Presentation Merging with Technologies June 2017
Safe Practice in Earthing and Protection
Almost 12 people die due to electrocution every day .
42 % of total fires occur due to electrical sources.
8% deaths that occur in factories are due to electricity
Follow Safety in Electrical Instalation
An Arcing Fault is the flow of current through
the air between phase conductors or phase
conductors and neutral or ground. Concentrated
radiant energy is released at the point of arcing
an a small amount of time resulting
in Extremely High Temperature.
Fire Accident Due to Lightning We
Want India Safe Practice Earthing and
Protection
Why Accidents happen?
Accidents generally happen due to lack of
maintenance, lack of Supervision, lack of knowledge,
over confidence and negligence. Accidents may also
happen due to one or more of the following reasons:
 Using improper tools
 Improper/non usage of protective devices
 Lack of proper instructions and supervision
 Mental/physical condition of the employee
 Poor Judgment
Surge in Systems and Result
11
4. Substations
Planning and design of substations to be based on the following
xii. Power Supply to the sub station auxillaries
a. AC Supply;
2 HT supplies shall be arranged from independent sources.
In addition, a DG set of suitable capacity to be provided
b. DC Supply:
2 sets of 220 V batteries each equipped with own charger
for substations of 220 kV & above. 2 sets of 50 V batteries for
PLCC system.
for substations of 132 kV & below, 1 set of battery each to
be provided
xii. For high current, XLPE cables to be employed. For LV/MV
systems, PVC cables corresponding to IS-1554, can be
employed
12
4. Substations
Planning and design of substations to be based on the following
xiv. Reliable communication link shall be provided on all EHT lines
for voice, Fax, protection, telemetry & SCADA
xv. Substation grounding shall be done in accordance with IEEE-
80
xvi. Size and no. of ICTs to be selected such that outage of one
shouldn’t overload the remaining ICTs or the underlying
system
xvii. The stuck breaker condition in the substation shall not cause
disruption of more than 4 feeders in 132 or 220 kV system,
more than 2 feeders in 400 kV system and more than one
feeder in 765 kV system
xviii. In substations of 220 kV and above, control room, PLCC room,
Relay testing room and electronic laboratory shall be air
conditioned
Why use system earthing
• Fix network to earth potential to
prevent dangerous voltages due to
capacitive couplings
• Reduction of fault current at earth fault
in unearthed network (with neutral
point impedance)
• Reduce over voltage
– For transient earth faults
– Increase in neutral point over voltage
– Coupling and lightning over voltage
ADVANTAGES OF EARTHING
For efficient/effective operation of any power system, it is very much essential to connect the
neutral to suitable earth connection. The following are the few advantages:
􀂄 Reduced operation & Maintenance cost
􀂄 Reduction in magnitude of transient over voltages.
􀂄 Improved lightning protection.
􀂄 Simplification of ground fault location.
􀂄 Improved system and equipment fault protection.
􀂄 Improved service reliability
􀂄 Greater safety for personnel & equipment
􀂄 Prompt and consistent operation of protective devices during earth fault.
It comprises earthing of all metal work of electrical equipment other than parts which are
normally live or current carrying. This is done to ensure effective operation of the protective
gear in the event of leakage through such metal work, the potential of which with respect to
neighboring objects may attain a value which would cause danger to life or risk of fire.
Touch Voltage (E touch)
The potential difference between a ground metallic structure and a point on the earth’s surface
separated by a distance equal to the normal maximum horizontal reach of a person,
approximately one meter
Step Voltage ( E step)
The potential difference between two points on the earth's surface separated by distance of one
pace that will be assumed to be one meter in the direction of maximum potential gradient.
Earth electrodes shall be provided at generating stations, substations and consumer premises
in accordance with the requirements.
Optimize the Size of Surge Arrestor:
Surge arresters are applied to a power system based on the line-to-ground voltage under normal
condition and abnormal conditions. Under ground-fault conditions, the line-to-ground voltage
can increase up to 1.73 per unit on the two, unfaulted.
