MEENAKSHI SUNDARARAJAN COLLEGE OF ENGINNERING,
KODAMBAKAM
M.E CONSTRUCTION ENGINEERING AND MANAGEMENT
CONSTRUCION MATERIAL MANANGEMENT
R. Shanmugapriya
311513418014
INTRODUCTION
• Materials management is a vital function for improving productivity in construction
projects.
• The management of materials should be considered at all the phases of the construction
process and throughout the construction and production periods.
• This is because poor materials management can often affect the overall construction time,
quality and budget.
• It is important for planning and controlling of materials to ensure that the right quality
and quantity of materials and installed equipment are appropriately specified in a timely
manner, obtained at a reasonable cost, and are available when needed.
Definition of Construction Material Management:
Material management is defined as planning, identification, procuring, storage,
receiving and distribution of materials. The purpose of material management is to
assure that the right materials are in the right place, in the right quantise when needed.
The responsibility of material management department for the flow of materials from
the time the materials are ordered, received, and stored until they are used in the basis
of material management.
Aim of Material Management
To get
1. The Right quality
2. Right quantity of supplies
3. At the Right time
4. At the Right place
5. For the Right cost
Objectives and Functions of Materials Management
Primary objectives can be classified as:
• Efficient materials planning
• Buying or Purchasing
• Procuring and receiving
• Storing and inventory control
• Supply and distribution of materials
• Quality assurance
Secondary Objectives of Materials Management :
• Efficient production scheduling
• To take make or buy decisions
• Prepare specifications and standization of materials
• To assist in product design and development
• Forecasting demand and quantity of materials requirements
• Quality control of materials purchased
• Material handling
• Use of value analysis and value engineering
• Developing skills of workers in materials management
• Smooth flow of materials in and out of the organization
Classification of Construction Material
Material Type Details Example
Bulk materials Materials that are delivered in mass and are
deposited in a container.
Sand,Gravel,Topsoil,Cement,
Concrete
Bagged materials Materials delivered in bags for ease of
handling and controlled use.
Cement
Palleted materials Bagged materials that are placed in pallets for
delivery
Cement, Doors
Packaged materials Materials that are packaged together to
prevent damage during transportation and
deterioration when they are stored.
Pipes,Tiles,Electrical Fitting
Various Construction Materials
Process of Construction Material Management
Materials Handling & Traffic Variety
..
.
.
.
Purchasing
Store Keeping
Inventory Control
Receiving, Inspection and Despatching
Value Analysis, Standardization and Variety
Reduction
Disposal of Scrap and Surplus, Material
Preservation
..
.
.
.
Material planning
1. Material Planning
• Materials planning include measuring, ordering and scheduling. It is emphasized
that planning is a very important process to increase the productivity, profit, and
assisting the time to complete the construction projects.
• The productivity of the construction project will be hanged if the material
planning process is not implemented properly.
2. Purchasing
Purchase the materials and have the services from supplier to get the support of operations as the construction
project from production to marketing, sales and logistics. For examples, a detailed material list and co-
ordination of the purchasing and order of material are significant to assuring the material will available on
construction site.
According to Ninad Shah and Manish Dave Purchasing procedure can be described as below:
• Step 1 – Material Indent
• Step 2 – Enquiry to Vendors
• Step 3 – Vendor Comparison
• Step 4 – Vendor Selection and Negotiations
• Step 5 – Purchase Order
• Step 6 – Vendor Evaluation
3.Inventory control department:
The duties of the inventory control department is to decide about the types of
ordering system, fixing the safety stock limits, fixing up the reorder level & maximum /
minimum stock level.
4.Receiving, inspection and despatching department
The responsibility of Receiving, inspection and despatching department is to
receive the materials when delivered by the suppliers. After receiving it, the quantity and
quality must be checked. Production parts and materials are checked against blueprints
and specifications. Non-production items are also reviewed. When once it is as per the
specifications given, the goods will be accepted
5. The Value Analysis and Standardization
The Value Analysis and Standardization offer greatest scope, in reducing the
materials cost. It also reduce the number of varieties and also helps in finding the
substitute for the materials at lesser cost.
6. Logistics
Logistics is a concept that stresses movement of the materials and it involve
planning, implementing, and controlling the movement and storage of all things from
raw materials to the finished f the product to meet client requirements. During
construction project, routing of the materials will affect the cost and time to complete
the construction projects.
7. Disposal of Scrap and Surplus, Material Preservation
• Stock control can categorize as a technique planned to be the cover and to ensure all materials or
equipment are available when needed.
• Stock control include raw materials, processed materials, assembly components, consumable stores,
general stores, maintenance materials and spares, work in progress and finished products.
• It is very important as the construction materials were delivery as requested and with the progression by
the proper management of stock control.
• At the same time, construction activities will generate big amount of the waste and it will cause difficulty
to the construction industry.
• However, with the planning of the material management which is effective will help to reduce the waste
of material and increase the profit of the companies.
Problems of Material Management
1. Organization Structure
The coordination and communication between estimating department, research and development department,
purchasing department, and plant and machineries department should be maintained at highest level
Main issues in organisation structure:
