Overview 
• The large investments required to drill for oil 
and gas are made primarily by oil companies. 
• Small oil companies invest mostly in shallow, 
less expensive wells drilled on land. 
• Investments in expensive offshore wells can 
be afforded only by large oil companies.
5 
Overview 
• A well is classified as a wildcat well if its 
purpose is to discover a new petroleum 
reservoir. 
• The development well is to exploit a known 
reservoir. 
• Usually the geological group recommends 
wildcat well location, while the reservoir 
engineering group recommends development 
well location.
6 
Overview 
• The drilling engineering groups make 
preliminary well designs & cost estimates for 
the proposed well. 
• The legal group secures the necessary 
drilling and production rights. 
• Surveyors establish & stake well location. 
• Usually the drilling is done by drilling 
contractor.
Contracting the Well to be Drilled 
• When a contract to drill an oil well is signed, many 
conditions and agreements are included. The 
drilling rig contractor will have agreed to drill a well 
to a specified depth. The conditions for payment are 
included. The contract payment may be based on 
the time on the location, a set sum of money, or by 
the foot. 
• Most wells are contracted by the foot, but the 
contract is likely to make allowances for unforeseen 
problems and non drilling activities, such as time 
spent allowing the casing cement to set. 
7
8 
Wellbore diagram
9 
Types of Casing 
• Conductor Casing 
• Surface Casing 
• Intermediate Casing 
• Production Casing 
• Liners 
• Tubing 
Figure 1: Typical Well Diagram
10 
Conductor Casing 
• A conductor string is a short length of large 
diameter pipe run where the ground is soft. It 
acts as a conduit to return drilling fluid to mud 
pits and prevents "cave in," the sloughing of 
ground around the rig base. It also protects 
shallow water sands. 
• ODs: 16, 18-5/8, 20, 24, 30 and 36 inches. 
• Setting depths: 50 to 250 feet.
11 
Surface Casing 
• Surface casing is the first string of casing 
used after the conductor pipe. It is required in 
some instances by law (to protect ground 
water) and is normally cemented full length. 
• Surface casing supports the BOP stack and 
subsequent casing and tubing strings, and is 
normally the only string designed to carry 
compression loads. 
• ODs: 13-3/8, 16, 18-5/8, 20, and 24 inches. 
• Setting depths: 200 to 5,000 feet.
Intermediate Casing 
• Intermediate casing is any string between the 
surface and production string. Intermediate 
casing may or may not be cemented full 
length. 
• Intermediate casing may be used to seal off 
weaker zones from higher pressure drilling 
fluids required in subsequent drilling. It may 
also protect previous casing strings from 
higher burst pressures, and provide support 
for liner casing. 
• ODs: 4-1/2 to 13-3/8 in. 
• Setting Depths: 2000 - 20,000 ft. 
12
13 
Production Casing 
• The production string is the primary pressure 
containment string It spans the total well 
depth and is not normally cemented full 
length. 
• Allows segregation of producing formations 
and undesirable fluids from contaminating 
production equipment. 
• ODs: 4-1/2, 5, 5-1/2, 7 and 7-5/8 in. 
• Setting Depths: 2000 - 30,000 ft.
Liners 
• Liners are short casing strings run to isolate 
specific formations. As they are normally 
short and relatively deep in the well, burst and 
collapse pressures control the design. 
• Also, it is normal to have only one weight, 
grade and joint type in the string. 
• Liners extend downward from the shoe of the 
previous casing string, and are normally 
cemented full length. Many liners use flush 
joint connections for improved clearances. 
• ODs: 4-1/2 to 9-5/8 in. 
• Setting Depths: 5000 - 20,000 ft. 
14
Tubing 
• Tubing conveys the oil or gas to the surface. 
In some wells dual or triple strings of tubing 
are used to isolate and produce different 
zones. In other circumstances, a dual string 
may be used where one produces and the 
other carries fluid pumped in to kill the well or 
to chemically inhibit the production string. 
• Tubing is usually replaced on a regular basis 
because of the wear caused by producing 
fluids or gases. 
• ODs: 1 to 4-1/2 in. 
• Setting Depths: 1000 - 25,000 ft. 
15
16 
Casing Diagram 
• MWD – after one stand 
drilled. 
• EMS – taken every stand 
while POOH, 
crosschecking MWD 
survey. 
• GSS – used when there 
is magnetic interference 
from casing string / fish. 
• GMS – used when critical 
depth measurement is 
required for perforation, 
testing, etc. 
Figure 2: Casing Diagram
17 
Example of Well Survey 
Figure 3: Well Survey
18 
END

Más contenido relacionado

La actualidad más candente

Well Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsWell Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal Wells
Sohil Shah
 

La actualidad más candente (20)

Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)
 
Drilling fluid
Drilling fluidDrilling fluid
Drilling fluid
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Well completion
Well completionWell completion
Well completion
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineering
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Petroleum well completion overview
Petroleum well completion overviewPetroleum well completion overview
Petroleum well completion overview
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6
 