Application of surge arresters on a power system is dependent on the effectiveness of the
system grounding. The over voltage condition that can occur during a ground fault can be
minimized by keeping the zero sequence impedance low. Therefore, optimization in sizing the
surge arresters on the system is dependent on the system grounding.
An effectively grounded power system allows the use of a lower rated surge arrester. The lower
rated surge arrester provides better surge protection at a lower cost. An effectively grounded
system can only be accomplished using a properly sized, multi-grounded system neutral.
With Single Grounded Neutral System require the use of full line-to-line voltage rated arresters.
This increases the cost of the surge arresters while at the same time reduces the protection
provided by the surge arrester. In addition, if the fourth wire neutral is not multi grounded, it
would be good practice to place surge arresters at appropriate locations on that conductor.
61850-9-261850-9-2
Total SA-Solution from Process to Station Level based on the IEC 61850
Standard
Total SA-Solution
G
M
Generation Transmission Distribution Load
Generation Transmission Distribution Consumption
Electric Power Systems
Offerings in ABB Power Systems
Substations
Network Management
Grid Systems
Power Generation
Protection & Control
•
Power Transmission & Distribution
Network
Secondary
substation
Distribution
substation
400 / 220 kV
132/66/11 kV
110 / 132 kV
11/22 kV
Transmission
substation
Main substation
400 V
Transformer
Power System
Transmission Lines: Electrical
Characteristics
1) Safety for Human life/ Building/Equipments:
To save human life from danger of electrical shock or death by blowing a fuse i.e. To provide an
alternative path for the fault current to flow so that it will not endanger the user
To protect buildings, machinery & appliances under fault conditions.
To ensure that all exposed conductive parts do not reach a dangerous potential.
To provide safe path to dissipate lightning and short circuit currents.
To provide stable platform for operation of sensitive electronic equipments i.e. To maintain the
voltage at any part of an electrical system at a known value so as to prevent over current or
excessive voltage on the appliances or equipment .
(2) Over voltage protection:
Lightning, line surges or unintentional contact with higher voltage lines can cause dangerously
high voltages to the electrical distribution system. Earthing provides an alternative path around
the electrical system to minimize damages in the System.
(3) Voltage stabilization:
There are many sources of electricity. Every transformer can be considered a separate source. If
there were not a common reference point for all these voltage sources it would be extremely
difficult to calculate their relationships to each other. The earth is the most omnipresent
conductive surface, and so it was adopted in the very beginnings of electrical distribution
systems as a nearly universal standard for all electric systems.
Factors affecting on Earth resistivity:
(1) Soil Resistivity:
It is the resistance of soil to the passage of electric current. The earth resistance value (ohmic
value) of an earth pit depends on soil resistivity. It is the resistance of the soil to the passage of
electric current.
It varies from soil to soil. It depends on the physical composition of the soil, moisture, dissolved
salts, grain size and distribution, seasonal variation, current magnitude etc.
In depends on the composition of soil, Moisture content, Dissolved salts, grain size and its
distribution, seasonal variation, current magnitude.
(2) Soil Condition:
Different soil conditions give different soil resistivity. Most of the soils are very poor conductors
of electricity when they are completely dry. Soil resistivity is measured in ohm-meters or ohm-
cm.
Soil plays a significant role in determining the performance of Electrode.
Soil with low resistivity is highly corrosive. If soil is dry then soil resistivity value will be very high.
If soil resistivity is high, earth resistance of electrode will also be high.
(3) Moisture:
Moisture has a great influence on resistivity value of soil. The resistivity of a soil can be
determined by the quantity of water held by the soil and resistivity of the water itself.
Conduction of electricity in soil is through water.
The resistance drops quickly to a more or less steady minimum value of about 15% moisture.
And further increase of moisture level in soil will have little effect on soil resistivity. In many