• Undefined scope
• Lack of communication between parties involved
• Incomplete drawings Plans are not completed and details are missing
• Lack of conformance to requirements
• Nonstandard specifications that are not commonly used
• Incomplete / ineffective meetings
• Difference between plans and specifications
• Don’t communicate exactly
2. Procurement problem
• Availability of material
• Availability of quantity
• Price reduction to match competitor’s price
• Late deliveries Materials are not delivered as per schedule
• Late or incorrect submittals
• Poor communication between parties
• Lack of conformance to requirements
• Unrealistic delivery dates
• Re handling of materials
• Storage areas are limited or are far from working area
• Theft or damaging during handling or other conditions
3. Storage Space
• Large number of materials is required depending on the magnitude of the project.
• And the term storage space implies both enclosed and open space that can be used to keep materials
of work safe until the need for it arise.
• All materials need protection against many threats such as pilferage, theft, damage or loss. Material
such as aggregates, bricks/blocks may not require enclosed storage protection than proper outdoor
positioning and stacking. However, other materials such as reinforcement bars, steel columns, timber,
and galvanized steel for trusses must be protected against contact with water in order to avoid
rust/corrosion.
• The size of proposed building may occupy 60% of the total project site, enabling the remaining 40%
to be used for temporary access and site facilities. In such case, the planners must arrange for periodic
delivery of certain materials to avoid cluttering the space, and maintain constant operation to keep the
4. Security Problem
Security of materials onsite is of paramount importance. Gradual pilferage
and theft are issues of concern to the project managers. Loss of materials
through pilferage and theft represent financial lost to the project as a whole,
and in the end it increases the cost of the project. Materials are prone to be
stolen despite being in store. And some materials as earlier mentioned may
not require indoor storage. Therefore, a well designated vigilante must be
maintained 24 hours onsite.
5. Availability of Materials on Market
• Steady flow of materials throughout project duration is among the primary
function of material management. However, this can be affected by market
availability of the material of work.
• Occasionally manufacturers can run out of raw material or be affected by
government policy to the extent that production may have to be slow or
suspended. Unavailability of materials of work on market can affect
material management by either increasing competition in material purchase
or delay the general work progress.
Importance of Materials Management
• Lower prices for material and equipment.
• Faster inventory turnover.
• Continuity of supply
• Reduced lead time
• Reduced transportation cost.
• Less duplication of efforts.
• Elimination of bulk- passing.
• Reduced materials obsolescence.
• Improved supplier relationship and better records and information.
• Better inter-department cooperation & Personnel development
Advantages of Materials Management
• The better accountability part of the material, as well as other departments and no
one can blame others.
• As materials management by a single authority, which can lead to better
coordination, because it became the central point of any substance-related
problems.
• Materials management departments to ensure a better quality materials provide a
request in a timely fashion department. This can lead to a better performance of
the organization.
• A materials management system is usually controlled through a system, therefore,
can help decision-making related to the material in the organization.
• An indirect use of materials management is the development of good quality
material, ethical and moral standards in an organization.
• Maximum company profit and Improvement of credibility
• Improved customer service
• Enhancement of communication
• Improved quality of staff
Inventory Control for Quantitative Analysis
Definition:
Inventory control can be defined as, “which ensures the supply of
required quantity and quality of inventory at the required time and at the
same time prevent unnecessary investment in inventories”
Objectives of Inventory Control
• To ensure that the supply of raw material & finished goods will remain continuous
so that production process is not halted and demands of customers are duly met.
• To minimise carrying cost of inventory.
• To keep investment in inventory at optimum level.
• To reduce the losses of theft, obsolescence & wastage etc.
• To make arrangement for sale of slow moving items.
• To minimise inventory ordering cost.
Main Techniques in Inventory Control
The Pareto principle states that 80% of the overall consumption value is
based on only 20% of total items. In other words, demand is not evenly
distributed between items: top sellers vastly outperform the rest. The
ABC approach states that, when reviewing inventory, a company should
rate items from A to C, basing its ratings on the following rules:
1.ABC Analysis
The ABC (Always Better Control) inventory control technique is based on the
principle that a small portion of the items may typically represent the bulk of money
value of the total inventory in construction process, while a relatively large number
of items may from a small part of the money value of stores. The money value is
ascertained by multiplying the quantity of material of each item by its unit price.
Procedure for ABC Analysis
• Make the list of all items of inventory.
• Determine the annual volume of usage & money value of each item.
• Multiply each item’s annual volume by its rupee value.
• Compute each item’s percentage of the total inventory in terms of annual usage in rupees
• “A” Category – 5% to 10% of the items represent 70% to 75% of the money value.
• “B” Category – 15% to 20% of the items represent 15% to 20% of the money.
• “C” Category – The remaining number of the items represent 5% to 10% of the money value.
• The relative position of these items show that items of category A should be under the maximum
control, items of category B may not be given that much attention and item C may be under a loose
control.
EOQ analysis
The EOQ refers to the order size that will result in the lowest total of ordering and
