Launch of CDE themed call for research proposals "Generic Enablers for Low Size, Weight, Power and Cost ISTAR". Call closes Friday 15 March 2013 at 1700 hrs. For more information visit: http://www.science.mod.uk/events/event_detail.aspx?eventid=199
15. The essentials
Based on a claim of future benefit
Contribution to realisation of future benefit
Logical programme of work
Evidential outcomes
Demonstration of progress towards goal
22. ISTAR Concepts and Solutions
• Five-year research programme
(started July 2011) funded by DST
Programme Office’s C4ISR Domain
• Role is to develop and validate
credible options for future ISTAR
systems at the Enterprise level
– Demonstrate the future art-of-the
possible in ISTAR
– Provide evidence based advice to key
decision makers
– Bringing coherence to ISTAR research
across all environments
• Supporting capability interventions
post 2017
Acronym buster:
UNCLASSIFIED DST – Defence Science and Technology
UNCLASSIFIED
C4ISR – Command, Control, Computers,
Communications, Intelligence,
Surveillance, Reconnaissance.
24. Prime
Approach Strand Leads
Defence SIs
• Major Industry collaboration framework
SMEs
• Further CDE calls
– Tranche 1 – Novel Integrated ISTAR Universities
– Tranche 2 – ISTAR Support to Urban Operations Engine Room Collaboration
Consortium
– Tranche 3 – Generic Enablers for Low-SWAPC ISTAR
– Tranche 4 - ...
• Long term experimentation plan (caveat: subject to change)
– Sep/Oct 2013: Innovation – Urban Operations
– Jan/Feb 2014: ISTAR Support to Urban Operations
– Spring 2014: Maritime sensor integration
– Sep-Nov 2014: Innovation – Low SWAPC
– + Integrated tactical ISTAR supported by multi-functional Air
ISTAR
UNCLASSIFIED
25. New paradigm for ISTAR research
• Live ISTAR experimentation
• Integrated Technology
Concepts
• Wide engagement with
industry
• First part of Enduring
Framework (2012-2016)
• Integration and exploitation across all application areas
• Stakeholder engagement is key element
UNCLASSIFIED
27. Global strategic trends
Four pervasive issues
• Climate change
• Globalisation
• Global inequality
• Innovation
Backdrop
• Instability
• Non-state conflict
• Energy efficiency
• Commercial
technology
Link: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/33717/GST4_v9_Feb10.pdf
Acronym buster:
06 February 2013 UNCLASSIFIEDSIFIED DCDC – Defence Concept
Development Centre
28. Future character of conflict
• Global trends indicate increasing instability and growing opportunity for
confrontation and conflict
• The character of conflict will continue to evolve, in many of our future operations we
are likely to face a range of simultaneous threats and adversaries in an anarchic
and extended operating area. Hybrid threats combining conventional, irregular and
high-end asymmetric threats in the same time and space are likely.
Congested Contested Constrained
Battlespace of 2020
Cluttered
Connected
Link: https://www.gov.uk/government/publications/future-character-of-conflict
UNCLASSIFIEDED
29. ISTAR
Intelligence, Surveillance, Target Acquisition and Reconnaissance
DCPD Direct Collect
Direct,
Collect,
Process,
Disseminate
Disseminate Process
Figure 1: DCPD Cycle
The Intelligence Cycle
Acronym buster:
UNCLASSIFIED DCPD – Direct, Collect,
Process, Disseminate
30. ISTAR
In practice:
• Massive complexity
• Multiple, simultaneous,
complex systems
operating
• Multiple, interrelated and
parallel decision cycles
taking place
Need to maximise:
• Depth and breadth of understanding
• Timeliness, accuracy and flexibility of decision making
UNCLASSIFIED
41. What do we want?
Innovative solutions to ISTAR challenges
• At Technology Readiness Level 3 → 5
• Looking for step-changes in capability rather than incremental
developments
• Demonstration at ICS experiment Sep – Nov 2014
– DEFCON 703 applies to experiment data
Guidance
• 12-18 month duration
• Cost: more likely to fund lower-cost (<£80k) proposals
• Partnership between Industry and academia encouraged
What do we not want?
• Market surveys
• Requirements capture
• 3-year PhDs
Acronym buster:
TRL – Technology Readiness
UNCLASSIFIED Level
42. Key dates
• 5 February 2013 – CDE call launch webinar
• 15 March 2013 – Call closes at 1700
• 3 May 2013 – Target for feedback provided and contract
placement initiated
• Sep – Nov 2014 – Demonstration at ICS experiment
• 30 November 2014 – Project closure