locations water table goes down in dry weather conditions. Therefore, it is essential to pour
water in and around the earth pit to maintain moisture in dry weather conditions. Moisture
9) Effect of current magnitude:
Soil resistivity in the vicinity of ground electrode may be affected by current flowing from the
electrode into the surrounding soil.
The thermal characteristics and the moisture content of the soil will determine if a current of a
given magnitude and duration will cause significant drying and thus increase the effect of soil
resistivity
Maintain less than one Ohm Resistance from EARTH PIT conductor to a distance of 15 Meters
around the EARTH PIT with another conductor dip on the Earth at least 500 mm deep. Check
Voltage between Earth Pit conductors to Neutral of Mains Supply 220V AC 50 Hz it should be
less than 2.0 Volts.
Maximum allowable Earth resistance:
Major power station= 0.5 Ohm.
Major Sub-stations= 1.0 Ohm
Minor Sub-station = 2 Ohm
Neutral Bushing. =2 Ohm
Service connection = 4 Ohm
Medium Voltage Network =2 Ohm
L.T.Lightening Arrestor= 4 Ohm
L.T.Pole= 5 Ohm
H.T.Pole =10 Ohm
Tower =20-30 Ohm
The different methodologies are adopted for earthing grid designs. Here we
adopted universal method as per IEEE-80.
An earthing design starts with a site analysis, collection of geological data, and
soil resistivity of the area. Typically, the site engineer or equipment manufacturers
specify a resistance-to-earth number. The National Electric Code (NEC) states that the
resistance-to-earth shall not exceed 25 Ω for a single electrode. However, some
reputed manufacturers will often specify 1 Ω and 0.5 Ω, depending upon the requirements
of their equipment and safety. When designing a
earthing system, the difficulty and costs increase extremely as the target resistance-toearth
approaches the unobtainable goal of zero Ω
Most affected parameters for the Earth Mat design are:
Magnitude of Fault Current
Duration of Fault.
Soil Resistivity
Resistivity of Surface Material (soil structure and soil model )
Shock Duration.
Material of Earth Mat Conductor
Earthing Mat Geometry (Area covered by Earth mat).
Permissible touch and step potentials
The design parameters are :
Size of Earth Grid Conductor
Safe Step and Touch Potential
Mesh Potential (Emesh)
Grid configureuration for Safe Operation
Number of Electrodes required
The earth resistance shall be as low as possible and shall not
exceed the
following limits:
Earth Resistance Values
Copper Cladded Conductor For Electrical
Installation
The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper. These
conductors/ wires
or strands are equipped with the strength of steel with the conductivity and copper with the better corrosion
resistance property. The concentric copper cladding is metallurgic ally bonded to a steel core through a continuous,
solid cladding process using pressure rolling for primary bonding. The copper cladding
thickness remains constant surrounding steel. We use different steel grades for the steel core result in Dead Soft
Annealed, High strength and Extra High Strength Characteristics.
The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in Annealed
and Hard drawn. We are delivering products with varied conductivity and tensile strength as per the customer need.
Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
Most Efficient JointProcess
It is efficient and superior to all existing surface –to-surface
mechanical retention connectors.
What is Exothermic Welding System?
Copper to Bi-Metal and Alumenium
Types of Exothermic Joints:
Possible to join any bi metal except aluminum
Exothermic welding is a process of making maintain free highly molecular bonding process is superior in
performance connection to any known mechanical or compression-type surface-to-surface contact connector.
Exothermic weld connections provide current carrying (fusing) capacity equal to that of the conductor and will
not deteriorate with age.
 It offers Electrical connections between two or more copper to copper and copper to steel conductors.
 Highly portable method as it does not require any external power source or heat source, so it can be done
almost anywhere.
 It provides strong permanent molecular bond among metallic conductors that cannot loosen and further will
not deteriorate with age.
 Connection does not corrode with time and it offers permanent conductivity.
JMV’s Clients
Neeraj Saini – 9910398538
Rahul Verma – 9910398535
Manav Chandra - 9910398999
manav@jmv.co.in