carrying costs for an item of inventory. If a firm place unnecessary orders it will
incur unneeded order costs. If a firm places too few order, it must maintain large
stocks of goods and will have excessive carrying cost.
Technologies in construction Material Management
The tools used in the construction industry change constantly with the
continuous changes of technology. Researchers are finding ways to
apply those changes in technology to construction in order to improve
production and lower the cost of the operations.
• Bar Codes Applications to Material Management
• RFID-Radio Frequency Identification
1.Bar Codes Applications to Material Management
Bar code applications in construction are mostly intended to provide accuracy in data
collection, to improve productivity and to save time in the data collection process.
• Typically, bar codes are used for materials and inventory management.
The scope of bar codes extends beyond materials management.
• Bar codes provide the advantage of relatively error free data collection, which
improves productivity and avoid errors.
• Some construction firms that use bar codes claim that it saves time, money and
labor while improving the accuracy of inventory.
The major applications of bar code to material management identified in
previous research can be identified as follow
• Field material control
• Warehouse maintenance and control
• Inventory control applications and tool and consumable material issue
• Purchasing and accounting
2. RFID-Radio Frequency Identification
A Radio Frequency Identification (RFID) system is an automated data collection system similar to
bar code. RFID applications in construction are mostly intended to provide accuracy in data
collection, to improve productivity and to save time in the data collection process.
An ADC (Automated Data Collection) technology that:
• uses radiofrequency waves to transfer data between a reader and a movable item to identify,
categorize,track..
• Is fast and does not require physical sight or contact between reader/scanner and the tagged item.
• Performs the operation using low cost components.
• Attempts to provide unique identification and backend integration that allows for wide range of
applications.
How RFID Works:
There are two primary components of an RFID system as shown in Figure The whole RFID
system requires the tags and the reader including an antenna to be operated
Details of RFID System Components
RFID Components Details
Tags Tags or transponder are normally located on the object or people
to be identified.
Reader Reader interrogator provides, read and write/read facilities
through a fixed or mobile reader to communicate data to and
from the tags.
Antenna Antenna is the conductive element that enables the tag to send
and receive data
Passive RFID Tags
Passive RFID Tag
• Generally, passive tags have shorter read ranges of a few inches to 30 feet, but
have a long life than active tags.
• The passive RFID tags consist of a microchip attached to an antenna and can be
packaged in a different way such as mounted on a substrate to create a tag,
sandwiched between an adhesive layer and a paper label to create a printable
RFID label (or smart label), embedded in a plastic card, a key fob, the wall of a
plastic container, and special packaging (to resist heat, cold or harsh cleaning
chemicals)
• Do not require power – Draws from Interrogator Field
• Lower storage capacities (few bits to 1 KB)
• Shorter read ranges (4 inches to 15 feet)
• Usually WriteOnceReadMany/ReadOnly tags
Active RFID Tags:
• Active RFID tags have their own internal power supply and are rewritable.
• The features of the active tags are much larger and heavier, and more expensive, but have a better
noise protection than passive tags.
• However, they have a shorter battery life of up to 10 years, with read range of 60 feet to 300 feet
(20 metres to 100 metres).
• The example of the active RFID tags can be shown in Figure 5. Active tags are more reliable in
environments such as water (including human/cattle, which are mostly water), metal (shipping
containers, vehicles), or at longer distances for generating strong responses from weak requests.
• They also have larger memories than passive tags and the ability to store additional information
sent by the transceiver
• Some RFID Tags
RFID READER
Uses of RFID:
RFID had been used for material tracking and material receipt in the construction
industry.
• Material Tracking: Material as the move in the jobsite since direct contact is not
required for data collection. This can avoid theft and lost since managers can
notice when materials are not where they are supposed to be.
• Materials Receipt: Materials can be easily verified as they arrive to the site. The
type of materials received can be known easily and verify if the right quantities
were received.
RFID Applications
• Manufacturing and Processing
oInventory and production process monitoring
oWarehouse order fulfilment
• Supply Chain Management
oInventory tracking systems
oLogistics management
• Retail
oInventory control and customer insight
oAuto checkout with reverse logistics
• Security
oAccess control
oCounterfeiting and Theft control/prevention
• Location Tracking
oTraffic movement control and parking management
RFID Application points
RFID advantages over barcodes
• No line of sight required for reading
• Multiple items can be read with a single scan
• Each tag can carry a lot of data (read/write)
• Individual items identified and not just the category
• Passive tags have a virtually unlimited lifetime
• Active tags can be read from great distances
• Can be combined with barcode technology
Conclusion
This paper has presented a review of Construction material management ,Inventory control and employment of
technology in construction projects.
• Good planning of materials management can help to avoid any delays of works on site and reduce any extra
cost for a project.
• It is important to manage all materials and inventory throughout construction activity and processes
• It discussed the materials management on construction projects and potential to employ RFID in materials
management practices.
• It clearly identified that these are important for effectively managing materials management in the
construction project in order to provide better handling of construction materials to provide an overall
performance of construction projects in term of time, budget (cost) and quality.

