SlideShare una empresa de Scribd logo
1 de 18
Descargar para leer sin conexión
BUILDING WITH GLASS
IN ARK DESIGN
MDIA
Contents
V1 Formalizing the Forward
V2Componentization
V3 Glass FutureTables
ARK ASSESSED VALUE
FORMALIZETHE
FORWARD
COMPONENTIZETHE
GLASS CONCEPT
GLASS FUTURE
TABLES
Contents
V1 Formalizing the Forward
V2Componentization
V3 Glass FutureTables
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 2
PROOFING THE
FORWARD
T&M
In the case of glass, the supply-
chain based market is not built
on a volumized product and so is
most accurate for this spectrum
Subtotal 1
Subtotal 2
Appendix I
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 3
App III
App III
TIME
RELATIONSHIP
BEGINS 2023
TheTime Bucket Comparison that we originally designated for
each product and infrastructure period is somewhat extended by
the requirement to succeed with the system environment.
However, it also forecasts a fully accommodated “whole-glass”
product as opposed to componentization that occurs within the
period to achieve a solid-state attribution for the product itself.
Componentization lends achievements to each period.
2.05 x 2 = 41
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 4
BIG DATES
Major Glass Products
20XX
Month
2031
Digital Glass: Furniture,
Appliances and
Dimensional Media; Green
Energy and Green Energy
Wall
20XX
Month
2034
Legacy Glass:
Repair, Maintenance,
Upgrade Access to
House, Cars, and
Road/Utility includes
Building
Accessibility.
20XX
Month
2059
Architectural Builds: Site
Level Development
includes innovation in
glass cars, roads,
instances of architecture.
20XX
Month
2069
Remote
Development:
whole glass
communities and
industries.
2070
Branch Partnering
Capability leading
into next System
Adaptation.
BRIJ CONSULTING, LLC JEAN MARSHALL 05
DG LG AB RD BR
The Timing of Glass
Products fits the
Timeline we
originally forecast
(see next)
Componentization 10/14/2022
LG AB RD
DG
Timeline 1
Digital Glass:
Furniture,
Appliances and
Dimensional Media
Timeline 2
Legacy Glass: Repair,
Maintenance, Upgrade
Access to House, Cars,
and Road/Utility includes
Building Accessibility
Timeline 3
Architectural Builds: Site
Level Development
includes innovation in
glass cars, roads,
instances of architecture
Timeline 4
Remote Development:
whole glass communities
and industries
NEW ARK ROADMAP
10/14/2022 BrijConsulting, LLC Jean Marshall 6
T1
T2
T3
T4
Year 3.6 Year 34.4
Year 10.4 Year 44.4
48.9
Partner
Complexity
50
New Products
Taperny Plan
GEC
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 7
Organization Start-ups
assign accountability
Product Media Startups
Glass Product Startups
From “CalendarCartography”
1
2
3
4
5
6
7
8
9
10
1
2
3 4
5
6
7
8
9
10
7
PRODUCT MAPPING
ALL GLASS FORWARD
DETAILS
UNDERLYING IMPACT
The All-Glass Forward is a combination of the efforts
of many companies and so is an assessment rather
than a compilation of the supply chain impact on the
glass forward. See Final Forward Next… The
underlying values lend credence to the outcome by
virtue of compiled metrics reconciled to it.
Appendix II
From “CalendarCartography” P
d
10/14/2022
BRIJ CONSULTING, LLC JEAN
MARSHALL
8
Slide 9
FINAL FORWARD
Our Final Forward appears to be
reconciled well to metric relationships
T&M = 1753
d
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 9
APP I
APP II Glass Mix
V-A V-A
LABOR ENGINEERING
Labor Engineering has produced a pattern of Production, Events and Tasks that produce a
functional labor yield in the Ark Mode Glass Building 50-year Path that we have developed.
This is a yield that is more than an interior yield or gain but is a compilation of the product
load assembly. [Lo (Curve dif.) in supply chain.]
The Synergy or Glass Works metric includes Glass Mix Cost and is lower by Labor Volume
than in the Branch Metric of the Magi and Marcus Engineering Branch Forward.
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 10
Compiled Production Metrics
From “Glass Cars”
See App I
Supply chain
=1.988/6.18747
PROJECT
SUMMARY
Contents
V1 Formalizing the Forward
Project time and task summaries with Final
Forward Reconciliation
V2 Componentization
SupplyChain Impact of various glass
componentization strata
V3 Glass FutureTables
Composition of Glass Delivery Systems and their
Table Arrangements
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 11
