ASAS-ASAS SAINS DATA
DALAM PENGANGKUTAN
SEM 2 SESI 2020/2021
PROJEK AKHIR
PROF. DATO’ IR. DR. RIZA ATIQ ABDULLAH BIN O.K. RAHMAT
MUHAMMAD MUSTAQIM BIN MOHD SHAFIE
A169543
1) Kirakan pengeluaran dan penarikan bagi setiap bandar
- Kadar pengeluaran : 2.2 setiap rumah
- Kadar penarikan : 3.3 bagi setiap 100m persegi luas lantai
Bandar Rumah Luas Lantai
A 16,500 1,050,000
B 19,000 1,290,000
C 31,000 1,940,000
D 27,000 1,850,000
E 21,500 1,430,000
F 17,500 1,230,000
Bandar Pengeluaran Penarikan
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
2) Jika 65% perjalanan menggunakan kereta persendirian dan purata isi kereta ialah 1.9
orang/kereta, kirakan pengeluaran dan penarikan perjalanan kereta bagi setiap
bandar
Bandar Pengeluaran Penarikan
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
65%
Pengeluaran Atau Penarikan X 65% / 1.9
3) Kirakan semula pengeluaran dan penarikan supaya jumlah pengeluaran dan penarikan
menjadi sama
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
Jumlah 99,724 99,234
Bandar Pengeluaran Penarikan
A 12,388 11,883
B 14,265 14,599
C 23,274 21,956
D 20,271 20,937
E 16,142 16,184
F 13,139 13,920
Jumlah 99,479 99,479
Purata = (99,724 + 99,234) / (2)
= 99,479
4) Kirakan matriks perjalanan asalan-tujuan
Tujuan
Jumlah Pengeluaran
Bandar A B C D E F
A 1,480 1,818 2,734 2,607 2,015 1,733 12,388
B 1,704 2,093 3,148 3,003 2,321 1,996 14,265
Asalan C 2,780 3,416 5,137 4,898 3,786 3,257 23,274
D 2,421 2,975 4,474 4,266 3,298 2,837 20,271
E 1,928 2,369 3,563 3,397 2,626 2,259 16,142
F 1,569 1,928 2,900 2,765 2,137 1,839 13,139
Jumlah Penarikan 11,883 14,599 21,956 20,937 16,184 13,920 99,479
5) Jika 70% perjalanan antara bandar menggunakan lebuh raya, kirakan semula matriks
perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
Bandar Pengeluaran Penarikan
A 8,693 8,298
B 10,010 10,194
C 16,332 15,331
D 14,225 14,620
E 11,327 11,301
F 9,220 9,720
Jumlah 69,807 69,465
70%
Purata = (69,807 + 69,465) / (2)
= 69,636
Untuk menjadikan P-P seimbang,
maka:
A x purata / jumlah A
B x purata / jumlah B
Bandar Pengeluaran Penarikan
A 8,671 8,318
B 9,985 10,219
C 16,292 15,369
D 14,190 14,656
E 11,300 11,329
F 9,197 9,744
Jumlah 69,636 69,636
Kirakan semula matriks perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya
Tujuan
Jumlah Pengeluaran
Bandar A B C D E F
A 1,036 1,273 1,914 1,825 1,411 1,213 8,671
B 1,193 1,465 2,204 2,102 1,624 1,397 9,985
Asalan C 1,946 2,391 3,596 3,429 2,651 2,280 16,292
D 1,695 2,082 3,132 2,987 2,308 1,986 14,190
E 1,350 1,658 2,494 2,378 1,838 1,581 11,300
F 1,099 1,350 2,030 1,936 1,496 1,287 9,197
Jumlah Penarikan 8,318 10,219 15,369 14,656 11,329 9,744 69,636
6) Umpukan pengaliran lalu lintas kereta di antara bandar-bandar bagi kedua-dua arah
Bandar A B C D E F
A 1,273 1,914 1,825 1,411 1,213
