE RECTANGLE. D C B A STEP 6 TAKE A MEASUREMENT FROM CORNER TO CORNER (A - D & B - C). WHATEVER A – D MEASURES THEN B – C MUST MEASURE THE SAME. IF BOTH DIMENSIONS ARE THE SAME THAT MEANS THAT EACH CORNER IS PERFECTLY SQUARE. IF DIMENSIONS DIFFER THEN THE SETTING OUT PROCESS MUST BE RE- CHECKED FOR FAULTS. STEP 7 AS A FINAL CHECK, RE-CHECK ALL THE DIMENSIONS FOR ACCURACY DC BA
  • 17. The next process is to erect CORNER PROFILES, set back from each corner. As shown above, timber pegs are driven into the ground and a timber profile board nailed across. SETTING OUT LINE PROFILE BOARD SIZE APPROX. 75mm x 30mm TIMBER PEGS APPROX. 50mm x 50mm STEEL SETTING OUT PIN SETTING OUT LINE
  • 18. CORNER PROFILES Because the steel setting out pins will need to be removed for excavation of the building, each timber corner profile, because it is set back, can remain in position whilst the building foundations are removed/excavated. The setting out lines are extended from the steel setting out pins and the positions of each line marked onto the profile board. When the bricklayer begins to set out the external walls he/she can attach the lines onto the relevant marks, without the need for having to set out the building again.
  • 19. THE POSITIONING OF SETTING OUT PROFILES FOR A TYPICAL BUILDING The setting out profiles are set back from the building so that they will not get hit by machinery working on the excavation. If excavation was to be carried out by hand the profiles could be positioned closer to the works.
  • 20. When the foundation concrete has set the original setting out lines are fastened to the setting out profiles, once again. The bricklayer now needs to transfer the lines positions onto the concrete foundation. This is achieved by carefully plumbing down where the lines travel and marking this onto the concrete. These marks represent the positions of the walls from above ground to below ground. LINES PLUMBED DOWN AND POSITIONS MARKED ON TO THIN SMEAR OF MORTAR. BRICKWORK CAN THEN BE SET OUT, BELOW GROUND LEVEL, IN THE CORRECT POSITION.
  • 21. LEVELLING Initially all four corners of a building will have to be built up to the same level. This is usually firstly achieved for the horizontal damp proof level, which is generally 150 mm, above finished ground level. All buildings have a levelling DATUM point. This datum would be shown on the working drawing and it is quite often the ground floor finished floor level, shown as F.F.L. More often than not this level is usually the same as the D.P.C. level. To find the F.F.L. / D.P.C. level of a proposed new building it may be necessary to transfer a level from a datum elsewhere, possibly a long way away. This would be one of the first tasks to be done on a construction site and a surveyor would set up the SITE DATUM or TEMPORARY BENCH MARK.
  • 22. site datum or temporary bench mark is a point where all levels, either above ground, or below ground are initially taken from. can be a length of steel angle iron set firmly into the ground and surrounded by concrete. to protect the datum from damage, by plant, it would be positioned away from activities and surrounded by a fence. Symbol relating to a datum point
  • 23. For greater distances more accurate devices are required, such as :- DUMPY LEVEL QUICK SET LEVEL TILTING LEVEL (AUTOMATIC) THEODOLITE LASER LEVEL