Más contenido relacionado

La actualidad más candente

Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction siteRonak Jain
 
070 Material Management and Construction Productivity
070 Material Management and Construction Productivity 070 Material Management and Construction Productivity
070 Material Management and Construction Productivity Dr Fereidoun Dejahang
 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnetnimbalkarpranit
 
Materials Managment System For Organizations
Materials Managment System For OrganizationsMaterials Managment System For Organizations
Materials Managment System For OrganizationsMuhammad Asif Khan
 
Material Management by akshay kakde
Material Management by akshay kakdeMaterial Management by akshay kakde
Material Management by akshay kakdeAkshay Kakde
 
Semester term project (cost & managerial accounting)
Semester term project (cost & managerial accounting)Semester term project (cost & managerial accounting)
Semester term project (cost & managerial accounting)Muhammad Asif Khan Awan
 
Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...Shrikant Kate
 
Material management in construction jeemi
Material management in construction jeemiMaterial management in construction jeemi
Material management in construction jeemiArfan Afzal
 
Material management
Material managementMaterial management
Material managementvruti patel
 
Application of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingApplication of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingIRJET Journal
 
Material management by kailash vilegave shivajirao S. Jondhle college of phar...
Material management by kailash vilegave shivajirao S. Jondhle college of phar...Material management by kailash vilegave shivajirao S. Jondhle college of phar...
Material management by kailash vilegave shivajirao S. Jondhle college of phar...Kailash Vilegave
 
Material management
Material managementMaterial management
Material managementMadiha Ahmed
 
Material management control power point presentation
Material management control power point presentationMaterial management control power point presentation
Material management control power point presentationMuhammad Asif Khan Awan
 
Material management Prof.Saurabh S. Bhange
Material management Prof.Saurabh S. BhangeMaterial management Prof.Saurabh S. Bhange
Material management Prof.Saurabh S. BhangeSaurabh Bhange
 
Material management presentation
Material management presentationMaterial management presentation
Material management presentationAshaEk
 
Materialmanagement&inventorycontrol
Materialmanagement&inventorycontrolMaterialmanagement&inventorycontrol
Materialmanagement&inventorycontrolManish Pandey
 

La actualidad más candente (19)

Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction site
 
070 Material Management and Construction Productivity
070 Material Management and Construction Productivity 070 Material Management and Construction Productivity
070 Material Management and Construction Productivity
 
Materials management ppt
Materials management pptMaterials management ppt
Materials management ppt
 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnet
 
Materials Managment System For Organizations
Materials Managment System For OrganizationsMaterials Managment System For Organizations
Materials Managment System For Organizations
 
Material Management by akshay kakde
Material Management by akshay kakdeMaterial Management by akshay kakde
Material Management by akshay kakde
 
Semester term project (cost & managerial accounting)
Semester term project (cost & managerial accounting)Semester term project (cost & managerial accounting)
Semester term project (cost & managerial accounting)
 
Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...
 
Material management in construction jeemi
Material management in construction jeemiMaterial management in construction jeemi
Material management in construction jeemi
 
Material management
Material managementMaterial management
Material management
 
Application of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential BuildingApplication of ABC Analysis for Material Management of a Residential Building
Application of ABC Analysis for Material Management of a Residential Building
 
Material management by kailash vilegave shivajirao S. Jondhle college of phar...
Material management by kailash vilegave shivajirao S. Jondhle college of phar...Material management by kailash vilegave shivajirao S. Jondhle college of phar...
Material management by kailash vilegave shivajirao S. Jondhle college of phar...
 
MS II UNIT MATERIAL MANAGEMENT PPT
MS II UNIT MATERIAL MANAGEMENT PPTMS II UNIT MATERIAL MANAGEMENT PPT
MS II UNIT MATERIAL MANAGEMENT PPT
 
Material management
Material managementMaterial management
Material management
 
Material management control power point presentation
Material management control power point presentationMaterial management control power point presentation
Material management control power point presentation
 
Material management Prof.Saurabh S. Bhange
Material management Prof.Saurabh S. BhangeMaterial management Prof.Saurabh S. Bhange
Material management Prof.Saurabh S. Bhange
 
Aishh mm
Aishh mmAishh mm
Aishh mm
 
Material management presentation
Material management presentationMaterial management presentation
Material management presentation
 
Materialmanagement&inventorycontrol
Materialmanagement&inventorycontrolMaterialmanagement&inventorycontrol
Materialmanagement&inventorycontrol
 

Similar a Constructionmaterialmanagement 140920032237-phpapp01

Unit IV Material Management _ Contracts.pptx
Unit IV Material Management _ Contracts.pptxUnit IV Material Management _ Contracts.pptx
Unit IV Material Management _ Contracts.pptxPranavDevale2
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET Journal
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Materials Management Introduction to Inventory.ppt
Materials Management  Introduction to Inventory.pptMaterials Management  Introduction to Inventory.ppt
Materials Management Introduction to Inventory.pptssuseref358a
 
Material and Inventory management By Nitin Shekapure
Material and Inventory management By Nitin ShekapureMaterial and Inventory management By Nitin Shekapure
Material and Inventory management By Nitin ShekapureNitin Shekapure
 
Material Management in Pharmacy Sector .pptx
Material Management in Pharmacy Sector .pptxMaterial Management in Pharmacy Sector .pptx
Material Management in Pharmacy Sector .pptxSobiaKamran2
 
CONSTRUCTION PERFORMANCE MANAGEMENT SLIDESHIRE.pptx
CONSTRUCTION PERFORMANCE MANAGEMENT  SLIDESHIRE.pptxCONSTRUCTION PERFORMANCE MANAGEMENT  SLIDESHIRE.pptx
CONSTRUCTION PERFORMANCE MANAGEMENT SLIDESHIRE.pptxabateniguse
 
Industrial management
Industrial managementIndustrial management
Industrial managementPrasathP13
 
Lec 5 - Unit 6 - Inventory.ppt
Lec 5 - Unit 6 - Inventory.pptLec 5 - Unit 6 - Inventory.ppt
Lec 5 - Unit 6 - Inventory.pptJobinJoseph295560
 