B 1,193 2,204 2,102 1,624 1,397
C 1,946 2,391 3,429 2,651 2,280
D 1,695 2,082 3,132 2,308 1,986
E 1,350 1,658 2,494 2,378 1,581
F 1,099 1,350 2,030 1,936 1,496
Bandar A B C D E F Umpukan
A 1,273 1,914 1,825 1,411 1,213 7,635
B 1,193 2,204 2,102 1,624 1,397 13,690
C 1,946 2,391 3,429 2,651 2,280 17,932
D 1,695 2,082 3,132 2,308 1,986 14,870
E 1,350 1,658 2,494 2,378 1,581 8,457
F 1,099 1,350 2,030 1,936 1,496
Umpukan 7,282 13,571 16,889 14,294 7,910
Umpukan pengeluaran dan penarikan kereta
7,635 13,690 17,932 14,870 8,457
7,910 14,296 16,889 13,571 7,282
A B C D E F
UMPUKAN PENGELUARAN DAN
PENARIKAN
7) Jika kadar tol yang dikenakan sebanyak RM0.20 bagi setiap km, kirakan jumlah kutipan
tol
Kadar yang perlu dibayar mengikut bandar :
Jarak x RM0.20
Jumlah kutipan per bandar:
(Jarak x RM0.20) x Jumlah perjalanan kereta
Jumlah kutipan tol jika bermula dari bandar A dan berakhir di bandar F
Bandar A B C D E F
Jumlah
kereta yang
memasuki tol
7,635 6,362 4,449 2,624 1,213
7,327 5,123 3,021 1,397
8,359 4,930 2,280
4,294 1,986
1,581
Jarak (KM) x
RM0.20
0 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60
RM 0 29,013 57,496 53,793 50,556 30,443
Jumlah RM221,302
Jumlah kutipan tol jika bermula dari bandar F dan berakhir di bandar A
Bandar A B C D E F
Jumlah
kereta yang
memasuki tol
1,098 2,448 4,478 6,414 7,910
1,350 3,008 5,502 7,880
1,695 3,777 6,909
1,946 4,337
1,193
Jarak (KM) x
RM0.20
RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 0
RM 26,671 56,995 50,666 48,599 28,476 0
Jumlah RM212,408
Jumlah kesemua kutipan tol = Jumlah kutipan tol jika bermula dari
bandar A dan berakhir di bandar F + Jumlah kutipan tol jika bermula dari
bandar F dan berakhir di bandar A
= (RM221,302 + RM212,408)
= RM433,709
8) Pengaliran lalu lintar yang anda kira adalah perjalanan sehari. Jika 30% pengaliran ini
adalah dalam masa satu jam puncak, kirakan pengaliran maksimum/jam
A B C D E F
Pengaliran
maksimum/jam
232 194 135 80 37
223 160 92 43
254 150 69
131 60
48
Pengiraan maksimum/jam = (70/100) x Perjalanan dari suatu bandar ÷ 𝟐𝟑
A B C D E F
Pengaliran
maksimum/jam
33 75 136 195 241
41 92 167 240
52 115 210
59 132
36
Jumlah: 1904 Jumlah: 1824
9) Lukiskan visual umpukan perjalanan antara bandar
7,635 13,690 17,932 14,870 8,457
7,282 13,571 16,889 14,296 7,910
A B C D E F
10) Jika muatan jalan raya ialah 1800 kereta/jam, berapa lorong lebuh raya ini patut dibina?
Laluan
Jumlah
umpukan
x 30%
Jumlah
lorong yang
diperlu
A B 7,635 2,291 2
B C 13,690 4,107 3
C D 17,932 5,389 3
D E 14,780 4,434 3
E F 8,457 2,537 2
Laluan
Jumlah
umpukan
x 30%
Jumlah
lorong yang
diperlu
F E 7,910 2,373 2
E D 14,294 4,288 3
D C 16,889 5,067 3
C B 13,571 4,071 3
B A 7,282 2,186 2
Bandar A ke Bandar F Bandar F ke Bandar A
2 Lorong
2 Lorong
2 Lorong
2 Lorong
3 Lorong
3 Lorong
3 Lorong
3 Lorong
3 Lorong
3 Lorong

