1. Marc Dexter Gabriel Par
SG Address: Block 860 Tampines Ave. 5 #06-635 Singapore 520860
PHIL. Address: Block 8 Lot 10 Fairisle St. South Hampton Subd. Sta. Rosa, Laguna 4026
SG Contact No. : +65-9836-0078
Phils. Contact No. : +63-917-542-7548
E-mail Address: marcdexterpar@yahoo.com
QUALIFICATIONS
More than 15 yearsofexperience in Supply Chain Management in supervisoryand managerial capacitiesand 5 years
experience in Project Management (Engineering,Procurementand Construction) in supervisoryand managerialcapacities.
Instrumental in reducing overhead costcaused by unconsolidatedschedule versus actualprogress andman-hourandsupply
chain mattersand contributing to operational goals and personnel relations.Strengths include schedule control,material
control,logistics/materialcontrol/warehousing,procurement,engineeringdesignand personnel management. Have the
ability to use proficiently Primavera3,MS Office, SAP, ERP, Navisworks,AutoCadandSmart Plantfor Materials.Prior
experience in supplychain,quality assurance and customer service with international firms.
PROFESSIONAL EXPERIENCE
HITACHI ASIA Ltd. October 2014 to Present
Singapore INTERNATIONAL PROCUREMENT
Assistant Purchasing Manager (Power, Infrastructure & Railways) - Responsible for developing, sourcing and
evaluating eligible suppliers/vendors; Strategic Sourcing; Conduct detailed supplier capability, evaluation, including but not
limited to production management, quality management, financial status check; Support various business units in
manufacturing expedition, delivery, coach vendor and overall project management; Information collection analysis and
networking; Commercial and technical negotiation with vendors and related stake holders; Conclude and fix contract clauses
and terms & conditions; Vendor/Supplier management; Liaise with logistics provider for shipment delivery.
Selected Contributions:
Sourcing of eligible vendors, negotiation of target cost and delivery of electrical components for switchgears assembly
project.
Sourcing of eligible system integrator and negotiation of cost for Automation system for Water treatment plant.
Sourcing of eligible vendors, negotiation of target cost and delivery of components for rolling stocks and railway
systems.
Sourcing of eligible supplier and negotiation of cost for signaling system for overseas railway project.
Sourcing of eligible system integrator and negotiation of cost for various components required by business unit in the
industry of Power, Infrastructure and Railways.
MITSUBISHI HEAVY INDUSTRIES, LTD. November 2005 to September 2014
Yokohama, Japan PETROCHEMICAL ENGINEERING COMPANY
Project Controller / Construction Senior Engineer / Supply Chain Analyst - Responsible for providing, analyzing and
reporting of Project schedule to Project Manager which includes Progress monitoring and control. Shall direct a team of
engineers to organize and reflect the primary breakdown of the Works, as indicated on the Work Breakdown Structure (WBS),
to comply with the needs of the Project. Shall allocate responsibility for the preparation, development and maintenance of
the Project Schedules (and networks) and maintenance of control lists for progress calculation and draft preparation for
reporting. Support the Construction Manager for day-to-day direction and operation and shall provide input directly to
Schedule for overall coordination of planning and scheduling activities. Also handles procurement, receiving, storing and
issuance of materials needed for Site ut ilization. Responsible for the preparation and presentatio n of Bill of Quantities as per
comment and revision.
Past working experience with MHI Overseas Projects:
2. C-PTA Plant, Guangzhou China, 2005: Material Systems Controller / Construction Engineer
Oman Fertilizer Plant, 2006: Material Systems Controller / Project Controller / Construction Engineer
Brunei Methanol Plant, 2008: Project Controller / Material Controller / Safety Supervisor
Singapore Poly Ethylene Plant, 2009-2011: Project Controller / Material Controller
Algeria-Oman Fertilizer Plant, 2011-2014: Project Controller / Material Controller
Selected Contributions:
Part of the team that provided database for progress monitoring on major construction works such as Piping Installation
and testing, Equipment Installation, E&I works, punchkilling and pre -commissioning works.