Well Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsWell Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal Wells
 
Skin Factor and Formation Damage
Skin Factor and Formation DamageSkin Factor and Formation Damage
Skin Factor and Formation Damage
 
Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5
 
Directional drilling Introduction
Directional drilling IntroductionDirectional drilling Introduction
Directional drilling Introduction
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic Fracturing
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Hydraulic fracturing
Hydraulic fracturingHydraulic fracturing
Hydraulic fracturing
 

Destacado

Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
Choong KW
 
Drilling and blasting powerpoint 2003
Drilling and blasting powerpoint 2003Drilling and blasting powerpoint 2003
Drilling and blasting powerpoint 2003
Yogesh Ghule
 

Destacado (20)

Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 
Introduction to drilling
Introduction to drillingIntroduction to drilling
Introduction to drilling
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 
Drilling and blasting powerpoint 2003
Drilling and blasting powerpoint 2003Drilling and blasting powerpoint 2003
Drilling and blasting powerpoint 2003
 
Drilling machines and operations
Drilling machines and operationsDrilling machines and operations
Drilling machines and operations
 
Rig Operations & Equipment
Rig Operations & EquipmentRig Operations & Equipment
Rig Operations & Equipment
 
PRESENTATION ON DRILLING MACHINE
PRESENTATION ON DRILLING MACHINEPRESENTATION ON DRILLING MACHINE
PRESENTATION ON DRILLING MACHINE
 
Drilling in mining
Drilling in miningDrilling in mining
Drilling in mining
 
Functions of drilling rig components Presentation
Functions of drilling rig components PresentationFunctions of drilling rig components Presentation
Functions of drilling rig components Presentation
 
Drilling machines in detail
Drilling machines in detailDrilling machines in detail
Drilling machines in detail
 
Drilling machine
Drilling machineDrilling machine
Drilling machine
 
Drilling equipment
Drilling equipmentDrilling equipment
Drilling equipment
 
Basic drilling engineering
Basic drilling engineeringBasic drilling engineering
Basic drilling engineering
 
Well Planning
Well PlanningWell Planning
Well Planning
 
Letter Format
Letter FormatLetter Format
Letter Format
 
Drilling engineering
Drilling engineeringDrilling engineering
Drilling engineering
 
Basic blasting
Basic  blastingBasic  blasting
Basic blasting
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 
Drilling machine
Drilling machineDrilling machine
Drilling machine
 

Similar a Introduction to Drilling Engineering

Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
odiliagilby
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
Ahmed Radwan
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
Mohamed Elnagar
 

Similar a Introduction to Drilling Engineering (20)

Casing design
Casing designCasing design
Casing design
 
WELL COMPLETIONS.pptx
WELL COMPLETIONS.pptxWELL COMPLETIONS.pptx
WELL COMPLETIONS.pptx
 
Anmol bhargava casing basics
Anmol bhargava   casing basicsAnmol bhargava   casing basics
Anmol bhargava casing basics
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
Casing
CasingCasing
Casing
 
Secondary cementing
Secondary cementingSecondary cementing
Secondary cementing
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Soil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxSoil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptx
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Cementing ii section 3
Cementing ii section 3Cementing ii section 3
Cementing ii section 3
 
Interlocking pavement
Interlocking pavementInterlocking pavement
Interlocking pavement
 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundation
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Cementation
CementationCementation
Cementation
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
 
Drilling imp
Drilling impDrilling imp
Drilling imp
 
Pigging Pipelines.pdf
Pigging Pipelines.pdfPigging Pipelines.pdf
Pigging Pipelines.pdf
 

Más de M.T.H Group

Más de M.T.H Group (20)

Engineering Internship in Yemen.pptx
Engineering Internship in Yemen.pptxEngineering Internship in Yemen.pptx
Engineering Internship in Yemen.pptx
 
License to operate a forklift truck 2
License to operate a forklift truck 2License to operate a forklift truck 2
License to operate a forklift truck 2
 
License to operate a forklift truck 1
License to operate a forklift truck 1License to operate a forklift truck 1
License to operate a forklift truck 1
 
Forklift Study Guide
Forklift Study GuideForklift Study Guide
Forklift Study Guide
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
Preparing & Delivering Oral Presentations
Preparing & Delivering Oral PresentationsPreparing & Delivering Oral Presentations
Preparing & Delivering Oral Presentations
 
Communication & Your Career
Communication & Your CareerCommunication & Your Career
Communication & Your Career
 
Technical Communication
Technical CommunicationTechnical Communication
Technical Communication
 
Technical Communication
Technical CommunicationTechnical Communication
Technical Communication
 
Technical Communication
Technical CommunicationTechnical Communication
Technical Communication
 
Technical Communication
Technical CommunicationTechnical Communication
Technical Communication
 