Luke 14:28-30 28 For which of you, intending to build a tower, does not sit
down first and count the cost, whether he has enough to finish it
Contents
V1 Formalizing the Forward
V2 Componentization
V3 Glass Future Tables
TOPICS TO COME
V2 Componentization
In the next ten years, Componentization
will provide benefits before solid state
glass performance mechanics arrive.
Many supply chain enumerations of
various component advantages to
building and architecture, cars, roads and
bridgeways will improve conditions,
including lands and delivery conveyances.
We will identify these supply chain events
and derive an impact statement.
V3 Glass Future Tables
The Glass Future Tables Concepts can be
depicted on a starting map to identify the
progression from componentization to its full
solid state engineering change. We will
supply a mapping to identify the 6-layer and
18-layer glass system outcomes as more
configurative than any previous example.
10/15/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 12
1196
The Incumbent Load composition enables the
transitional aspect of the supply chain
enumerations that occur and provides a
trace. Since time and money is equivalent in
glass, we can track the performance of it.
PRODUCTION OVERVIEW
LOADTESTED
The Product Load and the Production have
demonstrated integral strength
PRODUCT GROWTH
The Forward Financial is agreed
based on production growth
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 13
From “Glass Cars”
Carriage Burden
Appendix I
10/14/2022
BRIJ CONSULTING, LLC JEAN MARSHALL
14
TRANSITION
1.922
trans·duc·tion
1.The conversion of input energy of
one form into output energy of
another form. i.e., kinetic to green
The people sitting on the
Branch path will wait the
longest for IP but have the
most Intelligent Investment
1
2
The Outcome of
the Glass Path is a
Contiguous
Arrangement of
Wall Assimilation
here.
Thread Limit +.007
Appendix II
From “Supply Side”
Forward
Curve Compare
-11912+11932 = 20 + [1195 – 1193.2] =20 + 1.8 = 21.8-1.4 = 20.4 Curve
R=95.3
FURY
.
Statistical results on
VRD mix compared to
Product Load
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 15
Critical Path =T Stat on
an annual basis
Thruput difference 115836
-115100 = 736 -707.5
= 28.5 load
T&M
552.95-552.68
=.27 incumbent
See App I
R=95.3
Not included in
original
Appendix III
1.922
See App II
As Labor Volume
Increases, Costs
Decrease, such as
glass mix cost, and
Margins Increase
See App II
983
Product Load Assimilation Cost
Leverage Load
10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 16
wall
Ω
Ω
Appendix IV
Omega Crosswalk
.74
Incumbent
1.418/2 = 7.09 econometric
Supply Chain Impact
“Supply Side Portfolio” Compare to All Glass Final Forward
Hidden
Margin
“Dimensional
Building”
292.585 is a
statistical string in
the 95% integral
range
5845 x2 = 1169
Relative or Relational Equation?
•Can we set E = mc^2 and derive a good
answer? Not actually without relational
facts derived from a set order point
How do we find the points? Thruput, Omega
and Levered Outcome
•If E = 11092.30, m = 8.49, then c must be?
29.903
Purpose:
•to establish Remote Building Capability a
permanent IP is created in the Branching
Warehouse Application; IP in a
dimensional system is Intellectual Property
•Steps in the P-I-M table associate this
Encryption Paths
•paths are no longer necessary unless a new
process is added, and the map is extended
RELATIONAL OR RELATIVE ADDRESS?
10/14/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 17
Testing is
Key
I. Pipe Calc
AppendixV
Calculations From “Crossover Conveyance”
Ω
Ω
Change in the Thruput
without a REAL change
in terms does not change
the equation
Four Key Elements of Passing the Remote
Barrier of Dimensional Systems
P-I-MTable
Slide 9 excerpt
No Pipe
assimilation
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
BRIJ CONSULTING, LLC JEAN MARSHALL 18
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals 3.
Calling it Green: Components of Green Energy, short review:
Calling it Green requires new uses of potential and ^studies in
wave glass and graphical relationships can raise up a green
energy fluency that will lead to energy self-sufficiency 4.
Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
10/14/2022
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects

Más contenido relacionado

Similar a Building with Glass V1 Formalizing the Forward.pdf

Scope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdfScope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdfBrij Consulting, LLC
 
Scope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfScope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfBrij Consulting, LLC
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceBrij Consulting, LLC
 
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfCALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfBrij Consulting, LLC
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
comments on building with glass.pdf
comments on building with glass.pdfcomments on building with glass.pdf
comments on building with glass.pdfBrij Consulting, LLC
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionBrij Consulting, LLC
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfBrij Consulting, LLC
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfBrij Consulting, LLC
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfBrij Consulting, LLC
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
The Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeThe Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeBrij Consulting, LLC
 

Similar a Building with Glass V1 Formalizing the Forward.pdf (20)

Scope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdfScope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdf
 
Scope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfScope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdf
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the Instance
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfCALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and Drivers
 
SSE THE REMOTE END.pdf
SSE THE REMOTE END.pdfSSE THE REMOTE END.pdf
SSE THE REMOTE END.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Glass Mix Z-Form V1 thru V3
Glass Mix Z-Form V1 thru V3Glass Mix Z-Form V1 thru V3
Glass Mix Z-Form V1 thru V3
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
comments on building with glass.pdf
comments on building with glass.pdfcomments on building with glass.pdf
comments on building with glass.pdf
 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of Function
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdf
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix Expansion
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
The Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeThe Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark Mode
 

Más de Brij Consulting, LLC

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 

Más de Brij Consulting, LLC (20)

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 

Último

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Último (20)

(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Building with Glass V1 Formalizing the Forward.pdf