Production Management.pptx
Production Management.pptxProduction Management.pptx
Production Management.pptxROHIL
 
Lect 3_Procurement of Raw materials & MRP.pptx
Lect 3_Procurement of Raw materials & MRP.pptxLect 3_Procurement of Raw materials & MRP.pptx
Lect 3_Procurement of Raw materials & MRP.pptxArshiKhan670745
 

Similar a Constructionmaterialmanagement 140920032237-phpapp01 (20)

027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
Unit IV Material Management _ Contracts.pptx
Unit IV Material Management _ Contracts.pptxUnit IV Material Management _ Contracts.pptx
Unit IV Material Management _ Contracts.pptx
 
Material management
Material managementMaterial management
Material management
 
MATERIAL MGT.pptx
MATERIAL MGT.pptxMATERIAL MGT.pptx
MATERIAL MGT.pptx
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Material in cost accounting
Material in cost accountingMaterial in cost accounting
Material in cost accounting
 
Materials Management Introduction to Inventory.ppt
Materials Management  Introduction to Inventory.pptMaterials Management  Introduction to Inventory.ppt
Materials Management Introduction to Inventory.ppt
 
material mngmnt.pdf
material mngmnt.pdfmaterial mngmnt.pdf
material mngmnt.pdf
 
Material and Inventory management By Nitin Shekapure
Material and Inventory management By Nitin ShekapureMaterial and Inventory management By Nitin Shekapure
Material and Inventory management By Nitin Shekapure
 
CV FOR Rajendran
CV FOR RajendranCV FOR Rajendran
CV FOR Rajendran
 
Material Management in Pharmacy Sector .pptx
Material Management in Pharmacy Sector .pptxMaterial Management in Pharmacy Sector .pptx
Material Management in Pharmacy Sector .pptx
 
CONSTRUCTION PERFORMANCE MANAGEMENT SLIDESHIRE.pptx
CONSTRUCTION PERFORMANCE MANAGEMENT  SLIDESHIRE.pptxCONSTRUCTION PERFORMANCE MANAGEMENT  SLIDESHIRE.pptx
CONSTRUCTION PERFORMANCE MANAGEMENT SLIDESHIRE.pptx
 
Industrial management
Industrial managementIndustrial management
Industrial management
 
CV-MANOTOSH-02.07.15
CV-MANOTOSH-02.07.15CV-MANOTOSH-02.07.15
CV-MANOTOSH-02.07.15
 
CV-MANOTOSH-08.07.15
CV-MANOTOSH-08.07.15CV-MANOTOSH-08.07.15
CV-MANOTOSH-08.07.15
 
Magendran New Resume
Magendran New ResumeMagendran New Resume
Magendran New Resume
 
Lec 5 - Unit 6 - Inventory.ppt
Lec 5 - Unit 6 - Inventory.pptLec 5 - Unit 6 - Inventory.ppt
Lec 5 - Unit 6 - Inventory.ppt
 
Production Management.pptx
Production Management.pptxProduction Management.pptx
Production Management.pptx
 
Lect 3_Procurement of Raw materials & MRP.pptx
Lect 3_Procurement of Raw materials & MRP.pptxLect 3_Procurement of Raw materials & MRP.pptx
Lect 3_Procurement of Raw materials & MRP.pptx
 

Más de MVNVKUMAR

Priorities and Time Management-Short-KimberlyWiefling.ppt
Priorities and Time Management-Short-KimberlyWiefling.pptPriorities and Time Management-Short-KimberlyWiefling.ppt
Priorities and Time Management-Short-KimberlyWiefling.pptMVNVKUMAR
 
IOTS-Train-slides-w-audio.pptx
IOTS-Train-slides-w-audio.pptxIOTS-Train-slides-w-audio.pptx
IOTS-Train-slides-w-audio.pptxMVNVKUMAR
 
DISCIPLINE.ppt
DISCIPLINE.pptDISCIPLINE.ppt
DISCIPLINE.pptMVNVKUMAR
 
Physical security.docx
Physical security.docxPhysical security.docx
Physical security.docxMVNVKUMAR
 
DISCIPLINE.ppt
DISCIPLINE.pptDISCIPLINE.ppt
DISCIPLINE.pptMVNVKUMAR
 
KRA.s setting.ppt
KRA.s setting.pptKRA.s setting.ppt
KRA.s setting.pptMVNVKUMAR
 
HUMAN RIGHTS - latest.pptx
HUMAN RIGHTS - latest.pptxHUMAN RIGHTS - latest.pptx
HUMAN RIGHTS - latest.pptxMVNVKUMAR
 
HUMAN RIGHTS.pptx
HUMAN RIGHTS.pptxHUMAN RIGHTS.pptx
HUMAN RIGHTS.pptxMVNVKUMAR
 
3 employeediscipline-
3 employeediscipline-3 employeediscipline-
3 employeediscipline-MVNVKUMAR
 

Más de MVNVKUMAR (11)

Priorities and Time Management-Short-KimberlyWiefling.ppt
Priorities and Time Management-Short-KimberlyWiefling.pptPriorities and Time Management-Short-KimberlyWiefling.ppt
Priorities and Time Management-Short-KimberlyWiefling.ppt
 
IOTS-Train-slides-w-audio.pptx
IOTS-Train-slides-w-audio.pptxIOTS-Train-slides-w-audio.pptx
IOTS-Train-slides-w-audio.pptx
 