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Tugasan visual agihan perjalanan
Tugasan visual agihan perjalanan Tugasan visual agihan perjalanan
Tugasan visual agihan perjalanan
 
Visualisasi Penjanaan Perjalanan
Visualisasi Penjanaan Perjalanan Visualisasi Penjanaan Perjalanan
Visualisasi Penjanaan Perjalanan
 
Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)
 
Penjanaan Perjalanan
Penjanaan PerjalananPenjanaan Perjalanan
Penjanaan Perjalanan
 
A161446 Tugasan Pengagihan Perjalanan
A161446   Tugasan Pengagihan PerjalananA161446   Tugasan Pengagihan Perjalanan
A161446 Tugasan Pengagihan Perjalanan
 
Tugasan pisah ragaman
Tugasan pisah ragamanTugasan pisah ragaman
Tugasan pisah ragaman
 
Tugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalananTugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalanan
 
Tugasan kluster
Tugasan klusterTugasan kluster
Tugasan kluster
 
Tugasan 9 Pisah Ragaman (A168202)
Tugasan 9 Pisah Ragaman (A168202)Tugasan 9 Pisah Ragaman (A168202)
Tugasan 9 Pisah Ragaman (A168202)
 
Tugasan visual umpukan perjalanan (a171025)
Tugasan visual umpukan perjalanan (a171025)Tugasan visual umpukan perjalanan (a171025)
Tugasan visual umpukan perjalanan (a171025)
 
Tugasan visual agihan perjalanan
Tugasan visual agihan perjalananTugasan visual agihan perjalanan
Tugasan visual agihan perjalanan
 
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
 
A157071 Modul 8 Tugasan Visual Agihan Perjalanan
A157071 Modul 8 Tugasan Visual Agihan PerjalananA157071 Modul 8 Tugasan Visual Agihan Perjalanan
A157071 Modul 8 Tugasan Visual Agihan Perjalanan
 
Tugasan pengahan perjalanan
Tugasan pengahan perjalananTugasan pengahan perjalanan
Tugasan pengahan perjalanan
 
Pengagihan Perjalanan
Pengagihan PerjalananPengagihan Perjalanan
Pengagihan Perjalanan
 
Tugasan kluster (A170697)
Tugasan kluster (A170697)Tugasan kluster (A170697)
Tugasan kluster (A170697)
 
Tugasan Visual Umpukan Perjalanan (A169338)
Tugasan Visual Umpukan Perjalanan (A169338)Tugasan Visual Umpukan Perjalanan (A169338)
Tugasan Visual Umpukan Perjalanan (A169338)
 
A153491 tugasan pemilihan kenderaan
A153491 tugasan pemilihan kenderaanA153491 tugasan pemilihan kenderaan
A153491 tugasan pemilihan kenderaan
 
A157071 Modul 9 Tugasan Pisah Ragaman
A157071 Modul 9 Tugasan Pisah RagamanA157071 Modul 9 Tugasan Pisah Ragaman
A157071 Modul 9 Tugasan Pisah Ragaman
 
Tugasan Visual
Tugasan VisualTugasan Visual
Tugasan Visual
 

Similar a Projek Akhir Asas-Asas Sains Data dalam Pengangkutan

Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculations
janaka ruwan
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640
Sadegh Tabatabaei
 
Highway design raport(final) (group 2)
Highway design raport(final) (group 2)Highway design raport(final) (group 2)
Highway design raport(final) (group 2)
haayaav
 
Motorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) WctrMotorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) Wctr
hugorepolho
 

Similar a Projek Akhir Asas-Asas Sains Data dalam Pengangkutan (20)

Projek akhir a165585_zuriani
Projek akhir a165585_zurianiProjek akhir a165585_zuriani
Projek akhir a165585_zuriani
 
Projek akhir a163333
Projek akhir a163333Projek akhir a163333
Projek akhir a163333
 
Projek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptxProjek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptx
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case study
 
Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculations
 
New highway project
New highway projectNew highway project
New highway project
 
5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...
 
