SlideShare una empresa de Scribd logo
1 de 4
Mansour Fraih Al-Shammari Mobile No: 0505905664
E-mail ID: mansourfraih@gmail.com
Career Objective:
Seeking new challenges in Maintenance Turn-Around Planning, where I can effectively utilize
my supervisory, technical and analytical skills. Eager to secure a position that offer challenges
and growth potential in a teamwork environment.
Technical Skills:
Platforms : Windows XP, 7 & 8.
Packages : Primavera (P6), MS-Office Suite (Project, Word, Excel, Access,
PowerPoint, Outlook) & Internet Explorer.
ERP : SAP ECC 6.0.
Professional Experience:
AR-RAZI Apr 12 – Till date
E&I, T/A Supervisor
Responsibilities:-
• Prepare competitive Budget for scheduled Turn around.
• Make ensure the team is aware of turn around procedures & their implementations.
• Monitor & follow-up the preparation for turnaround progress with in a team & resolve
the hurdles.
• Conduct follow-up meetings with buyer to expedite the P.O’s.
• Conduct Scope of work meetings with vendors & resolve their technical queries.
• The additional scope of work to be reviewed under the framework of STA procedure
and with proper management approval.
• Conduct meetings with contractors especially to negotiate competitive cost, challenge
their schedule with extensive safety & quality.
• Ensure all service P.O’s are in place 6 months ahead of turn around.
• Close coordination with material group for ensuring the physical availability of all
reserved material to ensure smooth execution.
• Holding core team meetings during STA execution with all stackholders to get the
concerns as well as to review the progress.
• Ensure the safe T/A execution within framed time frame,
• Ensuring the unforeseen findings during STA execution dealt with prompt effectiveness
to avoid the impact.
• Ensure the closing of all Work orders & creation of SES within the procedural time post
T/A.
• Ensure the closure of respective WBS in SAP with complete cost settlement.
• The all-learning lessons are to be grasp and included in the next STA opportunity as
continual improvement.
• Preparation for SABIC (TARA) audit & liaison with its coordinator.
• Maintaining discipline & motivation in my team to get optimum output.
• Successfully took the responsibility while delegated as Manager TA many times.
• With great support of my team, I was awarded as best supervisor of 2012.
AR-RAZI Mar 08 – Apr 12
T/A Planner
Responsibilities:-
• Search for held W.O’s, T/A notifications in system & convert them to T/A WO’s.
• Develop scope of work & task list in system for planned jobs.
• Checks warehouse stock data for required materials, reserve the required materials for
stock items, raise PR’s for non-stock items.
• Estimate manpower and services requirements, create all items operations through
Work order system so that necessary Purchase requests are created.
• Communicate with SMO to expedite critical PR’s.
• Upon receiving the PCR package, analyze it’s feasibility to implement during T/A.
• Reviews scope and drawings, determines requirements, plans all required resources,
spares materials, services, schedule the PCR’s with execution team.
• Monitors and coordinates with PCRs execution team and ensure the completion of
jobs.
• After the job completion return the PCR’s package as per the procedure for close out
• Prepare T/A packages (SOW, material reservations, drawing, JSA, etc.) & issue to
execution team.
• Develop multidiscipline turnaround schedules (STA/ESD) & distribute to discipline level
leaders, supervisors. (viz. static equipment, pipe flushing / cleaning, rotary equipment
final alignment, instrument loop checks etc ) and commissioning activities.
• Attending managerial meetings for progress related and problem resolutions.