Physics 19
Physics 19Physics 19
Physics 19
 
Physics 18
Physics 18Physics 18
Physics 18
 
Physics 17
Physics 17Physics 17
Physics 17
 
Physics 17-2
Physics 17-2Physics 17-2
Physics 17-2
 
Physics 16
Physics 16Physics 16
Physics 16
 
Physics 15
Physics 15Physics 15
Physics 15
 
Physics 13
Physics 13Physics 13
Physics 13
 
Physics 12
Physics 12Physics 12
Physics 12
 
Physics 11
Physics 11Physics 11
Physics 11
 

Último

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Último (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 

Introduction to Drilling Engineering

  • 2. 2 Introduction • Location to rig release. • Wellbore diagram
  • 3. 3 Location Rig to Release
  • 4. 4 Overview • The large investments required to drill for oil and gas are made primarily by oil companies. • Small oil companies invest mostly in shallow, less expensive wells drilled on land. • Investments in expensive offshore wells can be afforded only by large oil companies.
  • 5. 5 Overview • A well is classified as a wildcat well if its purpose is to discover a new petroleum reservoir. • The development well is to exploit a known reservoir. • Usually the geological group recommends wildcat well location, while the reservoir engineering group recommends development well location.
  • 6. 6 Overview • The drilling engineering groups make preliminary well designs & cost estimates for the proposed well. • The legal group secures the necessary drilling and production rights. • Surveyors establish & stake well location. • Usually the drilling is done by drilling contractor.
  • 7. Contracting the Well to be Drilled • When a contract to drill an oil well is signed, many conditions and agreements are included. The drilling rig contractor will have agreed to drill a well to a specified depth. The conditions for payment are included. The contract payment may be based on the time on the location, a set sum of money, or by the foot. • Most wells are contracted by the foot, but the contract is likely to make allowances for unforeseen problems and non drilling activities, such as time spent allowing the casing cement to set. 7
  • 9. 9 Types of Casing • Conductor Casing • Surface Casing • Intermediate Casing • Production Casing • Liners • Tubing Figure 1: Typical Well Diagram
  • 10. 10 Conductor Casing • A conductor string is a short length of large diameter pipe run where the ground is soft. It acts as a conduit to return drilling fluid to mud pits and prevents "cave in," the sloughing of ground around the rig base. It also protects shallow water sands. • ODs: 16, 18-5/8, 20, 24, 30 and 36 inches. • Setting depths: 50 to 250 feet.
  • 11. 11 Surface Casing • Surface casing is the first string of casing used after the conductor pipe. It is required in some instances by law (to protect ground water) and is normally cemented full length. • Surface casing supports the BOP stack and subsequent casing and tubing strings, and is normally the only string designed to carry compression loads. • ODs: 13-3/8, 16, 18-5/8, 20, and 24 inches. • Setting depths: 200 to 5,000 feet.
  • 12. Intermediate Casing • Intermediate casing is any string between the surface and production string. Intermediate casing may or may not be cemented full length. • Intermediate casing may be used to seal off weaker zones from higher pressure drilling fluids required in subsequent drilling. It may also protect previous casing strings from higher burst pressures, and provide support for liner casing. • ODs: 4-1/2 to 13-3/8 in. • Setting Depths: 2000 - 20,000 ft. 12
  • 13. 13 Production Casing • The production string is the primary pressure containment string It spans the total well depth and is not normally cemented full length. • Allows segregation of producing formations and undesirable fluids from contaminating production equipment. • ODs: 4-1/2, 5, 5-1/2, 7 and 7-5/8 in. • Setting Depths: 2000 - 30,000 ft.
  • 14. Liners • Liners are short casing strings run to isolate specific formations. As they are normally short and relatively deep in the well, burst and collapse pressures control the design. • Also, it is normal to have only one weight, grade and joint type in the string. • Liners extend downward from the shoe of the previous casing string, and are normally cemented full length. Many liners use flush joint connections for improved clearances. • ODs: 4-1/2 to 9-5/8 in. • Setting Depths: 5000 - 20,000 ft. 14
  • 15. Tubing • Tubing conveys the oil or gas to the surface. In some wells dual or triple strings of tubing are used to isolate and produce different zones. In other circumstances, a dual string may be used where one produces and the other carries fluid pumped in to kill the well or to chemically inhibit the production string. • Tubing is usually replaced on a regular basis because of the wear caused by producing fluids or gases. • ODs: 1 to 4-1/2 in. • Setting Depths: 1000 - 25,000 ft. 15
  • 16. 16 Casing Diagram • MWD – after one stand drilled. • EMS – taken every stand while POOH, crosschecking MWD survey. • GSS – used when there is magnetic interference from casing string / fish. • GMS – used when critical depth measurement is required for perforation, testing, etc. Figure 2: Casing Diagram
  • 17. 17 Example of Well Survey Figure 3: Well Survey