Municipalidad de La Rioja: Ingresos y egresos
Municipalidad de La Rioja: Ingresos y egresosMunicipalidad de La Rioja: Ingresos y egresos
Municipalidad de La Rioja: Ingresos y egresos
 
Sesión 02
Sesión 02Sesión 02
Sesión 02
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019
 
Civil 150 project
Civil 150 projectCivil 150 project
Civil 150 project
 
Pavement design PowerPoint ERA
Pavement design PowerPoint ERAPavement design PowerPoint ERA
Pavement design PowerPoint ERA
 
Highway design raport(final) (group 2)
Highway design raport(final) (group 2)Highway design raport(final) (group 2)
Highway design raport(final) (group 2)
 
Motorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) WctrMotorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) Wctr
 
Tablas roadway design manual
Tablas roadway design manualTablas roadway design manual
Tablas roadway design manual
 
IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...
 
Comparative study of emission pollutants between BIM and VSP methods.
Comparative study of emission pollutants between BIM and VSP methods.Comparative study of emission pollutants between BIM and VSP methods.
Comparative study of emission pollutants between BIM and VSP methods.
 
total report
total reporttotal report
total report
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
 

Más de MUHAMMADMUSTAQIMMOHD3 (8)

Projek Akhir LMCP2502 Pengangkutan Bandar Projek Akhir
Projek Akhir LMCP2502  Pengangkutan Bandar Projek AkhirProjek Akhir LMCP2502  Pengangkutan Bandar Projek Akhir
Projek Akhir LMCP2502 Pengangkutan Bandar Projek Akhir
 
Tugasan penenangan lalu lintas
Tugasan penenangan lalu lintasTugasan penenangan lalu lintas
Tugasan penenangan lalu lintas
 
Laporan Audit Keselamatan Jalan Raya
Laporan Audit Keselamatan Jalan RayaLaporan Audit Keselamatan Jalan Raya
Laporan Audit Keselamatan Jalan Raya
 
Tugasan Mencerap Data A169543
Tugasan Mencerap Data A169543Tugasan Mencerap Data A169543
Tugasan Mencerap Data A169543
 
[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan
[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan
[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan
 
Tugasan_Hingar_3_A169543
Tugasan_Hingar_3_A169543Tugasan_Hingar_3_A169543
Tugasan_Hingar_3_A169543
 
Module 5 : Tugasan kluster
Module 5 : Tugasan klusterModule 5 : Tugasan kluster
Module 5 : Tugasan kluster
 
Sistem Pengangkutan di Petaling Jaya
Sistem Pengangkutan di Petaling JayaSistem Pengangkutan di Petaling Jaya
Sistem Pengangkutan di Petaling Jaya
 

Último

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Último (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 