Más contenido relacionado

La actualidad más candente

Electrical Earthing and types
Electrical Earthing and typesElectrical Earthing and types
Electrical Earthing and typesManjunath Kh
 
Overview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power SystemsOverview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power Systemsmichaeljmack
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing DesignIOSRJEEE
 
Vampire Electricity-Standby Power
Vampire Electricity-Standby PowerVampire Electricity-Standby Power
Vampire Electricity-Standby PowerGAURAV. H .TANDON
 
Safety rules and earthing
Safety rules and earthingSafety rules and earthing
Safety rules and earthingNikhil Pandit
 
NAPS Tank Grounding Lightning and Static Protection
NAPS Tank Grounding Lightning and Static ProtectionNAPS Tank Grounding Lightning and Static Protection
NAPS Tank Grounding Lightning and Static ProtectionRobert Sammons - FSE
 
Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...
Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...
Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...Living Online
 
Substation lightning protection and earthing standard(august 2019)
Substation lightning protection and earthing standard(august 2019)Substation lightning protection and earthing standard(august 2019)
Substation lightning protection and earthing standard(august 2019)Mahesh Chandra Manav
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Mahesh Chandra Manav
 
Practical Power Cabling and Earthing
Practical Power Cabling and EarthingPractical Power Cabling and Earthing
Practical Power Cabling and EarthingLiving Online
 
Earthing, grounding and isolation
Earthing, grounding and isolation Earthing, grounding and isolation
Earthing, grounding and isolation Dhananjaysinh Jhala
 
Alfredkim electrical earthing
Alfredkim electrical earthingAlfredkim electrical earthing
Alfredkim electrical earthingalfredkim
 

La actualidad más candente (20)

Earthing systems in mines - Phillip Wall
Earthing systems in mines - Phillip WallEarthing systems in mines - Phillip Wall
Earthing systems in mines - Phillip Wall
 
Electrical Earthing and types
Electrical Earthing and typesElectrical Earthing and types
Electrical Earthing and types
 
Overview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power SystemsOverview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power Systems
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing Design
 
Vampire Electricity-Standby Power
Vampire Electricity-Standby PowerVampire Electricity-Standby Power
Vampire Electricity-Standby Power
 
Safety Precautions Earthing
Safety Precautions EarthingSafety Precautions Earthing
Safety Precautions Earthing
 
Safety rules and earthing
Safety rules and earthingSafety rules and earthing
Safety rules and earthing
 
NAPS Tank Grounding Lightning and Static Protection
NAPS Tank Grounding Lightning and Static ProtectionNAPS Tank Grounding Lightning and Static Protection
NAPS Tank Grounding Lightning and Static Protection
 
Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...
Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...
Lightning, Surge Protection and Earthing of Electrical and Electronic Systems...
 
Substation lightning protection and earthing standard(august 2019)
Substation lightning protection and earthing standard(august 2019)Substation lightning protection and earthing standard(august 2019)
Substation lightning protection and earthing standard(august 2019)
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
 
Grounding
GroundingGrounding
Grounding
 
Practical Power Cabling and Earthing
Practical Power Cabling and EarthingPractical Power Cabling and Earthing
Practical Power Cabling and Earthing
 
HV Substation Earthing Guide - Central Networks
HV Substation Earthing Guide - Central NetworksHV Substation Earthing Guide - Central Networks
HV Substation Earthing Guide - Central Networks
 
Effect of grounding
Effect of groundingEffect of grounding
Effect of grounding
 
Earthing
EarthingEarthing
Earthing
 
Earthing
EarthingEarthing
Earthing
 
Earthing, grounding and isolation
Earthing, grounding and isolation Earthing, grounding and isolation
Earthing, grounding and isolation
 