DISCIPLINE.ppt
DISCIPLINE.pptDISCIPLINE.ppt
DISCIPLINE.ppt
 
Physical security.docx
Physical security.docxPhysical security.docx
Physical security.docx
 
DISCIPLINE.ppt
DISCIPLINE.pptDISCIPLINE.ppt
DISCIPLINE.ppt
 
KRA.s setting.ppt
KRA.s setting.pptKRA.s setting.ppt
KRA.s setting.ppt
 
HUMAN RIGHTS - latest.pptx
HUMAN RIGHTS - latest.pptxHUMAN RIGHTS - latest.pptx
HUMAN RIGHTS - latest.pptx
 
HUMAN RIGHTS.pptx
HUMAN RIGHTS.pptxHUMAN RIGHTS.pptx
HUMAN RIGHTS.pptx
 
3 employeediscipline-
3 employeediscipline-3 employeediscipline-
3 employeediscipline-
 
9435150
94351509435150
9435150
 
9435150
94351509435150
9435150
 

Último

webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 

Último (20)

webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 

Constructionmaterialmanagement 140920032237-phpapp01

  • 1. MEENAKSHI SUNDARARAJAN COLLEGE OF ENGINNERING, KODAMBAKAM M.E CONSTRUCTION ENGINEERING AND MANAGEMENT CONSTRUCION MATERIAL MANANGEMENT R. Shanmugapriya 311513418014
  • 2. INTRODUCTION • Materials management is a vital function for improving productivity in construction projects. • The management of materials should be considered at all the phases of the construction process and throughout the construction and production periods. • This is because poor materials management can often affect the overall construction time, quality and budget. • It is important for planning and controlling of materials to ensure that the right quality and quantity of materials and installed equipment are appropriately specified in a timely manner, obtained at a reasonable cost, and are available when needed.
  • 3. Definition of Construction Material Management: Material management is defined as planning, identification, procuring, storage, receiving and distribution of materials. The purpose of material management is to assure that the right materials are in the right place, in the right quantise when needed. The responsibility of material management department for the flow of materials from the time the materials are ordered, received, and stored until they are used in the basis of material management.
  • 4. Aim of Material Management To get 1. The Right quality 2. Right quantity of supplies 3. At the Right time 4. At the Right place 5. For the Right cost
  • 5. Objectives and Functions of Materials Management Primary objectives can be classified as: • Efficient materials planning • Buying or Purchasing • Procuring and receiving • Storing and inventory control • Supply and distribution of materials • Quality assurance
  • 6. Secondary Objectives of Materials Management : • Efficient production scheduling • To take make or buy decisions • Prepare specifications and standization of materials • To assist in product design and development • Forecasting demand and quantity of materials requirements • Quality control of materials purchased • Material handling • Use of value analysis and value engineering • Developing skills of workers in materials management • Smooth flow of materials in and out of the organization
  • 7. Classification of Construction Material Material Type Details Example Bulk materials Materials that are delivered in mass and are deposited in a container. Sand,Gravel,Topsoil,Cement, Concrete Bagged materials Materials delivered in bags for ease of handling and controlled use. Cement Palleted materials Bagged materials that are placed in pallets for delivery Cement, Doors Packaged materials Materials that are packaged together to prevent damage during transportation and deterioration when they are stored. Pipes,Tiles,Electrical Fitting
  • 9. Process of Construction Material Management Materials Handling & Traffic Variety .. . . . Purchasing Store Keeping Inventory Control Receiving, Inspection and Despatching Value Analysis, Standardization and Variety Reduction Disposal of Scrap and Surplus, Material Preservation .. . . . Material planning
  • 10. 1. Material Planning • Materials planning include measuring, ordering and scheduling. It is emphasized that planning is a very important process to increase the productivity, profit, and assisting the time to complete the construction projects. • The productivity of the construction project will be hanged if the material planning process is not implemented properly.
  • 11. 2. Purchasing Purchase the materials and have the services from supplier to get the support of operations as the construction project from production to marketing, sales and logistics. For examples, a detailed material list and co- ordination of the purchasing and order of material are significant to assuring the material will available on construction site. According to Ninad Shah and Manish Dave Purchasing procedure can be described as below: • Step 1 – Material Indent • Step 2 – Enquiry to Vendors • Step 3 – Vendor Comparison • Step 4 – Vendor Selection and Negotiations • Step 5 – Purchase Order • Step 6 – Vendor Evaluation
  • 12. 3.Inventory control department: The duties of the inventory control department is to decide about the types of ordering system, fixing the safety stock limits, fixing up the reorder level & maximum / minimum stock level. 4.Receiving, inspection and despatching department The responsibility of Receiving, inspection and despatching department is to receive the materials when delivered by the suppliers. After receiving it, the quantity and quality must be checked. Production parts and materials are checked against blueprints and specifications. Non-production items are also reviewed. When once it is as per the specifications given, the goods will be accepted
  • 13. 5. The Value Analysis and Standardization The Value Analysis and Standardization offer greatest scope, in reducing the materials cost. It also reduce the number of varieties and also helps in finding the substitute for the materials at lesser cost. 6. Logistics Logistics is a concept that stresses movement of the materials and it involve planning, implementing, and controlling the movement and storage of all things from raw materials to the finished f the product to meet client requirements. During construction project, routing of the materials will affect the cost and time to complete the construction projects.
  • 14. 7. Disposal of Scrap and Surplus, Material Preservation • Stock control can categorize as a technique planned to be the cover and to ensure all materials or equipment are available when needed. • Stock control include raw materials, processed materials, assembly components, consumable stores, general stores, maintenance materials and spares, work in progress and finished products. • It is very important as the construction materials were delivery as requested and with the progression by the proper management of stock control. • At the same time, construction activities will generate big amount of the waste and it will cause difficulty to the construction industry. • However, with the planning of the material management which is effective will help to reduce the waste of material and increase the profit of the companies.
