COMPANY PROFILE
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Corporate office: Noorjehan Tower (7th floor), 2. No Link Road, Banglamotor, Dhaka-1000.
Khulna office: RCC Bulbul Miru, A-34, Majid Sharoni Road, Sonadanga,Khulna-9000.
Factory: Plot-221, Dhaka Aricha Highway, Jadurchor, Savar-1230.
Phone: 02-9634782, Mobile-01715507082, 01675339272.
E-mail- nirmanshaily@yahoo.com.
Facebook :https://www.facebook.com/NirmanShaily
1
TBCS BUILDING AT COXSBAZAR AIRPORT,
NDE STEEL STRUCTURE LTD
HABIB AGRO JUTE BAG AT KOYA BAZAR, KHULNA
AREA: 20000 SFT SINO Mould Factory, Rajendrapur, Gazipur
INDEX GROUPArea: 25000 Sft
RCC HASAN TOWER
9-STORIED LUXURIOUS APARTMENT AT
KHAN-E- SABUR ROAD KHULNA
COMPLETED : JANUARY, 2013
A Total Solution Of Steel & RCC Building Design,
Supply, Fabrication & Erection Service
RCC NIRMAN
2
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
3
Contents
1. Company Details.
2. Introducing Our Organization.
3. Objectives.
4. Provide Services.
5. Team Management.
6. Design Code
7. Advantage
8. Working Area
9. Building Framing System & Accessories.
10. Experience on construction work as Contractor.
11. Photograph Regarding Completed Project.
12. Manpower (Steel Building).
13. Machineries, Tools & Equipment List for (Steel Building).
14. Manpower (RCC Building).
15. Machineries, Tools & Equipment List for (RCC Building).
16. CEO details.
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
4
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
1. Company Details.
Name Of Company RCC NIRMAN
Nirman Shaily Construction & Builders.
Address : Corporate office: Noorjehan Tower (7th floor),
2. No Link Road, Banglamotor, Dhaka-1000.
Khulna office: RCC Hasan Tower (1st Floor), 35
Khan –A-Sabur Road, Khulna-9000
Factory: Plot-K-221, Dhaka Archa Highway,
Jadurcor,Savar-1230.
Phone & Mobile : 02-9634782, 01715507082, 01675339272.
E-mail : nirmanshaily@yahoo.com.
Facebook :https://www.facebook.com/NirmanShaily
Bank : Brac Bank. ONE Bank, UCB, Bangladesh Commerce
Bank
Year Of Establishment : 2008
Field Of Activities : Design, Shop Detail, Fabrication & Installation
Of Pre-Engineered Steel Building.
Number Of Employees :350 nos
Managing Partner & CEO : Md. Mahabub Alam Jomaddar.
Partner : Sanjoy Chakraborty
Partner : Md.Sazzad Hossain
2. Introducing Our Organization
This is a great opportunity on our part to introduce us as on of the growing
Engineering Consultancy, Construction of RCC & Pre-engineered steel structure
Providers. We provide Architectural ,Structural solution & Supervision , Engage
with supply Erection & Fabrication activities related service to pre-engineered
steel structure. Our supply steel related Materials such as steel sheet panel
(Zinc-Aluminium alloy coated color tin), Decking panel, Column, Rafter, Beam,
purlin, Anchor bolt, Nut-bolts, Fasteners (Screws), Poly foil insulation,
Translucent Sheet, Bracing, Door, Canopy, Natural & Ridge ventilator and mostly
al the materials of Steel Building Construction.
We are very much concern about the quality work and try to gain authorities
satisfaction.
Further to be mention that, we are ready to provide necessary engineering
support including Structural Design, site supervision , erection & fabrication in
Construction Of RCC & steel structure sector.
In Conclusion ,If you think to build a Structure Rcc Building or Steel Building
then call us without any hesitation because we are always ready for work.
Quality work and client satisfaction is our general practice.
We are looking forward to listen you at earliest convenience.
Best Regards
5
Md. Mahabub Alam
MBA (MKT) SEU, MSS (NU)
Managing partner & CEO
RCC NIRMAN
Nirman Shaily Construction & Builders
Director
RCC Builders
Hotline : +8801715507082
Engr. Sanjoy Chakraborty
Chairman, RCC NIRMAN
Managing Director, RCC Builders
partner
Nirman Shaily Construction &
Builders
Mobile : 01922114400
Md. Mahabub Alam Sanjoy Chakraborty
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Md.Sazzad Hossain
Md.Sazzad Hossain
BSC Engr. Civil
partner
RCC NIRMAN
Nirman Shaily Construction &
Builders
Mobile: 01318757522
3. Objectives
Nirman Shaily Constriction & Builders is most effective source for
Engineering Consultancy, Construction of RCC & Pre-engineered steel building.
Simple or complex any other building in steel structure sector like Industrial
warehouse, feed mill, Garage, Agriculture building, Garments (Dying ,knit,
Composite etc all), Play Ground, Roof top Extention, Commercial, residential or any
other building in steel structure sector we can handle as per your requirement, We
have many years of experience & we have expert Design & Technical support .
Our objective is to fill up your requirement and support you by giving Quick and
quality service as per your requirement.
6
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
7
4. Provide Service
1. Engineering Consultancy & Construction Works.
2. Pre-Fabricated steel building service Provider.
a. Steel Building Design, supply Fabrication & Erection Work.
c. Materials Supply of Pre-Fabricated Steel Building.
d. Supply of stainless steel (ss) Products.
e. Erection of Various Stainless Steel (ss) Products.
3. Electrical & Firefighting Works.
a. Electrical Design.
b. Supply Electrical Wiring & fitting fixing.
c. Total Fire fighting works ( Design, Supply & Installation)
4. Industrial Civil work.
5. Residential Civil Work.
a. Decoration Work.
b. Interior Planning and Implementation.
c. Exterior Planning and Implementation.
d. Thai Work.
e. False Ceiling.
f. Piling Work.
g. All kind of Glass Work.
h. Steel Stair Fabrication.
i. Erection of Stainless Steel Products.
6. Project Management.
a. Drawing & Design
b. Supervision
c. Civil Estimation & Costing.
7. Civil Consultancy.
8. Steel Building Consultancy.
9.Landscaping, Roof Gardening ,Fountain & Green Decoration.
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
5. Team Management
Engr. Md. Nazrul Alam
Bsc. Engg.(Civil) BUET, FIEB-04180
Engr. Md. Mahabub Alam Engr. Sanjoy Chakraborty
MBA (MKT)SEU, MSS (NU) MD, RCC Builders Ltd
CEO & Managing Partner
Md.Sazzad Hossain
BSC Engr in Civil
Partner
Md. Shahinur Alam Md. Enamul Haque.
Head Of Design BSC –in-Civil Engineering
BSC.ENGG (CIVIL) BUET, MIEB25708 MIEB: 19474
Md. Rajib Ahmed Miss. Jharna Akter
BSC.ENGG (CIVIL) B.ARCH , STAMFORD
Engr. Md. Nazmul
BSC.ENGG (EEE)
Md. Arifur Rahman , BSS Md. Sohel Boktiar, MCOM
Miss. Shahana Akter, MBS. (NU)
Md. Abul Kalam Azad Md. Rasel Ahmed
BSC-in-Civil Engineering Diploma-in-Civil Engineering
Md. Ruhul Amin Md. Taufik
Diploma-in-Civil Engineering Diploma-in-Civil Engineering
Md. Saha Alam Md. Nurul Islam
Diploma-in-Civil Engineering Diploma-in-Civil Engineering
8
MANAGEMENT
DESIGN
ADMINISTRATION & ACCOUNT
SUPERVISION
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
ADVISOR
6. DESIGN CODE
We following Building Design codes:
A. Loads are Applied in accordance with:
a. BNBC-1993 (Bangladesh National Building Codes)
b. MBMA-2005 (Metal Building Manufacturers Associations)
c. 1300 Sumner Avenue Cleveland, Ohio 44115
d. Metal Building System Manual, 2010
B. Hot rolled and built-up Sections are designed in accordance with:
a. 1989 Manual of Steel Construction,
b. American Institutes of Steel Constructions (AISC)
c. 1 East Wacker Drive, Suite 3100, Chicago, Illinois 60601-2001, USA
C. Cold-formed members are designed in accordance with:
a. AISI-(American Iron and Steel Institute)
b. 2007 Edition of Cold Formed Steel Design Manual
c. 1000 16th Street, NW, Washington, DC 20036, USA
D. Welding is applied in accordance with:
a. AWS 01.1/01.1M-(2008 American welding society)
b. Structural Welding Code- Steel Manual
c. 550 NW LeJeune Road, Miami, FL 33126, USA
E. Structural Analysis, design and detailing is done by the aid of
following softwares:
a. STAAD Pro-2006
b. ETABS-9
c. SAPP-14
d. Autodesk Robot Millennium
e. Auto Cad-2010
9
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Lower building costs:.
In this tough economic time, everyone is on a tight budget, looking for values, &
more efficient ways to build without sacrificing quality. As standardized designs
is used to reduce engineering costs, pre-engineered building is the way to build
affordable, cost competitive structure.
Quick Delivery & Faster installation:
Time savings as much as one-third that of conventional construction time, pre-
engineered steel buildings eliminate the need for on-site modifications time and
expense to your project.
Lower lifecycle costs:
Achieve a greater return on investment (ROI) by choosing a pre-engineered
metal building system. Unforeseen repair costs. Pre-engineered steel buildings
can also be made extremely energy efficient to further lower operating costs.
Virtually unlimited design& architectural flexibility:
Pre-engineered metal buildings can accommodate just about any size project,
from offices to large multipurpose facilities. Steelco steel buildings offer a
clear span of up to 150 feet wide with no columns required, making it a great
solution for hangars, storage facilities, sanctuaries, convention centers, and
gymnasiums. High eave height
Expandability:
Expansion is another attribute that comes associated with pre-engineered steel
buildings. Expanding any existing structure is as easy as removing the end wall
and roof panel and replacing them as soon the new metal frame and wall have
been added. The advantageous feature is not only the convenience of the
expansion but also the economical cost of renovation and minimal interruption of
normal operations.
Green Technology:
Pre-engineered metal buildings are sustainable products with long life cycles,
and offer an affordable way to build a green building that can earn LEED®
credits. Steel building is made from recycled and recyclable steel.
Re-locatable:
Easily dismantlable & relocatable due to bolt & nut assembly. Optimum space
utilization also another attribute of steel building.
10
7. Advantage
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
8. Working Area
• Factory/Industrial building
• Power Station
• Commercial Building
• Residential Building
• Store/Warehouse
• Workshop/Garage
• Institutional Building
• Distribution centre
• Aircraft Hanger
• Exhibition Hall
• Foot over bridge
• Steel structure for silo/conveying materials
11
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
12
13
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
14
BUILD-UP SECTION FABRICATION FLOW
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
15
MEZZANINE FLOOR
CONNECTION IN BEAM & COLUMN
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
16
17
Angle Trim
Fasteners
Not all metal building system providers offer cast aluminum
zinc fasteners with each and every model. A Lifetime Warranty
insures that no red rust will form on the zinc cast head. An
EPDM sealing washer assures a waterproof seal even under
harsh conditions and is protected from ozone and ultraviolet
damage. The result is a longer lasting stronger structure that is
quicker and easier to erect.
Box Gutter
Box Gutter End cap Corner Trim
Downspout
Purlin
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Safeway Steel Buildings are available with a multitude of options for exterior design.