Hv sytem overvolatge
Hv sytem overvolatge Hv sytem overvolatge
Hv sytem overvolatge
 
Alfredkim electrical earthing
Alfredkim electrical earthingAlfredkim electrical earthing
Alfredkim electrical earthing
 

Similar a Presentation jmv internal

Importance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docxImportance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docxvikram desai
 
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)Andreas ILIOU - Elektro- Solar
 
Lightning concepts iii
Lightning concepts iiiLightning concepts iii
Lightning concepts iiiILDTECH
 
Wael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).ppt
Wael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).pptWael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).ppt
Wael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).pptDKChaitanyarajSingh
 
Earthing and grounding.pptx
Earthing and grounding.pptxEarthing and grounding.pptx
Earthing and grounding.pptxSuhailAbdul2
 
Earthing & Grounding (Easily Explained)
Earthing & Grounding (Easily Explained)Earthing & Grounding (Easily Explained)
Earthing & Grounding (Easily Explained)Muhammad Zaeem Sarfraz
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptsqhuet1
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptganesh2428364
 
Short-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptShort-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptJatmylHarnero1
 
Lightning Protection Considerations for Wired Systems
Lightning Protection Considerations for Wired SystemsLightning Protection Considerations for Wired Systems
Lightning Protection Considerations for Wired SystemsAnalynk Wireless, LLC
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systemsBiswajit Pratihari
 
Earthing of epg
Earthing  of epg Earthing  of epg
Earthing of epg marwadi
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lpsMahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lpsMahesh Chandra Manav
 

Similar a Presentation jmv internal (20)

Importance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docxImportance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docx
 
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
 
s.pdf
s.pdfs.pdf
s.pdf
 
Lightning concepts iii
Lightning concepts iiiLightning concepts iii
Lightning concepts iii
 
Grounding.ppt
Grounding.pptGrounding.ppt
Grounding.ppt
 
Wael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).ppt
Wael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).pptWael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).ppt
Wael Abdel-Rahman Mohamed Ahmed_Grounding_lecture(L5).ppt
 
Earthing and grounding.pptx
Earthing and grounding.pptxEarthing and grounding.pptx
Earthing and grounding.pptx
 
Earthing & Grounding (Easily Explained)
Earthing & Grounding (Easily Explained)Earthing & Grounding (Easily Explained)
Earthing & Grounding (Easily Explained)
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.ppt
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.ppt
 
تأريض2
تأريض2تأريض2
تأريض2
 
E04523236
E04523236E04523236
E04523236
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
Short-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptShort-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.ppt
 
Lightning Protection Considerations for Wired Systems
Lightning Protection Considerations for Wired SystemsLightning Protection Considerations for Wired Systems
Lightning Protection Considerations for Wired Systems
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
 
Earthing of epg
Earthing  of epg Earthing  of epg
Earthing of epg
 
Neutral grounding
Neutral groundingNeutral grounding
Neutral grounding
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 

Más de Mahesh Chandra Manav

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...Mahesh Chandra Manav
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfMahesh Chandra Manav
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyMahesh Chandra Manav
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue systemMahesh Chandra Manav
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstMahesh Chandra Manav
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue systemMahesh Chandra Manav
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)Mahesh Chandra Manav
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionMahesh Chandra Manav
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationMahesh Chandra Manav
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueMahesh Chandra Manav
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemMahesh Chandra Manav
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue systemMahesh Chandra Manav
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue systemMahesh Chandra Manav
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Mahesh Chandra Manav
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021Mahesh Chandra Manav
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleMahesh Chandra Manav
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VueMahesh Chandra Manav
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...Mahesh Chandra Manav
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingMahesh Chandra Manav
 

Más de Mahesh Chandra Manav (20)

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
 

Último

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 

Último (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Presentation jmv internal