  • 15. Problems of Material Management 1. Organization Structure The coordination and communication between estimating department, research and development department, purchasing department, and plant and machineries department should be maintained at highest level Main issues in organisation structure: • Undefined scope • Lack of communication between parties involved • Incomplete drawings Plans are not completed and details are missing • Lack of conformance to requirements • Nonstandard specifications that are not commonly used • Incomplete / ineffective meetings • Difference between plans and specifications • Don’t communicate exactly
  • 16. 2. Procurement problem • Availability of material • Availability of quantity • Price reduction to match competitor’s price • Late deliveries Materials are not delivered as per schedule • Late or incorrect submittals • Poor communication between parties • Lack of conformance to requirements • Unrealistic delivery dates • Re handling of materials • Storage areas are limited or are far from working area • Theft or damaging during handling or other conditions
  • 17. 3. Storage Space • Large number of materials is required depending on the magnitude of the project. • And the term storage space implies both enclosed and open space that can be used to keep materials of work safe until the need for it arise. • All materials need protection against many threats such as pilferage, theft, damage or loss. Material such as aggregates, bricks/blocks may not require enclosed storage protection than proper outdoor positioning and stacking. However, other materials such as reinforcement bars, steel columns, timber, and galvanized steel for trusses must be protected against contact with water in order to avoid rust/corrosion. • The size of proposed building may occupy 60% of the total project site, enabling the remaining 40% to be used for temporary access and site facilities. In such case, the planners must arrange for periodic delivery of certain materials to avoid cluttering the space, and maintain constant operation to keep the
  • 18. 4. Security Problem Security of materials onsite is of paramount importance. Gradual pilferage and theft are issues of concern to the project managers. Loss of materials through pilferage and theft represent financial lost to the project as a whole, and in the end it increases the cost of the project. Materials are prone to be stolen despite being in store. And some materials as earlier mentioned may not require indoor storage. Therefore, a well designated vigilante must be maintained 24 hours onsite.
  • 19. 5. Availability of Materials on Market • Steady flow of materials throughout project duration is among the primary function of material management. However, this can be affected by market availability of the material of work. • Occasionally manufacturers can run out of raw material or be affected by government policy to the extent that production may have to be slow or suspended. Unavailability of materials of work on market can affect material management by either increasing competition in material purchase or delay the general work progress.
  • 20. Importance of Materials Management • Lower prices for material and equipment. • Faster inventory turnover. • Continuity of supply • Reduced lead time • Reduced transportation cost. • Less duplication of efforts. • Elimination of bulk- passing. • Reduced materials obsolescence. • Improved supplier relationship and better records and information. • Better inter-department cooperation & Personnel development
  • 21. Advantages of Materials Management • The better accountability part of the material, as well as other departments and no one can blame others. • As materials management by a single authority, which can lead to better coordination, because it became the central point of any substance-related problems. • Materials management departments to ensure a better quality materials provide a request in a timely fashion department. This can lead to a better performance of the organization.
  • 22. • A materials management system is usually controlled through a system, therefore, can help decision-making related to the material in the organization. • An indirect use of materials management is the development of good quality material, ethical and moral standards in an organization. • Maximum company profit and Improvement of credibility • Improved customer service • Enhancement of communication • Improved quality of staff
  • 23. Inventory Control for Quantitative Analysis Definition: Inventory control can be defined as, “which ensures the supply of required quantity and quality of inventory at the required time and at the same time prevent unnecessary investment in inventories”
  • 24. Objectives of Inventory Control • To ensure that the supply of raw material & finished goods will remain continuous so that production process is not halted and demands of customers are duly met. • To minimise carrying cost of inventory. • To keep investment in inventory at optimum level. • To reduce the losses of theft, obsolescence & wastage etc. • To make arrangement for sale of slow moving items. • To minimise inventory ordering cost.
  • 25. Main Techniques in Inventory Control The Pareto principle states that 80% of the overall consumption value is based on only 20% of total items. In other words, demand is not evenly distributed between items: top sellers vastly outperform the rest. The ABC approach states that, when reviewing inventory, a company should rate items from A to C, basing its ratings on the following rules:
  • 26. 1.ABC Analysis The ABC (Always Better Control) inventory control technique is based on the principle that a small portion of the items may typically represent the bulk of money value of the total inventory in construction process, while a relatively large number of items may from a small part of the money value of stores. The money value is ascertained by multiplying the quantity of material of each item by its unit price.
  • 27. Procedure for ABC Analysis • Make the list of all items of inventory. • Determine the annual volume of usage & money value of each item. • Multiply each item’s annual volume by its rupee value. • Compute each item’s percentage of the total inventory in terms of annual usage in rupees • “A” Category – 5% to 10% of the items represent 70% to 75% of the money value. • “B” Category – 15% to 20% of the items represent 15% to 20% of the money. • “C” Category – The remaining number of the items represent 5% to 10% of the money value. • The relative position of these items show that items of category A should be under the maximum control, items of category B may not be given that much attention and item C may be under a loose control.