• Prepare reports for turnaround progress (’s” curves).
• Intimate the executors through various reports (layouts) to focus on critical path &
slipped activities to achieve the T/A milestones.
• Ensures co-ordination between various divisions, sections and disciplines during
execution, to ensure that all act in harmony for smooth execution of shutdown
• Arranged and conducted schedule review meetings with site supervisors,
subcontractors & vendors.
• Prepares handover equipment list to operation for plant start-up activities.
• Ensure return of the spares issued to ware house after Turnaround.
• Collect critique from all customers & develop lesson learning for future T/A’s.
• Create SES in system against the invoices.
• Prepare close out report with all related documents, closing all the pending
commitments of WBS.
• Transfer the pending jobs to next scheduled T/A and close out of the WBS through
procedure.
• Prepared project close out documentation.
AR-RAZI Mar 08 – Apr 12
SHE promoter
Responsibilities:-
• Act as a Fire marshal as & when necessary.
• Prepare & maintain SHE documentation.
• Prepare & organize SHE campaigns, events to aware employees & contractors.
• Inspect & audit the fire equipment’s.
• Prepare for annual SHE audit.
• Liaison with SHE auditor.
• SHEM-5 coordinator
AR-RAZI Feb 04 - Mar 08
Maintenance Scheduler
Responsibilities:-
• Equipment’s creation in SAP as per standards.
• Create work center, operational work center & maintain the hierarchy flow in SAP
• Develop multidiscipline maintenance plan in SAP as per SABIC 1 strategy.
• Create task list & assign to maintenance plan for automatic generation of PM W.O’s.
• Align & schedule maintenance plan in SAP as per end user requirement.
• Release weekly, monthly (PM/CM) multidiscipline work orders in SAP.
• Develop monthly reports to monitor the released & completed work order in SAP.
• Perform technically complete (TECO) monthly for all multidiscipline completed W.O &
their respective notifications.
• Develop monthly maintenance Key Performance Indicator (KPI) & share with end users
& management.
• Develop & communicate monthly backlog work order list to respective supervisors.
• Assigned as member of FANAR project to successful completion.
AR-RAZI May 97 - Feb 04
Electrical Technician
Responsibilities:-
• Execute preventive maintenance for all electrical equipment’s as per schedule.
• Close respective W.O’s for completed activities.
• Maintain reliability for substation, breakers, switchgear & panels.
• Perform maintenance for communication system.
• Perform maintenance for fire system.
• Operate GIS substation 115 K.V ~ 34.5 K.V and 6.6 K.V.
• Communicate with respective planners for spares ahead of schedule W.O’s.
• Perform maintenance activities during on-call.
• Always took the prompt action in case of any emergency,
• Always believe in learning new things and participated in technical discussion.
Educational Qualification:
• High School - Hail.
Trainings:
• Advanced Negotiation Skills.
• Arrazi - Positive Thinking Workshop.
• Basic Presentation Skills.
• Effective Utilization of Time.
• Emotional Intelligence Hygiene.
• Maintenance Planning & Scheduling.
• Maintenance Planning and Work Control.
• MDRM End-User (Product & Services).
• Planning & Scheduling With Primavera.
• Preventive and Predictive Maintenance.
• Process Plant Troubleshooting.
• Project Scheduling & Control Using MS-Project
• Report Writing Skills.
• Sap-Notification Processing.
• Sap-Order Processing-Completion Confirmation
• Supervisor Training.
• Technical Report Writing.
Personal Details:
• Father’s Name : Fraih Faraj Al-Shammari
• Age : 37
• Marital Status : Married
• Nationality : Saudi
• Languages Known : English and Arabic
• Address : Jubail.
*****