  • 1. Presentation Merging with Technologies June 2017 Safe Practice in Earthing and Protection Almost 12 people die due to electrocution every day . 42 % of total fires occur due to electrical sources. 8% deaths that occur in factories are due to electricity
  • 2. Follow Safety in Electrical Instalation
  • 3. An Arcing Fault is the flow of current through the air between phase conductors or phase conductors and neutral or ground. Concentrated radiant energy is released at the point of arcing an a small amount of time resulting in Extremely High Temperature.
  • 4. Fire Accident Due to Lightning We Want India Safe Practice Earthing and Protection
  • 5. Why Accidents happen? Accidents generally happen due to lack of maintenance, lack of Supervision, lack of knowledge, over confidence and negligence. Accidents may also happen due to one or more of the following reasons:  Using improper tools  Improper/non usage of protective devices  Lack of proper instructions and supervision  Mental/physical condition of the employee  Poor Judgment
  • 6. Surge in Systems and Result
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. 11 4. Substations Planning and design of substations to be based on the following xii. Power Supply to the sub station auxillaries a. AC Supply; 2 HT supplies shall be arranged from independent sources. In addition, a DG set of suitable capacity to be provided b. DC Supply: 2 sets of 220 V batteries each equipped with own charger for substations of 220 kV & above. 2 sets of 50 V batteries for PLCC system. for substations of 132 kV & below, 1 set of battery each to be provided xii. For high current, XLPE cables to be employed. For LV/MV systems, PVC cables corresponding to IS-1554, can be employed
  • 12. 12 4. Substations Planning and design of substations to be based on the following xiv. Reliable communication link shall be provided on all EHT lines for voice, Fax, protection, telemetry & SCADA xv. Substation grounding shall be done in accordance with IEEE- 80 xvi. Size and no. of ICTs to be selected such that outage of one shouldn’t overload the remaining ICTs or the underlying system xvii. The stuck breaker condition in the substation shall not cause disruption of more than 4 feeders in 132 or 220 kV system, more than 2 feeders in 400 kV system and more than one feeder in 765 kV system xviii. In substations of 220 kV and above, control room, PLCC room, Relay testing room and electronic laboratory shall be air conditioned
  • 13.
  • 14. Why use system earthing • Fix network to earth potential to prevent dangerous voltages due to capacitive couplings • Reduction of fault current at earth fault in unearthed network (with neutral point impedance) • Reduce over voltage – For transient earth faults – Increase in neutral point over voltage – Coupling and lightning over voltage
  • 15. ADVANTAGES OF EARTHING For efficient/effective operation of any power system, it is very much essential to connect the neutral to suitable earth connection. The following are the few advantages: 􀂄 Reduced operation & Maintenance cost 􀂄 Reduction in magnitude of transient over voltages. 􀂄 Improved lightning protection. 􀂄 Simplification of ground fault location. 􀂄 Improved system and equipment fault protection. 􀂄 Improved service reliability 􀂄 Greater safety for personnel & equipment 􀂄 Prompt and consistent operation of protective devices during earth fault. It comprises earthing of all metal work of electrical equipment other than parts which are normally live or current carrying. This is done to ensure effective operation of the protective gear in the event of leakage through such metal work, the potential of which with respect to neighboring objects may attain a value which would cause danger to life or risk of fire. Touch Voltage (E touch) The potential difference between a ground metallic structure and a point on the earth’s surface separated by a distance equal to the normal maximum horizontal reach of a person, approximately one meter Step Voltage ( E step) The potential difference between two points on the earth's surface separated by distance of one pace that will be assumed to be one meter in the direction of maximum potential gradient. Earth electrodes shall be provided at generating stations, substations and consumer premises in accordance with the requirements.