  • 1. BUILDING WITH GLASS IN ARK DESIGN MDIA Contents V1 Formalizing the Forward V2Componentization V3 Glass FutureTables
  • 2. ARK ASSESSED VALUE FORMALIZETHE FORWARD COMPONENTIZETHE GLASS CONCEPT GLASS FUTURE TABLES Contents V1 Formalizing the Forward V2Componentization V3 Glass FutureTables 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 2
  • 3. PROOFING THE FORWARD T&M In the case of glass, the supply- chain based market is not built on a volumized product and so is most accurate for this spectrum Subtotal 1 Subtotal 2 Appendix I 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 3 App III App III
  • 4. TIME RELATIONSHIP BEGINS 2023 TheTime Bucket Comparison that we originally designated for each product and infrastructure period is somewhat extended by the requirement to succeed with the system environment. However, it also forecasts a fully accommodated “whole-glass” product as opposed to componentization that occurs within the period to achieve a solid-state attribution for the product itself. Componentization lends achievements to each period. 2.05 x 2 = 41 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 4
  • 5. BIG DATES Major Glass Products 20XX Month 2031 Digital Glass: Furniture, Appliances and Dimensional Media; Green Energy and Green Energy Wall 20XX Month 2034 Legacy Glass: Repair, Maintenance, Upgrade Access to House, Cars, and Road/Utility includes Building Accessibility. 20XX Month 2059 Architectural Builds: Site Level Development includes innovation in glass cars, roads, instances of architecture. 20XX Month 2069 Remote Development: whole glass communities and industries. 2070 Branch Partnering Capability leading into next System Adaptation. BRIJ CONSULTING, LLC JEAN MARSHALL 05 DG LG AB RD BR The Timing of Glass Products fits the Timeline we originally forecast (see next) Componentization 10/14/2022
  • 6. LG AB RD DG Timeline 1 Digital Glass: Furniture, Appliances and Dimensional Media Timeline 2 Legacy Glass: Repair, Maintenance, Upgrade Access to House, Cars, and Road/Utility includes Building Accessibility Timeline 3 Architectural Builds: Site Level Development includes innovation in glass cars, roads, instances of architecture Timeline 4 Remote Development: whole glass communities and industries NEW ARK ROADMAP 10/14/2022 BrijConsulting, LLC Jean Marshall 6 T1 T2 T3 T4 Year 3.6 Year 34.4 Year 10.4 Year 44.4 48.9 Partner Complexity 50 New Products Taperny Plan GEC
  • 7. 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 7 Organization Start-ups assign accountability Product Media Startups Glass Product Startups From “CalendarCartography” 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 7 PRODUCT MAPPING
  • 8. ALL GLASS FORWARD DETAILS UNDERLYING IMPACT The All-Glass Forward is a combination of the efforts of many companies and so is an assessment rather than a compilation of the supply chain impact on the glass forward. See Final Forward Next… The underlying values lend credence to the outcome by virtue of compiled metrics reconciled to it. Appendix II From “CalendarCartography” P d 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 8 Slide 9
  • 9. FINAL FORWARD Our Final Forward appears to be reconciled well to metric relationships T&M = 1753 d 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 9 APP I APP II Glass Mix V-A V-A
  • 10. LABOR ENGINEERING Labor Engineering has produced a pattern of Production, Events and Tasks that produce a functional labor yield in the Ark Mode Glass Building 50-year Path that we have developed. This is a yield that is more than an interior yield or gain but is a compilation of the product load assembly. [Lo (Curve dif.) in supply chain.] The Synergy or Glass Works metric includes Glass Mix Cost and is lower by Labor Volume than in the Branch Metric of the Magi and Marcus Engineering Branch Forward. 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 10 Compiled Production Metrics From “Glass Cars” See App I Supply chain =1.988/6.18747
  • 11. PROJECT SUMMARY Contents V1 Formalizing the Forward Project time and task summaries with Final Forward Reconciliation V2 Componentization SupplyChain Impact of various glass componentization strata V3 Glass FutureTables Composition of Glass Delivery Systems and their Table Arrangements 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 11 Luke 14:28-30 28 For which of you, intending to build a tower, does not sit down first and count the cost, whether he has enough to finish it Contents V1 Formalizing the Forward V2 Componentization V3 Glass Future Tables
  • 12. TOPICS TO COME V2 Componentization In the next ten years, Componentization will provide benefits before solid state glass performance mechanics arrive. Many supply chain enumerations of various component advantages to building and architecture, cars, roads and bridgeways will improve conditions, including lands and delivery conveyances. We will identify these supply chain events and derive an impact statement. V3 Glass Future Tables The Glass Future Tables Concepts can be depicted on a starting map to identify the progression from componentization to its full solid state engineering change. We will supply a mapping to identify the 6-layer and 18-layer glass system outcomes as more configurative than any previous example. 10/15/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 12 1196 The Incumbent Load composition enables the transitional aspect of the supply chain enumerations that occur and provides a trace. Since time and money is equivalent in glass, we can track the performance of it.