Más contenido relacionado

La actualidad más candente

MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)Terry Dixon
 
REsume - Janine Strydom
REsume - Janine StrydomREsume - Janine Strydom
REsume - Janine StrydomJanine Strydom
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_fullJason Cole
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
Deborah Mountford October 2016
Deborah Mountford October 2016 Deborah Mountford October 2016
Deborah Mountford October 2016 Deborah Mountford
 
Glen &dimplex Process improvements
Glen &dimplex Process improvementsGlen &dimplex Process improvements
Glen &dimplex Process improvementsNigel Charles
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
Larry Finley Resume
Larry Finley ResumeLarry Finley Resume
Larry Finley ResumeLarry Finley
 
Robert Spargur Resume 1
Robert Spargur Resume 1Robert Spargur Resume 1
Robert Spargur Resume 1Robert Spargur
 

La actualidad más candente (19)

MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
PPMS - Packaging Leads Role Profile linkedin
PPMS - Packaging Leads Role Profile linkedinPPMS - Packaging Leads Role Profile linkedin
PPMS - Packaging Leads Role Profile linkedin
 
Humayun Akhtar Resume
Humayun Akhtar ResumeHumayun Akhtar Resume
Humayun Akhtar Resume
 
CormanV5dates
CormanV5datesCormanV5dates
CormanV5dates
 
PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)
 
REsume - Janine Strydom
REsume - Janine StrydomREsume - Janine Strydom
REsume - Janine Strydom
 
Kimberly_S_Gilbert_Resume
Kimberly_S_Gilbert_ResumeKimberly_S_Gilbert_Resume
Kimberly_S_Gilbert_Resume
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_full
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
kashif( 23-2-15)
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)
 
Deborah Mountford October 2016
Deborah Mountford October 2016 Deborah Mountford October 2016
Deborah Mountford October 2016
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
Resume%27-2
Resume%27-2Resume%27-2
Resume%27-2
 
Glen &dimplex Process improvements
Glen &dimplex Process improvementsGlen &dimplex Process improvements
Glen &dimplex Process improvements
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Varun Garg_CV
Varun Garg_CVVarun Garg_CV
Varun Garg_CV
 
Larry Finley Resume
Larry Finley ResumeLarry Finley Resume
Larry Finley Resume
 
Robert Spargur Resume 1
Robert Spargur Resume 1Robert Spargur Resume 1
Robert Spargur Resume 1
 

Destacado

Destacado (9)

Intb3 equipo 2
Intb3  equipo 2Intb3  equipo 2
Intb3 equipo 2
 
March MJB Graham/Online Guru event, Waterloo London
March MJB Graham/Online Guru event, Waterloo LondonMarch MJB Graham/Online Guru event, Waterloo London
March MJB Graham/Online Guru event, Waterloo London
 
Launchpad 2014 FAQ
Launchpad 2014 FAQLaunchpad 2014 FAQ
Launchpad 2014 FAQ
 
Catalog bluesonic 2015 2 web
Catalog bluesonic 2015 2 webCatalog bluesonic 2015 2 web
Catalog bluesonic 2015 2 web
 
Bio data updated
Bio data updatedBio data updated
Bio data updated
 
Moamen miedia cv
Moamen  miedia cvMoamen  miedia cv
Moamen miedia cv
 
Cambridge University Social Media Course 28-07-2015
Cambridge University Social Media Course 28-07-2015Cambridge University Social Media Course 28-07-2015
Cambridge University Social Media Course 28-07-2015
 
How to Use Twitter & Facebook as Lead Platforms
How to Use Twitter & Facebook as Lead PlatformsHow to Use Twitter & Facebook as Lead Platforms
How to Use Twitter & Facebook as Lead Platforms
 
My favourite book in english
My favourite book in englishMy favourite book in english
My favourite book in english
 

Similar a Mansour CV (20)

Synopsis
SynopsisSynopsis
Synopsis
 
HIDAIPP
HIDAIPPHIDAIPP
HIDAIPP
 
Vivek G
Vivek GVivek G
Vivek G
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
CV Gabor Vigh
CV Gabor VighCV Gabor Vigh
CV Gabor Vigh
 
Megan Smith CV June 2016
Megan Smith CV June 2016Megan Smith CV June 2016
Megan Smith CV June 2016
 
Cv
CvCv
Cv
 
Adinarayana S profile
Adinarayana S profileAdinarayana S profile
Adinarayana S profile
 
Gitanjali - SAP (MM)
Gitanjali - SAP (MM)Gitanjali - SAP (MM)
Gitanjali - SAP (MM)
 