  • 16. Optimize the Size of Surge Arrestor: Surge arresters are applied to a power system based on the line-to-ground voltage under normal condition and abnormal conditions. Under ground-fault conditions, the line-to-ground voltage can increase up to 1.73 per unit on the two, unfaulted. Application of surge arresters on a power system is dependent on the effectiveness of the system grounding. The over voltage condition that can occur during a ground fault can be minimized by keeping the zero sequence impedance low. Therefore, optimization in sizing the surge arresters on the system is dependent on the system grounding. An effectively grounded power system allows the use of a lower rated surge arrester. The lower rated surge arrester provides better surge protection at a lower cost. An effectively grounded system can only be accomplished using a properly sized, multi-grounded system neutral. With Single Grounded Neutral System require the use of full line-to-line voltage rated arresters. This increases the cost of the surge arresters while at the same time reduces the protection provided by the surge arrester. In addition, if the fourth wire neutral is not multi grounded, it would be good practice to place surge arresters at appropriate locations on that conductor.
  • 17. 61850-9-261850-9-2 Total SA-Solution from Process to Station Level based on the IEC 61850 Standard Total SA-Solution
  • 18. G M Generation Transmission Distribution Load Generation Transmission Distribution Consumption Electric Power Systems
  • 19. Offerings in ABB Power Systems Substations Network Management Grid Systems Power Generation
  • 21. Power Transmission & Distribution Network Secondary substation Distribution substation 400 / 220 kV 132/66/11 kV 110 / 132 kV 11/22 kV Transmission substation Main substation 400 V Transformer
  • 22. Power System Transmission Lines: Electrical Characteristics
  • 23. 1) Safety for Human life/ Building/Equipments: To save human life from danger of electrical shock or death by blowing a fuse i.e. To provide an alternative path for the fault current to flow so that it will not endanger the user To protect buildings, machinery & appliances under fault conditions. To ensure that all exposed conductive parts do not reach a dangerous potential. To provide safe path to dissipate lightning and short circuit currents. To provide stable platform for operation of sensitive electronic equipments i.e. To maintain the voltage at any part of an electrical system at a known value so as to prevent over current or excessive voltage on the appliances or equipment . (2) Over voltage protection: Lightning, line surges or unintentional contact with higher voltage lines can cause dangerously high voltages to the electrical distribution system. Earthing provides an alternative path around the electrical system to minimize damages in the System. (3) Voltage stabilization: There are many sources of electricity. Every transformer can be considered a separate source. If there were not a common reference point for all these voltage sources it would be extremely difficult to calculate their relationships to each other. The earth is the most omnipresent conductive surface, and so it was adopted in the very beginnings of electrical distribution systems as a nearly universal standard for all electric systems.
  • 24. Factors affecting on Earth resistivity: (1) Soil Resistivity: It is the resistance of soil to the passage of electric current. The earth resistance value (ohmic value) of an earth pit depends on soil resistivity. It is the resistance of the soil to the passage of electric current. It varies from soil to soil. It depends on the physical composition of the soil, moisture, dissolved salts, grain size and distribution, seasonal variation, current magnitude etc. In depends on the composition of soil, Moisture content, Dissolved salts, grain size and its distribution, seasonal variation, current magnitude. (2) Soil Condition: Different soil conditions give different soil resistivity. Most of the soils are very poor conductors of electricity when they are completely dry. Soil resistivity is measured in ohm-meters or ohm- cm. Soil plays a significant role in determining the performance of Electrode. Soil with low resistivity is highly corrosive. If soil is dry then soil resistivity value will be very high. If soil resistivity is high, earth resistance of electrode will also be high. (3) Moisture: Moisture has a great influence on resistivity value of soil. The resistivity of a soil can be determined by the quantity of water held by the soil and resistivity of the water itself. Conduction of electricity in soil is through water. The resistance drops quickly to a more or less steady minimum value of about 15% moisture. And further increase of moisture level in soil will have little effect on soil resistivity. In many locations water table goes down in dry weather conditions. Therefore, it is essential to pour water in and around the earth pit to maintain moisture in dry weather conditions. Moisture