The buyer may choose from four standard panel configurations in a galvalume
finish or eleven colors. (see panel color options). Let our design coordinators help
you develop a panel combination that will fit both your functional and budgetary
requirements.
18
Panel Options
Purlin Bearing Rib (PBR)
Roof Panels
Metal building components offers roof panels feature an extended "overlap" of
metal (per above) that greatly increases both the strength and water sealing
characteristics. Without this feature, roof seams can buckle under stress or load.
A completely water tight and stronger structure characterizes all of our
components.
Panels
Die Formed
Ridgecaps
Safeway offers "Die Formed Ridgecaps." These conform to all standard panel
configurations and provide a much tighter seal at the roof seam. This contributes to
greater energy savings, better pests control and moisture resistance. You can see
(at right) how die formed caps create a much better seal when compared to
overlapping caps.
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
19
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Foil
20
Sandwich Panel
Canopy
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
21
10. Experience on construction work as Contractor
Sl no Name of Project Name of Client Duration
Completion
Date
1
RADIANT ALLIANCE LTD
Project : Factory Building for at
Ashulia.
Work: Steel Building works
Building Area : 22000 Sft
Buildtrade Group
Trade Centre (Level-6)
99, kazi , Karwan Bazar, Dhaka-
1215, .
30 days
April
2011
2
RCC AB Garden
9-Storied Hotel
Plot- 44, Block- B, New Beach R/A,
Cox’s Bazar.
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
3 years
January
2010
3
Design fabrication and installation
of Fire Stair For BRACO (6-
storied) Commercial Cum
Residential Building
Work: Steel Stair works
House no-8/A, Road no- 50,
Gulshan- 2
Begum Rowsan Ara and Co 20 days
December
2011
4
NEW HOPE FEED MILL. CHINA
Project : RAW MATERIALS,
FINISH GODOWN & TOWER
BLOCK Project for at Munshiganj.
Work: Steel Building works
Building Area : 79000 Sft
Buildtrade Group
Trade Centre (Level-6)
99, kazi , Karwan Bazar, Dhaka-
1215, .
60 days
August
2011
5
BISMILLAH GROUP
Project : FACTORY BUILDING FOR
SAHARISH COMPOSITE TOWEL
LIMITED AT BHORAR CHALA,
SREEPUR, GAZIPUR.
Work: Steel Building works
Building Area : 70000 Sft
DESIGN DEN
16/5, Ground floor
Block-C
Mohammadpur
Dhaka-1207
60 days
March
2012
6
VERTICAL EXTENSION
Project : Vertical Extension on 5th floor
At Baridhara DOHS.Dhaka.
Building Area : 3500 Sft
Work: Steel Building works
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215
15 days
December
2011
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
22
Sl no Name of Project Name of Client Duration
Completion
Date
7
RCC Momotaz Mohol
7-Storied Luxurious Apartment
24, Circular Road, Dhanmondi
Dhaka
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
2.5 years
April
2011
8
VERTICAL EXTENSION
Project : Vertical Extension on 5th
floor At Baridhara DOHS.Dhaka.
Building Area : 3500 Sft
Work: Steel Building works
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215.
15 days
January
2012
9
CHANEL 9
Project : Studio for Chanel 9 at
Tejgaon.
Building Area : 10000 Sft
Works: Civil Works for Construction
of Studio for Chanel 9 at Tejgaon.
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215.
40 days
March
2012
10
Project : 3-stroied Rest House
Building at Jaydev pur, Gazipur
Work :Civil Works.
Thai Aluminium,
Tiles & Marble works.
Pavement tiles & Paint works
Begum Rowsan Ara and Co 100 days Completed
11
SHEPHERD TEXTILE
Project : SHEPHERD TEXTILE (BD) Ltd
at Maymansing.
Building Area : 115000 Sft
Work: Steel Building works
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215
60 days
December
2012
12
ACME
Project : Acme Sales Center
(6-storied) at Maymansing.
Building Area :25000.00 Sft
Work: Steel Building works
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215
70 days
February
2013
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Sl no Name of Project Name of Client Duration
Completion
Date
13
RCC Amzad Villa
6-Storied Apartment
97,East Razabazar, Dhaka
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
2 years
January
2012
14
BASUNDHARA GROUP
Project : Basundhara ROTO Printing
Press at Basundhara R/a.
Building Area :40000.00 Sft
Work: Steel Building works
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215
25 days
February
2013
15
JUTE MILL
Project : Haider Kazi Jute Mill at
Madaripur.
Building Area :40000.00 Sft
Work: Steel Building works
DESIGN DEN
16/5, Ground floor
Block-C
Mohammadpur
Dhaka-1207
25 days Dec,2013
16
KHULNA SHIP YARD
Project : FABRICATION SHADE FOR
KHULNA SHIP YARD
Weight: 1000.00 M. Ton
Work: Steel Building works
STEEMARK BUILDIND LTD
17/13, Paribagh
Sonargaon road
Dhaka-1000
90 days Dec,2013
17
PRAN RFL
Project : PRAN RFL Showroom
Building at Dhaka International Trade
fair.(2-Storied)
Work: Steel Building works
DESIGN DEN
16/5, Ground floor
Block-C
Mohammadpur
Dhaka-1207
7 days Dec,2013
18
PALMAL GROUP
Fabrication work for Palmal Group
forDesignDen Ltd, 25 Mton
DESIGN DEN, 16/5, Ground floor
Block-C, Mohammadpur
Dhaka-1207
15 days Sept,2014
23
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
24
Sl no Name of Project Name of Client Duration
Completion
Date
19
RCC Hasan Tower
9-Storied Luxuries Apartment
35, Khan-E-Sabur Road, Khulna
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
3.5 years
December
2013
20
STAR CERAMIC
Project : Star Ceramic ,Hobigonj
Work: Steel Building works
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215
25 days Aug,2014
21
BSRM
Project : BSRM Chittagong, Mirsorai
Building Area : 350000 Sft
Work : Sheeting Work
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215
60 days Sept,2014
22
Project: Fabrication work for
Nolua Tea Garden at Hobigonj,
Shylet, 35 M. Ton
15 days Aug,2014
23
ABA GROUP
Project : Factory building for ABA
Group at Maona Gazipur
Sewing Block :89000 Sft
Warehouse :70000 Sft (3-Storied)
Cutting & Finishing : 61000 Sft
Work: Steel Building works
Buildtrade Group
Dhaka Trade Centre (Level-6)
99, kazi Nazrul Islam Avenue,
Karwan Bazar, Dhaka-1215
60 days
April
2015
24
CJMCL Mill Project (Part)
at Mohora , Kalurghat ,
Chittagong.
ISPAHANI LTD
Area: 450000.00 Sft
Work: Supply & Installation of
Roof sheet & Accessories
M.M ISPAHANI LTD
Ispahani Building
(7th floor),
14-15, Motijheel C/A,
Dhaka-1000
Completed
January, 2016
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
25
Sl no Name of Project Name of Client Duration
Completion
Date
25
RCC Water Valley
8-Storied Luxuries Apartment with
Basement
Ba-84/B, South Badda, Gulshan, Dhaka
Work : Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
3.5 years
September
2014
26
INDEX COMPANIES
Project: SINO MOULD at
Rajendrapur
Work: Design, Supply, Fabrication &
erection work for SINO MOULD
FACTORIES.
Area: 10000 sft
INDEX COMPANIES
House- 34, Road-12
Baridhara Diplomatic Zone
Dhaka-1212
3 Month
Completed
Aug, 2016
27
INDEX COMPANIES
Project: feed mill at Bhaluka
Work: Design, Supply, Fabrication &
erection work for feed mill
FACTORIES.
Area: 9500 sft
INDEX COMPANIES
House- 34, Road-12
Baridhara Diplomatic Zone
Dhaka-1212
2Month
Completed
Aug, 2016
28
M/S ASADULLAH & BROTHERS
FILLING STATION
Project: Filling Station at Rajshahi
Work : Design, Supply, Fabrication &
erection work for Steel & Aluminium
Composite panel works.
Area: 2100.00 Sft
M/S ASADULLAH &
BROTHERS
RAJSHAHI
2 Month
Completed
Dec, 2016
29
ISLAMI BANK FOUNDATION
Project: Remodeling 3-Storied
Building at Savar.
ISLAMI BANK FOUNDATION
Al-Razi Complex ( 10th & 11 th
floor)
166, shahed Nazrul Islam saroni
Purana palton, Dhaka-1000
3MONTH
Completed
Nov/19
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
26
Sl no Name of Project Name of Client Duration
Completion
Date
30
PRE-FABRICATED BRIDGE
Project: 50 ft length 2 nos
Connecting Bridge at AzimPur
Grave yard Mosque.
Dept: DCC
Consutant: SHATOTTO
Arch. Rafik Azam
Dept: DCC
Consutant: SHATOTTO
Arch. Rafik Azam
21 Day
Completed
July/18
31
INDEX COMPANIES
Project: X-BIOZEN at Piroj ali,
Gazipur.
Work: 6-Storied pharmaceutical
buildings Civil work
Area:39000.00sft
INDEX COMPANIES
House- 34, Road-12
Baridhara Diplomatic Zone
Dhaka-1212
Completed
July/18
32
JHAL SOBUJE DHAKA PROJECT
PRE-FABRICATED STEEL WORKS
3-Storied Vertical remodeling and
renovation
Roof Top Café
Mashrabia Jali
Project: Rashulbagh Park
Dept: DCC
Consutant: SHATOTTO
Arch. Rafik Azam
Dept: SCC
Consutant: SHATOTTO
Arch. Rafik Azam
25 days
Completed
November/18
33
7-Stotied Commercial Cum Residential
Building at Cumilla.
Design & Supervision
Md. Mosiur Rahman
Assistant Editor
Daily Somokal
3 Year On-going
34
Vertical Up gradation on 6th floor
by pre-fabricated structure including civil,
sanitary & electrical works etc all complete.
Area: 2200 sft
Client: Maj. General Chowdhury
Sarwardi
House: 408/5
Road-07
2.5 Month Completed/ 19
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
27
Sl no Name of Project Name of Client Duration Completion Date
35
RCC Shopnil Garden
9-Storied Luxurious Apartment with
Basement
39, Ahsan Ahmrd Road, Khulna
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
3.5 years
Completed
December,20
36
JHAL SOBUJE DHAKA PROJECT
PRE-FABRICATED STEEL WORKS
Ikbal road Cricket Field, mohammadpur
Fencing work
Cricket and football ground
Dept: DNCC
Consultant: VITTI
Dept: DNCC
Consultant: VITTI
6.00 Month Completed
August,20
37
JHAL SOBUJE DHAKA PROJECT
PRE-FABRICATED STEEL WORKS
Project: BAISAKHI PARK, BANANI
Many kind of MS Fencing works
Dept: DNCC
Consultant: VITTI
Dept: DNCC
Consultant: VITTI
2.00 Month
Completed
December,2020
38
JHAL SOBUJE DHAKA PROJECT
PRE-FABRICATED STEEL WORKS
Project: BARIDHARA PARK, BANANI
Many kind of MS Fencing works
Dept: DNCC
Consultant: VITTI
Dept: DNCC
Consultant: VITTI
Completed
December,2020
39
ROOF TOP SHED FOR AB. KAIDR
MOLLAH HOUSE
Project: Roof Top shed
Consutant: SHATOTTO
Arch. Rafik Azam
Consultant: SHATOTTO 2.00 Month
Completed
December,21
40
PRE-FABRICATED STEEL WORKS
Project: Dr. FAZLE RABBI PARK,
GULSHAN
Noise Barrier
Walkway Shed
Bridge
Dept: DNCC
Consultant: BUET
Dept: DNCC
Consultant: BUET
3.0 Month On-going
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
28
Sl no Name of Project Name of Client Duration
Completion
Date
41
RCC F.M Tower
9-Storied Luxurious Apartment with
Basement
17, Samsur Rahman Road, Khulna
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
3 years
Completed
December,21
42
RCC Monir’s Dream
6-Storied Luxurious Apartment
209, Bonikpara, Pabla Main Road
Khulna
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
3 years
Completed
May,19
43
RCC Manaf Heights
9-Storied Luxurious Apartment
21, Khan-E-Sabur Road Khulna
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
3.5 years
Completed
July,21
44
RCC Apon Bhobon
9-Storied Luxurious Apartment
195, Sher-E-Bangla Road, Khulna
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
4years
Completed
July,21
45
RCC S.K Tower
9-Storied Luxurious Apartment
Plot-149, Road-09, Sonadanga,
Khulna
Work :Total Construction
Basis: Turn-Key.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
2 years
Completed
July,22
RCC BULBUL MERU
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
29