  • 28. EOQ analysis The EOQ refers to the order size that will result in the lowest total of ordering and carrying costs for an item of inventory. If a firm place unnecessary orders it will incur unneeded order costs. If a firm places too few order, it must maintain large stocks of goods and will have excessive carrying cost.
  • 29. Technologies in construction Material Management The tools used in the construction industry change constantly with the continuous changes of technology. Researchers are finding ways to apply those changes in technology to construction in order to improve production and lower the cost of the operations. • Bar Codes Applications to Material Management • RFID-Radio Frequency Identification
  • 30. 1.Bar Codes Applications to Material Management Bar code applications in construction are mostly intended to provide accuracy in data collection, to improve productivity and to save time in the data collection process. • Typically, bar codes are used for materials and inventory management. The scope of bar codes extends beyond materials management. • Bar codes provide the advantage of relatively error free data collection, which improves productivity and avoid errors. • Some construction firms that use bar codes claim that it saves time, money and labor while improving the accuracy of inventory.
  • 31. The major applications of bar code to material management identified in previous research can be identified as follow • Field material control • Warehouse maintenance and control • Inventory control applications and tool and consumable material issue • Purchasing and accounting
  • 32. 2. RFID-Radio Frequency Identification A Radio Frequency Identification (RFID) system is an automated data collection system similar to bar code. RFID applications in construction are mostly intended to provide accuracy in data collection, to improve productivity and to save time in the data collection process. An ADC (Automated Data Collection) technology that: • uses radiofrequency waves to transfer data between a reader and a movable item to identify, categorize,track.. • Is fast and does not require physical sight or contact between reader/scanner and the tagged item. • Performs the operation using low cost components. • Attempts to provide unique identification and backend integration that allows for wide range of applications.
  • 33. How RFID Works: There are two primary components of an RFID system as shown in Figure The whole RFID system requires the tags and the reader including an antenna to be operated
  • 34. Details of RFID System Components RFID Components Details Tags Tags or transponder are normally located on the object or people to be identified. Reader Reader interrogator provides, read and write/read facilities through a fixed or mobile reader to communicate data to and from the tags. Antenna Antenna is the conductive element that enables the tag to send and receive data
  • 36. Passive RFID Tag • Generally, passive tags have shorter read ranges of a few inches to 30 feet, but have a long life than active tags. • The passive RFID tags consist of a microchip attached to an antenna and can be packaged in a different way such as mounted on a substrate to create a tag, sandwiched between an adhesive layer and a paper label to create a printable RFID label (or smart label), embedded in a plastic card, a key fob, the wall of a plastic container, and special packaging (to resist heat, cold or harsh cleaning chemicals)
  • 37. • Do not require power – Draws from Interrogator Field • Lower storage capacities (few bits to 1 KB) • Shorter read ranges (4 inches to 15 feet) • Usually WriteOnceReadMany/ReadOnly tags
  • 38. Active RFID Tags: • Active RFID tags have their own internal power supply and are rewritable. • The features of the active tags are much larger and heavier, and more expensive, but have a better noise protection than passive tags. • However, they have a shorter battery life of up to 10 years, with read range of 60 feet to 300 feet (20 metres to 100 metres). • The example of the active RFID tags can be shown in Figure 5. Active tags are more reliable in environments such as water (including human/cattle, which are mostly water), metal (shipping containers, vehicles), or at longer distances for generating strong responses from weak requests. • They also have larger memories than passive tags and the ability to store additional information sent by the transceiver
  • 39.
  • 42. Uses of RFID: RFID had been used for material tracking and material receipt in the construction industry. • Material Tracking: Material as the move in the jobsite since direct contact is not required for data collection. This can avoid theft and lost since managers can notice when materials are not where they are supposed to be. • Materials Receipt: Materials can be easily verified as they arrive to the site. The type of materials received can be known easily and verify if the right quantities were received.
  • 43. RFID Applications • Manufacturing and Processing oInventory and production process monitoring oWarehouse order fulfilment • Supply Chain Management oInventory tracking systems oLogistics management • Retail oInventory control and customer insight oAuto checkout with reverse logistics • Security oAccess control oCounterfeiting and Theft control/prevention • Location Tracking oTraffic movement control and parking management
  • 45. RFID advantages over barcodes • No line of sight required for reading • Multiple items can be read with a single scan • Each tag can carry a lot of data (read/write) • Individual items identified and not just the category • Passive tags have a virtually unlimited lifetime • Active tags can be read from great distances • Can be combined with barcode technology
  • 46. Conclusion This paper has presented a review of Construction material management ,Inventory control and employment of technology in construction projects. • Good planning of materials management can help to avoid any delays of works on site and reduce any extra cost for a project. • It is important to manage all materials and inventory throughout construction activity and processes • It discussed the materials management on construction projects and potential to employ RFID in materials management practices. • It clearly identified that these are important for effectively managing materials management in the construction project in order to provide better handling of construction materials to provide an overall performance of construction projects in term of time, budget (cost) and quality.