Projek Akhir Asas-Asas Sains Data dalam Pengangkutan

  • 1. LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN SEM 2 SESI 2020/2021 PROJEK AKHIR PROF. DATO’ IR. DR. RIZA ATIQ ABDULLAH BIN O.K. RAHMAT MUHAMMAD MUSTAQIM BIN MOHD SHAFIE A169543
  • 2.
  • 3. 1) Kirakan pengeluaran dan penarikan bagi setiap bandar - Kadar pengeluaran : 2.2 setiap rumah - Kadar penarikan : 3.3 bagi setiap 100m persegi luas lantai Bandar Rumah Luas Lantai A 16,500 1,050,000 B 19,000 1,290,000 C 31,000 1,940,000 D 27,000 1,850,000 E 21,500 1,430,000 F 17,500 1,230,000 Bandar Pengeluaran Penarikan A 36,300 34,650 B 41,800 42,570 C 68,200 64,020 D 59,400 61,050 E 47,300 47,190 F 38,500 40,590
  • 4. 2) Jika 65% perjalanan menggunakan kereta persendirian dan purata isi kereta ialah 1.9 orang/kereta, kirakan pengeluaran dan penarikan perjalanan kereta bagi setiap bandar Bandar Pengeluaran Penarikan A 36,300 34,650 B 41,800 42,570 C 68,200 64,020 D 59,400 61,050 E 47,300 47,190 F 38,500 40,590 Bandar Pengeluaran Penarikan A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 65% Pengeluaran Atau Penarikan X 65% / 1.9
  • 5. 3) Kirakan semula pengeluaran dan penarikan supaya jumlah pengeluaran dan penarikan menjadi sama Bandar Pengeluaran Penarikan A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 Jumlah 99,724 99,234 Bandar Pengeluaran Penarikan A 12,388 11,883 B 14,265 14,599 C 23,274 21,956 D 20,271 20,937 E 16,142 16,184 F 13,139 13,920 Jumlah 99,479 99,479 Purata = (99,724 + 99,234) / (2) = 99,479
  • 6. 4) Kirakan matriks perjalanan asalan-tujuan Tujuan Jumlah Pengeluaran Bandar A B C D E F A 1,480 1,818 2,734 2,607 2,015 1,733 12,388 B 1,704 2,093 3,148 3,003 2,321 1,996 14,265 Asalan C 2,780 3,416 5,137 4,898 3,786 3,257 23,274 D 2,421 2,975 4,474 4,266 3,298 2,837 20,271 E 1,928 2,369 3,563 3,397 2,626 2,259 16,142 F 1,569 1,928 2,900 2,765 2,137 1,839 13,139 Jumlah Penarikan 11,883 14,599 21,956 20,937 16,184 13,920 99,479
  • 7. 5) Jika 70% perjalanan antara bandar menggunakan lebuh raya, kirakan semula matriks perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya Bandar Pengeluaran Penarikan A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 Bandar Pengeluaran Penarikan A 8,693 8,298 B 10,010 10,194 C 16,332 15,331 D 14,225 14,620 E 11,327 11,301 F 9,220 9,720 Jumlah 69,807 69,465 70%
  • 8. Purata = (69,807 + 69,465) / (2) = 69,636 Untuk menjadikan P-P seimbang, maka: A x purata / jumlah A B x purata / jumlah B Bandar Pengeluaran Penarikan A 8,671 8,318 B 9,985 10,219 C 16,292 15,369 D 14,190 14,656 E 11,300 11,329 F 9,197 9,744 Jumlah 69,636 69,636
  • 9. Kirakan semula matriks perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya Tujuan Jumlah Pengeluaran Bandar A B C D E F A 1,036 1,273 1,914 1,825 1,411 1,213 8,671 B 1,193 1,465 2,204 2,102 1,624 1,397 9,985 Asalan C 1,946 2,391 3,596 3,429 2,651 2,280 16,292 D 1,695 2,082 3,132 2,987 2,308 1,986 14,190 E 1,350 1,658 2,494 2,378 1,838 1,581 11,300 F 1,099 1,350 2,030 1,936 1,496 1,287 9,197 Jumlah Penarikan 8,318 10,219 15,369 14,656 11,329 9,744 69,636