Sl no Name of Project Name of Client Duration Completion Date
RCC DREAM CASTLE
(PROPOSED)
AFTAB NOGOR, DHAKA.
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
RCC DREAM
CASTLE
(PROPOSED)
AFTAB NOGOR,
DHAKA.
RCC ORCHID PLACE
Plot-412, Road-08, Block-K,
Basundhara
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
On-Going
RCC EKRAM TOWER
27, Islampur Road, Dholkhola,
Khulna
RCC BULDERS
Noorjehan Tower (7th Floor)
2. No. Link Road
Banglamotor,
Dhaka-1000
On-Going
46
NDE STEEL STRUCTURE
Project : TBCS BUILDING
COXSBAZAR AIRPORT
Total Weight: 700.00 MT
Work: Steel Building works
NDE STEEL STRUCTURE
HOUES-22, ROAD-4,
BLOCK-C, BANANI,
DHAKA-1213.
60 days On-Going
47
NDE STEEL STRUCTURE
Project : BD AUTO INDUSTRIES LTD
MIRSORAI ECONOMI ZONE
Total Weight: 2200.00 MT
Work: Steel Building works
NDE STEEL STRUCTURE
HOUES-22, ROAD-4,
BLOCK-C, BANANI,
DHAKA-1213.
180 days On-Going
48
NDE STEEL STRUCTURE
Project : NASIR JUTE INDUSTRIES LTD
KUSHTIA
Total Weight: 8500.00 MT
Work: Steel Building works
NDE STEEL STRUCTURE
HOUES-22, ROAD-4,
BLOCK-C, BANANI,
DHAKA-1213.
90 days On-Going
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
30
31
RCC MOMOTAZ MOHOL.
7-STORIED LUXURIOUS APARTMENT AT CIRCULAR ROAD, DHANMONDI
COMPLETED :JANUARY,2011
RCC AB GARDEN
9-STORIED HOTEL AT NEW BEACH ,COX’S BAZAR
COMPLETED :JANUARY,2010
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
32
33
34
Extension Garments Factory at Gazipur Master Bari.2008
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
35
BRACO Commercial Cum Residential Building at Gulshan, Sept,2010
Studio Channel -9 at Tejgaon,April,2012
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Project : ACME Sales Center at Maymansing.
Buildtrade Project
Work: Steel Building works
Photograph regarding Progress 36
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
RCC HASAN TOWER
9-STORIED LUXURIOUS APARTMENT AT KHAN-E- SABUR ROAD
KHULNA
COMPLETED : JANUARY, 2013
37
RCC WATER VALLEY
8-STORIED LUXURIOUS APARTMENT WITH BASEMENT AT
BADDA, GULSHAN
COMPLETED : SEPTEMBER, 2014
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Project : TEXTILE Building Project for SHEPHERD TEXTILE
(BD) Ltd at Maymansing.
Buildtrade Project
Work: Steel Building works
Area: 115000 Sft. Photograph regarding Progress on 06/10/2012
•38
Project : ROTO Printing Press for Basundhara at Basundhara R/A, Dhaka
Buildtrade Project . Work: Steel Building works
Area: 42000 Sft.Photograph regarding Progress
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
39
Steelmark Project
Fabrication Shade For Khulna Shipyard
Work: Steel Building works
1000 M.ton 79000 Sft
Completed on Dec,2013
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
2-Storied Building for PRAN RFL at Dhaka International
Trade Fair,2014
40
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
41
DESIGN DEN Ltd
Palmal Group , Ashulia
Fabrication works
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
42
43
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
44
Steelmark Project
Fabrication Shade For Khulna Shipyard
Work: Steel Building works
1000 M.ton 79000 Sft
Completed on Dec,2013
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
45
46
47
CLIENT: INDEX COMPANIES
PROJECT: SINO MOULD FACTORY
CLIENT: INDEX COMPANIES
PROJECT: MODELSINO MOULD FACTORY
VISITED BY INDEX HIGH OFFICIAL
ON-GOING PROJECT
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
48
RCC SOPNIL GARDEN.
9-STORIED APARTMENT WITH
BASEMENT AT AHSAN AHMED ROAD
KHULNA
RCC MONIR DREAMS.
6-STORIED AT DAULATH9UR KHULNA
RCC HEMONTHO CHYA
9-STORIED LUXURIOUS APARTMENT AT
TALPUKUR PAR , COMOLLA
RCC FM TOWER
9-STORIED APARTMENT WITH
BASEMENT AT SAMSUR RAHMAN ROAD
KHULNA
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
49
VISITED BY CLIENT
M/S ASADULLAH FILLING STATION
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
50
MAYOR MD. HANIF MOSQUE, AZIMPUR GRAVE YARD.
SOUTH CITY CORPORATION
CONSULTANT: SHATOTTO
SITE VISIT BY DESIGNER ENGR. MD. NAZRUL ALAM
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
51
VERTICAL UP GRADATION ON 6TH FLOOR AT BARIDHARA DOHS
House: 408/5, Road: 07
CLIENT : MAJ. GENERAL CHODHURY HASAN SARWARDI
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
52
JHAL SOBUJE DHAKA PROJECT AT RASHUL BAGH PARK
SOUTH CITY CORPORATION
CONSULTANT: SHATOTTO
VISITED BY CONSULTANT: ARCH. RAFIK AZAM
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
53
JHAL SOBUJE DHAKA PROJECT AT IKBAL ROAD CRICKET FIELD
NORT CITY CORPORATION
CONSULTANT: VITTI STHAPOT VRINDRA
VISITED BY CITY CORPORATION HEAD OFFICE PERSONEL &
CONSULTANT
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
54
RCC MANAF HEIGHT
9-STORIED LUXURIOUS APARTMENT AT KHAN-E-SABUR ROAD, KHULNA
RCC APON VHUBON
9-STORIED LUXURIOUS APARTMENT AT
SHER-E-BANGLA ROAD, KHULNA
RCC SK TOWER
9-STORIED LUXURIOUS APARTMENT AT
SHER-E-BANGLA ROAD, KHULNA
ON-GOING PROJECT
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
On-Going Project
Madina Dream Tower
G+11 Storied Commercial Cum Residential Building
Madina Nagar, Kona khola, Keranigonj.
55
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
56
ROF ROF TOWER
G+10 Storied Commercial Cum Residential
Building
Mahadi Nagar, Kamrangir cor, Keranigonj.
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
57
Sabuj Chaya
G+8 Storied Residential Building
rKeranigonj.
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
58
Kajla Dream Tower
Proposed Design, G+9 Storied Residential
Building
Demra,
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
59
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
60
RCC ORCHID PLACE
Plot-412, Road-08, Block-K, Basundhara.
RCC EKRAM TOWER
27, Islampur Road, Dholkhola, Khulna
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
61
RCC BULBUL MERU
A-34, Mojid Saroni Road, Sonadanga, Khulna.
RCC DREAM CASTLE (PROPOSED)
AFTAB NOGOR, DHAKA.
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
BAISAKHI PARK, BANANI
BAISAKHI PARK, BANANI
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
IKBAL ROAD CRICKET FIELD
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
IKBAL ROAD CRICKET FIELD
PROPOSED LOW HEIGHT FENC
IKBAL ROAD CRICKET FIELD
PROPOSED LOW HEIGHT FENC
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
65
ROOF TOP SHED FOR AB. KADER MOLLAH HOUSE , NORSHINDI
CONSULTANT: SHATOTTO
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
66
DR.FAZLE RABBI PARK
VISITED BY BUET AND DHAKA NORTH CITY CORPORATION
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
67
BD AUTO INDUSTRIES LTD AT MIRSORAI
NDE STEEL STRUCTURE LTD
WEIGTH: 2200 MT
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
68
TBCS BUILDING AT COXSBAZAR AIRPORT
NDE STEEL STRUCTURE LTD
WEIGTH: 700 MT
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
12. Manpower
01. B.sc Engineer (Civil) 7
02. Diploma Engineer (Civil) 10
03. Senior Technician ( Steel Building work) 50
04. Senior Fabricator 25
05. Forman ( Steel Building work) 25
06 . Skill Technician ( Steel Building work) 100
07. Skill labour ( Steel Building work) 220
13. Machineries, Tools & Equipment List
For Steel Building
01. Crane ( Rental) 5 Ton to 200 ton ( Rental)
02. Chain Kappa 50Nos
03. 5"& 6" Rig Set 30’/40’ 20Nos
04. Drill Machine 40Nos
05. Screw Machine 10Nos
06. Grinding Machine 40Nos
07. Wrench (Dale & Ring) 950Nos
08. Welding Machine 50Nos
09. Various size Wire etc.
69
RCC NIRMAN
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
70
14. CEO Details
EMPLOYMENT RECORD
Employer Duration
Position
Held Project Name Client
Duties and
Responsibilities
ENGINEERS AND
CONSULTANT
BANGLADESH LTD.
House # 8/A, Road # 50,
Gulshan -2, Dhaka.
From
January
2010 to
2011
Assistant
Engineer
(Civil).
POLICE PLAZA
CONCORD AT
GULSHAN-01.
Police
Kallyan
Trust
Was responsible for
construction
management, staff
development,
Supervision of
construction works
for quantity &
quality control,
preparation and
submission of
Progress reports.
Shahla K kabir Shahedur
Rahman Associates
House # 303 ( Gr. Floor ),
Road # 04, Baridhara DOHS,
Dhaka.
From
JUNE 2008
TO
DEC.2009
PROJECT
MANAGER
.
■ STYLO TEX
WARE LTD AT
BAHADURPUR,
GAZIPUR.
■ STYLO
FASHION LTD
AT
MASTERBARI,
GAZIPUR
STYLO
GROUP.
Was responsible for
Total construction
management, staff
development,
Supervision of
construction works
for quantity &
quality control,
Prepare estimate&
work program,
preparation and
submission of
Progress reports and
certification of
contractor's bill.
71
Employer Duration
Position
Held Project Name Client
Duties and
Responsibilities
ENGINEERS AND CONSULTANT
BANGLADESH LTD.
House # 8/A, Road # 50,
Gulshan -2, Dhaka.
From
Aug,2004
TO
MAY.2008
Assistant
Engineer
(Civil).
BANGLADESH
BANK COMPLEX
AT RANGPUR
(8-Storied
Foundation and 5-
Stoeried world
Class Central
Bank fasilated
Complex Building)
BANGLADESH
BANK
Was responsible for
Total construction
management, staff
development,
Supervision of
construction works
for quantity &
quality control,
Prepare estimate&
work program,
preparation and
submission of
Progress reports and
certification of
contractor's bill.
ENGINEERS AND CONSULTANT
BANGLADESH LTD.
House # 8/A, Road # 50,
Gulshan -2, Dhaka.
From
Dec, 2003
TO
JULY 2004
PROJECT
MANAGER.
(a) LAKE
PREMIUM ,
House no-14
. Road no - 140.
Gulshan - 01.
Dhaka.
(b) (b) GULSHAN
VIEW
House no - 8/A.
Road No- 50.
Gulshan - 02.
Dhaka.
ECBL Do
ENGINEERS AND CONSULTANT
BANGLADESH LTD.
House # 8/A, Road # 50,
Gulshan -2, Dhaka.
From
Jan,1999
TO
Nov, 2003
Assistant
Engineer
(Civil).
URBAN
PRIMARY
HEALTH CARE
PROJECT At
KHULNA
(24 Nos Building)
Asian
Development
Bank
Do
ENGINEERS AND CONSULTANT
BANGLADESH LTD.
House # 8/A, Road # 50,
Gulshan -2, Dhaka.
From
Jan, 1997
TO
AUG,1998
Site
Engineer
a)Open University at
Barisal( 6 storied
Foundation ).
b).Open University
at Jessore( 6 storied
Foundation ).
Asian
Development
Bank
Do
ENGINEERS AND CONSULTANT
BANGLADESH LTD.
House # 8/A, Road # 50,
Gulshan -2, Dhaka.
From May,
1995 TO
may,1996
Site
Engineer
LGED BHABAN
COMPLEX AT
AGARGAON
LGED Do
1.Md. Saleh Uddin Ahmed, Governor
Bangladesh Bank
2. Architect. Lailun Nahar Ekram,
MD, ECBL
3. Md. Enamul Haque, Chief Engr.
Bangladesh Bank
4. Abul Hashem Khan, Operative
Director, ECBL
5. Md. Mahabub Alam, Assistant
Engr, ECBL
1. Architect Dr. Sahidul Amin, BUET.
2. Prof. Dr. Fakrul Amin, BRTC, BUET
3. Dr. Shariful Islam, BRTC, BUET.
4. Md. Rafiqul Islam, Dept. Residence Engineer, ECBL
5. Md. Mahabub Alam, Assistant Engr, ECBL
74
17. Work as Consultant Engineer Of Government Project
Police Plaza Concord at Gulshan
Bangladesh Bank at Rangpur
75
Open University , Jessore & Barishal
Braco Building at Gulshan-2
Urban Primary Health Care Center at Khulna, 27 Nos
18. Our Working Arena
77
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
78
NIRMAN SHAILY CONSTRUCTION AND BUILDERS
Corporate office: Noorjehan Tower (8th floor), 2. No Link Road, Banglamotor, Dhaka-1000.
Khulna office: RCC Bulbul Miru, A-34, Majid Sharoni Road, Sonadanga,Khulna-9000.
Comilla Office: Silver Crecent Tower, Flat-B1, 2.No. Kandirpar, Comilla-3500, Phone: 081-73574
Factory: Plot-221, Dhak Aricha Highway, Jadurchor, Savar-1230.
Phone: 02-9634782, Mobile-01715507082, 01675339272.
E-mail- nirmanshaily@yahoo.com.
Facebook :https://www.facebook.com/NirmanShaily
RCC NIRMAN