Yash S Rawat CV-Rel
Yash S Rawat CV-RelYash S Rawat CV-Rel
Yash S Rawat CV-Rel
 
Revathi - Resume
Revathi - ResumeRevathi - Resume
Revathi - Resume
 
Inst Resume -16
Inst Resume -16Inst Resume -16
Inst Resume -16
 
Siddharth Dutta
Siddharth DuttaSiddharth Dutta
Siddharth Dutta
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
CV_VishalSarode
CV_VishalSarodeCV_VishalSarode
CV_VishalSarode
 
Yehia Negm Resume Functional
Yehia Negm Resume  FunctionalYehia Negm Resume  Functional
Yehia Negm Resume Functional
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
SAMBIT Resume-SAP PM & PP Consultant
SAMBIT Resume-SAP PM & PP ConsultantSAMBIT Resume-SAP PM & PP Consultant
SAMBIT Resume-SAP PM & PP Consultant
 
Rahul Sharma
Rahul SharmaRahul Sharma
Rahul Sharma
 

Mansour CV

  • 1. Mansour Fraih Al-Shammari Mobile No: 0505905664 E-mail ID: mansourfraih@gmail.com Career Objective: Seeking new challenges in Maintenance Turn-Around Planning, where I can effectively utilize my supervisory, technical and analytical skills. Eager to secure a position that offer challenges and growth potential in a teamwork environment. Technical Skills: Platforms : Windows XP, 7 & 8. Packages : Primavera (P6), MS-Office Suite (Project, Word, Excel, Access, PowerPoint, Outlook) & Internet Explorer. ERP : SAP ECC 6.0. Professional Experience: AR-RAZI Apr 12 – Till date E&I, T/A Supervisor Responsibilities:- • Prepare competitive Budget for scheduled Turn around. • Make ensure the team is aware of turn around procedures & their implementations. • Monitor & follow-up the preparation for turnaround progress with in a team & resolve the hurdles. • Conduct follow-up meetings with buyer to expedite the P.O’s. • Conduct Scope of work meetings with vendors & resolve their technical queries. • The additional scope of work to be reviewed under the framework of STA procedure and with proper management approval. • Conduct meetings with contractors especially to negotiate competitive cost, challenge their schedule with extensive safety & quality. • Ensure all service P.O’s are in place 6 months ahead of turn around. • Close coordination with material group for ensuring the physical availability of all reserved material to ensure smooth execution. • Holding core team meetings during STA execution with all stackholders to get the concerns as well as to review the progress. • Ensure the safe T/A execution within framed time frame, • Ensuring the unforeseen findings during STA execution dealt with prompt effectiveness to avoid the impact. • Ensure the closing of all Work orders & creation of SES within the procedural time post T/A. • Ensure the closure of respective WBS in SAP with complete cost settlement. • The all-learning lessons are to be grasp and included in the next STA opportunity as continual improvement. • Preparation for SABIC (TARA) audit & liaison with its coordinator. • Maintaining discipline & motivation in my team to get optimum output. • Successfully took the responsibility while delegated as Manager TA many times. • With great support of my team, I was awarded as best supervisor of 2012. AR-RAZI Mar 08 – Apr 12 T/A Planner
  • 2. Responsibilities:- • Search for held W.O’s, T/A notifications in system & convert them to T/A WO’s. • Develop scope of work & task list in system for planned jobs. • Checks warehouse stock data for required materials, reserve the required materials for stock items, raise PR’s for non-stock items. • Estimate manpower and services requirements, create all items operations through Work order system so that necessary Purchase requests are created. • Communicate with SMO to expedite critical PR’s. • Upon receiving the PCR package, analyze it’s feasibility to implement during T/A. • Reviews scope and drawings, determines requirements, plans all required resources, spares materials, services, schedule the PCR’s with execution team. • Monitors and coordinates with PCRs execution team and ensure the completion of jobs. • After the job completion return the PCR’s package as per the procedure for close out • Prepare T/A packages (SOW, material reservations, drawing, JSA, etc.) & issue