  • 10. 6) Umpukan pengaliran lalu lintas kereta di antara bandar-bandar bagi kedua-dua arah Bandar A B C D E F A 1,273 1,914 1,825 1,411 1,213 B 1,193 2,204 2,102 1,624 1,397 C 1,946 2,391 3,429 2,651 2,280 D 1,695 2,082 3,132 2,308 1,986 E 1,350 1,658 2,494 2,378 1,581 F 1,099 1,350 2,030 1,936 1,496
  • 11. Bandar A B C D E F Umpukan A 1,273 1,914 1,825 1,411 1,213 7,635 B 1,193 2,204 2,102 1,624 1,397 13,690 C 1,946 2,391 3,429 2,651 2,280 17,932 D 1,695 2,082 3,132 2,308 1,986 14,870 E 1,350 1,658 2,494 2,378 1,581 8,457 F 1,099 1,350 2,030 1,936 1,496 Umpukan 7,282 13,571 16,889 14,294 7,910 Umpukan pengeluaran dan penarikan kereta
  • 12. 7,635 13,690 17,932 14,870 8,457 7,910 14,296 16,889 13,571 7,282 A B C D E F UMPUKAN PENGELUARAN DAN PENARIKAN
  • 13. 7) Jika kadar tol yang dikenakan sebanyak RM0.20 bagi setiap km, kirakan jumlah kutipan tol Kadar yang perlu dibayar mengikut bandar : Jarak x RM0.20 Jumlah kutipan per bandar: (Jarak x RM0.20) x Jumlah perjalanan kereta
  • 14. Jumlah kutipan tol jika bermula dari bandar A dan berakhir di bandar F Bandar A B C D E F Jumlah kereta yang memasuki tol 7,635 6,362 4,449 2,624 1,213 7,327 5,123 3,021 1,397 8,359 4,930 2,280 4,294 1,986 1,581 Jarak (KM) x RM0.20 0 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 RM 0 29,013 57,496 53,793 50,556 30,443 Jumlah RM221,302
  • 15. Jumlah kutipan tol jika bermula dari bandar F dan berakhir di bandar A Bandar A B C D E F Jumlah kereta yang memasuki tol 1,098 2,448 4,478 6,414 7,910 1,350 3,008 5,502 7,880 1,695 3,777 6,909 1,946 4,337 1,193 Jarak (KM) x RM0.20 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 0 RM 26,671 56,995 50,666 48,599 28,476 0 Jumlah RM212,408
  • 16. Jumlah kesemua kutipan tol = Jumlah kutipan tol jika bermula dari bandar A dan berakhir di bandar F + Jumlah kutipan tol jika bermula dari bandar F dan berakhir di bandar A = (RM221,302 + RM212,408) = RM433,709
  • 17. 8) Pengaliran lalu lintar yang anda kira adalah perjalanan sehari. Jika 30% pengaliran ini adalah dalam masa satu jam puncak, kirakan pengaliran maksimum/jam A B C D E F Pengaliran maksimum/jam 232 194 135 80 37 223 160 92 43 254 150 69 131 60 48 Pengiraan maksimum/jam = (70/100) x Perjalanan dari suatu bandar ÷ 𝟐𝟑 A B C D E F Pengaliran maksimum/jam 33 75 136 195 241 41 92 167 240 52 115 210 59 132 36 Jumlah: 1904 Jumlah: 1824
  • 18. 9) Lukiskan visual umpukan perjalanan antara bandar 7,635 13,690 17,932 14,870 8,457 7,282 13,571 16,889 14,296 7,910 A B C D E F
  • 19.
  • 20. 10) Jika muatan jalan raya ialah 1800 kereta/jam, berapa lorong lebuh raya ini patut dibina? Laluan Jumlah umpukan x 30% Jumlah lorong yang diperlu A B 7,635 2,291 2 B C 13,690 4,107 3 C D 17,932 5,389 3 D E 14,780 4,434 3 E F 8,457 2,537 2 Laluan Jumlah umpukan x 30% Jumlah lorong yang diperlu F E 7,910 2,373 2 E D 14,294 4,288 3 D C 16,889 5,067 3 C B 13,571 4,071 3 B A 7,282 2,186 2 Bandar A ke Bandar F Bandar F ke Bandar A
  • 21. 2 Lorong 2 Lorong 2 Lorong 2 Lorong 3 Lorong 3 Lorong 3 Lorong 3 Lorong 3 Lorong 3 Lorong