  • 13. PRODUCTION OVERVIEW LOADTESTED The Product Load and the Production have demonstrated integral strength PRODUCT GROWTH The Forward Financial is agreed based on production growth 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 13 From “Glass Cars” Carriage Burden Appendix I
  • 14. 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 14 TRANSITION 1.922 trans·duc·tion 1.The conversion of input energy of one form into output energy of another form. i.e., kinetic to green The people sitting on the Branch path will wait the longest for IP but have the most Intelligent Investment 1 2 The Outcome of the Glass Path is a Contiguous Arrangement of Wall Assimilation here. Thread Limit +.007 Appendix II From “Supply Side” Forward Curve Compare -11912+11932 = 20 + [1195 – 1193.2] =20 + 1.8 = 21.8-1.4 = 20.4 Curve R=95.3
  • 15. FURY . Statistical results on VRD mix compared to Product Load 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 15 Critical Path =T Stat on an annual basis Thruput difference 115836 -115100 = 736 -707.5 = 28.5 load T&M 552.95-552.68 =.27 incumbent See App I R=95.3 Not included in original Appendix III 1.922 See App II As Labor Volume Increases, Costs Decrease, such as glass mix cost, and Margins Increase See App II 983 Product Load Assimilation Cost Leverage Load
  • 16. 10/14/2022 BRIJ CONSULTING, LLC JEAN MARSHALL 16 wall Ω Ω Appendix IV Omega Crosswalk .74 Incumbent 1.418/2 = 7.09 econometric Supply Chain Impact “Supply Side Portfolio” Compare to All Glass Final Forward Hidden Margin “Dimensional Building” 292.585 is a statistical string in the 95% integral range 5845 x2 = 1169
  • 17. Relative or Relational Equation? •Can we set E = mc^2 and derive a good answer? Not actually without relational facts derived from a set order point How do we find the points? Thruput, Omega and Levered Outcome •If E = 11092.30, m = 8.49, then c must be? 29.903 Purpose: •to establish Remote Building Capability a permanent IP is created in the Branching Warehouse Application; IP in a dimensional system is Intellectual Property •Steps in the P-I-M table associate this Encryption Paths •paths are no longer necessary unless a new process is added, and the map is extended RELATIONAL OR RELATIVE ADDRESS? 10/14/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 17 Testing is Key I. Pipe Calc AppendixV Calculations From “Crossover Conveyance” Ω Ω Change in the Thruput without a REAL change in terms does not change the equation Four Key Elements of Passing the Remote Barrier of Dimensional Systems P-I-MTable Slide 9 excerpt No Pipe assimilation
  • 18. 1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property reconcilement for Conveyance 2. Crossover Conveyance: Beginning with Remote Signature, threading the advancing fingerprint with a glass path and integral site management, moving into SIMULATIONS in Real Time 3. Converge- The Remote Build: Tasks to consider the process of converging to the Remote Build Site and what considerations are given to producing a remote service or build out of a productive requirement, introducing sandbox theory. Phase I only considers the Kitchen Tech. Phase II is involved in whole home Media and Tech in Glass. Phase III develops the land and its attributes. This is three separate papers. BRIJ CONSULTING, LLC JEAN MARSHALL 18 1. Studying T&MM: the requirement for certification of mobility for competent conveyances 2. Portal Projects: the evidence, timing and intelligent use of portals 3. Calling it Green: Components of Green Energy, short review: Calling it Green requires new uses of potential and ^studies in wave glass and graphical relationships can raise up a green energy fluency that will lead to energy self-sufficiency 4. Dimensions in Multivariant Fabrications: Determining Forms and Contents of Green Energy and Blue Wave Cascade; relating elements to current science and future requirements 5. Wave and Lens Assimilation: The means to compile and to build in Glass Systems is described. The use of secant math. 6. Math Solutions for Wave and Lens Assimilations: See also Commentary for Math Solutions 7. Supply Side Portfolio: Timing and Model of Glass and Green events to fulfill path… Does the Tan Line help? 8. Partners in T Pluribus Unum: Measuring with Diacritical Marks 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process 13. Branch- Sound and Image Construction: Characterizing the branch capability of new applications, appliances and mode[ls] of operations 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) Motion Projects-8 Remote Theory-5 Ark Model-13 Digital-20 Go to https://www.slideshare.net/Marshallja/presentations https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for- wave-and-lens-assimilationpdf 10/14/2022 Roadmap: #47 & #48 & #49 Dimensional Building in Ark Design Glass Cars and New Product Roadmap Calendar Cartography Building with Glass #50 New Remote Theory Ark Model Motion Projects