  • 25. 9) Effect of current magnitude: Soil resistivity in the vicinity of ground electrode may be affected by current flowing from the electrode into the surrounding soil. The thermal characteristics and the moisture content of the soil will determine if a current of a given magnitude and duration will cause significant drying and thus increase the effect of soil resistivity Maintain less than one Ohm Resistance from EARTH PIT conductor to a distance of 15 Meters around the EARTH PIT with another conductor dip on the Earth at least 500 mm deep. Check Voltage between Earth Pit conductors to Neutral of Mains Supply 220V AC 50 Hz it should be less than 2.0 Volts. Maximum allowable Earth resistance: Major power station= 0.5 Ohm. Major Sub-stations= 1.0 Ohm Minor Sub-station = 2 Ohm Neutral Bushing. =2 Ohm Service connection = 4 Ohm Medium Voltage Network =2 Ohm L.T.Lightening Arrestor= 4 Ohm L.T.Pole= 5 Ohm H.T.Pole =10 Ohm Tower =20-30 Ohm
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. The different methodologies are adopted for earthing grid designs. Here we adopted universal method as per IEEE-80. An earthing design starts with a site analysis, collection of geological data, and soil resistivity of the area. Typically, the site engineer or equipment manufacturers specify a resistance-to-earth number. The National Electric Code (NEC) states that the resistance-to-earth shall not exceed 25 Ω for a single electrode. However, some reputed manufacturers will often specify 1 Ω and 0.5 Ω, depending upon the requirements of their equipment and safety. When designing a earthing system, the difficulty and costs increase extremely as the target resistance-toearth approaches the unobtainable goal of zero Ω Most affected parameters for the Earth Mat design are: Magnitude of Fault Current Duration of Fault. Soil Resistivity Resistivity of Surface Material (soil structure and soil model ) Shock Duration. Material of Earth Mat Conductor Earthing Mat Geometry (Area covered by Earth mat). Permissible touch and step potentials The design parameters are : Size of Earth Grid Conductor Safe Step and Touch Potential Mesh Potential (Emesh) Grid configureuration for Safe Operation Number of Electrodes required
  • 31. The earth resistance shall be as low as possible and shall not exceed the following limits: Earth Resistance Values
  • 32.
  • 33.
  • 34.
  • 35.
  • 36. Copper Cladded Conductor For Electrical Installation The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper. These conductors/ wires or strands are equipped with the strength of steel with the conductivity and copper with the better corrosion resistance property. The concentric copper cladding is metallurgic ally bonded to a steel core through a continuous, solid cladding process using pressure rolling for primary bonding. The copper cladding thickness remains constant surrounding steel. We use different steel grades for the steel core result in Dead Soft Annealed, High strength and Extra High Strength Characteristics. The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in Annealed and Hard drawn. We are delivering products with varied conductivity and tensile strength as per the customer need. Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
  • 37. Most Efficient JointProcess It is efficient and superior to all existing surface –to-surface mechanical retention connectors.
  • 38. What is Exothermic Welding System? Copper to Bi-Metal and Alumenium Types of Exothermic Joints: Possible to join any bi metal except aluminum Exothermic welding is a process of making maintain free highly molecular bonding process is superior in performance connection to any known mechanical or compression-type surface-to-surface contact connector. Exothermic weld connections provide current carrying (fusing) capacity equal to that of the conductor and will not deteriorate with age.  It offers Electrical connections between two or more copper to copper and copper to steel conductors.  Highly portable method as it does not require any external power source or heat source, so it can be done almost anywhere.  It provides strong permanent molecular bond among metallic conductors that cannot loosen and further will not deteriorate with age.  Connection does not corrode with time and it offers permanent conductivity.
  • 39.
  • 40.
  • 42. Neeraj Saini – 9910398538 Rahul Verma – 9910398535 Manav Chandra - 9910398999 manav@jmv.co.in