to execution team. • Develop multidiscipline turnaround schedules (STA/ESD) & distribute to discipline level leaders, supervisors. (viz. static equipment, pipe flushing / cleaning, rotary equipment final alignment, instrument loop checks etc ) and commissioning activities. • Attending managerial meetings for progress related and problem resolutions. • Prepare reports for turnaround progress (’s” curves). • Intimate the executors through various reports (layouts) to focus on critical path & slipped activities to achieve the T/A milestones. • Ensures co-ordination between various divisions, sections and disciplines during execution, to ensure that all act in harmony for smooth execution of shutdown • Arranged and conducted schedule review meetings with site supervisors, subcontractors & vendors. • Prepares handover equipment list to operation for plant start-up activities. • Ensure return of the spares issued to ware house after Turnaround. • Collect critique from all customers & develop lesson learning for future T/A’s. • Create SES in system against the invoices. • Prepare close out report with all related documents, closing all the pending commitments of WBS. • Transfer the pending jobs to next scheduled T/A and close out of the WBS through procedure. • Prepared project close out documentation. AR-RAZI Mar 08 – Apr 12 SHE promoter Responsibilities:- • Act as a Fire marshal as & when necessary. • Prepare & maintain SHE documentation. • Prepare & organize SHE campaigns, events to aware employees & contractors. • Inspect & audit the fire equipment’s. • Prepare for annual SHE audit. • Liaison with SHE auditor. • SHEM-5 coordinator AR-RAZI Feb 04 - Mar 08
  • 3. Maintenance Scheduler Responsibilities:- • Equipment’s creation in SAP as per standards. • Create work center, operational work center & maintain the hierarchy flow in SAP • Develop multidiscipline maintenance plan in SAP as per SABIC 1 strategy. • Create task list & assign to maintenance plan for automatic generation of PM W.O’s. • Align & schedule maintenance plan in SAP as per end user requirement. • Release weekly, monthly (PM/CM) multidiscipline work orders in SAP. • Develop monthly reports to monitor the released & completed work order in SAP. • Perform technically complete (TECO) monthly for all multidiscipline completed W.O & their respective notifications. • Develop monthly maintenance Key Performance Indicator (KPI) & share with end users & management. • Develop & communicate monthly backlog work order list to respective supervisors. • Assigned as member of FANAR project to successful completion. AR-RAZI May 97 - Feb 04 Electrical Technician Responsibilities:- • Execute preventive maintenance for all electrical equipment’s as per schedule. • Close respective W.O’s for completed activities. • Maintain reliability for substation, breakers, switchgear & panels. • Perform maintenance for communication system. • Perform maintenance for fire system. • Operate GIS substation 115 K.V ~ 34.5 K.V and 6.6 K.V. • Communicate with respective planners for spares ahead of schedule W.O’s. • Perform maintenance activities during on-call. • Always took the prompt action in case of any emergency, • Always believe in learning new things and participated in technical discussion. Educational Qualification: • High School - Hail. Trainings: • Advanced Negotiation Skills. • Arrazi - Positive Thinking Workshop. • Basic Presentation Skills. • Effective Utilization of Time. • Emotional Intelligence Hygiene. • Maintenance Planning & Scheduling. • Maintenance Planning and Work Control. • MDRM End-User (Product & Services). • Planning & Scheduling With Primavera. • Preventive and Predictive Maintenance. • Process Plant Troubleshooting. • Project Scheduling & Control Using MS-Project • Report Writing Skills. • Sap-Notification Processing. • Sap-Order Processing-Completion Confirmation
  • 4. • Supervisor Training. • Technical Report Writing. Personal Details: • Father’s Name : Fraih Faraj Al-Shammari • Age : 37 • Marital Status : Married • Nationality : Saudi • Languages Known : English and Arabic • Address : Jubail. *****