Más contenido relacionado

La actualidad más candente

Redistribution of moments-Part-1
Redistribution of moments-Part-1Redistribution of moments-Part-1
Redistribution of moments-Part-1Subhash Patankar
 
Slope deflection method
Slope deflection methodSlope deflection method
Slope deflection methodAnik Mamun
 
Fire Resistance of Steel Structures
Fire Resistance of Steel StructuresFire Resistance of Steel Structures
Fire Resistance of Steel StructuresAniket Gohil
 
Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete reportBudhramKamait1
 
ACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdfACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdffjimmy
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tankAamir Patni
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptCivil Insider
 
Structural steel design : beam-columns
Structural steel design : beam-columnsStructural steel design : beam-columns
Structural steel design : beam-columnsTimóteo Rocha
 
Unit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsUnit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsSelvakumar Palanisamy
 
1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank 1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank Thomas Magatu
 
Advanced Type Civil Engineering Structures
Advanced Type  Civil Engineering StructuresAdvanced Type  Civil Engineering Structures
Advanced Type Civil Engineering StructuresMalay Talaviya
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
Coupler (08102015)
Coupler (08102015)Coupler (08102015)
Coupler (08102015)Khairul Amri
 

La actualidad más candente (20)

Redistribution of moments-Part-1
Redistribution of moments-Part-1Redistribution of moments-Part-1
Redistribution of moments-Part-1
 
Slope deflection method
Slope deflection methodSlope deflection method
Slope deflection method
 
Fire Resistance of Steel Structures
Fire Resistance of Steel StructuresFire Resistance of Steel Structures
Fire Resistance of Steel Structures
 
Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete report
 
Project
ProjectProject
Project
 
ACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdfACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdf
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed Concept
 
Structural steel design : beam-columns
Structural steel design : beam-columnsStructural steel design : beam-columns
Structural steel design : beam-columns
 
Thumb rules for placing column layout
Thumb rules for placing column layoutThumb rules for placing column layout
Thumb rules for placing column layout
 
Unit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsUnit IV composite beams and continuous beams
Unit IV composite beams and continuous beams
 
Sp16 latest
Sp16 latestSp16 latest
Sp16 latest
 
Under Ground water tank design including estimation and costing
Under Ground  water tank design including estimation and costingUnder Ground  water tank design including estimation and costing
Under Ground water tank design including estimation and costing
 
Shahul
ShahulShahul
Shahul
 
1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank 1 regatta quay rehab boq 20120420 blank
1 regatta quay rehab boq 20120420 blank
 
Lecture 7 strap footing
Lecture 7  strap  footingLecture 7  strap  footing
Lecture 7 strap footing
 
Advanced Type Civil Engineering Structures
Advanced Type  Civil Engineering StructuresAdvanced Type  Civil Engineering Structures
Advanced Type Civil Engineering Structures
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Coupler (08102015)
Coupler (08102015)Coupler (08102015)
Coupler (08102015)
 