Conceptualized level 5 scheduling based on level 3 schedule to provide Subcontractors with more detailed, accurate and
comprehensible schedule.
Part of the team that generated the as-built documentation for Project Control as reference for future projects.
Established time study for general works and generated guidelines for each work
Ensure that supply chain activities are on schedule which includes sh ipment delivery, customs clearance, material
storage and issuance, non-conformance reporting, replacement, local purchasing and spare parts handover.
SAMSUNG ELECTRONICS PHILIPPINES December 2004 to November 2005
Calamba, Laguna ELECTRONICS COMPANY
Finished Goods Warehouse Manager - Responsible for stock control, warehouse and inventory management which
includes the facilities and other fixed assets. In-charge of the whole warehouse operations from stock transfer from
production lines up to the loading of finished goods into it`s designated container. It also includes over -seeing the
operations of warehouse company employees as well as t he third party logistics provider. In charge of the reconciliation
process of actual FG stocks versus system (SAP and ERP) inventory. In charge of the receipt of ship-back or returned items,
inventory of aging stocks, month-end and quarterly inventory. Spearheaded the documentation of all the policies and
procedures of finished goods warehouse operations.
PETBOWE CHEMTRADE CORPORATION September 2003 to November 2004
Potrero, Malabon TRADING COMPANY (Food & Industrial Raw Materials)
Distribution/Warehouse Supervisor - Responsible for stock control, warehouse administration, dispatching of delivery
items, asset management and report requirements. Responsible for stock control, warehouse administration, dispatching
of delivery items, asset management and reportorial requirements. Benchmarks performance and productivity thru the
Balanced Scorecard Performance Measures. Monitoring and control of ISO policies and procedures. Creation of strategies
for reducing cost and improving service. Determine the packaging and handling requirements of both the Distribution and
Warehousing Departments to increase warehouse order cycle and delivery time.
Procter & Gamble Phils. Inc. November 1997 to October 2002
Cabuyao Plant,Laguna Home & Personal Care, Baby Care (FMCG) MANUFACTURING PLANT
Supply Chain Supervisor - Manages the quality standards being implemented in the logistics and warehousing.
Performs document/forms analysis and design for product traceability. Prepares and collates a monthly production
performance report that reflects the total performance of the plant in terms of quality capability (e. g. 5S, GMP, Temp. and
humidity monitoring, Customer complaints, rejected items, repacked items, utility maintenance, equipment maintenace).
Reports to the plant manager and the plant’s QA head for resolutions of issues especially customer complaints. Assists the
Corporate Technical Services and Research & Development Departments in the revalidation of production and delivery
process parameters and the conduction of plant-level trials for developing and launching new products on a commercial
scale. Prepares visits to customers throughout the country to maintain good working relationship and upgrade client
satisfaction. Conducts regular Internal Quality Audits on other departments and issues Corrective and Preventive Ac tion
Reports on the deviations observed. Maintains a quarterly Quality Capability Rating of 89% with regards to company’s
quality standards. Trains new employees as well as contractors to align and ensure that quality standards and principles
are being followed and performs annual evaluation/appraisal of job performance for each regular employee and incoming
contractors. Conducts production process monitoring and control and when necessary, statistical process control to assess
and validate process capability. Troubleshoots product and process -related problems. Ensures that the company’s Quality
3. Plan, Standard Operating Procedures, Good Manufacturing Practices (GMP), and the Critical Control Points (HACCP) are
strictly followed and implemented.
EDUCATION / PROFESSIONAL REGISTRATION
Bachelor of Science in Electrical Engineering: Map úa Institute of Technology
Registered Electrical Engineer: Board Examination given by the Philippine Professional Regulation
Commission
PERSONAL PROFILE
Birthdate: February 5, 1976
Civil Status: Married
Passport No.: EB6965462
Working VISA: Engineer’s VISA in Japan until 2017 and E-Pass Permit in Singapore until Oct. 2016
References
- Available upon request -