Flat bottom Overhead Water tank
Flat bottom Overhead Water tankFlat bottom Overhead Water tank
Flat bottom Overhead Water tank
 

Similar a STEEL & RCC BUILDING PROVIDER IN BANGLADESH

Pre engineering building detailing steel construction detailing
Pre engineering building detailing   steel construction detailingPre engineering building detailing   steel construction detailing
Pre engineering building detailing steel construction detailingSteel Construction Detailing
 
Light Gauge Steel Framing - Stratus Steel
Light Gauge Steel Framing - Stratus SteelLight Gauge Steel Framing - Stratus Steel
Light Gauge Steel Framing - Stratus SteelYuktaChadha1
 
Get to know us - Stratus Steel (1).pdf
Get to know us - Stratus Steel (1).pdfGet to know us - Stratus Steel (1).pdf
Get to know us - Stratus Steel (1).pdfYuktaChadha1
 
Stratus Steel - LGSF Manufactures, India
Stratus Steel - LGSF Manufactures, IndiaStratus Steel - LGSF Manufactures, India
Stratus Steel - LGSF Manufactures, IndiaYuktaChadha2
 
Site report assignment
Site report assignmentSite report assignment
Site report assignmentSze Ting Kuek
 
Steel construction detailing steel construction detailing
Steel construction detailing   steel construction detailingSteel construction detailing   steel construction detailing
Steel construction detailing steel construction detailingSteel Construction Detailing
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Project 1 - Industrialised Building System
Project 1 - Industrialised Building SystemProject 1 - Industrialised Building System
Project 1 - Industrialised Building Systemhilmanaqil1
 
LIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURELIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTUREANKIT BAHAL
 

Similar a STEEL & RCC BUILDING PROVIDER IN BANGLADESH (20)

Pre engineering building detailing steel construction detailing
Pre engineering building detailing   steel construction detailingPre engineering building detailing   steel construction detailing
Pre engineering building detailing steel construction detailing
 
Brochure eb 2017
Brochure eb 2017Brochure eb 2017
Brochure eb 2017
 
Prefab company profile nw
Prefab company profile nwPrefab company profile nw
Prefab company profile nw
 
Light Gauge Steel Framing - Stratus Steel
Light Gauge Steel Framing - Stratus SteelLight Gauge Steel Framing - Stratus Steel
Light Gauge Steel Framing - Stratus Steel
 
Get to know us - Stratus Steel (1).pdf
Get to know us - Stratus Steel (1).pdfGet to know us - Stratus Steel (1).pdf
Get to know us - Stratus Steel (1).pdf
 
Stratus Steel - LGSF Manufactures, India
Stratus Steel - LGSF Manufactures, IndiaStratus Steel - LGSF Manufactures, India
Stratus Steel - LGSF Manufactures, India
 
Structural detailing services
Structural detailing servicesStructural detailing services
Structural detailing services
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
ecosteel Presentation
ecosteel Presentationecosteel Presentation
ecosteel Presentation
 
SE Roofing Solutions Profile - Copy
SE Roofing Solutions Profile - CopySE Roofing Solutions Profile - Copy
SE Roofing Solutions Profile - Copy
 
Multi Storey Steel Structures
Multi Storey Steel StructuresMulti Storey Steel Structures
Multi Storey Steel Structures
 
Steel construction detailing steel construction detailing
Steel construction detailing   steel construction detailingSteel construction detailing   steel construction detailing
Steel construction detailing steel construction detailing
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Steel frame work
Steel frame workSteel frame work
Steel frame work
 
Lecture 1_CIE 552.pdf
Lecture 1_CIE 552.pdfLecture 1_CIE 552.pdf
Lecture 1_CIE 552.pdf
 
Company brochure
Company brochureCompany brochure
Company brochure
 
Brochure Sunvik RTF
Brochure Sunvik RTFBrochure Sunvik RTF
Brochure Sunvik RTF
 
Steel Fabrication Drawings-new.pptx
Steel Fabrication Drawings-new.pptxSteel Fabrication Drawings-new.pptx
Steel Fabrication Drawings-new.pptx
 
Project 1 - Industrialised Building System
Project 1 - Industrialised Building SystemProject 1 - Industrialised Building System
Project 1 - Industrialised Building System
 
LIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURELIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURE
 

Último

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 

Último (20)

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

STEEL & RCC BUILDING PROVIDER IN BANGLADESH

  • 1. COMPANY PROFILE NIRMAN SHAILY CONSTRUCTION AND BUILDERS Corporate office: Noorjehan Tower (7th floor), 2. No Link Road, Banglamotor, Dhaka-1000. Khulna office: RCC Bulbul Miru, A-34, Majid Sharoni Road, Sonadanga,Khulna-9000. Factory: Plot-221, Dhaka Aricha Highway, Jadurchor, Savar-1230. Phone: 02-9634782, Mobile-01715507082, 01675339272. E-mail- nirmanshaily@yahoo.com. Facebook :https://www.facebook.com/NirmanShaily 1 TBCS BUILDING AT COXSBAZAR AIRPORT, NDE STEEL STRUCTURE LTD HABIB AGRO JUTE BAG AT KOYA BAZAR, KHULNA AREA: 20000 SFT SINO Mould Factory, Rajendrapur, Gazipur INDEX GROUPArea: 25000 Sft RCC HASAN TOWER 9-STORIED LUXURIOUS APARTMENT AT KHAN-E- SABUR ROAD KHULNA COMPLETED : JANUARY, 2013 A Total Solution Of Steel & RCC Building Design, Supply, Fabrication & Erection Service RCC NIRMAN
  • 2. 2 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 3. 3 Contents 1. Company Details. 2. Introducing Our Organization. 3. Objectives. 4. Provide Services. 5. Team Management. 6. Design Code 7. Advantage 8. Working Area 9. Building Framing System & Accessories. 10. Experience on construction work as Contractor. 11. Photograph Regarding Completed Project. 12. Manpower (Steel Building). 13. Machineries, Tools & Equipment List for (Steel Building). 14. Manpower (RCC Building). 15. Machineries, Tools & Equipment List for (RCC Building). 16. CEO details. RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 4. 4 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS 1. Company Details. Name Of Company RCC NIRMAN Nirman Shaily Construction & Builders. Address : Corporate office: Noorjehan Tower (7th floor), 2. No Link Road, Banglamotor, Dhaka-1000. Khulna office: RCC Hasan Tower (1st Floor), 35 Khan –A-Sabur Road, Khulna-9000 Factory: Plot-K-221, Dhaka Archa Highway, Jadurcor,Savar-1230. Phone & Mobile : 02-9634782, 01715507082, 01675339272. E-mail : nirmanshaily@yahoo.com. Facebook :https://www.facebook.com/NirmanShaily Bank : Brac Bank. ONE Bank, UCB, Bangladesh Commerce Bank Year Of Establishment : 2008 Field Of Activities : Design, Shop Detail, Fabrication & Installation Of Pre-Engineered Steel Building. Number Of Employees :350 nos Managing Partner & CEO : Md. Mahabub Alam Jomaddar. Partner : Sanjoy Chakraborty Partner : Md.Sazzad Hossain
  • 5. 2. Introducing Our Organization This is a great opportunity on our part to introduce us as on of the growing Engineering Consultancy, Construction of RCC & Pre-engineered steel structure Providers. We provide Architectural ,Structural solution & Supervision , Engage with supply Erection & Fabrication activities related service to pre-engineered steel structure. Our supply steel related Materials such as steel sheet panel (Zinc-Aluminium alloy coated color tin), Decking panel, Column, Rafter, Beam, purlin, Anchor bolt, Nut-bolts, Fasteners (Screws), Poly foil insulation, Translucent Sheet, Bracing, Door, Canopy, Natural & Ridge ventilator and mostly al the materials of Steel Building Construction. We are very much concern about the quality work and try to gain authorities satisfaction. Further to be mention that, we are ready to provide necessary engineering support including Structural Design, site supervision , erection & fabrication in Construction Of RCC & steel structure sector. In Conclusion ,If you think to build a Structure Rcc Building or Steel Building then call us without any hesitation because we are always ready for work. Quality work and client satisfaction is our general practice. We are looking forward to listen you at earliest convenience. Best Regards 5 Md. Mahabub Alam MBA (MKT) SEU, MSS (NU) Managing partner & CEO RCC NIRMAN Nirman Shaily Construction & Builders Director RCC Builders Hotline : +8801715507082 Engr. Sanjoy Chakraborty Chairman, RCC NIRMAN Managing Director, RCC Builders partner Nirman Shaily Construction & Builders Mobile : 01922114400 Md. Mahabub Alam Sanjoy Chakraborty RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS Md.Sazzad Hossain Md.Sazzad Hossain BSC Engr. Civil partner RCC NIRMAN Nirman Shaily Construction & Builders Mobile: 01318757522
  • 6. 3. Objectives Nirman Shaily Constriction & Builders is most effective source for Engineering Consultancy, Construction of RCC & Pre-engineered steel building. Simple or complex any other building in steel structure sector like Industrial warehouse, feed mill, Garage, Agriculture building, Garments (Dying ,knit, Composite etc all), Play Ground, Roof top Extention, Commercial, residential or any other building in steel structure sector we can handle as per your requirement, We have many years of experience & we have expert Design & Technical support . Our objective is to fill up your requirement and support you by giving Quick and quality service as per your requirement. 6 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 7. 7 4. Provide Service 1. Engineering Consultancy & Construction Works. 2. Pre-Fabricated steel building service Provider. a. Steel Building Design, supply Fabrication & Erection Work. c. Materials Supply of Pre-Fabricated Steel Building. d. Supply of stainless steel (ss) Products. e. Erection of Various Stainless Steel (ss) Products. 3. Electrical & Firefighting Works. a. Electrical Design. b. Supply Electrical Wiring & fitting fixing. c. Total Fire fighting works ( Design, Supply & Installation) 4. Industrial Civil work. 5. Residential Civil Work. a. Decoration Work. b. Interior Planning and Implementation. c. Exterior Planning and Implementation. d. Thai Work. e. False Ceiling. f. Piling Work. g. All kind of Glass Work. h. Steel Stair Fabrication. i. Erection of Stainless Steel Products. 6. Project Management. a. Drawing & Design b. Supervision c. Civil Estimation & Costing. 7. Civil Consultancy. 8. Steel Building Consultancy. 9.Landscaping, Roof Gardening ,Fountain & Green Decoration. RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 8. 5. Team Management Engr. Md. Nazrul Alam Bsc. Engg.(Civil) BUET, FIEB-04180 Engr. Md. Mahabub Alam Engr. Sanjoy Chakraborty MBA (MKT)SEU, MSS (NU) MD, RCC Builders Ltd CEO & Managing Partner Md.Sazzad Hossain BSC Engr in Civil Partner Md. Shahinur Alam Md. Enamul Haque. Head Of Design BSC –in-Civil Engineering BSC.ENGG (CIVIL) BUET, MIEB25708 MIEB: 19474 Md. Rajib Ahmed Miss. Jharna Akter BSC.ENGG (CIVIL) B.ARCH , STAMFORD Engr. Md. Nazmul BSC.ENGG (EEE) Md. Arifur Rahman , BSS Md. Sohel Boktiar, MCOM Miss. Shahana Akter, MBS. (NU) Md. Abul Kalam Azad Md. Rasel Ahmed BSC-in-Civil Engineering Diploma-in-Civil Engineering Md. Ruhul Amin Md. Taufik Diploma-in-Civil Engineering Diploma-in-Civil Engineering Md. Saha Alam Md. Nurul Islam Diploma-in-Civil Engineering Diploma-in-Civil Engineering 8 MANAGEMENT DESIGN ADMINISTRATION & ACCOUNT SUPERVISION RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS ADVISOR
  • 9. 6. DESIGN CODE We following Building Design codes: A. Loads are Applied in accordance with: a. BNBC-1993 (Bangladesh National Building Codes) b. MBMA-2005 (Metal Building Manufacturers Associations) c. 1300 Sumner Avenue Cleveland, Ohio 44115 d. Metal Building System Manual, 2010 B. Hot rolled and built-up Sections are designed in accordance with: a. 1989 Manual of Steel Construction, b. American Institutes of Steel Constructions (AISC) c. 1 East Wacker Drive, Suite 3100, Chicago, Illinois 60601-2001, USA C. Cold-formed members are designed in accordance with: a. AISI-(American Iron and Steel Institute) b. 2007 Edition of Cold Formed Steel Design Manual c. 1000 16th Street, NW, Washington, DC 20036, USA D. Welding is applied in accordance with: a. AWS 01.1/01.1M-(2008 American welding society) b. Structural Welding Code- Steel Manual c. 550 NW LeJeune Road, Miami, FL 33126, USA E. Structural Analysis, design and detailing is done by the aid of following softwares: a. STAAD Pro-2006 b. ETABS-9 c. SAPP-14 d. Autodesk Robot Millennium e. Auto Cad-2010 9 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 10. Lower building costs:. In this tough economic time, everyone is on a tight budget, looking for values, & more efficient ways to build without sacrificing quality. As standardized designs is used to reduce engineering costs, pre-engineered building is the way to build affordable, cost competitive structure. Quick Delivery & Faster installation: Time savings as much as one-third that of conventional construction time, pre- engineered steel buildings eliminate the need for on-site modifications time and expense to your project. Lower lifecycle costs: Achieve a greater return on investment (ROI) by choosing a pre-engineered metal building system. Unforeseen repair costs. Pre-engineered steel buildings can also be made extremely energy efficient to further lower operating costs. Virtually unlimited design& architectural flexibility: Pre-engineered metal buildings can accommodate just about any size project, from offices to large multipurpose facilities. Steelco steel buildings offer a clear span of up to 150 feet wide with no columns required, making it a great solution for hangars, storage facilities, sanctuaries, convention centers, and gymnasiums. High eave height Expandability: Expansion is another attribute that comes associated with pre-engineered steel buildings. Expanding any existing structure is as easy as removing the end wall and roof panel and replacing them as soon the new metal frame and wall have been added. The advantageous feature is not only the convenience of the expansion but also the economical cost of renovation and minimal interruption of normal operations. Green Technology: Pre-engineered metal buildings are sustainable products with long life cycles, and offer an affordable way to build a green building that can earn LEED® credits. Steel building is made from recycled and recyclable steel. Re-locatable: Easily dismantlable & relocatable due to bolt & nut assembly. Optimum space utilization also another attribute of steel building. 10 7. Advantage RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 11. 8. Working Area • Factory/Industrial building • Power Station • Commercial Building • Residential Building • Store/Warehouse • Workshop/Garage • Institutional Building • Distribution centre • Aircraft Hanger • Exhibition Hall • Foot over bridge • Steel structure for silo/conveying materials 11 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 12. 12
  • 13. 13 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 14. 14 BUILD-UP SECTION FABRICATION FLOW RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 15. 15 MEZZANINE FLOOR CONNECTION IN BEAM & COLUMN RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 16. 16
  • 17. 17 Angle Trim Fasteners Not all metal building system providers offer cast aluminum zinc fasteners with each and every model. A Lifetime Warranty insures that no red rust will form on the zinc cast head. An EPDM sealing washer assures a waterproof seal even under harsh conditions and is protected from ozone and ultraviolet damage. The result is a longer lasting stronger structure that is quicker and easier to erect. Box Gutter Box Gutter End cap Corner Trim Downspout Purlin RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 18. Safeway Steel Buildings are available with a multitude of options for exterior design. The buyer may choose from four standard panel configurations in a galvalume finish or eleven colors. (see panel color options). Let our design coordinators help you develop a panel combination that will fit both your functional and budgetary requirements. 18 Panel Options Purlin Bearing Rib (PBR) Roof Panels Metal building components offers roof panels feature an extended "overlap" of metal (per above) that greatly increases both the strength and water sealing characteristics. Without this feature, roof seams can buckle under stress or load. A completely water tight and stronger structure characterizes all of our components. Panels Die Formed Ridgecaps Safeway offers "Die Formed Ridgecaps." These conform to all standard panel configurations and provide a much tighter seal at the roof seam. This contributes to greater energy savings, better pests control and moisture resistance. You can see (at right) how die formed caps create a much better seal when compared to overlapping caps. RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 19. 19 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 20. Foil 20 Sandwich Panel Canopy RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 21. 21 10. Experience on construction work as Contractor Sl no Name of Project Name of Client Duration Completion Date 1 RADIANT ALLIANCE LTD Project : Factory Building for at Ashulia. Work: Steel Building works Building Area : 22000 Sft Buildtrade Group Trade Centre (Level-6) 99, kazi , Karwan Bazar, Dhaka- 1215, . 30 days April 2011 2 RCC AB Garden 9-Storied Hotel Plot- 44, Block- B, New Beach R/A, Cox’s Bazar. Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 3 years January 2010 3 Design fabrication and installation of Fire Stair For BRACO (6- storied) Commercial Cum Residential Building Work: Steel Stair works House no-8/A, Road no- 50, Gulshan- 2 Begum Rowsan Ara and Co 20 days December 2011 4 NEW HOPE FEED MILL. CHINA Project : RAW MATERIALS, FINISH GODOWN & TOWER BLOCK Project for at Munshiganj. Work: Steel Building works Building Area : 79000 Sft Buildtrade Group Trade Centre (Level-6) 99, kazi , Karwan Bazar, Dhaka- 1215, . 60 days August 2011 5 BISMILLAH GROUP Project : FACTORY BUILDING FOR SAHARISH COMPOSITE TOWEL LIMITED AT BHORAR CHALA, SREEPUR, GAZIPUR. Work: Steel Building works Building Area : 70000 Sft DESIGN DEN 16/5, Ground floor Block-C Mohammadpur Dhaka-1207 60 days March 2012 6 VERTICAL EXTENSION Project : Vertical Extension on 5th floor At Baridhara DOHS.Dhaka. Building Area : 3500 Sft Work: Steel Building works Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215 15 days December 2011 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 22. 22 Sl no Name of Project Name of Client Duration Completion Date 7 RCC Momotaz Mohol 7-Storied Luxurious Apartment 24, Circular Road, Dhanmondi Dhaka Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 2.5 years April 2011 8 VERTICAL EXTENSION Project : Vertical Extension on 5th floor At Baridhara DOHS.Dhaka. Building Area : 3500 Sft Work: Steel Building works Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215. 15 days January 2012 9 CHANEL 9 Project : Studio for Chanel 9 at Tejgaon. Building Area : 10000 Sft Works: Civil Works for Construction of Studio for Chanel 9 at Tejgaon. Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215. 40 days March 2012 10 Project : 3-stroied Rest House Building at Jaydev pur, Gazipur Work :Civil Works. Thai Aluminium, Tiles & Marble works. Pavement tiles & Paint works Begum Rowsan Ara and Co 100 days Completed 11 SHEPHERD TEXTILE Project : SHEPHERD TEXTILE (BD) Ltd at Maymansing. Building Area : 115000 Sft Work: Steel Building works Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215 60 days December 2012 12 ACME Project : Acme Sales Center (6-storied) at Maymansing. Building Area :25000.00 Sft Work: Steel Building works Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215 70 days February 2013 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 23. Sl no Name of Project Name of Client Duration Completion Date 13 RCC Amzad Villa 6-Storied Apartment 97,East Razabazar, Dhaka Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 2 years January 2012 14 BASUNDHARA GROUP Project : Basundhara ROTO Printing Press at Basundhara R/a. Building Area :40000.00 Sft Work: Steel Building works Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215 25 days February 2013 15 JUTE MILL Project : Haider Kazi Jute Mill at Madaripur. Building Area :40000.00 Sft Work: Steel Building works DESIGN DEN 16/5, Ground floor Block-C Mohammadpur Dhaka-1207 25 days Dec,2013 16 KHULNA SHIP YARD Project : FABRICATION SHADE FOR KHULNA SHIP YARD Weight: 1000.00 M. Ton Work: Steel Building works STEEMARK BUILDIND LTD 17/13, Paribagh Sonargaon road Dhaka-1000 90 days Dec,2013 17 PRAN RFL Project : PRAN RFL Showroom Building at Dhaka International Trade fair.(2-Storied) Work: Steel Building works DESIGN DEN 16/5, Ground floor Block-C Mohammadpur Dhaka-1207 7 days Dec,2013 18 PALMAL GROUP Fabrication work for Palmal Group forDesignDen Ltd, 25 Mton DESIGN DEN, 16/5, Ground floor Block-C, Mohammadpur Dhaka-1207 15 days Sept,2014 23 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 24. 24 Sl no Name of Project Name of Client Duration Completion Date 19 RCC Hasan Tower 9-Storied Luxuries Apartment 35, Khan-E-Sabur Road, Khulna Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 3.5 years December 2013 20 STAR CERAMIC Project : Star Ceramic ,Hobigonj Work: Steel Building works Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215 25 days Aug,2014 21 BSRM Project : BSRM Chittagong, Mirsorai Building Area : 350000 Sft Work : Sheeting Work Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215 60 days Sept,2014 22 Project: Fabrication work for Nolua Tea Garden at Hobigonj, Shylet, 35 M. Ton 15 days Aug,2014 23 ABA GROUP Project : Factory building for ABA Group at Maona Gazipur Sewing Block :89000 Sft Warehouse :70000 Sft (3-Storied) Cutting & Finishing : 61000 Sft Work: Steel Building works Buildtrade Group Dhaka Trade Centre (Level-6) 99, kazi Nazrul Islam Avenue, Karwan Bazar, Dhaka-1215 60 days April 2015 24 CJMCL Mill Project (Part) at Mohora , Kalurghat , Chittagong. ISPAHANI LTD Area: 450000.00 Sft Work: Supply & Installation of Roof sheet & Accessories M.M ISPAHANI LTD Ispahani Building (7th floor), 14-15, Motijheel C/A, Dhaka-1000 Completed January, 2016 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 25. 25 Sl no Name of Project Name of Client Duration Completion Date 25 RCC Water Valley 8-Storied Luxuries Apartment with Basement Ba-84/B, South Badda, Gulshan, Dhaka Work : Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 3.5 years September 2014 26 INDEX COMPANIES Project: SINO MOULD at Rajendrapur Work: Design, Supply, Fabrication & erection work for SINO MOULD FACTORIES. Area: 10000 sft INDEX COMPANIES House- 34, Road-12 Baridhara Diplomatic Zone Dhaka-1212 3 Month Completed Aug, 2016 27 INDEX COMPANIES Project: feed mill at Bhaluka Work: Design, Supply, Fabrication & erection work for feed mill FACTORIES. Area: 9500 sft INDEX COMPANIES House- 34, Road-12 Baridhara Diplomatic Zone Dhaka-1212 2Month Completed Aug, 2016 28 M/S ASADULLAH & BROTHERS FILLING STATION Project: Filling Station at Rajshahi Work : Design, Supply, Fabrication & erection work for Steel & Aluminium Composite panel works. Area: 2100.00 Sft M/S ASADULLAH & BROTHERS RAJSHAHI 2 Month Completed Dec, 2016 29 ISLAMI BANK FOUNDATION Project: Remodeling 3-Storied Building at Savar. ISLAMI BANK FOUNDATION Al-Razi Complex ( 10th & 11 th floor) 166, shahed Nazrul Islam saroni Purana palton, Dhaka-1000 3MONTH Completed Nov/19 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 26. 26 Sl no Name of Project Name of Client Duration Completion Date 30 PRE-FABRICATED BRIDGE Project: 50 ft length 2 nos Connecting Bridge at AzimPur Grave yard Mosque. Dept: DCC Consutant: SHATOTTO Arch. Rafik Azam Dept: DCC Consutant: SHATOTTO Arch. Rafik Azam 21 Day Completed July/18 31 INDEX COMPANIES Project: X-BIOZEN at Piroj ali, Gazipur. Work: 6-Storied pharmaceutical buildings Civil work Area:39000.00sft INDEX COMPANIES House- 34, Road-12 Baridhara Diplomatic Zone Dhaka-1212 Completed July/18 32 JHAL SOBUJE DHAKA PROJECT PRE-FABRICATED STEEL WORKS 3-Storied Vertical remodeling and renovation Roof Top Café Mashrabia Jali Project: Rashulbagh Park Dept: DCC Consutant: SHATOTTO Arch. Rafik Azam Dept: SCC Consutant: SHATOTTO Arch. Rafik Azam 25 days Completed November/18 33 7-Stotied Commercial Cum Residential Building at Cumilla. Design & Supervision Md. Mosiur Rahman Assistant Editor Daily Somokal 3 Year On-going 34 Vertical Up gradation on 6th floor by pre-fabricated structure including civil, sanitary & electrical works etc all complete. Area: 2200 sft Client: Maj. General Chowdhury Sarwardi House: 408/5 Road-07 2.5 Month Completed/ 19 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 27. 27 Sl no Name of Project Name of Client Duration Completion Date 35 RCC Shopnil Garden 9-Storied Luxurious Apartment with Basement 39, Ahsan Ahmrd Road, Khulna Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 3.5 years Completed December,20 36 JHAL SOBUJE DHAKA PROJECT PRE-FABRICATED STEEL WORKS Ikbal road Cricket Field, mohammadpur Fencing work Cricket and football ground Dept: DNCC Consultant: VITTI Dept: DNCC Consultant: VITTI 6.00 Month Completed August,20 37 JHAL SOBUJE DHAKA PROJECT PRE-FABRICATED STEEL WORKS Project: BAISAKHI PARK, BANANI Many kind of MS Fencing works Dept: DNCC Consultant: VITTI Dept: DNCC Consultant: VITTI 2.00 Month Completed December,2020 38 JHAL SOBUJE DHAKA PROJECT PRE-FABRICATED STEEL WORKS Project: BARIDHARA PARK, BANANI Many kind of MS Fencing works Dept: DNCC Consultant: VITTI Dept: DNCC Consultant: VITTI Completed December,2020 39 ROOF TOP SHED FOR AB. KAIDR MOLLAH HOUSE Project: Roof Top shed Consutant: SHATOTTO Arch. Rafik Azam Consultant: SHATOTTO 2.00 Month Completed December,21 40 PRE-FABRICATED STEEL WORKS Project: Dr. FAZLE RABBI PARK, GULSHAN Noise Barrier Walkway Shed Bridge Dept: DNCC Consultant: BUET Dept: DNCC Consultant: BUET 3.0 Month On-going RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 28. 28 Sl no Name of Project Name of Client Duration Completion Date 41 RCC F.M Tower 9-Storied Luxurious Apartment with Basement 17, Samsur Rahman Road, Khulna Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 3 years Completed December,21 42 RCC Monir’s Dream 6-Storied Luxurious Apartment 209, Bonikpara, Pabla Main Road Khulna Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 3 years Completed May,19 43 RCC Manaf Heights 9-Storied Luxurious Apartment 21, Khan-E-Sabur Road Khulna Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 3.5 years Completed July,21 44 RCC Apon Bhobon 9-Storied Luxurious Apartment 195, Sher-E-Bangla Road, Khulna Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 4years Completed July,21 45 RCC S.K Tower 9-Storied Luxurious Apartment Plot-149, Road-09, Sonadanga, Khulna Work :Total Construction Basis: Turn-Key. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 2 years Completed July,22 RCC BULBUL MERU RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 29. 29 Sl no Name of Project Name of Client Duration Completion Date RCC DREAM CASTLE (PROPOSED) AFTAB NOGOR, DHAKA. RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 RCC DREAM CASTLE (PROPOSED) AFTAB NOGOR, DHAKA. RCC ORCHID PLACE Plot-412, Road-08, Block-K, Basundhara RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 On-Going RCC EKRAM TOWER 27, Islampur Road, Dholkhola, Khulna RCC BULDERS Noorjehan Tower (7th Floor) 2. No. Link Road Banglamotor, Dhaka-1000 On-Going 46 NDE STEEL STRUCTURE Project : TBCS BUILDING COXSBAZAR AIRPORT Total Weight: 700.00 MT Work: Steel Building works NDE STEEL STRUCTURE HOUES-22, ROAD-4, BLOCK-C, BANANI, DHAKA-1213. 60 days On-Going 47 NDE STEEL STRUCTURE Project : BD AUTO INDUSTRIES LTD MIRSORAI ECONOMI ZONE Total Weight: 2200.00 MT Work: Steel Building works NDE STEEL STRUCTURE HOUES-22, ROAD-4, BLOCK-C, BANANI, DHAKA-1213. 180 days On-Going 48 NDE STEEL STRUCTURE Project : NASIR JUTE INDUSTRIES LTD KUSHTIA Total Weight: 8500.00 MT Work: Steel Building works NDE STEEL STRUCTURE HOUES-22, ROAD-4, BLOCK-C, BANANI, DHAKA-1213. 90 days On-Going RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 30. 30
  • 31. 31 RCC MOMOTAZ MOHOL. 7-STORIED LUXURIOUS APARTMENT AT CIRCULAR ROAD, DHANMONDI COMPLETED :JANUARY,2011 RCC AB GARDEN 9-STORIED HOTEL AT NEW BEACH ,COX’S BAZAR COMPLETED :JANUARY,2010 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 32. 32
  • 33. 33
  • 34. 34 Extension Garments Factory at Gazipur Master Bari.2008 NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 35. 35 BRACO Commercial Cum Residential Building at Gulshan, Sept,2010 Studio Channel -9 at Tejgaon,April,2012 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 36. Project : ACME Sales Center at Maymansing. Buildtrade Project Work: Steel Building works Photograph regarding Progress 36 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 37. RCC HASAN TOWER 9-STORIED LUXURIOUS APARTMENT AT KHAN-E- SABUR ROAD KHULNA COMPLETED : JANUARY, 2013 37 RCC WATER VALLEY 8-STORIED LUXURIOUS APARTMENT WITH BASEMENT AT BADDA, GULSHAN COMPLETED : SEPTEMBER, 2014 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 38. Project : TEXTILE Building Project for SHEPHERD TEXTILE (BD) Ltd at Maymansing. Buildtrade Project Work: Steel Building works Area: 115000 Sft. Photograph regarding Progress on 06/10/2012 •38 Project : ROTO Printing Press for Basundhara at Basundhara R/A, Dhaka Buildtrade Project . Work: Steel Building works Area: 42000 Sft.Photograph regarding Progress RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 39. 39 Steelmark Project Fabrication Shade For Khulna Shipyard Work: Steel Building works 1000 M.ton 79000 Sft Completed on Dec,2013 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 40. 2-Storied Building for PRAN RFL at Dhaka International Trade Fair,2014 40 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 41. 41 DESIGN DEN Ltd Palmal Group , Ashulia Fabrication works RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 42. 42
  • 43. 43 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 44. 44 Steelmark Project Fabrication Shade For Khulna Shipyard Work: Steel Building works 1000 M.ton 79000 Sft Completed on Dec,2013 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 45. 45
  • 46. 46
  • 47. 47 CLIENT: INDEX COMPANIES PROJECT: SINO MOULD FACTORY CLIENT: INDEX COMPANIES PROJECT: MODELSINO MOULD FACTORY VISITED BY INDEX HIGH OFFICIAL ON-GOING PROJECT RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 48. 48 RCC SOPNIL GARDEN. 9-STORIED APARTMENT WITH BASEMENT AT AHSAN AHMED ROAD KHULNA RCC MONIR DREAMS. 6-STORIED AT DAULATH9UR KHULNA RCC HEMONTHO CHYA 9-STORIED LUXURIOUS APARTMENT AT TALPUKUR PAR , COMOLLA RCC FM TOWER 9-STORIED APARTMENT WITH BASEMENT AT SAMSUR RAHMAN ROAD KHULNA RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 49. 49 VISITED BY CLIENT M/S ASADULLAH FILLING STATION RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 50. 50 MAYOR MD. HANIF MOSQUE, AZIMPUR GRAVE YARD. SOUTH CITY CORPORATION CONSULTANT: SHATOTTO SITE VISIT BY DESIGNER ENGR. MD. NAZRUL ALAM RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 51. 51 VERTICAL UP GRADATION ON 6TH FLOOR AT BARIDHARA DOHS House: 408/5, Road: 07 CLIENT : MAJ. GENERAL CHODHURY HASAN SARWARDI RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 52. 52 JHAL SOBUJE DHAKA PROJECT AT RASHUL BAGH PARK SOUTH CITY CORPORATION CONSULTANT: SHATOTTO VISITED BY CONSULTANT: ARCH. RAFIK AZAM RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 53. 53 JHAL SOBUJE DHAKA PROJECT AT IKBAL ROAD CRICKET FIELD NORT CITY CORPORATION CONSULTANT: VITTI STHAPOT VRINDRA VISITED BY CITY CORPORATION HEAD OFFICE PERSONEL & CONSULTANT RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 54. 54 RCC MANAF HEIGHT 9-STORIED LUXURIOUS APARTMENT AT KHAN-E-SABUR ROAD, KHULNA RCC APON VHUBON 9-STORIED LUXURIOUS APARTMENT AT SHER-E-BANGLA ROAD, KHULNA RCC SK TOWER 9-STORIED LUXURIOUS APARTMENT AT SHER-E-BANGLA ROAD, KHULNA ON-GOING PROJECT RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 55. On-Going Project Madina Dream Tower G+11 Storied Commercial Cum Residential Building Madina Nagar, Kona khola, Keranigonj. 55 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 56. 56 ROF ROF TOWER G+10 Storied Commercial Cum Residential Building Mahadi Nagar, Kamrangir cor, Keranigonj. RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 57. 57 Sabuj Chaya G+8 Storied Residential Building rKeranigonj. RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 58. 58 Kajla Dream Tower Proposed Design, G+9 Storied Residential Building Demra, RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 59. 59 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 60. 60 RCC ORCHID PLACE Plot-412, Road-08, Block-K, Basundhara. RCC EKRAM TOWER 27, Islampur Road, Dholkhola, Khulna RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 61. 61 RCC BULBUL MERU A-34, Mojid Saroni Road, Sonadanga, Khulna. RCC DREAM CASTLE (PROPOSED) AFTAB NOGOR, DHAKA. RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 62. BAISAKHI PARK, BANANI BAISAKHI PARK, BANANI RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 63. IKBAL ROAD CRICKET FIELD RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 64. IKBAL ROAD CRICKET FIELD PROPOSED LOW HEIGHT FENC IKBAL ROAD CRICKET FIELD PROPOSED LOW HEIGHT FENC RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 65. 65 ROOF TOP SHED FOR AB. KADER MOLLAH HOUSE , NORSHINDI CONSULTANT: SHATOTTO RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 66. 66 DR.FAZLE RABBI PARK VISITED BY BUET AND DHAKA NORTH CITY CORPORATION RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 67. 67 BD AUTO INDUSTRIES LTD AT MIRSORAI NDE STEEL STRUCTURE LTD WEIGTH: 2200 MT RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 68. 68 TBCS BUILDING AT COXSBAZAR AIRPORT NDE STEEL STRUCTURE LTD WEIGTH: 700 MT RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 69. 12. Manpower 01. B.sc Engineer (Civil) 7 02. Diploma Engineer (Civil) 10 03. Senior Technician ( Steel Building work) 50 04. Senior Fabricator 25 05. Forman ( Steel Building work) 25 06 . Skill Technician ( Steel Building work) 100 07. Skill labour ( Steel Building work) 220 13. Machineries, Tools & Equipment List For Steel Building 01. Crane ( Rental) 5 Ton to 200 ton ( Rental) 02. Chain Kappa 50Nos 03. 5"& 6" Rig Set 30’/40’ 20Nos 04. Drill Machine 40Nos 05. Screw Machine 10Nos 06. Grinding Machine 40Nos 07. Wrench (Dale & Ring) 950Nos 08. Welding Machine 50Nos 09. Various size Wire etc. 69 RCC NIRMAN NIRMAN SHAILY CONSTRUCTION AND BUILDERS
  • 70. 70 14. CEO Details EMPLOYMENT RECORD Employer Duration Position Held Project Name Client Duties and Responsibilities ENGINEERS AND CONSULTANT BANGLADESH LTD. House # 8/A, Road # 50, Gulshan -2, Dhaka. From January 2010 to 2011 Assistant Engineer (Civil). POLICE PLAZA CONCORD AT GULSHAN-01. Police Kallyan Trust Was responsible for construction management, staff development, Supervision of construction works for quantity & quality control, preparation and submission of Progress reports. Shahla K kabir Shahedur Rahman Associates House # 303 ( Gr. Floor ), Road # 04, Baridhara DOHS, Dhaka. From JUNE 2008 TO DEC.2009 PROJECT MANAGER . ■ STYLO TEX WARE LTD AT BAHADURPUR, GAZIPUR. ■ STYLO FASHION LTD AT MASTERBARI, GAZIPUR STYLO GROUP. Was responsible for Total construction management, staff development, Supervision of construction works for quantity & quality control, Prepare estimate& work program, preparation and submission of Progress reports and certification of contractor's bill.
  • 71. 71 Employer Duration Position Held Project Name Client Duties and Responsibilities ENGINEERS AND CONSULTANT BANGLADESH LTD. House # 8/A, Road # 50, Gulshan -2, Dhaka. From Aug,2004 TO MAY.2008 Assistant Engineer (Civil). BANGLADESH BANK COMPLEX AT RANGPUR (8-Storied Foundation and 5- Stoeried world Class Central Bank fasilated Complex Building) BANGLADESH BANK Was responsible for Total construction management, staff development, Supervision of construction works for quantity & quality control, Prepare estimate& work program, preparation and submission of Progress reports and certification of contractor's bill. ENGINEERS AND CONSULTANT BANGLADESH LTD. House # 8/A, Road # 50, Gulshan -2, Dhaka. From Dec, 2003 TO JULY 2004 PROJECT MANAGER. (a) LAKE PREMIUM , House no-14 . Road no - 140. Gulshan - 01. Dhaka. (b) (b) GULSHAN VIEW House no - 8/A. Road No- 50. Gulshan - 02. Dhaka. ECBL Do ENGINEERS AND CONSULTANT BANGLADESH LTD. House # 8/A, Road # 50, Gulshan -2, Dhaka. From Jan,1999 TO Nov, 2003 Assistant Engineer (Civil). URBAN PRIMARY HEALTH CARE PROJECT At KHULNA (24 Nos Building) Asian Development Bank Do ENGINEERS AND CONSULTANT BANGLADESH LTD. House # 8/A, Road # 50, Gulshan -2, Dhaka. From Jan, 1997 TO AUG,1998 Site Engineer a)Open University at Barisal( 6 storied Foundation ). b).Open University at Jessore( 6 storied Foundation ). Asian Development Bank Do ENGINEERS AND CONSULTANT BANGLADESH LTD. House # 8/A, Road # 50, Gulshan -2, Dhaka. From May, 1995 TO may,1996 Site Engineer LGED BHABAN COMPLEX AT AGARGAON LGED Do
  • 72.
  • 73. 1.Md. Saleh Uddin Ahmed, Governor Bangladesh Bank 2. Architect. Lailun Nahar Ekram, MD, ECBL 3. Md. Enamul Haque, Chief Engr. Bangladesh Bank 4. Abul Hashem Khan, Operative Director, ECBL 5. Md. Mahabub Alam, Assistant Engr, ECBL 1. Architect Dr. Sahidul Amin, BUET. 2. Prof. Dr. Fakrul Amin, BRTC, BUET 3. Dr. Shariful Islam, BRTC, BUET. 4. Md. Rafiqul Islam, Dept. Residence Engineer, ECBL 5. Md. Mahabub Alam, Assistant Engr, ECBL
  • 74. 74 17. Work as Consultant Engineer Of Government Project Police Plaza Concord at Gulshan Bangladesh Bank at Rangpur
  • 75. 75 Open University , Jessore & Barishal Braco Building at Gulshan-2 Urban Primary Health Care Center at Khulna, 27 Nos
  • 78. 78 NIRMAN SHAILY CONSTRUCTION AND BUILDERS Corporate office: Noorjehan Tower (8th floor), 2. No Link Road, Banglamotor, Dhaka-1000. Khulna office: RCC Bulbul Miru, A-34, Majid Sharoni Road, Sonadanga,Khulna-9000. Comilla Office: Silver Crecent Tower, Flat-B1, 2.No. Kandirpar, Comilla-3500, Phone: 081-73574 Factory: Plot-221, Dhak Aricha Highway, Jadurchor, Savar-1230. Phone: 02-9634782, Mobile-01715507082, 01675339272. E-mail- nirmanshaily@yahoo.com. Facebook :https://www.facebook.com/NirmanShaily RCC NIRMAN